SlideShare ist ein Scribd-Unternehmen logo
1 von 14
EESSI - Electronic Exchange of Social
       Security Information

RO perspective



                  Bianca Culea - CNPAS
EESSI Architecture:

                     CI                                                                       CI      CI
                                CI
          CI                                                                 Member    National            CI
                     National                                                State 2   Network
                     Network
                                                                                                            CI
          Member                                                                                      CI
          State 1                                          EESSI
                                                   International Network

                                                        sTESTA


             CI
                                                                                                      Member State 3
         National
         Network                                                                                                       CI
                           Member                                                                     National
                           State “n”                                                                  Network
        CI          CI                                                                                                 CI
                                                                            Member                               CI
                                            National             National   State 4
                                            Network              Network
                                       CI
                                                                            CI
                                              CI        CI
                                                                    CI                 Coordination          Access
                                                                                                                            CI
                                                                                                                                 Competent
                                                                                       Node                  Point               Institution


Source: European Commission
RO – 4 Access Points:
Access Point              Covered areas

               Pension, Legislation Applicable and Work
  ApRO04          Accidents and Occupational Diseases
  ApRO03                      Sickness
  ApRO02                   Family Benefits
                           Unemployment
  ApRO01
International part                 National part
                                     of Access Point                  of Access Point


                                                                                                        CI      CI      CI
    Member
    State 1
                                                       Access Point
                                                Electronic contact point

                EESSI                  International                      National                           National
        International Network              traffic                         traffic                           Network



     Member
     State 2


                    International                         Internal                  National
                   EESSI Protocol                        “Bridging”              EESSI Protocol        Network for
                                                          Protocol                                    Social Security

                                                                 Access       International Part   National Part of          Competent
                                                                 Point        of Access Point      Access Point         CI   Institution



Source: European Commission
Routing Architecture:
5


                           MS                                                           CI 1
                                                                                               D 1 (SP A)

                                                                                WEBIC
                                               AP-RI
                                       IPAP                           NPAP
     Original message                                                                           Messages in DB
     sent to CI 1                                                                DB             and seen by user:
                               EMS            CI1-D1     EMD
     (found in DS)                                                                                 CI1 (SP A)
                                              WEBIC
                                              Adapter
                                                                                               D 2 (SP B)
                                              CI1-D2
                        ICD1         ICD2      XML                               NA
          CN                                  Adapter

                                                              CI2
                                                              NA
                                                            Adapter                             Messages in DB
                                                                                 DB             and seen by user:
                                                                                                   CI1 (SP B)
                                DB                          Custom
                                                            Routing
                                                                                        CI 2
                                                                                 NA


    Messages in DB:                           Depending on a
                                              parameter in the body
      CI1 (SP A)                              of the SED                         DB             Messages in DB
         CI2                                                                                    and seen by user:
                                              (SP=SED Parameter)
      CI1 (SP B)                                                                                       CI2

                                                                       Page 5
General schedule – Master Directory data
upload:
EESSI - April 2010 - RO Status:
 4 APs established
 AP’s Administrators and Managers established
 CN/Master Directory content for all 4 APs uploaded
 S - testa connected for all 4 APs
 Training on PAI and MMI for all 4 APs staff
 PAI and MMI RO related information checked
  (minor modification still needed)
 PAI translation (RO) done.
RO target: January 2011 - ???
Integration of EESSI into national environment, reengineering
national application


                  Six Testing Member States to
 Mid October 2010
                  test ALL the components of
        ↓
                  the EESSI system
  31 November
      2010        End User and national administrator training for all

  1 December 2010
                     Installation, configuration of various EESSI components for
         ↓
                     all and testing.
  28 February 2011

   1 March 2011      A testing campaign of exchanges with the WEBIC will be
         ↓           organises for the non testing Member States will be
     1 Mai 2011      organised with
Trainings:

September 2010 until the end of November,
trainings for national users and administrator
will take place.

The purpose of the training is to prepare the
Member States for the installation,
configuration, administration and the use of
the Reference Implementation and the WEBIC.
General schedule: Bid preparation
conditionality:
 Documentation – final versions:
 June 2010 - ICD2 and Protocol Design
 Document
 middle of August : Coordination Node,
 Reference Implementation, WEBIC

 So,………………….Bid preparation can start……!
RO & EESSI:
• from January 2011, once the local EESSI
  components are installed, Member States
  will be in a position to start establishing the
  connexion of EESSI to their national
  environment through the ICD2 interface by
  adapting/configuring national connectors
  and developing or reengineering national
  applications.
RO: Bid scope:
Required hardware for 4 APs

• NPAPs development
• National Applications reengineering and APs
  integration
• Technical support
• Trainings
Ro – “EESSI enabled” scenario:
• June – October 2010 – Bid preparation and launch
• November – December 2010 – Bid evaluation
• January - February 2011 – IPAPs installations and
  tests
• May 2011 – NPAPs & National Applications first
  release
• June 2011-October 2011 – NPAPs & National
  Applications and EESSI integration tests

• December 2011 – RO EESSI “enabled”
Thank you!

Weitere ähnliche Inhalte

Was ist angesagt?

Websphere Application Server V8.5
Websphere Application Server V8.5Websphere Application Server V8.5
Websphere Application Server V8.5IBM WebSphereIndia
 
Spring vs. spring boot
Spring vs. spring bootSpring vs. spring boot
Spring vs. spring bootChloeChoi23
 
Audit Vault Database Firewall 12.2.0.1.0 installation
Audit Vault Database Firewall 12.2.0.1.0 installationAudit Vault Database Firewall 12.2.0.1.0 installation
Audit Vault Database Firewall 12.2.0.1.0 installationPinto Das
 
ibm websphere admin training | websphere admin course | ibm websphere adminis...
ibm websphere admin training | websphere admin course | ibm websphere adminis...ibm websphere admin training | websphere admin course | ibm websphere adminis...
ibm websphere admin training | websphere admin course | ibm websphere adminis...Nancy Thomas
 
Getting up to speed with Kafka Connect: from the basics to the latest feature...
Getting up to speed with Kafka Connect: from the basics to the latest feature...Getting up to speed with Kafka Connect: from the basics to the latest feature...
Getting up to speed with Kafka Connect: from the basics to the latest feature...HostedbyConfluent
 
SR-IOV: The Key Enabling Technology for Fully Virtualized HPC Clusters
SR-IOV: The Key Enabling Technology for Fully Virtualized HPC ClustersSR-IOV: The Key Enabling Technology for Fully Virtualized HPC Clusters
SR-IOV: The Key Enabling Technology for Fully Virtualized HPC ClustersGlenn K. Lockwood
 
IBM Cloud: Direct Link Guide (OBSOLETED, see newer version)
IBM Cloud: Direct Link Guide (OBSOLETED, see newer version)IBM Cloud: Direct Link Guide (OBSOLETED, see newer version)
IBM Cloud: Direct Link Guide (OBSOLETED, see newer version)Tomoyuki Niijima
 
WebSphere application server 8.5.5 - quick overview
WebSphere application server 8.5.5 - quick overviewWebSphere application server 8.5.5 - quick overview
WebSphere application server 8.5.5 - quick overviewChris Sparshott
 
MariaDB 제품 소개
MariaDB 제품 소개MariaDB 제품 소개
MariaDB 제품 소개NeoClova
 
Sistemas Distribuídos - Comunicação Distribuída - EJB (JBoss 7)
Sistemas Distribuídos - Comunicação Distribuída - EJB (JBoss 7)Sistemas Distribuídos - Comunicação Distribuída - EJB (JBoss 7)
Sistemas Distribuídos - Comunicação Distribuída - EJB (JBoss 7)Adriano Teixeira de Souza
 
확장가능한 웹 아키텍쳐 구축 방안
확장가능한 웹 아키텍쳐 구축 방안 확장가능한 웹 아키텍쳐 구축 방안
확장가능한 웹 아키텍쳐 구축 방안 IMQA
 
MariaDB 마이그레이션 - 네오클로바
MariaDB 마이그레이션 - 네오클로바MariaDB 마이그레이션 - 네오클로바
MariaDB 마이그레이션 - 네오클로바NeoClova
 
EVPN-Presentation.pptx
EVPN-Presentation.pptxEVPN-Presentation.pptx
EVPN-Presentation.pptxVimalMallick
 
【第四回 ゼロからはじめる Oracle Solaris 11】02 統合アーカイブが変える仮想化環境の構築
【第四回 ゼロからはじめる Oracle Solaris 11】02 統合アーカイブが変える仮想化環境の構築	【第四回 ゼロからはじめる Oracle Solaris 11】02 統合アーカイブが変える仮想化環境の構築
【第四回 ゼロからはじめる Oracle Solaris 11】02 統合アーカイブが変える仮想化環境の構築 SolarisJP
 
Embracing DevOps through database migrations with Flyway
Embracing DevOps through database migrations with FlywayEmbracing DevOps through database migrations with Flyway
Embracing DevOps through database migrations with FlywayRed Gate Software
 
Red Hat OpenStack 17 저자직강+스터디그룹_2주차
Red Hat OpenStack 17 저자직강+스터디그룹_2주차Red Hat OpenStack 17 저자직강+스터디그룹_2주차
Red Hat OpenStack 17 저자직강+스터디그룹_2주차Nalee Jang
 
Attacking Drupal
Attacking DrupalAttacking Drupal
Attacking DrupalGreg Foss
 
VRRP (virtual router redundancy protocol)
VRRP (virtual router redundancy protocol)VRRP (virtual router redundancy protocol)
VRRP (virtual router redundancy protocol)Netwax Lab
 

Was ist angesagt? (20)

Websphere Application Server V8.5
Websphere Application Server V8.5Websphere Application Server V8.5
Websphere Application Server V8.5
 
Spring vs. spring boot
Spring vs. spring bootSpring vs. spring boot
Spring vs. spring boot
 
Audit Vault Database Firewall 12.2.0.1.0 installation
Audit Vault Database Firewall 12.2.0.1.0 installationAudit Vault Database Firewall 12.2.0.1.0 installation
Audit Vault Database Firewall 12.2.0.1.0 installation
 
ibm websphere admin training | websphere admin course | ibm websphere adminis...
ibm websphere admin training | websphere admin course | ibm websphere adminis...ibm websphere admin training | websphere admin course | ibm websphere adminis...
ibm websphere admin training | websphere admin course | ibm websphere adminis...
 
Getting up to speed with Kafka Connect: from the basics to the latest feature...
Getting up to speed with Kafka Connect: from the basics to the latest feature...Getting up to speed with Kafka Connect: from the basics to the latest feature...
Getting up to speed with Kafka Connect: from the basics to the latest feature...
 
SR-IOV: The Key Enabling Technology for Fully Virtualized HPC Clusters
SR-IOV: The Key Enabling Technology for Fully Virtualized HPC ClustersSR-IOV: The Key Enabling Technology for Fully Virtualized HPC Clusters
SR-IOV: The Key Enabling Technology for Fully Virtualized HPC Clusters
 
IBM Cloud: Direct Link Guide (OBSOLETED, see newer version)
IBM Cloud: Direct Link Guide (OBSOLETED, see newer version)IBM Cloud: Direct Link Guide (OBSOLETED, see newer version)
IBM Cloud: Direct Link Guide (OBSOLETED, see newer version)
 
Apache tomcat
Apache tomcatApache tomcat
Apache tomcat
 
WebSphere application server 8.5.5 - quick overview
WebSphere application server 8.5.5 - quick overviewWebSphere application server 8.5.5 - quick overview
WebSphere application server 8.5.5 - quick overview
 
MariaDB 제품 소개
MariaDB 제품 소개MariaDB 제품 소개
MariaDB 제품 소개
 
Sistemas Distribuídos - Comunicação Distribuída - EJB (JBoss 7)
Sistemas Distribuídos - Comunicação Distribuída - EJB (JBoss 7)Sistemas Distribuídos - Comunicação Distribuída - EJB (JBoss 7)
Sistemas Distribuídos - Comunicação Distribuída - EJB (JBoss 7)
 
확장가능한 웹 아키텍쳐 구축 방안
확장가능한 웹 아키텍쳐 구축 방안 확장가능한 웹 아키텍쳐 구축 방안
확장가능한 웹 아키텍쳐 구축 방안
 
MariaDB 마이그레이션 - 네오클로바
MariaDB 마이그레이션 - 네오클로바MariaDB 마이그레이션 - 네오클로바
MariaDB 마이그레이션 - 네오클로바
 
EVPN-Presentation.pptx
EVPN-Presentation.pptxEVPN-Presentation.pptx
EVPN-Presentation.pptx
 
【第四回 ゼロからはじめる Oracle Solaris 11】02 統合アーカイブが変える仮想化環境の構築
【第四回 ゼロからはじめる Oracle Solaris 11】02 統合アーカイブが変える仮想化環境の構築	【第四回 ゼロからはじめる Oracle Solaris 11】02 統合アーカイブが変える仮想化環境の構築
【第四回 ゼロからはじめる Oracle Solaris 11】02 統合アーカイブが変える仮想化環境の構築
 
Embracing DevOps through database migrations with Flyway
Embracing DevOps through database migrations with FlywayEmbracing DevOps through database migrations with Flyway
Embracing DevOps through database migrations with Flyway
 
Red Hat OpenStack 17 저자직강+스터디그룹_2주차
Red Hat OpenStack 17 저자직강+스터디그룹_2주차Red Hat OpenStack 17 저자직강+스터디그룹_2주차
Red Hat OpenStack 17 저자직강+스터디그룹_2주차
 
Attacking Drupal
Attacking DrupalAttacking Drupal
Attacking Drupal
 
VRRP (virtual router redundancy protocol)
VRRP (virtual router redundancy protocol)VRRP (virtual router redundancy protocol)
VRRP (virtual router redundancy protocol)
 
The kvm virtualization way
The kvm virtualization wayThe kvm virtualization way
The kvm virtualization way
 

Andere mochten auch

RINA detailed components overview and implementation discussion
RINA detailed components overview and implementation discussionRINA detailed components overview and implementation discussion
RINA detailed components overview and implementation discussionEleni Trouva
 
2010 - Regulations 883/2004 & 987/2009 - Ongoing work
2010 - Regulations 883/2004 & 987/2009 - Ongoing work2010 - Regulations 883/2004 & 987/2009 - Ongoing work
2010 - Regulations 883/2004 & 987/2009 - Ongoing worktrESS Network
 
2010 - New Social Security Regulations
2010 - New Social Security Regulations2010 - New Social Security Regulations
2010 - New Social Security RegulationstrESS Network
 
2010 - Modernised EU Social Security Coordination and Applicable Legislation
2010 - Modernised EU Social Security Coordination and Applicable Legislation2010 - Modernised EU Social Security Coordination and Applicable Legislation
2010 - Modernised EU Social Security Coordination and Applicable LegislationtrESS Network
 
Irati goals and achievements - 3rd RINA Workshop
Irati goals and achievements - 3rd RINA WorkshopIrati goals and achievements - 3rd RINA Workshop
Irati goals and achievements - 3rd RINA WorkshopEleni Trouva
 
2013 - trESS presentation FR
2013 - trESS presentation FR2013 - trESS presentation FR
2013 - trESS presentation FRtrESS Network
 

Andere mochten auch (6)

RINA detailed components overview and implementation discussion
RINA detailed components overview and implementation discussionRINA detailed components overview and implementation discussion
RINA detailed components overview and implementation discussion
 
2010 - Regulations 883/2004 & 987/2009 - Ongoing work
2010 - Regulations 883/2004 & 987/2009 - Ongoing work2010 - Regulations 883/2004 & 987/2009 - Ongoing work
2010 - Regulations 883/2004 & 987/2009 - Ongoing work
 
2010 - New Social Security Regulations
2010 - New Social Security Regulations2010 - New Social Security Regulations
2010 - New Social Security Regulations
 
2010 - Modernised EU Social Security Coordination and Applicable Legislation
2010 - Modernised EU Social Security Coordination and Applicable Legislation2010 - Modernised EU Social Security Coordination and Applicable Legislation
2010 - Modernised EU Social Security Coordination and Applicable Legislation
 
Irati goals and achievements - 3rd RINA Workshop
Irati goals and achievements - 3rd RINA WorkshopIrati goals and achievements - 3rd RINA Workshop
Irati goals and achievements - 3rd RINA Workshop
 
2013 - trESS presentation FR
2013 - trESS presentation FR2013 - trESS presentation FR
2013 - trESS presentation FR
 

Mehr von trESS Network

2013 - trESS presentation EN
2013 - trESS presentation EN2013 - trESS presentation EN
2013 - trESS presentation ENtrESS Network
 
2010 - ANALIZA PRIMEROV
2010 - ANALIZA PRIMEROV2010 - ANALIZA PRIMEROV
2010 - ANALIZA PRIMEROVtrESS Network
 
2010 - Priprave na izvajanje novih Uredb 883/2004/ES in 987/2009/ES
2010 - Priprave na izvajanje novih Uredb 883/2004/ES in 987/2009/ES2010 - Priprave na izvajanje novih Uredb 883/2004/ES in 987/2009/ES
2010 - Priprave na izvajanje novih Uredb 883/2004/ES in 987/2009/EStrESS Network
 
2010 - Modernised EU Social Security Coordination and Old-Age Pensions
2010 - Modernised EU Social Security Coordination and Old-Age Pensions2010 - Modernised EU Social Security Coordination and Old-Age Pensions
2010 - Modernised EU Social Security Coordination and Old-Age PensionstrESS Network
 
2010 - BISTVENE NOVOSTI V UREDBAH 883/04 in 987/09
2010 - BISTVENE NOVOSTI V UREDBAH 883/04 in 987/092010 - BISTVENE NOVOSTI V UREDBAH 883/04 in 987/09
2010 - BISTVENE NOVOSTI V UREDBAH 883/04 in 987/09trESS Network
 
2010 - Kratek pregled zgodovinskega razvoja koordinacije sistemov socialne va...
2010 - Kratek pregled zgodovinskega razvoja koordinacije sistemov socialne va...2010 - Kratek pregled zgodovinskega razvoja koordinacije sistemov socialne va...
2010 - Kratek pregled zgodovinskega razvoja koordinacije sistemov socialne va...trESS Network
 
2010 - Advising Individuals on Their Rights in Europe
2010 - Advising Individuals on Their Rights in Europe2010 - Advising Individuals on Their Rights in Europe
2010 - Advising Individuals on Their Rights in EuropetrESS Network
 
2010 - Review 2009/10
2010 - Review 2009/102010 - Review 2009/10
2010 - Review 2009/10trESS Network
 
2010 - Föräldrapenning
2010 - Föräldrapenning2010 - Föräldrapenning
2010 - FöräldrapenningtrESS Network
 
2010 - Familjeförmåner/Inkomstbaserad föräldrapenning Fallet Sverige
2010 - Familjeförmåner/Inkomstbaserad föräldrapenning Fallet Sverige2010 - Familjeförmåner/Inkomstbaserad föräldrapenning Fallet Sverige
2010 - Familjeförmåner/Inkomstbaserad föräldrapenning Fallet SverigetrESS Network
 
2010 - Öresundsöverenskommelsen - the Öresund application
2010 - Öresundsöverenskommelsen - the Öresund application2010 - Öresundsöverenskommelsen - the Öresund application
2010 - Öresundsöverenskommelsen - the Öresund applicationtrESS Network
 
2010 - Lagvalsreglerna i förordning 883/04
2010 - Lagvalsreglerna i förordning 883/042010 - Lagvalsreglerna i förordning 883/04
2010 - Lagvalsreglerna i förordning 883/04trESS Network
 
2010 - National trESS Seminar - Case studies
2010 - National trESS Seminar - Case studies2010 - National trESS Seminar - Case studies
2010 - National trESS Seminar - Case studiestrESS Network
 
2010 - Where do we stand – what problems do we have?
2010 - Where do we stand – what problems do we have?2010 - Where do we stand – what problems do we have?
2010 - Where do we stand – what problems do we have?trESS Network
 
2010 - Coordonarea modernizată a sistemelor de asigurări de şomaj
2010 - Coordonarea modernizată a sistemelor de asigurări de şomaj2010 - Coordonarea modernizată a sistemelor de asigurări de şomaj
2010 - Coordonarea modernizată a sistemelor de asigurări de şomajtrESS Network
 
2010 - Pregătiri la nivel naţional pentru trecerea la
2010 - Pregătiri la nivel naţional pentru trecerea la 2010 - Pregătiri la nivel naţional pentru trecerea la
2010 - Pregătiri la nivel naţional pentru trecerea la trESS Network
 
2010 - C.N.P.A.S. Accidente de Muncă şi Boli Profesionale
2010 - C.N.P.A.S. Accidente de Muncă şi Boli Profesionale2010 - C.N.P.A.S. Accidente de Muncă şi Boli Profesionale
2010 - C.N.P.A.S. Accidente de Muncă şi Boli ProfesionaletrESS Network
 
2010 - Întâmpinarea Regulamentelor (CE) nr. 883/2004 şi nr. 987/2009 de către...
2010 - Întâmpinarea Regulamentelor (CE) nr. 883/2004 şi nr. 987/2009 de către...2010 - Întâmpinarea Regulamentelor (CE) nr. 883/2004 şi nr. 987/2009 de către...
2010 - Întâmpinarea Regulamentelor (CE) nr. 883/2004 şi nr. 987/2009 de către...trESS Network
 
2010 - Pregătirea aplicarii Regulamentului 883/2004 în România
2010 - Pregătirea aplicarii Regulamentului 883/2004 în România2010 - Pregătirea aplicarii Regulamentului 883/2004 în România
2010 - Pregătirea aplicarii Regulamentului 883/2004 în RomâniatrESS Network
 

Mehr von trESS Network (20)

2013 - trESS presentation EN
2013 - trESS presentation EN2013 - trESS presentation EN
2013 - trESS presentation EN
 
2010 - ANALIZA PRIMEROV
2010 - ANALIZA PRIMEROV2010 - ANALIZA PRIMEROV
2010 - ANALIZA PRIMEROV
 
2010 - CASE STUDIES
2010 - CASE STUDIES2010 - CASE STUDIES
2010 - CASE STUDIES
 
2010 - Priprave na izvajanje novih Uredb 883/2004/ES in 987/2009/ES
2010 - Priprave na izvajanje novih Uredb 883/2004/ES in 987/2009/ES2010 - Priprave na izvajanje novih Uredb 883/2004/ES in 987/2009/ES
2010 - Priprave na izvajanje novih Uredb 883/2004/ES in 987/2009/ES
 
2010 - Modernised EU Social Security Coordination and Old-Age Pensions
2010 - Modernised EU Social Security Coordination and Old-Age Pensions2010 - Modernised EU Social Security Coordination and Old-Age Pensions
2010 - Modernised EU Social Security Coordination and Old-Age Pensions
 
2010 - BISTVENE NOVOSTI V UREDBAH 883/04 in 987/09
2010 - BISTVENE NOVOSTI V UREDBAH 883/04 in 987/092010 - BISTVENE NOVOSTI V UREDBAH 883/04 in 987/09
2010 - BISTVENE NOVOSTI V UREDBAH 883/04 in 987/09
 
2010 - Kratek pregled zgodovinskega razvoja koordinacije sistemov socialne va...
2010 - Kratek pregled zgodovinskega razvoja koordinacije sistemov socialne va...2010 - Kratek pregled zgodovinskega razvoja koordinacije sistemov socialne va...
2010 - Kratek pregled zgodovinskega razvoja koordinacije sistemov socialne va...
 
2010 - Advising Individuals on Their Rights in Europe
2010 - Advising Individuals on Their Rights in Europe2010 - Advising Individuals on Their Rights in Europe
2010 - Advising Individuals on Their Rights in Europe
 
2010 - Review 2009/10
2010 - Review 2009/102010 - Review 2009/10
2010 - Review 2009/10
 
2010 - Föräldrapenning
2010 - Föräldrapenning2010 - Föräldrapenning
2010 - Föräldrapenning
 
2010 - Familjeförmåner/Inkomstbaserad föräldrapenning Fallet Sverige
2010 - Familjeförmåner/Inkomstbaserad föräldrapenning Fallet Sverige2010 - Familjeförmåner/Inkomstbaserad föräldrapenning Fallet Sverige
2010 - Familjeförmåner/Inkomstbaserad föräldrapenning Fallet Sverige
 
2010 - Öresundsöverenskommelsen - the Öresund application
2010 - Öresundsöverenskommelsen - the Öresund application2010 - Öresundsöverenskommelsen - the Öresund application
2010 - Öresundsöverenskommelsen - the Öresund application
 
2010 - Lagvalsreglerna i förordning 883/04
2010 - Lagvalsreglerna i förordning 883/042010 - Lagvalsreglerna i förordning 883/04
2010 - Lagvalsreglerna i förordning 883/04
 
2010 - National trESS Seminar - Case studies
2010 - National trESS Seminar - Case studies2010 - National trESS Seminar - Case studies
2010 - National trESS Seminar - Case studies
 
2010 - Where do we stand – what problems do we have?
2010 - Where do we stand – what problems do we have?2010 - Where do we stand – what problems do we have?
2010 - Where do we stand – what problems do we have?
 
2010 - Coordonarea modernizată a sistemelor de asigurări de şomaj
2010 - Coordonarea modernizată a sistemelor de asigurări de şomaj2010 - Coordonarea modernizată a sistemelor de asigurări de şomaj
2010 - Coordonarea modernizată a sistemelor de asigurări de şomaj
 
2010 - Pregătiri la nivel naţional pentru trecerea la
2010 - Pregătiri la nivel naţional pentru trecerea la 2010 - Pregătiri la nivel naţional pentru trecerea la
2010 - Pregătiri la nivel naţional pentru trecerea la
 
2010 - C.N.P.A.S. Accidente de Muncă şi Boli Profesionale
2010 - C.N.P.A.S. Accidente de Muncă şi Boli Profesionale2010 - C.N.P.A.S. Accidente de Muncă şi Boli Profesionale
2010 - C.N.P.A.S. Accidente de Muncă şi Boli Profesionale
 
2010 - Întâmpinarea Regulamentelor (CE) nr. 883/2004 şi nr. 987/2009 de către...
2010 - Întâmpinarea Regulamentelor (CE) nr. 883/2004 şi nr. 987/2009 de către...2010 - Întâmpinarea Regulamentelor (CE) nr. 883/2004 şi nr. 987/2009 de către...
2010 - Întâmpinarea Regulamentelor (CE) nr. 883/2004 şi nr. 987/2009 de către...
 
2010 - Pregătirea aplicarii Regulamentului 883/2004 în România
2010 - Pregătirea aplicarii Regulamentului 883/2004 în România2010 - Pregătirea aplicarii Regulamentului 883/2004 în România
2010 - Pregătirea aplicarii Regulamentului 883/2004 în România
 

2010 - EESSI - Electronic Exchange of Social Security Information

  • 1. EESSI - Electronic Exchange of Social Security Information RO perspective Bianca Culea - CNPAS
  • 2. EESSI Architecture: CI CI CI CI CI Member National CI National State 2 Network Network CI Member CI State 1 EESSI International Network sTESTA CI Member State 3 National Network CI Member National State “n” Network CI CI CI Member CI National National State 4 Network Network CI CI CI CI CI Coordination Access CI Competent Node Point Institution Source: European Commission
  • 3. RO – 4 Access Points: Access Point Covered areas Pension, Legislation Applicable and Work ApRO04 Accidents and Occupational Diseases ApRO03 Sickness ApRO02 Family Benefits Unemployment ApRO01
  • 4. International part National part of Access Point of Access Point CI CI CI Member State 1 Access Point Electronic contact point EESSI International National National International Network traffic traffic Network Member State 2 International Internal National EESSI Protocol “Bridging” EESSI Protocol Network for Protocol Social Security Access International Part National Part of Competent Point of Access Point Access Point CI Institution Source: European Commission
  • 5. Routing Architecture: 5 MS CI 1 D 1 (SP A) WEBIC AP-RI IPAP NPAP Original message Messages in DB sent to CI 1 DB and seen by user: EMS CI1-D1 EMD (found in DS) CI1 (SP A) WEBIC Adapter D 2 (SP B) CI1-D2 ICD1 ICD2 XML NA CN Adapter CI2 NA Adapter Messages in DB DB and seen by user: CI1 (SP B) DB Custom Routing CI 2 NA Messages in DB: Depending on a parameter in the body CI1 (SP A) of the SED DB Messages in DB CI2 and seen by user: (SP=SED Parameter) CI1 (SP B) CI2 Page 5
  • 6. General schedule – Master Directory data upload:
  • 7. EESSI - April 2010 - RO Status:  4 APs established  AP’s Administrators and Managers established  CN/Master Directory content for all 4 APs uploaded  S - testa connected for all 4 APs  Training on PAI and MMI for all 4 APs staff  PAI and MMI RO related information checked (minor modification still needed)  PAI translation (RO) done.
  • 8. RO target: January 2011 - ??? Integration of EESSI into national environment, reengineering national application Six Testing Member States to Mid October 2010 test ALL the components of ↓ the EESSI system 31 November 2010 End User and national administrator training for all 1 December 2010 Installation, configuration of various EESSI components for ↓ all and testing. 28 February 2011 1 March 2011 A testing campaign of exchanges with the WEBIC will be ↓ organises for the non testing Member States will be 1 Mai 2011 organised with
  • 9. Trainings: September 2010 until the end of November, trainings for national users and administrator will take place. The purpose of the training is to prepare the Member States for the installation, configuration, administration and the use of the Reference Implementation and the WEBIC.
  • 10. General schedule: Bid preparation conditionality: Documentation – final versions: June 2010 - ICD2 and Protocol Design Document middle of August : Coordination Node, Reference Implementation, WEBIC So,………………….Bid preparation can start……!
  • 11. RO & EESSI: • from January 2011, once the local EESSI components are installed, Member States will be in a position to start establishing the connexion of EESSI to their national environment through the ICD2 interface by adapting/configuring national connectors and developing or reengineering national applications.
  • 12. RO: Bid scope: Required hardware for 4 APs • NPAPs development • National Applications reengineering and APs integration • Technical support • Trainings
  • 13. Ro – “EESSI enabled” scenario: • June – October 2010 – Bid preparation and launch • November – December 2010 – Bid evaluation • January - February 2011 – IPAPs installations and tests • May 2011 – NPAPs & National Applications first release • June 2011-October 2011 – NPAPs & National Applications and EESSI integration tests • December 2011 – RO EESSI “enabled”

Hinweis der Redaktion

  1. Adding notes my note your note