Flooding 7 River Tees Case Study
1. River Tees case study Key idea: River use and management Examples of hard engineering solutions on a major UK river Need photocopy of R. Tees case study sheet BP93
6. Cow Green, a two mile long reservoir was built between 1967 and 1971 to supply the industries of Teesside The dam is about 1/4 mile long, took three years to build and holds back 40,000 million litres of water