CONTOH: 
KONSEP PEMBUATAN 
SARANA AIR BERSIH 
OLEH: KHOIRUL UMAM
TUJUAN 
KEGIATAN INI BERTUJUAN AGAR MASYARAKAT MENDAPATKAN DISTRIBUSI AIR 
BERSIH UNTUK DIGUNAKAN DALAM AKTIVITAS SEHARI-H...
RENCANA IMPLEMENTASI 
• PERBAIKAN INSTALASI PIPA 
• PEMASANGAN PIPA UTAMA 1,5” SEPANJANG 400 METER 
• PEMASANGAN PERANGKAT...
DIAGRAM 
SKEMA 
INSTALASI
KALKUKASI BIAYA 
• VARIABEL BIAYA: 
• PELANGGAN = 25 ORANG 
• PIPA UTAMA = 400 METER 
• HARGA PIPA = RP43.500 PER 4 METER ...
KALKULASI BIAYA 
BIAYA AWAL 
• PEMASANGAN PIPA UTAMA: 
• 400M X (RP43.500/4) = RP4.350.000 
• PEMASANGAN PENGONTROL OTOMAT...
KALKULASI BIAYA 
BIAYA OPERASIONAL BERDASARKAN PENGISIAN TOREN: 
• KEBUTUHAN VOLUME DISTRIBUSI AIR: 
• 40 (LITER) X 5 (ORA...
KALKULASI BIAYA 
BIAYA OPERASIONAL KARYAWAN: 
• KARYAWAN OPERATOR: 
• RP200.000 X 1 (ORANG) = RP200.000 
• KARYAWAN PENCAT...
KALKULASI HARGA PELANGGAN 
• ABONEMEN BERDASARKAN BIAYA KARYAWAN: 
• RP350.000/25 (ORG) = RP14.000 
• HARGA PER LITER: 
• ...
PROJECT PLANNER
KELOMPOK STUDI DAN IMPLEMENTASI IPTEK (KSI-IPTEK) 
CONTACT PERSON : KHOIRUL UMAM, S.PD., M.T. 
E-MAIL : UMAM@KSI-IPTEK.COM...
Nächste SlideShare
Wird geladen in …5
×

Contoh Konsep Pembuatan Sarana Air Bersih

756 Aufrufe

Veröffentlicht am

Contoh konsep pembuatan sarana air bersih untuk didistribusikan kepada masyarakat yang kualitas airnya kurang baik atau tercemar.

Veröffentlicht in: Umweltschutz
0 Kommentare
0 Gefällt mir
Statistik
Notizen
  • Als Erste(r) kommentieren

  • Gehören Sie zu den Ersten, denen das gefällt!

Keine Downloads
Aufrufe
Aufrufe insgesamt
756
Auf SlideShare
0
Aus Einbettungen
0
Anzahl an Einbettungen
24
Aktionen
Geteilt
0
Downloads
16
Kommentare
0
Gefällt mir
0
Einbettungen 0
Keine Einbettungen

Keine Notizen für die Folie

Contoh Konsep Pembuatan Sarana Air Bersih

  1. 1. CONTOH: KONSEP PEMBUATAN SARANA AIR BERSIH OLEH: KHOIRUL UMAM
  2. 2. TUJUAN KEGIATAN INI BERTUJUAN AGAR MASYARAKAT MENDAPATKAN DISTRIBUSI AIR BERSIH UNTUK DIGUNAKAN DALAM AKTIVITAS SEHARI-HARI
  3. 3. RENCANA IMPLEMENTASI • PERBAIKAN INSTALASI PIPA • PEMASANGAN PIPA UTAMA 1,5” SEPANJANG 400 METER • PEMASANGAN PERANGKAT PENGONTROL OTOMATIS • PEMBUATAN REGULASI SISTEM
  4. 4. DIAGRAM SKEMA INSTALASI
  5. 5. KALKUKASI BIAYA • VARIABEL BIAYA: • PELANGGAN = 25 ORANG • PIPA UTAMA = 400 METER • HARGA PIPA = RP43.500 PER 4 METER • RADAR TOREN = RP50.000 • SELENOID VALVE = RP150.000 • OUTPUT DAYA POMPA = 880 WATT • HARGA LISTRIK PER KWH = RP769  RP800 • ASUMSI WAKTU PENGISIAN TOREN = 1 JAM • KAPASITAS TOTAL TOREN = 1.750 LITER • ASUMSI PEMAKAIAN PELANGGAN = 40 LITER PER ORANG • ASUMSI RATA-RATA PENGGUNA PER KK = 5 ORANG • GAJI KARYAWAN OPERATOR 1 ORANG = RP200.000 • GAJI KARYAWAN PENCATAT WATER METER = RP50.000 PER ORANG X 3 ORANG = RP150.000
  6. 6. KALKULASI BIAYA BIAYA AWAL • PEMASANGAN PIPA UTAMA: • 400M X (RP43.500/4) = RP4.350.000 • PEMASANGAN PENGONTROL OTOMATIS (SELENOIDA + RADAR): • (RP50.000 + RP150.000) X 2 = RP400.000 • HONOR 2 ORANG PEKERJA/TUKANG: • RP100.000 X 2 (ORANG) X 3 (HARI) = RP600.000
  7. 7. KALKULASI BIAYA BIAYA OPERASIONAL BERDASARKAN PENGISIAN TOREN: • KEBUTUHAN VOLUME DISTRIBUSI AIR: • 40 (LITER) X 5 (ORANG) X 25 (KK) = 5000 LITER PER HARI • WAKTU PENGISIAN TOREN: • 5000/1.750 = 2,86 (KALI PENGISIAN) X 1 (JAM) = 2,86 (JAM) PER HARI • PEMAKAIAN LISTRIK PENGISIAN TOREN: • (880 (WATT) / 1000) X 2,86 (JAM) X RP800 = RP2.013 (PER HARI) X 30 (HARI) = RP60.390 (PER BULAN)
  8. 8. KALKULASI BIAYA BIAYA OPERASIONAL KARYAWAN: • KARYAWAN OPERATOR: • RP200.000 X 1 (ORANG) = RP200.000 • KARYAWAN PENCATAT WATER METER: • RP50.000 X 3 (ORANG) = RP150.000 NOTE: • JUMLAH KARYAWAN 3 ORANG DENGAN ASUMSI KARYAWAN OPERATOR DIBERDAYAKAN JUGA SEBAGAI KARYAWAN PENCATAT WATER METER
  9. 9. KALKULASI HARGA PELANGGAN • ABONEMEN BERDASARKAN BIAYA KARYAWAN: • RP350.000/25 (ORG) = RP14.000 • HARGA PER LITER: • RP60.390/(5000 (LITER) X 30 (BULAN)) = RP0,4  RP400 PER KUBIK • ASUMSI TAGIHAN PELANGGAN YANG MENGGUNAKAN YANG TERDIRI DARI 5 ORANG ANGGOTA KELUARGA: • 40 (LITER) X 5 (ORANG) X 30 (HARI) = 6000 (LITER) X RP0,4 = RP2.400 + RP14.000 (ABONEMEN) = RP16.400 PER BULAN
  10. 10. PROJECT PLANNER
  11. 11. KELOMPOK STUDI DAN IMPLEMENTASI IPTEK (KSI-IPTEK) CONTACT PERSON : KHOIRUL UMAM, S.PD., M.T. E-MAIL : UMAM@KSI-IPTEK.COM TERIMAKASIH...

×