SlideShare ist ein Scribd-Unternehmen logo
1 von 33
The Scottish Ferries Review
Consultation Document 2010
Mull – 28 July 2010
Judith Ainsley
Introduction
• General presentation on Ferries review
• Q&A
• Workshop on routes and services
methodology
• Opportunity for final questions
The Consultation
• Consultation Document, not a Plan
• Runs to 30 September 2010
• Questionnaires to complete and return
• 33 key questions
• scottishferriesreview@scotland.gsi.gov.uk
• 0131 244 1539
• Documents available on our website
Commitment to Ferries
• Essential part of our transport network
• Essential for access to vital services
• Enable movement of freight
• Encourage sustainable and growing
communities
• Must provide a safe, sustainable system
• Quality employment
Summary of the Review:
• Inform a long term Ferries Strategy – to 2022
• Influence next round of tendering for services
• Investment programme for vessels and ports
and harbours
• All publicly funded ferries included – Scottish
Government and local authority funded
• No potential routes excluded
• Needs of passengers, cars, commercial vehicles
and freight all to be considered
Lack of consistency
• Funding services
• Funding vessels
• Funding harbour infrastructure
• Responsibility for delivery
• What routes and what level of service
• Tendered services
• Provision of vessels
What we’ve done so far
• Been helped in forming opinions by project
groups
• Consultants and CMAL carried out specific
pieces of work to inform us
• Public consultation events last year
• Extensive data collection
Challenges
• Less money available to invest in and
support ferries
• Ageing fleet and need for investment
• Ageing harbour infrastructure and need for
investment
• Escalating fuel and crew costs
• Subsidy levels increasing
Funding and Procurement
• To 2022 need £604m for vessels
• To 2022 need £180m for ports and
harbours replacement
• To 2022 need £7.5m p.a. annually for
ports and harbours maintenance
• The services also need to be funded -
2007/8 cost for all c. £103m, 2008/9 for
DML c.£90m
• We are asking you to consider options
Funding Options
• The status quo
• CMAL to access funds through alternative
structural or financing routes
• Ports and harbours could be self-funding
• Users of the service to pay more
• Open the market up to greater competition
Procurement Options for services
• Tender some routes singly with the option for operators
to bring their own vessel(s) to the tendered routes?
• Specific routes are suggested
• Allow single routes to be “bundled” or stagger the
tenders?
• Leave remaining routes within the 2 large bundles?
• Loosen the tender requirements, specifying only the
minimum level service to allow operators the flexibility to
innovate?
• What should be specified?
Fares Options
• Increase all fares
• Increase visitor fares
• Reduce fares for island/peninsula
residents
• Reduce fares for commercial vehicles
• RET or other distance based
• To manage demand
• Mixed approach
Fares Questions
• Asking you to consider what the rationale
for/purpose of the fares policy should be.
• Should fares differentiate between
islanders/residents of peninsular
communities and other ferry users?
• One fares policy across Scotland or
different policies dependant on needs of
communities?
What services should be funded?
• We have developed a methodology –
based on Summer timetables - for
determining what routes and services are
needed
• We will now do the same for Winter
timetable
How should services be provided?
• Who should be responsible for providing
ferry services that need public subsidy?
• Should there be central procurement
expertise regardless of who is responsible
for the provision of the service?
Options
• Status quo – inconsistent approach
• Scottish Government becomes
responsible for all
• Local Authorities/RTPs become
responsible for all
• A more consistent split of responsibility for
example….
How responsibility could be split?
• SG responsible for services between
mainland and islands, LAs or RTPs
responsible for all others
• Dependant on administration at either end
of the route
• Dependant on whether the route is
classed as a “sea” route or one with less
onerous conditions
Accessibility
• Disabled people, those travelling with
children or luggage, PRMs
• Equalities Impact Assessment at Draft
Plan stage
• Accessibility Assessments carried out
• Recommendations from this work in the
consultation document and you are asked
for your views
Accessibility
• Should they be implemented now?
• Included in future tender
requirements?
• Accessibility improvement fund?
• Information system indicating the
degree of accessibility?
Environmental Issues
• Some questions regarding reducing
emissions aimed at operators
• Question 33, would you support longer
journey times as part of a CO2 emissions
reduction programme?
• Do you have any other suggestions to
reduce emissions?
Any questions so far?
Part 2 - Workshop session
• Opportunity to explore and discuss our initial findings
for Mull, Iona, Ardnamurchan and Morvern. So far we
have considered:
1. what you need your ferry for
2. what a service would look like to meet these needs
3. where the gaps are
• We have still to consider options to address the gaps
and prioritise future spending
Checking we’ve got this right?
• Aware that in defining the needs of the
community and defining a ferry service to
meet those needs there might be things
we haven’t got quite right.
• We need you to tell us what you think –
have we described your community
correctly?
do we need to change anything?
Current Issues
Mull
• Complicated timetable with variations on sailings;
Integration with other public transport modes on
mainland
Iona
• Limited sailings, winter timetable and inconsistent
timetables/sailings
Ardnamurchan and Morvern
• Limited timetable
• Winter timetable and inconsistent timetable
Household survey results
• An average of 67% of people on Mull who use the ferry
most are either quite or highly satisfied with their current
services.
• Iona – small sample size so combined with other
communities, therefore no separate figures available.
• An average of 79% of people in Ardnamurchan and
Morvern who use the ferry most are either quite or highly
satisfied with their current services.
• Average satisfaction for the network is 73%.
What you need your ferry for -
1. Commuting - importance of ferry to enable regular
commuting and business travel to and from
community.
2. Personal – if people are dependent on basic services
and facilities from the mainland
3. Supply chain - where communities have good access
to public amenities and shopping – these amenities
need supplying
4. Export/Import - where an island requires the ferry to
cope with high levels of freight transit.
5. Tourism – how dependent is the island on tourism.
Initial findings
• Mull - Export/Import and Tourism are equally important.
Followed by Supply chain, Personal and then
Commuting
• Iona – Tourism is important. Followed by Commuting,
Personal, Export/Import and then Supply Chain
• Ardnamurchan-Tourism and Commuting are equally
important. Followed by Supply chain and then Personal
and Export/import
• Morvern- Personal, Export/Import and Tourism are all
equally important. Followed by Commuting and Supply
chain.
• Does this feel right?
How did we assess this?
• Commuting –We used household survey
data. We looked at the % of people who
said their principle use was commuting or
business travel;
• Personal - We considered the population
density of the island and weighted this
against factors such as whether the
community has access to local
healthcare/school facilities etc;
How did we assess this?
• Supply chain - The measure for this
dependency was the population size of the
island;
• Export/import -The measure for this
dependency is commercial vehicle lane
metres;
• Tourism - measured by the average
number of people employed in tourism for
the community and the ratio of summer
and winter patronage.
Defining a service
• In defining a service to meet these needs
we have considered:
1.Crossing time;
2.number of sailings per day;
3.length of operating day; and,
4.the number of days per week the service runs
Initial analysis
• Mull - A slightly longer crossing time together with a
longer operating day. And no change to sailings per day
or days per week.
• Iona - A longer crossing time, a reduced number of
sailings per day, a shorter operating day and a reduced
number of days per week.
• Ardnamurchan - No change to the length of crossing
time, a reduced number of sailings per day, a longer
operating day and no change to the number of days per
week.
• Morvern – A longer crossing time and a reduced
number of sailings per day, a longer operating day and
no change to the number of days per week.
• However, we will take account of consultation responses
and where applicable Steps 5 and 6 yet to be applied
Steps 5 and 6
• Identify options to address proposed
changes at Step 4
• STAG based appraisal
• Objectives to take account of current
issues
• Prioritise future spend across the Scottish
ferries network
What happens next?
• Public consultation to 30 September 2010
• 43 events within this period
• Draft Ferries Plan with more detailed Strategic
Environmental Assessment and an Equalities
Impact Assessment
• Further minimum 6 week consultation period
• Final Ferries Plan

Weitere ähnliche Inhalte

Andere mochten auch (8)

Infographics presentation
Infographics presentationInfographics presentation
Infographics presentation
 
Blue Badge Improvement Service
Blue Badge Improvement ServiceBlue Badge Improvement Service
Blue Badge Improvement Service
 
Role of national government in travel & tourism
Role of national government in travel & tourism Role of national government in travel & tourism
Role of national government in travel & tourism
 
The Tourism Industry - one industry concept
The Tourism Industry - one industry conceptThe Tourism Industry - one industry concept
The Tourism Industry - one industry concept
 
Roads maintenance review
Roads maintenance reviewRoads maintenance review
Roads maintenance review
 
A positive and negative effect on tourism
A positive and negative effect on tourismA positive and negative effect on tourism
A positive and negative effect on tourism
 
Economic importance of tourism
Economic importance of tourismEconomic importance of tourism
Economic importance of tourism
 
Economic impact of tourism
Economic impact of tourismEconomic impact of tourism
Economic impact of tourism
 

Ähnlich wie Scottish Ferries Review - Mull

Securing modal shift to bus FINAL - Nick Phillips, Borough of Poole
Securing modal shift to bus FINAL - Nick Phillips, Borough of PooleSecuring modal shift to bus FINAL - Nick Phillips, Borough of Poole
Securing modal shift to bus FINAL - Nick Phillips, Borough of Poole
Nick Phillips
 
Wk 3_Role of Transportation in the supply chain.pptx
Wk 3_Role of Transportation in the supply chain.pptxWk 3_Role of Transportation in the supply chain.pptx
Wk 3_Role of Transportation in the supply chain.pptx
ssusercbc19c
 
Transport Management & Theory Practices (8)
Transport Management & Theory Practices (8)Transport Management & Theory Practices (8)
Transport Management & Theory Practices (8)
Tengku Faisal Tg Arifin
 
2014 APA Conference - Noel Comeaux
2014 APA Conference - Noel Comeaux2014 APA Conference - Noel Comeaux
2014 APA Conference - Noel Comeaux
Stephanie Camay
 
Vessel efficiency comp glasgow roadmapping
Vessel efficiency comp glasgow roadmappingVessel efficiency comp glasgow roadmapping
Vessel efficiency comp glasgow roadmapping
KTN
 

Ähnlich wie Scottish Ferries Review - Mull (20)

transportation-.pptx
transportation-.pptxtransportation-.pptx
transportation-.pptx
 
Proposed peak hour_extensions_public_meeting_presentation
Proposed peak hour_extensions_public_meeting_presentationProposed peak hour_extensions_public_meeting_presentation
Proposed peak hour_extensions_public_meeting_presentation
 
Ecmhi m95 washburn
Ecmhi m95 washburnEcmhi m95 washburn
Ecmhi m95 washburn
 
Securing modal shift to bus FINAL - Nick Phillips, Borough of Poole
Securing modal shift to bus FINAL - Nick Phillips, Borough of PooleSecuring modal shift to bus FINAL - Nick Phillips, Borough of Poole
Securing modal shift to bus FINAL - Nick Phillips, Borough of Poole
 
Wk 3_Role of Transportation in the supply chain.pptx
Wk 3_Role of Transportation in the supply chain.pptxWk 3_Role of Transportation in the supply chain.pptx
Wk 3_Role of Transportation in the supply chain.pptx
 
monorail system implication in Sri Lanka
monorail system implication in Sri Lankamonorail system implication in Sri Lanka
monorail system implication in Sri Lanka
 
Designing Sustainable Supply Chains - Amar Ramudhin, University of Hull
Designing Sustainable Supply Chains - Amar Ramudhin, University of HullDesigning Sustainable Supply Chains - Amar Ramudhin, University of Hull
Designing Sustainable Supply Chains - Amar Ramudhin, University of Hull
 
Transport Management & Theory Practices (8)
Transport Management & Theory Practices (8)Transport Management & Theory Practices (8)
Transport Management & Theory Practices (8)
 
Maritime skills development in Africa
Maritime skills development in AfricaMaritime skills development in Africa
Maritime skills development in Africa
 
2014 APA Conference - Noel Comeaux
2014 APA Conference - Noel Comeaux2014 APA Conference - Noel Comeaux
2014 APA Conference - Noel Comeaux
 
Port Development, Review of Maritime Transport 2014
Port Development, Review of Maritime Transport 2014Port Development, Review of Maritime Transport 2014
Port Development, Review of Maritime Transport 2014
 
Vessel efficiency comp glasgow roadmapping
Vessel efficiency comp glasgow roadmappingVessel efficiency comp glasgow roadmapping
Vessel efficiency comp glasgow roadmapping
 
Vessel efficiency UKMIA Adrian Waddams
Vessel efficiency UKMIA Adrian WaddamsVessel efficiency UKMIA Adrian Waddams
Vessel efficiency UKMIA Adrian Waddams
 
Capacity management in large projects
Capacity management in large projectsCapacity management in large projects
Capacity management in large projects
 
The long way home
The long way homeThe long way home
The long way home
 
Perceptions of trucking industrialist towards congestion problems and Potenti...
Perceptions of trucking industrialist towards congestion problems and Potenti...Perceptions of trucking industrialist towards congestion problems and Potenti...
Perceptions of trucking industrialist towards congestion problems and Potenti...
 
Transportation
 Transportation Transportation
Transportation
 
Batterie pour INTEGRA Terry Waugh uk
Batterie pour INTEGRA Terry Waugh ukBatterie pour INTEGRA Terry Waugh uk
Batterie pour INTEGRA Terry Waugh uk
 
Is there a future for railways in the Maritimes?
Is there a future for railways in the Maritimes?Is there a future for railways in the Maritimes?
Is there a future for railways in the Maritimes?
 
Water vessel
Water vesselWater vessel
Water vessel
 

Kürzlich hochgeladen

Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
Fi L
 

Kürzlich hochgeladen (20)

Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdf
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdf
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 

Scottish Ferries Review - Mull

  • 1. The Scottish Ferries Review Consultation Document 2010 Mull – 28 July 2010 Judith Ainsley
  • 2. Introduction • General presentation on Ferries review • Q&A • Workshop on routes and services methodology • Opportunity for final questions
  • 3. The Consultation • Consultation Document, not a Plan • Runs to 30 September 2010 • Questionnaires to complete and return • 33 key questions • scottishferriesreview@scotland.gsi.gov.uk • 0131 244 1539 • Documents available on our website
  • 4. Commitment to Ferries • Essential part of our transport network • Essential for access to vital services • Enable movement of freight • Encourage sustainable and growing communities • Must provide a safe, sustainable system • Quality employment
  • 5. Summary of the Review: • Inform a long term Ferries Strategy – to 2022 • Influence next round of tendering for services • Investment programme for vessels and ports and harbours • All publicly funded ferries included – Scottish Government and local authority funded • No potential routes excluded • Needs of passengers, cars, commercial vehicles and freight all to be considered
  • 6. Lack of consistency • Funding services • Funding vessels • Funding harbour infrastructure • Responsibility for delivery • What routes and what level of service • Tendered services • Provision of vessels
  • 7. What we’ve done so far • Been helped in forming opinions by project groups • Consultants and CMAL carried out specific pieces of work to inform us • Public consultation events last year • Extensive data collection
  • 8. Challenges • Less money available to invest in and support ferries • Ageing fleet and need for investment • Ageing harbour infrastructure and need for investment • Escalating fuel and crew costs • Subsidy levels increasing
  • 9. Funding and Procurement • To 2022 need £604m for vessels • To 2022 need £180m for ports and harbours replacement • To 2022 need £7.5m p.a. annually for ports and harbours maintenance • The services also need to be funded - 2007/8 cost for all c. £103m, 2008/9 for DML c.£90m • We are asking you to consider options
  • 10. Funding Options • The status quo • CMAL to access funds through alternative structural or financing routes • Ports and harbours could be self-funding • Users of the service to pay more • Open the market up to greater competition
  • 11. Procurement Options for services • Tender some routes singly with the option for operators to bring their own vessel(s) to the tendered routes? • Specific routes are suggested • Allow single routes to be “bundled” or stagger the tenders? • Leave remaining routes within the 2 large bundles? • Loosen the tender requirements, specifying only the minimum level service to allow operators the flexibility to innovate? • What should be specified?
  • 12. Fares Options • Increase all fares • Increase visitor fares • Reduce fares for island/peninsula residents • Reduce fares for commercial vehicles • RET or other distance based • To manage demand • Mixed approach
  • 13. Fares Questions • Asking you to consider what the rationale for/purpose of the fares policy should be. • Should fares differentiate between islanders/residents of peninsular communities and other ferry users? • One fares policy across Scotland or different policies dependant on needs of communities?
  • 14. What services should be funded? • We have developed a methodology – based on Summer timetables - for determining what routes and services are needed • We will now do the same for Winter timetable
  • 15. How should services be provided? • Who should be responsible for providing ferry services that need public subsidy? • Should there be central procurement expertise regardless of who is responsible for the provision of the service?
  • 16. Options • Status quo – inconsistent approach • Scottish Government becomes responsible for all • Local Authorities/RTPs become responsible for all • A more consistent split of responsibility for example….
  • 17. How responsibility could be split? • SG responsible for services between mainland and islands, LAs or RTPs responsible for all others • Dependant on administration at either end of the route • Dependant on whether the route is classed as a “sea” route or one with less onerous conditions
  • 18. Accessibility • Disabled people, those travelling with children or luggage, PRMs • Equalities Impact Assessment at Draft Plan stage • Accessibility Assessments carried out • Recommendations from this work in the consultation document and you are asked for your views
  • 19. Accessibility • Should they be implemented now? • Included in future tender requirements? • Accessibility improvement fund? • Information system indicating the degree of accessibility?
  • 20. Environmental Issues • Some questions regarding reducing emissions aimed at operators • Question 33, would you support longer journey times as part of a CO2 emissions reduction programme? • Do you have any other suggestions to reduce emissions?
  • 22. Part 2 - Workshop session • Opportunity to explore and discuss our initial findings for Mull, Iona, Ardnamurchan and Morvern. So far we have considered: 1. what you need your ferry for 2. what a service would look like to meet these needs 3. where the gaps are • We have still to consider options to address the gaps and prioritise future spending
  • 23. Checking we’ve got this right? • Aware that in defining the needs of the community and defining a ferry service to meet those needs there might be things we haven’t got quite right. • We need you to tell us what you think – have we described your community correctly? do we need to change anything?
  • 24. Current Issues Mull • Complicated timetable with variations on sailings; Integration with other public transport modes on mainland Iona • Limited sailings, winter timetable and inconsistent timetables/sailings Ardnamurchan and Morvern • Limited timetable • Winter timetable and inconsistent timetable
  • 25. Household survey results • An average of 67% of people on Mull who use the ferry most are either quite or highly satisfied with their current services. • Iona – small sample size so combined with other communities, therefore no separate figures available. • An average of 79% of people in Ardnamurchan and Morvern who use the ferry most are either quite or highly satisfied with their current services. • Average satisfaction for the network is 73%.
  • 26. What you need your ferry for - 1. Commuting - importance of ferry to enable regular commuting and business travel to and from community. 2. Personal – if people are dependent on basic services and facilities from the mainland 3. Supply chain - where communities have good access to public amenities and shopping – these amenities need supplying 4. Export/Import - where an island requires the ferry to cope with high levels of freight transit. 5. Tourism – how dependent is the island on tourism.
  • 27. Initial findings • Mull - Export/Import and Tourism are equally important. Followed by Supply chain, Personal and then Commuting • Iona – Tourism is important. Followed by Commuting, Personal, Export/Import and then Supply Chain • Ardnamurchan-Tourism and Commuting are equally important. Followed by Supply chain and then Personal and Export/import • Morvern- Personal, Export/Import and Tourism are all equally important. Followed by Commuting and Supply chain. • Does this feel right?
  • 28. How did we assess this? • Commuting –We used household survey data. We looked at the % of people who said their principle use was commuting or business travel; • Personal - We considered the population density of the island and weighted this against factors such as whether the community has access to local healthcare/school facilities etc;
  • 29. How did we assess this? • Supply chain - The measure for this dependency was the population size of the island; • Export/import -The measure for this dependency is commercial vehicle lane metres; • Tourism - measured by the average number of people employed in tourism for the community and the ratio of summer and winter patronage.
  • 30. Defining a service • In defining a service to meet these needs we have considered: 1.Crossing time; 2.number of sailings per day; 3.length of operating day; and, 4.the number of days per week the service runs
  • 31. Initial analysis • Mull - A slightly longer crossing time together with a longer operating day. And no change to sailings per day or days per week. • Iona - A longer crossing time, a reduced number of sailings per day, a shorter operating day and a reduced number of days per week. • Ardnamurchan - No change to the length of crossing time, a reduced number of sailings per day, a longer operating day and no change to the number of days per week. • Morvern – A longer crossing time and a reduced number of sailings per day, a longer operating day and no change to the number of days per week. • However, we will take account of consultation responses and where applicable Steps 5 and 6 yet to be applied
  • 32. Steps 5 and 6 • Identify options to address proposed changes at Step 4 • STAG based appraisal • Objectives to take account of current issues • Prioritise future spend across the Scottish ferries network
  • 33. What happens next? • Public consultation to 30 September 2010 • 43 events within this period • Draft Ferries Plan with more detailed Strategic Environmental Assessment and an Equalities Impact Assessment • Further minimum 6 week consultation period • Final Ferries Plan

Hinweis der Redaktion

  1. These figures are to support the publicly funded ferry services. They do not include costs at private ports. Do we know how much it costs per annum to fund all the currently publicly funded services?
  2. The specific routes are Ardrossan – Brodick, Wemyss Bay – Rothesay, Oban – Craignure, Largs – Cumbrae and the Pentland Firth.