GDAS PM Professions:
PMP Study Group
               Session #3: Professional Responsibility & Integration Management




Monique Howard
September 19, 2008

© 2005 Hewlett-Packard Development Company, L.P.
The information contained herein is subject to change without notice
Agenda
•   Summary of Focus
    − Professional Responsibility
    − Integration Management
•   Open Forum: Participant Questions
•   Study Group Questions
•   Wrap Up
Professional Responsibility
•   Responsibility of the Profession
    − Compliance with all organizational rules and policies
    − Candidate/Certificant Professional Practice
    − Advancement of the Profession
•   Responsibilities to Customers and the Public
    − Qualifications, experience and performance of
      professional services
    − Conflict of interest situations and other prohibited
      professional conduct
•   Can be about 18 questions
Integration Management
•   Key concepts to understand:
    − Seven Processes
      •   Develop Project Charter
      •   Develop Preliminary Project Scope Statement
      •   Develop Project Management Plan
      •   Direct and Manage Project Execution
      •   Monitor and Control Project Work
      •   Integrated Change Control
      •   Close Project

    − PMBOK
      • ITTO Matrix, Page Number: 70
•   Expect up to 14 questions
Open Forum: Participant Questions



  If you have a question, raise your hand
Study Group Questions
Delivery Format:

•Each Question will be displayed and read
•Survey Box will be used to solicit answer
•Based on responses, we will discuss options
•Answer will be revealed
1. You are managing a contract which has outsourced software development for
    microprocessor design to a vendor. Since this field is rapidly evolving, you know
    that you should be able to manage changes to the contract. The paperwork,
    tracking systems, and approval levels for authorizing changes should be
    documented in:
       A.   Contract Change Control System
       B.   Inspections and Audits
       C.   Performance Reporting
       D.   Several systems including Records Management, Claims Administration
            System, Performance Reporting System etc
1. You are managing a contract which has outsourced software development for
    microprocessor design to a vendor. Since this field is rapidly evolving, you know
    that you should be able to manage changes to the contract. The paperwork,
    tracking systems, and approval levels for authorizing changes should be
    documented in:
       A.   Contract Change Control System
       B.   Inspections and Audits
       C.   Performance Reporting
       D.   Several systems including Records Management, Claims Administration
            System, Performance Reporting System etc




       Answer:     A
       Justification:     A Contract Change Control System defines the processes
       by which the contract can be modified. It includes the paperwork,
       tracking systems, dispute resolution procedures, and approval levels
       necessary for authorizing changes.

       Reference: PMBOK Third Edition, Page Number: 292
2. In your new company, you realize that some of the financial statements of the
   company do not follow US GAAP Accounting Standards and are hence inaccurate. In
   this case, what should you do first?

    A. Inform the US government agencies of the inaccurate accounting practices in the
       company.
    B. Talk to your finance managers about why you think that they may be violating the
       standard accounting standards.
    C. Since you are new to the company, you assume that finance standards are different in
       the company - hence do not do anything about the issue.
    D. Talk with the finance manager in your previous company to get expert opinion about
       accounting standards in the new company.
2. In your new company, you realize that some of the financial statements of the
   company do not follow US GAAP Accounting Standards and are hence inaccurate. In
   this case, what should you do first?

    A. Inform the US government agencies of the inaccurate accounting practices in the
       company.
    B. Talk to your finance managers about why you think that they may be violating the
       standard accounting standards.
    C. Since you are new to the company, you assume that finance standards are different in
       the company - hence do not do anything about the issue.
    D. Talk with the finance manager in your previous company to get expert opinion about
       accounting standards in the new company.


    Answer:     B  
    Justification:     
    * Option 2 is the best answer, because it aims at trying to understand and resolve the
    problem
    * Option 1 is the last option - to be preferred after all other alternatives are exhausted,
    and you are convinced that your new company is involved in malpractice
    * Option 3 just avoids the issue
    * Option 4 i.e. talking with the finance manager in your previous company is not
    recommended because you may be compromising proprietary information

    Reference: pmstudy.com notes as mentioned above
3. Your project is in the planning phase and you are paid every fortnight for the work to
   be done during the fortnight. You have been informed by the project sponsor that
   there has been a revaluation of projects within your company and your project will
   not be getting any additional funding. In this case, you should:


     A.   stop work immediately and release all resources.
     B.   perform appropriate closure for the project.
     C.   decrease team size.
     D.   remove non-critical tasks to decrease cost.
3. Your project is in the planning phase and you are paid every fortnight for the work to
   be done during the fortnight. You have been informed by the project sponsor that
   there has been a revaluation of projects within your company and your project will
   not be getting any additional funding. In this case, you should:


     A.   stop work immediately and release all resources.
     B.   perform appropriate closure for the project.
     C.   decrease team size.
     D.   remove non-critical tasks to decrease cost.


     Correct Choice:     B 
     Justification:     The project or phase, after either achieving its objectives or being
     terminated for other reasons, requires closure. Project Closure consists of documenting
     project results to formalize acceptance of the product of the project by the sponsor, or
     customer.

     Reference: pmstudy.com notes as mentioned above

     pmstudy.com comments:
     Option A: Without performing Administrative Closure, if resources are released, all the
     benefits of the project are lost
     Option C, Option D: They just postpone the problem and do not solve(resolve) the issue
4. Managing risks and documenting them is very important in project planning process.
   You are in the process of defining key risks, including constraints and assumptions,
   and planned responses and contingencies. These details will be included in the:


   A. Project Plan
   B. Project Baseline
   C. Risk Response Plan
   D. Risk Baseline
4. Managing risks and documenting them is very important in project planning process.
   You are in the process of defining key risks, including constraints and assumptions,
   and planned responses and contingencies. These details will be included in the:


   A. Project Plan
   B. Project Baseline
   C. Risk Response Plan
   D. Risk Baseline



   Correct Choice:     A
   Justification:     The project plan includes the risk management plan. Risk Management
   Plan includes defining key risks, including constraints and assumptions, and planned
   responses and contingencies

   Reference: PMBOK Third Edition, Page Number: 89
5. You had worked as a project manager in a firm specializing in making
   semiconductor chips. Now that you are working with a competitor,



  A. you should not be using the knowledge gained in the first company to improve the
     competitor's product.
  B. you can use the knowledge gained in the first company to improve the competitor's
     product.
  C. before doing anything which may adversely impact prospects of the first company,
     you should get their approval.
  D. you should do nothing which provides competition to or undermines the products
     of the first company.
5. You had worked as a project manager in a firm specializing in making
   semiconductor chips. Now that you are working with a competitor,



  A. you should not be using the knowledge gained in the first company to improve the
     competitor's product.
  B. you can use the knowledge gained in the first company to improve the competitor's
     product.
  C. before doing anything which may adversely impact prospects of the first company,
     you should get their approval.
  D. you should do nothing which provides competition to or undermines the products
     of the first company.



  Correct Choice:     B  
  Justification:     Knowledge gained in one company is not proprietary
  information and can be used in subsequent jobs. Choice 1, Choice 3 and
  Choice 4 are inappropriate because you may have to work in projects for
  the competitor which will adversely impact products of the first company
  you worked for. This is acceptable so long as you do not unethically use
  any contacts or proprietary information from the first company.

  Reference: pmstudy.com notes as mentioned above
6. The organization of the project is very important for successful implementation.
   Which factor does not have an impact on the design of the project organization?


    1.   Environmental Forces
    2.   Schedule Limitations
    3.   Strategic Choices
    4.   Technological Factors
6. The organization of the project is very important for successful implementation.
   Which factor does not have an impact on the design of the project organization?


    1.   Environmental Forces
    2.   Schedule Limitations
    3.   Strategic Choices
    4.   Technological Factors




Correct Choice:     B 
Justification:     Schedule limitations can shape the size of the project team
but will not influence its organizational design.

Reference: Project Management - A Systems Approach to Planning,
Scheduling and Controlling; Also Mentioned in "Organizing Projects for
success"
7. You have been having a lot of heated discussions with your colleague about an issue,
    and this is resulting in a hostile environment. To "cool-off" this hostile situation, you
    agree with your colleague`s point of view. The conflict resolution mode that you are
    using is:

    A.   Problem Solving
    B.   Withdrawal
    C.   Forcing
    D.   Confrontation
7. You have been having a lot of heated discussions with your colleague about an issue,
    and this is resulting in a hostile environment. To "cool-off" this hostile situation, you
    agree with your colleague`s point of view. The conflict resolution mode that you are
    using is:

    A.   Problem Solving
    B.   Withdrawal
    C.   Forcing
    D.   Confrontation

   Correct Choice:     B
   Justification:     




   Reference: Project Management - A Systems Approach to Planning, Scheduling and
   Controlling, Page Number: 389
8. You are aware that an employee in your project may potentially get a promotion.
   However, there is a possibility that he may get transferred after his promotion, thus
   impacting your project. In this situation, you should:

    A. give a bad recommendation about the person so as to delay the promotion of
       the person until the project is over.
    B. inform the employee about the potential promotion, and ask him to transition
       his responsibilities to another person.
    C. after the employee gets the promotion and is told of the transfer, you ask him to
       prepare a transition plan.
    D. hire another resource who can replace the person after he gets the promotion.
8. You are aware that an employee in your project may potentially get a promotion.
   However, there is a possibility that he may get transferred after his promotion, thus
   impacting your project. In this situation, you should:

     A. give a bad recommendation about the person so as to delay the promotion of
        the person until the project is over.
     B. inform the employee about the potential promotion, and ask him to transition
        his responsibilities to another person.
     C. after the employee gets the promotion and is told of the transfer, you ask him to
        prepare a transition plan.
     D. hire another resource who can replace the person after he gets the promotion.


 Correct Choice:     C 
 Justification:     
 Option 3 is the best answer - you are not sure whether the resource will get a promotion or get
 transferred. So, after the promotion/transfer is confirmed, you should ask him to do a proper
 transition. Option 2 and Option 4 assume that the person will be getting a promotion and transfer
 - since this is not certain as of now, if you go ahead with this assumption and the promotion does
 not happen, it will cause problems from a human resource management perspective. Option 1 is
 unethical

 Reference: pmstudy.com notes as mentioned above
9. While doing quality inspection, few defects were identified in the product. After
   rectifying the defects, the repaired items were reinspected and accepted.
   Subsequently, a notification was issued, which can also be referred to as:

     A. Validated Defect Repair
     B. Product Acceptance
     C. Quality Audit
     D. Approved Change Request
9. While doing quality inspection, few defects were identified in the product. After
   rectifying the defects, the repaired items were reinspected and accepted.
   Subsequently, a notification was issued, which can also be referred to as:

     A. Validated Defect Repair
     B. Product Acceptance
     C. Quality Audit
     D. Approved Change Request




 Correct Choice:     A  
 Justification:     Validated Defect Repair: Notification that reinspected repaired items
 have either been accepted or rejected.

 Reference: PMBOK Third Edition, Page Number: 93
10. You are doing some work under contract, when the buyer requests you to add
   some additional requirements which were not defined in the original contract.
   Since satisfying the buyer is of paramount interest, you go ahead and incorporate
   the requirements as part of the project. You are violating which Code of
   Professional Conduct:

     A. Responsibility to maintain and satisfy the scope and objectives
     B. Responsibility to ensure that a conflict of interest does not compromise
        legitimate interests
     C. Responsibility to provide accurate and truthful representations
     D. No Code of Professional Conduct is violated
10. You are doing some work under contract, when the buyer requests you to add
   some additional requirements which were not defined in the original contract.
   Since satisfying the buyer is of paramount interest, you go ahead and incorporate
   the requirements as part of the project. You are violating which Code of
   Professional Conduct:

     A. Responsibility to maintain and satisfy the scope and objectives
     B. Responsibility to ensure that a conflict of interest does not compromise
        legitimate interests
     C. Responsibility to provide accurate and truthful representations
     D. No Code of Professional Conduct is violated




        Correct Choice:     A 
        Justification:     

        Reference: Project Management - Code of Professional Conduct (PMI)
11. In a recent job interview, you were asked to define the most important
   characteristic of a project manager. Which of the following will be your best
   answer?
   A.   Subject matter expert
   B.   Integrator
   C.   Creative person
   D.   Risk minimizer
11. In a recent job interview, you were asked to define the most important
   characteristic of a project manager. Which of the following will be your best
   answer?
    A.   Subject matter expert
    B.   Integrator
    C.   Creative person
    D.   Risk minimizer

Correct Choice:     B  
Justification:     In project management context, integration includes characteristics of
unification, consolidation, articulation, and integrative actions that are crucial to project
completion, successfully meeting customer and other stakeholder requirements, and managing
expectations.

Reference: PMBOK Third Edition Page 77

pmstudy.com notes: The most important characteristic of a project manager is being an
Integrator who can manage all the different interfaces in the project. The project manager should
also be a good Communicator because a project manager usually spends more than 50% of his
time communicating with different project stakeholders.

Option 1: A project manager need not be a subject matter expert. There may be several subject
matter experts for the project from whom the project manager can take advice when required.
Option 3: Creativity is desirable but not the most important characteristic of a project manager.
Option 4: A project manager should try to minimize risks in the project. However, this again is
not the most important characteristic of a project manager.
12. As a PMP Certified project manager, you are responsible for all of the following
   EXCEPT:


   A. Maintaining the confidentiality of sensitive information which you have access
      to
   B. Managing conflict of interest situations in your project
   C. Ensuring the integrity of your team-members
   D. Refraining from offering and accepting inappropriate payments, gifts and other
      forms of communication
12. As a PMP Certified project manager, you are responsible for all of the following
   EXCEPT:


   A. Maintaining the confidentiality of sensitive information which you have access
      to
   B. Managing conflict of interest situations in your project
   C. Ensuring the integrity of your team-members
   D. Refraining from offering and accepting inappropriate payments, gifts and other
      forms of communication




  Correct Choice:     C 
  Justification:     You cannot be responsible for the integrity of your team-members; but you
  should definitely try to influence your team-members to perform all project activities in an
  ethical manner and with integrity.

  All the remaining activities are mentioned in the PMP Code of Professional Conduct as
  responsibilities of a project manager

  Reference: pmstudy.com notes as mentioned above
13. In your project, you want to monitor and control project processes associated with
    initiating, planning, executing and closing. This will help you take corrective or
    preventive action to control project performance. In this context, what should you do
    first?
    A. Review all project forecasts
    B. Detail all the activities of project team members involved in executing
       administrative closure for the project
    C. Review the project management plan and work performance information for your
       project
    D. Manage Project Risks
13. In your project, you want to monitor and control project processes associated with
    initiating, planning, executing and closing. This will help you take corrective or
    preventive action to control project performance. In this context, what should you do
    first?
    A. Review all project forecasts
    B. Detail all the activities of project team members involved in executing
       administrative closure for the project
    C. Review the project management plan and work performance information for your
       project
    D. Manage Project Risks
 Correct Choice:     C  
 Justification:     Figure 4-7

 Reference: PMBOK Third Edition, Page Number: 95

 pmstudy.com notes: Monitor and control project processes associated with initiating, planning,
 executing and closing" refers to "Monitor and Control Project work" - this is done as part of Project
 Integration Management. PMBOK Page 94

 Option 1: Project Forecasts are created as an output from Monitor and Control Project Work
 (PMBOK Page 95). Option 2: This is done as part of administrative closure that happens when we
 are in Close Project phase (PMBOK Page 100). Option 3: Reviewing the project management plan
 and work performance information for your project is the first thing that you should do. These are
 inputs to "Monitor and Control Project" (PMBOK Page 95). Option 4: Managing project risks is not
 done as part of the "Monitor and Control Project" process
14. In a project management context, all the following are Constructive Roles EXCEPT:

   1.   Information Seeker
   2.   Recognition Seeker
   3.   Consensus Taker
   4.   Information Giver
14. In a project management context, all the following are Constructive Roles EXCEPT:

   1.   Information Seeker
   2.   Recognition Seeker
   3.   Consensus Taker
   4.   Information Giver


  Correct Choice:     B
  Justification:     




  Reference: Project Management - A Systems Approach to Planning, Scheduling and
  Controlling, Page Number: 215-216
15. You have recently appointed a project manager to handle a critical project in
   your organization. You want to provide the project manager with authority to
   apply organizational resources to project activities. Which document should you
   use?

   A.   Resource Authorization Document
   B.   Work Breakdown Structure
   C.   Project Charter
   D.   Project Scope Statement
15. You have recently appointed a project manager to handle a critical project in
    your organization. You want to provide the project manager with authority to
    apply organizational resources to project activities. Which document should you
    use?

    A.   Resource Authorization Document
    B.   Work Breakdown Structure
    C.   Project Charter
    D.   Project Scope Statement




Correct Choice:     C
Justification:     The project charter provides the project manager with the
authority to apply organizational resources to project activities.

Reference: PMBOK Third Edition, Page Number: 81
16. Your previous project manager made most decisions by himself without
   consulting subordinates. So, he believed in a leadership style that was:

    A.   Laissez Faire
    B.   Assertive
    C.   Autocratic
    D.   Coaching
16. Your previous project manager made most decisions by himself without
   consulting subordinates. So, he believed in a leadership style that was:

    A.   Laissez Faire
    B.   Assertive
    C.   Autocratic
    D.   Coaching


Correct Choice:     C  
Justification:     




Reference: pmstudy.com notes as mentioned above
17. In which document will you find the code of account identifier, statement of work,
   responsible organization, and a list of schedule milestones?


   A.   WBS
   B.   WBS Dictionary
   C.   PERT/CPM Charts
   D.   Roles and Responsibilities Matrix
17. In which document will you find the code of account identifier, statement of work,
   responsible organization, and a list of schedule milestones?


   A.   WBS
   B.   WBS Dictionary
   C.   PERT/CPM Charts
   D.   Roles and Responsibilities Matrix




 Correct Choice:     B
 Justification:     WBS Dictionary : For each WBS component, the WBS
 dictionary includes a code of account identifier, a statement of work,
 responsible organization and a list of schedule milestones.

 Reference: PMBOK Third Edition, Page Number: 117
18. You are working in the project office of your organization. What is your job
   responsibility?


    A. Managing the operational activities in the company
    B. Always managing Human Resource and Risk Management issues for
       projects
    C. Providing support functions to project managers in the form of training,
       software, standardized policies etc.
    D. Providing Subject Matter Expertise in the functional areas of the project
18. You are working in the project office of your organization. What is your job
   responsibility?


    A. Managing the operational activities in the company
    B. Always managing Human Resource and Risk Management issues for
       projects
    C. Providing support functions to project managers in the form of training,
       software, standardized policies etc.
    D. Providing Subject Matter Expertise in the functional areas of the project



 Correct Choice:     C  
 Justification:     A Project Management Office (PMO) is an organizational unit to centralize
 and coordinate the management of projects under its domain. A PMO can also be referred to
 as ... "project office." PMOs can operate in a continuum from providing project management
 support functions in the form of training, software, standardized policies and procedures, to
 actual direct management and responsibility for achieving the project objectives.

 Reference: PMBOK Third Edition, Page Number: 17
19. You are the project manager for a construction project and there are 121 people
   reporting to you. Your job requires that you sanction work to others and ensure
   that the work is done at the right time. The tool you use is:

    A.   Work Breakdown Structure
    B.   Work Authorization System
    C.   PERT/CPM/Network Diagrams
    D.   WBS Dictionaries
19. You are the project manager for a construction project and there are 121 people
   reporting to you. Your job requires that you sanction work to others and ensure
   that the work is done at the right time. The tool you use is:

    A.   Work Breakdown Structure
    B.   Work Authorization System
    C.   PERT/CPM/Network Diagrams
    D.   WBS Dictionaries




  Correct Choice:     B 
  Justification:     Work Authorization System: It includes the steps,
  documents, tracking system, and defined approval levels needed to issue
  work authorizations.

  Reference: PMBOK Third Edition, Page Number: 379
20. A restriction (e.g. limited budget) that affects the performance of the project is also
    called a(an):


    1.   Constraint
    2.   Assumption
    3.   Kill point
    4.   Risk
20. A restriction (e.g. limited budget) that affects the performance of the project is also
    called a(an):


    1.   Constraint
    2.   Assumption
    3.   Kill point
    4.   Risk




 Correct Choice:     A  
 Justification:     Project constraints: ... For example, a predefined budget or any imposed dates
 (schedule milestones) are included in constraints

 Reference: PMBOK Third Edition, Page Number: 111

 A constraint is an applicable restriction that will affect the performance of the project. For
 example, a predefined budget is a constraint that is highly likely to limit the options of the
 team regarding scope, staffing, and schedule.
21. You are the project manager of a civil construction company involved with building
    houses. In your project, you often use Work Breakdown Structures (WBS) from your
    previous projects as templates. A Work Breakdown Structure can be used for all of
    the following except:

    A.   Tracking project performance against cost and schedule
    B.   Creating a network diagram, with task dependencies
    C.   Creating a project schedule
    D.   Assigning resources to work on different work elements
21. You are the project manager of a civil construction company involved with building
    houses. In your project, you often use Work Breakdown Structures (WBS) from your
    previous projects as templates. A Work Breakdown Structure can be used for all of
    the following except:

    A.   Tracking project performance against cost and schedule
    B.   Creating a network diagram, with task dependencies
    C.   Creating a project schedule
    D.   Assigning resources to work on different work elements




Correct Choice:     B
Justification:     Task dependencies are not evident in a WBS. WBS does not specify the time
frame in which different tasks should be accomplished.

Reference: pmstudy.com notes as mentioned above; Also, please refer to PMBOK 3rd Edition,
Page 113
22. You have scheduled a contractor conference after two days with potential contractors
   to discuss a procurement. Today, the senior management informed you that there is a
   very high probability of the project being canceled. You should

    A. cancel the meeting
    B. go ahead with the meeting but inform the contractors that the project may be
       canceled
    C. go ahead with the meeting as usual
    D. wait until the meeting, to see if there is a change in the status of the project
22. You have scheduled a contractor conference after two days with potential contractors
   to discuss a procurement. Today, the senior management informed you that there is a
   very high probability of the project being canceled. You should

    A. cancel the meeting
    B. go ahead with the meeting but inform the contractors that the project may be
       canceled
    C. go ahead with the meeting as usual
    D. wait until the meeting, to see if there is a change in the status of the project




 Correct Choice:     A  
 Justification:     Option 1 is the best choice. There is no point in having the meeting and wasting
 time if there is a high probability of the project being canceled.

 Reference: pmstudy.com notes as mentioned above
23. A customer informed you that it is preferable to change a certain aspect of the project.
   What should you do first?


    A. Talk with team members to understand implications of the change
    B. Communicate the change to the Management to get their inputs
    C. Open up a Change Control
    D. Do sizing for the change and communicate to the customer
23. A customer informed you that it is preferable to change a certain aspect of the project.
   What should you do first?


    A. Talk with team members to understand implications of the change
    B. Communicate the change to the Management to get their inputs
    C. Open up a Change Control
    D. Do sizing for the change and communicate to the customer




 Correct Choice:     A  
 Justification:     Anytime there is a potential request for a change from a customer,

 1. Understand what functionality was requested - Talk with team-members to assess the
 implication of the change
 2. Open up a Change Control if there is a formal Change Control Mechanism
 3. Communicate the change to the management, and inform the customer about the impact of the
 change (e.g. increase in sizing, schedule etc.)
 4. If change is accepted, go ahead and implement the changes


 Reference: pmstudy.com notes as mentioned above
24. As a project manager, Project Plan Development is an important element of managing
   projects. Which phase of the project management life-cycle does Project Plan
   Development belong to?

    A. Initiation Process
    B. Planning Process
    C. Execution Process
    D. Controlling Process
24. As a project manager, Project Plan Development is an important element of managing
   projects. Which phase of the project management life-cycle does Project Plan
   Development belong to?

    A. Initiation Process
    B. Planning Process
    C. Execution Process
    D. Controlling Process




 Correct Choice:     B  
 Justification:     Project Plan Development is done as part of the Planning Process.

 Reference: pmstudy.com notes as mentioned above
25. If you would like to find out who will be approving changes in your project
   deliverables and documentation, you can refer to the:


    A. Change Control System
    B. Project Plan
    C. Organization Chart
    D. Resource Assignment Matrix
25. If you would like to find out who will be approving changes in your project
   deliverables and documentation, you can refer to the:


    A. Change Control System
    B. Project Plan
    C. Organization Chart
    D. Resource Assignment Matrix




 Correct Choice:     A
 Justification:     Change control system: A collection of formal documented procedures that define
 how project deliverables and documentation will be controlled, changed, and approved

 Reference: PMBOK Third Edition, Page Number: 353

 A change control system is a collection of formal documented procedures that define how project
 performance will be monitored and evaluated, and includes the steps by which official project
 documents may be changed. It includes the paperwork, tracking systems, processes and approval
 levels necessary for authorizing changes.
Wrap Up
Conference Number: 547-941-6414 or 866-547-8978
Passcode: Leader – 844306338, Participant – 370670831

4   Scope Management         September   2:00pm   Presenter:      https://
    (PMBOK Chapters 5)       25          EST
                                                  www.rooms.hp.com/attend/default.aspx?key
                                                  =EHYAWGDPHR
                                                  Participant:    https://
                                                  www.rooms.hp.com/attend/default.aspx?key
                                                  =EPKQ5PM2NU

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Pmstudy exam 2
Pmstudy exam 2Pmstudy exam 2
Pmstudy exam 2
 
Pm study project risk management test
Pm study project  risk management testPm study project  risk management test
Pm study project risk management test
 
Pmstudy exam_1
Pmstudy exam_1Pmstudy exam_1
Pmstudy exam_1
 
Risk 9-pm study project risk management-test
Risk 9-pm study project risk management-testRisk 9-pm study project risk management-test
Risk 9-pm study project risk management-test
 
PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360
 
Pmstudy exam 4
Pmstudy exam 4Pmstudy exam 4
Pmstudy exam 4
 
Pmstudy exam 3
Pmstudy exam 3Pmstudy exam 3
Pmstudy exam 3
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
 
Risk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazRisk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbaz
 
Risk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ansRisk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ans
 
Q+&+as+
Q+&+as+Q+&+as+
Q+&+as+
 
Self test engine PSP-PMI-SP
Self test engine PSP-PMI-SPSelf test engine PSP-PMI-SP
Self test engine PSP-PMI-SP
 
Pmp test 04
Pmp test 04Pmp test 04
Pmp test 04
 
Pmp test 05
Pmp test 05Pmp test 05
Pmp test 05
 
Risk 8- pm study question risk management
Risk 8- pm study question risk managementRisk 8- pm study question risk management
Risk 8- pm study question risk management
 
Risk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ansRisk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ans
 
Pmp test 02
Pmp test 02Pmp test 02
Pmp test 02
 
Pmi rmp
Pmi rmpPmi rmp
Pmi rmp
 
Exam1
Exam1Exam1
Exam1
 
04 pmp integration management exam
04 pmp integration management exam04 pmp integration management exam
04 pmp integration management exam
 

Andere mochten auch

Andere mochten auch (19)

4.contracting
4.contracting4.contracting
4.contracting
 
01 project management framework
01 project management framework01 project management framework
01 project management framework
 
Pmp scope chapter 5
Pmp scope chapter 5Pmp scope chapter 5
Pmp scope chapter 5
 
Pmp communication chapter 10
Pmp communication chapter 10Pmp communication chapter 10
Pmp communication chapter 10
 
Pmp cost chapter 7
Pmp cost chapter 7Pmp cost chapter 7
Pmp cost chapter 7
 
Pmp time chapter 6
Pmp time chapter 6Pmp time chapter 6
Pmp time chapter 6
 
Pmp integration chapter 4
Pmp integration chapter 4Pmp integration chapter 4
Pmp integration chapter 4
 
Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
 
Projects Performance Analysis & Forecasting
Projects Performance Analysis & Forecasting Projects Performance Analysis & Forecasting
Projects Performance Analysis & Forecasting
 
Pmp risk chapter 11
Pmp risk chapter 11Pmp risk chapter 11
Pmp risk chapter 11
 
PMP / Framework 1 2-3
PMP / Framework 1 2-3PMP / Framework 1 2-3
PMP / Framework 1 2-3
 
Pmp stakeholder chapter 13
Pmp stakeholder chapter 13Pmp stakeholder chapter 13
Pmp stakeholder chapter 13
 
Pmp procurement chapter 12
Pmp procurement chapter 12Pmp procurement chapter 12
Pmp procurement chapter 12
 
Pmp hr chapter 9
Pmp hr chapter 9Pmp hr chapter 9
Pmp hr chapter 9
 
Pmbok 4th edition chapter 12 - Project Procurement Management
Pmbok 4th edition   chapter 12 - Project Procurement ManagementPmbok 4th edition   chapter 12 - Project Procurement Management
Pmbok 4th edition chapter 12 - Project Procurement Management
 
Kpi for product manager
Kpi for product managerKpi for product manager
Kpi for product manager
 
2015 Upload Campaigns Calendar - SlideShare
2015 Upload Campaigns Calendar - SlideShare2015 Upload Campaigns Calendar - SlideShare
2015 Upload Campaigns Calendar - SlideShare
 
What to Upload to SlideShare
What to Upload to SlideShareWhat to Upload to SlideShare
What to Upload to SlideShare
 
Getting Started With SlideShare
Getting Started With SlideShareGetting Started With SlideShare
Getting Started With SlideShare
 

Ähnlich wie Session 3 gdas pmp study group presentation

PMP assessment exam 1.1
PMP assessment exam 1.1PMP assessment exam 1.1
PMP assessment exam 1.1
Daniel Hucks
 

Ähnlich wie Session 3 gdas pmp study group presentation (20)

PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
 
04 pmp integration management exam
04 pmp integration management exam04 pmp integration management exam
04 pmp integration management exam
 
Pmp4
Pmp4Pmp4
Pmp4
 
PMP Exam Sample Questions 9
PMP Exam Sample Questions 9PMP Exam Sample Questions 9
PMP Exam Sample Questions 9
 
Full length mock test useful for PMP Exam folks
Full length mock test useful for PMP Exam folksFull length mock test useful for PMP Exam folks
Full length mock test useful for PMP Exam folks
 
Pmp test 01
Pmp test 01Pmp test 01
Pmp test 01
 
Pmp Questions Complete
Pmp Questions CompletePmp Questions Complete
Pmp Questions Complete
 
Pmp full mock test – 200 questions
Pmp full mock test – 200 questionsPmp full mock test – 200 questions
Pmp full mock test – 200 questions
 
PMP certification
PMP certificationPMP certification
PMP certification
 
Pmbok 6th edition_practice_questions
Pmbok 6th edition_practice_questionsPmbok 6th edition_practice_questions
Pmbok 6th edition_practice_questions
 
PMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for ProfessionalsPMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for Professionals
 
PMP assessment exam 1.1
PMP assessment exam 1.1PMP assessment exam 1.1
PMP assessment exam 1.1
 
PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdf
 
11 formalities for setting up a small business enterprise
11 formalities for setting up a small business enterprise11 formalities for setting up a small business enterprise
11 formalities for setting up a small business enterprise
 
Pmp sample questions
Pmp sample questionsPmp sample questions
Pmp sample questions
 
05 pmp scope management exam
05 pmp scope management exam05 pmp scope management exam
05 pmp scope management exam
 
Free PMP® Practice Exam Questions
 Free PMP® Practice Exam Questions Free PMP® Practice Exam Questions
Free PMP® Practice Exam Questions
 
PMP Certificate- introduction
PMP Certificate- introductionPMP Certificate- introduction
PMP Certificate- introduction
 
Performance Evaluation Presentation | De Grandis Sporting Goods
Performance Evaluation Presentation | De Grandis Sporting GoodsPerformance Evaluation Presentation | De Grandis Sporting Goods
Performance Evaluation Presentation | De Grandis Sporting Goods
 
Prince 2 Themes Part.1.pdf
Prince 2 Themes Part.1.pdfPrince 2 Themes Part.1.pdf
Prince 2 Themes Part.1.pdf
 

Mehr von Tu Nguyen, PMP®,PMI-RMP® (20)

3.estimating
3.estimating3.estimating
3.estimating
 
2.tendering
2.tendering2.tendering
2.tendering
 
1.introduction
1.introduction1.introduction
1.introduction
 
Node
NodeNode
Node
 
Contract
ContractContract
Contract
 
Cash flow
Cash flowCash flow
Cash flow
 
Bar chart
Bar chartBar chart
Bar chart
 
Arrow computation
Arrow computationArrow computation
Arrow computation
 
Arrow
ArrowArrow
Arrow
 
Administration
AdministrationAdministration
Administration
 
Time cost-trade-off
Time cost-trade-offTime cost-trade-off
Time cost-trade-off
 
Time cost-control
Time cost-controlTime cost-control
Time cost-control
 
Resources
ResourcesResources
Resources
 
Pert
PertPert
Pert
 
Organization
OrganizationOrganization
Organization
 
Ch 6 construction progress control
Ch 6 construction progress controlCh 6 construction progress control
Ch 6 construction progress control
 
Ch 4 cash flow and investment appraisal
Ch 4 cash flow and investment appraisalCh 4 cash flow and investment appraisal
Ch 4 cash flow and investment appraisal
 
Ch 3 contract strategy
Ch 3 contract strategyCh 3 contract strategy
Ch 3 contract strategy
 
Ch 2 planning and scheduling
Ch 2 planning and schedulingCh 2 planning and scheduling
Ch 2 planning and scheduling
 
Ch 1 organization of construction projects
Ch 1 organization of construction projectsCh 1 organization of construction projects
Ch 1 organization of construction projects
 

Session 3 gdas pmp study group presentation

  • 1. GDAS PM Professions: PMP Study Group Session #3: Professional Responsibility & Integration Management Monique Howard September 19, 2008 © 2005 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice
  • 2. Agenda • Summary of Focus − Professional Responsibility − Integration Management • Open Forum: Participant Questions • Study Group Questions • Wrap Up
  • 3. Professional Responsibility • Responsibility of the Profession − Compliance with all organizational rules and policies − Candidate/Certificant Professional Practice − Advancement of the Profession • Responsibilities to Customers and the Public − Qualifications, experience and performance of professional services − Conflict of interest situations and other prohibited professional conduct • Can be about 18 questions
  • 4. Integration Management • Key concepts to understand: − Seven Processes • Develop Project Charter • Develop Preliminary Project Scope Statement • Develop Project Management Plan • Direct and Manage Project Execution • Monitor and Control Project Work • Integrated Change Control • Close Project − PMBOK • ITTO Matrix, Page Number: 70 • Expect up to 14 questions
  • 5. Open Forum: Participant Questions If you have a question, raise your hand
  • 6. Study Group Questions Delivery Format: •Each Question will be displayed and read •Survey Box will be used to solicit answer •Based on responses, we will discuss options •Answer will be revealed
  • 7. 1. You are managing a contract which has outsourced software development for microprocessor design to a vendor. Since this field is rapidly evolving, you know that you should be able to manage changes to the contract. The paperwork, tracking systems, and approval levels for authorizing changes should be documented in: A. Contract Change Control System B. Inspections and Audits C. Performance Reporting D. Several systems including Records Management, Claims Administration System, Performance Reporting System etc
  • 8. 1. You are managing a contract which has outsourced software development for microprocessor design to a vendor. Since this field is rapidly evolving, you know that you should be able to manage changes to the contract. The paperwork, tracking systems, and approval levels for authorizing changes should be documented in: A. Contract Change Control System B. Inspections and Audits C. Performance Reporting D. Several systems including Records Management, Claims Administration System, Performance Reporting System etc Answer:     A Justification:     A Contract Change Control System defines the processes by which the contract can be modified. It includes the paperwork, tracking systems, dispute resolution procedures, and approval levels necessary for authorizing changes. Reference: PMBOK Third Edition, Page Number: 292
  • 9. 2. In your new company, you realize that some of the financial statements of the company do not follow US GAAP Accounting Standards and are hence inaccurate. In this case, what should you do first? A. Inform the US government agencies of the inaccurate accounting practices in the company. B. Talk to your finance managers about why you think that they may be violating the standard accounting standards. C. Since you are new to the company, you assume that finance standards are different in the company - hence do not do anything about the issue. D. Talk with the finance manager in your previous company to get expert opinion about accounting standards in the new company.
  • 10. 2. In your new company, you realize that some of the financial statements of the company do not follow US GAAP Accounting Standards and are hence inaccurate. In this case, what should you do first? A. Inform the US government agencies of the inaccurate accounting practices in the company. B. Talk to your finance managers about why you think that they may be violating the standard accounting standards. C. Since you are new to the company, you assume that finance standards are different in the company - hence do not do anything about the issue. D. Talk with the finance manager in your previous company to get expert opinion about accounting standards in the new company. Answer:     B   Justification:      * Option 2 is the best answer, because it aims at trying to understand and resolve the problem * Option 1 is the last option - to be preferred after all other alternatives are exhausted, and you are convinced that your new company is involved in malpractice * Option 3 just avoids the issue * Option 4 i.e. talking with the finance manager in your previous company is not recommended because you may be compromising proprietary information Reference: pmstudy.com notes as mentioned above
  • 11. 3. Your project is in the planning phase and you are paid every fortnight for the work to be done during the fortnight. You have been informed by the project sponsor that there has been a revaluation of projects within your company and your project will not be getting any additional funding. In this case, you should: A. stop work immediately and release all resources. B. perform appropriate closure for the project. C. decrease team size. D. remove non-critical tasks to decrease cost.
  • 12. 3. Your project is in the planning phase and you are paid every fortnight for the work to be done during the fortnight. You have been informed by the project sponsor that there has been a revaluation of projects within your company and your project will not be getting any additional funding. In this case, you should: A. stop work immediately and release all resources. B. perform appropriate closure for the project. C. decrease team size. D. remove non-critical tasks to decrease cost. Correct Choice:     B  Justification:     The project or phase, after either achieving its objectives or being terminated for other reasons, requires closure. Project Closure consists of documenting project results to formalize acceptance of the product of the project by the sponsor, or customer. Reference: pmstudy.com notes as mentioned above pmstudy.com comments: Option A: Without performing Administrative Closure, if resources are released, all the benefits of the project are lost Option C, Option D: They just postpone the problem and do not solve(resolve) the issue
  • 13. 4. Managing risks and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the: A. Project Plan B. Project Baseline C. Risk Response Plan D. Risk Baseline
  • 14. 4. Managing risks and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the: A. Project Plan B. Project Baseline C. Risk Response Plan D. Risk Baseline Correct Choice:     A Justification:     The project plan includes the risk management plan. Risk Management Plan includes defining key risks, including constraints and assumptions, and planned responses and contingencies Reference: PMBOK Third Edition, Page Number: 89
  • 15. 5. You had worked as a project manager in a firm specializing in making semiconductor chips. Now that you are working with a competitor, A. you should not be using the knowledge gained in the first company to improve the competitor's product. B. you can use the knowledge gained in the first company to improve the competitor's product. C. before doing anything which may adversely impact prospects of the first company, you should get their approval. D. you should do nothing which provides competition to or undermines the products of the first company.
  • 16. 5. You had worked as a project manager in a firm specializing in making semiconductor chips. Now that you are working with a competitor, A. you should not be using the knowledge gained in the first company to improve the competitor's product. B. you can use the knowledge gained in the first company to improve the competitor's product. C. before doing anything which may adversely impact prospects of the first company, you should get their approval. D. you should do nothing which provides competition to or undermines the products of the first company. Correct Choice:     B   Justification:     Knowledge gained in one company is not proprietary information and can be used in subsequent jobs. Choice 1, Choice 3 and Choice 4 are inappropriate because you may have to work in projects for the competitor which will adversely impact products of the first company you worked for. This is acceptable so long as you do not unethically use any contacts or proprietary information from the first company. Reference: pmstudy.com notes as mentioned above
  • 17. 6. The organization of the project is very important for successful implementation. Which factor does not have an impact on the design of the project organization? 1. Environmental Forces 2. Schedule Limitations 3. Strategic Choices 4. Technological Factors
  • 18. 6. The organization of the project is very important for successful implementation. Which factor does not have an impact on the design of the project organization? 1. Environmental Forces 2. Schedule Limitations 3. Strategic Choices 4. Technological Factors Correct Choice:     B  Justification:     Schedule limitations can shape the size of the project team but will not influence its organizational design. Reference: Project Management - A Systems Approach to Planning, Scheduling and Controlling; Also Mentioned in "Organizing Projects for success"
  • 19. 7. You have been having a lot of heated discussions with your colleague about an issue, and this is resulting in a hostile environment. To "cool-off" this hostile situation, you agree with your colleague`s point of view. The conflict resolution mode that you are using is: A. Problem Solving B. Withdrawal C. Forcing D. Confrontation
  • 20. 7. You have been having a lot of heated discussions with your colleague about an issue, and this is resulting in a hostile environment. To "cool-off" this hostile situation, you agree with your colleague`s point of view. The conflict resolution mode that you are using is: A. Problem Solving B. Withdrawal C. Forcing D. Confrontation Correct Choice:     B Justification:      Reference: Project Management - A Systems Approach to Planning, Scheduling and Controlling, Page Number: 389
  • 21. 8. You are aware that an employee in your project may potentially get a promotion. However, there is a possibility that he may get transferred after his promotion, thus impacting your project. In this situation, you should: A. give a bad recommendation about the person so as to delay the promotion of the person until the project is over. B. inform the employee about the potential promotion, and ask him to transition his responsibilities to another person. C. after the employee gets the promotion and is told of the transfer, you ask him to prepare a transition plan. D. hire another resource who can replace the person after he gets the promotion.
  • 22. 8. You are aware that an employee in your project may potentially get a promotion. However, there is a possibility that he may get transferred after his promotion, thus impacting your project. In this situation, you should: A. give a bad recommendation about the person so as to delay the promotion of the person until the project is over. B. inform the employee about the potential promotion, and ask him to transition his responsibilities to another person. C. after the employee gets the promotion and is told of the transfer, you ask him to prepare a transition plan. D. hire another resource who can replace the person after he gets the promotion. Correct Choice:     C  Justification:      Option 3 is the best answer - you are not sure whether the resource will get a promotion or get transferred. So, after the promotion/transfer is confirmed, you should ask him to do a proper transition. Option 2 and Option 4 assume that the person will be getting a promotion and transfer - since this is not certain as of now, if you go ahead with this assumption and the promotion does not happen, it will cause problems from a human resource management perspective. Option 1 is unethical Reference: pmstudy.com notes as mentioned above
  • 23. 9. While doing quality inspection, few defects were identified in the product. After rectifying the defects, the repaired items were reinspected and accepted. Subsequently, a notification was issued, which can also be referred to as: A. Validated Defect Repair B. Product Acceptance C. Quality Audit D. Approved Change Request
  • 24. 9. While doing quality inspection, few defects were identified in the product. After rectifying the defects, the repaired items were reinspected and accepted. Subsequently, a notification was issued, which can also be referred to as: A. Validated Defect Repair B. Product Acceptance C. Quality Audit D. Approved Change Request Correct Choice:     A   Justification:     Validated Defect Repair: Notification that reinspected repaired items have either been accepted or rejected. Reference: PMBOK Third Edition, Page Number: 93
  • 25. 10. You are doing some work under contract, when the buyer requests you to add some additional requirements which were not defined in the original contract. Since satisfying the buyer is of paramount interest, you go ahead and incorporate the requirements as part of the project. You are violating which Code of Professional Conduct: A. Responsibility to maintain and satisfy the scope and objectives B. Responsibility to ensure that a conflict of interest does not compromise legitimate interests C. Responsibility to provide accurate and truthful representations D. No Code of Professional Conduct is violated
  • 26. 10. You are doing some work under contract, when the buyer requests you to add some additional requirements which were not defined in the original contract. Since satisfying the buyer is of paramount interest, you go ahead and incorporate the requirements as part of the project. You are violating which Code of Professional Conduct: A. Responsibility to maintain and satisfy the scope and objectives B. Responsibility to ensure that a conflict of interest does not compromise legitimate interests C. Responsibility to provide accurate and truthful representations D. No Code of Professional Conduct is violated Correct Choice:     A  Justification:      Reference: Project Management - Code of Professional Conduct (PMI)
  • 27. 11. In a recent job interview, you were asked to define the most important characteristic of a project manager. Which of the following will be your best answer? A. Subject matter expert B. Integrator C. Creative person D. Risk minimizer
  • 28. 11. In a recent job interview, you were asked to define the most important characteristic of a project manager. Which of the following will be your best answer? A. Subject matter expert B. Integrator C. Creative person D. Risk minimizer Correct Choice:     B   Justification:     In project management context, integration includes characteristics of unification, consolidation, articulation, and integrative actions that are crucial to project completion, successfully meeting customer and other stakeholder requirements, and managing expectations. Reference: PMBOK Third Edition Page 77 pmstudy.com notes: The most important characteristic of a project manager is being an Integrator who can manage all the different interfaces in the project. The project manager should also be a good Communicator because a project manager usually spends more than 50% of his time communicating with different project stakeholders. Option 1: A project manager need not be a subject matter expert. There may be several subject matter experts for the project from whom the project manager can take advice when required. Option 3: Creativity is desirable but not the most important characteristic of a project manager. Option 4: A project manager should try to minimize risks in the project. However, this again is not the most important characteristic of a project manager.
  • 29. 12. As a PMP Certified project manager, you are responsible for all of the following EXCEPT: A. Maintaining the confidentiality of sensitive information which you have access to B. Managing conflict of interest situations in your project C. Ensuring the integrity of your team-members D. Refraining from offering and accepting inappropriate payments, gifts and other forms of communication
  • 30. 12. As a PMP Certified project manager, you are responsible for all of the following EXCEPT: A. Maintaining the confidentiality of sensitive information which you have access to B. Managing conflict of interest situations in your project C. Ensuring the integrity of your team-members D. Refraining from offering and accepting inappropriate payments, gifts and other forms of communication Correct Choice:     C  Justification:     You cannot be responsible for the integrity of your team-members; but you should definitely try to influence your team-members to perform all project activities in an ethical manner and with integrity. All the remaining activities are mentioned in the PMP Code of Professional Conduct as responsibilities of a project manager Reference: pmstudy.com notes as mentioned above
  • 31. 13. In your project, you want to monitor and control project processes associated with initiating, planning, executing and closing. This will help you take corrective or preventive action to control project performance. In this context, what should you do first? A. Review all project forecasts B. Detail all the activities of project team members involved in executing administrative closure for the project C. Review the project management plan and work performance information for your project D. Manage Project Risks
  • 32. 13. In your project, you want to monitor and control project processes associated with initiating, planning, executing and closing. This will help you take corrective or preventive action to control project performance. In this context, what should you do first? A. Review all project forecasts B. Detail all the activities of project team members involved in executing administrative closure for the project C. Review the project management plan and work performance information for your project D. Manage Project Risks Correct Choice:     C   Justification:     Figure 4-7 Reference: PMBOK Third Edition, Page Number: 95 pmstudy.com notes: Monitor and control project processes associated with initiating, planning, executing and closing" refers to "Monitor and Control Project work" - this is done as part of Project Integration Management. PMBOK Page 94 Option 1: Project Forecasts are created as an output from Monitor and Control Project Work (PMBOK Page 95). Option 2: This is done as part of administrative closure that happens when we are in Close Project phase (PMBOK Page 100). Option 3: Reviewing the project management plan and work performance information for your project is the first thing that you should do. These are inputs to "Monitor and Control Project" (PMBOK Page 95). Option 4: Managing project risks is not done as part of the "Monitor and Control Project" process
  • 33. 14. In a project management context, all the following are Constructive Roles EXCEPT: 1. Information Seeker 2. Recognition Seeker 3. Consensus Taker 4. Information Giver
  • 34. 14. In a project management context, all the following are Constructive Roles EXCEPT: 1. Information Seeker 2. Recognition Seeker 3. Consensus Taker 4. Information Giver Correct Choice:     B Justification:      Reference: Project Management - A Systems Approach to Planning, Scheduling and Controlling, Page Number: 215-216
  • 35. 15. You have recently appointed a project manager to handle a critical project in your organization. You want to provide the project manager with authority to apply organizational resources to project activities. Which document should you use? A. Resource Authorization Document B. Work Breakdown Structure C. Project Charter D. Project Scope Statement
  • 36. 15. You have recently appointed a project manager to handle a critical project in your organization. You want to provide the project manager with authority to apply organizational resources to project activities. Which document should you use? A. Resource Authorization Document B. Work Breakdown Structure C. Project Charter D. Project Scope Statement Correct Choice:     C Justification:     The project charter provides the project manager with the authority to apply organizational resources to project activities. Reference: PMBOK Third Edition, Page Number: 81
  • 37. 16. Your previous project manager made most decisions by himself without consulting subordinates. So, he believed in a leadership style that was: A. Laissez Faire B. Assertive C. Autocratic D. Coaching
  • 38. 16. Your previous project manager made most decisions by himself without consulting subordinates. So, he believed in a leadership style that was: A. Laissez Faire B. Assertive C. Autocratic D. Coaching Correct Choice:     C   Justification:      Reference: pmstudy.com notes as mentioned above
  • 39. 17. In which document will you find the code of account identifier, statement of work, responsible organization, and a list of schedule milestones? A. WBS B. WBS Dictionary C. PERT/CPM Charts D. Roles and Responsibilities Matrix
  • 40. 17. In which document will you find the code of account identifier, statement of work, responsible organization, and a list of schedule milestones? A. WBS B. WBS Dictionary C. PERT/CPM Charts D. Roles and Responsibilities Matrix Correct Choice:     B Justification:     WBS Dictionary : For each WBS component, the WBS dictionary includes a code of account identifier, a statement of work, responsible organization and a list of schedule milestones. Reference: PMBOK Third Edition, Page Number: 117
  • 41. 18. You are working in the project office of your organization. What is your job responsibility? A. Managing the operational activities in the company B. Always managing Human Resource and Risk Management issues for projects C. Providing support functions to project managers in the form of training, software, standardized policies etc. D. Providing Subject Matter Expertise in the functional areas of the project
  • 42. 18. You are working in the project office of your organization. What is your job responsibility? A. Managing the operational activities in the company B. Always managing Human Resource and Risk Management issues for projects C. Providing support functions to project managers in the form of training, software, standardized policies etc. D. Providing Subject Matter Expertise in the functional areas of the project Correct Choice:     C   Justification:     A Project Management Office (PMO) is an organizational unit to centralize and coordinate the management of projects under its domain. A PMO can also be referred to as ... "project office." PMOs can operate in a continuum from providing project management support functions in the form of training, software, standardized policies and procedures, to actual direct management and responsibility for achieving the project objectives. Reference: PMBOK Third Edition, Page Number: 17
  • 43. 19. You are the project manager for a construction project and there are 121 people reporting to you. Your job requires that you sanction work to others and ensure that the work is done at the right time. The tool you use is: A. Work Breakdown Structure B. Work Authorization System C. PERT/CPM/Network Diagrams D. WBS Dictionaries
  • 44. 19. You are the project manager for a construction project and there are 121 people reporting to you. Your job requires that you sanction work to others and ensure that the work is done at the right time. The tool you use is: A. Work Breakdown Structure B. Work Authorization System C. PERT/CPM/Network Diagrams D. WBS Dictionaries Correct Choice:     B  Justification:     Work Authorization System: It includes the steps, documents, tracking system, and defined approval levels needed to issue work authorizations. Reference: PMBOK Third Edition, Page Number: 379
  • 45. 20. A restriction (e.g. limited budget) that affects the performance of the project is also called a(an): 1. Constraint 2. Assumption 3. Kill point 4. Risk
  • 46. 20. A restriction (e.g. limited budget) that affects the performance of the project is also called a(an): 1. Constraint 2. Assumption 3. Kill point 4. Risk Correct Choice:     A   Justification:     Project constraints: ... For example, a predefined budget or any imposed dates (schedule milestones) are included in constraints Reference: PMBOK Third Edition, Page Number: 111 A constraint is an applicable restriction that will affect the performance of the project. For example, a predefined budget is a constraint that is highly likely to limit the options of the team regarding scope, staffing, and schedule.
  • 47. 21. You are the project manager of a civil construction company involved with building houses. In your project, you often use Work Breakdown Structures (WBS) from your previous projects as templates. A Work Breakdown Structure can be used for all of the following except: A. Tracking project performance against cost and schedule B. Creating a network diagram, with task dependencies C. Creating a project schedule D. Assigning resources to work on different work elements
  • 48. 21. You are the project manager of a civil construction company involved with building houses. In your project, you often use Work Breakdown Structures (WBS) from your previous projects as templates. A Work Breakdown Structure can be used for all of the following except: A. Tracking project performance against cost and schedule B. Creating a network diagram, with task dependencies C. Creating a project schedule D. Assigning resources to work on different work elements Correct Choice:     B Justification:     Task dependencies are not evident in a WBS. WBS does not specify the time frame in which different tasks should be accomplished. Reference: pmstudy.com notes as mentioned above; Also, please refer to PMBOK 3rd Edition, Page 113
  • 49. 22. You have scheduled a contractor conference after two days with potential contractors to discuss a procurement. Today, the senior management informed you that there is a very high probability of the project being canceled. You should A. cancel the meeting B. go ahead with the meeting but inform the contractors that the project may be canceled C. go ahead with the meeting as usual D. wait until the meeting, to see if there is a change in the status of the project
  • 50. 22. You have scheduled a contractor conference after two days with potential contractors to discuss a procurement. Today, the senior management informed you that there is a very high probability of the project being canceled. You should A. cancel the meeting B. go ahead with the meeting but inform the contractors that the project may be canceled C. go ahead with the meeting as usual D. wait until the meeting, to see if there is a change in the status of the project Correct Choice:     A   Justification:     Option 1 is the best choice. There is no point in having the meeting and wasting time if there is a high probability of the project being canceled. Reference: pmstudy.com notes as mentioned above
  • 51. 23. A customer informed you that it is preferable to change a certain aspect of the project. What should you do first? A. Talk with team members to understand implications of the change B. Communicate the change to the Management to get their inputs C. Open up a Change Control D. Do sizing for the change and communicate to the customer
  • 52. 23. A customer informed you that it is preferable to change a certain aspect of the project. What should you do first? A. Talk with team members to understand implications of the change B. Communicate the change to the Management to get their inputs C. Open up a Change Control D. Do sizing for the change and communicate to the customer Correct Choice:     A   Justification:     Anytime there is a potential request for a change from a customer, 1. Understand what functionality was requested - Talk with team-members to assess the implication of the change 2. Open up a Change Control if there is a formal Change Control Mechanism 3. Communicate the change to the management, and inform the customer about the impact of the change (e.g. increase in sizing, schedule etc.) 4. If change is accepted, go ahead and implement the changes Reference: pmstudy.com notes as mentioned above
  • 53. 24. As a project manager, Project Plan Development is an important element of managing projects. Which phase of the project management life-cycle does Project Plan Development belong to? A. Initiation Process B. Planning Process C. Execution Process D. Controlling Process
  • 54. 24. As a project manager, Project Plan Development is an important element of managing projects. Which phase of the project management life-cycle does Project Plan Development belong to? A. Initiation Process B. Planning Process C. Execution Process D. Controlling Process Correct Choice:     B   Justification:     Project Plan Development is done as part of the Planning Process. Reference: pmstudy.com notes as mentioned above
  • 55. 25. If you would like to find out who will be approving changes in your project deliverables and documentation, you can refer to the: A. Change Control System B. Project Plan C. Organization Chart D. Resource Assignment Matrix
  • 56. 25. If you would like to find out who will be approving changes in your project deliverables and documentation, you can refer to the: A. Change Control System B. Project Plan C. Organization Chart D. Resource Assignment Matrix Correct Choice:     A Justification:     Change control system: A collection of formal documented procedures that define how project deliverables and documentation will be controlled, changed, and approved Reference: PMBOK Third Edition, Page Number: 353 A change control system is a collection of formal documented procedures that define how project performance will be monitored and evaluated, and includes the steps by which official project documents may be changed. It includes the paperwork, tracking systems, processes and approval levels necessary for authorizing changes.
  • 57. Wrap Up Conference Number: 547-941-6414 or 866-547-8978 Passcode: Leader – 844306338, Participant – 370670831 4 Scope Management September 2:00pm Presenter: https:// (PMBOK Chapters 5) 25 EST www.rooms.hp.com/attend/default.aspx?key =EHYAWGDPHR Participant: https:// www.rooms.hp.com/attend/default.aspx?key =EPKQ5PM2NU