What is more important
in a Project - Time,
Cost or Quality ?
by Satyashri Mohanty




Project management literature talks about the need to measure and control all three variables of the
project – Time, Quality, and Costs (or budget). Most project managers would tell from their experience that
there are inherent conflicts between these variables. In many situations, when people try and speed up
projects, they invest in additional resources, making the budget go haywire. While in many other situations,
scope or quality is compromised to get a delayed project back on track. The conflict is also the other way
round; when managers try and control budgets, time takes a backseat. (Long rounds of negotiation with
multiple vendor cause significant delays in purchase items). Similarly, people try to scope in more in a
particular project in order to meet the “real” needs of the client, thus compromising on time and budget.
(for example, specific unplanned features that will help the client use the software more effectively!!).

With this experience, the need to monitor and control these three variables evolved – so that there is no
compromise on either of them. Good project management is to ensure that all the three variables meet the
standards defined in the original commitment. This would entail that all the three factors must be
monitored and controlled. Right?

This is a widely accepted theory. But in the real time scenario, no effective solution has been developed to
deal with the associated conflicts. It becomes very complex for a manager to derive the optimum from all
the three variables. For example, how much more time can one afford to spend on negotiating a cheaper
deal with the vendor, without compromising on project delivery. The extra time spent in negotiation may be
recovered later or it might not be. One can only check the efficacy of the decision in hindsight. In taking
decisions at runtime, some managers make a choice between what is visibly getting compromised at that
point in time or wherever there is maximum pressure for control. As a result many mangers find themselves
focusing too much on one variable during one phase of the project and then focusing on the other in the
next phase. For example, in many E&C projects, costs are controlled very strictly during the initial part of
the project while time slips away and towards the end of the project, people spend a lot to get the project
back on track. Similarly, in a software environment, you can find many scope compromises close to an
important release date. In a shutdown project, many scoped items will be skipped at the end, when it
becomes obvious that the due date is in jeopardy.


Vector Consulting Group                                                                   www.vectorconsulting.in
Leveraging
What is more important in a Project - Time, Cost or Quality ?                           Consulting Group   the Potential




Thus we can conclude that attempting to manage all three variables together does not help. It adds to the
complexity and encourages compromises all throughout the project. In the end, none of the variables are
satisfactorily managed; people invariably look at compromises made on some of the variables and then
conclude that they have to focus on all the three. Well focus on many, actually means no focus.

To find a better solution, we need more understanding on how the variables are related to each other.
Many would claim that they all are negatively co-related. To be good with one means to be bad with the
other. It is almost like trying to keep all the ping-pong balls simultaneously under water in a swimming pool.
You get one down, the other moves up. Right?

However, in the actual execution of a project, time is the most important variable which controls the other
two positively – to manage time effectively means to be good on costs and quality. It is only when the
project goes out of control that the variables start becoming negatively co-related.

Let us check with our collective experience.

Most projects environments suffer from significant waste in time, particularly in the initial part of the
project. The projects gain momentum only close to important milestones or at the end, when the resources
stretch beyond their natural limits. The proposals finalization for new products may months together but
when it comes to final testing of the product, people expect it to be over as of yesterday. Similarly, it would
take months to finalize a contractor but resources will work 24 hours at the end to hit the delivery date.
Managers would tolerate days of delays in customer approval of design in the initial part of the project but
work overtime to meet the due date at the end of the project. Often people take up tasks without complete
preparation in order to gain lost time thus leading to more rework and poor quality.

If we are able to minimize this waste of time in the initial part of the project, then the pressure on time
observed towards the end will reduce significantly. Most of the compromises made on budgets, scope, and
quality actually stem from this pressure to complete the project in time.

Projects which utilize time efficiently will also ensure a better quality output. So it is not surprising that
projects which are delivered ahead of time are also delivered within budgets and with good quality. Even
though hard data of project performance points to this relationship between quality and time, the
commonly held belief is lesser time means poor quality.

How have the people developed the idea that time and quality are negatively correlated? It comes from
their experience - they do remember that whenever there was pressure of time, quality and scope were
compromised hence it is an obvious assumption that adequate time (read no time pressure), leads to better
quality.

It is true that when someone tries to do a task less than its touch time or the net time quality is bound to
suffer but the key question is why did we land up in this mess? Retrospecting on the project, we invariably
find a lot of time being wasted in the form of interruptions in the project or unnecessary work expansion in
the earlier which, could have been easily avoided. If that time was not optimized and utilized to its full
potential, this situation would not arise.

So in a way, lesser project lead time actually means lesser pressure. The key is in maximizing time
utilization. Time seems to be the most important variable. The focus on time throughout the project not
only helps in preventing the compromises but also in most project environments, time is directly related to
money made by the company.


Vector Consulting Group                                                                       www.vectorconsulting.in
Leveraging
What is more important in a Project - Time, Cost or Quality ?                                         Consulting Group   the Potential




For example, for a shutdown project, early completion means early production. For a multi-project
environment, lower lead times means that resources are free much earlier to do more projects. For a large
plant erection, early commissioning is earlier than planned pay back period.

CCPM processes of execution helps in preventing such waste of time in projects. Without any intermediate
deadlines and focus on buffer management, the pressure for meeting task deadlines goes away. With a
focus on flow management, the issues causing interruptions are resolved ASAP. The flow of project
improves significantly while reducing the chaotic expediting environment. Resources do not overstretch to
complete projects earlier. This in turn helps in improving quality and prevents scope compromises.

Do we have a proof? Our experience does support the hypothesis.

In our experience of implementing CCPM in a software environment, not only the lead time reduced, but
also the bugs reported in the software dropped down significantly. In a shutdown environment, CCPM
implementation helped reduce the ramp up time to peak production besides helping finish the project
much ahead of schedule.(Ramp up time to peak production is an indicator of quality of shut down projects).
For a panel tool and die cast dies manufacturer, the TO sample quality improved from 85% accurate to more
than 90% accuracy.




The Author is a founding Director of Vector Consulting Group – India's largest and premier Theory of constraints based consulting
company that engages with leading corporate to deliver bottom line results and takes its fee from the increase of profit thus
delivered.




Vector Consulting Group                                                                                     www.vectorconsulting.in

More Related Content

More from Vector Consulting Group

Engineering & Construction Industry Case Study
Engineering & Construction Industry Case Study Engineering & Construction Industry Case Study
Engineering & Construction Industry Case Study Vector Consulting Group
 
Equipment Manufacturing Industry Case Study
Equipment Manufacturing Industry Case Study Equipment Manufacturing Industry Case Study
Equipment Manufacturing Industry Case Study Vector Consulting Group
 
Consumer Goods & Retail Industry Case Study
Consumer Goods & Retail Industry Case StudyConsumer Goods & Retail Industry Case Study
Consumer Goods & Retail Industry Case StudyVector Consulting Group
 
Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...Vector Consulting Group
 
Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...Vector Consulting Group
 
Unlock the hidden potential of the fashion supply chain
Unlock the hidden potential of the fashion supply chainUnlock the hidden potential of the fashion supply chain
Unlock the hidden potential of the fashion supply chainVector Consulting Group
 
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic Vector Consulting Group
 
Leveraging Franchisees for Profitable Growth in Retail: Infographic
Leveraging Franchisees for Profitable Growth in Retail: InfographicLeveraging Franchisees for Profitable Growth in Retail: Infographic
Leveraging Franchisees for Profitable Growth in Retail: InfographicVector Consulting Group
 
Nuggets on Consumer Goods and Retail Supply Chain
Nuggets on Consumer Goods and Retail Supply ChainNuggets on Consumer Goods and Retail Supply Chain
Nuggets on Consumer Goods and Retail Supply ChainVector Consulting Group
 
Theory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case StudyTheory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case StudyVector Consulting Group
 
TOC- Improve FMCG Distribution Channel Performance
TOC- Improve FMCG Distribution Channel PerformanceTOC- Improve FMCG Distribution Channel Performance
TOC- Improve FMCG Distribution Channel PerformanceVector Consulting Group
 

More from Vector Consulting Group (19)

Engineering & Construction Industry Case Study
Engineering & Construction Industry Case Study Engineering & Construction Industry Case Study
Engineering & Construction Industry Case Study
 
Equipment Manufacturing Industry Case Study
Equipment Manufacturing Industry Case Study Equipment Manufacturing Industry Case Study
Equipment Manufacturing Industry Case Study
 
Consumer Goods & Retail Industry Case Study
Consumer Goods & Retail Industry Case StudyConsumer Goods & Retail Industry Case Study
Consumer Goods & Retail Industry Case Study
 
Textile Industry case study
Textile Industry case studyTextile Industry case study
Textile Industry case study
 
Auto Industry Case Study
Auto Industry Case Study Auto Industry Case Study
Auto Industry Case Study
 
Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...
 
Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...
 
An After Thought on the After Market
An After Thought on the After MarketAn After Thought on the After Market
An After Thought on the After Market
 
Unlock the hidden potential of the fashion supply chain
Unlock the hidden potential of the fashion supply chainUnlock the hidden potential of the fashion supply chain
Unlock the hidden potential of the fashion supply chain
 
Auto Industry Outlook 2012
Auto Industry Outlook 2012Auto Industry Outlook 2012
Auto Industry Outlook 2012
 
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
 
Leveraging Franchisees for Profitable Growth in Retail: Infographic
Leveraging Franchisees for Profitable Growth in Retail: InfographicLeveraging Franchisees for Profitable Growth in Retail: Infographic
Leveraging Franchisees for Profitable Growth in Retail: Infographic
 
Nuggets on Consumer Goods and Retail Supply Chain
Nuggets on Consumer Goods and Retail Supply ChainNuggets on Consumer Goods and Retail Supply Chain
Nuggets on Consumer Goods and Retail Supply Chain
 
Nuggets on Auto Industry
Nuggets on Auto IndustryNuggets on Auto Industry
Nuggets on Auto Industry
 
Insights on Managing People by VCG
Insights on Managing People by VCGInsights on Managing People by VCG
Insights on Managing People by VCG
 
Dealing with variety in supply chain
Dealing with variety in supply chainDealing with variety in supply chain
Dealing with variety in supply chain
 
Theory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case StudyTheory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case Study
 
TOC- Improve FMCG Distribution Channel Performance
TOC- Improve FMCG Distribution Channel PerformanceTOC- Improve FMCG Distribution Channel Performance
TOC- Improve FMCG Distribution Channel Performance
 
TOC's role in IT success
TOC's role in IT successTOC's role in IT success
TOC's role in IT success
 

Recently uploaded

Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 

Recently uploaded (20)

Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 

What is more important in projects – Time, cost or quality?

  • 1. Research Reports Leveraging Articles Consulting Group the Potential What is more important in a Project - Time, Cost or Quality ? by Satyashri Mohanty Project management literature talks about the need to measure and control all three variables of the project – Time, Quality, and Costs (or budget). Most project managers would tell from their experience that there are inherent conflicts between these variables. In many situations, when people try and speed up projects, they invest in additional resources, making the budget go haywire. While in many other situations, scope or quality is compromised to get a delayed project back on track. The conflict is also the other way round; when managers try and control budgets, time takes a backseat. (Long rounds of negotiation with multiple vendor cause significant delays in purchase items). Similarly, people try to scope in more in a particular project in order to meet the “real” needs of the client, thus compromising on time and budget. (for example, specific unplanned features that will help the client use the software more effectively!!). With this experience, the need to monitor and control these three variables evolved – so that there is no compromise on either of them. Good project management is to ensure that all the three variables meet the standards defined in the original commitment. This would entail that all the three factors must be monitored and controlled. Right? This is a widely accepted theory. But in the real time scenario, no effective solution has been developed to deal with the associated conflicts. It becomes very complex for a manager to derive the optimum from all the three variables. For example, how much more time can one afford to spend on negotiating a cheaper deal with the vendor, without compromising on project delivery. The extra time spent in negotiation may be recovered later or it might not be. One can only check the efficacy of the decision in hindsight. In taking decisions at runtime, some managers make a choice between what is visibly getting compromised at that point in time or wherever there is maximum pressure for control. As a result many mangers find themselves focusing too much on one variable during one phase of the project and then focusing on the other in the next phase. For example, in many E&C projects, costs are controlled very strictly during the initial part of the project while time slips away and towards the end of the project, people spend a lot to get the project back on track. Similarly, in a software environment, you can find many scope compromises close to an important release date. In a shutdown project, many scoped items will be skipped at the end, when it becomes obvious that the due date is in jeopardy. Vector Consulting Group www.vectorconsulting.in
  • 2. Leveraging What is more important in a Project - Time, Cost or Quality ? Consulting Group the Potential Thus we can conclude that attempting to manage all three variables together does not help. It adds to the complexity and encourages compromises all throughout the project. In the end, none of the variables are satisfactorily managed; people invariably look at compromises made on some of the variables and then conclude that they have to focus on all the three. Well focus on many, actually means no focus. To find a better solution, we need more understanding on how the variables are related to each other. Many would claim that they all are negatively co-related. To be good with one means to be bad with the other. It is almost like trying to keep all the ping-pong balls simultaneously under water in a swimming pool. You get one down, the other moves up. Right? However, in the actual execution of a project, time is the most important variable which controls the other two positively – to manage time effectively means to be good on costs and quality. It is only when the project goes out of control that the variables start becoming negatively co-related. Let us check with our collective experience. Most projects environments suffer from significant waste in time, particularly in the initial part of the project. The projects gain momentum only close to important milestones or at the end, when the resources stretch beyond their natural limits. The proposals finalization for new products may months together but when it comes to final testing of the product, people expect it to be over as of yesterday. Similarly, it would take months to finalize a contractor but resources will work 24 hours at the end to hit the delivery date. Managers would tolerate days of delays in customer approval of design in the initial part of the project but work overtime to meet the due date at the end of the project. Often people take up tasks without complete preparation in order to gain lost time thus leading to more rework and poor quality. If we are able to minimize this waste of time in the initial part of the project, then the pressure on time observed towards the end will reduce significantly. Most of the compromises made on budgets, scope, and quality actually stem from this pressure to complete the project in time. Projects which utilize time efficiently will also ensure a better quality output. So it is not surprising that projects which are delivered ahead of time are also delivered within budgets and with good quality. Even though hard data of project performance points to this relationship between quality and time, the commonly held belief is lesser time means poor quality. How have the people developed the idea that time and quality are negatively correlated? It comes from their experience - they do remember that whenever there was pressure of time, quality and scope were compromised hence it is an obvious assumption that adequate time (read no time pressure), leads to better quality. It is true that when someone tries to do a task less than its touch time or the net time quality is bound to suffer but the key question is why did we land up in this mess? Retrospecting on the project, we invariably find a lot of time being wasted in the form of interruptions in the project or unnecessary work expansion in the earlier which, could have been easily avoided. If that time was not optimized and utilized to its full potential, this situation would not arise. So in a way, lesser project lead time actually means lesser pressure. The key is in maximizing time utilization. Time seems to be the most important variable. The focus on time throughout the project not only helps in preventing the compromises but also in most project environments, time is directly related to money made by the company. Vector Consulting Group www.vectorconsulting.in
  • 3. Leveraging What is more important in a Project - Time, Cost or Quality ? Consulting Group the Potential For example, for a shutdown project, early completion means early production. For a multi-project environment, lower lead times means that resources are free much earlier to do more projects. For a large plant erection, early commissioning is earlier than planned pay back period. CCPM processes of execution helps in preventing such waste of time in projects. Without any intermediate deadlines and focus on buffer management, the pressure for meeting task deadlines goes away. With a focus on flow management, the issues causing interruptions are resolved ASAP. The flow of project improves significantly while reducing the chaotic expediting environment. Resources do not overstretch to complete projects earlier. This in turn helps in improving quality and prevents scope compromises. Do we have a proof? Our experience does support the hypothesis. In our experience of implementing CCPM in a software environment, not only the lead time reduced, but also the bugs reported in the software dropped down significantly. In a shutdown environment, CCPM implementation helped reduce the ramp up time to peak production besides helping finish the project much ahead of schedule.(Ramp up time to peak production is an indicator of quality of shut down projects). For a panel tool and die cast dies manufacturer, the TO sample quality improved from 85% accurate to more than 90% accuracy. The Author is a founding Director of Vector Consulting Group – India's largest and premier Theory of constraints based consulting company that engages with leading corporate to deliver bottom line results and takes its fee from the increase of profit thus delivered. Vector Consulting Group www.vectorconsulting.in