SlideShare a Scribd company logo
1 of 19
Integrating PCF with SAP

      Stewart Graham
        SAP Savants




                           1
SAP Cost Reporting and PCF
Integration
• Introduction

  – Stewart Graham – SAP Savants
        • SAP since 1995
        • Specialise in PM,MM,PS,CO and QM
        • Consulting and bespoke development

  – Today we will :
        • Review SAP Modules that contributes to Cost Reporting
        • Review SAP Data that contributes to Cost Reporting
        • Review how PCF would integrate with SAP – Larger
          Projects and TARS
        • Review how SAP can be used for smaller projects


                                                                  2
PCF / SAP Integration

        Why is cost reporting so difficult ?

 Why can’t I look at my maintenance order spend
                   for the month
   Why can’t I accurately forecast my project
                       spend

  Let’s start by looking at the key modules and
               there contributing data
                                                  3
PCF / SAP Integration
                        Controlling

                        Project Systems

                 PM     Materials Management
    CO
                        Plant Maintenance

       MM        PS



                                               4
PCF / SAP Integration
                        Controlling

                        Project Systems
                  PM
  CO                    Materials Management

                        Plant Maintenance

                 PS
    MM



                                               5
PCF / SAP Integration
• Cost Centers -> Cost Center Groups
                                         CO
• Cost Elements -> Cost Element Groups
• Planned Costs
• Planned versions
• Actual Costs
• Statistical Postings
• Settlements
• Assessments
• Forecasts
• Activities

                                              6
PCF / SAP Integration
• Projects                               PS
• WBS Elements -> ‘Real’ & Statistical
• Capital
• Expense
• Planned Costs
• Planned versions
• Budgets
• Commitments
• Actual Costs



                                              7
PCF / SAP Integration
• Material Masters
• Service Masters                              MM
• Requisitions
• Purchase Orders
• Contracts
• Reservations
• Vendors
• Receipts / Returns
• Issues – Direct (reservation) and Indirect (cost object)
• Service Entries


                                                             8
PCF / SAP Integration
• Notifications
• Maintenance Orders                       PM
• Technical Objects (EQs and Flocs)
• Revisions
• Order Types & Maintenance Activity Types
• Planned Costs
• Components (Materials)
• Confirmations
• Actual Costs
• Settlement rules
• Assignments to WBS elements
                                                9
PCF / SAP Integration
                        Controlling

                        Project Systems
                  PM
  CO                    Materials Management

                        Plant Maintenance

                 PS
    MM



                                               10
Too much to understand ...
 PCF / SAP Integration




                             11
PCF / SAP Integration


                                                                                    X
                                   Project
                                                                                      PO ?


                      WBS A                       WBS B            PO X


         WBS A.1               WBS A.2


                                              Order 004            PO Y
Order 001        Order 002     Order 003


                                                                   PO Z


                     Service           Goods              Goods                    Accounting
 Confirmations                                                       Allocations
                     Entries           Receipts           Issues                   Documents




                                                                                                12
PCF / SAP Integration
   BAPI SAP environment

                                   BAPI Layer                                                      Project




                                                                                     WBS A                    WBS B            PO X



                                                                          WBS A.1              WBS A.2


                                    Get Project                                                              Order 004
                                                                                                                               PO Y
                                                              Order 001         Order 002      Order 003




                                                                                                                               PO Z

           PCF               API
                             API




                             API                                      Service                 Goods          Goods                     Accounting
                                      Get CO      Confirmations
                                                                      Entries                Receipts        Issues
                                                                                                                         Allocations   Documents



                             API
  vN.N           Client
Database         Configuration




                                                                                                                                                    13
PCF / SAP Integration
• Overview - Get BAPIs (Project / CO - controlling ). Time stamped so that they can pull
  delta/incremental/information

   – Get Project
          • Set up project in PCF
          • Connect to an SAP Object(s)
               –   PS Project(s)
               –   PS WBS Element(s)
               –   PM Revision(s)
               –   PM Maintenance Order(s)
               –   CO Internal Orders(s)
          • Identify free radicals (unassigned POs)
          • Extract data on a schedule / on demand

   – Get CO
          • For the defined PCF project
          • Pull CO documents
          • Pull extended attributes of the CO document
               –   Confirmation get the AFRU data (work center, personnel no, text …)
               –   Goods receipt (material details, vendor, who) ….




                                                                                           14
Improving reporing in SAP
                            Controlling

                            Project Systems
                  PM
  CO                        Materials Management

                            Plant Maintenance

                PS
    MM



                                                   15
Too much to understand ...
 SAP reporting … made better




                               16
SAP reporting … made better
                    Click here to get
                    the procurement
                         status




                                          Click here ...




                                        To get the detail
                                         down here ...

                                         no more drill
                                           through




                                                            17
SAP reporting … made better
                       Click button to                   Apply filter for all
                                                         or only those that
                      show calendar
                                                            may cause
                      view of costs ...
                                                             problems
                       think outlook


                Click any level in
                 the hierarchy




                                              Too see all
                                          planned materials.
                                             WBS and/or
                                                Orders




                                                                                18
SAP reporting … made better
              Move forwards or
              backwards reporting
                Change in time
                 period to weeks




                                    19

More Related Content

What's hot

Supply Chain Management - Project Package
Supply Chain Management - Project PackageSupply Chain Management - Project Package
Supply Chain Management - Project PackageFerenc Rákóczy
 
Supply chain process in the UN
Supply chain process in the UNSupply chain process in the UN
Supply chain process in the UNKate Allen
 
Metrics Based Software Supplier Selection
Metrics Based Software Supplier SelectionMetrics Based Software Supplier Selection
Metrics Based Software Supplier Selectionhans_kuijpers
 
2010 oow contracts_sig
2010 oow contracts_sig2010 oow contracts_sig
2010 oow contracts_sigDZee Solutions
 
Case Study: How Crestron Electronics Improved the Efficiency of Its Customer ...
Case Study: How Crestron Electronics Improved the Efficiency of Its Customer ...Case Study: How Crestron Electronics Improved the Efficiency of Its Customer ...
Case Study: How Crestron Electronics Improved the Efficiency of Its Customer ...Andrew Ho
 
Openerp Project Slides
Openerp Project SlidesOpenerp Project Slides
Openerp Project SlidesOdoo
 
Nice Flow Charts Prof Servs
Nice Flow Charts Prof ServsNice Flow Charts Prof Servs
Nice Flow Charts Prof Servsguest78aa88
 
2012 Ohug Presentation Show
2012 Ohug Presentation Show2012 Ohug Presentation Show
2012 Ohug Presentation Showllw8503
 

What's hot (10)

Tabel ranti
Tabel rantiTabel ranti
Tabel ranti
 
Supply Chain Management - Project Package
Supply Chain Management - Project PackageSupply Chain Management - Project Package
Supply Chain Management - Project Package
 
Mind tree ip soc
Mind tree ip socMind tree ip soc
Mind tree ip soc
 
Supply chain process in the UN
Supply chain process in the UNSupply chain process in the UN
Supply chain process in the UN
 
Metrics Based Software Supplier Selection
Metrics Based Software Supplier SelectionMetrics Based Software Supplier Selection
Metrics Based Software Supplier Selection
 
2010 oow contracts_sig
2010 oow contracts_sig2010 oow contracts_sig
2010 oow contracts_sig
 
Case Study: How Crestron Electronics Improved the Efficiency of Its Customer ...
Case Study: How Crestron Electronics Improved the Efficiency of Its Customer ...Case Study: How Crestron Electronics Improved the Efficiency of Its Customer ...
Case Study: How Crestron Electronics Improved the Efficiency of Its Customer ...
 
Openerp Project Slides
Openerp Project SlidesOpenerp Project Slides
Openerp Project Slides
 
Nice Flow Charts Prof Servs
Nice Flow Charts Prof ServsNice Flow Charts Prof Servs
Nice Flow Charts Prof Servs
 
2012 Ohug Presentation Show
2012 Ohug Presentation Show2012 Ohug Presentation Show
2012 Ohug Presentation Show
 

Similar to Integrating PCF with SAP

Walley.tina
Walley.tinaWalley.tina
Walley.tinaNASAPMC
 
Oracle priamvera p6 analytics r1
Oracle priamvera p6 analytics r1Oracle priamvera p6 analytics r1
Oracle priamvera p6 analytics r1Mark Kromer
 
Oracle primavera p6 analytics r1
Oracle primavera p6 analytics r1Oracle primavera p6 analytics r1
Oracle primavera p6 analytics r1Mark Kromer
 
CPFR Process Model
CPFR Process ModelCPFR Process Model
CPFR Process ModelCHIN Kok Poh
 
Opticon - Construction ERP Overview presentation
Opticon - Construction ERP Overview presentationOpticon - Construction ERP Overview presentation
Opticon - Construction ERP Overview presentationSoftTech Engineers
 
Sap archiving 407_nalabothula
Sap archiving 407_nalabothulaSap archiving 407_nalabothula
Sap archiving 407_nalabothulavenunala
 
Final groupassignmentpresentation g4_mode1_2012
Final groupassignmentpresentation g4_mode1_2012Final groupassignmentpresentation g4_mode1_2012
Final groupassignmentpresentation g4_mode1_2012Bryan Johnson
 
SAP NetWeaver BW Powered by SAP HANA
SAP NetWeaver BW Powered by SAP HANASAP NetWeaver BW Powered by SAP HANA
SAP NetWeaver BW Powered by SAP HANASAP Technology
 
Evaluating Php As A Technology Platform For Soa Implementations
 Evaluating Php As A Technology Platform For Soa Implementations Evaluating Php As A Technology Platform For Soa Implementations
Evaluating Php As A Technology Platform For Soa ImplementationsVedanta Barooah
 
Intacct integration demo 2012
Intacct integration demo 2012Intacct integration demo 2012
Intacct integration demo 2012Ash Alhashim
 
How to choose and implement wms
How to choose and implement wmsHow to choose and implement wms
How to choose and implement wmsSubhan Novianda
 
Bi Fast Track Overview
Bi Fast Track OverviewBi Fast Track Overview
Bi Fast Track OverviewB.I. Voyage
 
Implementing a Complex Supply Chain Planning Process at Bloom Energy
Implementing a Complex Supply Chain Planning Process at Bloom EnergyImplementing a Complex Supply Chain Planning Process at Bloom Energy
Implementing a Complex Supply Chain Planning Process at Bloom EnergyJade Global
 
arcplan dynaSight Enterprise 최신 버전 포지셔닝
arcplan dynaSight Enterprise 최신 버전 포지셔닝arcplan dynaSight Enterprise 최신 버전 포지셔닝
arcplan dynaSight Enterprise 최신 버전 포지셔닝mosaicnet
 
20070829 PPM afdelingsmøde
20070829 PPM afdelingsmøde20070829 PPM afdelingsmøde
20070829 PPM afdelingsmødeKim Holm
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01pmfigliola
 

Similar to Integrating PCF with SAP (20)

Walley.tina
Walley.tinaWalley.tina
Walley.tina
 
Oracle priamvera p6 analytics r1
Oracle priamvera p6 analytics r1Oracle priamvera p6 analytics r1
Oracle priamvera p6 analytics r1
 
Oracle primavera p6 analytics r1
Oracle primavera p6 analytics r1Oracle primavera p6 analytics r1
Oracle primavera p6 analytics r1
 
CPFR Process Model
CPFR Process ModelCPFR Process Model
CPFR Process Model
 
Opticon - Construction ERP Overview presentation
Opticon - Construction ERP Overview presentationOpticon - Construction ERP Overview presentation
Opticon - Construction ERP Overview presentation
 
Canadian BPC User Conference May 19 2011
Canadian BPC User Conference May 19 2011Canadian BPC User Conference May 19 2011
Canadian BPC User Conference May 19 2011
 
Sap archiving 407_nalabothula
Sap archiving 407_nalabothulaSap archiving 407_nalabothula
Sap archiving 407_nalabothula
 
Final groupassignmentpresentation g4_mode1_2012
Final groupassignmentpresentation g4_mode1_2012Final groupassignmentpresentation g4_mode1_2012
Final groupassignmentpresentation g4_mode1_2012
 
SAP NetWeaver BW Powered by SAP HANA
SAP NetWeaver BW Powered by SAP HANASAP NetWeaver BW Powered by SAP HANA
SAP NetWeaver BW Powered by SAP HANA
 
Evaluating Php As A Technology Platform For Soa Implementations
 Evaluating Php As A Technology Platform For Soa Implementations Evaluating Php As A Technology Platform For Soa Implementations
Evaluating Php As A Technology Platform For Soa Implementations
 
Intacct integration demo 2012
Intacct integration demo 2012Intacct integration demo 2012
Intacct integration demo 2012
 
How to choose and implement wms
How to choose and implement wmsHow to choose and implement wms
How to choose and implement wms
 
KBACE Learning Platform Webinar
KBACE Learning Platform WebinarKBACE Learning Platform Webinar
KBACE Learning Platform Webinar
 
Ibm Cio 2010 Outlook
Ibm Cio 2010 OutlookIbm Cio 2010 Outlook
Ibm Cio 2010 Outlook
 
Bi Fast Track Overview
Bi Fast Track OverviewBi Fast Track Overview
Bi Fast Track Overview
 
Product Costing
Product CostingProduct Costing
Product Costing
 
Implementing a Complex Supply Chain Planning Process at Bloom Energy
Implementing a Complex Supply Chain Planning Process at Bloom EnergyImplementing a Complex Supply Chain Planning Process at Bloom Energy
Implementing a Complex Supply Chain Planning Process at Bloom Energy
 
arcplan dynaSight Enterprise 최신 버전 포지셔닝
arcplan dynaSight Enterprise 최신 버전 포지셔닝arcplan dynaSight Enterprise 최신 버전 포지셔닝
arcplan dynaSight Enterprise 최신 버전 포지셔닝
 
20070829 PPM afdelingsmøde
20070829 PPM afdelingsmøde20070829 PPM afdelingsmøde
20070829 PPM afdelingsmøde
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 

More from tracksoftware

All About the Admins
All About the AdminsAll About the Admins
All About the Adminstracksoftware
 
Rising Tide of Rate Management
Rising Tide of Rate ManagementRising Tide of Rate Management
Rising Tide of Rate Managementtracksoftware
 
Next-Generation Asset Tracking
Next-Generation Asset TrackingNext-Generation Asset Tracking
Next-Generation Asset Trackingtracksoftware
 
Equipment and Materials Modules: Why You Need Them
Equipment and Materials Modules: Why You Need ThemEquipment and Materials Modules: Why You Need Them
Equipment and Materials Modules: Why You Need Themtracksoftware
 
Product Roadmap Overview
Product Roadmap OverviewProduct Roadmap Overview
Product Roadmap Overviewtracksoftware
 
ERP Integration: Now, More Than Ever
ERP Integration: Now, More Than EverERP Integration: Now, More Than Ever
ERP Integration: Now, More Than Evertracksoftware
 
Track Software -- Shell presentation
Track Software -- Shell presentationTrack Software -- Shell presentation
Track Software -- Shell presentationtracksoftware
 
Track Software -- Customer survey results
Track Software -- Customer survey resultsTrack Software -- Customer survey results
Track Software -- Customer survey resultstracksoftware
 
Track Software -- Track 6.1 and 6.2 Highlights
Track Software -- Track 6.1 and 6.2 Highlights Track Software -- Track 6.1 and 6.2 Highlights
Track Software -- Track 6.1 and 6.2 Highlights tracksoftware
 

More from tracksoftware (13)

Going Global
Going GlobalGoing Global
Going Global
 
All About the Admins
All About the AdminsAll About the Admins
All About the Admins
 
Rising Tide of Rate Management
Rising Tide of Rate ManagementRising Tide of Rate Management
Rising Tide of Rate Management
 
Next-Generation Asset Tracking
Next-Generation Asset TrackingNext-Generation Asset Tracking
Next-Generation Asset Tracking
 
So how do you
So how do youSo how do you
So how do you
 
Equipment and Materials Modules: Why You Need Them
Equipment and Materials Modules: Why You Need ThemEquipment and Materials Modules: Why You Need Them
Equipment and Materials Modules: Why You Need Them
 
Product Roadmap Overview
Product Roadmap OverviewProduct Roadmap Overview
Product Roadmap Overview
 
ERP Integration: Now, More Than Ever
ERP Integration: Now, More Than EverERP Integration: Now, More Than Ever
ERP Integration: Now, More Than Ever
 
Valero 6.2 Upgrade
Valero 6.2 UpgradeValero 6.2 Upgrade
Valero 6.2 Upgrade
 
What's New With 6.2
What's New With 6.2What's New With 6.2
What's New With 6.2
 
Track Software -- Shell presentation
Track Software -- Shell presentationTrack Software -- Shell presentation
Track Software -- Shell presentation
 
Track Software -- Customer survey results
Track Software -- Customer survey resultsTrack Software -- Customer survey results
Track Software -- Customer survey results
 
Track Software -- Track 6.1 and 6.2 Highlights
Track Software -- Track 6.1 and 6.2 Highlights Track Software -- Track 6.1 and 6.2 Highlights
Track Software -- Track 6.1 and 6.2 Highlights
 

Integrating PCF with SAP

  • 1. Integrating PCF with SAP Stewart Graham SAP Savants 1
  • 2. SAP Cost Reporting and PCF Integration • Introduction – Stewart Graham – SAP Savants • SAP since 1995 • Specialise in PM,MM,PS,CO and QM • Consulting and bespoke development – Today we will : • Review SAP Modules that contributes to Cost Reporting • Review SAP Data that contributes to Cost Reporting • Review how PCF would integrate with SAP – Larger Projects and TARS • Review how SAP can be used for smaller projects 2
  • 3. PCF / SAP Integration Why is cost reporting so difficult ? Why can’t I look at my maintenance order spend for the month Why can’t I accurately forecast my project spend Let’s start by looking at the key modules and there contributing data 3
  • 4. PCF / SAP Integration Controlling Project Systems PM Materials Management CO Plant Maintenance MM PS 4
  • 5. PCF / SAP Integration Controlling Project Systems PM CO Materials Management Plant Maintenance PS MM 5
  • 6. PCF / SAP Integration • Cost Centers -> Cost Center Groups CO • Cost Elements -> Cost Element Groups • Planned Costs • Planned versions • Actual Costs • Statistical Postings • Settlements • Assessments • Forecasts • Activities 6
  • 7. PCF / SAP Integration • Projects PS • WBS Elements -> ‘Real’ & Statistical • Capital • Expense • Planned Costs • Planned versions • Budgets • Commitments • Actual Costs 7
  • 8. PCF / SAP Integration • Material Masters • Service Masters MM • Requisitions • Purchase Orders • Contracts • Reservations • Vendors • Receipts / Returns • Issues – Direct (reservation) and Indirect (cost object) • Service Entries 8
  • 9. PCF / SAP Integration • Notifications • Maintenance Orders PM • Technical Objects (EQs and Flocs) • Revisions • Order Types & Maintenance Activity Types • Planned Costs • Components (Materials) • Confirmations • Actual Costs • Settlement rules • Assignments to WBS elements 9
  • 10. PCF / SAP Integration Controlling Project Systems PM CO Materials Management Plant Maintenance PS MM 10
  • 11. Too much to understand ... PCF / SAP Integration 11
  • 12. PCF / SAP Integration X Project PO ? WBS A WBS B PO X WBS A.1 WBS A.2 Order 004 PO Y Order 001 Order 002 Order 003 PO Z Service Goods Goods Accounting Confirmations Allocations Entries Receipts Issues Documents 12
  • 13. PCF / SAP Integration BAPI SAP environment BAPI Layer Project WBS A WBS B PO X WBS A.1 WBS A.2 Get Project Order 004 PO Y Order 001 Order 002 Order 003 PO Z PCF API API API Service Goods Goods Accounting Get CO Confirmations Entries Receipts Issues Allocations Documents API vN.N Client Database Configuration 13
  • 14. PCF / SAP Integration • Overview - Get BAPIs (Project / CO - controlling ). Time stamped so that they can pull delta/incremental/information – Get Project • Set up project in PCF • Connect to an SAP Object(s) – PS Project(s) – PS WBS Element(s) – PM Revision(s) – PM Maintenance Order(s) – CO Internal Orders(s) • Identify free radicals (unassigned POs) • Extract data on a schedule / on demand – Get CO • For the defined PCF project • Pull CO documents • Pull extended attributes of the CO document – Confirmation get the AFRU data (work center, personnel no, text …) – Goods receipt (material details, vendor, who) …. 14
  • 15. Improving reporing in SAP Controlling Project Systems PM CO Materials Management Plant Maintenance PS MM 15
  • 16. Too much to understand ... SAP reporting … made better 16
  • 17. SAP reporting … made better Click here to get the procurement status Click here ... To get the detail down here ... no more drill through 17
  • 18. SAP reporting … made better Click button to Apply filter for all or only those that show calendar may cause view of costs ... problems think outlook Click any level in the hierarchy Too see all planned materials. WBS and/or Orders 18
  • 19. SAP reporting … made better Move forwards or backwards reporting Change in time period to weeks 19