SlideShare ist ein Scribd-Unternehmen logo
1 von 8
Downloaden Sie, um offline zu lesen
1
Name: Taysseer Ahmed Abd-El-Gellel El-Qady.
Birth Date: 22nd of January 1979.
Nationality: Egyptian.
Gerund: Female.
Address:  Extension of Abdelsalam Elshazly St., Ahmed El-Qady House, Damanhur
City, El Behera Governorate
E-mail address: ta.elkady@Gmail.com.
Phone Number(s): 002 – 01127742453
002 – 045 – 3190115
Objective:
Seeking a challenging and rewarding position in your esteemed company that will allow
expanding my experience and a chance to use my knowledge.
Qualification:  The degree of Engineering Master In Construction & Project Management
2011 - Alex. University with title (Towards Understanding of Cost Trends in
One of the Local Companies in Steel Construction Realm), grade "Very Good".
 B.Sc. of civil engineering 2000, grade "Good" - Alex. University.
 Graduation project: Structural analysis, grade "Very Good".
Languages:  English: TOEFL 595/700 Very Good command 2011.
Computer Skills: AutoCAD2010 – Primavera 6.1 - Primavera 3.1 – Microsoft office 2010(Word - Excel -
Access - Power point ) – Staad III ver.22 – sap2000
Training/Professional
Experience:
 2008-2010:
 Working as a project planner (applying primavera 3.1 & 6) at Allam sons Co.-
Allam steel division (Amria plant) in:
 Ain El Sokhna Power plant station.
 National theater - Steel Structure (Shwaya and steel roof).
 EPPC-project /UHDE-Port Said.
 Nubaria power station plant.
 El-Atf power station plant.
 Saint gobian glass factory – Ain El-Sokhna.
 New scope for Saint Gobain Glass plant.
 2008-2010:
2
 Working as a cost estimator at Allam sons Co.-Allam steel division (Amria
plant) in:
 Nubaria power station project III.
 Sphinx float glass factory-Sadat city.
 Assuit cement plant.
 El-Atf power station plant.
 Kuraymat power station plant.
 Saint gobainh glass factory –Ain El-Sokhna.
 UHDE/EPPC-project package (3) – B.U.S.
 UHDE/EPPC-project package (4) – B.U.S.
 Algeria cement factory package (1) - structural steel.
 Algeria cement factory package (2) - civil work.
 EZZ DR factory – Ain El-Soukhna package (1)-structural steel.
 EZZ DR factory – Ain El-Soukhna package (2)-civil work.
 Shoaiba power plant (tanks) – Soudia.
 Ahli united bank, Egypt (AUBE) head office- project, new Cairo city.
 Arabian Cement Company.
 Sulphuric Acid & SPP Plants and Offsites – TECHNIP.
 Housing and Construction Bank Project.
 Cullet cones - Saint Gobain project.
 Sulphuric Acid & SPP Plants and off sites – UHDE.
 Sulphuric Acid & SPP Plants and off sites –LITWIN.
 Sulphuric Acid & SPP Plants and off sites - UHDE / Mechanical St
Structure Package.
 Nubaria project ladders & handrails.
 Saint Gobain projact.
 National Meuseum of Egyptian civilization bridges (CORIDOR 5).
 Batch plant Cones - saint gobain project.
 Mogama Al Arab project.
 Egyptian Stock Exchange.
 Fertilizer Complex, EAGRIUM, Egypt - civil work.
 6000t/d cement plant / RUSSIA.
 Nubarria sugar beet factory.
 6 October Intake & Pumps Steel Structure.
 El - Sewedy Cement Company - Algeria.
 Media project - steel frames & covering works. / Algeria.
 St. St. For Covered Storage Area (5 silos) project.
 Benisaf & chleff cement factories in Algeria (structure steel work,
steel plate work &steel inserts work).
 P & G BAB CARE EXPANSION PLANT -6th OF OCTOBER CITY.
3
 Isolux tram way- Algeria.
 P&G Baby Care Factory –Tanks.
 HURGADAH INTERNATIONAL AIRPORT TERMINAL
BUILDING AND LAND SIDE FACILITIES – steel structre.
 NPC – Crane Girder.
 Saint Gobain Project- Batch plant Hoppers.
 NPC - Air shatter.
 Pipe mould (Equipment).
 Rehabilitation of El Sallam International Hospital - Maadi – Cairo.
 Aswan Fertilizers complex.
 Shereif Arafa Studios.
 Bostick Factory.
 Ain Defla Jail – Algeria.
 Naser City Center- Mall Building.
 NEW DAR AL FOUAD HOSPITAL - NASR CITY - Tank.
 Realisation d'un immeuble de bureau KPMG nouveau quartier
d'affaire d' Alger commune de Bab Ezzouar - steel structure.
 NEW DAR AL FOUAD HOSPITAL - NASR CITY - steel structure.
 HURGADAH INTERNATIONAL AIRPORT TERMINAL
BUILDING AND LAND SIDE FACILITIES - metal work.
 El Ain El Sokhna Supercritical thermal power plant unit 1 &2- Steel
Structure.
 Nuwaiba power station.
 PISCINE OLYMPIQUE A AIN NAADJA – Algeria.
 Cairo International New Hotel ( Airotel)-1 - Bridge link.
 Nubaria beet suger factory - cones –Egypt.
 Metro Market Stores - 6th October.
 National theater.
 Borg El Arab Storage Truss.
 ISSC Kuraymat - Tanks.
 Ammonium Nitrate Plant - Ain Sokhna steel structure.
 Assuit cement.
 NSCC cement plant with capacity 5,000 t/d - Al - Arish - North
Sinai Governorate - E g y p t - steel structure.
 Alexanderia construction co. package - Built up beams.
 NSCC cement plant with capacity 5,000 t/d - Al - Arish - North
Sinai Governorate - E g y p t - steel structure –package 2.
 convention center project- structural steel-Libya
 Cement production plant 1.5 million tons annual - steel structure.
 320 DPGF Charpente métallique ‫اﻟﺠﺰاﺋﺮ‬ ‫ﺑﺪوﻟﺔ‬ ‫ﺑﻮھﺮان‬ ‫اﻟﺘﻄﻮﯾﺮ‬ ‫و‬ ‫اﻟﺒﺤﻮث‬ ‫ﻣﺒﻨﻲ‬
4
 Cement production plant 1.5 million tons annual - steel structure.
 ISCC Kuraymate Demineralized Water Tanks
 The 6th of october water treatment plant (carbon steel pipes).
 Safwa Garden Center- steel structure.
 Madinaty mall steel structure.
 Mall of africa project -Internal Entertainment Area Steel Structure
Skeleton
 Ammonium Nitrate Plant - Ain Sokhna - package 2.
 ‫اﻹدارﯾﺔ‬ ‫ﻟﻠﺮﻗﺎﺑﺔ‬ ‫اﻟﻌﺎﻣﺔ‬ ‫اﻟﮭﯿﺌﺔ‬
 Lycée International Alexandre Dumas – Alger
 Arab union Co. Silos
 ARABIA CEMENT COMPANY-CEMENT FACTORY IN RAMLIYA
(EGYPT)/steel structure
 The extension of El omraa ceramic plant /steel structure
 UCC mall & bridges steel structure
 2001-2008:
 Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing K.7.300 Tard El-Bossily Drain Bridge & other bridges.
Contractor: El Mustafa Office for construction.
Value: 896,640E.P. AS:
Earth Work = 4000 m3
Plain Concrete = 160 m3
Filling concrete = 195 m3
Small Aggregates concrete = 22 m3
Pre-cast R. C. Piles = 1210 m
Steel Piles filled with R.C. = 400 m
Steel bridges = 38.135 ton
Reinforced Concrete = 400 m3
 Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing the coverage of 300mrs length of El-Aslab drain in Shabrakhit – with
social box of development.
Contractor: Eng. mohammed Ibrahem Abo Awaga.
Value: 344,300 E.P. AS:
Earth work = 800 m3
Plain concrete foundation = 350 m3
R .C . pipes lining ( diam. 1.00 m) = 300 m
Reinforced concrete = 180 m3
Mortar pitching = 100 m3
5
R .C . pipes lining ( diam. 0.15 : 0.50 m) = 50 m
 Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing the protection of the right side of Magror Edco drain from K.10.50 to
K.14.00 & the right side of Tard El-Bossily drain from the escape to k.2.50.
Contractor: Abdeen Khalaf Bedawy.
Value: 815,552E.P. AS:
Earth work = 1000 m3
Plain concrete = 20 m3
R.C. pipes lining ( diam. 1.50 m) = 15 m
Mortar pitching = 600 m3
Dry pitching = 4000 m3
Road earth working (width = 6.00 m) =36000 m2
Road earth working (width = 6.00 m, thick. = 0.25 m) =36000 m2
 Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing the covered drainage net in El Maraca (2400 feddan).
Contractor: Abdullah El-Kholli &his sons’ co.
Value: 3,360,718E.P. AS:
Earth work = 1010750 m3
R .C . pipes lining ( diam. 4" : 24") = 1560 m
P.V.C. /P.E. pipes lining ( diam 4" : 24") = 47270 m
Man hole =190 no.
Mortar pitching = 200 m3
 Sharing as project engineer in West delta drainage project management-
Damanhur in:
Construction of south of El-Behara drainage management & Damanhur
engineering buildings.
Contractor: The cooperative productivity association to construct & pave roads &the
public elbows - Damanhur.
Sub-Contractor: Sallah hassona .
Value: 2,908,875E.P.
And other similar work in West delta area AS:
P.C. basement for roads = 70 m3
Plain concrete = 2750 m3
Reinforced concrete = 5600 m
Brick walls = 500 m3 & 3000 m2
Electrical works = 2 units
Plastering = 4000 m2
Flooring = 1000 m2
6
Plumping works = 150 m U.P.V.C. pipes diam. 015 m, 50 m diam. 0.20m, 100 m
diam. 0.25 m, 15 no. manholes.
Joinery work = 500 m2
Steel sheets roofing = 150 m2
Alarm & fire fighting system = 1 unit
Painting = 4600 m2
 Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing K40.050 Edco Drain Bridge & other bridges.
Value: 1,269,972.5E.P. AS:
Steel Piles filled with R.C. = 600 m
Steel bridges = 60.25 ton
 Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing the coverage of 700mrs length of Oreen drain in Shabrakhit – with
social box of development.
Contractor: The cooperative productivity association of architecture & decorative
design.
Value: 399500E.P. AS:
Earth work = 1500 m3
Plain concrete foundation = 700 m3
R.C. pipes lining ( diam. 1.00 m) = 700 m
Reinforced concrete = 280 m3
Mortar pitching = 100 m3
R.C. pipes lining ( diam. 0.15 : 0.50 m) = 100
 Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing the covered drainage net in El Rwad & El Fatteh , ElKerdoud & Abd
ElRahman Bessar (5850 fedaan).
Contractor: El Safa organization for architectural contracts. (Eng. Ahmed Brackat).
Value: 8,838,150 E.P. AS:
Earth work = 3957500 m3
R.C. pipes lining ( diam. 4" : 24") = 1630 m
P.V.C. /P.E. pipes lining ( diam. 4" : 24") = 406540 m
Man hole = 360 no.
Mortar pitching = 470 m3
 Working as project engineer in West delta drainage project management-
Damanhur in:
The construction of K.1.200 El-Tahade drain R.C. pipe syphon underneath El-
Rayah El-Nassery (2.00 Mrs. Diam. 90 Mrs. Length) by tunnel excavation (Pipe
7
Jacking System).
Contractor: The Arabic company of Lands reclamation.
Value: 2,387,121.500E.P. AS:
Earth work = 1000 m3
Plain concrete foundation = 60 m3
Reinforced concrete = 160 m3
Mortar pitching = 400 m3
Pre-cast R.C. pipes of 2.00 mr diam. Lining by tunnel excavation (Pipe Jacking
System). = 92 m
Steel work =6 ton
 Working as project engineer in West delta drainage project management-
Damanhur in:
Constructing the covered drainage net in Alli ben Abi-Talleb (2200 fedaan).
Contractor: El Eman for general contracts. (Eman Ibrahem Yossif).
Value: 2,941,809.81 E.P. AS:
Earth work = 1490000 m3
R.C. pipes lining ( diam. 4" : 24") = 705 m
P.V.C. /P.E. pipes lining ( diam. 4" : 24") = 150320 m
Man hole = 126 no.
Mortar pitching = 350 m3
 Before graduation:
 Training in General Management for Irrigation Projects development west
Delta – Damanhur.
 Training in General Sector of Educational Construction – Damanhur.
Another Skills:  Sharing in studying & producing covered drainage net contracts, Bridges
construction contracts &contracts of finishing & repairing of administrative &
residential buildings in West delta drainage project management-Damanhur.
 Office surveying works.
 Study & check drawings.
 Monitoring the work according to the plan.
 Site surveying.
 Have the ability to learn and work in any new field required in a short time.
 Punctual and ready to improve my skills.
Hoppies:  Gymnastic, aerobics.
 Reading.
 Listening to music.
 Learning languages.
 Needle crafts.
 Drawing.
8
****************************

Weitere ähnliche Inhalte

Was ist angesagt?

Ahmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-BakyAhmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-BakyAhmed Kamal
 
Eslam cv final 2016
Eslam cv final 2016Eslam cv final 2016
Eslam cv final 2016eslam orabi
 
Wael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCEDWael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCEDwael elbana
 
Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati∴
 
FINISHING QA/QC MANAGER
FINISHING QA/QC MANAGERFINISHING QA/QC MANAGER
FINISHING QA/QC MANAGERAYMAN NAWAM
 
Updated khaled fahmy cv
Updated khaled fahmy cvUpdated khaled fahmy cv
Updated khaled fahmy cvKHALED FAHMY
 
13.12.15. Bio-Data.Pabitra Roy.DOC
13.12.15. Bio-Data.Pabitra Roy.DOC13.12.15. Bio-Data.Pabitra Roy.DOC
13.12.15. Bio-Data.Pabitra Roy.DOCPabitra Roy
 
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - InfrastructuresMOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - InfrastructuresMostafa Hassan
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)AHMED SAKR
 
Mohamed Kamal Mahmoud_cv
Mohamed Kamal Mahmoud_cvMohamed Kamal Mahmoud_cv
Mohamed Kamal Mahmoud_cvMohamed Kamal
 
C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)ALI ALLAM
 
Ahmed as Road design eng
Ahmed as Road design engAhmed as Road design eng
Ahmed as Road design engahmed hasien
 
Mohamed sayed Mohamed Ali - Civil Structure Enginner
Mohamed sayed Mohamed Ali - Civil Structure EnginnerMohamed sayed Mohamed Ali - Civil Structure Enginner
Mohamed sayed Mohamed Ali - Civil Structure EnginnerMohamed Sayed
 

Was ist angesagt? (19)

AMRO SALAH C.V
AMRO SALAH C.VAMRO SALAH C.V
AMRO SALAH C.V
 
Ahmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-BakyAhmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-Baky
 
Eslam cv final 2016
Eslam cv final 2016Eslam cv final 2016
Eslam cv final 2016
 
Mahmoud Abou EL-Hmad
Mahmoud Abou EL-HmadMahmoud Abou EL-Hmad
Mahmoud Abou EL-Hmad
 
english CV
english CVenglish CV
english CV
 
aminCV 2016
aminCV 2016aminCV 2016
aminCV 2016
 
Wael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCEDWael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCED
 
Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
FINISHING QA/QC MANAGER
FINISHING QA/QC MANAGERFINISHING QA/QC MANAGER
FINISHING QA/QC MANAGER
 
E - cv.
E - cv.E - cv.
E - cv.
 
Updated khaled fahmy cv
Updated khaled fahmy cvUpdated khaled fahmy cv
Updated khaled fahmy cv
 
13.12.15. Bio-Data.Pabitra Roy.DOC
13.12.15. Bio-Data.Pabitra Roy.DOC13.12.15. Bio-Data.Pabitra Roy.DOC
13.12.15. Bio-Data.Pabitra Roy.DOC
 
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - InfrastructuresMOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
Mohamed Kamal Mahmoud_cv
Mohamed Kamal Mahmoud_cvMohamed Kamal Mahmoud_cv
Mohamed Kamal Mahmoud_cv
 
C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)
 
Ahmed as Road design eng
Ahmed as Road design engAhmed as Road design eng
Ahmed as Road design eng
 
Mohamed sayed Mohamed Ali - Civil Structure Enginner
Mohamed sayed Mohamed Ali - Civil Structure EnginnerMohamed sayed Mohamed Ali - Civil Structure Enginner
Mohamed sayed Mohamed Ali - Civil Structure Enginner
 

Andere mochten auch

מרכז גמישות
מרכז גמישותמרכז גמישות
מרכז גמישותkeren1234
 
Feliz dìa papà
Feliz dìa papà Feliz dìa papà
Feliz dìa papà Mariuxi1901
 
บริการต่างๆบนอินเทอร์เน็ต
บริการต่างๆบนอินเทอร์เน็ตบริการต่างๆบนอินเทอร์เน็ต
บริการต่างๆบนอินเทอร์เน็ตNoei Chupat
 
GEC+ 2016: Ken Krull
GEC+ 2016: Ken KrullGEC+ 2016: Ken Krull
GEC+ 2016: Ken KrullPeter Komives
 
GEC+ 2016: Sajid Islam
GEC+ 2016: Sajid IslamGEC+ 2016: Sajid Islam
GEC+ 2016: Sajid IslamPeter Komives
 
DASt 022 Direktifi, Eğitim sunusu
DASt 022 Direktifi, Eğitim sunusuDASt 022 Direktifi, Eğitim sunusu
DASt 022 Direktifi, Eğitim sunusuGazi YALÇIN
 
Acta informacion de rendimiento
Acta informacion de rendimientoActa informacion de rendimiento
Acta informacion de rendimientojual48 alvarado
 
GEC+ 2016: Gene Seow
GEC+ 2016: Gene SeowGEC+ 2016: Gene Seow
GEC+ 2016: Gene SeowPeter Komives
 
Eleştirel düşünme
Eleştirel düşünmeEleştirel düşünme
Eleştirel düşünmenazlimu
 
RESOLUCIÓN DE SECRETARÍA GENERAL Nº 018-2017-MINEDU
RESOLUCIÓN DE SECRETARÍA GENERAL Nº 018-2017-MINEDURESOLUCIÓN DE SECRETARÍA GENERAL Nº 018-2017-MINEDU
RESOLUCIÓN DE SECRETARÍA GENERAL Nº 018-2017-MINEDUNabel Paulino Guerra Huaranca
 
GEC+ 2016: Emanuele Santi
GEC+ 2016: Emanuele SantiGEC+ 2016: Emanuele Santi
GEC+ 2016: Emanuele SantiPeter Komives
 
GEC+ 2016: Ivan Sandjaja
GEC+ 2016: Ivan SandjajaGEC+ 2016: Ivan Sandjaja
GEC+ 2016: Ivan SandjajaPeter Komives
 
Guardianes de las abejas (Determinar el comportamiento biológico de la abeja ...
Guardianes de las abejas (Determinar el comportamiento biológico de la abeja ...Guardianes de las abejas (Determinar el comportamiento biológico de la abeja ...
Guardianes de las abejas (Determinar el comportamiento biológico de la abeja ...CTeI Putumayo
 
Volume of a pyramid
Volume of a pyramidVolume of a pyramid
Volume of a pyramidScott Bailey
 

Andere mochten auch (20)

מרכז גמישות
מרכז גמישותמרכז גמישות
מרכז גמישות
 
Feliz dìa papà
Feliz dìa papà Feliz dìa papà
Feliz dìa papà
 
บริการต่างๆบนอินเทอร์เน็ต
บริการต่างๆบนอินเทอร์เน็ตบริการต่างๆบนอินเทอร์เน็ต
บริการต่างๆบนอินเทอร์เน็ต
 
GEC+ 2016: Ken Krull
GEC+ 2016: Ken KrullGEC+ 2016: Ken Krull
GEC+ 2016: Ken Krull
 
GEC+ 2016: Sajid Islam
GEC+ 2016: Sajid IslamGEC+ 2016: Sajid Islam
GEC+ 2016: Sajid Islam
 
DASt 022 Direktifi, Eğitim sunusu
DASt 022 Direktifi, Eğitim sunusuDASt 022 Direktifi, Eğitim sunusu
DASt 022 Direktifi, Eğitim sunusu
 
resume
resumeresume
resume
 
Acta informacion de rendimiento
Acta informacion de rendimientoActa informacion de rendimiento
Acta informacion de rendimiento
 
Netis katalogus 2014 magyar
Netis katalogus 2014 magyarNetis katalogus 2014 magyar
Netis katalogus 2014 magyar
 
12 jyotilinga
12 jyotilinga12 jyotilinga
12 jyotilinga
 
Cep telefonu
Cep telefonuCep telefonu
Cep telefonu
 
GEC+ 2016: Gene Seow
GEC+ 2016: Gene SeowGEC+ 2016: Gene Seow
GEC+ 2016: Gene Seow
 
Eleştirel düşünme
Eleştirel düşünmeEleştirel düşünme
Eleştirel düşünme
 
RESOLUCIÓN DE SECRETARÍA GENERAL Nº 018-2017-MINEDU
RESOLUCIÓN DE SECRETARÍA GENERAL Nº 018-2017-MINEDURESOLUCIÓN DE SECRETARÍA GENERAL Nº 018-2017-MINEDU
RESOLUCIÓN DE SECRETARÍA GENERAL Nº 018-2017-MINEDU
 
GEC+ 2016: Emanuele Santi
GEC+ 2016: Emanuele SantiGEC+ 2016: Emanuele Santi
GEC+ 2016: Emanuele Santi
 
GEC+ 2016: Ivan Sandjaja
GEC+ 2016: Ivan SandjajaGEC+ 2016: Ivan Sandjaja
GEC+ 2016: Ivan Sandjaja
 
Reglm. intern 2016
 Reglm. intern 2016  Reglm. intern 2016
Reglm. intern 2016
 
Guardianes de las abejas (Determinar el comportamiento biológico de la abeja ...
Guardianes de las abejas (Determinar el comportamiento biológico de la abeja ...Guardianes de las abejas (Determinar el comportamiento biológico de la abeja ...
Guardianes de las abejas (Determinar el comportamiento biológico de la abeja ...
 
Volume of a pyramid
Volume of a pyramidVolume of a pyramid
Volume of a pyramid
 
Nombramiento 2015 region junin
Nombramiento 2015 region juninNombramiento 2015 region junin
Nombramiento 2015 region junin
 

Ähnlich wie curriculum vitae with a photo

Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Muhammad Hegazy
 
eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)khaled sonbol
 
Essam Afifi CV 19-10-015
Essam Afifi CV 19-10-015 Essam Afifi CV 19-10-015
Essam Afifi CV 19-10-015 essam afifi
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)
18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)
18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)Sawsan Ali
 
Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal EngineerAhmad Hassan
 

Ähnlich wie curriculum vitae with a photo (20)

Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
CV_Rizeq 2016
CV_Rizeq 2016CV_Rizeq 2016
CV_Rizeq 2016
 
C.V.
C.V.C.V.
C.V.
 
Abd El-Rahman Wakeb CV
Abd El-Rahman Wakeb CVAbd El-Rahman Wakeb CV
Abd El-Rahman Wakeb CV
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
 
eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)
 
Ahmed C.V
Ahmed C.VAhmed C.V
Ahmed C.V
 
Reda cv en
Reda cv enReda cv en
Reda cv en
 
reda cv EN
reda cv ENreda cv EN
reda cv EN
 
cv mohamed mostafa 6
cv mohamed mostafa 6cv mohamed mostafa 6
cv mohamed mostafa 6
 
osama cv
osama cvosama cv
osama cv
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 
Essam Afifi CV 19-10-015
Essam Afifi CV 19-10-015 Essam Afifi CV 19-10-015
Essam Afifi CV 19-10-015
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
Aac booklet
Aac bookletAac booklet
Aac booklet
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)
18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)
18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)
 
Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 

curriculum vitae with a photo

  • 1. 1 Name: Taysseer Ahmed Abd-El-Gellel El-Qady. Birth Date: 22nd of January 1979. Nationality: Egyptian. Gerund: Female. Address:  Extension of Abdelsalam Elshazly St., Ahmed El-Qady House, Damanhur City, El Behera Governorate E-mail address: ta.elkady@Gmail.com. Phone Number(s): 002 – 01127742453 002 – 045 – 3190115 Objective: Seeking a challenging and rewarding position in your esteemed company that will allow expanding my experience and a chance to use my knowledge. Qualification:  The degree of Engineering Master In Construction & Project Management 2011 - Alex. University with title (Towards Understanding of Cost Trends in One of the Local Companies in Steel Construction Realm), grade "Very Good".  B.Sc. of civil engineering 2000, grade "Good" - Alex. University.  Graduation project: Structural analysis, grade "Very Good". Languages:  English: TOEFL 595/700 Very Good command 2011. Computer Skills: AutoCAD2010 – Primavera 6.1 - Primavera 3.1 – Microsoft office 2010(Word - Excel - Access - Power point ) – Staad III ver.22 – sap2000 Training/Professional Experience:  2008-2010:  Working as a project planner (applying primavera 3.1 & 6) at Allam sons Co.- Allam steel division (Amria plant) in:  Ain El Sokhna Power plant station.  National theater - Steel Structure (Shwaya and steel roof).  EPPC-project /UHDE-Port Said.  Nubaria power station plant.  El-Atf power station plant.  Saint gobian glass factory – Ain El-Sokhna.  New scope for Saint Gobain Glass plant.  2008-2010:
  • 2. 2  Working as a cost estimator at Allam sons Co.-Allam steel division (Amria plant) in:  Nubaria power station project III.  Sphinx float glass factory-Sadat city.  Assuit cement plant.  El-Atf power station plant.  Kuraymat power station plant.  Saint gobainh glass factory –Ain El-Sokhna.  UHDE/EPPC-project package (3) – B.U.S.  UHDE/EPPC-project package (4) – B.U.S.  Algeria cement factory package (1) - structural steel.  Algeria cement factory package (2) - civil work.  EZZ DR factory – Ain El-Soukhna package (1)-structural steel.  EZZ DR factory – Ain El-Soukhna package (2)-civil work.  Shoaiba power plant (tanks) – Soudia.  Ahli united bank, Egypt (AUBE) head office- project, new Cairo city.  Arabian Cement Company.  Sulphuric Acid & SPP Plants and Offsites – TECHNIP.  Housing and Construction Bank Project.  Cullet cones - Saint Gobain project.  Sulphuric Acid & SPP Plants and off sites – UHDE.  Sulphuric Acid & SPP Plants and off sites –LITWIN.  Sulphuric Acid & SPP Plants and off sites - UHDE / Mechanical St Structure Package.  Nubaria project ladders & handrails.  Saint Gobain projact.  National Meuseum of Egyptian civilization bridges (CORIDOR 5).  Batch plant Cones - saint gobain project.  Mogama Al Arab project.  Egyptian Stock Exchange.  Fertilizer Complex, EAGRIUM, Egypt - civil work.  6000t/d cement plant / RUSSIA.  Nubarria sugar beet factory.  6 October Intake & Pumps Steel Structure.  El - Sewedy Cement Company - Algeria.  Media project - steel frames & covering works. / Algeria.  St. St. For Covered Storage Area (5 silos) project.  Benisaf & chleff cement factories in Algeria (structure steel work, steel plate work &steel inserts work).  P & G BAB CARE EXPANSION PLANT -6th OF OCTOBER CITY.
  • 3. 3  Isolux tram way- Algeria.  P&G Baby Care Factory –Tanks.  HURGADAH INTERNATIONAL AIRPORT TERMINAL BUILDING AND LAND SIDE FACILITIES – steel structre.  NPC – Crane Girder.  Saint Gobain Project- Batch plant Hoppers.  NPC - Air shatter.  Pipe mould (Equipment).  Rehabilitation of El Sallam International Hospital - Maadi – Cairo.  Aswan Fertilizers complex.  Shereif Arafa Studios.  Bostick Factory.  Ain Defla Jail – Algeria.  Naser City Center- Mall Building.  NEW DAR AL FOUAD HOSPITAL - NASR CITY - Tank.  Realisation d'un immeuble de bureau KPMG nouveau quartier d'affaire d' Alger commune de Bab Ezzouar - steel structure.  NEW DAR AL FOUAD HOSPITAL - NASR CITY - steel structure.  HURGADAH INTERNATIONAL AIRPORT TERMINAL BUILDING AND LAND SIDE FACILITIES - metal work.  El Ain El Sokhna Supercritical thermal power plant unit 1 &2- Steel Structure.  Nuwaiba power station.  PISCINE OLYMPIQUE A AIN NAADJA – Algeria.  Cairo International New Hotel ( Airotel)-1 - Bridge link.  Nubaria beet suger factory - cones –Egypt.  Metro Market Stores - 6th October.  National theater.  Borg El Arab Storage Truss.  ISSC Kuraymat - Tanks.  Ammonium Nitrate Plant - Ain Sokhna steel structure.  Assuit cement.  NSCC cement plant with capacity 5,000 t/d - Al - Arish - North Sinai Governorate - E g y p t - steel structure.  Alexanderia construction co. package - Built up beams.  NSCC cement plant with capacity 5,000 t/d - Al - Arish - North Sinai Governorate - E g y p t - steel structure –package 2.  convention center project- structural steel-Libya  Cement production plant 1.5 million tons annual - steel structure.  320 DPGF Charpente métallique ‫اﻟﺠﺰاﺋﺮ‬ ‫ﺑﺪوﻟﺔ‬ ‫ﺑﻮھﺮان‬ ‫اﻟﺘﻄﻮﯾﺮ‬ ‫و‬ ‫اﻟﺒﺤﻮث‬ ‫ﻣﺒﻨﻲ‬
  • 4. 4  Cement production plant 1.5 million tons annual - steel structure.  ISCC Kuraymate Demineralized Water Tanks  The 6th of october water treatment plant (carbon steel pipes).  Safwa Garden Center- steel structure.  Madinaty mall steel structure.  Mall of africa project -Internal Entertainment Area Steel Structure Skeleton  Ammonium Nitrate Plant - Ain Sokhna - package 2.  ‫اﻹدارﯾﺔ‬ ‫ﻟﻠﺮﻗﺎﺑﺔ‬ ‫اﻟﻌﺎﻣﺔ‬ ‫اﻟﮭﯿﺌﺔ‬  Lycée International Alexandre Dumas – Alger  Arab union Co. Silos  ARABIA CEMENT COMPANY-CEMENT FACTORY IN RAMLIYA (EGYPT)/steel structure  The extension of El omraa ceramic plant /steel structure  UCC mall & bridges steel structure  2001-2008:  Working as project engineer in West delta drainage project management- Damanhur in: Constructing K.7.300 Tard El-Bossily Drain Bridge & other bridges. Contractor: El Mustafa Office for construction. Value: 896,640E.P. AS: Earth Work = 4000 m3 Plain Concrete = 160 m3 Filling concrete = 195 m3 Small Aggregates concrete = 22 m3 Pre-cast R. C. Piles = 1210 m Steel Piles filled with R.C. = 400 m Steel bridges = 38.135 ton Reinforced Concrete = 400 m3  Working as project engineer in West delta drainage project management- Damanhur in: Constructing the coverage of 300mrs length of El-Aslab drain in Shabrakhit – with social box of development. Contractor: Eng. mohammed Ibrahem Abo Awaga. Value: 344,300 E.P. AS: Earth work = 800 m3 Plain concrete foundation = 350 m3 R .C . pipes lining ( diam. 1.00 m) = 300 m Reinforced concrete = 180 m3 Mortar pitching = 100 m3
  • 5. 5 R .C . pipes lining ( diam. 0.15 : 0.50 m) = 50 m  Working as project engineer in West delta drainage project management- Damanhur in: Constructing the protection of the right side of Magror Edco drain from K.10.50 to K.14.00 & the right side of Tard El-Bossily drain from the escape to k.2.50. Contractor: Abdeen Khalaf Bedawy. Value: 815,552E.P. AS: Earth work = 1000 m3 Plain concrete = 20 m3 R.C. pipes lining ( diam. 1.50 m) = 15 m Mortar pitching = 600 m3 Dry pitching = 4000 m3 Road earth working (width = 6.00 m) =36000 m2 Road earth working (width = 6.00 m, thick. = 0.25 m) =36000 m2  Working as project engineer in West delta drainage project management- Damanhur in: Constructing the covered drainage net in El Maraca (2400 feddan). Contractor: Abdullah El-Kholli &his sons’ co. Value: 3,360,718E.P. AS: Earth work = 1010750 m3 R .C . pipes lining ( diam. 4" : 24") = 1560 m P.V.C. /P.E. pipes lining ( diam 4" : 24") = 47270 m Man hole =190 no. Mortar pitching = 200 m3  Sharing as project engineer in West delta drainage project management- Damanhur in: Construction of south of El-Behara drainage management & Damanhur engineering buildings. Contractor: The cooperative productivity association to construct & pave roads &the public elbows - Damanhur. Sub-Contractor: Sallah hassona . Value: 2,908,875E.P. And other similar work in West delta area AS: P.C. basement for roads = 70 m3 Plain concrete = 2750 m3 Reinforced concrete = 5600 m Brick walls = 500 m3 & 3000 m2 Electrical works = 2 units Plastering = 4000 m2 Flooring = 1000 m2
  • 6. 6 Plumping works = 150 m U.P.V.C. pipes diam. 015 m, 50 m diam. 0.20m, 100 m diam. 0.25 m, 15 no. manholes. Joinery work = 500 m2 Steel sheets roofing = 150 m2 Alarm & fire fighting system = 1 unit Painting = 4600 m2  Working as project engineer in West delta drainage project management- Damanhur in: Constructing K40.050 Edco Drain Bridge & other bridges. Value: 1,269,972.5E.P. AS: Steel Piles filled with R.C. = 600 m Steel bridges = 60.25 ton  Working as project engineer in West delta drainage project management- Damanhur in: Constructing the coverage of 700mrs length of Oreen drain in Shabrakhit – with social box of development. Contractor: The cooperative productivity association of architecture & decorative design. Value: 399500E.P. AS: Earth work = 1500 m3 Plain concrete foundation = 700 m3 R.C. pipes lining ( diam. 1.00 m) = 700 m Reinforced concrete = 280 m3 Mortar pitching = 100 m3 R.C. pipes lining ( diam. 0.15 : 0.50 m) = 100  Working as project engineer in West delta drainage project management- Damanhur in: Constructing the covered drainage net in El Rwad & El Fatteh , ElKerdoud & Abd ElRahman Bessar (5850 fedaan). Contractor: El Safa organization for architectural contracts. (Eng. Ahmed Brackat). Value: 8,838,150 E.P. AS: Earth work = 3957500 m3 R.C. pipes lining ( diam. 4" : 24") = 1630 m P.V.C. /P.E. pipes lining ( diam. 4" : 24") = 406540 m Man hole = 360 no. Mortar pitching = 470 m3  Working as project engineer in West delta drainage project management- Damanhur in: The construction of K.1.200 El-Tahade drain R.C. pipe syphon underneath El- Rayah El-Nassery (2.00 Mrs. Diam. 90 Mrs. Length) by tunnel excavation (Pipe
  • 7. 7 Jacking System). Contractor: The Arabic company of Lands reclamation. Value: 2,387,121.500E.P. AS: Earth work = 1000 m3 Plain concrete foundation = 60 m3 Reinforced concrete = 160 m3 Mortar pitching = 400 m3 Pre-cast R.C. pipes of 2.00 mr diam. Lining by tunnel excavation (Pipe Jacking System). = 92 m Steel work =6 ton  Working as project engineer in West delta drainage project management- Damanhur in: Constructing the covered drainage net in Alli ben Abi-Talleb (2200 fedaan). Contractor: El Eman for general contracts. (Eman Ibrahem Yossif). Value: 2,941,809.81 E.P. AS: Earth work = 1490000 m3 R.C. pipes lining ( diam. 4" : 24") = 705 m P.V.C. /P.E. pipes lining ( diam. 4" : 24") = 150320 m Man hole = 126 no. Mortar pitching = 350 m3  Before graduation:  Training in General Management for Irrigation Projects development west Delta – Damanhur.  Training in General Sector of Educational Construction – Damanhur. Another Skills:  Sharing in studying & producing covered drainage net contracts, Bridges construction contracts &contracts of finishing & repairing of administrative & residential buildings in West delta drainage project management-Damanhur.  Office surveying works.  Study & check drawings.  Monitoring the work according to the plan.  Site surveying.  Have the ability to learn and work in any new field required in a short time.  Punctual and ready to improve my skills. Hoppies:  Gymnastic, aerobics.  Reading.  Listening to music.  Learning languages.  Needle crafts.  Drawing.