UEM CONSTRUCTION SDN BHD
   http://www.uembuilders.com/uemc_n/
CORPORATE STRUCTURE




       UEM Builders       UEM Builders-Ansal
    (Singapore) Pte Ltd      API Pvt Ltd
Buildings
 -   Hospitals
 -   Airports
 -   Townships
 -   Stadiums
 -   Industrial Parks
 -   Residential & Commercial
                                 Infrastructure
                                - Roads
                                - Rail
                                - Drainage
                                - Bridges
                                - Utilities
                                - Landscaping
Earthworks
- Earth cutting and filling
- Ground treatment
- Retaining wall system
500


              400


              300
USD Million
              200


              100


                0
                    2007   2008   2009

                           Year
   40 years’ experience in engineering & construction

   880 experienced professional staff (Engineers, Architects, QS,

    Accountants)

   USD 315 million paid up capital

   USD 1.3 billion total assets

   Machineries available for local and international projects

   USD 80mil worth of equipment in India, Malaysia and Qatar
LANDMARK PROJECTS




http://www.uembuilders.com/uemc_n/
NORTH SOUTH EXPRESSWAY




     848 km of tolled expressway

     Completed in 1993

     Project cost: USD 1.8 bil.

     Role: Concessionaire, Project Management,
      Construction
KUALA LUMPUR INTERNATIONAL AIRPORT
Integrated Development




                         Development Area                100 km2
                         Development Period              7 years
                         Gross Development Value (GDV)   USD 3.6 bil
                                                         Project Management
                         Role                            Construction (Satellite
                                                         Building)
NATIONAL SPORTS COMPLEX




   100,000 seat capacity National Stadium (outdoor stadium)

    16,000 seat Putra Stadium (indoor stadium)

    3,700 seat National Aquatic Centre (swimming complex)

   Completed in 1998

   Project cost: USD 400 million

   Role: Concessionaire, Project Management, Construction
KUALA LUMPUR LIGHT RAIL TRANSIT




 Total length: 29 km (22 km elevated, 5 km underground and 2 km
  at-grade)

 First world’s longest driverless LRT system completed in 1999
 Capacity: 25,000 passengers/hr/direction
 Project cost: USD2.04 billion
 Role: Concessionaire, Project Management, Construction.
COMPLETED PROJECTS




http://www.uembuilders.com/uemc_n/
EXPRESSWAYS

                                                                                    NORTH SOUTH
                                                                                    EXPRESSWAY
                                                                                    Construction and O&M of
                                                                                    955 km tolled Highway




PENANG BRIDGE
Operation and Maintenance of 13.5 km bridge




MALAYSIA SINGAPORE SECOND CROSSING
Construction and O&M of 44 km of highways including 2 km bridge
                                                                         NORTH SOUTH EXPRESSWAY
                                                                         CENTRAL LINK
                                                                         Construction and O&M of 45 km of tolled
                                                                         expressway
NORTH-SOUTH EXPRESSWAY


     Construction of several packages amounting to 203 km dual
      two lanes tolled expressway.
     Involved in implementation of heavy repair works and
      routine maintenance of the completed 848 km
      expressway since 1994.
     Completed in May 1995.
     Project cost: USD 630 million.
NORTH SOUTH EXPRESSWAY CENTRAL LINK

        Construction of 45 km of tolled expressway linking NKVE to
         Nilai North Interchange at NSE. Gateway to KLIA airport and
         Cyberjaya/Putrajaya.
        Involved in implementation of heavy repair works and routine
         maintenance of the completed 60 km expressway since 1997.
        Completed in December 1997.
        Project cost: USD 236 million.
MALAYSIA-SINGAPORE SECOND CROSSING BRIDGE

   Construction of 44 km of dual two/three lane tolled
    expressway and 2 km of bridge linking Johor to Singapore
    and to Johor City & NSE.
   Involved in implementation of heavy repair works and
    routine maintenance of the completed 44 km expressway
    since 1997.
   Completed in December 1997.
   Project cost: USD 310 million.
NORTH-SOUTH EXPRESSWAY- THIRD LANE WIDENING

 North South Expressway – Proposed Third
    Lane Widening and Modification for Non-
    Stop Through Traffic for Packages 1, 2A,
    2B, 3A, 3B, 4, 5 and 5A.
 Commenced:
   Package 1 -July 2005 (Completed)
   Package 2A,2B,3A,3B & 4 –Aug 2005
    (Completed)
   Package 5 – August 2005 (Completed)
   Package 5A –July 2005 (Completed)
 Value : USD 253 million
PENANG BRIDGE WIDENING
   Construction of widening of the existing Penang Bridge.
   Involvement of rejuvenation of the existing east side
    approach embankment foundations alongside extending
    the existing substructure of the main viaduct and
    providing longitudinal beams and construction of Uni-
    Directional Ramps to mainland side.
   Completed on August 2009.
   Project cost: USD 143 million.
COMPLETED HIGHWAYS IN INDIA
MAJOR HIGHWAYS COMPLETED IN INDIA
   Construction & Maintenance (for 15 years) of
    Tuni - Anakapalli, NH 5, Andhra Pradesh
       Length                : 59 km.
       Project Cost (@ EPC) : USD 48 mil.



   Construction & Maintenance (for 15 years) of
    Tambaram-Tindivanam,NH 45,Tamil Nadu
       Length                : 93 km.
       Project Cost         : USD 63 mil.


 Tumkur–Haveri-NH4,     Pkg. 2,4,5-Karnataka
       Length               : 200 km.
       Project Cost (@ EPC) : USD 152.7 mil.
MAJOR HIGHWAYS COMPLETED IN INDIA
 Bhiwandi-Kalyan-Shil   Phata, Maharastra
     Length                 : 25 km.
     Project Cost           : USD 17 mil.




 Etawah to    Sikandra-NH 2, Uttar Pradesh – Pckg.1C

     Length                 : 72km.
     Project Cost           : USD 63 mil.




 Kerala State   Transport Project Phase-1
     Length                  : 127 km.
     Project Cost           : USD 50 mil.
MANILA-CAVITE TOLL EXPRESSWAY PKG 1, PHILIPPINES


                     Upgrading of existing R1 Expressway

                     Length: 6.6km dual 3-lane highway

                     Completed: April 1998

                     Project cost: USD23 million
PROJECT IN QATAR
         Qatar Primary Routes - Salwa Road Phase 1
         Upgrading 81 km dual 4 lane highway linking
          Qatar-Saudi Border at Salwa to Doha
         Total project cost: USD 265 million.
         Completed: December 2008
TRANSPORTATION




                                                              ELECTRIFIED DOUBLE TRACK
                                                              Construction of total 182km of
                                                              Electrified Double Track Railway Lines
                                                              between two major cities




LIGHT RAIL TRANSIT SYSTEM
Construction of total 29km elevated, underground and at
grade track including stations for the driverless automated
Light Rail Transit.
PUTRA LIGHT RAIL TRANSIT STATIONS, KUALA LUMPUR
      Completed: 1999
      Value: USD 494.3 million
Project involved the construction of 29 km track way for Light
Rail Transit System in Kuala Lumpur involving 22 km elevated
track, 5 km underground tunnel and 2 km at-grade track.
Construction of 5 underground LRT stations, 17 above-ground
and 2 at-grade stations throughout the LRT system.
Longest driverless automated LRT in the world.
Implemented in November 1994 and completed in June 1999.
IPOH-RAWANG ELECTRIFIED DOUBLE TRACKING



            Construction of 155 bridge crossings for the 182 km

             electrified railway line linking Rawang to Ipoh.

            Project Cost: USD 436 million.

            31st March 2007
BUILDINGS & FACILITIES


MARDI Agriculture Centre
Construction of National Stadium,
aquatic centre and indoor stadium                                 NATIONAL HEART INSTITUTE
for the nation sport facilities.                                  Construction of new healthcare facilities for the
                                                                  extension of the National Heart Institute.




NATIONAL SPORTS COMPLEX                                            KUALA LUMPUR INTERNATIONAL
Construction of National Stadium, aquatic centre
and indoor stadium for the nation sport facilities.                AIRPORT (KLIA)
                                                                   Construction of Satellite Building and ancillary
                                                                   works for the Malaysia’s largest airport.




MINISTRY OF FINANCE II BUILDING
Construction of Government Building for the
Federal Government Administrative Centre in
Putrajaya.                                                                        JSNAC
                                                                                  Construction of Johor State New
                                                                                  Administration Centre in Johor
NATIONAL SPORTS COMPLEX, BUKIT JALIL, KUALA LUMPUR

    Completed: 1998
    Value: USD 286 million

100,000 capacity National Stadium (outdoor
stadium), 3,700 seat National Aquatic Centre
(swimming complex) and 16,000 seat Putra
Stadium (indoor stadium).
Implemented in January 1994 and completed in
July 1998 for the XVI Commonwealth Games.
COMMONWEALTH GAMES VILLAGE, BUKIT JALIL, KUALA LUMPUR
     Completed: 1998
     Value: USD 77.7 million
     Gross Floor Area: 198,774 m²

 Construction of multi storey apartment blocks
 complete with recreational facilities.
 1,500 units were built in total.
KUALA LUMPUR INTERNATIONAL AIRPORT,
                SATELLITE BUILDING, SEPANG
     Completed: 1998
     Value: USD 157 million
     Gross Floor Area: 148,000 m².




Design and construction of the satellite building
and its ancillary works as part of the Kuala
Lumpur International Airport Complex.
Project implementation in joint venture with
international  construction companies    as
consortium partners.
EAST MALAYSIA HOSPITALS




      Completed: 2005
      Value: USD 256 million
     The planning, design, construction, equipping, commissioning
     and maintenance of six hospitals with a combined total of 976
     beds were delivered to the Ministry of Health Malaysia in stages
     from 2002 till 2005. Five of the hospitals are located in the state
     of Sabah in East Malaysia, namely Lahad Datu, Keningau,
     Kuala Penyu, Pitas and Kunak. One more hospital is located in
     the state of Sarawak, also in East Malaysia, in Sarikei.
EAST MALAYSIA HOSPITALS


                                                   Sarikei, Sarawak

                                              Completed: December 2005
                                              Value: USD 74 million
                                              Total of 268 beds
                                              Gross Floor Area: 40,000 sq. ft




        Pitas, Sabah

 Completed: June 2005
 Value: USD 24 million
 Total of 76 beds
 Gross Floor Area: 15,284 m2
EAST MALAYSIA HOSPITALS
                                                    Kuala Penyu, Sabah
                                                Completed: May 2005
                                                Value: USD 22 million
                                                Total of 76 beds
                                                Gross Floor Area: 15,284 m2




      Kunak, Sabah

 Completed: May 2005
 Value: USD 24 million
 Total of 76 beds
 Gross Floor Area: 15,284 m2
EAST MALAYSIA HOSPITALS
Keningau, Sabah




                                       Completed: September 2002
                                       Value: USD 58 million
                                       Total of 212 beds
                                       Gross Floor Area: 63,477 m2
EAST MALAYSIA HOSPITALS
Lahad Datu, Sabah




                                     Completed: January 2002
                                     Value: USD 61 million
                                     Total of 268 beds
                                     Gross Floor Area: 68,1000 m2
EAST MALAYSIA HOSPITALS
Sarikei Hospital, Malaysia (268 Beds)




   Completed: December 2003
   Value: USD 74 million
   Total of 268 beds
   Gross Floor Area: 40,000 sqft.
UNIVERSITY OF TECHNOLOGY PETRONAS (UTP) MOSQUE,
                 TRONOH, PERAK

                        Completed: October 2005
                        Value: USD 7.7 million
                        Gross Floor Area: 5,659 m²
                         The construction and completion of this
                         uniquely designed ‘floating’ mosque at
                         Bandar Seri Iskandar, Perak has a
                         capacity to accommodate 4,000
                         people.
                         The enclosed main prayer area is air-
                         conditioned and can accommodate
                         1,000 people. The covered prayer area,
                         accommodating 3,000 people, which
                         was previously ventilated naturally, has
                         been changed into an air-conditioned
                         system.
DANAU VILLA LINK HOME, TAMAN DESA, KUALA LUMPUR

• Commenced: 10 September 2004
• Completion: 6 November 2005
• Value: USD90.5 million

Construction and completion of 64
units of 3-storey link home and
sewerage pump, Danau Villa Link
Home, Taman Desa, Kuala Lumpur.
MINISTRY OF FINANCE BUILDING 2, PUTRAJAYA

                 Commenced: 4 December 2002
                 Completed: 30 April 2007
                 Value: USD 60 million
                 Gross Floor Area: 67,108 m²
                  Design, construction and completion of office
                  buildings to house agencies under the Ministry of
                  Finance at the New Federal Government
                  Administrative Centre in Putrajaya.
                  2 office blocks, 8 and 10-storey high with each
                  housing two levels of basement car parks.
                  Scope of works include interior design works.
CASA DESA CONDOMINIUM, KUALA LUMPUR
Commenced: 11 July 2005
Completed : 31 March 2008    For the 410-unit Casa Desa Condominium, the
Value: USD 24 million        contract package consists of substructure works and
Gross Floor Area: 9,794 m2   superstructure works.
                              Project involves construction of 7 blocks of
                              condominium buildings including earthworks, bored
                              piling and pile caps.
AGRICULTURE EXPOSITION CENTRE (PHASE 2)-MARDI, SERDANG

 Project : Agriculture Exposition Centre (Phase 2) –

   MARDI, Serdang

 Commenced : 27 November 2007

 Completed : 30 June 2008

 Value : USD 64 million

 Gross Floor Area: 25,000 m²
JOHOR STATE NEW ADMINISTRATIVE CENTRE (JSNAC),
                          PHASE 1, JOHOR
    Commenced: November 2005
    Completed: August 2008
    Value: USD 62 million

The development of the JSNAC on a 320-acre site
located at Bandar Nusajaya, 25 km from Johor
Bahru, Johor is divided into three precincts
comprising the Government precinct (273 acres), VIP
residences and Istana reserve (17 acres) and
government housing reserve (30 acres).


                                                      Phase 1 of this development is
                                                      divided into five packages where
                                                      three packages, has been
                                                      awarded. Project involves the
                                                      construction of office buildings
                                                      for the new state administrative
                                                      centre in Johor.
STATE DEPARTMENT COMPLEX (JSNAC), NUSAJAYA

Commenced: November 2005
Completed: February 2009
Value: USD 63 million
UEM GROUP NEW CORPORATE OFFICE, KUALA LUMPUR
                         Commenced: 1 June 2005
                         Completed: December 2008
                         Value: USD 45 million
                         Gross Floor Area: 35,000 m²




                  This project involves the design and construction of a 29-
                  storey office building with an 8-storey annex building at
                  KL Sentral. The scope of works involves interior design.
PLUS HEADQUARTERS, SUBANG

              Development of one block of 10-storey
               office tower at Subang Toll, Petaling Jaya,
               Selangor Darul Ehsan
              Commenced : 15 January 2007
              Completed : December 2008
              Value : USD 29 million
NATIONAL HEART INSTITUTE, KUALA LUMPUR

Commenced: 5 September 2005
Completed: March 2009
Value: USD 64.6 million
Gross Floor Area: 32,840 m²




                               Design, construction, supply and commissioning
                               and maintenance of new healthcare facilities for
                               the extension of the National Heart Institute.
                               This project is divided into four phases and works
                               entail the renovating and refurbishing of existing
                               facilities.
COLLEGE OF TECHNOLOGY (COT), DOHA, QATAR

 Constructionof 21 multidisciplinary buildings comprising
classrooms, workshops/labs, cafeterias, recreation facilities,
auditorium and administration buildings with a total area of
63,000 m2 and external infrastructure for campus area of
300,000 m2.

 Project   cost: USD 100 million.

 Completed:    October 2006
GOVERNMENT APARTMENTS, PUTRAJAYA
             Project : 548 Units (5 Blocks) Apartment

             Using Industrialised Building System (IBS) Method

             Commenced : September 2006

             Exp. Completion : March 2008

             Value : USD 39 million

             Gross Floor Area: 60,500 m²
RESORTS WORLD AT SENTOSA, SINGAPORE

 Proposed Basement Structural Works for
   Universal Studio

 Commenced: March 2008                      MC04-F1

 Completed: July 2008

 Value: USD 4.5 million

 Gross Floor Area: 65,800 m²
ON-GOING PROJECTS




http://www.uembuilders.com/uemc_n/
BANK KERJASAMA RAKYAT HEADQUARTERS, KUALA LUMPUR
    Design, construction and completion of 2 office

      towers (32 and 38-storeys), 1 block of 8-storey

      annex comprises of car parks and 1 unit PPU

    Commenced : 1 June 2009

    Exp. Completion : December 2011

    Value : USD 26 million

    Gross Floor Area: 188,000 m²
PENANG SECOND BRIDGE
 Project : Design, Construction and Completion of the
  Penang Second Bridge.
    Package 2 : Super-structure Works of Approach Spans.
   • Overall length - 24 km
   • Length over water - 17 km,
   • Main span : Length - 250 meters
   • Height clearance (above water) – 30 meters
   • Number of vehicle lanes – 2 + 1 for motorcycles (each
      direction)
 Commenced : June 2009
 Exp. Completion : March 2013
 Value : USD 473 million
PHG’-S’GOR RAW WATER TRANSFER PROJECT

                       Pahang - Selangor Raw Water Transfer

                         Project Lot 1-1, Water Transfers

                         Tunnel & Related Works (2,260 Mld.)

                       Commenced : June 2009

                       Exp. Completion : May 2014

                       Value : USD 400 million

                       Length: 44.6km ; Diameter: 5.2m
   1,765-acre Sushant Golf City Project in Lucknow, Uttar Pradesh

                                          Project : Construction of various

                                            building and engineering works at

                                            Sushant Golf City, Lucknow U.P. India.

                                          Commenced : 1 April 2008

                                          Exp. Completion : February 2012

                                          Value : USD 497 million

                                          Total Development Area : 1,765 acre
4000 UNITS HOUSING PROJECT, BRUNEI
 Project : 4000 units Housing Project for the

   National Housing Scheme, Brunei.

 Commenced : 2 February 2010

 Exp. Completion : February 2014

 Value : USD 290 million

 Total Development Area: 309 hectares
NEW LCC TERMINAL AT KLIA, SEPANG
               Project : Design, Construction and Completion,

                 Testing, Commissioning and Maintenance of Main

                 Terminal Building, Satellite Building, Sky Bridge

                 and Piers.

               Commenced : 16 August 2010

               Exp. Completion : April 2012

               Value : USD 316 million
Thank You
This document is the property of United Engineers (Malaysia) Berhad. Neither the whole nor any part of this document may be reproduced, stored or transmitted in any forms or by any means without
written permission of United Engineers (Malaysia) Berhad.
This document is designed to provide information in relation to the subject matter covered for this presentation and should not be used for any other purpose. Whilst every care has been taken in its
preparation, no person should draw conclusions purely on the basis of the material contained herein. If assistance is required, reference should be made to the relevant professional of United Engineers
(Malaysia) Berhad.

Weitere ähnliche Inhalte

Was ist angesagt?

Malaysia Logistics
Malaysia LogisticsMalaysia Logistics
Malaysia LogisticsYAU MEE LIM
 
Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)Er Mohtisham Ali
 
Lucknow metro rail project internship report
Lucknow metro rail project internship report Lucknow metro rail project internship report
Lucknow metro rail project internship report Aditya Pratap Singh
 
AECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PAECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PMadhava Kulal
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro projectAkshathaBhandary
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTATUL SHUKLA
 
Civil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - FinalCivil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - FinalMohamed Aboughaly
 
CV of Yogesh Final
CV of Yogesh FinalCV of Yogesh Final
CV of Yogesh FinalYogesh V.K
 
Lmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationLmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationPrakhar Tri
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityPramod Kumar
 

Was ist angesagt? (20)

Malaysia Logistics
Malaysia LogisticsMalaysia Logistics
Malaysia Logistics
 
Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)
 
Lucknow metro rail project internship report
Lucknow metro rail project internship report Lucknow metro rail project internship report
Lucknow metro rail project internship report
 
Kenya rail sector
 Kenya rail sector Kenya rail sector
Kenya rail sector
 
Metro ppt - copy
Metro ppt - copyMetro ppt - copy
Metro ppt - copy
 
pdf C.V RAVIKANNIAPPAN
pdf C.V RAVIKANNIAPPANpdf C.V RAVIKANNIAPPAN
pdf C.V RAVIKANNIAPPAN
 
AECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PAECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.P
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro project
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORT
 
Civil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - FinalCivil Engineer (Roads) with photo - Final
Civil Engineer (Roads) with photo - Final
 
CV-FEB2016
CV-FEB2016CV-FEB2016
CV-FEB2016
 
Fellow report
Fellow reportFellow report
Fellow report
 
CV of Yogesh Final
CV of Yogesh FinalCV of Yogesh Final
CV of Yogesh Final
 
lucknow metro ppt
lucknow metro pptlucknow metro ppt
lucknow metro ppt
 
JMRC TRAINING FINAL REPORT
JMRC TRAINING FINAL   REPORT JMRC TRAINING FINAL   REPORT
JMRC TRAINING FINAL REPORT
 
Lmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationLmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporation
 
C.V.
C.V.C.V.
C.V.
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
Resume sk tyagi
Resume sk tyagiResume sk tyagi
Resume sk tyagi
 
Eg in 049912
Eg in 049912Eg in 049912
Eg in 049912
 

Ähnlich wie Uemc apr 19_2011

Ähnlich wie Uemc apr 19_2011 (20)

NHAI-E-Coffee-Table.pdf
NHAI-E-Coffee-Table.pdfNHAI-E-Coffee-Table.pdf
NHAI-E-Coffee-Table.pdf
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
Akhtar Resume
Akhtar ResumeAkhtar Resume
Akhtar Resume
 
CV Abdul Saeed
CV Abdul SaeedCV Abdul Saeed
CV Abdul Saeed
 
Presentation slide
Presentation slidePresentation slide
Presentation slide
 
Metro project in inda
Metro project in indaMetro project in inda
Metro project in inda
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL
 
cv1
cv1cv1
cv1
 
Lucknow metro report
Lucknow metro reportLucknow metro report
Lucknow metro report
 
Buddh international circuit
Buddh international circuitBuddh international circuit
Buddh international circuit
 
Mmmodified copy
Mmmodified   copyMmmodified   copy
Mmmodified copy
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
Usbrlp at a glance
Usbrlp at a glanceUsbrlp at a glance
Usbrlp at a glance
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
SR. SITE ENGINEER
SR. SITE ENGINEERSR. SITE ENGINEER
SR. SITE ENGINEER
 

Uemc apr 19_2011

  • 1. UEM CONSTRUCTION SDN BHD http://www.uembuilders.com/uemc_n/
  • 2. CORPORATE STRUCTURE UEM Builders UEM Builders-Ansal (Singapore) Pte Ltd API Pvt Ltd
  • 3. Buildings - Hospitals - Airports - Townships - Stadiums - Industrial Parks - Residential & Commercial Infrastructure - Roads - Rail - Drainage - Bridges - Utilities - Landscaping Earthworks - Earth cutting and filling - Ground treatment - Retaining wall system
  • 4. 500 400 300 USD Million 200 100 0 2007 2008 2009 Year
  • 5. 40 years’ experience in engineering & construction  880 experienced professional staff (Engineers, Architects, QS, Accountants)  USD 315 million paid up capital  USD 1.3 billion total assets  Machineries available for local and international projects  USD 80mil worth of equipment in India, Malaysia and Qatar
  • 7. NORTH SOUTH EXPRESSWAY  848 km of tolled expressway  Completed in 1993  Project cost: USD 1.8 bil.  Role: Concessionaire, Project Management, Construction
  • 8. KUALA LUMPUR INTERNATIONAL AIRPORT Integrated Development Development Area 100 km2 Development Period 7 years Gross Development Value (GDV) USD 3.6 bil Project Management Role Construction (Satellite Building)
  • 9. NATIONAL SPORTS COMPLEX  100,000 seat capacity National Stadium (outdoor stadium) 16,000 seat Putra Stadium (indoor stadium) 3,700 seat National Aquatic Centre (swimming complex)  Completed in 1998  Project cost: USD 400 million  Role: Concessionaire, Project Management, Construction
  • 10. KUALA LUMPUR LIGHT RAIL TRANSIT  Total length: 29 km (22 km elevated, 5 km underground and 2 km at-grade)  First world’s longest driverless LRT system completed in 1999  Capacity: 25,000 passengers/hr/direction  Project cost: USD2.04 billion  Role: Concessionaire, Project Management, Construction.
  • 12. EXPRESSWAYS NORTH SOUTH EXPRESSWAY Construction and O&M of 955 km tolled Highway PENANG BRIDGE Operation and Maintenance of 13.5 km bridge MALAYSIA SINGAPORE SECOND CROSSING Construction and O&M of 44 km of highways including 2 km bridge NORTH SOUTH EXPRESSWAY CENTRAL LINK Construction and O&M of 45 km of tolled expressway
  • 13. NORTH-SOUTH EXPRESSWAY  Construction of several packages amounting to 203 km dual two lanes tolled expressway.  Involved in implementation of heavy repair works and routine maintenance of the completed 848 km expressway since 1994.  Completed in May 1995.  Project cost: USD 630 million.
  • 14. NORTH SOUTH EXPRESSWAY CENTRAL LINK  Construction of 45 km of tolled expressway linking NKVE to Nilai North Interchange at NSE. Gateway to KLIA airport and Cyberjaya/Putrajaya.  Involved in implementation of heavy repair works and routine maintenance of the completed 60 km expressway since 1997.  Completed in December 1997.  Project cost: USD 236 million.
  • 15. MALAYSIA-SINGAPORE SECOND CROSSING BRIDGE  Construction of 44 km of dual two/three lane tolled expressway and 2 km of bridge linking Johor to Singapore and to Johor City & NSE.  Involved in implementation of heavy repair works and routine maintenance of the completed 44 km expressway since 1997.  Completed in December 1997.  Project cost: USD 310 million.
  • 16. NORTH-SOUTH EXPRESSWAY- THIRD LANE WIDENING  North South Expressway – Proposed Third Lane Widening and Modification for Non- Stop Through Traffic for Packages 1, 2A, 2B, 3A, 3B, 4, 5 and 5A.  Commenced:  Package 1 -July 2005 (Completed)  Package 2A,2B,3A,3B & 4 –Aug 2005 (Completed)  Package 5 – August 2005 (Completed)  Package 5A –July 2005 (Completed)  Value : USD 253 million
  • 17. PENANG BRIDGE WIDENING  Construction of widening of the existing Penang Bridge.  Involvement of rejuvenation of the existing east side approach embankment foundations alongside extending the existing substructure of the main viaduct and providing longitudinal beams and construction of Uni- Directional Ramps to mainland side.  Completed on August 2009.  Project cost: USD 143 million.
  • 19. MAJOR HIGHWAYS COMPLETED IN INDIA  Construction & Maintenance (for 15 years) of Tuni - Anakapalli, NH 5, Andhra Pradesh  Length : 59 km.  Project Cost (@ EPC) : USD 48 mil.  Construction & Maintenance (for 15 years) of Tambaram-Tindivanam,NH 45,Tamil Nadu  Length : 93 km.  Project Cost : USD 63 mil.  Tumkur–Haveri-NH4, Pkg. 2,4,5-Karnataka  Length : 200 km.  Project Cost (@ EPC) : USD 152.7 mil.
  • 20. MAJOR HIGHWAYS COMPLETED IN INDIA  Bhiwandi-Kalyan-Shil Phata, Maharastra  Length : 25 km.  Project Cost : USD 17 mil.  Etawah to Sikandra-NH 2, Uttar Pradesh – Pckg.1C  Length : 72km.  Project Cost : USD 63 mil.  Kerala State Transport Project Phase-1  Length : 127 km.  Project Cost : USD 50 mil.
  • 21. MANILA-CAVITE TOLL EXPRESSWAY PKG 1, PHILIPPINES  Upgrading of existing R1 Expressway  Length: 6.6km dual 3-lane highway  Completed: April 1998  Project cost: USD23 million
  • 22. PROJECT IN QATAR  Qatar Primary Routes - Salwa Road Phase 1  Upgrading 81 km dual 4 lane highway linking Qatar-Saudi Border at Salwa to Doha  Total project cost: USD 265 million.  Completed: December 2008
  • 23. TRANSPORTATION ELECTRIFIED DOUBLE TRACK Construction of total 182km of Electrified Double Track Railway Lines between two major cities LIGHT RAIL TRANSIT SYSTEM Construction of total 29km elevated, underground and at grade track including stations for the driverless automated Light Rail Transit.
  • 24. PUTRA LIGHT RAIL TRANSIT STATIONS, KUALA LUMPUR Completed: 1999 Value: USD 494.3 million Project involved the construction of 29 km track way for Light Rail Transit System in Kuala Lumpur involving 22 km elevated track, 5 km underground tunnel and 2 km at-grade track. Construction of 5 underground LRT stations, 17 above-ground and 2 at-grade stations throughout the LRT system. Longest driverless automated LRT in the world. Implemented in November 1994 and completed in June 1999.
  • 25. IPOH-RAWANG ELECTRIFIED DOUBLE TRACKING  Construction of 155 bridge crossings for the 182 km electrified railway line linking Rawang to Ipoh.  Project Cost: USD 436 million.  31st March 2007
  • 26. BUILDINGS & FACILITIES MARDI Agriculture Centre Construction of National Stadium, aquatic centre and indoor stadium NATIONAL HEART INSTITUTE for the nation sport facilities. Construction of new healthcare facilities for the extension of the National Heart Institute. NATIONAL SPORTS COMPLEX KUALA LUMPUR INTERNATIONAL Construction of National Stadium, aquatic centre and indoor stadium for the nation sport facilities. AIRPORT (KLIA) Construction of Satellite Building and ancillary works for the Malaysia’s largest airport. MINISTRY OF FINANCE II BUILDING Construction of Government Building for the Federal Government Administrative Centre in Putrajaya. JSNAC Construction of Johor State New Administration Centre in Johor
  • 27. NATIONAL SPORTS COMPLEX, BUKIT JALIL, KUALA LUMPUR Completed: 1998 Value: USD 286 million 100,000 capacity National Stadium (outdoor stadium), 3,700 seat National Aquatic Centre (swimming complex) and 16,000 seat Putra Stadium (indoor stadium). Implemented in January 1994 and completed in July 1998 for the XVI Commonwealth Games.
  • 28. COMMONWEALTH GAMES VILLAGE, BUKIT JALIL, KUALA LUMPUR Completed: 1998 Value: USD 77.7 million Gross Floor Area: 198,774 m² Construction of multi storey apartment blocks complete with recreational facilities. 1,500 units were built in total.
  • 29. KUALA LUMPUR INTERNATIONAL AIRPORT, SATELLITE BUILDING, SEPANG Completed: 1998 Value: USD 157 million Gross Floor Area: 148,000 m². Design and construction of the satellite building and its ancillary works as part of the Kuala Lumpur International Airport Complex. Project implementation in joint venture with international construction companies as consortium partners.
  • 30. EAST MALAYSIA HOSPITALS Completed: 2005 Value: USD 256 million The planning, design, construction, equipping, commissioning and maintenance of six hospitals with a combined total of 976 beds were delivered to the Ministry of Health Malaysia in stages from 2002 till 2005. Five of the hospitals are located in the state of Sabah in East Malaysia, namely Lahad Datu, Keningau, Kuala Penyu, Pitas and Kunak. One more hospital is located in the state of Sarawak, also in East Malaysia, in Sarikei.
  • 31. EAST MALAYSIA HOSPITALS Sarikei, Sarawak  Completed: December 2005  Value: USD 74 million  Total of 268 beds  Gross Floor Area: 40,000 sq. ft Pitas, Sabah  Completed: June 2005  Value: USD 24 million  Total of 76 beds  Gross Floor Area: 15,284 m2
  • 32. EAST MALAYSIA HOSPITALS Kuala Penyu, Sabah  Completed: May 2005  Value: USD 22 million  Total of 76 beds  Gross Floor Area: 15,284 m2 Kunak, Sabah  Completed: May 2005  Value: USD 24 million  Total of 76 beds  Gross Floor Area: 15,284 m2
  • 33. EAST MALAYSIA HOSPITALS Keningau, Sabah  Completed: September 2002  Value: USD 58 million  Total of 212 beds  Gross Floor Area: 63,477 m2
  • 34. EAST MALAYSIA HOSPITALS Lahad Datu, Sabah  Completed: January 2002  Value: USD 61 million  Total of 268 beds  Gross Floor Area: 68,1000 m2
  • 35. EAST MALAYSIA HOSPITALS Sarikei Hospital, Malaysia (268 Beds)  Completed: December 2003  Value: USD 74 million  Total of 268 beds  Gross Floor Area: 40,000 sqft.
  • 36. UNIVERSITY OF TECHNOLOGY PETRONAS (UTP) MOSQUE, TRONOH, PERAK Completed: October 2005 Value: USD 7.7 million Gross Floor Area: 5,659 m² The construction and completion of this uniquely designed ‘floating’ mosque at Bandar Seri Iskandar, Perak has a capacity to accommodate 4,000 people. The enclosed main prayer area is air- conditioned and can accommodate 1,000 people. The covered prayer area, accommodating 3,000 people, which was previously ventilated naturally, has been changed into an air-conditioned system.
  • 37. DANAU VILLA LINK HOME, TAMAN DESA, KUALA LUMPUR • Commenced: 10 September 2004 • Completion: 6 November 2005 • Value: USD90.5 million Construction and completion of 64 units of 3-storey link home and sewerage pump, Danau Villa Link Home, Taman Desa, Kuala Lumpur.
  • 38. MINISTRY OF FINANCE BUILDING 2, PUTRAJAYA Commenced: 4 December 2002 Completed: 30 April 2007 Value: USD 60 million Gross Floor Area: 67,108 m² Design, construction and completion of office buildings to house agencies under the Ministry of Finance at the New Federal Government Administrative Centre in Putrajaya. 2 office blocks, 8 and 10-storey high with each housing two levels of basement car parks. Scope of works include interior design works.
  • 39. CASA DESA CONDOMINIUM, KUALA LUMPUR Commenced: 11 July 2005 Completed : 31 March 2008 For the 410-unit Casa Desa Condominium, the Value: USD 24 million contract package consists of substructure works and Gross Floor Area: 9,794 m2 superstructure works. Project involves construction of 7 blocks of condominium buildings including earthworks, bored piling and pile caps.
  • 40. AGRICULTURE EXPOSITION CENTRE (PHASE 2)-MARDI, SERDANG  Project : Agriculture Exposition Centre (Phase 2) – MARDI, Serdang  Commenced : 27 November 2007  Completed : 30 June 2008  Value : USD 64 million  Gross Floor Area: 25,000 m²
  • 41. JOHOR STATE NEW ADMINISTRATIVE CENTRE (JSNAC), PHASE 1, JOHOR Commenced: November 2005 Completed: August 2008 Value: USD 62 million The development of the JSNAC on a 320-acre site located at Bandar Nusajaya, 25 km from Johor Bahru, Johor is divided into three precincts comprising the Government precinct (273 acres), VIP residences and Istana reserve (17 acres) and government housing reserve (30 acres). Phase 1 of this development is divided into five packages where three packages, has been awarded. Project involves the construction of office buildings for the new state administrative centre in Johor.
  • 42. STATE DEPARTMENT COMPLEX (JSNAC), NUSAJAYA Commenced: November 2005 Completed: February 2009 Value: USD 63 million
  • 43. UEM GROUP NEW CORPORATE OFFICE, KUALA LUMPUR Commenced: 1 June 2005 Completed: December 2008 Value: USD 45 million Gross Floor Area: 35,000 m² This project involves the design and construction of a 29- storey office building with an 8-storey annex building at KL Sentral. The scope of works involves interior design.
  • 44. PLUS HEADQUARTERS, SUBANG  Development of one block of 10-storey office tower at Subang Toll, Petaling Jaya, Selangor Darul Ehsan  Commenced : 15 January 2007  Completed : December 2008  Value : USD 29 million
  • 45. NATIONAL HEART INSTITUTE, KUALA LUMPUR Commenced: 5 September 2005 Completed: March 2009 Value: USD 64.6 million Gross Floor Area: 32,840 m² Design, construction, supply and commissioning and maintenance of new healthcare facilities for the extension of the National Heart Institute. This project is divided into four phases and works entail the renovating and refurbishing of existing facilities.
  • 46. COLLEGE OF TECHNOLOGY (COT), DOHA, QATAR  Constructionof 21 multidisciplinary buildings comprising classrooms, workshops/labs, cafeterias, recreation facilities, auditorium and administration buildings with a total area of 63,000 m2 and external infrastructure for campus area of 300,000 m2.  Project cost: USD 100 million.  Completed: October 2006
  • 47. GOVERNMENT APARTMENTS, PUTRAJAYA  Project : 548 Units (5 Blocks) Apartment  Using Industrialised Building System (IBS) Method  Commenced : September 2006  Exp. Completion : March 2008  Value : USD 39 million  Gross Floor Area: 60,500 m²
  • 48. RESORTS WORLD AT SENTOSA, SINGAPORE  Proposed Basement Structural Works for Universal Studio  Commenced: March 2008 MC04-F1  Completed: July 2008  Value: USD 4.5 million  Gross Floor Area: 65,800 m²
  • 50. BANK KERJASAMA RAKYAT HEADQUARTERS, KUALA LUMPUR  Design, construction and completion of 2 office towers (32 and 38-storeys), 1 block of 8-storey annex comprises of car parks and 1 unit PPU  Commenced : 1 June 2009  Exp. Completion : December 2011  Value : USD 26 million  Gross Floor Area: 188,000 m²
  • 51. PENANG SECOND BRIDGE  Project : Design, Construction and Completion of the Penang Second Bridge.  Package 2 : Super-structure Works of Approach Spans. • Overall length - 24 km • Length over water - 17 km, • Main span : Length - 250 meters • Height clearance (above water) – 30 meters • Number of vehicle lanes – 2 + 1 for motorcycles (each direction)  Commenced : June 2009  Exp. Completion : March 2013  Value : USD 473 million
  • 52. PHG’-S’GOR RAW WATER TRANSFER PROJECT  Pahang - Selangor Raw Water Transfer Project Lot 1-1, Water Transfers Tunnel & Related Works (2,260 Mld.)  Commenced : June 2009  Exp. Completion : May 2014  Value : USD 400 million  Length: 44.6km ; Diameter: 5.2m
  • 53. 1,765-acre Sushant Golf City Project in Lucknow, Uttar Pradesh  Project : Construction of various building and engineering works at Sushant Golf City, Lucknow U.P. India.  Commenced : 1 April 2008  Exp. Completion : February 2012  Value : USD 497 million  Total Development Area : 1,765 acre
  • 54. 4000 UNITS HOUSING PROJECT, BRUNEI  Project : 4000 units Housing Project for the National Housing Scheme, Brunei.  Commenced : 2 February 2010  Exp. Completion : February 2014  Value : USD 290 million  Total Development Area: 309 hectares
  • 55. NEW LCC TERMINAL AT KLIA, SEPANG  Project : Design, Construction and Completion, Testing, Commissioning and Maintenance of Main Terminal Building, Satellite Building, Sky Bridge and Piers.  Commenced : 16 August 2010  Exp. Completion : April 2012  Value : USD 316 million
  • 56. Thank You This document is the property of United Engineers (Malaysia) Berhad. Neither the whole nor any part of this document may be reproduced, stored or transmitted in any forms or by any means without written permission of United Engineers (Malaysia) Berhad. This document is designed to provide information in relation to the subject matter covered for this presentation and should not be used for any other purpose. Whilst every care has been taken in its preparation, no person should draw conclusions purely on the basis of the material contained herein. If assistance is required, reference should be made to the relevant professional of United Engineers (Malaysia) Berhad.