SlideShare ist ein Scribd-Unternehmen logo
1 von 79
Downloaden Sie, um offline zu lesen
ANALISIS SISMO RESISTENTE(GUSTAVO ARANDA PALOMINO)
COLUMNA: VIGAS(1ro,2do y 3er nivel): VIGAS(4to nivel):
PERALTE = 0.45 m PERALTE: 0.5 m PERALTE:
ANCHO = 0.3 m ANCHO: 0.3 m ANCHO:
E= Lm(La distancia mayor en el sentido del techo)/25 Lm=
E= 0.20952381 E= 0.2 m
MURO= 0.15
MURO= 0.25 PESO ESP. DEL CONCRETO= 2.4 Tn/m3
PESO ESP. DEL LADRILLO= 1.8 Tn/m3
ALTURAS DE PISO A TECHO: metrado para columnas:
h1= 4 m h1= 3.7
h2= 3 m h2= 3.2
h3= 3 m h3= 3.45
h4= 3.5 m h4= 1.95
TERCER NIVEL COLUMNA C-4:
h= 1.7
DISTANCIA A EJES METRADO DE LOSAS: X Y
L1= 5.3 PAÑO 1= 5 4.1
L2= 4.4 PAÑO 2= 4.1 4.1
L3= 5.8 PAÑO 3= 5.5 4.1
L4= 4.4 PAÑO 4= 5 4.1
L5= 4.4 PAÑO 5= 4.1 4.1
PAÑO 6= 5.5 4.1
elemento peralte(m) ancho(m) altura(m) peso esp.(tn/m3)
colum.A-1 0.45 0.3 3.7 2.4
colum.A-2 0.45 0.3 3.7 2.4
colum.A-3 0.45 0.3 3.7 2.4
colum.A-4 0.45 0.3 3.7 2.4
colum.B-1 0.45 0.3 3.7 2.4
colum.B-2 0.45 0.3 3.7 2.4
colum.B-3 0.45 0.3 3.7 2.4
colum.B-4 0.45 0.3 3.7 2.4
colum.C-1 0.45 0.3 3.7 2.4
colum.C-2 0.45 0.3 3.7 2.4
colum.C-3 0.45 0.3 3.7 2.4
colum.C-4 0.45 0.3 3.7 2.4
METRADO DE COLUMNAS DEL SEGUNDO NIVEL
elemento peralte(m) ancho(m) altura(m) peso esp.(tn/m3)
colum.A-1 0.45 0.3 3.2 2.4
colum.A-2 0.45 0.3 3.2 2.4
colum.A-3 0.45 0.3 3.2 2.4
colum.A-4 0.45 0.3 3.2 2.4
colum.B-1 0.45 0.3 3.2 2.4
colum.B-2 0.45 0.3 3.2 2.4
DIMENSIONES
DIMENSIONES
colum.B-3 0.45 0.3 3.2 2.4
colum.B-4 0.45 0.3 3.2 2.4
colum.C-1 0.45 0.3 3.2 2.4
colum.C-2 0.45 0.3 3.2 2.4
colum.C-3 0.45 0.3 3.2 2.4
colum.C-4 0.45 0.3 3.2 2.4
METRADO DE COLUMNAS DEL TERCEL NIVEL
DIMENSIONES
elemento peralte(m) ancho(m) altura(m) peso esp.(tn/m3)
colum.A-1 0.45 0.3 3.45 2.4
colum.A-2 0.45 0.3 3.45 2.4
colum.A-3 0.45 0.3 3.45 2.4
colum.A-4 0.45 0.3 3.45 2.4
colum.B-1 0.45 0.3 3.45 2.4
colum.B-2 0.45 0.3 3.45 2.4
colum.B-3 0.45 0.3 3.45 2.4
colum.B-4 0.45 0.3 3.45 2.4
colum.C-1 0.45 0.3 3.45 2.4
colum.C-2 0.45 0.3 3.45 2.4
colum.C-3 0.45 0.3 3.45 2.4
colum.C-4 0.45 0.3 1.7 2.4
METRADO DE COLUMNAS DEL CUARTO NIVEL
DIMENSIONES
elemento peralte(m) ancho(m) altura(m) peso esp.(tn/m3)
colum.A-1 0.45 0.3 1.95 2.4
colum.A-2 0.45 0.3 1.95 2.4
colum.A-3 0.45 0.3 1.95 2.4
colum.A-4 0.45 0.3 1.95 2.4
colum.B-1 0.45 0.3 1.95 2.4
colum.B-2 0.45 0.3 1.95 2.4
colum.B-3 0.45 0.3 1.95 2.4
colum.B-4 0.45 0.3 1.95 2.4
colum.C-1 0.45 0.3 1.95 2.4
colum.C-2 0.45 0.3 1.95 2.4
colum.C-3 0.45 0.3 1.95 2.4
elemento longitud(m) elemento longitud(m)
VIGA EJE-1 VIGA EJE-A
TRAMO AB= 4.35 TRAMO 1-2 5
TRAMO BC= 3.55 TRAMO 2-3 3.7
VIGA EJE-2 TRAMO 3-4 5.6
TRAMO AB= 4.35 VIGA EJE-B
TRAMO BC= 3.55 TRAMO 1-2 5
VIGA EJE-3 TRAMO 2-3 3.7
TRAMO AB= 4.35 TRAMO 3-4 5.6
TRAMO BC= 3.55 VIGA EJE-C
VIGA EJE-4 TRAMO 1-2 5
TRAMO AB= 4.35 TRAMO 2-3 3.7
TRAMO BC= 3.55 TRAMO 3-4 5.6
METRADO DE VIGAS DEL PRIMER NIVEL
DIMENSIONES
elemento peralte(m) ancho(m) longitud(m) peso esp.(tn/m3)
VIGA EJE-1
TRAMO AB 0.5 0.3 4.35 2.4
TRAMO BC 0.5 0.3 3.55 2.4
VIGA EJE-2
TRAMO AB 0.5 0.3 4.35 2.4
TRAMO BC 0.5 0.3 3.55 2.4
VIGA EJE-3
TRAMO AB 0.5 0.3 4.35 2.4
TRAMO BC 0.5 0.3 3.55 2.4
VIGA EJE-4
TRAMO AB 0.5 0.3 4.35 2.4
TRAMO BC 0.5 0.3 3.55 2.4
VIGA EJE-A
TRAMO 1-2 0.5 0.3 5 2.4
TRAMO 2-3 0.5 0.3 3.7 2.4
TRAMO 3-4 0.5 0.3 5.6 2.4
VIGA EJE-B
TRAMO 1-2 0.5 0.3 5 2.4
TRAMO 2-3 0.5 0.3 3.7 2.4
TRAMO 3-4 0.5 0.3 5.6 2.4
VIGA EJE-C
TRAMO 1-2 0.5 0.3 5 2.4
TRAMO 2-3 0.5 0.3 3.7 2.4
TRAMO 3-4 0.5 0.3 5.6 2.4
O ARANDA PALOMINO)
VIGAS(4to nivel): METRADO DE VIGAS DEL SEGUNDO NIVEL
0.4 m DIMENSIONES
0.3 m elemento peralte(m) ancho(m)
VIGA EJE-1
4.4 m TRAMO AB 0.5 0.3
TRAMO BC 0.5 0.3
VIGA EJE-2
TRAMO AB 0.5 0.3
TRAMO BC 0.5 0.3
VIGA EJE-3
TRAMO AB 0.5 0.3
TRAMO BC 0.5 0.3
VIGA EJE-4
TRAMO AB 0.5 0.3
TRAMO BC 0.5 0.3
VIGA EJE-A
TRAMO 1-2 0.5 0.3
TRAMO 2-3 0.5 0.3
TRAMO 3-4 0.5 0.3
VIGA EJE-B
TRAMO 1-2 0.5 0.3
TRAMO 2-3 0.5 0.3
TRAMO 3-4 0.5 0.3
VIGA EJE-C
TRAMO 1-2 0.5 0.3
peso(tn) TRAMO 2-3 0.5 0.3
1.1988 TRAMO 3-4 0.5 0.3
1.1988
1.1988
1.1988
1.1988 METRADO DE VIGAS DEL TERCER NIVEL
1.1988 DIMENSIONES
1.1988 elemento peralte(m) ancho(m)
1.1988 VIGA EJE-1
1.1988 TRAMO AB 0.5 0.3
1.1988 TRAMO BC 0.5 0.3
1.1988 VIGA EJE-2
1.1988 TRAMO AB 0.5 0.3
14.3856 TRAMO BC 0.5 0.3
VIGA EJE-3
TRAMO AB 0.5 0.3
TRAMO BC 0.5 0.3
VIGA EJE-4
peso(tn) TRAMO AB 0.5 0.3
1.0368 TRAMO BC 0.5 0.3
1.0368 VIGA EJE-A
1.0368 TRAMO 1-2 0.5 0.3
1.0368 TRAMO 2-3 0.5 0.3
1.0368 TRAMO 3-4 0.5 0.3
1.0368 VIGA EJE-B
1.0368 TRAMO 1-2 0.5 0.3
1.0368 TRAMO 2-3 0.5 0.3
1.0368 TRAMO 3-4 0.5 0.3
1.0368 VIGA EJE-C
1.0368 TRAMO 1-2 0.5 0.3
1.0368 TRAMO 2-3 0.5 0.3
12.4416 TRAMO 3-4 0.5 0.3
METRADO DE VIGAS DEL CUARTO NIVEL
DIMENSIONES
elemento peralte(m) ancho(m)
VIGA EJE-1
TRAMO AB 0.4 0.3
peso(tn) TRAMO BC 0.4 0.3
1.1178 VIGA EJE-2
1.1178 TRAMO AB 0.4 0.3
1.1178 TRAMO BC 0.4 0.3
1.1178 VIGA EJE-3
1.1178 TRAMO AB 0.4 0.3
1.1178 TRAMO BC 0.4 0.3
1.1178 VIGA EJE-4
1.1178 TRAMO AB 0.4 0.3
1.1178 VIGA EJE-A
1.1178 TRAMO 1-2 0.4 0.3
1.1178 TRAMO 2-3 0.4 0.3
0.5508 TRAMO 3-4 0.4 0.3
12.8466 VIGA EJE-B
TRAMO 1-2 0.4 0.3
TRAMO 2-3 0.4 0.3
TRAMO 3-4 0.4 0.3
VIGA EJE-C
TRAMO 1-2 0.4 0.3
TRAMO 2-3 0.4 0.3
peso(tn)
0.63
0.63
0.63 METRADO DE LOSA
0.63
0.63 METRADO DE LOSA DEL PRIMER NIVEL
0.63 DIMENSIONES
0.63 elemento LONG.X(m) LONG.Y(m)
0.63 paño-1 5 4.1
0.63 paño-2 4.1 4.1
0.63 paño-3 5.5 4.1
0.63 paño-4 5 4.1
6.95 paño-5 4.1 4.1
paño-6 5.5 4.1
METRADO DE LOSA DEL SEGUNDO NIVEL
DIMENSIONES
elemento LONG.X(m) LONG.Y(m)
paño-1 5 4.1
paño-2 4.1 4.1
paño-3 5.5 4.1
paño-4 5 4.1
paño-5 4.1 4.1
paño-6 5.5 4.1
peso(tn)
1.566
1.278
1.566
1.278
1.566
1.278
1.566
1.278
1.8
1.332
2.016
1.8
1.332
2.016
1.8
1.332
2.016
26.82
METRADO DE VIGAS DEL SEGUNDO NIVEL
METRADO DE LOSA DEL
longitud(m) peso esp.(tn/m3) peso(tn)
elemento
4.35 2.4 1.566 paño-1
3.55 2.4 1.278 paño-2
paño-3
4.35 2.4 1.566 paño-4
3.55 2.4 1.278 paño-5
paño-6
4.35 2.4 1.566
3.55 2.4 1.278
4.35 2.4 1.566 METRADO DE LOSA DEL C
3.55 2.4 1.278
elemento
5 2.4 1.8 paño-1
3.7 2.4 1.332 paño-2
5.6 2.4 2.016 paño-3
paño-4
5 2.4 1.8 paño-5
3.7 2.4 1.332
5.6 2.4 2.016
5 2.4 1.8 MURO-1=
3.7 2.4 1.332 MURO-2=
5.6 2.4 2.016 MURO-3=
26.82 MURO-4=
MURO-5=
MURO-6=
METRADO DE VIGAS DEL TERCER NIVEL MURO-6(A)=
MURO-7=
longitud(m) peso esp.(tn/m3) peso(tn) MURO-8=
MURO-9=
4.35 2.4 1.566
3.55 2.4 1.278
h= 1 m
4.35 2.4 1.566 h(1er nivel)= 3.7 m =
3.55 2.4 1.278 h(2do nivel)= 2.7 m =
h(3er nivel)= 2.7 m =
4.35 2.4 1.566 h(4to nivel)= 3.3 m =
3.55 2.4 1.278 M3 Y M15 DEL TERCER NIVEL(h)=
4.35 2.4 1.566 ANCHO DE LOS MUROS:
3.55 2.4 1.278
M1,M2,M3,M7,M8,M9= 0.25
5 2.4 1.8 M4,M5,M6,M6(A),M10,M10(A),M11,M11(A),M12,M13,M13(A),M14,M14
3.7 2.4 1.332
5.6 2.4 2.016
M6(A),M13(A) Y M16 DEL CUARTO NIVEL(h)=
5 2.4 1.8
3.7 2.4 1.332
5.6 2.4 2.016
5 2.4 1.8
3.7 2.4 1.332
5.6 2.4 2.016
26.82
VIGAS DEL CUARTO NIVEL
longitud(m) peso esp.(tn/m3) peso(tn)
elemento
4.35 2.4 1.2528 MURO-1
3.55 2.4 1.0224 MURO-2
MURO-3
4.35 2.4 1.2528 MURO-4
3.55 2.4 1.0224 MURO-5
MURO-6
4.35 2.4 1.2528 MURO-7
3.55 2.4 1.0224 MURO-8
MURO-9
4.35 2.4 1.2528 MURO-10
MURO-11
5 2.4 1.44 MURO-12
3.7 2.4 1.0656 MURO-13
5.6 2.4 1.6128 MURO-14
MURO-15
5 2.4 1.44 MURO-16
3.7 2.4 1.0656
5.6 2.4 1.6128
5 2.4 1.44
3.7 2.4 1.0656
18.8208
METRADO DE LOSA
elemento
AREA(m2) Qd(tn/m2) peso(tn) MURO-1
20.5 0.48 9.84 MURO-2
16.81 0.48 8.0688 MURO-3
22.55 0.48 10.824 MURO-4
20.5 0.48 9.84 MURO-5
16.81 0.48 8.0688 MURO-6
22.55 0.48 10.824 MURO-7
119.72 57.4656 MURO-8
MURO-9
MURO-10(A)
MURO-11(A)
ADO DE LOSA DEL SEGUNDO NIVEL MURO-12
MURO-13
AREA(m2) Qd(tn/m2) peso(tn) MURO-14
20.5 0.48 9.84 MURO-15
16.81 0.48 8.0688 MURO-16
22.55 0.48 10.824
20.5 0.48 9.84
16.81 0.48 8.0688
22.55 0.48 10.824
119.72 57.4656
elemento
MURO-1
MURO-2
MURO-3
MURO-4
MURO-5
MURO-6
MURO-7
MURO-8
MURO-9
MURO-10
MURO-11
MURO-12
MURO-13
MURO-14
MURO-15
MURO-16
METRADO DE MUROS D
elemento
MURO-1
MURO-2
MURO-6(A)
MURO-7
MURO-8
MURO-9
MURO-13(A)
MURO-14(A)
MURO-16
METRADO DE LOSA DEL TERCER NIVEL
DIMENSIONES
LONG.X(m) LONG.Y(m) AREA(m2) Qd(tn/m2) peso(tn)
5 4.1 20.5 0.48 9.84
4.1 4.1 16.81 0.48 8.0688
5.5 4.1 22.55 0.48 10.824
5 4.1 20.5 0.48 9.84
4.1 4.1 16.81 0.48 8.0688
5.5 4.1 22.55 0.48 10.824
119.72 57.4656
METRADO DE LOSA DEL CUARTO NIVEL
DIMENSIONES
LONG.X(m) LONG.Y(m) AREA(m2) Qd(tn/m2) peso(tn)
5 4.1 20.5 0.48 9.84
4.1 4.1 16.81 0.48 8.0688
5.5 4.1 22.55 0.48 10.824
5 4.1 20.5 0.48 9.84
4.1 4.1 16.81 0.48 8.0688
97.17 46.6416
longitud(m) longitud(m)
5 MURO-10= 2.95
4.1 MURO-10(A)= 3.95
5.5 MURO-11= 2.95
4 MURO-11(A)= 3.95
3.1 MURO-12= 3.95
4.5 MURO-13= 2.95
5.5 MURO-13(A)= 3.95
5 MURO-14= 3.95
4.1 MURO-14(A)= 2.95
5.5 MURO-15= 3.95
MURO-16= 3.95
3.2 m
2.7 m VENTANA 4TO NIVEL:
3 m hv= 1.3 m
1.65 m
1.35 m
m
A),M11,M11(A),M12,M13,M13(A),M14,M14(A),M15,M16= 0.15 m
Y M16 DEL CUARTO NIVEL(h)= 0.35
METRADO DE MUROS DEL PRIMER NIVEL
DIMENSIONES
ANCHO(m) ALTO(m) longitud(m) peso esp.(tn/m3) peso(tn)
0.25 3.2 5 1.8 7.2
0.25 3.2 4.1 1.8 5.904
0.25 3.2 5.5 1.8 7.92
0.15 3.2 4 1.8 3.456
0.15 3.2 3.1 1.8 2.6784
0.15 3.2 4.5 1.8 3.888
0.25 3.2 5 1.8 7.2
0.25 3.2 4.1 1.8 5.904
0.25 3.2 5.5 1.8 7.92
0.15 1 2.95 1.8 0.7965
0.15 1 2.95 1.8 0.7965
0.15 3.2 3.95 1.8 3.4128
0.15 3.2 2.95 1.8 2.5488
0.15 3.2 3.95 1.8 3.4128
0.15 3.2 3.95 1.8 3.4128
0.15 3.2 3.95 1.8 3.4128
69.8634
METRADO DE MUROS DEL SEGUNDO NIVEL
DIMENSIONES
ANCHO(m) ALTO(m) longitud(m) peso esp.(tn/m3) peso(tn)
0.25 2.7 5 1.8 6.075
0.25 2.7 4.1 1.8 4.9815
0.25 2.7 5.5 1.8 6.6825
0.15 2.7 4 1.8 2.916
0.15 2.7 3.1 1.8 2.2599
0.15 2.7 4.5 1.8 3.2805
0.25 2.7 5 1.8 6.075
0.25 2.7 4.1 1.8 4.9815
0.25 2.7 5.5 1.8 6.6825
0.15 1 3.95 1.8 1.0665
0.15 1 3.95 1.8 1.0665
0.15 2.7 3.95 1.8 2.87955
0.15 2.7 2.95 1.8 2.15055
0.15 2.7 3.95 1.8 2.87955
0.15 2.7 3.95 1.8 2.87955
0.15 2.7 3.95 1.8 2.87955
59.73615
METRADO DE MUROS DEL TERCER NIVEL
DIMENSIONES
ANCHO(m) ALTO(m) longitud(m) peso esp.(tn/m3) peso(tn)
0.25 3 5.0 1.8 6.75
0.25 3 4.1 1.8 5.535
0.25 1.35 5.5 1.8 3.34125
0.15 3 4.0 1.8 3.24
0.15 3 3.1 1.8 2.511
0.15 3 4.5 1.8 3.645
0.25 3 5.0 1.8 6.75
0.25 3 4.1 1.8 5.535
0.25 3 5.5 1.8 7.425
0.15 1 4.4 1.8 1.1745
0.15 1 3.6 1.8 0.9585
0.15 3 4.0 1.8 3.1995
0.15 3 3.0 1.8 2.3895
0.15 3 4.0 1.8 3.1995
0.15 1.35 4.0 1.8 1.439775
0.15 3 4.0 1.8 3.1995
60.293025
METRADO DE MUROS DEL CUARTO NIVEL
DIMENSIONES
ANCHO(m) ALTO(m) longitud(m) peso esp.(tn/m3) peso(tn)
0.25 1.65 5 1.8 3.7125
0.25 1.65 4.1 1.8 3.04425
0.15 0.35 5.5 1.8 0.51975
0.25 1.65 5 1.8 3.7125
0.25 1.65 4.1 1.8 3.04425
0.25 1.65 5.5 1.8 4.08375
0.15 0.35 3.95 1.8 0.373275
0.15 1.65 2.95 1.8 1.314225
0.15 0.35 3.95 1.8 0.373275
20.177775
paño-4
paño-5
paño-6
MURO-1
MURO-2
MURO-3
MURO-4
MURO-5
MURO-6
MURO-7
MURO-8
MURO-9
MURO-10(A)
MURO-11(A)
MURO-12
MURO-13
MURO-14
MURO-15
MURO-16
XG=
YG=
PESO DE CARGA MUERTA DE LA ESTRUCTURA
ELEMENTOS 1ER NIVEL 2DO NIVEL 3er NIVEL 4to NIVEL peso(tn)
COLUMNAS 14.3856 12.4416 12.8466 6.9498 46.6236
VIGAS 0 26.82 26.82 18.8208 72.4608
LOSA 57.4656 57.4656 57.4656 46.6416 219.0384
MUROS 69.8634 59.73615 60.293025 20.177775 210.07035
141.7146 156.46335 157.425225 92.589975 548.19315
PESO DE CARGA VIVA DE LA ESTRUCTURA
ELEMENTOS AREA(m2) S/C(Tn/m2) peso(tn)
1ER NIVEL 119.72 0.5 59.86
2DO NIVEL 119.72 0.5 59.86
3er NIVEL 119.72 0.4 47.888
4to NIVEL 97.17 0.15 14.5755
456.33 182.1835
%S/C(Tn)= 25%66.155
PESO TOTAL DE LA ESTRUCTURA
ELEMENTOS C. MUERTA %S/C(Tn) peso(tn)
1ER NIVEL 141.7146 14.965 156.6796
2DO NIVEL 156.46335 14.965 171.42835
3er NIVEL 157.425225 11.972 169.397225
4to NIVEL 92.589975 3.643875 96.23385
593.739025
%S/C(Tn)= 25%66.155
CALCULO DEL CENTRO DE MASA
PRIMER NIVEL
CENTRO DE GRAVEDAD
ELEMENTO PESO(tn) X(mts) Y(mts) P*X(tn-mts) P*Y(tn-mts)
colum.A-1 1.1988 0 8.8 0 10.54944
colum.A-2 1.1988 5.3 8.8 6.35364 10.54944
colum.A-3 1.1988 9.7 8.8 11.62836 10.54944
colum.A-4 1.1988 15.5 8.8 18.5814 10.54944
colum.B-1 1.1988 0 4.4 0 5.27472
colum.B-2 1.1988 5.3 4.4 6.35364 5.27472
colum.B-3 1.1988 9.7 4.4 11.62836 5.27472
colum.B-4 1.1988 15.5 4.4 18.5814 5.27472
colum.C-1 1.1988 0 0 0 0
colum.C-2 1.1988 5.3 0 6.35364 0
colum.C-3 1.1988 9.7 0 11.62836 0
colum.C-4 1.1988 15.5 0 18.5814 0
VIGA EJE-1
TRAMO AB 1.566 0 6.6 0 10.3356
TRAMO BC 1.278 0 2.2 0 2.8116
VIGA EJE-2
TRAMO AB 1.566 5.3 6.6 8.2998 10.3356
TRAMO BC 1.278 5.3 2.2 6.7734 2.8116
VIGA EJE-3
TRAMO AB 1.566 9.7 6.6 15.1902 10.3356
TRAMO BC 1.278 9.7 2.2 12.3966 2.8116
VIGA EJE-4 0 0
TRAMO AB 1.566 15.5 6.6 24.273 10.3356
TRAMO BC 1.278 15.5 2.2 19.809 2.8116
VIGA EJE-A 0 0
TRAMO 1-2 1.8 2.65 8.8 4.77 15.84
TRAMO 2-3 1.332 7.5 8.8 9.99 11.7216
TRAMO 3-4 2.016 12.6 8.8 25.4016 17.7408
VIGA EJE-B 0 0
TRAMO 1-2 0 2.65 4.4 0 0
TRAMO 2-3 0 7.5 4.4 0 0
TRAMO 3-4 2.016 12.6 4.4 25.4016 8.8704
VIGA EJE-C 0 0
TRAMO 1-2 1.8 2.65 0 4.77 0
TRAMO 2-3 1.332 7.5 0 9.99 0
TRAMO 3-4 2.016 12.6 0 25.4016 0
paño-1 9.84 2.65 6.6 26.076 64.944
paño-2 8.0688 7.5 6.6 60.516 53.25408
paño-3 10.824 12.6 6.6 136.3824 71.4384
paño-4 9.84 2.65 2.2 26.076 21.648
paño-5 8.0688 7.5 2.2 60.516 17.75136
paño-6 10.824 12.6 2.2 136.3824 23.8128
MURO-1 7.2 2.65 0 19.08 0
MURO-2 5.904 7.5 0 44.28 0
MURO-3 7.92 12.6 0 99.792 0
MURO-4 3.456 2.15 4.4 7.4304 15.2064
MURO-5 2.6784 8 4.4 21.4272 11.78496
MURO-6 3.888 13.1 4.4 50.9328 17.1072
MURO-7 7.2 2.65 8.8 19.08 63.36
MURO-8 5.904 7.5 8.8 44.28 51.9552
MURO-9 7.92 12.6 8.8 99.792 69.696
MURO-10 0.7965 0 2.7 0 2.15055
MURO-11 0.7965 0 7.1 0 5.65515
MURO-12 3.4128 5.3 6.6 18.08784 22.52448
MURO-13 2.5488 9.7 2.7 24.72336 6.88176
MURO-14 3.4128 9.7 6.6 33.10416 22.52448
MURO-15 3.4128 15.5 2.2 52.8984 7.50816
MURO-16 3.4128 15.5 6.6 52.8984 22.52448
165.4026 1335.91236 741.7857
XG= 8.07673132
YG= 4.48472817
CALCULO DEL CENTRO DE MASA
SEGUNDO NIVEL
CENTRO DE GRAVEDAD
ELEMENTO PESO(tn) X(mts) Y(mts) P*X(tn-mts) P*Y(tn-mts)
colum.A-1 1.0368 0 8.8 0 9.12384
colum.A-2 1.0368 5.3 8.8 5.49504 9.12384
colum.A-3 1.0368 9.7 8.8 10.05696 9.12384
colum.A-4 1.0368 15.5 8.8 16.0704 9.12384
colum.B-1 1.0368 0 4.4 0 4.56192
colum.B-2 1.0368 5.3 4.4 5.49504 4.56192
colum.B-3 1.0368 9.7 4.4 10.05696 4.56192
colum.B-4 1.0368 15.5 4.4 16.0704 4.56192
colum.C-1 1.0368 0 0 0 0
colum.C-2 1.0368 5.3 0 5.49504 0
colum.C-3 1.0368 9.7 0 10.05696 0
colum.C-4 1.0368 15.5 0 16.0704 0
VIGA EJE-1
TRAMO AB 1.566 0 6.6 0 10.3356
TRAMO BC 1.278 0 2.2 0 2.8116
VIGA EJE-2
TRAMO AB 1.566 5.3 6.6 8.2998 10.3356
TRAMO BC 1.278 5.3 2.2 6.7734 2.8116
VIGA EJE-3
TRAMO AB 1.566 9.7 6.6 15.1902 10.3356
TRAMO BC 1.278 9.7 2.2 12.3966 2.8116
VIGA EJE-4
TRAMO AB 1.566 15.5 6.6 24.273 10.3356
TRAMO BC 1.278 15.5 2.2 19.809 2.8116
VIGA EJE-A
TRAMO 1-2 1.8 2.65 8.8 4.77 15.84
TRAMO 2-3 1.332 7.5 8.8 9.99 11.7216
TRAMO 3-4 2.016 12.6 8.8 25.4016 17.7408
VIGA EJE-B
TRAMO 1-2 1.8 2.65 4.4 4.77 7.92
TRAMO 2-3 1.332 7.5 4.4 9.99 5.8608
TRAMO 3-4 2.016 12.6 4.4 25.4016 8.8704
VIGA EJE-C 0 0
TRAMO 1-2 1.8 2.65 0 4.77 0
TRAMO 2-3 1.332 7.5 0 9.99 0
TRAMO 3-4 2.016 12.6 0 25.4016 0
paño-1 9.84 2.65 6.6 26.076 64.944
paño-2 8.0688 7.5 6.6 60.516 53.25408
paño-3 10.824 12.6 6.6 136.3824 71.4384
paño-4 9.84 2.65 2.2 26.076 21.648
paño-5 8.0688 7.5 2.2 60.516 17.75136
paño-6 10.824 12.6 2.2 136.3824 23.8128
MURO-1 6.075 2.65 0 16.09875 0
MURO-2 4.9815 7.5 0 37.36125 0
MURO-3 6.6825 12.6 0 84.1995 0
MURO-4 2.916 2.15 4.4 6.2694 12.8304
MURO-5 2.2599 8 4.4 18.0792 9.94356
MURO-6 3.2805 13.1 4.4 42.97455 14.4342
MURO-7 6.075 2.65 0 16.09875 0
MURO-8 4.9815 7.5 0 37.36125 0
MURO-9 6.6825 12.6 0 84.1995 0
MURO-10(A) 1.0665 0 2.2 0 2.3463
MURO-11(A) 1.0665 0 6.6 0 7.0389
MURO-12 2.87955 5.3 6.6 15.261615 19.00503
MURO-13 2.15055 9.7 2.7 20.860335 5.806485
MURO-14 2.87955 9.7 6.6 27.931635 19.00503
MURO-15 2.87955 15.5 2.2 44.633025 6.33501
MURO-16 2.87955 15.5 6.6 44.633025 19.00503
156.46335 1244.00459 543.884025
XG= 7.95077304
YG= 3.47611134
MURO-11
MURO-12
MURO-13
MURO-14
MURO-15
MURO-16
CALCULO
ELEMENTO
colum.A-1
colum.A-2
colum.A-3
colum.A-4
colum.B-1
colum.B-2
colum.B-3
colum.B-4
colum.C-1
colum.C-2
colum.C-3
colum.C-4
VIGA EJE-1
TRAMO AB
TRAMO BC
VIGA EJE-2
TRAMO AB
TRAMO BC
VIGA EJE-3
TRAMO AB
TRAMO BC
VIGA EJE-4
TRAMO AB
TRAMO BC
VIGA EJE-A
TRAMO 1-2
TRAMO 2-3
TRAMO 3-4
VIGA EJE-B
TRAMO 1-2
TRAMO 2-3
TRAMO 3-4
VIGA EJE-C
TRAMO 1-2
TRAMO 2-3
TRAMO 3-4
paño-1
paño-2
paño-3
paño-4
paño-5
paño-6
MURO-1
MURO-2
MURO-3
MURO-4
MURO-5
MURO-6
MURO-7
MURO-8
MURO-9
MURO-10(A)
MURO-11(A)
MURO-12
MURO-13
MURO-14
MURO-15
MURO-16
CALCULO
ELEMENTO
colum.A-1
colum.A-2
colum.A-3
colum.A-4
colum.B-1
colum.B-2
colum.B-3
colum.B-4
colum.C-1
colum.C-2
colum.C-3
colum.C-4
VIGA EJE-1
TRAMO AB
TRAMO BC
VIGA EJE-2
TRAMO AB
TRAMO BC
VIGA EJE-3
TRAMO AB
TRAMO BC
VIGA EJE-4
TRAMO AB
TRAMO BC
VIGA EJE-A
TRAMO 1-2
TRAMO 2-3
TRAMO 3-4
VIGA EJE-B
TRAMO 1-2
TRAMO 2-3
TRAMO 3-4
VIGA EJE-C
TRAMO 1-2
TRAMO 2-3
TRAMO 3-4
paño-1
paño-2
paño-3
paño-4
paño-5
paño-6
MURO-1
MURO-2
MURO-3
MURO-4
MURO-5
MURO-6
MURO-7
MURO-8
MURO-9
MURO-10(A)
MURO-11(A)
MURO-12
MURO-13
MURO-14
MURO-15
MURO-16
CALCULO
ELEMENTO
colum.A-1
colum.A-2
colum.A-3
colum.A-4
colum.B-1
colum.B-2
colum.B-3
colum.B-4
colum.C-1
colum.C-2
colum.C-3
VIGA EJE-1
TRAMO AB
TRAMO BC
VIGA EJE-2
TRAMO AB
TRAMO BC
VIGA EJE-3
TRAMO AB
TRAMO BC
VIGA EJE-4
TRAMO AB
VIGA EJE-A
TRAMO 1-2
TRAMO 2-3
TRAMO 3-4
VIGA EJE-B
TRAMO 1-2
TRAMO 2-3
TRAMO 3-4
VIGA EJE-C
TRAMO 1-2
TRAMO 2-3
paño-1
paño-2
paño-3
paño-4
paño-5
MURO-1
MURO-2
MURO-6(A)
MURO-7
MURO-8
MURO-9
MURO-13(A)
MURO-14(A)
MURO-16
CALCULO DEL CENTRO DE MASA
TERCER NIVEL
CENTRO DE GRAVEDAD
ELEMENTO PESO(tn) X(mts) Y(mts) P*X(tn-mts)
colum.A-1 1.1178 0 8.8 0
colum.A-2 1.1178 5.3 8.8 5.92434
colum.A-3 1.1178 9.7 8.8 10.84266
colum.A-4 1.1178 15.5 8.8 17.3259
colum.B-1 1.1178 0 4.4 0
colum.B-2 1.1178 5.3 4.4 5.92434
colum.B-3 1.1178 9.7 4.4 10.84266
colum.B-4 1.1178 15.5 4.4 17.3259
colum.C-1 1.1178 0 0 0
colum.C-2 1.1178 5.3 0 5.92434
colum.C-3 1.1178 9.7 0 10.84266
colum.C-4 0.5508 15.5 0 8.5374
VIGA EJE-1
TRAMO AB 1.566 0 6.6 0
TRAMO BC 1.278 0 2.2 0
VIGA EJE-2
TRAMO AB 1.566 5.3 6.6 8.2998
TRAMO BC 1.278 5.3 2.2 6.7734
VIGA EJE-3
TRAMO AB 1.566 9.7 6.6 15.1902
TRAMO BC 1.278 9.7 2.2 12.3966
VIGA EJE-4 0
TRAMO AB 1.566 15.5 6.6 24.273
TRAMO BC 1.278 15.5 2.2 19.809
VIGA EJE-A
TRAMO 1-2 1.8 2.65 8.8 4.77
TRAMO 2-3 1.332 7.5 8.8 9.99
TRAMO 3-4 2.016 12.6 8.8 25.4016
VIGA EJE-B 0
TRAMO 1-2 1.8 2.65 4.4 4.77
TRAMO 2-3 1.332 7.5 4.4 9.99
TRAMO 3-4 2.016 12.6 4.4 25.4016
VIGA EJE-C 0
TRAMO 1-2 1.8 2.65 0 4.77
TRAMO 2-3 1.332 7.5 0 9.99
TRAMO 3-4 2.016 12.6 0 25.4016
paño-1 9.84 2.65 6.6 26.076
paño-2 8.0688 7.5 6.6 60.516
paño-3 10.824 12.6 6.6 136.3824
paño-4 9.84 2.65 2.2 26.076
paño-5 8.0688 7.5 2.2 60.516
paño-6 10.824 12.6 2.2 136.3824
MURO-1 6.75 2.65 0 17.8875
MURO-2 5.535 7.5 0 41.5125
MURO-3 3.34125 12.6 0 42.09975
MURO-4 3.24 2.15 4.4 6.966
MURO-5 2.511 8 4.4 20.088
MURO-6 3.645 13.1 4.4 47.7495
MURO-7 6.75 2.65 8.8 17.8875
MURO-8 5.535 7.5 8.8 41.5125
MURO-9 7.425 12.6 8.8 93.555
MURO-10(A) 1.1745 0 2.2 0
MURO-11(A) 0.9585 0 6.6 0
MURO-12 3.1995 5.3 6.6 16.95735
MURO-13 2.3895 9.7 2.7 23.17815
MURO-14 3.1995 9.7 6.6 31.03515
MURO-15 1.439775 15.5 2.2 22.3165125
MURO-16 3.1995 15.5 6.6 49.59225
157.425225 1219.00346
XG= 7.74338079
YG= 4.63128152
CALCULO DEL CENTRO DE MASA
CUARTO NIVEL
CENTRO DE GRAVEDAD
ELEMENTO PESO(tn) X(mts) Y(mts) P*X(tn-mts)
colum.A-1 0.6318 0 8.8 0
colum.A-2 0.6318 5.3 8.8 3.34854
colum.A-3 0.6318 9.7 8.8 6.12846
colum.A-4 0.6318 15.5 8.8 9.7929
colum.B-1 0.6318 0 4.4 0
colum.B-2 0.6318 5.3 4.4 3.34854
colum.B-3 0.6318 9.7 4.4 6.12846
colum.B-4 0.6318 15.5 4.4 9.7929
colum.C-1 0.6318 0 0 0
colum.C-2 0.6318 5.3 0 3.34854
colum.C-3 0.6318 9.7 0 6.12846
VIGA EJE-1
TRAMO AB 1.2528 0 6.6 0
TRAMO BC 1.0224 0 2.2 0
VIGA EJE-2
TRAMO AB 1.2528 5.3 6.6 6.63984
TRAMO BC 1.0224 5.3 2.2 5.41872
VIGA EJE-3
TRAMO AB 1.2528 9.7 6.6 12.15216
TRAMO BC 1.0224 9.7 2.2 9.91728
VIGA EJE-4 0
TRAMO AB 1.2528 15.5 6.6 19.4184
VIGA EJE-A
TRAMO 1-2 1.44 2.65 8.8 3.816
TRAMO 2-3 1.0656 7.5 8.8 7.992
TRAMO 3-4 1.6128 12.6 8.8 20.32128
VIGA EJE-B 0
TRAMO 1-2 1.44 2.65 4.4 3.816
TRAMO 2-3 1.0656 7.5 4.4 7.992
TRAMO 3-4 1.6128 12.6 4.4 20.32128
VIGA EJE-C 0
TRAMO 1-2 1.44 2.65 0 3.816
TRAMO 2-3 1.0656 7.5 0 7.992
paño-1 9.84 2.65 6.6 26.076
paño-2 8.0688 7.5 6.6 60.516
paño-3 10.824 12.6 6.6 136.3824
paño-4 9.84 2.65 2.2 26.076
paño-5 8.0688 7.5 2.2 60.516
MURO-1 3.7125 2.65 0 9.838125
MURO-2 3.04425 7.5 0 22.831875
MURO-6(A) 0.51975 12.6 4.4 6.54885
MURO-7 3.7125 2.65 8.8 9.838125
MURO-8 3.04425 7.5 8.8 22.831875
MURO-9 4.08375 12.6 8.8 51.45525
MURO-13(A) 0.373275 9.7 2.2 3.6207675
MURO-14(A) 1.314225 9.7 6.6 12.7479825
MURO-16 0.373275 15.5 6.6 5.7857625
92.589975 632.694773
XG= 6.83329672
YG= 5.03533482
CALCULO DEL CENTRO DE RIGIDECES
ELEMENTO AREA X
PRIMER NIVEL
B H BH3 HB3 m
colum.A-1 0.300 0.450 0.027 0.012 0
colum.A-2 0.300 0.450 0.027 0.012 5.3
colum.A-3 0.300 0.450 0.027 0.012 9.7
colum.A-4 0.300 0.450 0.027 0.012 15.5
colum.B-1 0.300 0.450 0.027 0.012 0
colum.B-2 0.300 0.450 0.027 0.012 5.3
colum.B-3 0.300 0.450 0.027 0.012 9.7
colum.B-4 0.300 0.450 0.027 0.012 15.5
colum.C-1 0.300 0.450 0.027 0.012 0
colum.C-2 0.300 0.450 0.027 0.012 5.3
colum.C-3 0.300 0.450 0.027 0.012 9.7
colum.C-4 0.300 0.450 0.027 0.012 15.5
VIGA EJE-1
TRAMO AB 3.950 0.300 0.107 18.489 0
TRAMO BC 3.950 0.300 0.107 18.489 0
VIGA EJE-2
TRAMO AB 3.950 0.300 0.107 18.489 5.3
TRAMO BC 3.950 0.300 0.107 18.489 5.3
VIGA EJE-3
TRAMO AB 3.950 0.300 0.107 18.489 9.7
TRAMO BC 3.950 0.300 0.107 18.489 9.7
VIGA EJE-4
TRAMO AB 3.950 0.300 0.107 18.489 15.5
TRAMO BC 3.950 0.300 0.107 18.489 15.5
VIGA EJE-A
TRAMO 1-2 0.500 5.000 62.500 0.625 2.65
TRAMO 2-3 0.500 4.100 34.461 0.513 7.5
TRAMO 3-4 0.500 5.500 83.188 0.688 12.6
VIGA EJE-B
TRAMO 1-2 0.500 5.000 62.500 0.625 2.65
TRAMO 2-3 0.500 4.100 34.461 0.513 7.5
TRAMO 3-4 0.500 5.500 83.188 0.688 12.6
VIGA EJE-C
TRAMO 1-2 0.500 5.000 62.500 0.625 2.65
TRAMO 2-3 0.500 4.100 34.461 0.513 7.5
TRAMO 3-4 0.500 5.500 83.188 0.688 12.6
paño-1 4.100 5.000 512.500 344.605 2.65
paño-2 4.100 4.100 282.576 282.576 7.5
paño-3 4.100 5.500 682.138 379.066 12.6
paño-4 4.100 5.000 512.500 344.605 2.65
paño-5 4.100 4.100 282.576 282.576 7.5
paño-6 4.1000 5.500 682.138 379.066 12.6
MURO-1 5.000 0.250 0.078 31.250 2.65
MURO-2 4.100 0.250 0.064 17.230 7.5
MURO-3 5.500 0.250 0.086 41.594 12.6
MURO-4 4.000 0.150 0.014 9.600 2.15
MURO-5 3.100 0.150 0.010 4.469 8
MURO-6 4.500 0.150 0.015 13.669 13.1
MURO-7 5.000 0.250 0.078 31.250 2.65
MURO-8 4.100 0.250 0.064 17.230 7.5
MURO-9 5.500 0.250 0.086 41.594 12.6
MURO-10 0.150 2.950 3.851 0.010 0
MURO-11 0.150 2.950 3.851 0.010 0
MURO-12 0.150 3.950 9.244 0.013 5.3
MURO-13 0.150 2.950 3.851 0.010 9.7
MURO-14 0.150 3.950 9.244 0.013 9.7
MURO-15 0.150 3.950 9.244 0.013 15.5
MURO-16 0.150 3.950 9.244 0.013 15.5
3545.078 2373.994
CENTRO DE RIGIDEZ :
X = 8.191
Y = 4.400
CALCULO DEL CENTRO DE RIGIDECES
ELEMENTO X
B H BH3 HB3 m
colum.A-1 0.300 0.450 0.027 0.012 0
colum.A-2 0.300 0.450 0.027 0.012 5.3
colum.A-3 0.300 0.450 0.027 0.012 9.7
colum.A-4 0.300 0.450 0.027 0.012 15.5
colum.B-1 0.300 0.450 0.027 0.012 0
colum.B-2 0.300 0.450 0.027 0.012 5.3
AREA
SEGUNDO NIVEL
colum.B-3 0.300 0.450 0.027 0.012 9.7
colum.B-4 0.300 0.450 0.027 0.012 15.5
colum.C-1 0.300 0.450 0.027 0.012 0
colum.C-2 0.300 0.450 0.027 0.012 5.3
colum.C-3 0.300 0.450 0.027 0.012 9.7
colum.C-4 0.300 0.450 0.027 0.012 15.5
VIGA EJE-1
TRAMO AB 3.950 0.300 0.107 18.489 0
TRAMO BC 3.950 0.300 0.107 18.489 0
VIGA EJE-2
TRAMO AB 3.950 0.300 0.107 18.489 5.3
TRAMO BC 3.950 0.300 0.107 18.489 5.3
VIGA EJE-3
TRAMO AB 3.950 0.300 0.107 18.489 9.7
TRAMO BC 3.950 0.300 0.107 18.489 9.7
VIGA EJE-4
TRAMO AB 3.950 0.300 0.107 18.489 15.5
TRAMO BC 3.950 0.300 0.107 18.489 15.5
VIGA EJE-A
TRAMO 1-2 0.500 5.000 62.500 0.625 2.65
TRAMO 2-3 0.500 4.100 34.461 0.513 7.5
TRAMO 3-4 0.500 5.500 83.188 0.688 12.6
VIGA EJE-B
TRAMO 1-2 0.500 5.000 62.500 0.625 2.65
TRAMO 2-3 0.500 4.100 34.461 0.513 7.5
TRAMO 3-4 0.500 5.500 83.188 0.688 12.6
VIGA EJE-C
TRAMO 1-2 0.500 5.000 62.500 0.625 2.65
TRAMO 2-3 0.500 4.100 34.461 0.513 7.5
TRAMO 3-4 0.500 5.500 83.188 0.688 12.6
paño-1 4.100 5.000 512.500 344.605 2.65
paño-2 4.100 4.100 282.576 282.576 7.5
paño-3 4.100 5.500 682.138 379.066 12.6
paño-4 4.100 5.000 512.500 344.605 2.65
paño-5 4.100 4.100 282.576 282.576 7.5
paño-6 4.100 5.500 682.138 379.066 12.6
MURO-1 5.000 0.250 0.078 31.250 2.65
MURO-2 4.100 0.250 0.064 17.230 7.5
MURO-3 5.500 0.250 0.086 41.594 12.6
MURO-4 4.000 0.150 0.014 9.600 2.15
MURO-5 3.100 0.150 0.010 4.469 8
MURO-6 4.500 0.150 0.015 13.669 13.1
MURO-7 5.000 0.250 0.078 31.250 2.65
MURO-8 4.100 0.250 0.064 17.230 7.5
MURO-9 5.500 0.250 0.086 41.594 12.6
MURO-10(A) 0.150 3.950 9.244 0.013 0
MURO-11(A) 0.150 3.950 9.244 0.013 0
MURO-12 0.150 3.950 9.244 0.013 5.3
MURO-13 0.150 2.950 3.851 0.010 9.7
MURO-14 0.150 3.950 9.244 0.013 9.7
MURO-15 0.150 3.950 9.244 0.013 15.5
MURO-16 0.150 3.950 9.244 0.013 15.5
3555.866 2374.001
CENTRO DE RIGIDEZ :
X = 8.166
Y = 4.066
CALCULO DEL CENTRO DE RIGIDECES
ELEMENTO X
B H BH3 HB3 m
colum.A-1 0.30 0.45 0.03 0.01 0
colum.A-2 0.30 0.45 0.03 0.01 5.3
colum.A-3 0.30 0.45 0.03 0.01 9.7
colum.A-4 0.30 0.45 0.03 0.01 15.5
colum.B-1 0.30 0.45 0.03 0.01 0
colum.B-2 0.30 0.45 0.03 0.01 5.3
colum.B-3 0.30 0.45 0.03 0.01 9.7
colum.B-4 0.30 0.45 0.03 0.01 15.5
colum.C-1 0.30 0.45 0.03 0.01 0
colum.C-2 0.30 0.45 0.03 0.01 5.3
colum.C-3 0.30 0.45 0.03 0.01 9.7
colum.C-4 0.30 0.45 0.03 0.01 15.5
VIGA EJE-1
TRAMO AB 3.95 0.30 0.11 18.49 0
TRAMO BC 3.95 0.30 0.11 18.49 0
VIGA EJE-2
TRAMO AB 3.95 0.30 0.11 18.49 5.3
TRAMO BC 3.95 0.30 0.11 18.49 5.3
VIGA EJE-3
TRAMO AB 3.95 0.30 0.11 18.49 9.7
TRAMO BC 3.95 0.30 0.11 18.49 9.7
VIGA EJE-4
TRAMO AB 3.95 0.30 0.11 18.49 15.5
TRAMO BC 3.95 0.30 0.11 18.49 15.5
VIGA EJE-A
TRAMO 1-2 0.50 5.00 62.50 0.63 2.65
TRAMO 2-3 0.50 4.10 34.46 0.51 7.5
TRAMO 3-4 0.50 5.50 83.19 0.69 12.6
VIGA EJE-B
TERCER NIVEL
AREA
TRAMO 1-2 0.50 5.00 62.50 0.63 2.65
TRAMO 2-3 0.50 4.10 34.46 0.51 7.5
TRAMO 3-4 0.50 5.50 83.19 0.69 12.6
VIGA EJE-C
TRAMO 1-2 0.50 5.00 62.50 0.63 2.65
TRAMO 2-3 0.50 4.10 34.46 0.51 7.5
TRAMO 3-4 0.50 5.50 83.19 0.69 12.6
paño-1 4.10 5.00 512.50 344.61 2.65
paño-2 4.10 4.10 282.58 282.58 7.5
paño-3 4.10 5.50 682.14 379.07 12.6
paño-4 4.10 5.00 512.50 344.61 2.65
paño-5 4.10 4.10 282.58 282.58 7.5
paño-6 4.10 5.50 682.14 379.07 12.6
MURO-1 5.00 0.25 0.08 31.25 2.65
MURO-2 4.10 0.25 0.06 17.23 7.5
MURO-3 5.50 0.25 0.09 41.59 12.6
MURO-4 4.00 0.15 0.01 9.60 2.15
MURO-5 3.10 0.15 0.01 4.47 8
MURO-6 4.50 0.15 0.02 13.67 13.1
MURO-7 5.00 0.25 0.08 31.25 2.65
MURO-8 4.10 0.25 0.06 17.23 7.5
MURO-9 5.50 0.25 0.09 41.59 12.6
MURO-10(A) 0.15 4.35 12.35 0.01 0
MURO-11(A) 0.15 3.55 6.71 0.01 0
MURO-12 0.15 3.95 9.24 0.01 5.3
MURO-13 0.15 2.95 3.85 0.01 9.7
MURO-14 0.15 3.95 9.24 0.01 9.7
MURO-15 0.15 3.95 9.24 0.01 15.5
MURO-16 0.15 3.95 9.24 0.01 15.5
3556.43 2374.00
CENTRO DE RIGIDEZ :
X = 8.165
Y = 4.400
CALCULO DEL CENTRO DE RIGIDECES
CUARTO NIVEL
ELEMENTO X
B H BH3 HB3 m
colum.A-1 0.30 0.45 0.03 0.01 0
colum.A-2 0.30 0.45 0.03 0.01 5.3
colum.A-3 0.30 0.45 0.03 0.01 9.7
colum.A-4 0.30 0.45 0.03 0.01 15.5
colum.B-1 0.30 0.45 0.03 0.01 0
colum.B-2 0.30 0.45 0.03 0.01 5.3
colum.B-3 0.30 0.45 0.03 0.01 9.7
colum.B-4 0.30 0.45 0.03 0.01 15.5
colum.C-1 0.30 0.45 0.03 0.01 0
colum.C-2 0.30 0.45 0.03 0.01 5.3
colum.C-3 0.30 0.45 0.03 0.01 9.7
VIGA EJE-1 0
TRAMO AB 3.95 0.30 0.11 18.49 0
TRAMO BC 3.95 0.30 0.11 18.49 0
VIGA EJE-2 0
TRAMO AB 3.95 0.30 0.11 18.49 5.3
TRAMO BC 3.95 0.30 0.11 18.49 5.3
VIGA EJE-3 0
TRAMO AB 3.95 0.30 0.11 18.49 9.7
TRAMO BC 3.95 0.30 0.11 18.49 9.7
VIGA EJE-4 0
TRAMO AB 3.95 0.30 0.11 18.49 15.5
VIGA EJE-A 0
TRAMO 1-2 0.40 5.00 50.00 0.32 2.65
TRAMO 2-3 0.40 4.10 27.57 0.26 7.5
TRAMO 3-4 0.40 5.50 66.55 0.35 12.6
VIGA EJE-B 0
TRAMO 1-2 0.40 5.00 50.00 0.32 2.65
TRAMO 2-3 0.40 4.10 27.57 0.26 7.5
TRAMO 3-4 0.40 5.50 66.55 0.35 12.6
VIGA EJE-C 0
TRAMO 1-2 0.40 5.00 50.00 0.32 2.65
TRAMO 2-3 0.40 4.10 27.57 0.26 7.5
paño-1 4.10 5.00 512.50 344.61 2.65
paño-2 4.10 4.10 282.58 282.58 7.5
paño-3 4.10 5.50 682.14 379.07 12.6
paño-4 4.10 5.00 512.50 344.61 2.65
paño-5 4.10 4.10 282.58 282.58 7.5
MURO-1 5.00 0.25 0.08 31.25 2.65
MURO-2 4.10 0.25 0.06 17.23 7.5
MURO-6(A) 5.50 0.15 0.02 24.96 12.6
MURO-7 5.00 0.25 0.08 31.25 2.65
MURO-8 4.10 0.25 0.06 17.23 7.5
MURO-9 5.50 0.25 0.09 41.59 12.6
MURO-13(A) 0.15 3.95 9.24 0.01 9.7
MURO-14(A) 0.15 2.95 3.85 0.01 9.7
MURO-16 0.15 3.95 9.24 0.01 15.5
AREA
2661.87 1928.98
CENTRO DE RIGIDEZ :
X = 6.959
Y = 4.949
P*Y(tn-mts)
9.83664
9.83664
9.83664
9.83664
4.91832
4.91832
4.91832
4.91832
0
0
0
0
10.3356
2.8116
10.3356
2.8116
10.3356
2.8116
0
10.3356
2.8116
15.84
11.7216
17.7408
0
7.92
5.8608
8.8704
0
0
0
0
64.944
53.25408
71.4384
21.648
17.75136
23.8128
0
0
0
14.256
11.0484
16.038
59.4
48.708
65.34
2.5839
6.3261
21.1167
6.45165
21.1167
3.167505
21.1167
729.080535
P*Y(tn-mts)
5.55984
5.55984
5.55984
5.55984
2.77992
2.77992
2.77992
2.77992
0
0
0
8.26848
2.24928
8.26848
2.24928
8.26848
2.24928
0
8.26848
12.672
9.37728
14.19264
0
6.336
4.68864
7.09632
0
0
0
64.944
53.25408
71.4384
21.648
17.75136
0
0
2.2869
32.67
26.7894
35.937
0.821205
8.673885
2.463615
466.221525
Y
m X*BH3 Y*HB3
8.8 0.000 0.107
8.8 0.145 0.107
8.8 0.265 0.107
8.8 0.424 0.107
4.4 0.000 0.053
4.4 0.145 0.053
4.4 0.265 0.053
4.4 0.424 0.053
0 0.000 0.000
0 0.145 0.000
0 0.265 0.000
0 0.424 0.000
6.6 0.000 122.027
2.2 0.000 40.676
6.6 0.565 122.027
2.2 0.565 40.676
6.6 1.035 122.027
2.2 1.035 40.676
6.6 1.653 122.027
2.2 1.653 40.676
8.8 165.625 5.500
8.8 258.454 4.510
8.8 1048.163 6.050
4.4 165.625 2.750
4.4 258.454 2.255
4.4 1048.163 3.025
0 165.625 0.000
0 258.454 0.000
0 1048.163 0.000
6.6 1358.125 2274.393
6.6 2119.321 1865.002
6.6 8594.933 2501.832
2.2 1358.125 758.131
2.2 2119.321 621.667
2.2 8594.933 833.944
0 0.207 0.000
0 0.480 0.000
0 1.083 0.000
4.4 0.029 42.240
4.4 0.084 19.662
4.4 0.199 60.143
8.8 0.207 275.000
8.8 0.480 151.626
8.8 1.083 366.025
2.7 0.000 0.027
7.1 0.000 0.071
6.6 48.996 0.088
2.7 37.353 0.027
6.6 89.671 0.088
2.2 143.289 0.029
6.6 143.289 0.088
29036.939 10445.627
Y
m X*BH3 Y*HB3
8.8 0.000 0.107
8.8 0.145 0.107
8.8 0.265 0.107
8.8 0.424 0.107
4.4 0.000 0.053
4.4 0.145 0.053
4.4 0.265 0.053
4.4 0.424 0.053
0 0.000 0.000
0 0.145 0.000
0 0.265 0.000
0 0.424 0.000
6.6 0.000 122.027
2.2 0.000 40.676
6.6 0.565 122.027
2.2 0.565 40.676
6.6 1.035 122.027
2.2 1.035 40.676
6.6 1.653 122.027
2.2 1.653 40.676
8.8 165.625 5.500
8.8 258.454 4.510
8.8 1048.163 6.050
4.4 165.625 2.750
4.4 258.454 2.255
4.4 1048.163 3.025
0 165.625 0.000
0 258.454 0.000
0 1048.163 0.000
6.6 1358.125 2274.393
6.6 2119.321 1865.002
6.6 8594.933 2501.832
2.2 1358.125 758.131
2.2 2119.321 621.667
2.2 8594.933 833.944
0 0.207 0.000
0 0.480 0.000
0 1.083 0.000
4.4 0.029 42.240
4.4 0.084 19.662
4.4 0.199 60.143
0 0.207 0.000
0 0.480 0.000
0 1.083 0.000
2.2 0.000 0.029
6.6 0.000 0.088
6.6 48.996 0.088
2.7 37.353 0.027
6.6 89.671 0.088
2.2 143.289 0.029
6.6 143.289 0.088
29036.939 9652.995
Y
m X*BH3 Y*HB3
8.8 0.00 0.11
8.8 0.14 0.11
8.8 0.27 0.11
8.8 0.42 0.11
4.4 0.00 0.05
4.4 0.14 0.05
4.4 0.27 0.05
4.4 0.42 0.05
0 0.00 0.00
0 0.14 0.00
0 0.27 0.00
0 0.42 0.00
6.6 0.00 122.03
2.2 0.00 40.68
6.6 0.57 122.03
2.2 0.57 40.68
6.6 1.03 122.03
2.2 1.03 40.68
6.6 1.65 122.03
2.2 1.65 40.68
8.8 165.63 5.50
8.8 258.45 4.51
8.8 1048.16 6.05
4.4 165.63 2.75
4.4 258.45 2.26
4.4 1048.16 3.03
0 165.63 0.00
0 258.45 0.00
0 1048.16 0.00
6.6 1358.13 2274.39
6.6 2119.32 1865.00
6.6 8594.93 2501.83
2.2 1358.13 758.13
2.2 2119.32 621.67
2.2 8594.93 833.94
0 0.21 0.00
0 0.48 0.00
0 1.08 0.00
4.4 0.03 42.24
4.4 0.08 19.66
4.4 0.20 60.14
8.8 0.21 275.00
8.8 0.48 151.63
8.8 1.08 366.03
2.2 0.00 0.03
6.6 0.00 0.08
6.6 49.00 0.09
2.7 37.35 0.03
6.6 89.67 0.09
2.2 143.29 0.03
6.6 143.29 0.09
29036.94 10445.64
Y
m X*BH3 Y*HB3
8.8 0.00 0.11
8.8 0.14 0.11
8.8 0.27 0.11
8.8 0.42 0.11
4.4 0.00 0.05
4.4 0.14 0.05
4.4 0.27 0.05
4.4 0.42 0.05
0 0.00 0.00
0 0.14 0.00
0 0.27 0.00
0
6.6 0.00 122.03
2.2 0.00 40.68
0
6.6 0.57 122.03
2.2 0.57 40.68
6.6 1.03 122.03
2.2 1.03 40.68
0
6.6 1.65 122.03
0
8.8 132.50 2.82
8.8 206.76 2.31
8.8 838.53 3.10
0
4.4 132.50 1.41
4.4 206.76 1.15
4.4 838.53 1.55
0
0 132.50 0.00
0 206.76 0.00
6.6 1358.13 2274.39
6.6 2119.32 1865.00
6.6 8594.93 2501.83
2.2 1358.13 758.13
2.2 2119.32 621.67
0 0.21 0.00
0 0.48 0.00
4.4 0.23 109.81
8.8 0.21 275.00
8.8 0.48 151.63
8.8 1.08 366.03
2.2 89.67 0.03
6.6 37.35 0.07
6.6 143.29 0.09
18524.61 9546.78
Metrado cuatro niveles
Metrado cuatro niveles
Metrado cuatro niveles
Metrado cuatro niveles
Metrado cuatro niveles
Metrado cuatro niveles
Metrado cuatro niveles
Metrado cuatro niveles
Metrado cuatro niveles

Weitere ähnliche Inhalte

Ähnlich wie Metrado cuatro niveles

Mathcad 17-slab design
Mathcad   17-slab designMathcad   17-slab design
Mathcad 17-slab designmichael mutitu
 
METHOD OF EXTRAPOLATION FOR OBTAINING THE RESISTANCE
METHOD OF EXTRAPOLATION FOR OBTAINING THE RESISTANCEMETHOD OF EXTRAPOLATION FOR OBTAINING THE RESISTANCE
METHOD OF EXTRAPOLATION FOR OBTAINING THE RESISTANCEpragalath manickam
 
Sb bora dry-coolers-ver.1.2_en
Sb bora dry-coolers-ver.1.2_enSb bora dry-coolers-ver.1.2_en
Sb bora dry-coolers-ver.1.2_enYury Naumov
 
Sb bora dry-coolers-std-ver.1.2_en
Sb bora dry-coolers-std-ver.1.2_enSb bora dry-coolers-std-ver.1.2_en
Sb bora dry-coolers-std-ver.1.2_enYury Naumov
 
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSUMARDIONO .
 
Reguladora de Fluxo - SC3W Series Specifications - ckd corporation
Reguladora de Fluxo - SC3W Series Specifications - ckd corporation Reguladora de Fluxo - SC3W Series Specifications - ckd corporation
Reguladora de Fluxo - SC3W Series Specifications - ckd corporation Júlio Gengo
 
Iso 2768-tolerances drawings
Iso  2768-tolerances drawingsIso  2768-tolerances drawings
Iso 2768-tolerances drawingskumarkk1969
 
Bolt and weld_capacities
Bolt and weld_capacitiesBolt and weld_capacities
Bolt and weld_capacitiesJohneey Deep
 
Bolt and weld_capacities
Bolt and weld_capacitiesBolt and weld_capacities
Bolt and weld_capacitiesSiddiq Mohammed
 
[Tdb] vrf 360 cst for tk ver 1.0
[Tdb] vrf 360 cst for tk ver 1.0[Tdb] vrf 360 cst for tk ver 1.0
[Tdb] vrf 360 cst for tk ver 1.0Haluk TOSUN
 
Coates Hire - Trench Shoring Solutions
Coates Hire - Trench Shoring SolutionsCoates Hire - Trench Shoring Solutions
Coates Hire - Trench Shoring SolutionsRafi Tchopourian
 
Catalog 2023 | Integrix Optics | Optics Trade
Catalog 2023 | Integrix Optics | Optics TradeCatalog 2023 | Integrix Optics | Optics Trade
Catalog 2023 | Integrix Optics | Optics TradeOptics-Trade
 
Basic regression control blasting limits
Basic regression control blasting limitsBasic regression control blasting limits
Basic regression control blasting limitsPeter Krausz
 

Ähnlich wie Metrado cuatro niveles (20)

Mathcad 17-slab design
Mathcad   17-slab designMathcad   17-slab design
Mathcad 17-slab design
 
Diseño Plancha Extrema - End Plate
Diseño Plancha Extrema - End PlateDiseño Plancha Extrema - End Plate
Diseño Plancha Extrema - End Plate
 
METHOD OF EXTRAPOLATION FOR OBTAINING THE RESISTANCE
METHOD OF EXTRAPOLATION FOR OBTAINING THE RESISTANCEMETHOD OF EXTRAPOLATION FOR OBTAINING THE RESISTANCE
METHOD OF EXTRAPOLATION FOR OBTAINING THE RESISTANCE
 
Sb bora dry-coolers-ver.1.2_en
Sb bora dry-coolers-ver.1.2_enSb bora dry-coolers-ver.1.2_en
Sb bora dry-coolers-ver.1.2_en
 
Sb bora dry-coolers-std-ver.1.2_en
Sb bora dry-coolers-std-ver.1.2_enSb bora dry-coolers-std-ver.1.2_en
Sb bora dry-coolers-std-ver.1.2_en
 
sm ch2 open akan.pdf
sm ch2 open akan.pdfsm ch2 open akan.pdf
sm ch2 open akan.pdf
 
New grid design
New grid designNew grid design
New grid design
 
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
 
Mojtaba Hasanlu's Portfolios in Rotor
Mojtaba Hasanlu's Portfolios in RotorMojtaba Hasanlu's Portfolios in Rotor
Mojtaba Hasanlu's Portfolios in Rotor
 
Low Range Pressure Switches MA series
Low Range Pressure Switches MA seriesLow Range Pressure Switches MA series
Low Range Pressure Switches MA series
 
Low Range Pressure Switches MN series
Low Range Pressure Switches MN seriesLow Range Pressure Switches MN series
Low Range Pressure Switches MN series
 
Reguladora de Fluxo - SC3W Series Specifications - ckd corporation
Reguladora de Fluxo - SC3W Series Specifications - ckd corporation Reguladora de Fluxo - SC3W Series Specifications - ckd corporation
Reguladora de Fluxo - SC3W Series Specifications - ckd corporation
 
Iso 2768-tolerances drawings
Iso  2768-tolerances drawingsIso  2768-tolerances drawings
Iso 2768-tolerances drawings
 
Bolt and weld_capacities
Bolt and weld_capacitiesBolt and weld_capacities
Bolt and weld_capacities
 
Bolt and weld_capacities
Bolt and weld_capacitiesBolt and weld_capacities
Bolt and weld_capacities
 
Phy youngs modulus
Phy youngs modulusPhy youngs modulus
Phy youngs modulus
 
[Tdb] vrf 360 cst for tk ver 1.0
[Tdb] vrf 360 cst for tk ver 1.0[Tdb] vrf 360 cst for tk ver 1.0
[Tdb] vrf 360 cst for tk ver 1.0
 
Coates Hire - Trench Shoring Solutions
Coates Hire - Trench Shoring SolutionsCoates Hire - Trench Shoring Solutions
Coates Hire - Trench Shoring Solutions
 
Catalog 2023 | Integrix Optics | Optics Trade
Catalog 2023 | Integrix Optics | Optics TradeCatalog 2023 | Integrix Optics | Optics Trade
Catalog 2023 | Integrix Optics | Optics Trade
 
Basic regression control blasting limits
Basic regression control blasting limitsBasic regression control blasting limits
Basic regression control blasting limits
 

Kürzlich hochgeladen

ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxnelietumpap1
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 

Kürzlich hochgeladen (20)

ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 

Metrado cuatro niveles

  • 1. ANALISIS SISMO RESISTENTE(GUSTAVO ARANDA PALOMINO) COLUMNA: VIGAS(1ro,2do y 3er nivel): VIGAS(4to nivel): PERALTE = 0.45 m PERALTE: 0.5 m PERALTE: ANCHO = 0.3 m ANCHO: 0.3 m ANCHO: E= Lm(La distancia mayor en el sentido del techo)/25 Lm= E= 0.20952381 E= 0.2 m MURO= 0.15 MURO= 0.25 PESO ESP. DEL CONCRETO= 2.4 Tn/m3 PESO ESP. DEL LADRILLO= 1.8 Tn/m3 ALTURAS DE PISO A TECHO: metrado para columnas: h1= 4 m h1= 3.7 h2= 3 m h2= 3.2 h3= 3 m h3= 3.45 h4= 3.5 m h4= 1.95 TERCER NIVEL COLUMNA C-4: h= 1.7 DISTANCIA A EJES METRADO DE LOSAS: X Y L1= 5.3 PAÑO 1= 5 4.1 L2= 4.4 PAÑO 2= 4.1 4.1 L3= 5.8 PAÑO 3= 5.5 4.1 L4= 4.4 PAÑO 4= 5 4.1 L5= 4.4 PAÑO 5= 4.1 4.1 PAÑO 6= 5.5 4.1 elemento peralte(m) ancho(m) altura(m) peso esp.(tn/m3) colum.A-1 0.45 0.3 3.7 2.4 colum.A-2 0.45 0.3 3.7 2.4 colum.A-3 0.45 0.3 3.7 2.4 colum.A-4 0.45 0.3 3.7 2.4 colum.B-1 0.45 0.3 3.7 2.4 colum.B-2 0.45 0.3 3.7 2.4 colum.B-3 0.45 0.3 3.7 2.4 colum.B-4 0.45 0.3 3.7 2.4 colum.C-1 0.45 0.3 3.7 2.4 colum.C-2 0.45 0.3 3.7 2.4 colum.C-3 0.45 0.3 3.7 2.4 colum.C-4 0.45 0.3 3.7 2.4 METRADO DE COLUMNAS DEL SEGUNDO NIVEL elemento peralte(m) ancho(m) altura(m) peso esp.(tn/m3) colum.A-1 0.45 0.3 3.2 2.4 colum.A-2 0.45 0.3 3.2 2.4 colum.A-3 0.45 0.3 3.2 2.4 colum.A-4 0.45 0.3 3.2 2.4 colum.B-1 0.45 0.3 3.2 2.4 colum.B-2 0.45 0.3 3.2 2.4 DIMENSIONES DIMENSIONES
  • 2. colum.B-3 0.45 0.3 3.2 2.4 colum.B-4 0.45 0.3 3.2 2.4 colum.C-1 0.45 0.3 3.2 2.4 colum.C-2 0.45 0.3 3.2 2.4 colum.C-3 0.45 0.3 3.2 2.4 colum.C-4 0.45 0.3 3.2 2.4 METRADO DE COLUMNAS DEL TERCEL NIVEL DIMENSIONES elemento peralte(m) ancho(m) altura(m) peso esp.(tn/m3) colum.A-1 0.45 0.3 3.45 2.4 colum.A-2 0.45 0.3 3.45 2.4 colum.A-3 0.45 0.3 3.45 2.4 colum.A-4 0.45 0.3 3.45 2.4 colum.B-1 0.45 0.3 3.45 2.4 colum.B-2 0.45 0.3 3.45 2.4 colum.B-3 0.45 0.3 3.45 2.4 colum.B-4 0.45 0.3 3.45 2.4 colum.C-1 0.45 0.3 3.45 2.4 colum.C-2 0.45 0.3 3.45 2.4 colum.C-3 0.45 0.3 3.45 2.4 colum.C-4 0.45 0.3 1.7 2.4 METRADO DE COLUMNAS DEL CUARTO NIVEL DIMENSIONES elemento peralte(m) ancho(m) altura(m) peso esp.(tn/m3) colum.A-1 0.45 0.3 1.95 2.4 colum.A-2 0.45 0.3 1.95 2.4 colum.A-3 0.45 0.3 1.95 2.4 colum.A-4 0.45 0.3 1.95 2.4 colum.B-1 0.45 0.3 1.95 2.4 colum.B-2 0.45 0.3 1.95 2.4 colum.B-3 0.45 0.3 1.95 2.4 colum.B-4 0.45 0.3 1.95 2.4 colum.C-1 0.45 0.3 1.95 2.4 colum.C-2 0.45 0.3 1.95 2.4 colum.C-3 0.45 0.3 1.95 2.4 elemento longitud(m) elemento longitud(m) VIGA EJE-1 VIGA EJE-A
  • 3. TRAMO AB= 4.35 TRAMO 1-2 5 TRAMO BC= 3.55 TRAMO 2-3 3.7 VIGA EJE-2 TRAMO 3-4 5.6 TRAMO AB= 4.35 VIGA EJE-B TRAMO BC= 3.55 TRAMO 1-2 5 VIGA EJE-3 TRAMO 2-3 3.7 TRAMO AB= 4.35 TRAMO 3-4 5.6 TRAMO BC= 3.55 VIGA EJE-C VIGA EJE-4 TRAMO 1-2 5 TRAMO AB= 4.35 TRAMO 2-3 3.7 TRAMO BC= 3.55 TRAMO 3-4 5.6 METRADO DE VIGAS DEL PRIMER NIVEL DIMENSIONES elemento peralte(m) ancho(m) longitud(m) peso esp.(tn/m3) VIGA EJE-1 TRAMO AB 0.5 0.3 4.35 2.4 TRAMO BC 0.5 0.3 3.55 2.4 VIGA EJE-2 TRAMO AB 0.5 0.3 4.35 2.4 TRAMO BC 0.5 0.3 3.55 2.4 VIGA EJE-3 TRAMO AB 0.5 0.3 4.35 2.4 TRAMO BC 0.5 0.3 3.55 2.4 VIGA EJE-4 TRAMO AB 0.5 0.3 4.35 2.4 TRAMO BC 0.5 0.3 3.55 2.4 VIGA EJE-A TRAMO 1-2 0.5 0.3 5 2.4 TRAMO 2-3 0.5 0.3 3.7 2.4 TRAMO 3-4 0.5 0.3 5.6 2.4 VIGA EJE-B TRAMO 1-2 0.5 0.3 5 2.4 TRAMO 2-3 0.5 0.3 3.7 2.4 TRAMO 3-4 0.5 0.3 5.6 2.4 VIGA EJE-C TRAMO 1-2 0.5 0.3 5 2.4 TRAMO 2-3 0.5 0.3 3.7 2.4 TRAMO 3-4 0.5 0.3 5.6 2.4
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. O ARANDA PALOMINO) VIGAS(4to nivel): METRADO DE VIGAS DEL SEGUNDO NIVEL 0.4 m DIMENSIONES 0.3 m elemento peralte(m) ancho(m) VIGA EJE-1 4.4 m TRAMO AB 0.5 0.3 TRAMO BC 0.5 0.3 VIGA EJE-2 TRAMO AB 0.5 0.3 TRAMO BC 0.5 0.3 VIGA EJE-3 TRAMO AB 0.5 0.3 TRAMO BC 0.5 0.3 VIGA EJE-4 TRAMO AB 0.5 0.3 TRAMO BC 0.5 0.3 VIGA EJE-A TRAMO 1-2 0.5 0.3 TRAMO 2-3 0.5 0.3 TRAMO 3-4 0.5 0.3 VIGA EJE-B TRAMO 1-2 0.5 0.3 TRAMO 2-3 0.5 0.3 TRAMO 3-4 0.5 0.3 VIGA EJE-C TRAMO 1-2 0.5 0.3 peso(tn) TRAMO 2-3 0.5 0.3 1.1988 TRAMO 3-4 0.5 0.3 1.1988 1.1988 1.1988 1.1988 METRADO DE VIGAS DEL TERCER NIVEL 1.1988 DIMENSIONES 1.1988 elemento peralte(m) ancho(m) 1.1988 VIGA EJE-1 1.1988 TRAMO AB 0.5 0.3 1.1988 TRAMO BC 0.5 0.3 1.1988 VIGA EJE-2 1.1988 TRAMO AB 0.5 0.3 14.3856 TRAMO BC 0.5 0.3 VIGA EJE-3 TRAMO AB 0.5 0.3 TRAMO BC 0.5 0.3 VIGA EJE-4 peso(tn) TRAMO AB 0.5 0.3 1.0368 TRAMO BC 0.5 0.3 1.0368 VIGA EJE-A 1.0368 TRAMO 1-2 0.5 0.3 1.0368 TRAMO 2-3 0.5 0.3 1.0368 TRAMO 3-4 0.5 0.3 1.0368 VIGA EJE-B
  • 12. 1.0368 TRAMO 1-2 0.5 0.3 1.0368 TRAMO 2-3 0.5 0.3 1.0368 TRAMO 3-4 0.5 0.3 1.0368 VIGA EJE-C 1.0368 TRAMO 1-2 0.5 0.3 1.0368 TRAMO 2-3 0.5 0.3 12.4416 TRAMO 3-4 0.5 0.3 METRADO DE VIGAS DEL CUARTO NIVEL DIMENSIONES elemento peralte(m) ancho(m) VIGA EJE-1 TRAMO AB 0.4 0.3 peso(tn) TRAMO BC 0.4 0.3 1.1178 VIGA EJE-2 1.1178 TRAMO AB 0.4 0.3 1.1178 TRAMO BC 0.4 0.3 1.1178 VIGA EJE-3 1.1178 TRAMO AB 0.4 0.3 1.1178 TRAMO BC 0.4 0.3 1.1178 VIGA EJE-4 1.1178 TRAMO AB 0.4 0.3 1.1178 VIGA EJE-A 1.1178 TRAMO 1-2 0.4 0.3 1.1178 TRAMO 2-3 0.4 0.3 0.5508 TRAMO 3-4 0.4 0.3 12.8466 VIGA EJE-B TRAMO 1-2 0.4 0.3 TRAMO 2-3 0.4 0.3 TRAMO 3-4 0.4 0.3 VIGA EJE-C TRAMO 1-2 0.4 0.3 TRAMO 2-3 0.4 0.3 peso(tn) 0.63 0.63 0.63 METRADO DE LOSA 0.63 0.63 METRADO DE LOSA DEL PRIMER NIVEL 0.63 DIMENSIONES 0.63 elemento LONG.X(m) LONG.Y(m) 0.63 paño-1 5 4.1 0.63 paño-2 4.1 4.1 0.63 paño-3 5.5 4.1 0.63 paño-4 5 4.1 6.95 paño-5 4.1 4.1 paño-6 5.5 4.1
  • 13. METRADO DE LOSA DEL SEGUNDO NIVEL DIMENSIONES elemento LONG.X(m) LONG.Y(m) paño-1 5 4.1 paño-2 4.1 4.1 paño-3 5.5 4.1 paño-4 5 4.1 paño-5 4.1 4.1 paño-6 5.5 4.1 peso(tn) 1.566 1.278 1.566 1.278 1.566 1.278 1.566 1.278 1.8 1.332 2.016 1.8 1.332 2.016 1.8 1.332 2.016 26.82
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21. METRADO DE VIGAS DEL SEGUNDO NIVEL METRADO DE LOSA DEL longitud(m) peso esp.(tn/m3) peso(tn) elemento 4.35 2.4 1.566 paño-1 3.55 2.4 1.278 paño-2 paño-3 4.35 2.4 1.566 paño-4 3.55 2.4 1.278 paño-5 paño-6 4.35 2.4 1.566 3.55 2.4 1.278 4.35 2.4 1.566 METRADO DE LOSA DEL C 3.55 2.4 1.278 elemento 5 2.4 1.8 paño-1 3.7 2.4 1.332 paño-2 5.6 2.4 2.016 paño-3 paño-4 5 2.4 1.8 paño-5 3.7 2.4 1.332 5.6 2.4 2.016 5 2.4 1.8 MURO-1= 3.7 2.4 1.332 MURO-2= 5.6 2.4 2.016 MURO-3= 26.82 MURO-4= MURO-5= MURO-6= METRADO DE VIGAS DEL TERCER NIVEL MURO-6(A)= MURO-7= longitud(m) peso esp.(tn/m3) peso(tn) MURO-8= MURO-9= 4.35 2.4 1.566 3.55 2.4 1.278 h= 1 m 4.35 2.4 1.566 h(1er nivel)= 3.7 m = 3.55 2.4 1.278 h(2do nivel)= 2.7 m = h(3er nivel)= 2.7 m = 4.35 2.4 1.566 h(4to nivel)= 3.3 m = 3.55 2.4 1.278 M3 Y M15 DEL TERCER NIVEL(h)= 4.35 2.4 1.566 ANCHO DE LOS MUROS: 3.55 2.4 1.278 M1,M2,M3,M7,M8,M9= 0.25 5 2.4 1.8 M4,M5,M6,M6(A),M10,M10(A),M11,M11(A),M12,M13,M13(A),M14,M14 3.7 2.4 1.332 5.6 2.4 2.016 M6(A),M13(A) Y M16 DEL CUARTO NIVEL(h)=
  • 22. 5 2.4 1.8 3.7 2.4 1.332 5.6 2.4 2.016 5 2.4 1.8 3.7 2.4 1.332 5.6 2.4 2.016 26.82 VIGAS DEL CUARTO NIVEL longitud(m) peso esp.(tn/m3) peso(tn) elemento 4.35 2.4 1.2528 MURO-1 3.55 2.4 1.0224 MURO-2 MURO-3 4.35 2.4 1.2528 MURO-4 3.55 2.4 1.0224 MURO-5 MURO-6 4.35 2.4 1.2528 MURO-7 3.55 2.4 1.0224 MURO-8 MURO-9 4.35 2.4 1.2528 MURO-10 MURO-11 5 2.4 1.44 MURO-12 3.7 2.4 1.0656 MURO-13 5.6 2.4 1.6128 MURO-14 MURO-15 5 2.4 1.44 MURO-16 3.7 2.4 1.0656 5.6 2.4 1.6128 5 2.4 1.44 3.7 2.4 1.0656 18.8208 METRADO DE LOSA elemento AREA(m2) Qd(tn/m2) peso(tn) MURO-1 20.5 0.48 9.84 MURO-2 16.81 0.48 8.0688 MURO-3 22.55 0.48 10.824 MURO-4 20.5 0.48 9.84 MURO-5 16.81 0.48 8.0688 MURO-6 22.55 0.48 10.824 MURO-7 119.72 57.4656 MURO-8 MURO-9
  • 23. MURO-10(A) MURO-11(A) ADO DE LOSA DEL SEGUNDO NIVEL MURO-12 MURO-13 AREA(m2) Qd(tn/m2) peso(tn) MURO-14 20.5 0.48 9.84 MURO-15 16.81 0.48 8.0688 MURO-16 22.55 0.48 10.824 20.5 0.48 9.84 16.81 0.48 8.0688 22.55 0.48 10.824 119.72 57.4656 elemento MURO-1 MURO-2 MURO-3 MURO-4 MURO-5 MURO-6 MURO-7 MURO-8 MURO-9 MURO-10 MURO-11 MURO-12 MURO-13 MURO-14 MURO-15 MURO-16 METRADO DE MUROS D elemento MURO-1 MURO-2 MURO-6(A)
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31. METRADO DE LOSA DEL TERCER NIVEL DIMENSIONES LONG.X(m) LONG.Y(m) AREA(m2) Qd(tn/m2) peso(tn) 5 4.1 20.5 0.48 9.84 4.1 4.1 16.81 0.48 8.0688 5.5 4.1 22.55 0.48 10.824 5 4.1 20.5 0.48 9.84 4.1 4.1 16.81 0.48 8.0688 5.5 4.1 22.55 0.48 10.824 119.72 57.4656 METRADO DE LOSA DEL CUARTO NIVEL DIMENSIONES LONG.X(m) LONG.Y(m) AREA(m2) Qd(tn/m2) peso(tn) 5 4.1 20.5 0.48 9.84 4.1 4.1 16.81 0.48 8.0688 5.5 4.1 22.55 0.48 10.824 5 4.1 20.5 0.48 9.84 4.1 4.1 16.81 0.48 8.0688 97.17 46.6416 longitud(m) longitud(m) 5 MURO-10= 2.95 4.1 MURO-10(A)= 3.95 5.5 MURO-11= 2.95 4 MURO-11(A)= 3.95 3.1 MURO-12= 3.95 4.5 MURO-13= 2.95 5.5 MURO-13(A)= 3.95 5 MURO-14= 3.95 4.1 MURO-14(A)= 2.95 5.5 MURO-15= 3.95 MURO-16= 3.95 3.2 m 2.7 m VENTANA 4TO NIVEL: 3 m hv= 1.3 m 1.65 m 1.35 m m A),M11,M11(A),M12,M13,M13(A),M14,M14(A),M15,M16= 0.15 m Y M16 DEL CUARTO NIVEL(h)= 0.35
  • 32. METRADO DE MUROS DEL PRIMER NIVEL DIMENSIONES ANCHO(m) ALTO(m) longitud(m) peso esp.(tn/m3) peso(tn) 0.25 3.2 5 1.8 7.2 0.25 3.2 4.1 1.8 5.904 0.25 3.2 5.5 1.8 7.92 0.15 3.2 4 1.8 3.456 0.15 3.2 3.1 1.8 2.6784 0.15 3.2 4.5 1.8 3.888 0.25 3.2 5 1.8 7.2 0.25 3.2 4.1 1.8 5.904 0.25 3.2 5.5 1.8 7.92 0.15 1 2.95 1.8 0.7965 0.15 1 2.95 1.8 0.7965 0.15 3.2 3.95 1.8 3.4128 0.15 3.2 2.95 1.8 2.5488 0.15 3.2 3.95 1.8 3.4128 0.15 3.2 3.95 1.8 3.4128 0.15 3.2 3.95 1.8 3.4128 69.8634 METRADO DE MUROS DEL SEGUNDO NIVEL DIMENSIONES ANCHO(m) ALTO(m) longitud(m) peso esp.(tn/m3) peso(tn) 0.25 2.7 5 1.8 6.075 0.25 2.7 4.1 1.8 4.9815 0.25 2.7 5.5 1.8 6.6825 0.15 2.7 4 1.8 2.916 0.15 2.7 3.1 1.8 2.2599 0.15 2.7 4.5 1.8 3.2805 0.25 2.7 5 1.8 6.075 0.25 2.7 4.1 1.8 4.9815 0.25 2.7 5.5 1.8 6.6825
  • 33. 0.15 1 3.95 1.8 1.0665 0.15 1 3.95 1.8 1.0665 0.15 2.7 3.95 1.8 2.87955 0.15 2.7 2.95 1.8 2.15055 0.15 2.7 3.95 1.8 2.87955 0.15 2.7 3.95 1.8 2.87955 0.15 2.7 3.95 1.8 2.87955 59.73615 METRADO DE MUROS DEL TERCER NIVEL DIMENSIONES ANCHO(m) ALTO(m) longitud(m) peso esp.(tn/m3) peso(tn) 0.25 3 5.0 1.8 6.75 0.25 3 4.1 1.8 5.535 0.25 1.35 5.5 1.8 3.34125 0.15 3 4.0 1.8 3.24 0.15 3 3.1 1.8 2.511 0.15 3 4.5 1.8 3.645 0.25 3 5.0 1.8 6.75 0.25 3 4.1 1.8 5.535 0.25 3 5.5 1.8 7.425 0.15 1 4.4 1.8 1.1745 0.15 1 3.6 1.8 0.9585 0.15 3 4.0 1.8 3.1995 0.15 3 3.0 1.8 2.3895 0.15 3 4.0 1.8 3.1995 0.15 1.35 4.0 1.8 1.439775 0.15 3 4.0 1.8 3.1995 60.293025 METRADO DE MUROS DEL CUARTO NIVEL DIMENSIONES ANCHO(m) ALTO(m) longitud(m) peso esp.(tn/m3) peso(tn) 0.25 1.65 5 1.8 3.7125 0.25 1.65 4.1 1.8 3.04425 0.15 0.35 5.5 1.8 0.51975
  • 34. 0.25 1.65 5 1.8 3.7125 0.25 1.65 4.1 1.8 3.04425 0.25 1.65 5.5 1.8 4.08375 0.15 0.35 3.95 1.8 0.373275 0.15 1.65 2.95 1.8 1.314225 0.15 0.35 3.95 1.8 0.373275 20.177775 paño-4 paño-5 paño-6 MURO-1 MURO-2 MURO-3 MURO-4 MURO-5 MURO-6 MURO-7 MURO-8 MURO-9 MURO-10(A) MURO-11(A) MURO-12 MURO-13 MURO-14 MURO-15 MURO-16 XG= YG=
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41. PESO DE CARGA MUERTA DE LA ESTRUCTURA ELEMENTOS 1ER NIVEL 2DO NIVEL 3er NIVEL 4to NIVEL peso(tn) COLUMNAS 14.3856 12.4416 12.8466 6.9498 46.6236 VIGAS 0 26.82 26.82 18.8208 72.4608 LOSA 57.4656 57.4656 57.4656 46.6416 219.0384 MUROS 69.8634 59.73615 60.293025 20.177775 210.07035 141.7146 156.46335 157.425225 92.589975 548.19315 PESO DE CARGA VIVA DE LA ESTRUCTURA ELEMENTOS AREA(m2) S/C(Tn/m2) peso(tn) 1ER NIVEL 119.72 0.5 59.86 2DO NIVEL 119.72 0.5 59.86 3er NIVEL 119.72 0.4 47.888 4to NIVEL 97.17 0.15 14.5755 456.33 182.1835 %S/C(Tn)= 25%66.155 PESO TOTAL DE LA ESTRUCTURA ELEMENTOS C. MUERTA %S/C(Tn) peso(tn) 1ER NIVEL 141.7146 14.965 156.6796 2DO NIVEL 156.46335 14.965 171.42835 3er NIVEL 157.425225 11.972 169.397225 4to NIVEL 92.589975 3.643875 96.23385 593.739025 %S/C(Tn)= 25%66.155
  • 42. CALCULO DEL CENTRO DE MASA PRIMER NIVEL CENTRO DE GRAVEDAD ELEMENTO PESO(tn) X(mts) Y(mts) P*X(tn-mts) P*Y(tn-mts) colum.A-1 1.1988 0 8.8 0 10.54944 colum.A-2 1.1988 5.3 8.8 6.35364 10.54944 colum.A-3 1.1988 9.7 8.8 11.62836 10.54944 colum.A-4 1.1988 15.5 8.8 18.5814 10.54944 colum.B-1 1.1988 0 4.4 0 5.27472 colum.B-2 1.1988 5.3 4.4 6.35364 5.27472 colum.B-3 1.1988 9.7 4.4 11.62836 5.27472 colum.B-4 1.1988 15.5 4.4 18.5814 5.27472 colum.C-1 1.1988 0 0 0 0 colum.C-2 1.1988 5.3 0 6.35364 0 colum.C-3 1.1988 9.7 0 11.62836 0 colum.C-4 1.1988 15.5 0 18.5814 0 VIGA EJE-1 TRAMO AB 1.566 0 6.6 0 10.3356 TRAMO BC 1.278 0 2.2 0 2.8116 VIGA EJE-2 TRAMO AB 1.566 5.3 6.6 8.2998 10.3356 TRAMO BC 1.278 5.3 2.2 6.7734 2.8116 VIGA EJE-3 TRAMO AB 1.566 9.7 6.6 15.1902 10.3356 TRAMO BC 1.278 9.7 2.2 12.3966 2.8116 VIGA EJE-4 0 0 TRAMO AB 1.566 15.5 6.6 24.273 10.3356 TRAMO BC 1.278 15.5 2.2 19.809 2.8116 VIGA EJE-A 0 0 TRAMO 1-2 1.8 2.65 8.8 4.77 15.84 TRAMO 2-3 1.332 7.5 8.8 9.99 11.7216 TRAMO 3-4 2.016 12.6 8.8 25.4016 17.7408 VIGA EJE-B 0 0 TRAMO 1-2 0 2.65 4.4 0 0 TRAMO 2-3 0 7.5 4.4 0 0 TRAMO 3-4 2.016 12.6 4.4 25.4016 8.8704 VIGA EJE-C 0 0 TRAMO 1-2 1.8 2.65 0 4.77 0 TRAMO 2-3 1.332 7.5 0 9.99 0 TRAMO 3-4 2.016 12.6 0 25.4016 0
  • 43. paño-1 9.84 2.65 6.6 26.076 64.944 paño-2 8.0688 7.5 6.6 60.516 53.25408 paño-3 10.824 12.6 6.6 136.3824 71.4384 paño-4 9.84 2.65 2.2 26.076 21.648 paño-5 8.0688 7.5 2.2 60.516 17.75136 paño-6 10.824 12.6 2.2 136.3824 23.8128 MURO-1 7.2 2.65 0 19.08 0 MURO-2 5.904 7.5 0 44.28 0 MURO-3 7.92 12.6 0 99.792 0 MURO-4 3.456 2.15 4.4 7.4304 15.2064 MURO-5 2.6784 8 4.4 21.4272 11.78496 MURO-6 3.888 13.1 4.4 50.9328 17.1072 MURO-7 7.2 2.65 8.8 19.08 63.36 MURO-8 5.904 7.5 8.8 44.28 51.9552 MURO-9 7.92 12.6 8.8 99.792 69.696 MURO-10 0.7965 0 2.7 0 2.15055 MURO-11 0.7965 0 7.1 0 5.65515 MURO-12 3.4128 5.3 6.6 18.08784 22.52448 MURO-13 2.5488 9.7 2.7 24.72336 6.88176 MURO-14 3.4128 9.7 6.6 33.10416 22.52448 MURO-15 3.4128 15.5 2.2 52.8984 7.50816 MURO-16 3.4128 15.5 6.6 52.8984 22.52448 165.4026 1335.91236 741.7857 XG= 8.07673132 YG= 4.48472817 CALCULO DEL CENTRO DE MASA SEGUNDO NIVEL CENTRO DE GRAVEDAD ELEMENTO PESO(tn) X(mts) Y(mts) P*X(tn-mts) P*Y(tn-mts) colum.A-1 1.0368 0 8.8 0 9.12384 colum.A-2 1.0368 5.3 8.8 5.49504 9.12384 colum.A-3 1.0368 9.7 8.8 10.05696 9.12384 colum.A-4 1.0368 15.5 8.8 16.0704 9.12384 colum.B-1 1.0368 0 4.4 0 4.56192 colum.B-2 1.0368 5.3 4.4 5.49504 4.56192 colum.B-3 1.0368 9.7 4.4 10.05696 4.56192 colum.B-4 1.0368 15.5 4.4 16.0704 4.56192 colum.C-1 1.0368 0 0 0 0 colum.C-2 1.0368 5.3 0 5.49504 0 colum.C-3 1.0368 9.7 0 10.05696 0 colum.C-4 1.0368 15.5 0 16.0704 0 VIGA EJE-1 TRAMO AB 1.566 0 6.6 0 10.3356 TRAMO BC 1.278 0 2.2 0 2.8116 VIGA EJE-2 TRAMO AB 1.566 5.3 6.6 8.2998 10.3356
  • 44. TRAMO BC 1.278 5.3 2.2 6.7734 2.8116 VIGA EJE-3 TRAMO AB 1.566 9.7 6.6 15.1902 10.3356 TRAMO BC 1.278 9.7 2.2 12.3966 2.8116 VIGA EJE-4 TRAMO AB 1.566 15.5 6.6 24.273 10.3356 TRAMO BC 1.278 15.5 2.2 19.809 2.8116 VIGA EJE-A TRAMO 1-2 1.8 2.65 8.8 4.77 15.84 TRAMO 2-3 1.332 7.5 8.8 9.99 11.7216 TRAMO 3-4 2.016 12.6 8.8 25.4016 17.7408 VIGA EJE-B TRAMO 1-2 1.8 2.65 4.4 4.77 7.92 TRAMO 2-3 1.332 7.5 4.4 9.99 5.8608 TRAMO 3-4 2.016 12.6 4.4 25.4016 8.8704 VIGA EJE-C 0 0 TRAMO 1-2 1.8 2.65 0 4.77 0 TRAMO 2-3 1.332 7.5 0 9.99 0 TRAMO 3-4 2.016 12.6 0 25.4016 0 paño-1 9.84 2.65 6.6 26.076 64.944 paño-2 8.0688 7.5 6.6 60.516 53.25408 paño-3 10.824 12.6 6.6 136.3824 71.4384 paño-4 9.84 2.65 2.2 26.076 21.648 paño-5 8.0688 7.5 2.2 60.516 17.75136 paño-6 10.824 12.6 2.2 136.3824 23.8128 MURO-1 6.075 2.65 0 16.09875 0 MURO-2 4.9815 7.5 0 37.36125 0 MURO-3 6.6825 12.6 0 84.1995 0 MURO-4 2.916 2.15 4.4 6.2694 12.8304 MURO-5 2.2599 8 4.4 18.0792 9.94356 MURO-6 3.2805 13.1 4.4 42.97455 14.4342 MURO-7 6.075 2.65 0 16.09875 0 MURO-8 4.9815 7.5 0 37.36125 0 MURO-9 6.6825 12.6 0 84.1995 0 MURO-10(A) 1.0665 0 2.2 0 2.3463 MURO-11(A) 1.0665 0 6.6 0 7.0389 MURO-12 2.87955 5.3 6.6 15.261615 19.00503 MURO-13 2.15055 9.7 2.7 20.860335 5.806485 MURO-14 2.87955 9.7 6.6 27.931635 19.00503 MURO-15 2.87955 15.5 2.2 44.633025 6.33501 MURO-16 2.87955 15.5 6.6 44.633025 19.00503 156.46335 1244.00459 543.884025 XG= 7.95077304 YG= 3.47611134
  • 46. colum.B-3 colum.B-4 colum.C-1 colum.C-2 colum.C-3 colum.C-4 VIGA EJE-1 TRAMO AB TRAMO BC VIGA EJE-2 TRAMO AB TRAMO BC VIGA EJE-3 TRAMO AB TRAMO BC VIGA EJE-4 TRAMO AB TRAMO BC VIGA EJE-A TRAMO 1-2 TRAMO 2-3 TRAMO 3-4 VIGA EJE-B TRAMO 1-2 TRAMO 2-3 TRAMO 3-4 VIGA EJE-C TRAMO 1-2 TRAMO 2-3 TRAMO 3-4 paño-1 paño-2 paño-3 paño-4 paño-5 paño-6 MURO-1 MURO-2 MURO-3 MURO-4 MURO-5 MURO-6 MURO-7 MURO-8 MURO-9 MURO-10(A) MURO-11(A) MURO-12 MURO-13 MURO-14 MURO-15 MURO-16
  • 47. CALCULO ELEMENTO colum.A-1 colum.A-2 colum.A-3 colum.A-4 colum.B-1 colum.B-2 colum.B-3 colum.B-4 colum.C-1 colum.C-2 colum.C-3 colum.C-4 VIGA EJE-1 TRAMO AB TRAMO BC VIGA EJE-2 TRAMO AB TRAMO BC VIGA EJE-3 TRAMO AB TRAMO BC VIGA EJE-4 TRAMO AB TRAMO BC VIGA EJE-A TRAMO 1-2 TRAMO 2-3 TRAMO 3-4 VIGA EJE-B
  • 48. TRAMO 1-2 TRAMO 2-3 TRAMO 3-4 VIGA EJE-C TRAMO 1-2 TRAMO 2-3 TRAMO 3-4 paño-1 paño-2 paño-3 paño-4 paño-5 paño-6 MURO-1 MURO-2 MURO-3 MURO-4 MURO-5 MURO-6 MURO-7 MURO-8 MURO-9 MURO-10(A) MURO-11(A) MURO-12 MURO-13 MURO-14 MURO-15 MURO-16 CALCULO
  • 49. ELEMENTO colum.A-1 colum.A-2 colum.A-3 colum.A-4 colum.B-1 colum.B-2 colum.B-3 colum.B-4 colum.C-1 colum.C-2 colum.C-3 VIGA EJE-1 TRAMO AB TRAMO BC VIGA EJE-2 TRAMO AB TRAMO BC VIGA EJE-3 TRAMO AB TRAMO BC VIGA EJE-4 TRAMO AB VIGA EJE-A TRAMO 1-2 TRAMO 2-3 TRAMO 3-4 VIGA EJE-B TRAMO 1-2 TRAMO 2-3 TRAMO 3-4 VIGA EJE-C TRAMO 1-2 TRAMO 2-3 paño-1 paño-2 paño-3 paño-4 paño-5 MURO-1 MURO-2 MURO-6(A) MURO-7 MURO-8 MURO-9 MURO-13(A) MURO-14(A) MURO-16
  • 50.
  • 51. CALCULO DEL CENTRO DE MASA TERCER NIVEL CENTRO DE GRAVEDAD ELEMENTO PESO(tn) X(mts) Y(mts) P*X(tn-mts) colum.A-1 1.1178 0 8.8 0 colum.A-2 1.1178 5.3 8.8 5.92434 colum.A-3 1.1178 9.7 8.8 10.84266 colum.A-4 1.1178 15.5 8.8 17.3259 colum.B-1 1.1178 0 4.4 0 colum.B-2 1.1178 5.3 4.4 5.92434 colum.B-3 1.1178 9.7 4.4 10.84266 colum.B-4 1.1178 15.5 4.4 17.3259 colum.C-1 1.1178 0 0 0 colum.C-2 1.1178 5.3 0 5.92434 colum.C-3 1.1178 9.7 0 10.84266 colum.C-4 0.5508 15.5 0 8.5374 VIGA EJE-1 TRAMO AB 1.566 0 6.6 0 TRAMO BC 1.278 0 2.2 0 VIGA EJE-2 TRAMO AB 1.566 5.3 6.6 8.2998 TRAMO BC 1.278 5.3 2.2 6.7734 VIGA EJE-3 TRAMO AB 1.566 9.7 6.6 15.1902 TRAMO BC 1.278 9.7 2.2 12.3966 VIGA EJE-4 0 TRAMO AB 1.566 15.5 6.6 24.273 TRAMO BC 1.278 15.5 2.2 19.809 VIGA EJE-A TRAMO 1-2 1.8 2.65 8.8 4.77 TRAMO 2-3 1.332 7.5 8.8 9.99 TRAMO 3-4 2.016 12.6 8.8 25.4016 VIGA EJE-B 0 TRAMO 1-2 1.8 2.65 4.4 4.77 TRAMO 2-3 1.332 7.5 4.4 9.99 TRAMO 3-4 2.016 12.6 4.4 25.4016 VIGA EJE-C 0 TRAMO 1-2 1.8 2.65 0 4.77 TRAMO 2-3 1.332 7.5 0 9.99 TRAMO 3-4 2.016 12.6 0 25.4016 paño-1 9.84 2.65 6.6 26.076 paño-2 8.0688 7.5 6.6 60.516 paño-3 10.824 12.6 6.6 136.3824 paño-4 9.84 2.65 2.2 26.076 paño-5 8.0688 7.5 2.2 60.516 paño-6 10.824 12.6 2.2 136.3824 MURO-1 6.75 2.65 0 17.8875 MURO-2 5.535 7.5 0 41.5125 MURO-3 3.34125 12.6 0 42.09975 MURO-4 3.24 2.15 4.4 6.966
  • 52. MURO-5 2.511 8 4.4 20.088 MURO-6 3.645 13.1 4.4 47.7495 MURO-7 6.75 2.65 8.8 17.8875 MURO-8 5.535 7.5 8.8 41.5125 MURO-9 7.425 12.6 8.8 93.555 MURO-10(A) 1.1745 0 2.2 0 MURO-11(A) 0.9585 0 6.6 0 MURO-12 3.1995 5.3 6.6 16.95735 MURO-13 2.3895 9.7 2.7 23.17815 MURO-14 3.1995 9.7 6.6 31.03515 MURO-15 1.439775 15.5 2.2 22.3165125 MURO-16 3.1995 15.5 6.6 49.59225 157.425225 1219.00346 XG= 7.74338079 YG= 4.63128152 CALCULO DEL CENTRO DE MASA CUARTO NIVEL CENTRO DE GRAVEDAD ELEMENTO PESO(tn) X(mts) Y(mts) P*X(tn-mts) colum.A-1 0.6318 0 8.8 0 colum.A-2 0.6318 5.3 8.8 3.34854 colum.A-3 0.6318 9.7 8.8 6.12846 colum.A-4 0.6318 15.5 8.8 9.7929 colum.B-1 0.6318 0 4.4 0 colum.B-2 0.6318 5.3 4.4 3.34854 colum.B-3 0.6318 9.7 4.4 6.12846 colum.B-4 0.6318 15.5 4.4 9.7929 colum.C-1 0.6318 0 0 0 colum.C-2 0.6318 5.3 0 3.34854 colum.C-3 0.6318 9.7 0 6.12846 VIGA EJE-1 TRAMO AB 1.2528 0 6.6 0 TRAMO BC 1.0224 0 2.2 0 VIGA EJE-2 TRAMO AB 1.2528 5.3 6.6 6.63984 TRAMO BC 1.0224 5.3 2.2 5.41872 VIGA EJE-3 TRAMO AB 1.2528 9.7 6.6 12.15216 TRAMO BC 1.0224 9.7 2.2 9.91728 VIGA EJE-4 0 TRAMO AB 1.2528 15.5 6.6 19.4184 VIGA EJE-A TRAMO 1-2 1.44 2.65 8.8 3.816 TRAMO 2-3 1.0656 7.5 8.8 7.992
  • 53. TRAMO 3-4 1.6128 12.6 8.8 20.32128 VIGA EJE-B 0 TRAMO 1-2 1.44 2.65 4.4 3.816 TRAMO 2-3 1.0656 7.5 4.4 7.992 TRAMO 3-4 1.6128 12.6 4.4 20.32128 VIGA EJE-C 0 TRAMO 1-2 1.44 2.65 0 3.816 TRAMO 2-3 1.0656 7.5 0 7.992 paño-1 9.84 2.65 6.6 26.076 paño-2 8.0688 7.5 6.6 60.516 paño-3 10.824 12.6 6.6 136.3824 paño-4 9.84 2.65 2.2 26.076 paño-5 8.0688 7.5 2.2 60.516 MURO-1 3.7125 2.65 0 9.838125 MURO-2 3.04425 7.5 0 22.831875 MURO-6(A) 0.51975 12.6 4.4 6.54885 MURO-7 3.7125 2.65 8.8 9.838125 MURO-8 3.04425 7.5 8.8 22.831875 MURO-9 4.08375 12.6 8.8 51.45525 MURO-13(A) 0.373275 9.7 2.2 3.6207675 MURO-14(A) 1.314225 9.7 6.6 12.7479825 MURO-16 0.373275 15.5 6.6 5.7857625 92.589975 632.694773 XG= 6.83329672 YG= 5.03533482 CALCULO DEL CENTRO DE RIGIDECES ELEMENTO AREA X PRIMER NIVEL
  • 54. B H BH3 HB3 m colum.A-1 0.300 0.450 0.027 0.012 0 colum.A-2 0.300 0.450 0.027 0.012 5.3 colum.A-3 0.300 0.450 0.027 0.012 9.7 colum.A-4 0.300 0.450 0.027 0.012 15.5 colum.B-1 0.300 0.450 0.027 0.012 0 colum.B-2 0.300 0.450 0.027 0.012 5.3 colum.B-3 0.300 0.450 0.027 0.012 9.7 colum.B-4 0.300 0.450 0.027 0.012 15.5 colum.C-1 0.300 0.450 0.027 0.012 0 colum.C-2 0.300 0.450 0.027 0.012 5.3 colum.C-3 0.300 0.450 0.027 0.012 9.7 colum.C-4 0.300 0.450 0.027 0.012 15.5 VIGA EJE-1 TRAMO AB 3.950 0.300 0.107 18.489 0 TRAMO BC 3.950 0.300 0.107 18.489 0 VIGA EJE-2 TRAMO AB 3.950 0.300 0.107 18.489 5.3 TRAMO BC 3.950 0.300 0.107 18.489 5.3 VIGA EJE-3 TRAMO AB 3.950 0.300 0.107 18.489 9.7 TRAMO BC 3.950 0.300 0.107 18.489 9.7 VIGA EJE-4 TRAMO AB 3.950 0.300 0.107 18.489 15.5 TRAMO BC 3.950 0.300 0.107 18.489 15.5 VIGA EJE-A TRAMO 1-2 0.500 5.000 62.500 0.625 2.65 TRAMO 2-3 0.500 4.100 34.461 0.513 7.5 TRAMO 3-4 0.500 5.500 83.188 0.688 12.6 VIGA EJE-B TRAMO 1-2 0.500 5.000 62.500 0.625 2.65 TRAMO 2-3 0.500 4.100 34.461 0.513 7.5 TRAMO 3-4 0.500 5.500 83.188 0.688 12.6 VIGA EJE-C TRAMO 1-2 0.500 5.000 62.500 0.625 2.65 TRAMO 2-3 0.500 4.100 34.461 0.513 7.5 TRAMO 3-4 0.500 5.500 83.188 0.688 12.6 paño-1 4.100 5.000 512.500 344.605 2.65 paño-2 4.100 4.100 282.576 282.576 7.5 paño-3 4.100 5.500 682.138 379.066 12.6 paño-4 4.100 5.000 512.500 344.605 2.65 paño-5 4.100 4.100 282.576 282.576 7.5 paño-6 4.1000 5.500 682.138 379.066 12.6 MURO-1 5.000 0.250 0.078 31.250 2.65 MURO-2 4.100 0.250 0.064 17.230 7.5 MURO-3 5.500 0.250 0.086 41.594 12.6 MURO-4 4.000 0.150 0.014 9.600 2.15 MURO-5 3.100 0.150 0.010 4.469 8 MURO-6 4.500 0.150 0.015 13.669 13.1 MURO-7 5.000 0.250 0.078 31.250 2.65 MURO-8 4.100 0.250 0.064 17.230 7.5
  • 55. MURO-9 5.500 0.250 0.086 41.594 12.6 MURO-10 0.150 2.950 3.851 0.010 0 MURO-11 0.150 2.950 3.851 0.010 0 MURO-12 0.150 3.950 9.244 0.013 5.3 MURO-13 0.150 2.950 3.851 0.010 9.7 MURO-14 0.150 3.950 9.244 0.013 9.7 MURO-15 0.150 3.950 9.244 0.013 15.5 MURO-16 0.150 3.950 9.244 0.013 15.5 3545.078 2373.994 CENTRO DE RIGIDEZ : X = 8.191 Y = 4.400 CALCULO DEL CENTRO DE RIGIDECES ELEMENTO X B H BH3 HB3 m colum.A-1 0.300 0.450 0.027 0.012 0 colum.A-2 0.300 0.450 0.027 0.012 5.3 colum.A-3 0.300 0.450 0.027 0.012 9.7 colum.A-4 0.300 0.450 0.027 0.012 15.5 colum.B-1 0.300 0.450 0.027 0.012 0 colum.B-2 0.300 0.450 0.027 0.012 5.3 AREA SEGUNDO NIVEL
  • 56. colum.B-3 0.300 0.450 0.027 0.012 9.7 colum.B-4 0.300 0.450 0.027 0.012 15.5 colum.C-1 0.300 0.450 0.027 0.012 0 colum.C-2 0.300 0.450 0.027 0.012 5.3 colum.C-3 0.300 0.450 0.027 0.012 9.7 colum.C-4 0.300 0.450 0.027 0.012 15.5 VIGA EJE-1 TRAMO AB 3.950 0.300 0.107 18.489 0 TRAMO BC 3.950 0.300 0.107 18.489 0 VIGA EJE-2 TRAMO AB 3.950 0.300 0.107 18.489 5.3 TRAMO BC 3.950 0.300 0.107 18.489 5.3 VIGA EJE-3 TRAMO AB 3.950 0.300 0.107 18.489 9.7 TRAMO BC 3.950 0.300 0.107 18.489 9.7 VIGA EJE-4 TRAMO AB 3.950 0.300 0.107 18.489 15.5 TRAMO BC 3.950 0.300 0.107 18.489 15.5 VIGA EJE-A TRAMO 1-2 0.500 5.000 62.500 0.625 2.65 TRAMO 2-3 0.500 4.100 34.461 0.513 7.5 TRAMO 3-4 0.500 5.500 83.188 0.688 12.6 VIGA EJE-B TRAMO 1-2 0.500 5.000 62.500 0.625 2.65 TRAMO 2-3 0.500 4.100 34.461 0.513 7.5 TRAMO 3-4 0.500 5.500 83.188 0.688 12.6 VIGA EJE-C TRAMO 1-2 0.500 5.000 62.500 0.625 2.65 TRAMO 2-3 0.500 4.100 34.461 0.513 7.5 TRAMO 3-4 0.500 5.500 83.188 0.688 12.6 paño-1 4.100 5.000 512.500 344.605 2.65 paño-2 4.100 4.100 282.576 282.576 7.5 paño-3 4.100 5.500 682.138 379.066 12.6 paño-4 4.100 5.000 512.500 344.605 2.65 paño-5 4.100 4.100 282.576 282.576 7.5 paño-6 4.100 5.500 682.138 379.066 12.6 MURO-1 5.000 0.250 0.078 31.250 2.65 MURO-2 4.100 0.250 0.064 17.230 7.5 MURO-3 5.500 0.250 0.086 41.594 12.6 MURO-4 4.000 0.150 0.014 9.600 2.15 MURO-5 3.100 0.150 0.010 4.469 8 MURO-6 4.500 0.150 0.015 13.669 13.1 MURO-7 5.000 0.250 0.078 31.250 2.65 MURO-8 4.100 0.250 0.064 17.230 7.5 MURO-9 5.500 0.250 0.086 41.594 12.6 MURO-10(A) 0.150 3.950 9.244 0.013 0 MURO-11(A) 0.150 3.950 9.244 0.013 0 MURO-12 0.150 3.950 9.244 0.013 5.3 MURO-13 0.150 2.950 3.851 0.010 9.7 MURO-14 0.150 3.950 9.244 0.013 9.7 MURO-15 0.150 3.950 9.244 0.013 15.5 MURO-16 0.150 3.950 9.244 0.013 15.5
  • 57. 3555.866 2374.001 CENTRO DE RIGIDEZ : X = 8.166 Y = 4.066 CALCULO DEL CENTRO DE RIGIDECES ELEMENTO X B H BH3 HB3 m colum.A-1 0.30 0.45 0.03 0.01 0 colum.A-2 0.30 0.45 0.03 0.01 5.3 colum.A-3 0.30 0.45 0.03 0.01 9.7 colum.A-4 0.30 0.45 0.03 0.01 15.5 colum.B-1 0.30 0.45 0.03 0.01 0 colum.B-2 0.30 0.45 0.03 0.01 5.3 colum.B-3 0.30 0.45 0.03 0.01 9.7 colum.B-4 0.30 0.45 0.03 0.01 15.5 colum.C-1 0.30 0.45 0.03 0.01 0 colum.C-2 0.30 0.45 0.03 0.01 5.3 colum.C-3 0.30 0.45 0.03 0.01 9.7 colum.C-4 0.30 0.45 0.03 0.01 15.5 VIGA EJE-1 TRAMO AB 3.95 0.30 0.11 18.49 0 TRAMO BC 3.95 0.30 0.11 18.49 0 VIGA EJE-2 TRAMO AB 3.95 0.30 0.11 18.49 5.3 TRAMO BC 3.95 0.30 0.11 18.49 5.3 VIGA EJE-3 TRAMO AB 3.95 0.30 0.11 18.49 9.7 TRAMO BC 3.95 0.30 0.11 18.49 9.7 VIGA EJE-4 TRAMO AB 3.95 0.30 0.11 18.49 15.5 TRAMO BC 3.95 0.30 0.11 18.49 15.5 VIGA EJE-A TRAMO 1-2 0.50 5.00 62.50 0.63 2.65 TRAMO 2-3 0.50 4.10 34.46 0.51 7.5 TRAMO 3-4 0.50 5.50 83.19 0.69 12.6 VIGA EJE-B TERCER NIVEL AREA
  • 58. TRAMO 1-2 0.50 5.00 62.50 0.63 2.65 TRAMO 2-3 0.50 4.10 34.46 0.51 7.5 TRAMO 3-4 0.50 5.50 83.19 0.69 12.6 VIGA EJE-C TRAMO 1-2 0.50 5.00 62.50 0.63 2.65 TRAMO 2-3 0.50 4.10 34.46 0.51 7.5 TRAMO 3-4 0.50 5.50 83.19 0.69 12.6 paño-1 4.10 5.00 512.50 344.61 2.65 paño-2 4.10 4.10 282.58 282.58 7.5 paño-3 4.10 5.50 682.14 379.07 12.6 paño-4 4.10 5.00 512.50 344.61 2.65 paño-5 4.10 4.10 282.58 282.58 7.5 paño-6 4.10 5.50 682.14 379.07 12.6 MURO-1 5.00 0.25 0.08 31.25 2.65 MURO-2 4.10 0.25 0.06 17.23 7.5 MURO-3 5.50 0.25 0.09 41.59 12.6 MURO-4 4.00 0.15 0.01 9.60 2.15 MURO-5 3.10 0.15 0.01 4.47 8 MURO-6 4.50 0.15 0.02 13.67 13.1 MURO-7 5.00 0.25 0.08 31.25 2.65 MURO-8 4.10 0.25 0.06 17.23 7.5 MURO-9 5.50 0.25 0.09 41.59 12.6 MURO-10(A) 0.15 4.35 12.35 0.01 0 MURO-11(A) 0.15 3.55 6.71 0.01 0 MURO-12 0.15 3.95 9.24 0.01 5.3 MURO-13 0.15 2.95 3.85 0.01 9.7 MURO-14 0.15 3.95 9.24 0.01 9.7 MURO-15 0.15 3.95 9.24 0.01 15.5 MURO-16 0.15 3.95 9.24 0.01 15.5 3556.43 2374.00 CENTRO DE RIGIDEZ : X = 8.165 Y = 4.400 CALCULO DEL CENTRO DE RIGIDECES CUARTO NIVEL
  • 59. ELEMENTO X B H BH3 HB3 m colum.A-1 0.30 0.45 0.03 0.01 0 colum.A-2 0.30 0.45 0.03 0.01 5.3 colum.A-3 0.30 0.45 0.03 0.01 9.7 colum.A-4 0.30 0.45 0.03 0.01 15.5 colum.B-1 0.30 0.45 0.03 0.01 0 colum.B-2 0.30 0.45 0.03 0.01 5.3 colum.B-3 0.30 0.45 0.03 0.01 9.7 colum.B-4 0.30 0.45 0.03 0.01 15.5 colum.C-1 0.30 0.45 0.03 0.01 0 colum.C-2 0.30 0.45 0.03 0.01 5.3 colum.C-3 0.30 0.45 0.03 0.01 9.7 VIGA EJE-1 0 TRAMO AB 3.95 0.30 0.11 18.49 0 TRAMO BC 3.95 0.30 0.11 18.49 0 VIGA EJE-2 0 TRAMO AB 3.95 0.30 0.11 18.49 5.3 TRAMO BC 3.95 0.30 0.11 18.49 5.3 VIGA EJE-3 0 TRAMO AB 3.95 0.30 0.11 18.49 9.7 TRAMO BC 3.95 0.30 0.11 18.49 9.7 VIGA EJE-4 0 TRAMO AB 3.95 0.30 0.11 18.49 15.5 VIGA EJE-A 0 TRAMO 1-2 0.40 5.00 50.00 0.32 2.65 TRAMO 2-3 0.40 4.10 27.57 0.26 7.5 TRAMO 3-4 0.40 5.50 66.55 0.35 12.6 VIGA EJE-B 0 TRAMO 1-2 0.40 5.00 50.00 0.32 2.65 TRAMO 2-3 0.40 4.10 27.57 0.26 7.5 TRAMO 3-4 0.40 5.50 66.55 0.35 12.6 VIGA EJE-C 0 TRAMO 1-2 0.40 5.00 50.00 0.32 2.65 TRAMO 2-3 0.40 4.10 27.57 0.26 7.5 paño-1 4.10 5.00 512.50 344.61 2.65 paño-2 4.10 4.10 282.58 282.58 7.5 paño-3 4.10 5.50 682.14 379.07 12.6 paño-4 4.10 5.00 512.50 344.61 2.65 paño-5 4.10 4.10 282.58 282.58 7.5 MURO-1 5.00 0.25 0.08 31.25 2.65 MURO-2 4.10 0.25 0.06 17.23 7.5 MURO-6(A) 5.50 0.15 0.02 24.96 12.6 MURO-7 5.00 0.25 0.08 31.25 2.65 MURO-8 4.10 0.25 0.06 17.23 7.5 MURO-9 5.50 0.25 0.09 41.59 12.6 MURO-13(A) 0.15 3.95 9.24 0.01 9.7 MURO-14(A) 0.15 2.95 3.85 0.01 9.7 MURO-16 0.15 3.95 9.24 0.01 15.5 AREA
  • 60. 2661.87 1928.98 CENTRO DE RIGIDEZ : X = 6.959 Y = 4.949
  • 64. m X*BH3 Y*HB3 8.8 0.000 0.107 8.8 0.145 0.107 8.8 0.265 0.107 8.8 0.424 0.107 4.4 0.000 0.053 4.4 0.145 0.053 4.4 0.265 0.053 4.4 0.424 0.053 0 0.000 0.000 0 0.145 0.000 0 0.265 0.000 0 0.424 0.000 6.6 0.000 122.027 2.2 0.000 40.676 6.6 0.565 122.027 2.2 0.565 40.676 6.6 1.035 122.027 2.2 1.035 40.676 6.6 1.653 122.027 2.2 1.653 40.676 8.8 165.625 5.500 8.8 258.454 4.510 8.8 1048.163 6.050 4.4 165.625 2.750 4.4 258.454 2.255 4.4 1048.163 3.025 0 165.625 0.000 0 258.454 0.000 0 1048.163 0.000 6.6 1358.125 2274.393 6.6 2119.321 1865.002 6.6 8594.933 2501.832 2.2 1358.125 758.131 2.2 2119.321 621.667 2.2 8594.933 833.944 0 0.207 0.000 0 0.480 0.000 0 1.083 0.000 4.4 0.029 42.240 4.4 0.084 19.662 4.4 0.199 60.143 8.8 0.207 275.000 8.8 0.480 151.626
  • 65. 8.8 1.083 366.025 2.7 0.000 0.027 7.1 0.000 0.071 6.6 48.996 0.088 2.7 37.353 0.027 6.6 89.671 0.088 2.2 143.289 0.029 6.6 143.289 0.088 29036.939 10445.627 Y m X*BH3 Y*HB3 8.8 0.000 0.107 8.8 0.145 0.107 8.8 0.265 0.107 8.8 0.424 0.107 4.4 0.000 0.053 4.4 0.145 0.053
  • 66. 4.4 0.265 0.053 4.4 0.424 0.053 0 0.000 0.000 0 0.145 0.000 0 0.265 0.000 0 0.424 0.000 6.6 0.000 122.027 2.2 0.000 40.676 6.6 0.565 122.027 2.2 0.565 40.676 6.6 1.035 122.027 2.2 1.035 40.676 6.6 1.653 122.027 2.2 1.653 40.676 8.8 165.625 5.500 8.8 258.454 4.510 8.8 1048.163 6.050 4.4 165.625 2.750 4.4 258.454 2.255 4.4 1048.163 3.025 0 165.625 0.000 0 258.454 0.000 0 1048.163 0.000 6.6 1358.125 2274.393 6.6 2119.321 1865.002 6.6 8594.933 2501.832 2.2 1358.125 758.131 2.2 2119.321 621.667 2.2 8594.933 833.944 0 0.207 0.000 0 0.480 0.000 0 1.083 0.000 4.4 0.029 42.240 4.4 0.084 19.662 4.4 0.199 60.143 0 0.207 0.000 0 0.480 0.000 0 1.083 0.000 2.2 0.000 0.029 6.6 0.000 0.088 6.6 48.996 0.088 2.7 37.353 0.027 6.6 89.671 0.088 2.2 143.289 0.029 6.6 143.289 0.088
  • 67. 29036.939 9652.995 Y m X*BH3 Y*HB3 8.8 0.00 0.11 8.8 0.14 0.11 8.8 0.27 0.11 8.8 0.42 0.11 4.4 0.00 0.05 4.4 0.14 0.05 4.4 0.27 0.05 4.4 0.42 0.05 0 0.00 0.00 0 0.14 0.00 0 0.27 0.00 0 0.42 0.00 6.6 0.00 122.03 2.2 0.00 40.68 6.6 0.57 122.03 2.2 0.57 40.68 6.6 1.03 122.03 2.2 1.03 40.68 6.6 1.65 122.03 2.2 1.65 40.68 8.8 165.63 5.50 8.8 258.45 4.51 8.8 1048.16 6.05
  • 68. 4.4 165.63 2.75 4.4 258.45 2.26 4.4 1048.16 3.03 0 165.63 0.00 0 258.45 0.00 0 1048.16 0.00 6.6 1358.13 2274.39 6.6 2119.32 1865.00 6.6 8594.93 2501.83 2.2 1358.13 758.13 2.2 2119.32 621.67 2.2 8594.93 833.94 0 0.21 0.00 0 0.48 0.00 0 1.08 0.00 4.4 0.03 42.24 4.4 0.08 19.66 4.4 0.20 60.14 8.8 0.21 275.00 8.8 0.48 151.63 8.8 1.08 366.03 2.2 0.00 0.03 6.6 0.00 0.08 6.6 49.00 0.09 2.7 37.35 0.03 6.6 89.67 0.09 2.2 143.29 0.03 6.6 143.29 0.09 29036.94 10445.64
  • 69. Y m X*BH3 Y*HB3 8.8 0.00 0.11 8.8 0.14 0.11 8.8 0.27 0.11 8.8 0.42 0.11 4.4 0.00 0.05 4.4 0.14 0.05 4.4 0.27 0.05 4.4 0.42 0.05 0 0.00 0.00 0 0.14 0.00 0 0.27 0.00 0 6.6 0.00 122.03 2.2 0.00 40.68 0 6.6 0.57 122.03 2.2 0.57 40.68 6.6 1.03 122.03 2.2 1.03 40.68 0 6.6 1.65 122.03 0 8.8 132.50 2.82 8.8 206.76 2.31 8.8 838.53 3.10 0 4.4 132.50 1.41 4.4 206.76 1.15 4.4 838.53 1.55 0 0 132.50 0.00 0 206.76 0.00 6.6 1358.13 2274.39 6.6 2119.32 1865.00 6.6 8594.93 2501.83 2.2 1358.13 758.13 2.2 2119.32 621.67 0 0.21 0.00 0 0.48 0.00 4.4 0.23 109.81 8.8 0.21 275.00 8.8 0.48 151.63 8.8 1.08 366.03 2.2 89.67 0.03 6.6 37.35 0.07 6.6 143.29 0.09