Just 1.5 percent of Bosnia and Herzegovina’s total installed electricity capacity comes from renewable sources. The
technical potential of renewable energy is huge, particularly in solar photovoltaic energy. Both of the country’s two
political entities, the Republic Srpska (RS) and the Federation of Bosnia and Herzegovina (FBiH), promote electricity
generated from renewable sources via a feed-in tariff. In both RS and FBiH, the guaranteed tariffs are calculated by
addingtechnology-specificpremiumstoareferenceprice.InFBiH,technology-specificconversionfactorsaremultiplied
by the reference price of 0.081 BAM/kW-h. In RS, absolute determined premiums are added to the reference price of
0.0541BAM/kW-hinRS.RSalsooffersapremiumforelectricityproducedfromrenewablesources,whichiseithersold
directly to the market or is used for its own consumption.Tariffs are granted for 15 years in RS, and for 12 years in FBiH.
Bosnia and Herzegovina’s is ranked 131st
in theWorld Bank’s Ease of Doing Business index (IFC &World Bank, 2014).
Bosnia & Herzegovina
General Country
Information
Population: 3,883,916
Surface Area: 51,210 km²
Capital City: Sarajevo
GDP (2012): $ 17 billion
GDP Per Capita (2012): $ 4,447
WB Ease of Doing Business: 131
Sources: Karakosta et al. (2012); Lalic et al. (2011); ECS (2012); SERC (2012); EWEA (2013); Pavlovic et al. (2013); World Bank (2014);
Renewable Facts (2013); Hoogwijk and Graus (2008); Hoogwijk (2004); JRC (2011); SRS NET & EEE (2008); and UNDP calculations.
R E N E W A B L E E N E R G Y S N A P S H O T :
Key information about renewable energy in Bosnia and Herzegovina
Empowered lives.
Resilient nations.
1.5%
RE Share
3,964 MW
Total Installed Capacity
Biomass Solar PV Wind Small Hydro
0 < 1 0 59.8
600 48,700 2,000 600
60 MW
Installed RE Capacity
Electricity Generating
Capacity 2012
Installed Renewable Electricity
Capacity 2012 in MW
Technical Potential for Installed
Renewable Electricity Capacity in MW
In line with EU Directive 2009/28/EC,
Bosnia and Herzegovina is commit-
ted to an ambitious national binding
target of 40 percent share of renew-
able energy sources in the gross final
energy consumption by 2020 (EC,
2012). Bosnia and Herzegovina con-
sists of two separate political entities,
each with different energy laws and
regulations. In FBiH, the Law on the
Use of Renewable Energy Sources
and Efficient Cogeneration, adopted
in2013,theLawonElectricityandthe
Decree on the Use of Renewable En-
ergy and Cogeneration form the leg-
islativebasisfortherenewableenergy
policy. RS also adopted a new law on
Renewable Energy in 2013. That, to-
gether with the decision of the Reg-
ulatory Commission for Energy of
Republic of Srpska on the tariff level
and premium prices, governs the
promotion of renewable energy. In
both entities, renewable energy de-
velopers enjoy other incentives, e.g. priority in dispatch or distribution in FBiH. Both entities prioritize grid connection
for renewable energy source operators. FBiH and RS both offer other incentives for foreign investors, such as cus-
toms-free imported materials in FBiH and corporate tax exemption in RS (FIPA, 2012). Energy generation is licenced
in both RS and FBiH. Licences are issued by the Regulatory Commission for Electricity in Federation BIH in FBiH and
by the Regulatory Commission for Energy of Republic of Srpska in RS respectively.To be eligible for the feed-in tariffs,
renewable energy plant developers must have qualified producer status, which is obtained from the Regulatory
Commission for Energy in Federation of Bosnia and Herzegovina (FERK) in FBiH and REERS in RS.The new renewable
energy legislation significantly improves capacity authorization and access to distribution networks, which is likely
to increase effectiveness of renewable energy promotion (IRENA, 2013).
R E N E W A B L E E N E R G Y S N A P S H O T :
Legislation and Policy:
Feed-in tariff and feed-in premium promotion in Republic Srpska
Source: RERS (2013) BAM/€ exchange rate as on 28 February 2014.
Eligible technologies Additional constrain Installed capacity Tariffgrantedin€/MW-h Premium in€/MW-h
Wind < 10 MW 84.47 40.95
Solar PV
(since 01.01.2014)
ground mounted
ground mounted
< 50 KW
50 KW - 250 KW
250 KW - 1 MW
< 250 KW
250 KW - 1 MW
173.74
150.68
120.56
139.84
111.51
130.23
107.12
77.05
96.28
68.00
Hydro
< 1 MW
1 - 5 MW
5 - 10 MW
78.79
67.85
63.66
35.28
24.34
20.14
Biomass
< 1 MW
1 - 5 MW
211.16
115.60
79.86
72.09
1 Geothermal, land fill gas, biogas and liquid fuel gas power plants are also eligible to receive a feed-in tariff (FBiH, 2013).
Eligible technologies Installed capacity Tariff granted in €/MW-h
Wind – 51.77
Solar
< 10 KW
10 KW - 30 KW
30 KW - 150 KW
150 KW - 1MW
1 MW - 10 MW
exceeding 10 MW
310.61
273.34
248.49
173.94
157.38
124.24
Hydro
< 150 KW
150 KW - 1 MW
1 - 10 MW
48.46
41.99
41.83
Solid Biomass
from Forestry
and Agriculture
< 150 KW
150 KW - 1 MW
1 - 10 MW
exceeding 10 MW
60.88
60.05
59.22
58.39
Solid Biomass
from Wood
< 150 KW
150 KW - 1 MW
1 - 10 MW
exceeding 10 MW
59.22
58.39
57.57
56.74
Feed-in tariff in the Federation of Bosnia and Herzegovina1
Source: FBiH (2011) and FBiH (2013) BAM/€ exchange rate as on 28 February 2014.
Bosnia & Herzegovina
Institutions:
Organization Responsibility Website
Ministry of Economy,
Energy and Development
- Responsible for energy policy in the Republic
of Srpska
www.vladars.net
Federal Ministry of Energy,
Mining and Industry
- Responsible for energy policy in the Federation
of Bosnia and Herzegovina
www.fbihvlada.gov.ba/
State Electricity Regulatory
Commission (SERC)
- Responsible for regulation of electricity transmission,
transmission system operation and international
trade in electricity
- Authoritative body for generation, distribution and
supply of electricity for customers in autonomous
Brčko District
Regulatory Commission for
Energy of Republic of Srpska
(REERS)
- Responsible for regulation in generation, distribution
and trading of electricity in the Republic Srpska
- Issues licences in the electricity sector and grants
status as eligible producer of RES
www.reers.ba/
Regulatory Commission for
Energy in Federation of
Bosnia and Herzegovina
(FERK)
- Responsible for regulation in generation, distribution
and trading of electricity in the Federation of Bosnia
and Herzegovina
- Issues licences in the electricity sector and grants
status as eligible producer of RES
www.ferk.ba/_
Elektroprenos
-Elektroprijenos
- Transmission System Operator responsible for trans-
mission and management of the national grid
www.elprenosbih.ba/
Foreign Investment
Promotion Agency of Bosnia
and Herzegovina (FIPA)
- Foreign Investment Promotion Agency of Bosnia and
Herzegovina responsible to facilitate and support
foreign direct investment on state level
www.fipa.gov.ba/
Invest in Srpska - Investment Agency responsible to attract, consult and
facilitate potential investors in the Republic of Srpska
www.investsrpska.net/index.aspx?PageID
=287&menuID=215
Organization Responsibility Website
Elektro Doboj (Bosnia),
Fichtner (Germany)
In January 2013, the Republic of Srpska’s state-owned elec-
tricity utility, Elektro Doboj, signed a €2.76 million consul-
tancy contract with German Fichtner GmbH for the
development of the Cijevna 3 small hydropower plant. The
plant will have an installed capacity of 13.8 MW. The con-
struction and equipment will be financed with a €50 million
loan by German KfW Development Bank and Elektro Doboj
intends to call a tender for the construction in early 2014.
Under development
Elektroprivreda HZHB
(Bosnian)
As the country’s first wind farm, the Mesihovina project has
44 MW installed capacity and estimated construction costs
of €78 million is under construction. Germany’s KfW Devel-
opment Bank has provided a grant and a reduced-interest
loan to cover some €72 million, with Elektroprivreda HZHB
covering the remaining €6 million.
Under construction
Recent projects
Bosnia & Herzegovina
References
EnergyCharterSecretariat(ECS),2012:In-DepthReview
ofEnergyEfficiencyPolicyandProgrammes–BosniaAnd
Herzegovina.Availableat:www.encharter.org/filead-
min/user_upload/Publications/BiH_EE_2012_ENG.pdf
Energy Community (EC), 2012: Energy Community Min-
isterial Council adopts Renewable Energy 2020 targets.
Available at: www.energy-community.org/portal/page/
portal/ENC_HOME/NEWS/News_Details?p_new_
id=6342
EuropeanWind Energy Association (EWEA), 2013: An-
nual Report 2012. Available at: www.ewea.org/filead-
min/files/library/publications/reports/EWEA_Annual
_Report_2012.pdf
Federation of Bosnia and Herzegovina (FBIH), 2011: Reg-
ulation amending regulation on use of renewable en-
ergy and co-generation. Available at:
www.fbihvlada.gov.ba/bosanski/zakoni/2010/ure-
dbe/13hrv.html (Bosnian)
Federation of Bosnia and Herzegovina (FBIH), 2013: Law
on the Use of Renewable Energy Sources and Efficient
Cogeneration. Available at:
www.fbihvlada.gov.ba/bosanski/zakoni/
Foreign Investment Promotion Agency of Bosnia and
Herzegovina (FIPA), 2012: Incentives for foreign in-
vestors. Available at:
www.fipa.gov.ba/informacije/povlastice/strani_investi-
tori/default.aspx?id=141&langTag=en-US
Hoogwijk, M., 2004: On the global and regional poten-
tial of renewable energy sources. Utrecht: Universiteit
Utrecht, Faculteit Scheikunde. Dissertation. Available at:
http://igitur-archive.library.uu.nl/dissertations/2004-
0309-123617/full.pdf
Hoogwiijk, M. andW. Graus, 2008: Global Potential of
Renewable Energy Sources: A Literature Assessment.
Available at:
www.ecofys.com/files/files/report_global_potential_of
_renewable_energy_sources_a_literature_assess-
ment.pdf
International Finance Corporation (IFC) andWorld Bank,
2014: Doing Business – Measuring Business Regula-
tions. Available at: www.doingbusiness.org/data/ex-
ploreeconomies/bosnia-and-herzegovina/
International Renewable Energy Agency (IRENA), 2013:
IRENA Executive StrategyWorkshop on Renewable En-
ergy in South East Europe - Background PaperTopic A -
Renewable Energy Action Plans and Regulations to Har-
monise with EU Directives (Revised Draft 20131201).
Availabe at: www.irena.org/DocumentDownloads/
events/2013 /December/Background_Paper-A.pdf
Joint Research Centre of the European Commission
(JRC), 2011:Technical Assessment of the Renewable En-
ergy Action Plans. Available at:
http://ec.europa.eu/dgs/jrc/downloads/jrc_reference_r
eport_2011_reap.pdf
Karakosta, C., Flouri, M., Dimopoulou, S. and J. Psarras,
2012: Analysis of renewable energy progress in the
Western Balkan countries: Bosnia–Herzegovina and Ser-
bia. In: Renewable and Sustainable Energy Reviews, 16:
5166-5175
Lalic, D., Popowski, K., Gecevska,V.,Vasilevska, S. P., and
Z.Tesic, 2011: Analysis of the opportunities and chal-
lenges for renewable energy market in theWestern
Balkan countries. In: Renewable and Sustainable Energy
Reviews, 15: 3187-3195
Pavlovic,T. M., Milosavljevic, D. D., Mirjanic, D., Pantic, L.
S., Radonjic, I. S., and D. Pirsl, 2013: Assessments and per-
spectives of PV solar power engineering in the Republic
of Srpska (Bosnia and Herzegovina). In: Renewable and
Sustainable Energy Reviews, 18: 119-133
Regulatory Commission for Energy of Republic of Srpska
(RERS), 2013: Guaranteed redemption prices and premi-
ums for electricity generated from renewable energy
sources or in efficient cogeneration facilities: Available
at: www.reers.ba/sites/default/files/Decision_Guaran-
teed_Prices_July2013.pdf
Renewable Facts, 2013: Bosnia and Herzegovina. Avail-
able at: www.renewablefacts.com/country/bosnia-and-
herzegovina
Scientific Reference System on New EnergyTechnolo-
gies, Energy End-use Efficiency and Energy (SRS NET &
EEE), 2008:WP3-Technology data - Executive Summary
on Small Hydro. Available at: http://srs.epu.ntua.gr/Por-
tals/SRS/material/technologyreview/Small%20Hydro.pdf
State Electricity Regulator Commission (SERC), 2012: Re-
port on Activities of the State Electricity Regulatory
Commission. Available at: www.derk.ba/Docu-
mentsPDFs/DERK_izvjestaj_o_radu_2012-en.pdf
World Bank, 2014: Data Catalog. Available at: http://dat-
acatalog.worldbank.org/
Opportunities to finance renewable energy projects in Bosnia and Herzegovina
Financing organization Details Website
Western Balkans
Sustainable Energy
Financing Facility
(WEBSEFF)
Provides loans of between €2 million and €5 million
through local banks (Raiffeisen Bank d.d. or Bosna i
Hercegovina UniCredit Bank d.d.) for private invest-
ments in energy efficiency or renewable energy proj-
ects. Loans can cover 100 percent of the investment
costs.
www.webseff.com/
Western Balkans
Sustainable Energy
Direct Financing Facility
(WeBSEDFF)
Locally SMEs with a sound financial and economic
structure and sufficient means of equity capital can
apply for direct loans from the European Bank for Re-
construction and Development’s WeBSEDFF of be-
tween €2 million and €6 million.
www.websedff.com
Green Growth Fund Provides direct and indirect (through financial inter-
mediaries) financing for small scale renewable energy
projects usually not larger than EUR 50 million.
www.ggf.lu/
International Finance
Corporation (IFC)
With investment (equity, loans and other financial in-
struments) and advisory services, IFC supports invest-
ment with focus on Climate change, including
investments in infrastructure and energy sectors.
www.ifc.org/
European Bank
for Reconstruction
and Development (EBRD)
Provides renewable energy developers with equity,
loans and loan guarantees for projects with good
commercial prospects of up to 15 years’duration.
www.ebrd.com/pages/workingwithus/pro
jects.shtml

Weitere ähnliche Inhalte

Was ist angesagt?

How It Works
How It WorksHow It Works
How It WorkstotalEC
 
Renewable Energy The Sunrise Industry
Renewable Energy   The Sunrise IndustryRenewable Energy   The Sunrise Industry
Renewable Energy The Sunrise IndustryFernando Penarroyo
 
EASTERN AFRICA POWER POOL (EAPP) AND EAST AFRICAN COMMUNITY (EAC)
EASTERN AFRICA POWER POOL (EAPP) AND EAST AFRICAN COMMUNITY (EAC)EASTERN AFRICA POWER POOL (EAPP) AND EAST AFRICAN COMMUNITY (EAC)
EASTERN AFRICA POWER POOL (EAPP) AND EAST AFRICAN COMMUNITY (EAC)Parti Djibouti
 
Cyprus Energy Market
Cyprus Energy MarketCyprus Energy Market
Cyprus Energy MarketSeanergies
 
Polish Regional State Television – On the Border Between Regional and Nationa...
Polish Regional State Television – On the Border Between Regional and Nationa...Polish Regional State Television – On the Border Between Regional and Nationa...
Polish Regional State Television – On the Border Between Regional and Nationa...Środkowoeuropejskie Studia Polityczne
 

Was ist angesagt? (7)

How It Works
How It WorksHow It Works
How It Works
 
Renewable Energy The Sunrise Industry
Renewable Energy   The Sunrise IndustryRenewable Energy   The Sunrise Industry
Renewable Energy The Sunrise Industry
 
Slovenia
SloveniaSlovenia
Slovenia
 
EASTERN AFRICA POWER POOL (EAPP) AND EAST AFRICAN COMMUNITY (EAC)
EASTERN AFRICA POWER POOL (EAPP) AND EAST AFRICAN COMMUNITY (EAC)EASTERN AFRICA POWER POOL (EAPP) AND EAST AFRICAN COMMUNITY (EAC)
EASTERN AFRICA POWER POOL (EAPP) AND EAST AFRICAN COMMUNITY (EAC)
 
Sri Lanka Economy
Sri Lanka EconomySri Lanka Economy
Sri Lanka Economy
 
Cyprus Energy Market
Cyprus Energy MarketCyprus Energy Market
Cyprus Energy Market
 
Polish Regional State Television – On the Border Between Regional and Nationa...
Polish Regional State Television – On the Border Between Regional and Nationa...Polish Regional State Television – On the Border Between Regional and Nationa...
Polish Regional State Television – On the Border Between Regional and Nationa...
 

Ähnlich wie Bosnia & herzegovina

Albania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniAlbania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniLorenc Gordani
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...Lulzim
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...Lulzim
 
Dr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy SectorDr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy SectorAdmir Softic
 
International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaSimeon Arnaudov
 
Albanian Hydro by Dr. Lorenc Gordani
Albanian Hydro by Dr. Lorenc GordaniAlbanian Hydro by Dr. Lorenc Gordani
Albanian Hydro by Dr. Lorenc GordaniLorenc Gordani
 

Ähnlich wie Bosnia & herzegovina (20)

Croatia
CroatiaCroatia
Croatia
 
Macedonia
MacedoniaMacedonia
Macedonia
 
Belarus
BelarusBelarus
Belarus
 
Azerbaijan
AzerbaijanAzerbaijan
Azerbaijan
 
Albania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniAlbania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordani
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...
 
Bulgaria
BulgariaBulgaria
Bulgaria
 
Serbia
SerbiaSerbia
Serbia
 
Romania
RomaniaRomania
Romania
 
Latvia
LatviaLatvia
Latvia
 
Moldova
MoldovaMoldova
Moldova
 
Slovenia
SloveniaSlovenia
Slovenia
 
Czech republic
Czech republicCzech republic
Czech republic
 
Dr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy SectorDr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy Sector
 
Montenegro
MontenegroMontenegro
Montenegro
 
Ukraine
UkraineUkraine
Ukraine
 
Armenia
ArmeniaArmenia
Armenia
 
International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case Bulgaria
 
Albanian Hydro by Dr. Lorenc Gordani
Albanian Hydro by Dr. Lorenc GordaniAlbanian Hydro by Dr. Lorenc Gordani
Albanian Hydro by Dr. Lorenc Gordani
 

Mehr von UNDP Eurasia

2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy PalmerUNDP Eurasia
 
2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan ZverzhanovskiUNDP Eurasia
 
2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben SlayUNDP Eurasia
 
2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta AyoungUNDP Eurasia
 
2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka CetkovicUNDP Eurasia
 
2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim BouevUNDP Eurasia
 
2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel StanderUNDP Eurasia
 
2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill IlinskiUNDP Eurasia
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill SavrassovUNDP Eurasia
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` ConnellUNDP Eurasia
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri LaneUNDP Eurasia
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno HeuvelUNDP Eurasia
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke TaishiUNDP Eurasia
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga ButoUNDP Eurasia
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David SimmonsUNDP Eurasia
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie KrausUNDP Eurasia
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy PalmerUNDP Eurasia
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina WhalleyUNDP Eurasia
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom AvivUNDP Eurasia
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning LudolphsUNDP Eurasia
 

Mehr von UNDP Eurasia (20)

2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer
 
2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski
 
2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay
 
2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung
 
2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic
 
2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev
 
2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander
 
2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs
 

Bosnia & herzegovina

  • 1. Just 1.5 percent of Bosnia and Herzegovina’s total installed electricity capacity comes from renewable sources. The technical potential of renewable energy is huge, particularly in solar photovoltaic energy. Both of the country’s two political entities, the Republic Srpska (RS) and the Federation of Bosnia and Herzegovina (FBiH), promote electricity generated from renewable sources via a feed-in tariff. In both RS and FBiH, the guaranteed tariffs are calculated by addingtechnology-specificpremiumstoareferenceprice.InFBiH,technology-specificconversionfactorsaremultiplied by the reference price of 0.081 BAM/kW-h. In RS, absolute determined premiums are added to the reference price of 0.0541BAM/kW-hinRS.RSalsooffersapremiumforelectricityproducedfromrenewablesources,whichiseithersold directly to the market or is used for its own consumption.Tariffs are granted for 15 years in RS, and for 12 years in FBiH. Bosnia and Herzegovina’s is ranked 131st in theWorld Bank’s Ease of Doing Business index (IFC &World Bank, 2014). Bosnia & Herzegovina General Country Information Population: 3,883,916 Surface Area: 51,210 km² Capital City: Sarajevo GDP (2012): $ 17 billion GDP Per Capita (2012): $ 4,447 WB Ease of Doing Business: 131 Sources: Karakosta et al. (2012); Lalic et al. (2011); ECS (2012); SERC (2012); EWEA (2013); Pavlovic et al. (2013); World Bank (2014); Renewable Facts (2013); Hoogwijk and Graus (2008); Hoogwijk (2004); JRC (2011); SRS NET & EEE (2008); and UNDP calculations. R E N E W A B L E E N E R G Y S N A P S H O T : Key information about renewable energy in Bosnia and Herzegovina Empowered lives. Resilient nations. 1.5% RE Share 3,964 MW Total Installed Capacity Biomass Solar PV Wind Small Hydro 0 < 1 0 59.8 600 48,700 2,000 600 60 MW Installed RE Capacity Electricity Generating Capacity 2012 Installed Renewable Electricity Capacity 2012 in MW Technical Potential for Installed Renewable Electricity Capacity in MW
  • 2. In line with EU Directive 2009/28/EC, Bosnia and Herzegovina is commit- ted to an ambitious national binding target of 40 percent share of renew- able energy sources in the gross final energy consumption by 2020 (EC, 2012). Bosnia and Herzegovina con- sists of two separate political entities, each with different energy laws and regulations. In FBiH, the Law on the Use of Renewable Energy Sources and Efficient Cogeneration, adopted in2013,theLawonElectricityandthe Decree on the Use of Renewable En- ergy and Cogeneration form the leg- islativebasisfortherenewableenergy policy. RS also adopted a new law on Renewable Energy in 2013. That, to- gether with the decision of the Reg- ulatory Commission for Energy of Republic of Srpska on the tariff level and premium prices, governs the promotion of renewable energy. In both entities, renewable energy de- velopers enjoy other incentives, e.g. priority in dispatch or distribution in FBiH. Both entities prioritize grid connection for renewable energy source operators. FBiH and RS both offer other incentives for foreign investors, such as cus- toms-free imported materials in FBiH and corporate tax exemption in RS (FIPA, 2012). Energy generation is licenced in both RS and FBiH. Licences are issued by the Regulatory Commission for Electricity in Federation BIH in FBiH and by the Regulatory Commission for Energy of Republic of Srpska in RS respectively.To be eligible for the feed-in tariffs, renewable energy plant developers must have qualified producer status, which is obtained from the Regulatory Commission for Energy in Federation of Bosnia and Herzegovina (FERK) in FBiH and REERS in RS.The new renewable energy legislation significantly improves capacity authorization and access to distribution networks, which is likely to increase effectiveness of renewable energy promotion (IRENA, 2013). R E N E W A B L E E N E R G Y S N A P S H O T : Legislation and Policy: Feed-in tariff and feed-in premium promotion in Republic Srpska Source: RERS (2013) BAM/€ exchange rate as on 28 February 2014. Eligible technologies Additional constrain Installed capacity Tariffgrantedin€/MW-h Premium in€/MW-h Wind < 10 MW 84.47 40.95 Solar PV (since 01.01.2014) ground mounted ground mounted < 50 KW 50 KW - 250 KW 250 KW - 1 MW < 250 KW 250 KW - 1 MW 173.74 150.68 120.56 139.84 111.51 130.23 107.12 77.05 96.28 68.00 Hydro < 1 MW 1 - 5 MW 5 - 10 MW 78.79 67.85 63.66 35.28 24.34 20.14 Biomass < 1 MW 1 - 5 MW 211.16 115.60 79.86 72.09 1 Geothermal, land fill gas, biogas and liquid fuel gas power plants are also eligible to receive a feed-in tariff (FBiH, 2013). Eligible technologies Installed capacity Tariff granted in €/MW-h Wind – 51.77 Solar < 10 KW 10 KW - 30 KW 30 KW - 150 KW 150 KW - 1MW 1 MW - 10 MW exceeding 10 MW 310.61 273.34 248.49 173.94 157.38 124.24 Hydro < 150 KW 150 KW - 1 MW 1 - 10 MW 48.46 41.99 41.83 Solid Biomass from Forestry and Agriculture < 150 KW 150 KW - 1 MW 1 - 10 MW exceeding 10 MW 60.88 60.05 59.22 58.39 Solid Biomass from Wood < 150 KW 150 KW - 1 MW 1 - 10 MW exceeding 10 MW 59.22 58.39 57.57 56.74 Feed-in tariff in the Federation of Bosnia and Herzegovina1 Source: FBiH (2011) and FBiH (2013) BAM/€ exchange rate as on 28 February 2014.
  • 3. Bosnia & Herzegovina Institutions: Organization Responsibility Website Ministry of Economy, Energy and Development - Responsible for energy policy in the Republic of Srpska www.vladars.net Federal Ministry of Energy, Mining and Industry - Responsible for energy policy in the Federation of Bosnia and Herzegovina www.fbihvlada.gov.ba/ State Electricity Regulatory Commission (SERC) - Responsible for regulation of electricity transmission, transmission system operation and international trade in electricity - Authoritative body for generation, distribution and supply of electricity for customers in autonomous Brčko District Regulatory Commission for Energy of Republic of Srpska (REERS) - Responsible for regulation in generation, distribution and trading of electricity in the Republic Srpska - Issues licences in the electricity sector and grants status as eligible producer of RES www.reers.ba/ Regulatory Commission for Energy in Federation of Bosnia and Herzegovina (FERK) - Responsible for regulation in generation, distribution and trading of electricity in the Federation of Bosnia and Herzegovina - Issues licences in the electricity sector and grants status as eligible producer of RES www.ferk.ba/_ Elektroprenos -Elektroprijenos - Transmission System Operator responsible for trans- mission and management of the national grid www.elprenosbih.ba/ Foreign Investment Promotion Agency of Bosnia and Herzegovina (FIPA) - Foreign Investment Promotion Agency of Bosnia and Herzegovina responsible to facilitate and support foreign direct investment on state level www.fipa.gov.ba/ Invest in Srpska - Investment Agency responsible to attract, consult and facilitate potential investors in the Republic of Srpska www.investsrpska.net/index.aspx?PageID =287&menuID=215 Organization Responsibility Website Elektro Doboj (Bosnia), Fichtner (Germany) In January 2013, the Republic of Srpska’s state-owned elec- tricity utility, Elektro Doboj, signed a €2.76 million consul- tancy contract with German Fichtner GmbH for the development of the Cijevna 3 small hydropower plant. The plant will have an installed capacity of 13.8 MW. The con- struction and equipment will be financed with a €50 million loan by German KfW Development Bank and Elektro Doboj intends to call a tender for the construction in early 2014. Under development Elektroprivreda HZHB (Bosnian) As the country’s first wind farm, the Mesihovina project has 44 MW installed capacity and estimated construction costs of €78 million is under construction. Germany’s KfW Devel- opment Bank has provided a grant and a reduced-interest loan to cover some €72 million, with Elektroprivreda HZHB covering the remaining €6 million. Under construction Recent projects
  • 4. Bosnia & Herzegovina References EnergyCharterSecretariat(ECS),2012:In-DepthReview ofEnergyEfficiencyPolicyandProgrammes–BosniaAnd Herzegovina.Availableat:www.encharter.org/filead- min/user_upload/Publications/BiH_EE_2012_ENG.pdf Energy Community (EC), 2012: Energy Community Min- isterial Council adopts Renewable Energy 2020 targets. Available at: www.energy-community.org/portal/page/ portal/ENC_HOME/NEWS/News_Details?p_new_ id=6342 EuropeanWind Energy Association (EWEA), 2013: An- nual Report 2012. Available at: www.ewea.org/filead- min/files/library/publications/reports/EWEA_Annual _Report_2012.pdf Federation of Bosnia and Herzegovina (FBIH), 2011: Reg- ulation amending regulation on use of renewable en- ergy and co-generation. Available at: www.fbihvlada.gov.ba/bosanski/zakoni/2010/ure- dbe/13hrv.html (Bosnian) Federation of Bosnia and Herzegovina (FBIH), 2013: Law on the Use of Renewable Energy Sources and Efficient Cogeneration. Available at: www.fbihvlada.gov.ba/bosanski/zakoni/ Foreign Investment Promotion Agency of Bosnia and Herzegovina (FIPA), 2012: Incentives for foreign in- vestors. Available at: www.fipa.gov.ba/informacije/povlastice/strani_investi- tori/default.aspx?id=141&langTag=en-US Hoogwijk, M., 2004: On the global and regional poten- tial of renewable energy sources. Utrecht: Universiteit Utrecht, Faculteit Scheikunde. Dissertation. Available at: http://igitur-archive.library.uu.nl/dissertations/2004- 0309-123617/full.pdf Hoogwiijk, M. andW. Graus, 2008: Global Potential of Renewable Energy Sources: A Literature Assessment. Available at: www.ecofys.com/files/files/report_global_potential_of _renewable_energy_sources_a_literature_assess- ment.pdf International Finance Corporation (IFC) andWorld Bank, 2014: Doing Business – Measuring Business Regula- tions. Available at: www.doingbusiness.org/data/ex- ploreeconomies/bosnia-and-herzegovina/ International Renewable Energy Agency (IRENA), 2013: IRENA Executive StrategyWorkshop on Renewable En- ergy in South East Europe - Background PaperTopic A - Renewable Energy Action Plans and Regulations to Har- monise with EU Directives (Revised Draft 20131201). Availabe at: www.irena.org/DocumentDownloads/ events/2013 /December/Background_Paper-A.pdf Joint Research Centre of the European Commission (JRC), 2011:Technical Assessment of the Renewable En- ergy Action Plans. Available at: http://ec.europa.eu/dgs/jrc/downloads/jrc_reference_r eport_2011_reap.pdf Karakosta, C., Flouri, M., Dimopoulou, S. and J. Psarras, 2012: Analysis of renewable energy progress in the Western Balkan countries: Bosnia–Herzegovina and Ser- bia. In: Renewable and Sustainable Energy Reviews, 16: 5166-5175 Lalic, D., Popowski, K., Gecevska,V.,Vasilevska, S. P., and Z.Tesic, 2011: Analysis of the opportunities and chal- lenges for renewable energy market in theWestern Balkan countries. In: Renewable and Sustainable Energy Reviews, 15: 3187-3195 Pavlovic,T. M., Milosavljevic, D. D., Mirjanic, D., Pantic, L. S., Radonjic, I. S., and D. Pirsl, 2013: Assessments and per- spectives of PV solar power engineering in the Republic of Srpska (Bosnia and Herzegovina). In: Renewable and Sustainable Energy Reviews, 18: 119-133 Regulatory Commission for Energy of Republic of Srpska (RERS), 2013: Guaranteed redemption prices and premi- ums for electricity generated from renewable energy sources or in efficient cogeneration facilities: Available at: www.reers.ba/sites/default/files/Decision_Guaran- teed_Prices_July2013.pdf Renewable Facts, 2013: Bosnia and Herzegovina. Avail- able at: www.renewablefacts.com/country/bosnia-and- herzegovina Scientific Reference System on New EnergyTechnolo- gies, Energy End-use Efficiency and Energy (SRS NET & EEE), 2008:WP3-Technology data - Executive Summary on Small Hydro. Available at: http://srs.epu.ntua.gr/Por- tals/SRS/material/technologyreview/Small%20Hydro.pdf State Electricity Regulator Commission (SERC), 2012: Re- port on Activities of the State Electricity Regulatory Commission. Available at: www.derk.ba/Docu- mentsPDFs/DERK_izvjestaj_o_radu_2012-en.pdf World Bank, 2014: Data Catalog. Available at: http://dat- acatalog.worldbank.org/ Opportunities to finance renewable energy projects in Bosnia and Herzegovina Financing organization Details Website Western Balkans Sustainable Energy Financing Facility (WEBSEFF) Provides loans of between €2 million and €5 million through local banks (Raiffeisen Bank d.d. or Bosna i Hercegovina UniCredit Bank d.d.) for private invest- ments in energy efficiency or renewable energy proj- ects. Loans can cover 100 percent of the investment costs. www.webseff.com/ Western Balkans Sustainable Energy Direct Financing Facility (WeBSEDFF) Locally SMEs with a sound financial and economic structure and sufficient means of equity capital can apply for direct loans from the European Bank for Re- construction and Development’s WeBSEDFF of be- tween €2 million and €6 million. www.websedff.com Green Growth Fund Provides direct and indirect (through financial inter- mediaries) financing for small scale renewable energy projects usually not larger than EUR 50 million. www.ggf.lu/ International Finance Corporation (IFC) With investment (equity, loans and other financial in- struments) and advisory services, IFC supports invest- ment with focus on Climate change, including investments in infrastructure and energy sectors. www.ifc.org/ European Bank for Reconstruction and Development (EBRD) Provides renewable energy developers with equity, loans and loan guarantees for projects with good commercial prospects of up to 15 years’duration. www.ebrd.com/pages/workingwithus/pro jects.shtml