Slovenia’s share of installed renewable capacity amounts to almost 10 percent of the total installed electricity
capacity. However, the technical potential – particularly for solar power – if fully exploited would be more than
five times as much than the current total installed capacity. To increase its share in renewable energy electricity
production, the Government of Slovenia promotes electricity generated from renewable sources with a feed-in
tariff. Eligible is electricity produced from wind, solar, geothermal, biogas, biomass and hydropower plants. The
maximum eligibility period for the feed-in tariff is 15 years and it applies only to plants with an installed capacity
Slovenia
Sources: EBRD (2009); ESHA (2011); EWEA (2013); EurObserv’Er (2013); Knez and Jereb (2013); Obtrecht et al. (2011); Domjan (2009);
World Bank (2014); EC (2013); Renewable Facts (2013); EIA (2013); SRS NET & EEE (2008); Hoogwijk and Graus (2008); Hoogwijk
(2004); JRC (2011); and UNDP calculations.
R E N E W A B L E E N E R G Y S N A P S H O T :
Key information about renewable energy in Slovenia
Empowered lives.
Resilient nations.
9.9%
RE Share
3,376 MW
Total Installed Capacity
Biomass Solar PV Wind Small Hydro
0 217.4 0 1181
700 19,200 600 300
335 MW
Installed RE Capacity
Electricity Generating
Capacity 2012
Installed Renewable Electricity
Capacity 2012 in MW
Technical Potential for Installed
Renewable Electricity Capacity in MW
1 Value is from 2011
General Country
Information
Population: 2,058,152
Surface Area: 20,270 km²
Capital City: Ljubljana
GDP (2012): $ 45.3 billion
GDP Per Capita (2012): $ 22,001
WB Ease of Doing Business: 33
of less than 5 MW. However, renewable energy power plants up to 125 MW may apply for a feed-in premium.
The premium is calculated by reference costs of electricity per technology, the reference market price and a fixed
correction factor.4
For example, wind power plants between 10 MW and 125 MW power capacity can receive a
premium of €43.18/MW-h, which is added to the market price (ResLegal, 2013).5
In theWorld Bank’s ease of Doing
Business index, Slovenia is ranked in 33rd
position (IFC & World Bank, 2014).
As a member state of the European Union, Slovenia has committed itself, in accordance with EU Directive
2009/28/EC, to a national binding target of 25 percent share of renewable energy in the gross final energy con-
sumption by 2020 (Republic of Slovenia, 2010).The Energy Act, last amended in 2012, is the main legal document
defining the basic principles for energy policy and the energy market. Together with the Decree on the Issue of
Certificates for Energy Generation Plants and the Decree on Support for Electricity Generated from Renewable
Energy Sources, it also defines eligibility, procedure and the amount of renewable energy promotion with feed-
in tariffs and premium. There are also other renewable energy promotion instruments. Renewable energy de-
velopers enjoy prioritized access to the grid. Slovenia offers tax exemption for foreign investments of up to 40
percent of the amount invested. The corporate tax rate is generally relatively low at 17 percent, and is expected
to be reduced to 15 percent in 2015 (Invest Slovenia, 2013). Loans and grants for renewable energy investment
are available.The Energy Agency grants licences for activity in the energy sector, e.g. energy generation, and de-
cides whether renewable energy producers are eligible for the feed-in tariff or the premium.
Legislation and policy
R E N E W A B L E E N E R G Y S N A P S H O T :
Source: Government of the Republic of Slovenia (2012)
Feed-in tariff in Slovenia2
Eligible technologies Additional constraint Installed capacity Tariff granted in
€/MW-h
Wind <5 MW 95.38
Solar3
Building integrated/other
Building integrated/other
Building integrated/other
<50 KW
<1 MW
<5 MW
122.57/ 115.16
112.10 / 106.1
93.01/ 85.54
Hydro <50 KW
<1 MW
<5 MW
105.47
92.61
82.34
Biomass At least 90 percent of the products used
must be from wood
<50 KW
<1 MW
<5 MW
By individual case
224.35
167.43
2 Electricity produced from biomass and geothermal power plants is also eligible for the feed-in tariff (ResLegal, 2013).
3 The tariffs for solar power in the table reflect the tariffs that were applicable in October 2013. Tariffs for solar power plants are
subject to monthly recalculation due to applied degression.
4 A detailed overview of the feed-in premium is given in the Decree on Support for Electricity Generated from Renewable Energy
Source (link provided in the sources).
5 Assuming a reference market price of electricity of €0.0566 per kW-h in 2013.
Slovenia
Institutions
Organization Responsibility Website
The Ministry of the Economy - Shapes the overall national policy and strategy in the
energy sector
www.mgrt.gov.si/en/
Energy Agency Slovenia - Energy market regulator, responsible for licencing in
the energy sector
- Responsible for granting feed-in tariff and premium
www.agen-rs.si/en/
BORZEN - Power Market Operator provides and facilitate coor-
dinated operation of the Slovenian electricity system
- Via the internal centre for RES/CHP it operates the
support scheme for the generation of energy from
RES
www.borzen.si/
ELES - State owned Transmission System Operator responsi-
ble for electricity transmission and management of
the national grid
www.investslovenia.org/
Invest Slovenia - As part of Slovenian Public Agency for Entrepreneur-
ship, Innovation, Development, Investment and
Tourism Investment Agency, responsible to attract,
consult and facilitate potential investors
www.investslovenia.org/
Opportunities to finance renewable energy projects in Slovenia
Financing organization Details Website
Eko sklad The Environmental Fund of the Republic of Slovenia
awards low-interest loans to renewable energy proj-
ects through a tendering process. There is a current
call for applications to subsidize the reconstruction
and renovation of renewable energy plants. Eligible
investors include private and public legal entities and
individuals in Slovenia. The maximum loan is for €24
million for municipalities, enterprises and other legal
entities (15 years credit period) and €5 million for resi-
dents (10 years credit period).
www.ekosklad.si/
Subsidy Scheme
of the Ministry
for Infrastructure
The Ministry for Infrastructure and Spatial Planning
awards subsidies through a tendering process to com-
panies that invest in energy efficiency, renewable en-
ergy and combined heating and power projects.
These cover a maximum of 50 percent of an invest-
ment project’s eligible costs.
www.mzip.gov.si/
Slovenia
References
Domjan, S., 2009: Country Study on Political Framework
and Availability of Biomass. Available at: www.central
2013.eu/fileadmin/user_upload/Downloads/outputlib/
4biomass_country_study_ Slovenia.pdf
EurObserv’Er, 2013:The State of Renewable Energies in
Europe, Edition 2012. Available at: www.energies-
renouvelables.org/observ-er/stat_baro/barobilan/
barobilan12.pdf
European Bank for Reconstruction and Development
(EBRD), 2009: Slovenia – Country Profile. Available at:
http://ws2-23.myloadspring.com/sites/renew/
countries/slovenia/profile.aspx
EuropeanCommission(EC),2013:EUEnergyinFigures-
StatisticalPocketBook2013.Availableat:http://ec.europa.
eu/energy/publications/doc/2013_pocketbook.pdf
EuropeanWind Energy Association (EWEA), 2013:
Annual Report 2012. Available at:
www.ewea.org/fileadmin/files/library/publications/
reports/EWEA_Annual_Report_2012.pdf
Government of the Republic of Slovenia, 2012: Decree
on Support for Electricity Generated from Renewable
Energy Sources. Available at:
www.mzip.gov.si/fileadmin/mzip.gov.si/pageuploads/
Energetika/Sprejeti_predpisi/RES_ENG.pdf
Hoogwijk, M., 2004: On the global and regional
potential of renewable energy sources. Utrecht:
Universiteit Utrecht, Faculteit Scheikunde. Dissertation.
Available at: http://igitur-archive.library.uu.nl/
dissertations/2004-0309-123617/full.pdf
Hoogwiijk, M. andW. Graus, 2008: Global Potential of
Renewable Energy Sources: A Literature Assessment.
Available at: www.ecofys.com/files/files
/report_global_potential_of_renewable_energy_
sources_a_literature_assessment.pdf
International Finance Corporation (IFC) andWorld Bank,
2014: Doing Business – Measuring Business
Regulations. Available at: www.doingbusiness.org
/data/exploreeconomies/slovenia/
Invest Slovenia, 2013: Fiscal Incentives – CorporateTax.
Available at: www.investslovenia.org/business-
environment/incentives/fiscal-incentives/
Joint Research Centre of the European Commission
(JRC), 2011:Technical Assessment of the Renewable
Energy Action Plans. Available at:
http://ec.europa.eu/dgs/jrc/downloads/jrc_reference
_report_2011_reap.pdf
Knez, M., and B. Jereb, 2013: Solar power plants –
Alternative sustainable approach to greener
environment: A case of Slovenia. In: Sustainable Cities
and Society, 6: 27-32
Obtrecht, M., Furjan, P., and M. Delcnjak, 2011:
Evaluation and Analysis of Renewable Energy Sources
Potential in Slovenia and its Compatibility Examination
with Slovenian National Renewable Energy Action Plan.
Presented atWord Energy Congress 2011 Sweden.
Available at:
www.ep.liu.se/ecp/057/vol10/019/ecp57vol10_019.pdf
Renewable energy policy database and support
(ResLegal), 2013: An initiative of the European
Commission – Romania. Available at: www.res-legal.eu
Renewable Facts, 2013: Slovenia. Available at:
www.renewablefacts.com/country/slovenia
Republic of Slovenia, 2010: National Renewable Energy
Action Plan 2010 – 2020 Slovenia. Available at: http://
ec.europa.eu/energy/renewables/action_plan_en.htm
Scientific Reference System on New Energy
Technologies, Energy End-use Efficiency and Energy
(SRS NET & EEE), 2008:WP3-Technology data - Executive
Summary on Small Hydro. Available at:
http://srs.epu.ntua.gr/Portals/SRS/material/
technologyreview/Small%20Hydro.pdf
U.S. Energy Information Administration (EIA), 2013:
Levelized Cost of New Generation Resources in the
Annual Energy Outlook 2013. Available at:
www.eia.gov/forecasts/aeo/electricity_generation.cfm
World Bank, 2014: Data Catalog. Available at:
http://datacatalog.worldbank.org/
Recent projects
Company Project Status
KPV Solar GmbH (Austria) Operates 5.704 MW solar photovoltaic power plants
(ground mounted and roof-top installations).
Commissioned
Financing organization Details Website
EU Means
- European Investment Fund
(EIF)
- European Investment Bank
(EIB)
- Structural Funds
Loans and guarantees through commercial banks as
Intermediaries (e.g. Banka Koper, Banka Celje) and pri-
vate equity/venture capital are available.
www.europa.eu/youreurope/business/fi-
nance-support/access-to-finance/
International
Finance Corporation
With investment (equity, loans and other financial in-
struments) and advisory services, IFC supports may
still support investment in which private financing re-
mains limited.
www.ifc.org/
European Bank
for Reconstruction
and Development (EBRD)
Provides renewable energy developers with equity,
loans and loan guarantees for projects with good
commercial prospects of up to 15 years’duration.
www.ebrd.com/pages/workingwithus/pro
jects.shtml

Weitere ähnliche Inhalte

Was ist angesagt?

Renewable Energy for Lithuania: Offshore Wind
Renewable Energy for Lithuania: Offshore WindRenewable Energy for Lithuania: Offshore Wind
Renewable Energy for Lithuania: Offshore WindJustinas Pagirys
 
Conference_Paper_Stroputė_2014
Conference_Paper_Stroputė_2014Conference_Paper_Stroputė_2014
Conference_Paper_Stroputė_2014Neringa Stropute
 
International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaSimeon Arnaudov
 
Macro-economic study on hydropower in Europe
Macro-economic study on hydropower in EuropeMacro-economic study on hydropower in Europe
Macro-economic study on hydropower in EuropeStatkraft
 
3 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 20133 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 2013UNDPhr
 
ETI Supply Chain Wksp 2
ETI Supply Chain Wksp 2ETI Supply Chain Wksp 2
ETI Supply Chain Wksp 2mer13l
 
Crash Course on Offshore Wind Energy – Gdańsk (26.10.2012) – Legal aspects an...
Crash Course on Offshore Wind Energy – Gdańsk (26.10.2012) – Legal aspects an...Crash Course on Offshore Wind Energy – Gdańsk (26.10.2012) – Legal aspects an...
Crash Course on Offshore Wind Energy – Gdańsk (26.10.2012) – Legal aspects an...Pomcert
 
19 sonja protic conference_presentation_v1
19 sonja protic conference_presentation_v119 sonja protic conference_presentation_v1
19 sonja protic conference_presentation_v1UNDPhr
 

Was ist angesagt? (20)

Serbia
SerbiaSerbia
Serbia
 
Renewable Energy for Lithuania: Offshore Wind
Renewable Energy for Lithuania: Offshore WindRenewable Energy for Lithuania: Offshore Wind
Renewable Energy for Lithuania: Offshore Wind
 
Poland
PolandPoland
Poland
 
Montenegro
MontenegroMontenegro
Montenegro
 
Lithuania
LithuaniaLithuania
Lithuania
 
Azerbaijan
AzerbaijanAzerbaijan
Azerbaijan
 
Conference_Paper_Stroputė_2014
Conference_Paper_Stroputė_2014Conference_Paper_Stroputė_2014
Conference_Paper_Stroputė_2014
 
International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case Bulgaria
 
Macro-economic study on hydropower in Europe
Macro-economic study on hydropower in EuropeMacro-economic study on hydropower in Europe
Macro-economic study on hydropower in Europe
 
Albania[1]
Albania[1]Albania[1]
Albania[1]
 
3 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 20133 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 2013
 
Kyrgyzstan
KyrgyzstanKyrgyzstan
Kyrgyzstan
 
Moldova
MoldovaMoldova
Moldova
 
ETI Supply Chain Wksp 2
ETI Supply Chain Wksp 2ETI Supply Chain Wksp 2
ETI Supply Chain Wksp 2
 
B2_Kukuczka
B2_KukuczkaB2_Kukuczka
B2_Kukuczka
 
Georgia
GeorgiaGeorgia
Georgia
 
Energy and the EU budget 2014-2020
Energy and the EU budget 2014-2020Energy and the EU budget 2014-2020
Energy and the EU budget 2014-2020
 
Crash Course on Offshore Wind Energy – Gdańsk (26.10.2012) – Legal aspects an...
Crash Course on Offshore Wind Energy – Gdańsk (26.10.2012) – Legal aspects an...Crash Course on Offshore Wind Energy – Gdańsk (26.10.2012) – Legal aspects an...
Crash Course on Offshore Wind Energy – Gdańsk (26.10.2012) – Legal aspects an...
 
Uzbekistan
UzbekistanUzbekistan
Uzbekistan
 
19 sonja protic conference_presentation_v1
19 sonja protic conference_presentation_v119 sonja protic conference_presentation_v1
19 sonja protic conference_presentation_v1
 

Andere mochten auch

Weaver Back To School Night2
Weaver Back To School Night2Weaver Back To School Night2
Weaver Back To School Night2jweaver00
 
Unit 3 Notes Final
Unit 3 Notes FinalUnit 3 Notes Final
Unit 3 Notes Finaljweaver00
 
Mesopotamia2
Mesopotamia2Mesopotamia2
Mesopotamia2jweaver00
 
America as a World Power Unit Notes
America as a World Power Unit NotesAmerica as a World Power Unit Notes
America as a World Power Unit Notesjweaver00
 
Deploy Laravel on Heroku
Deploy Laravel on HerokuDeploy Laravel on Heroku
Deploy Laravel on HerokuEric Johnson
 

Andere mochten auch (6)

Weaver Back To School Night2
Weaver Back To School Night2Weaver Back To School Night2
Weaver Back To School Night2
 
Unit 3 Notes Final
Unit 3 Notes FinalUnit 3 Notes Final
Unit 3 Notes Final
 
Mesopotamia2
Mesopotamia2Mesopotamia2
Mesopotamia2
 
America as a World Power Unit Notes
America as a World Power Unit NotesAmerica as a World Power Unit Notes
America as a World Power Unit Notes
 
Volstead Act Presentation
Volstead Act PresentationVolstead Act Presentation
Volstead Act Presentation
 
Deploy Laravel on Heroku
Deploy Laravel on HerokuDeploy Laravel on Heroku
Deploy Laravel on Heroku
 

Ähnlich wie Slovenia

Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...Lulzim
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...Lulzim
 
Opportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketOpportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketEnerjimiz Güneş
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfGlennBerry13
 
Miro Zeman - Department of Electrical Sustainable Energy
Miro Zeman - Department of Electrical Sustainable EnergyMiro Zeman - Department of Electrical Sustainable Energy
Miro Zeman - Department of Electrical Sustainable EnergyDutch Power
 
Leveling the playing field - the economics of electricity generation in Europe
Leveling the playing field - the economics of electricity generation in EuropeLeveling the playing field - the economics of electricity generation in Europe
Leveling the playing field - the economics of electricity generation in EuropeDavid Owain Clubb
 
Bosnia & herzegovina
Bosnia & herzegovinaBosnia & herzegovina
Bosnia & herzegovinaUNDP Eurasia
 
Carbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity GridCarbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity GridMykola Shlapak
 
UK - Norway plugin vehicle roundtable summary report
UK - Norway plugin vehicle roundtable summary reportUK - Norway plugin vehicle roundtable summary report
UK - Norway plugin vehicle roundtable summary reportInnovate UK
 

Ähnlich wie Slovenia (17)

Ukraine
UkraineUkraine
Ukraine
 
Belarus
BelarusBelarus
Belarus
 
Armenia
ArmeniaArmenia
Armenia
 
Romania
RomaniaRomania
Romania
 
Kazakhstan
KazakhstanKazakhstan
Kazakhstan
 
Tajikistan
TajikistanTajikistan
Tajikistan
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...
 
Opportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketOpportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy Market
 
Turkey
TurkeyTurkey
Turkey
 
Quality Energy Investment Opportunities 100mw letonia
Quality Energy  Investment Opportunities 100mw letoniaQuality Energy  Investment Opportunities 100mw letonia
Quality Energy Investment Opportunities 100mw letonia
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdf
 
Miro Zeman - Department of Electrical Sustainable Energy
Miro Zeman - Department of Electrical Sustainable EnergyMiro Zeman - Department of Electrical Sustainable Energy
Miro Zeman - Department of Electrical Sustainable Energy
 
Leveling the playing field - the economics of electricity generation in Europe
Leveling the playing field - the economics of electricity generation in EuropeLeveling the playing field - the economics of electricity generation in Europe
Leveling the playing field - the economics of electricity generation in Europe
 
Bosnia & herzegovina
Bosnia & herzegovinaBosnia & herzegovina
Bosnia & herzegovina
 
Carbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity GridCarbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity Grid
 
UK - Norway plugin vehicle roundtable summary report
UK - Norway plugin vehicle roundtable summary reportUK - Norway plugin vehicle roundtable summary report
UK - Norway plugin vehicle roundtable summary report
 

Mehr von UNDP Eurasia

2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy PalmerUNDP Eurasia
 
2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan ZverzhanovskiUNDP Eurasia
 
2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben SlayUNDP Eurasia
 
2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta AyoungUNDP Eurasia
 
2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka CetkovicUNDP Eurasia
 
2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim BouevUNDP Eurasia
 
2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel StanderUNDP Eurasia
 
2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill IlinskiUNDP Eurasia
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill SavrassovUNDP Eurasia
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` ConnellUNDP Eurasia
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri LaneUNDP Eurasia
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno HeuvelUNDP Eurasia
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke TaishiUNDP Eurasia
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga ButoUNDP Eurasia
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David SimmonsUNDP Eurasia
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie KrausUNDP Eurasia
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy PalmerUNDP Eurasia
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina WhalleyUNDP Eurasia
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom AvivUNDP Eurasia
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning LudolphsUNDP Eurasia
 

Mehr von UNDP Eurasia (20)

2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer
 
2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski
 
2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay
 
2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung
 
2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic
 
2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev
 
2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander
 
2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs
 

Kürzlich hochgeladen

Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Scott Andery
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...Wes McKinney
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 

Kürzlich hochgeladen (20)

Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 

Slovenia

  • 1. Slovenia’s share of installed renewable capacity amounts to almost 10 percent of the total installed electricity capacity. However, the technical potential – particularly for solar power – if fully exploited would be more than five times as much than the current total installed capacity. To increase its share in renewable energy electricity production, the Government of Slovenia promotes electricity generated from renewable sources with a feed-in tariff. Eligible is electricity produced from wind, solar, geothermal, biogas, biomass and hydropower plants. The maximum eligibility period for the feed-in tariff is 15 years and it applies only to plants with an installed capacity Slovenia Sources: EBRD (2009); ESHA (2011); EWEA (2013); EurObserv’Er (2013); Knez and Jereb (2013); Obtrecht et al. (2011); Domjan (2009); World Bank (2014); EC (2013); Renewable Facts (2013); EIA (2013); SRS NET & EEE (2008); Hoogwijk and Graus (2008); Hoogwijk (2004); JRC (2011); and UNDP calculations. R E N E W A B L E E N E R G Y S N A P S H O T : Key information about renewable energy in Slovenia Empowered lives. Resilient nations. 9.9% RE Share 3,376 MW Total Installed Capacity Biomass Solar PV Wind Small Hydro 0 217.4 0 1181 700 19,200 600 300 335 MW Installed RE Capacity Electricity Generating Capacity 2012 Installed Renewable Electricity Capacity 2012 in MW Technical Potential for Installed Renewable Electricity Capacity in MW 1 Value is from 2011 General Country Information Population: 2,058,152 Surface Area: 20,270 km² Capital City: Ljubljana GDP (2012): $ 45.3 billion GDP Per Capita (2012): $ 22,001 WB Ease of Doing Business: 33
  • 2. of less than 5 MW. However, renewable energy power plants up to 125 MW may apply for a feed-in premium. The premium is calculated by reference costs of electricity per technology, the reference market price and a fixed correction factor.4 For example, wind power plants between 10 MW and 125 MW power capacity can receive a premium of €43.18/MW-h, which is added to the market price (ResLegal, 2013).5 In theWorld Bank’s ease of Doing Business index, Slovenia is ranked in 33rd position (IFC & World Bank, 2014). As a member state of the European Union, Slovenia has committed itself, in accordance with EU Directive 2009/28/EC, to a national binding target of 25 percent share of renewable energy in the gross final energy con- sumption by 2020 (Republic of Slovenia, 2010).The Energy Act, last amended in 2012, is the main legal document defining the basic principles for energy policy and the energy market. Together with the Decree on the Issue of Certificates for Energy Generation Plants and the Decree on Support for Electricity Generated from Renewable Energy Sources, it also defines eligibility, procedure and the amount of renewable energy promotion with feed- in tariffs and premium. There are also other renewable energy promotion instruments. Renewable energy de- velopers enjoy prioritized access to the grid. Slovenia offers tax exemption for foreign investments of up to 40 percent of the amount invested. The corporate tax rate is generally relatively low at 17 percent, and is expected to be reduced to 15 percent in 2015 (Invest Slovenia, 2013). Loans and grants for renewable energy investment are available.The Energy Agency grants licences for activity in the energy sector, e.g. energy generation, and de- cides whether renewable energy producers are eligible for the feed-in tariff or the premium. Legislation and policy R E N E W A B L E E N E R G Y S N A P S H O T : Source: Government of the Republic of Slovenia (2012) Feed-in tariff in Slovenia2 Eligible technologies Additional constraint Installed capacity Tariff granted in €/MW-h Wind <5 MW 95.38 Solar3 Building integrated/other Building integrated/other Building integrated/other <50 KW <1 MW <5 MW 122.57/ 115.16 112.10 / 106.1 93.01/ 85.54 Hydro <50 KW <1 MW <5 MW 105.47 92.61 82.34 Biomass At least 90 percent of the products used must be from wood <50 KW <1 MW <5 MW By individual case 224.35 167.43 2 Electricity produced from biomass and geothermal power plants is also eligible for the feed-in tariff (ResLegal, 2013). 3 The tariffs for solar power in the table reflect the tariffs that were applicable in October 2013. Tariffs for solar power plants are subject to monthly recalculation due to applied degression. 4 A detailed overview of the feed-in premium is given in the Decree on Support for Electricity Generated from Renewable Energy Source (link provided in the sources). 5 Assuming a reference market price of electricity of €0.0566 per kW-h in 2013.
  • 3. Slovenia Institutions Organization Responsibility Website The Ministry of the Economy - Shapes the overall national policy and strategy in the energy sector www.mgrt.gov.si/en/ Energy Agency Slovenia - Energy market regulator, responsible for licencing in the energy sector - Responsible for granting feed-in tariff and premium www.agen-rs.si/en/ BORZEN - Power Market Operator provides and facilitate coor- dinated operation of the Slovenian electricity system - Via the internal centre for RES/CHP it operates the support scheme for the generation of energy from RES www.borzen.si/ ELES - State owned Transmission System Operator responsi- ble for electricity transmission and management of the national grid www.investslovenia.org/ Invest Slovenia - As part of Slovenian Public Agency for Entrepreneur- ship, Innovation, Development, Investment and Tourism Investment Agency, responsible to attract, consult and facilitate potential investors www.investslovenia.org/ Opportunities to finance renewable energy projects in Slovenia Financing organization Details Website Eko sklad The Environmental Fund of the Republic of Slovenia awards low-interest loans to renewable energy proj- ects through a tendering process. There is a current call for applications to subsidize the reconstruction and renovation of renewable energy plants. Eligible investors include private and public legal entities and individuals in Slovenia. The maximum loan is for €24 million for municipalities, enterprises and other legal entities (15 years credit period) and €5 million for resi- dents (10 years credit period). www.ekosklad.si/ Subsidy Scheme of the Ministry for Infrastructure The Ministry for Infrastructure and Spatial Planning awards subsidies through a tendering process to com- panies that invest in energy efficiency, renewable en- ergy and combined heating and power projects. These cover a maximum of 50 percent of an invest- ment project’s eligible costs. www.mzip.gov.si/
  • 4. Slovenia References Domjan, S., 2009: Country Study on Political Framework and Availability of Biomass. Available at: www.central 2013.eu/fileadmin/user_upload/Downloads/outputlib/ 4biomass_country_study_ Slovenia.pdf EurObserv’Er, 2013:The State of Renewable Energies in Europe, Edition 2012. Available at: www.energies- renouvelables.org/observ-er/stat_baro/barobilan/ barobilan12.pdf European Bank for Reconstruction and Development (EBRD), 2009: Slovenia – Country Profile. Available at: http://ws2-23.myloadspring.com/sites/renew/ countries/slovenia/profile.aspx EuropeanCommission(EC),2013:EUEnergyinFigures- StatisticalPocketBook2013.Availableat:http://ec.europa. eu/energy/publications/doc/2013_pocketbook.pdf EuropeanWind Energy Association (EWEA), 2013: Annual Report 2012. Available at: www.ewea.org/fileadmin/files/library/publications/ reports/EWEA_Annual_Report_2012.pdf Government of the Republic of Slovenia, 2012: Decree on Support for Electricity Generated from Renewable Energy Sources. Available at: www.mzip.gov.si/fileadmin/mzip.gov.si/pageuploads/ Energetika/Sprejeti_predpisi/RES_ENG.pdf Hoogwijk, M., 2004: On the global and regional potential of renewable energy sources. Utrecht: Universiteit Utrecht, Faculteit Scheikunde. Dissertation. Available at: http://igitur-archive.library.uu.nl/ dissertations/2004-0309-123617/full.pdf Hoogwiijk, M. andW. Graus, 2008: Global Potential of Renewable Energy Sources: A Literature Assessment. Available at: www.ecofys.com/files/files /report_global_potential_of_renewable_energy_ sources_a_literature_assessment.pdf International Finance Corporation (IFC) andWorld Bank, 2014: Doing Business – Measuring Business Regulations. Available at: www.doingbusiness.org /data/exploreeconomies/slovenia/ Invest Slovenia, 2013: Fiscal Incentives – CorporateTax. Available at: www.investslovenia.org/business- environment/incentives/fiscal-incentives/ Joint Research Centre of the European Commission (JRC), 2011:Technical Assessment of the Renewable Energy Action Plans. Available at: http://ec.europa.eu/dgs/jrc/downloads/jrc_reference _report_2011_reap.pdf Knez, M., and B. Jereb, 2013: Solar power plants – Alternative sustainable approach to greener environment: A case of Slovenia. In: Sustainable Cities and Society, 6: 27-32 Obtrecht, M., Furjan, P., and M. Delcnjak, 2011: Evaluation and Analysis of Renewable Energy Sources Potential in Slovenia and its Compatibility Examination with Slovenian National Renewable Energy Action Plan. Presented atWord Energy Congress 2011 Sweden. Available at: www.ep.liu.se/ecp/057/vol10/019/ecp57vol10_019.pdf Renewable energy policy database and support (ResLegal), 2013: An initiative of the European Commission – Romania. Available at: www.res-legal.eu Renewable Facts, 2013: Slovenia. Available at: www.renewablefacts.com/country/slovenia Republic of Slovenia, 2010: National Renewable Energy Action Plan 2010 – 2020 Slovenia. Available at: http:// ec.europa.eu/energy/renewables/action_plan_en.htm Scientific Reference System on New Energy Technologies, Energy End-use Efficiency and Energy (SRS NET & EEE), 2008:WP3-Technology data - Executive Summary on Small Hydro. Available at: http://srs.epu.ntua.gr/Portals/SRS/material/ technologyreview/Small%20Hydro.pdf U.S. Energy Information Administration (EIA), 2013: Levelized Cost of New Generation Resources in the Annual Energy Outlook 2013. Available at: www.eia.gov/forecasts/aeo/electricity_generation.cfm World Bank, 2014: Data Catalog. Available at: http://datacatalog.worldbank.org/ Recent projects Company Project Status KPV Solar GmbH (Austria) Operates 5.704 MW solar photovoltaic power plants (ground mounted and roof-top installations). Commissioned Financing organization Details Website EU Means - European Investment Fund (EIF) - European Investment Bank (EIB) - Structural Funds Loans and guarantees through commercial banks as Intermediaries (e.g. Banka Koper, Banka Celje) and pri- vate equity/venture capital are available. www.europa.eu/youreurope/business/fi- nance-support/access-to-finance/ International Finance Corporation With investment (equity, loans and other financial in- struments) and advisory services, IFC supports may still support investment in which private financing re- mains limited. www.ifc.org/ European Bank for Reconstruction and Development (EBRD) Provides renewable energy developers with equity, loans and loan guarantees for projects with good commercial prospects of up to 15 years’duration. www.ebrd.com/pages/workingwithus/pro jects.shtml