Armoured Face Conveyor (AFC) pans
changing in a working Longwall face
      using Monorail system
  -AN INNOVATIVE APPROACH



                       SINGARENI
                       COLLIERIES
                         COMPANY
                          LIMITED
ON THE OCCASION
       OF
ENGINEER’S DAY
PRESENTATION OUTLINE


•   About GDK.10A Incline
•   Details of Panel No.7
•   Reasons for replacement of AFC
•   Conventional methods
•   Monorail transport system
•   Sequence of Operations
•   Safety & Advantages
•   Conclusion
SALIENT FEATURES OF
        GDK 10A INCLINE
Mine started on          : 16-06-1985
Introduction of Longwall : FEB, 1994
No. of workable seams    : 2 (No.1 & 2)
Present working seam     : No.1 Seam
No of LW panels completed: 8
Total production         : 54 LT
Balance reserves         : 35.82 LT
Balance life             : 3.5 Years
Project cost             : Rs. 116.53 Crores
PRODUCTION PROFILE OF GDK-10A

                                         (Coal production in LT)



Section        2003-04     2004-05     2005-06      2006-07
               (Achiev.)   (Achiev.)   (Achiev.)    (Target)
     HS          0.09        0.01          0              0
MM        LW     4.00        3.48         4.16          5.00
          RH     0.32        0.29         0.32          0.40
      SDL        0.69        0.93         0.92          0.96
MM TOT.          5.01        4.70         5.40          6.36
 TOTAL           5.12        4.71        5.40          6.36
Plan of
 No.1 Seam
GDK 10A INC.
How a Longwall face
   looks like…
PANEL NO 7

Face Length                     :   116 m
Panel Length                    :   940 m
No of chock supports            :   80 Nos
Shearer                         :   2 X 375 KW
AFC                             :   2 X 150 KW
BSL                             :   1 X 150 KW
Lump Breaker                    :   1 X 90 KW


This panel was planned with uphill AFC transport to
eliminate water problem. After a retreat of about 400 m
it was decided to change the AFC pans as the condition
of AFC was severely deteriorated. Monorail system was
used for transport of AFC pans along the face.
Longwall
             Panel No.7
                                 MAIN GATE (46L)




                                     400m
                                        GOAF




TAIL GATE (49L)        FACE STOP LINE



                  Uphill Transport is planned in this Panel
REASONS FOR
    REPLACEMENT OF AFC PANS
  The quality of AFC pans was very poor.
  AFC components were supplied by 3 different
  suppliers.
  Percentage of AFC breakdowns was about
  22.5% of available working time and
  resulted in loss of output of 20,000 Tons per
  month.
  Slow face retreat caused strata control
  problems during periodical weightings.

Taking into consideration of the time loss,
production loss and safety aspects, it was
decided to replace the total AFC with new pans.
CONVENTIONAL METHODS AVAILABLE
         FOR AFC PANS CHANGING

    The sequence of operations include:
1         - Extra cut in front of AFC
          - Meshing of roof and face bolting
          - Laying of track in front of AFC and
            installation of compact hauler
          - Dismantling of old pans, loading and
            transport out bye and simultaneously
            transporting new pans to face and
            assembling.
    This method requires extra time for giving extra
    cut and meshing. Dismantling and removing of
    old pans and assembling new pans may be done
    from any end.
CONVENTIONAL METHODS AVAILABLE
         FOR AFC PANS CHANGING


1
CONVENTIONAL METHODS AVAILABLE
         FOR AFC PANS CHANGING
    This method does not require an extra cut but the
    sequence of operation include:
2     •

      •
          Dismantling of Tail gate (TG) drive
          Installation of compact hauler
      •   Dismantling of old pans, loading and transport out bye
          starting from the Top gate end
      •   Track extension in the place where old pans are
          removed
      •   Removing all the old pans one after the other up to the
          Bottom gate end and continuing track extension,
      •   Transport of new pans and unloading,
      •   Removing the track and assembling new pans starting
          from the Bottom gate end.
      •   Assembling TG drive.


    In this method the old AFC will have to be completely
    removed before installing the new pans.
2

    CONVENTIONAL
      METHODS
      AVAILABLE
     FOR AFC PANS
      CHANGING
WHY MONO RAIL TRANSPORT
   SYSTEM IS SELECTED

The conventional systems take around 15
to 20 days time for changing total AFC.

In conventional systems a clear space is
required for laying curved track in Tail gate
junction and also for accommodating Tail
drive.

The roof condition in Tail gate and also
along the face was not good.
BAR CHART OF ACTIVITIES


                    Total changing of AFC pans was completed
                    in 8 days.
S.NO.                 ACTIVITY              DAY 1   DAY 2   DAY 3   DAY 4   DAY 5   DAY 6   DAY 7   DAY 8
 1      FACE CLEANING & BAMBOO BOLTING

 2      MONORAIL FIXING

 3      OLD PANS REMOVING, TRANSPORT TO
        TG AND LOADING
 4      NEW PANS TRANSPORT TO TG, LIFTING
        WITH MONO RAIL, TRANSPORT AND UN
        LOADING IN FACE
 5      PANS ASSEMBLING,TOP CHAIN
        CONNECTION AND MONORAIL REMOVAL
 8      TRIAL RUN
DESCRIPTION OF MONORAIL SYSTEM



Monorail transport system consists of the
following components:
      1) Monorail
      2) Bogie
      3) Lifting arrangements
      4) Winch or Hauler (Optional where the
      gradient is more and require more effort
      for pulling)
Plan showing the
         Total Face layout
       with Monorail system




PANEL NO.7
MONO RAIL

•   The monorails are made of
    rolled section of ISMB150mm x
    75mm of 6 m length.

•   They are anchored to the chock
    canopies by chain links and
    clamps.

•   In gate roadway the monorail is
    anchored by a clamp to the eye
    bolt grouted in the roof.

•   Monorail joints are clamped at
    the top and welded at the
    bottom for smooth travel.
BOGIE

• Monorail Bogie was made of 15mm
 MS plates and rollers fitted with
 bearings.

• It
   has provision for fixing a ram or
 chain block for lifting purpose.

• Bogie   moves on monorail.
MONO RAIL BOGIE


3" X 6" RS JOIST




15mm MS PLATES     BEARINGS




                                                                                                    BOGIE
 BOLT AND NUT




                    LIFTING HYDRAULIC CYLINDER




                                                                          PARTS OF MONO RAIL BOGIE
                                                                                                                                              240 mm

                                                                                     0 40 mm

            FRONT VIEW                           SIDE VIEW                            100 mm                                      255 mm




                                                                                                                                      15 mm MS PLATE
                                                                                          LIFTING HYDRAULIC CYLINDER
                                                      3"X 6" RS JOIST




                                                                        620 mm
                                                                                                         0 100 mm



                                                                                                                       M36X160 STRUD

                                                                                          0 40mm                       AND M25 BOLT
                                                                                                       BEARING


                                                                                 120 mm
LIFTING ARRANGEMENT


•   Hydraulic ram or chain pulley block can be
    used for lifting purpose.

•   It is fitted to the monorail bogie. Because of
    height constraint hydraulic ram is used.

•   After lifting the AFC pans with the help of
    ram pressure, it is retained by closing On-Off
    valves fitted to the connecting hoses.
WINCH (or) HAULER


•   For pulling effort a winch or hauler is used.

•   If the winch or hauler is erected in bottom
    gate road instead of top gate, rope has to be
    passed through diversion pulley.

•   12mm or 16mm flexible rope is used with
    the winch.

•   Signaling arrangement provided all along the
    face to ensure safety of operation.
Transport of pans by
                    pulling or pushing of
                          the bogie




Arrangement of
diversion pullies
FACE CONDITION
         BEFORE CHANGING AFC

•   There were total 70 pans in the face from
    C7 to C76, excluding the pans of MG and TG
    drives.
•   Shearer was parked between C7 and C16.
•   Dismantling of old pans was started from TG
    end, Simultaneously monorail was laid up to
    C17.
•   After changing of pans up to C17, shearer
    was taken down to C17-C26 and pans
    required for the other side of shearer were
    unloaded at C27 and pulled through the gap
    between shearer and face.
AFC PANS CHANGING
                  – SEQUENCE OF OPERATIONS

•   AFC pans were transported from surface to
    Longwall face through tail gate and kept under
    the monorail.

•   Pans were lifted with monorail bogie in TG.

•   Hauler rope was attached to the bogie and it was
    pulled. Bogie moved on the monorail from tail
    gate lifting point up to the unloading point in the
    face.

•   Stop blocks were used to prevent run away of
    bogie.
Monorail
                   negotiating a curve
                   in tail gate junction




Arrangement of
monorail at face
     curve
AFC PANS CHANGING
                – SEQUENCE OF OPERATIONS

•   New pan was unloaded at the site with the
    help of the same hydraulic cylinder.

•   Old pans were lifted in the face, transported
    with the same bogie to tail gate and
    unloaded in to the half tub.

•   A loop line was given in tail gate for
    shunting the old pans loaded half tubs from
    where they were transported to surface.
AFC PANS CHANGING
              – SEQUENCE OF OPERATIONS
•   Total 70 old pans were replaced with new pans
    starting from tail gate end.

•   Replacement of one pan took about 45 to 60
    minutes.

•   An average of 15 pans were changed per day.

•   After completion of AFC pans assembling, top
    chain spreading and jointing was done and AFC
    trial run taken. Mean while monorails were
    dismantled and normal production resumed.
SAFETY FEATURES
Depending upon the load to be handled the
anchoring, steel sections, bogies, lifting device and
chains were designed, taking maximum factor of
safety into consideration.

Persons were not directly coming into contact with
the heavy materials while transportation.

Anchoring of the monorails was at every 1.5 m
interval increased the load bearing capacity.

Sprags were applied immediately behind the bogie
travel at the interval of 1.5 m to prevent the
running back towards down hill.
APPLICATIONS

Monorail system of transport can be widely used in
underground mining works for loading, unloading,
shifting of heavy machineries and equipment.

Monorail system can be used at Longwall salvage
and installation operations.

Winder house and haulage installations          for
replacing of gearbox, motor, drum, shaft etc.

Pumping stations.

Shaft insets for loading and unloading of materials
into the cage.
ADVANTAGES

•   More safety.
•   Less manpower.
•   Easy to handle.
•   Faster system of transport / replacement of worn-
    out items.
•   The monorail system can be fabricated and
    installed at mine level with the help of workshop.
•   The cost is very less when compared to other
    systems.
•   The workmen are more interested to use this
    system as less physical exertion is involved for
    handling / transport of the material.
•   The system can be further improvised by
    providing motorised lifting device / bogie.
CONCLUSION

•   The monorail system was found to be more
    useful for changing the AFC in a working
    Longwall panel.

•   Total AFC pans were changed within 8 days
    using 1200 man shifts against the normal
    time of 20 days using 3000 man shifts, thus
    saving about 1800 man shifts and 12 days
    production costing around Rs. 2 Crores.

•   This system is more safe, easy to fabricate,
    install and operate.
THANK
 YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Working of icc bwe-rock breaker
Working of icc bwe-rock breakerWorking of icc bwe-rock breaker
Working of icc bwe-rock breakerSATYANARAYANA I
 
Development and depillaring with continuous miner
Development and depillaring with continuous minerDevelopment and depillaring with continuous miner
Development and depillaring with continuous minerSafdar Ali
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO Akanksha Priya
 
Comparison between skip winding and high angle conveyor for vertical transport
Comparison between skip winding and high angle conveyor for vertical transportComparison between skip winding and high angle conveyor for vertical transport
Comparison between skip winding and high angle conveyor for vertical transportShyamal Bag
 
Ppt of pre casting yard
Ppt of pre casting yardPpt of pre casting yard
Ppt of pre casting yardRavinder Singh
 
Ground Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional DrillingGround Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional DrillingTim Leung
 
Presentation 6th mining congress MGMI, by S.K.Bag
Presentation 6th mining congress MGMI, by S.K.BagPresentation 6th mining congress MGMI, by S.K.Bag
Presentation 6th mining congress MGMI, by S.K.BagShyamal Bag
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDDDemzy George
 
Designing a shaft system
Designing a shaft systemDesigning a shaft system
Designing a shaft systemSafdar Ali
 
Surface miner and its performance (1)
Surface miner and its performance (1)Surface miner and its performance (1)
Surface miner and its performance (1)Safdar Ali
 
An experience of Loading pattern on Power supports with Sand stone roof in SCCL
An experience of Loading pattern on Power supports with Sand stone roof in SCCLAn experience of Loading pattern on Power supports with Sand stone roof in SCCL
An experience of Loading pattern on Power supports with Sand stone roof in SCCLMD.Suresh Kumar
 
Balancing Diagram ppt
Balancing Diagram pptBalancing Diagram ppt
Balancing Diagram pptArunKumar6667
 
SUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUESSUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUESR821992
 
Roller adjustment-and-skew
Roller adjustment-and-skewRoller adjustment-and-skew
Roller adjustment-and-skewmkpq pasha
 
Piling work method statement cm- ms- bw - 002
Piling work method statement   cm- ms- bw - 002Piling work method statement   cm- ms- bw - 002
Piling work method statement cm- ms- bw - 002Minh Bui Si
 
05 archondohdm4deteriorationbituminousroadsjanuary08
05 archondohdm4deteriorationbituminousroadsjanuary0805 archondohdm4deteriorationbituminousroadsjanuary08
05 archondohdm4deteriorationbituminousroadsjanuary08Husam Alssalihi
 

Was ist angesagt? (20)

Working of icc bwe-rock breaker
Working of icc bwe-rock breakerWorking of icc bwe-rock breaker
Working of icc bwe-rock breaker
 
Development and depillaring with continuous miner
Development and depillaring with continuous minerDevelopment and depillaring with continuous miner
Development and depillaring with continuous miner
 
Surface miner
Surface minerSurface miner
Surface miner
 
Dragline
DraglineDragline
Dragline
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
 
Comparison between skip winding and high angle conveyor for vertical transport
Comparison between skip winding and high angle conveyor for vertical transportComparison between skip winding and high angle conveyor for vertical transport
Comparison between skip winding and high angle conveyor for vertical transport
 
Ppt of pre casting yard
Ppt of pre casting yardPpt of pre casting yard
Ppt of pre casting yard
 
Ground Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional DrillingGround Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional Drilling
 
Presentation 6th mining congress MGMI, by S.K.Bag
Presentation 6th mining congress MGMI, by S.K.BagPresentation 6th mining congress MGMI, by S.K.Bag
Presentation 6th mining congress MGMI, by S.K.Bag
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDD
 
Viaduct segment
Viaduct segmentViaduct segment
Viaduct segment
 
Designing a shaft system
Designing a shaft systemDesigning a shaft system
Designing a shaft system
 
Surface miner and its performance (1)
Surface miner and its performance (1)Surface miner and its performance (1)
Surface miner and its performance (1)
 
An experience of Loading pattern on Power supports with Sand stone roof in SCCL
An experience of Loading pattern on Power supports with Sand stone roof in SCCLAn experience of Loading pattern on Power supports with Sand stone roof in SCCL
An experience of Loading pattern on Power supports with Sand stone roof in SCCL
 
Balancing Diagram ppt
Balancing Diagram pptBalancing Diagram ppt
Balancing Diagram ppt
 
Metro Work
Metro WorkMetro Work
Metro Work
 
SUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUESSUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUES
 
Roller adjustment-and-skew
Roller adjustment-and-skewRoller adjustment-and-skew
Roller adjustment-and-skew
 
Piling work method statement cm- ms- bw - 002
Piling work method statement   cm- ms- bw - 002Piling work method statement   cm- ms- bw - 002
Piling work method statement cm- ms- bw - 002
 
05 archondohdm4deteriorationbituminousroadsjanuary08
05 archondohdm4deteriorationbituminousroadsjanuary0805 archondohdm4deteriorationbituminousroadsjanuary08
05 archondohdm4deteriorationbituminousroadsjanuary08
 

Andere mochten auch

Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & IndiaVR M
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectVR M
 
[Cv] tedy satria
[Cv]   tedy satria[Cv]   tedy satria
[Cv] tedy satriaTedy Satria
 
Hal-Hal Yang Penting dalam Survey Tambang
Hal-Hal Yang Penting dalam Survey TambangHal-Hal Yang Penting dalam Survey Tambang
Hal-Hal Yang Penting dalam Survey TambangEdhis Triyono Hermawan
 
Ilmuwan minescape
Ilmuwan minescapeIlmuwan minescape
Ilmuwan minescapeairfanza
 
kalimatan timur, samarinda
kalimatan timur, samarindakalimatan timur, samarinda
kalimatan timur, samarindaALAM SEKITAR
 
Term Mining and Terminology Management in a Corporate Setting Perspective
Term Mining and Terminology Management in a Corporate Setting PerspectiveTerm Mining and Terminology Management in a Corporate Setting Perspective
Term Mining and Terminology Management in a Corporate Setting PerspectiveLuigi Muzii
 
Evaluasi Cadangan-Minescape
Evaluasi Cadangan-MinescapeEvaluasi Cadangan-Minescape
Evaluasi Cadangan-Minescapeazharuldk
 
Training mainscape
Training mainscapeTraining mainscape
Training mainscapeEdhet OanSly
 
Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...
Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...
Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...MD.Suresh Kumar
 
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...Mario Yuven
 
Ekonomi Mineral by Yuli Kusumawati
Ekonomi Mineral by Yuli KusumawatiEkonomi Mineral by Yuli Kusumawati
Ekonomi Mineral by Yuli Kusumawatiyulika usman
 
Pengantar perencanaan tambang
Pengantar perencanaan tambangPengantar perencanaan tambang
Pengantar perencanaan tambangUVRI - UKDM
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling processVR M
 
Bolter miner @ Russia
Bolter miner @ RussiaBolter miner @ Russia
Bolter miner @ RussiaVR M
 
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...Mario Yuven
 
Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...
Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...
Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...Mario Yuven
 

Andere mochten auch (20)

Longwall mining
Longwall miningLongwall mining
Longwall mining
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & India
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining project
 
[Cv] tedy satria
[Cv]   tedy satria[Cv]   tedy satria
[Cv] tedy satria
 
Hal-Hal Yang Penting dalam Survey Tambang
Hal-Hal Yang Penting dalam Survey TambangHal-Hal Yang Penting dalam Survey Tambang
Hal-Hal Yang Penting dalam Survey Tambang
 
Ilmuwan minescape
Ilmuwan minescapeIlmuwan minescape
Ilmuwan minescape
 
kalimatan timur, samarinda
kalimatan timur, samarindakalimatan timur, samarinda
kalimatan timur, samarinda
 
All , minescape
All , minescapeAll , minescape
All , minescape
 
Term Mining and Terminology Management in a Corporate Setting Perspective
Term Mining and Terminology Management in a Corporate Setting PerspectiveTerm Mining and Terminology Management in a Corporate Setting Perspective
Term Mining and Terminology Management in a Corporate Setting Perspective
 
Evaluasi Cadangan-Minescape
Evaluasi Cadangan-MinescapeEvaluasi Cadangan-Minescape
Evaluasi Cadangan-Minescape
 
Open cut coal
Open cut coalOpen cut coal
Open cut coal
 
Training mainscape
Training mainscapeTraining mainscape
Training mainscape
 
Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...
Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...
Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...
 
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_08...
 
Ekonomi Mineral by Yuli Kusumawati
Ekonomi Mineral by Yuli KusumawatiEkonomi Mineral by Yuli Kusumawati
Ekonomi Mineral by Yuli Kusumawati
 
Pengantar perencanaan tambang
Pengantar perencanaan tambangPengantar perencanaan tambang
Pengantar perencanaan tambang
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling process
 
Bolter miner @ Russia
Bolter miner @ RussiaBolter miner @ Russia
Bolter miner @ Russia
 
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...
Tambang STTNAS _ Mata Kuliah Batubara_Semester IV_Coal sttnas supandi_2014_09...
 
Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...
Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...
Materi Kuliah Komputasi tambang Materi 1 Kuliah Teknik Pertambangan STTNAS Yo...
 

Ähnlich wie Longwall AFC changing - innovation

Rolling Stock.ppt
Rolling Stock.pptRolling Stock.ppt
Rolling Stock.pptMohitSonu2
 
Linear guide roller bearing
Linear guide roller bearingLinear guide roller bearing
Linear guide roller bearingVicky Chou
 
Linear guide roller bearing
Linear guide roller bearingLinear guide roller bearing
Linear guide roller bearingVicky Chou
 
Driveline & Axle System.pptx
Driveline & Axle System.pptxDriveline & Axle System.pptx
Driveline & Axle System.pptxMeghanNagvekar
 
Inertia dynamic wrap spring clutches & brakes_specsheet
Inertia dynamic wrap spring clutches & brakes_specsheetInertia dynamic wrap spring clutches & brakes_specsheet
Inertia dynamic wrap spring clutches & brakes_specsheetElectromate
 
Conveyor System Accessories By Luff Industries
Conveyor System Accessories By Luff IndustriesConveyor System Accessories By Luff Industries
Conveyor System Accessories By Luff Industriesluffindustries
 
Thomson Linear Super Metric Ball Bushing Bearings
Thomson Linear Super Metric Ball Bushing Bearings Thomson Linear Super Metric Ball Bushing Bearings
Thomson Linear Super Metric Ball Bushing Bearings Electromate
 
Thomson super metric_ball_bushing_bearings_specsheet
Thomson super metric_ball_bushing_bearings_specsheetThomson super metric_ball_bushing_bearings_specsheet
Thomson super metric_ball_bushing_bearings_specsheetElectromate
 
FORCE, Herramientas Frenos y transmision
FORCE, Herramientas Frenos y transmisionFORCE, Herramientas Frenos y transmision
FORCE, Herramientas Frenos y transmisiontienda911
 
Exxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.ppt
Exxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.pptExxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.ppt
Exxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.pptssuseraa800d
 
Zero Turn Radius Presentation - Team Panache
Zero Turn Radius Presentation - Team PanacheZero Turn Radius Presentation - Team Panache
Zero Turn Radius Presentation - Team PanacheSiddhesh Ozarkar
 
Ogura Industrial Products
Ogura Industrial ProductsOgura Industrial Products
Ogura Industrial ProductsJim Milbaugh
 

Ähnlich wie Longwall AFC changing - innovation (20)

Loco bogies clw
Loco bogies clwLoco bogies clw
Loco bogies clw
 
Rolling Stock.ppt
Rolling Stock.pptRolling Stock.ppt
Rolling Stock.ppt
 
Linear guide roller bearing
Linear guide roller bearingLinear guide roller bearing
Linear guide roller bearing
 
Linear guide roller bearing
Linear guide roller bearingLinear guide roller bearing
Linear guide roller bearing
 
Driveline & Axle System.pptx
Driveline & Axle System.pptxDriveline & Axle System.pptx
Driveline & Axle System.pptx
 
MTI Equipment
MTI EquipmentMTI Equipment
MTI Equipment
 
Inertia dynamic wrap spring clutches & brakes_specsheet
Inertia dynamic wrap spring clutches & brakes_specsheetInertia dynamic wrap spring clutches & brakes_specsheet
Inertia dynamic wrap spring clutches & brakes_specsheet
 
Conveyor System Accessories By Luff Industries
Conveyor System Accessories By Luff IndustriesConveyor System Accessories By Luff Industries
Conveyor System Accessories By Luff Industries
 
Mysilo Chain Conveyors
Mysilo Chain ConveyorsMysilo Chain Conveyors
Mysilo Chain Conveyors
 
Mysilo chain conveyors
Mysilo chain conveyorsMysilo chain conveyors
Mysilo chain conveyors
 
Casnub Bogies
Casnub BogiesCasnub Bogies
Casnub Bogies
 
McGill Metric CAMROL Bearings brochure
McGill Metric CAMROL Bearings brochureMcGill Metric CAMROL Bearings brochure
McGill Metric CAMROL Bearings brochure
 
Thomson Linear Super Metric Ball Bushing Bearings
Thomson Linear Super Metric Ball Bushing Bearings Thomson Linear Super Metric Ball Bushing Bearings
Thomson Linear Super Metric Ball Bushing Bearings
 
Thomson super metric_ball_bushing_bearings_specsheet
Thomson super metric_ball_bushing_bearings_specsheetThomson super metric_ball_bushing_bearings_specsheet
Thomson super metric_ball_bushing_bearings_specsheet
 
FORCE, Herramientas Frenos y transmision
FORCE, Herramientas Frenos y transmisionFORCE, Herramientas Frenos y transmision
FORCE, Herramientas Frenos y transmision
 
Exxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.ppt
Exxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.pptExxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.ppt
Exxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.ppt
 
2nd review
2nd review2nd review
2nd review
 
Zero Turn Radius Presentation - Team Panache
Zero Turn Radius Presentation - Team PanacheZero Turn Radius Presentation - Team Panache
Zero Turn Radius Presentation - Team Panache
 
Ogura Industrial Products
Ogura Industrial ProductsOgura Industrial Products
Ogura Industrial Products
 
JPMA Mill Coupling Presentation
JPMA Mill Coupling PresentationJPMA Mill Coupling Presentation
JPMA Mill Coupling Presentation
 

Mehr von VR M

Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialVR M
 
Energy - India (11th Plan)
Energy - India (11th Plan)Energy - India (11th Plan)
Energy - India (11th Plan)VR M
 
Methods of extraction in Opencast mine
Methods of extraction in Opencast mineMethods of extraction in Opencast mine
Methods of extraction in Opencast mineVR M
 
Vulcan tutorial 01
Vulcan tutorial 01Vulcan tutorial 01
Vulcan tutorial 01VR M
 
Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)VR M
 
Haul road design
Haul road designHaul road design
Haul road designVR M
 
Openpit Design Fundas
Openpit Design FundasOpenpit Design Fundas
Openpit Design FundasVR M
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentalsVR M
 
Statutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineStatutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineVR M
 
Top ten in world
Top ten in worldTop ten in world
Top ten in worldVR M
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining TechnologyVR M
 
Mine communication sysetms
Mine communication sysetmsMine communication sysetms
Mine communication sysetmsVR M
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersVR M
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesVR M
 
Longwall - The road ahead
Longwall - The road aheadLongwall - The road ahead
Longwall - The road aheadVR M
 
Design of Longwall for 2 seam of Ramagundam
Design of Longwall for 2 seam of RamagundamDesign of Longwall for 2 seam of Ramagundam
Design of Longwall for 2 seam of RamagundamVR M
 
Longwall exp india-expectations
Longwall exp india-expectationsLongwall exp india-expectations
Longwall exp india-expectationsVR M
 
Future Longwalls in India
Future Longwalls in IndiaFuture Longwalls in India
Future Longwalls in IndiaVR M
 
Caving behaviour in Longwall
Caving behaviour in LongwallCaving behaviour in Longwall
Caving behaviour in LongwallVR M
 
Press wing
Press wing Press wing
Press wing VR M
 

Mehr von VR M (20)

Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - Tutorial
 
Energy - India (11th Plan)
Energy - India (11th Plan)Energy - India (11th Plan)
Energy - India (11th Plan)
 
Methods of extraction in Opencast mine
Methods of extraction in Opencast mineMethods of extraction in Opencast mine
Methods of extraction in Opencast mine
 
Vulcan tutorial 01
Vulcan tutorial 01Vulcan tutorial 01
Vulcan tutorial 01
 
Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)
 
Haul road design
Haul road designHaul road design
Haul road design
 
Openpit Design Fundas
Openpit Design FundasOpenpit Design Fundas
Openpit Design Fundas
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentals
 
Statutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineStatutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mine
 
Top ten in world
Top ten in worldTop ten in world
Top ten in world
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining Technology
 
Mine communication sysetms
Mine communication sysetmsMine communication sysetms
Mine communication sysetms
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of Papers
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal mines
 
Longwall - The road ahead
Longwall - The road aheadLongwall - The road ahead
Longwall - The road ahead
 
Design of Longwall for 2 seam of Ramagundam
Design of Longwall for 2 seam of RamagundamDesign of Longwall for 2 seam of Ramagundam
Design of Longwall for 2 seam of Ramagundam
 
Longwall exp india-expectations
Longwall exp india-expectationsLongwall exp india-expectations
Longwall exp india-expectations
 
Future Longwalls in India
Future Longwalls in IndiaFuture Longwalls in India
Future Longwalls in India
 
Caving behaviour in Longwall
Caving behaviour in LongwallCaving behaviour in Longwall
Caving behaviour in Longwall
 
Press wing
Press wing Press wing
Press wing
 

Kürzlich hochgeladen

Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditSkynet Technologies
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...AliaaTarek5
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Scott Andery
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 

Kürzlich hochgeladen (20)

Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance Audit
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 

Longwall AFC changing - innovation

  • 1. Armoured Face Conveyor (AFC) pans changing in a working Longwall face using Monorail system -AN INNOVATIVE APPROACH SINGARENI COLLIERIES COMPANY LIMITED
  • 2. ON THE OCCASION OF ENGINEER’S DAY
  • 3. PRESENTATION OUTLINE • About GDK.10A Incline • Details of Panel No.7 • Reasons for replacement of AFC • Conventional methods • Monorail transport system • Sequence of Operations • Safety & Advantages • Conclusion
  • 4. SALIENT FEATURES OF GDK 10A INCLINE Mine started on : 16-06-1985 Introduction of Longwall : FEB, 1994 No. of workable seams : 2 (No.1 & 2) Present working seam : No.1 Seam No of LW panels completed: 8 Total production : 54 LT Balance reserves : 35.82 LT Balance life : 3.5 Years Project cost : Rs. 116.53 Crores
  • 5. PRODUCTION PROFILE OF GDK-10A (Coal production in LT) Section 2003-04 2004-05 2005-06 2006-07 (Achiev.) (Achiev.) (Achiev.) (Target) HS 0.09 0.01 0 0 MM LW 4.00 3.48 4.16 5.00 RH 0.32 0.29 0.32 0.40 SDL 0.69 0.93 0.92 0.96 MM TOT. 5.01 4.70 5.40 6.36 TOTAL 5.12 4.71 5.40 6.36
  • 6. Plan of No.1 Seam GDK 10A INC.
  • 7. How a Longwall face looks like…
  • 8. PANEL NO 7 Face Length : 116 m Panel Length : 940 m No of chock supports : 80 Nos Shearer : 2 X 375 KW AFC : 2 X 150 KW BSL : 1 X 150 KW Lump Breaker : 1 X 90 KW This panel was planned with uphill AFC transport to eliminate water problem. After a retreat of about 400 m it was decided to change the AFC pans as the condition of AFC was severely deteriorated. Monorail system was used for transport of AFC pans along the face.
  • 9. Longwall Panel No.7 MAIN GATE (46L) 400m GOAF TAIL GATE (49L) FACE STOP LINE Uphill Transport is planned in this Panel
  • 10. REASONS FOR REPLACEMENT OF AFC PANS The quality of AFC pans was very poor. AFC components were supplied by 3 different suppliers. Percentage of AFC breakdowns was about 22.5% of available working time and resulted in loss of output of 20,000 Tons per month. Slow face retreat caused strata control problems during periodical weightings. Taking into consideration of the time loss, production loss and safety aspects, it was decided to replace the total AFC with new pans.
  • 11. CONVENTIONAL METHODS AVAILABLE FOR AFC PANS CHANGING The sequence of operations include: 1 - Extra cut in front of AFC - Meshing of roof and face bolting - Laying of track in front of AFC and installation of compact hauler - Dismantling of old pans, loading and transport out bye and simultaneously transporting new pans to face and assembling. This method requires extra time for giving extra cut and meshing. Dismantling and removing of old pans and assembling new pans may be done from any end.
  • 12. CONVENTIONAL METHODS AVAILABLE FOR AFC PANS CHANGING 1
  • 13. CONVENTIONAL METHODS AVAILABLE FOR AFC PANS CHANGING This method does not require an extra cut but the sequence of operation include: 2 • • Dismantling of Tail gate (TG) drive Installation of compact hauler • Dismantling of old pans, loading and transport out bye starting from the Top gate end • Track extension in the place where old pans are removed • Removing all the old pans one after the other up to the Bottom gate end and continuing track extension, • Transport of new pans and unloading, • Removing the track and assembling new pans starting from the Bottom gate end. • Assembling TG drive. In this method the old AFC will have to be completely removed before installing the new pans.
  • 14. 2 CONVENTIONAL METHODS AVAILABLE FOR AFC PANS CHANGING
  • 15. WHY MONO RAIL TRANSPORT SYSTEM IS SELECTED The conventional systems take around 15 to 20 days time for changing total AFC. In conventional systems a clear space is required for laying curved track in Tail gate junction and also for accommodating Tail drive. The roof condition in Tail gate and also along the face was not good.
  • 16. BAR CHART OF ACTIVITIES Total changing of AFC pans was completed in 8 days. S.NO. ACTIVITY DAY 1 DAY 2 DAY 3 DAY 4 DAY 5 DAY 6 DAY 7 DAY 8 1 FACE CLEANING & BAMBOO BOLTING 2 MONORAIL FIXING 3 OLD PANS REMOVING, TRANSPORT TO TG AND LOADING 4 NEW PANS TRANSPORT TO TG, LIFTING WITH MONO RAIL, TRANSPORT AND UN LOADING IN FACE 5 PANS ASSEMBLING,TOP CHAIN CONNECTION AND MONORAIL REMOVAL 8 TRIAL RUN
  • 17. DESCRIPTION OF MONORAIL SYSTEM Monorail transport system consists of the following components: 1) Monorail 2) Bogie 3) Lifting arrangements 4) Winch or Hauler (Optional where the gradient is more and require more effort for pulling)
  • 18. Plan showing the Total Face layout with Monorail system PANEL NO.7
  • 19. MONO RAIL • The monorails are made of rolled section of ISMB150mm x 75mm of 6 m length. • They are anchored to the chock canopies by chain links and clamps. • In gate roadway the monorail is anchored by a clamp to the eye bolt grouted in the roof. • Monorail joints are clamped at the top and welded at the bottom for smooth travel.
  • 20. BOGIE • Monorail Bogie was made of 15mm MS plates and rollers fitted with bearings. • It has provision for fixing a ram or chain block for lifting purpose. • Bogie moves on monorail.
  • 21. MONO RAIL BOGIE 3" X 6" RS JOIST 15mm MS PLATES BEARINGS BOGIE BOLT AND NUT LIFTING HYDRAULIC CYLINDER PARTS OF MONO RAIL BOGIE 240 mm 0 40 mm FRONT VIEW SIDE VIEW 100 mm 255 mm 15 mm MS PLATE LIFTING HYDRAULIC CYLINDER 3"X 6" RS JOIST 620 mm 0 100 mm M36X160 STRUD 0 40mm AND M25 BOLT BEARING 120 mm
  • 22. LIFTING ARRANGEMENT • Hydraulic ram or chain pulley block can be used for lifting purpose. • It is fitted to the monorail bogie. Because of height constraint hydraulic ram is used. • After lifting the AFC pans with the help of ram pressure, it is retained by closing On-Off valves fitted to the connecting hoses.
  • 23. WINCH (or) HAULER • For pulling effort a winch or hauler is used. • If the winch or hauler is erected in bottom gate road instead of top gate, rope has to be passed through diversion pulley. • 12mm or 16mm flexible rope is used with the winch. • Signaling arrangement provided all along the face to ensure safety of operation.
  • 24. Transport of pans by pulling or pushing of the bogie Arrangement of diversion pullies
  • 25. FACE CONDITION BEFORE CHANGING AFC • There were total 70 pans in the face from C7 to C76, excluding the pans of MG and TG drives. • Shearer was parked between C7 and C16. • Dismantling of old pans was started from TG end, Simultaneously monorail was laid up to C17. • After changing of pans up to C17, shearer was taken down to C17-C26 and pans required for the other side of shearer were unloaded at C27 and pulled through the gap between shearer and face.
  • 26. AFC PANS CHANGING – SEQUENCE OF OPERATIONS • AFC pans were transported from surface to Longwall face through tail gate and kept under the monorail. • Pans were lifted with monorail bogie in TG. • Hauler rope was attached to the bogie and it was pulled. Bogie moved on the monorail from tail gate lifting point up to the unloading point in the face. • Stop blocks were used to prevent run away of bogie.
  • 27. Monorail negotiating a curve in tail gate junction Arrangement of monorail at face curve
  • 28. AFC PANS CHANGING – SEQUENCE OF OPERATIONS • New pan was unloaded at the site with the help of the same hydraulic cylinder. • Old pans were lifted in the face, transported with the same bogie to tail gate and unloaded in to the half tub. • A loop line was given in tail gate for shunting the old pans loaded half tubs from where they were transported to surface.
  • 29. AFC PANS CHANGING – SEQUENCE OF OPERATIONS • Total 70 old pans were replaced with new pans starting from tail gate end. • Replacement of one pan took about 45 to 60 minutes. • An average of 15 pans were changed per day. • After completion of AFC pans assembling, top chain spreading and jointing was done and AFC trial run taken. Mean while monorails were dismantled and normal production resumed.
  • 30. SAFETY FEATURES Depending upon the load to be handled the anchoring, steel sections, bogies, lifting device and chains were designed, taking maximum factor of safety into consideration. Persons were not directly coming into contact with the heavy materials while transportation. Anchoring of the monorails was at every 1.5 m interval increased the load bearing capacity. Sprags were applied immediately behind the bogie travel at the interval of 1.5 m to prevent the running back towards down hill.
  • 31. APPLICATIONS Monorail system of transport can be widely used in underground mining works for loading, unloading, shifting of heavy machineries and equipment. Monorail system can be used at Longwall salvage and installation operations. Winder house and haulage installations for replacing of gearbox, motor, drum, shaft etc. Pumping stations. Shaft insets for loading and unloading of materials into the cage.
  • 32. ADVANTAGES • More safety. • Less manpower. • Easy to handle. • Faster system of transport / replacement of worn- out items. • The monorail system can be fabricated and installed at mine level with the help of workshop. • The cost is very less when compared to other systems. • The workmen are more interested to use this system as less physical exertion is involved for handling / transport of the material. • The system can be further improvised by providing motorised lifting device / bogie.
  • 33. CONCLUSION • The monorail system was found to be more useful for changing the AFC in a working Longwall panel. • Total AFC pans were changed within 8 days using 1200 man shifts against the normal time of 20 days using 3000 man shifts, thus saving about 1800 man shifts and 12 days production costing around Rs. 2 Crores. • This system is more safe, easy to fabricate, install and operate.