1. 1
Name: Taysseer Ahmed Abd-El-Gellel El-Qady.
Birth Date: 22nd of January 1979.
Nationality: Egyptian.
Gerund: Female.
Address: Extension of Abdelsalam Elshazly St., Ahmed El-Qady House, Damanhur
City, El Behera Governorate
E-mail address: ta.elkady@Gmail.com.
Phone Number(s): 002 – 01127742453
002 – 045 – 3190115
Objective:
Seeking a challenging and rewarding position in your esteemed company that will allow
expanding my experience and a chance to use my knowledge.
Qualification: The degree of Engineering Master In Construction & Project Management
2011 - Alex. University with title (Towards Understanding of Cost Trends in
One of the Local Companies in Steel Construction Realm), grade "Very Good".
B.Sc. of civil engineering 2000, grade "Good" - Alex. University.
Graduation project: Structural analysis, grade "Very Good".
Languages: English: TOEFL 595/700 Very Good command 2011.
Computer Skills: AutoCAD2010 – Primavera 6.1 - Primavera 3.1 – Microsoft office 2010(Word - Excel -
Access - Power point ) – Staad III ver.22 – sap2000
Training/Professional
Experience:
2008-2010:
Working as a project planner (applying primavera 3.1 & 6) at Allam sons Co.-
Allam steel division (Amria plant) in:
Ain El Sokhna Power plant station.
National theater - Steel Structure (Shwaya and steel roof).
EPPC-project /UHDE-Port Said.
Nubaria power station plant.
El-Atf power station plant.
Saint gobian glass factory – Ain El-Sokhna.
New scope for Saint Gobain Glass plant.
2008-2010:
2. 2
Working as a cost estimator at Allam sons Co.-Allam steel division (Amria
plant) in:
Nubaria power station project III.
Sphinx float glass factory-Sadat city.
Assuit cement plant.
El-Atf power station plant.
Kuraymat power station plant.
Saint gobainh glass factory –Ain El-Sokhna.
UHDE/EPPC-project package (3) – B.U.S.
UHDE/EPPC-project package (4) – B.U.S.
Algeria cement factory package (1) - structural steel.
Algeria cement factory package (2) - civil work.
EZZ DR factory – Ain El-Soukhna package (1)-structural steel.
EZZ DR factory – Ain El-Soukhna package (2)-civil work.
Shoaiba power plant (tanks) – Soudia.
Ahli united bank, Egypt (AUBE) head office- project, new Cairo city.
Arabian Cement Company.
Sulphuric Acid & SPP Plants and Offsites – TECHNIP.
Housing and Construction Bank Project.
Cullet cones - Saint Gobain project.
Sulphuric Acid & SPP Plants and off sites – UHDE.
Sulphuric Acid & SPP Plants and off sites –LITWIN.
Sulphuric Acid & SPP Plants and off sites - UHDE / Mechanical St
Structure Package.
Nubaria project ladders & handrails.
Saint Gobain projact.
National Meuseum of Egyptian civilization bridges (CORIDOR 5).
Batch plant Cones - saint gobain project.
Mogama Al Arab project.
Egyptian Stock Exchange.
Fertilizer Complex, EAGRIUM, Egypt - civil work.
6000t/d cement plant / RUSSIA.
Nubarria sugar beet factory.
6 October Intake & Pumps Steel Structure.
El - Sewedy Cement Company - Algeria.
Media project - steel frames & covering works. / Algeria.
St. St. For Covered Storage Area (5 silos) project.
Benisaf & chleff cement factories in Algeria (structure steel work,
steel plate work &steel inserts work).
P & G BAB CARE EXPANSION PLANT -6th OF OCTOBER CITY.
3. 3
Isolux tram way- Algeria.
P&G Baby Care Factory –Tanks.
HURGADAH INTERNATIONAL AIRPORT TERMINAL
BUILDING AND LAND SIDE FACILITIES – steel structre.
NPC – Crane Girder.
Saint Gobain Project- Batch plant Hoppers.
NPC - Air shatter.
Pipe mould (Equipment).
Rehabilitation of El Sallam International Hospital - Maadi – Cairo.
Aswan Fertilizers complex.
Shereif Arafa Studios.
Bostick Factory.
Ain Defla Jail – Algeria.
Naser City Center- Mall Building.
NEW DAR AL FOUAD HOSPITAL - NASR CITY - Tank.
Realisation d'un immeuble de bureau KPMG nouveau quartier
d'affaire d' Alger commune de Bab Ezzouar - steel structure.
NEW DAR AL FOUAD HOSPITAL - NASR CITY - steel structure.
HURGADAH INTERNATIONAL AIRPORT TERMINAL
BUILDING AND LAND SIDE FACILITIES - metal work.
El Ain El Sokhna Supercritical thermal power plant unit 1 &2- Steel
Structure.
Nuwaiba power station.
PISCINE OLYMPIQUE A AIN NAADJA – Algeria.
Cairo International New Hotel ( Airotel)-1 - Bridge link.
Nubaria beet suger factory - cones –Egypt.
Metro Market Stores - 6th October.
National theater.
Borg El Arab Storage Truss.
ISSC Kuraymat - Tanks.
Ammonium Nitrate Plant - Ain Sokhna steel structure.
Assuit cement.
NSCC cement plant with capacity 5,000 t/d - Al - Arish - North
Sinai Governorate - E g y p t - steel structure.
Alexanderia construction co. package - Built up beams.
NSCC cement plant with capacity 5,000 t/d - Al - Arish - North
Sinai Governorate - E g y p t - steel structure –package 2.
convention center project- structural steel-Libya
Cement production plant 1.5 million tons annual - steel structure.
320 DPGF Charpente métallique اﻟﺠﺰاﺋﺮ ﺑﺪوﻟﺔ ﺑﻮھﺮان اﻟﺘﻄﻮﯾﺮ و اﻟﺒﺤﻮث ﻣﺒﻨﻲ
4. 4
Cement production plant 1.5 million tons annual - steel structure.
ISCC Kuraymate Demineralized Water Tanks
The 6th of october water treatment plant (carbon steel pipes).
Safwa Garden Center- steel structure.
Madinaty mall steel structure.
Mall of africa project -Internal Entertainment Area Steel Structure
Skeleton
Ammonium Nitrate Plant - Ain Sokhna - package 2.
اﻹدارﯾﺔ ﻟﻠﺮﻗﺎﺑﺔ اﻟﻌﺎﻣﺔ اﻟﮭﯿﺌﺔ
Lycée International Alexandre Dumas – Alger
Arab union Co. Silos
ARABIA CEMENT COMPANY-CEMENT FACTORY IN RAMLIYA
(EGYPT)/steel structure
The extension of El omraa ceramic plant /steel structure
UCC mall & bridges steel structure
2001-2008:
Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing K.7.300 Tard El-Bossily Drain Bridge & other bridges.
Contractor: El Mustafa Office for construction.
Value: 896,640E.P. AS:
Earth Work = 4000 m3
Plain Concrete = 160 m3
Filling concrete = 195 m3
Small Aggregates concrete = 22 m3
Pre-cast R. C. Piles = 1210 m
Steel Piles filled with R.C. = 400 m
Steel bridges = 38.135 ton
Reinforced Concrete = 400 m3
Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing the coverage of 300mrs length of El-Aslab drain in Shabrakhit – with
social box of development.
Contractor: Eng. mohammed Ibrahem Abo Awaga.
Value: 344,300 E.P. AS:
Earth work = 800 m3
Plain concrete foundation = 350 m3
R .C . pipes lining ( diam. 1.00 m) = 300 m
Reinforced concrete = 180 m3
Mortar pitching = 100 m3
5. 5
R .C . pipes lining ( diam. 0.15 : 0.50 m) = 50 m
Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing the protection of the right side of Magror Edco drain from K.10.50 to
K.14.00 & the right side of Tard El-Bossily drain from the escape to k.2.50.
Contractor: Abdeen Khalaf Bedawy.
Value: 815,552E.P. AS:
Earth work = 1000 m3
Plain concrete = 20 m3
R.C. pipes lining ( diam. 1.50 m) = 15 m
Mortar pitching = 600 m3
Dry pitching = 4000 m3
Road earth working (width = 6.00 m) =36000 m2
Road earth working (width = 6.00 m, thick. = 0.25 m) =36000 m2
Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing the covered drainage net in El Maraca (2400 feddan).
Contractor: Abdullah El-Kholli &his sons’ co.
Value: 3,360,718E.P. AS:
Earth work = 1010750 m3
R .C . pipes lining ( diam. 4" : 24") = 1560 m
P.V.C. /P.E. pipes lining ( diam 4" : 24") = 47270 m
Man hole =190 no.
Mortar pitching = 200 m3
Sharing as project engineer in West delta drainage project management-
Damanhur in:
Construction of south of El-Behara drainage management & Damanhur
engineering buildings.
Contractor: The cooperative productivity association to construct & pave roads &the
public elbows - Damanhur.
Sub-Contractor: Sallah hassona .
Value: 2,908,875E.P.
And other similar work in West delta area AS:
P.C. basement for roads = 70 m3
Plain concrete = 2750 m3
Reinforced concrete = 5600 m
Brick walls = 500 m3 & 3000 m2
Electrical works = 2 units
Plastering = 4000 m2
Flooring = 1000 m2
6. 6
Plumping works = 150 m U.P.V.C. pipes diam. 015 m, 50 m diam. 0.20m, 100 m
diam. 0.25 m, 15 no. manholes.
Joinery work = 500 m2
Steel sheets roofing = 150 m2
Alarm & fire fighting system = 1 unit
Painting = 4600 m2
Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing K40.050 Edco Drain Bridge & other bridges.
Value: 1,269,972.5E.P. AS:
Steel Piles filled with R.C. = 600 m
Steel bridges = 60.25 ton
Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing the coverage of 700mrs length of Oreen drain in Shabrakhit – with
social box of development.
Contractor: The cooperative productivity association of architecture & decorative
design.
Value: 399500E.P. AS:
Earth work = 1500 m3
Plain concrete foundation = 700 m3
R.C. pipes lining ( diam. 1.00 m) = 700 m
Reinforced concrete = 280 m3
Mortar pitching = 100 m3
R.C. pipes lining ( diam. 0.15 : 0.50 m) = 100
Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing the covered drainage net in El Rwad & El Fatteh , ElKerdoud & Abd
ElRahman Bessar (5850 fedaan).
Contractor: El Safa organization for architectural contracts. (Eng. Ahmed Brackat).
Value: 8,838,150 E.P. AS:
Earth work = 3957500 m3
R.C. pipes lining ( diam. 4" : 24") = 1630 m
P.V.C. /P.E. pipes lining ( diam. 4" : 24") = 406540 m
Man hole = 360 no.
Mortar pitching = 470 m3
Working as project engineer in West delta drainage project management-
Damanhur in:
The construction of K.1.200 El-Tahade drain R.C. pipe syphon underneath El-
Rayah El-Nassery (2.00 Mrs. Diam. 90 Mrs. Length) by tunnel excavation (Pipe
7. 7
Jacking System).
Contractor: The Arabic company of Lands reclamation.
Value: 2,387,121.500E.P. AS:
Earth work = 1000 m3
Plain concrete foundation = 60 m3
Reinforced concrete = 160 m3
Mortar pitching = 400 m3
Pre-cast R.C. pipes of 2.00 mr diam. Lining by tunnel excavation (Pipe Jacking
System). = 92 m
Steel work =6 ton
Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing the covered drainage net in Alli ben Abi-Talleb (2200 fedaan).
Contractor: El Eman for general contracts. (Eman Ibrahem Yossif).
Value: 2,941,809.81 E.P. AS:
Earth work = 1490000 m3
R.C. pipes lining ( diam. 4" : 24") = 705 m
P.V.C. /P.E. pipes lining ( diam. 4" : 24") = 150320 m
Man hole = 126 no.
Mortar pitching = 350 m3
Before graduation:
Training in General Management for Irrigation Projects development west
Delta – Damanhur.
Training in General Sector of Educational Construction – Damanhur.
Another Skills: Sharing in studying & producing covered drainage net contracts, Bridges
construction contracts &contracts of finishing & repairing of administrative &
residential buildings in West delta drainage project management-Damanhur.
Office surveying works.
Study & check drawings.
Monitoring the work according to the plan.
Site surveying.
Have the ability to learn and work in any new field required in a short time.
Punctual and ready to improve my skills.
Hoppies: Gymnastic, aerobics.
Reading.
Listening to music.
Learning languages.
Needle crafts.
Drawing.