Marine Corps Amphibious Combat Vehicle
(ACV) and Marine Personnel Carrier (MPC):
Background and Issues for Congress
Andrew Feickert
Specialist in Military Ground Forces
January 15, 2014

Congressional Research Service
7-5700
www.crs.gov
R42723
Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC)

Summary
On January 6, 2011, after spending approximately $3 billion in developmental funding, the
Marine Corps cancelled the Expeditionary Fighting Vehicle (EFV) program due to poor reliability
demonstrated during operational testing and excessive cost growth. Because the EFV was
intended to replace the 40-year-old Amphibious Assault Vehicle (AAV), the Pentagon pledged to
move quickly to develop a “more affordable and sustainable” vehicle to replace the EFV. The
Amphibious Combat Vehicle (ACV) is intended to replace the AAV, incorporating some EFV
capabilities but in a more practical and cost-efficient manner. In concert with the ACV, the
Marines were developing the Marine Personnel Carrier (MPC) to serve as a survivable and
mobile platform to transport Marines when ashore. The MPC was not intended to be amphibious
like an AAV, EFV, or the ACV but instead would be required to have a swim capability for inland
waterways such as rivers, lakes, and other water obstacles such as shore-to-shore operations in the
littorals. Both vehicles are intended to play a central role in future Marine amphibious operation.
The ACV is scheduled to enter service between FY2020 and FY2022 and the Marines currently
plan on acquiring 573 ACVs. Total program and per vehicle costs have not yet been made public,
with the Marines citing ongoing affordability and vehicle mix studies as the primary reason why
definitive costs are not yet available.
On June 14, 2013, it was reported that Marine leadership had put the MPC program “on ice” due
to budgetary pressures but the program might be resurrected some 10 years down the road. The
Marines reportedly will continue to communicate with defense industry, so if the decision is made
to restart the MPC program, it can be done in an expeditious and cost-efficient manner.
Both the House and Senate Armed Services Committees have recommended fully funding the
Administration’s FY2014 ACV Budget Request of $136.967 million in Research, Development,
Test & Evaluation (RDT&E) funding. The House Appropriations Committee recommended a $14
million cut to the Administration’s request due to program delay.
Potential issues for Congress include the possible operational impact of the deferment of the MPC
as well as how feasible will it be to restart the MPC program after an extended delay? Another
issue is the possible delay of the ACV program—either due to immature high water speed
technology or the effects of sequestration. This report will be updated.

Congressional Research Service
Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC)

Contents
Background ...................................................................................................................................... 1
Significance for Congress ................................................................................................................ 2
Why the Marines Want These Vehicles ........................................................................................... 2
ACV........................................................................................................................................... 2
MPC........................................................................................................................................... 2
Intended Operational Capabilities ................................................................................................... 3
ACV........................................................................................................................................... 3
MPC........................................................................................................................................... 3
Is There a Need for a Marine Corps Amphibious Assault Capability? ............................................ 4
Program Information........................................................................................................................ 5
ACV Acquisition ...................................................................................................................... 5
How Many ACVs Do the Marines Intend to Procure? .............................................................. 6
When Is the ACV Scheduled to Enter Service?......................................................................... 6
What Are the Estimated Total Program and Per Vehicle Costs?................................................ 6
High Speed ACV ....................................................................................................................... 6
Possible ACV Program Delay ................................................................................................... 7
Congressional Activity..................................................................................................................... 7
The Administration’s FY2014 Budget Request ......................................................................... 7
National Defense Authorization Act for FY2014 (H.R. 1960) .................................................. 7
Section 251—Annual Comptroller General Report on the Amphibious Combat
Vehicle Acquisition Program............................................................................................ 7
National Defense Authorization Act for FY2014 (S. 1197) ...................................................... 7
Department of Defense Appropriations Bill, 2014 .................................................................... 8
Potential Issues for Congress ........................................................................................................... 8
Operational Impact of the Deferment of the MPC .................................................................... 8
How Feasible Will It Be to Restart the MPC Program? ............................................................ 8
Clarification on Possible Delay of the ACV Program ............................................................... 8

Contacts
Author Contact Information............................................................................................................. 9

Congressional Research Service
Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC)

Background
U.S. Code, Title 10, Section 5063, United States Marine Corps: Composition and Functions,
dated October 1, 1986, states:
The Marine Corps will be organized, trained and equipped to provide an amphibious and
land operations capability to seize advanced naval bases and to conduct naval land
campaigns.

In this regard, the Marines are required by law to have the necessary equipment to conduct
amphibious operations and land operations. The ACV and MPC are considered integral systems
by the Department of Defense (DOD) and Marine Corps to meet this legal requirement.
On January 6, 2011, after spending approximately $3 billion in developmental funding, the
Marine Corps—with “encouragement” from DOD—cancelled the Expeditionary Fighting Vehicle
(EFV) program. The EFV was intended to replace the 40-year-old Amphibious Assault Vehicle
(AAV), which currently transports Marines from ships to shore under hostile conditions. The EFV
was cancelled due to excessive cost growth and poor performance in operational testing.
Recognizing the need to replace the AAV, the Pentagon pledged to move quickly to develop a
“more affordable and sustainable” vehicle to take the place of the EFV. The Amphibious Combat
Vehicle (ACV) is intended to replace the AAV, incorporating some EFV capabilities but in a more
practical and cost-efficient manner.
In concert with the ACV, the Marines were developing the Marine Personnel Carrier (MPC) to
serve as a survivable and mobile platform to transport Marines when ashore. At present, the
Marines do not have a wheeled armored fighting vehicle that can operate as a dedicated infantry
carrier with Marine maneuver forces inland. The MPC was not intended to be amphibious like an
AAV, EFV, or the ACV but instead would be required to have a swim capability for inland
waterways such as rivers, lakes, and other water obstacles such as shore-to-shore operations in the
littorals. Because of a perceived amphibious “redundancy,” some have questioned the need for
both the ACV and MPC. In June 2013, citing budgetary pressures, the Marines reportedly put the
MPC program “on ice” and suggested that it might not be resurrected for about 10 years.1
With the Marines involved in decades-long land conflicts in Iraq and Afghanistan and
proliferating anti-access technologies such as guided missiles, some analysts questioned if the
Marines would ever again be called on to conduct a large-scale amphibious assault operation. In
response to these questions and the perceived need to examine the post-Iraq and Afghanistan
Marine Corps, the Department of the Navy and DOD studied the requirement to conduct largescale amphibious operations and in early 2012 released a strategic vision for how amphibious
operations will be conducted in the future. The primary assertion of this study is that the Marine
Corps’ and Navy’s amphibious capabilities serve a central role in the defense of the global
interests of a maritime nation. The need to maintain an amphibious assault capability is viewed by
Marine Corps leadership as establishing the requirement for the ACV and MPC.

1

Lee Hudson, “Marines Put Marine Personnel Carrier on Shelf Due to Budget Constraints,” InsideDefense.com, June
14, 2013.

Congressional Research Service

1
Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC)

Significance for Congress
Congress is responsible for authorizing and appropriating funds for all weapon systems programs,
including the ACV and the MPC. In its oversight role, Congress is concerned about how the ACV
and MPC would enable the Marines to conduct not only amphibious operations but also
operations ashore. Given past problems associated with EFV development, as well as current and
future budgetary constraints, Congress is actively looking at the necessity, viability, and
affordability of both programs.

Why the Marines Want These Vehicles
ACV
At present, the Marines use the AAV-7A1 series amphibious assault vehicle to move Marines
from ship to shore. The Marines have used the AAV since 1971 and will continue to use it until
replaced by the ACV or a similar vehicle. Over the years, the Marines claim the AAV has become
increasingly difficult to operate, maintain, and sustain. As weapons technology and threat
capabilities have evolved over the preceding four decades, the AAV—despite upgrades—is
viewed as having capabilities shortfalls in the areas of water and land mobility performance,
lethality, protection, and network capability. The AAV’s two-mile ship-to-shore range is viewed
by many as a significant survivability issue not only for the vehicle itself but also for naval
amphibious forces.

MPC
While the AAV has some armor protection and can operate inland to a limited extent, it is not
intended for use as an infantry combat vehicle. The Marines do have the LAV-25, Light Armored
Vehicle-25, an eight-wheeled armored vehicle that carries a crew of three and six additional
Marines. The LAV-25 is armed with a 25 mm chain gun and a 7.62 mm machine gun and is not
fully amphibious as it cannot cross a surf zone and would get to the beach via some type of
connector such as the Landing Craft, Air Cushioned (LCAC). The LAV-25 has been in service
since 1983. According to the Marine Program Executive Office (PEO) Land Systems, the LAV is
not employed as an armored personnel carrier and usually carries a four-person Marine
scout/reconnaissance team in addition to its crew.2 In this regard, the MPC was viewed as
necessary by Marine leadership for the transport and enhanced armor protection of Marine
infantry forces.

2

Program Executive Office (PEO) Land Systems Marine Personnel Carrier Fact Sheet, 2010.

Congressional Research Service

2
Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC)

Intended Operational Capabilities
ACV3
The Marines’ Request for Information (RFI)4 to industry provides an overview of the operational
requirements for the ACV. These requirements include the following:
•

The proposed vehicle must be able to self-deploy from amphibious shipping and
deliver a reinforced Marine infantry squad (17 Marines) from a launch distance at
or beyond 12 miles with a speed of not less than 8 knots in seas with 1-foot
significant wave height and must be able to operate in seas up to 3-foot
significant wave height.

•

The vehicle must be able to maneuver with the mechanized task force for
sustained operations ashore in all types of terrain. The vehicle’s road and crosscountry speed as well as its range should be greater than or equal to the M-1A1
Tank.

•

The vehicle’s protection characteristics should be able to protect against direct
and indirect fire and mines and improvised explosive device (IED) threats.

•

The vehicle should be able to accommodate command and control (C2) systems
that permit it to operate both at sea and on land. The vehicle, at a minimum,
should have a stabilized machine gun in order to engage enemy infantry and light
vehicles.

MPC5
The Marine Corps’ Request for Information (RFI)6 to industry provided an overview of the
operational requirements for the MPC. These requirements included the following:
•

The vehicle must accommodate nine Marines and two crew members and have a
“robust tactical swim capability (shore-to-shore [not designed to embark from an
amphibious ship]) and be capable of operating at 6 knots in a fully developed
sea.”7

3

Unless otherwise noted, information in this section is taken from the Amphibious Vehicle Request for Information
(RFI) issued by the Marine Corps Systems Command on February 11, 2011.
4
The Federal Acquisition Regulation defines an RFI as “a document used to obtain price, delivery, other market
information, or capabilities for planning purposes when the Government does not presently intend to issue a
solicitation. [FAR 15.202(e)].”
5
Unless otherwise noted, information in this section is taken from Annex A: Marine Personnel Carrier (MPC) Family
of Vehicles (FOV) Requirements Set to the Marine Personnel Carrier Request for Information (RFI), February 17,
2011.
6
The Federal Acquisition Regulation defines an RFI as “a document used to obtain price, delivery, other market
information, or capabilities for planning purposes when the Government does not presently intend to issue a
solicitation. [FAR 15.202(e)].”
7
Annex A: Marine Personnel Carrier (MPC) Family of Vehicles (FOV) Requirements Set to the Marine Personnel
Carrier Request for Information (RFI), February 17, 2011.

Congressional Research Service

3
Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC)

•

The vehicle must be able to operate on land with M-1A1 Tanks in mechanized
task forces across the Marine Corps’ mission profile.

•

The vehicle shall provide protection for the occupants from the blasts, fragments,
and incapacitating effects of attack from kinetic threats, indirect fire, and
improvised explosive devices and mines.

•

The vehicle shall be capable of firing existing Marine anti-structure and antiarmor missiles and should be able to accommodate existing command and
control (C2) systems.

Is There a Need for a Marine Corps Amphibious
Assault Capability?
As previously noted, Title 10 requires the Marines to have an amphibious and land operations
capability. Marine involvement in protracted land campaigns in Iraq and Afghanistan and the
growing acquisition of anti-access technologies, such as guided missiles, by both state and nonstate actors, led some influential military thinkers to question if the Marines would ever again be
called upon to conduct large-scale amphibious assault operations.8 In a May 2010 speech, then
Secretary of Defense Robert Gates noted rogue nations and non-state movements such as
Hezbollah possessed sophisticated anti-ship guided missiles, such as the Chinese-designed C-802,
which could destroy naval ships and force them to stay far off shore, thereby making an
amphibious assault by Marines highly dangerous.9 These and similar pronouncements by some
defense analysts led to questioning the need for dedicated amphibious assault capabilities in light
of growing “anti-access” technologies and weapon systems available to both hostile nations and
non-state actors. This debate resulted in a series of DOD and academic studies examining the
need for an amphibious assault capability.
In early 2012, DOD began publishing the results of studies and supporting concepts that it
asserted affirmed the need for the Marine Corps to maintain an amphibious assault capability. In
March 2012, the Army and Marine Corps issued Gaining and Maintaining Access: An ArmyMarine Corps Concept, which expressed the views of the two services on how they would project
and sustain military power world-wide in the face of growing challenges to access and entry.10
The two services note:
Marine Corps forces embarked on amphibious shipping are specifically designed to provide
multi-domain capabilities that are employed from the sea. U.S. Army forces may also
operate from the sea in some scenarios. Sea-based forces utilize littoral maneuver (via
surface and/or vertical means) to exploit gaps and seams in enemy defenses, deceive
adversaries, and maneuver directly to key objectives ashore.11

8

Tony Perry and Julian E. Barnes, “U.S. Rethinks a Marine Corps Specialty: Storming Beaches,” Los Angeles Times,
June 21, 2010.
9
Ibid.
10
Information in this section was taken from “Gaining and Maintaining Access: An Army-Marine Corps Concept,”
authored by the United States Army’s Army Capabilities Integration Center and the United States Marine Corps Marine
Corps Combat Development Command, March 2012.
11
Ibid., pp 9-10.

Congressional Research Service

4
Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC)

In April 2012, the Marine Corps published the results of an Amphibious Capabilities Working
Group study on naval amphibious capability. The study, Naval Amphibious Capability in the 21st
Century: Strategic Opportunity and a Vision for Change, contends the United States is a maritime
nation with critical maritime interests, noting 90% of global commerce that travels by sea is most
vulnerable where sea meets land in the littorals.12 The study further finds “for a maritime nation
with global interests, a minimal two brigade amphibious force represents a sound investment in
ensuring access for the rest of the joint force.”13 While the study did not explicitly call for the
development of the ACV or MPC—the study recommendations are characterized as resourceinformed, program-neutral—the ACV and MPC are used in the study for evaluating the ability to
project power ashore. While large-scale, World War II-type amphibious operations might no
longer be the norm, the study suggests there are other roles for the ACV and MPC. Noting that
emerging battlefield capabilities could mean that small teams might now have the ability to
generate effects once associated with larger forces, the Marines propose that company landing
teams (CLTs) might now be a more appropriately sized force for most amphibious operations.14
CLTs are viewed as being small enough to be inserted in a single wave but large enough to
provide a capable force immediately. Another alternative to large scale amphibious operations are
small-scale amphibious raids described as “an historical forte of the Marine Corps.”15 These raid
forces go ashore only for the duration of the operation and then return to the sea. These raids
could be useful in denying terrorist sanctuary, securing potential weapons of mass destruction
(WMD) sites, destroying pirate safe havens, or destroying threat capabilities in port.16 In this
sense, Naval Amphibious Capability in the 21st Century: Strategic Opportunity and a Vision for
Change might be viewed as redefining thinking about the role of amphibious operations and
making an argument for the need for the ACV and MPC.

Program Information
ACV Acquisition17
The ACV is currently in the Material Solution Analysis (MSA)18 phase of development. DOD
notes:
The ACV provides the Marine Corps with an assault amphibian capability that is able to
transition from forcible entry operations to sustained operations ashore. It will deliver
12
Information in this section was taken from “Naval Amphibious Capability in the 21st Century: Strategic Opportunity
and a Vision for Change,” a report of the Amphibious Capabilities Working Group, April 27, 2012.
13
Ibid., p. 12.
14
Ibid., p. 48.
15
Ibid., p. 49.
16
Ibid.
17
Information in this section is taken from Department of Defense, FY2014 Program Acquisition Costs by Weapon
System, April 2013, p. 3-8.
18
According to the Defense Acquisition University Glossary of Defense Acquisition Acronyms and Terms, 15th
Edition, December 2012, MSA is the first phase of the Defense Acquisition Management System as defined and
established by Department of Defense Instruction 5000.02. The purpose of this phase is to analyze and recommend
materiel solutions for the capability need identified in the Initial Capabilities Document (ICD). During this phase, an
Analysis of Alternatives (AoA) will be conducted and a Technology Development Strategy (TDS) and draft Capability
Development Document (CDD) will be formulated.

Congressional Research Service

5
Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC)

Marine Infantry from ship to shore and then maneuver with other combat vehicles in Marine
Air Ground Task Force operations. The ACV will provide the Marine landing force with
armored mobility from ship to objective for traditional warfare and other employment
capabilities across the range of military operations. It will self-deploy from amphibious
ships, deliver a 17 Marine Infantry squad from a launch distance of at least 12 miles from
shore and transition from water to ground operations without tactical pause.19

How Many ACVs Do the Marines Intend to Procure?
According to Marine officials, the Marines intend to procure 573 ACVs.

When Is the ACV Scheduled to Enter Service?
The ACV is scheduled to achieve Initial Operating Capability (IOC)20 between FY2020 and
FY2022, depending on the outcome of the Analysis of Alternatives (AoA)21 and final acquisition
plans.

What Are the Estimated Total Program and Per Vehicle Costs?
According to Marine officials, “Per vehicle and total program costs will be informed by the cost
studies conducted as part of the recently completed Analyses of Alternatives (AoA). There are
various affordability courses that are being looked at as part of the Marine Corps overall combat
vehicle mix. Those analyses are all pre-decisional and have not yet been briefed to senior
officials.”22

High Speed ACV23
Reports suggest the Marines might possibly “shelve” the ACV program if technology needed to
develop a high water speed ACV is not sufficiently mature. The Marines view high water speed
as an important factor in both protecting Marines embarked on ACVs from hostile fire as well as
for offshore Navy vessels transporting the Marines. Marine leadership was reportedly briefed on
the technological feasibility and cost of high-speed ACVs in late December 2013 but no decision
on the future direction of the GCV was made, with Marine spokesman stating the Commandant of
the Marine Corps would make his decision “soon” and that the ACV remained his number one
19

Ibid.
IOC is attained when some units and/or organizations in the force structure scheduled to receive a system have
received it and have the ability to employ and maintain it. Defense Acquisition University Glossary of Defense
Acquisition Acronyms and Terms, 13th Edition, November 2009.
21
The AoA assesses potential materiel solutions to satisfy the capability need documented in the approved Initial
Capabilities Document (ICD). It focuses on identification and analysis of alternatives, measures of effectiveness
(MOEs), cost, schedule, concepts of operations, and overall risk, including the sensitivity of each alternative to possible
changes in key assumptions or variables. Defense Acquisition University Glossary of Defense Acquisition Acronyms
and Terms, 13th Edition, November 2009.
22
From an e-mail to CRS from the Marine Corps Office of the Program Manager for Advanced Amphibious Assault.
23
Christopher J. Castelli, “General: Marine Corps Could Shelve Development of High-Speed ACV,”
InsideDefense.com, October 25, 2013 and Paul McLeary, “Marines Tread Carefully in Search for New Amphibious
Vehicle,” Defense News, September 20, 2013.
20

Congressional Research Service

6
Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC)

acquisition priority.24 The Marines have reportedly extended a series of ACV trade studies by six
months, possibly in part to examine the high water speed ACV in more detail.

Possible ACV Program Delay25
Reports suggest that Marine leadership has indicated that many programs will be slowed because
of sequestration-related cuts and that the ACV could possibly be delayed by up to three years. It is
not known how the Bipartisan Budget Act of 2013 (H.J.Res. 59) will affect the Marines spending
plans and if the possibility of a three-year delay to the ACV program is still valid.

Congressional Activity
The Administration’s FY2014 Budget Request26
The Administration’s FY2014 Budget Request for the ACV was $136.967 million in Research,
Development, Test & Evaluation (RDT&E) funding.

National Defense Authorization Act for FY2014 (H.R. 1960)27
The House recommended fully funding the Administration’s FY2014 ACV Budget Request and
also included the following provision:

Section 251—Annual Comptroller General Report on the Amphibious Combat
Vehicle Acquisition Program
This section would require the Comptroller General of the United States to conduct an annual
review of the Amphibious Combat Vehicle acquisition program and provide the results of the
review to the congressional defense committees by March 1, 2014, and annually thereafter
through 2018.28

National Defense Authorization Act for FY2014 (S. 1197)29
The Senate recommended fully funding the Administration’s FY2014 ACV Budget Request.
24

Lee Hudson, “ACV Team Briefed by Commandant in Late December, Awaiting Feedback,” InsideDefense.com,
January 10, 2014.
25
Lee Hudson, “Stackley: ACV Might Be Delayed Up to Three Years Under Sequestration,” InsideDefense.com,
October 25, 2013.
26
Information in this section is taken from Department of Defense, FY2014 Program Acquisition Costs by Weapon
System, April 2013, p. 3-8.
27
H.Rept. 113-102, National Defense Authorization Act for Fiscal Year 2014, Report of the Committee on Armed
Services House of Representatives on H.R. 1960, June 7, 2013.
28
Ibid., p. 110.
29
S.Rept. 113-44 Report, National Defense Authorization Act for Fiscal Year 2014, Report to Accompany S. 1197,
Committee on Armed Services, United States Senate, June 20, 2013, p. 337.

Congressional Research Service

7
Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC)

Department of Defense Appropriations Bill, 201430
The House recommended funding the FY2014 ACV Budget Request at $122.967 million—a $14
million decrease due to program delay.

Potential Issues for Congress
Operational Impact of the Deferment of the MPC
In various discussions about the future of Marine Corps operations, the MPC has featured
prominently in terms of both amphibious operations and Marine operations ashore. Given the
possibility that it might be another decade before MPC development efforts are restarted and a
number of years after that before the vehicle reaches the force, Congress might wish to further
explore the operational implications of the MPC deferment. How will the Marine Corps
compensate during this period for not having the MPC? Will the Marines need to acquire
additional vehicles, such as the Joint Light Tactical Vehicle (JLTV),31 to fill the void created by
not acquiring 579 MPCs? Another potential issue for examination could be if additional vehicles
are not acquired to compensate for the MPCs, will the Marines need to modify how they conduct
amphibious and ground operations?

How Feasible Will It Be to Restart the MPC Program?
Reports suggest the Marines will maintain close contact with defense industry should the
budgetary situation improve to the point where the Marines can restart the program. While this
might be achievable over the course over the next couple years, Congress might wish to examine
the feasibility of restarting the MPC program after a prolonged deferment such as 5 to 10 years.
Given technological advancements as well as emerging threat weapons systems and the
constantly changing geo-strategic environment, it is difficult to imagine that current MPC
developmental requirements would be valid or relevant 5 to 10 years from now and that a
complete program restart would be required. Given this possibility, it might be prudent to
establish some guidelines on restarting the program, perhaps establishing criteria on when it
would be necessary to initiate a new MPC program as opposed to simply restating the existing
program.

Clarification on Possible Delay of the ACV Program
Given the Marines extension of the of ACV trade studies and earlier statements about a possible
three-year program delay, Congress might choose to obtain a more definitive commitment from
the Marines on the ACV’s future. If the ACV is to be delayed—either due to lack of a high water
speed capability or budgetary resources—there are both operational and cost ramifications that
need to be fully examined and taken into account by defense planners.
30

Report 113-xxx, Department of Defense Appropriations Bill, 2014, Report of the Committee on Appropriations, June
7, 2013, p. 221.
31
For additional information on the JLTV see CRS Report RS22942, Joint Light Tactical Vehicle (JLTV): Background
and Issues for Congress, by Andrew Feickert.

Congressional Research Service

8
Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC)

Author Contact Information
Andrew Feickert
Specialist in Military Ground Forces
afeickert@crs.loc.gov, 7-7673

Congressional Research Service

9

Weitere ähnliche Inhalte

Was ist angesagt?

Paramedics of Marine Casualties
Paramedics of Marine CasualtiesParamedics of Marine Casualties
Paramedics of Marine CasualtiesFernando Lehrer
 
80 2 (dragged) 2 from lulu
80 2 (dragged) 2 from lulu80 2 (dragged) 2 from lulu
80 2 (dragged) 2 from luluMarianne Molchan
 
Railway construction and maintenance - Railways, airports, docks and harbour ...
Railway construction and maintenance - Railways, airports, docks and harbour ...Railway construction and maintenance - Railways, airports, docks and harbour ...
Railway construction and maintenance - Railways, airports, docks and harbour ...Shanmugasundaram N
 
OPNAVINST 1420.1B (OFFICER PROGRAMS)
OPNAVINST 1420.1B (OFFICER PROGRAMS)OPNAVINST 1420.1B (OFFICER PROGRAMS)
OPNAVINST 1420.1B (OFFICER PROGRAMS)A.J. Stone
 
Smart Transcripts.PDF
Smart Transcripts.PDFSmart Transcripts.PDF
Smart Transcripts.PDFKris Mock
 
MECHENG-776-PROJECT-REPORT-2016-Jithendr-Sudev-Kahanendr-482900395
MECHENG-776-PROJECT-REPORT-2016-Jithendr-Sudev-Kahanendr-482900395MECHENG-776-PROJECT-REPORT-2016-Jithendr-Sudev-Kahanendr-482900395
MECHENG-776-PROJECT-REPORT-2016-Jithendr-Sudev-Kahanendr-482900395Kahan Sudev
 
comboReportServlet
comboReportServletcomboReportServlet
comboReportServletRandy Hodges
 
AUTONOMOUS SHIP NAVIGATION UNDER DEEP LEARNING AND THE CHALLENGES IN COLREGS
AUTONOMOUS SHIP NAVIGATION UNDER DEEP LEARNING AND THE CHALLENGES IN COLREGSAUTONOMOUS SHIP NAVIGATION UNDER DEEP LEARNING AND THE CHALLENGES IN COLREGS
AUTONOMOUS SHIP NAVIGATION UNDER DEEP LEARNING AND THE CHALLENGES IN COLREGSLokukaluge Prasad Perera
 
Amsa notice 18-2012 navigation practices
Amsa notice 18-2012 navigation practicesAmsa notice 18-2012 navigation practices
Amsa notice 18-2012 navigation practicesanilrai
 
rwservlet
rwservletrwservlet
rwservletals067
 
DIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGH
DIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGHDIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGH
DIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGHsubhash singh
 

Was ist angesagt? (20)

Paramedics of Marine Casualties
Paramedics of Marine CasualtiesParamedics of Marine Casualties
Paramedics of Marine Casualties
 
80 2 (dragged) 2 from lulu
80 2 (dragged) 2 from lulu80 2 (dragged) 2 from lulu
80 2 (dragged) 2 from lulu
 
Railway construction and maintenance - Railways, airports, docks and harbour ...
Railway construction and maintenance - Railways, airports, docks and harbour ...Railway construction and maintenance - Railways, airports, docks and harbour ...
Railway construction and maintenance - Railways, airports, docks and harbour ...
 
OPNAVINST 1420.1B (OFFICER PROGRAMS)
OPNAVINST 1420.1B (OFFICER PROGRAMS)OPNAVINST 1420.1B (OFFICER PROGRAMS)
OPNAVINST 1420.1B (OFFICER PROGRAMS)
 
Smart Transcripts.PDF
Smart Transcripts.PDFSmart Transcripts.PDF
Smart Transcripts.PDF
 
MECHENG-776-PROJECT-REPORT-2016-Jithendr-Sudev-Kahanendr-482900395
MECHENG-776-PROJECT-REPORT-2016-Jithendr-Sudev-Kahanendr-482900395MECHENG-776-PROJECT-REPORT-2016-Jithendr-Sudev-Kahanendr-482900395
MECHENG-776-PROJECT-REPORT-2016-Jithendr-Sudev-Kahanendr-482900395
 
Npc force weekly 02 apr 06 apr 2012
Npc force weekly 02 apr   06 apr 2012Npc force weekly 02 apr   06 apr 2012
Npc force weekly 02 apr 06 apr 2012
 
Topic 1.23 Commissioning Programs
Topic 1.23 Commissioning ProgramsTopic 1.23 Commissioning Programs
Topic 1.23 Commissioning Programs
 
Npc force weekly 22 26 july 2013
Npc force weekly 22 26 july 2013Npc force weekly 22 26 july 2013
Npc force weekly 22 26 july 2013
 
comboReportServlet
comboReportServletcomboReportServlet
comboReportServlet
 
AUTONOMOUS SHIP NAVIGATION UNDER DEEP LEARNING AND THE CHALLENGES IN COLREGS
AUTONOMOUS SHIP NAVIGATION UNDER DEEP LEARNING AND THE CHALLENGES IN COLREGSAUTONOMOUS SHIP NAVIGATION UNDER DEEP LEARNING AND THE CHALLENGES IN COLREGS
AUTONOMOUS SHIP NAVIGATION UNDER DEEP LEARNING AND THE CHALLENGES IN COLREGS
 
Resume Current 9-15
Resume Current 9-15Resume Current 9-15
Resume Current 9-15
 
Surveys of Merchant Ships
Surveys of Merchant Ships Surveys of Merchant Ships
Surveys of Merchant Ships
 
Amsa notice 18-2012 navigation practices
Amsa notice 18-2012 navigation practicesAmsa notice 18-2012 navigation practices
Amsa notice 18-2012 navigation practices
 
Crude by Rail Report for Pennsylvania
Crude by Rail Report for PennsylvaniaCrude by Rail Report for Pennsylvania
Crude by Rail Report for Pennsylvania
 
Ben Longoria Resume1
Ben Longoria Resume1Ben Longoria Resume1
Ben Longoria Resume1
 
JST 20160906
JST 20160906JST 20160906
JST 20160906
 
Official Resume
Official ResumeOfficial Resume
Official Resume
 
rwservlet
rwservletrwservlet
rwservlet
 
DIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGH
DIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGHDIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGH
DIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGH
 

Ähnlich wie CRS Report on Marine Corps Amphibious Combat Vehicle and MPC (Jan 2014)

GAO - Surface Ships: Status of the Navy’s Phased Modernization Plan
GAO - Surface Ships: Status of the Navy’s Phased Modernization PlanGAO - Surface Ships: Status of the Navy’s Phased Modernization Plan
GAO - Surface Ships: Status of the Navy’s Phased Modernization PlanTom "Blad" Lindblad
 
Comparing the Costs of Submarine Maintenance at Public and Private Shipyards
Comparing the Costs of Submarine Maintenance at Public and Private ShipyardsComparing the Costs of Submarine Maintenance at Public and Private Shipyards
Comparing the Costs of Submarine Maintenance at Public and Private ShipyardsCongressional Budget Office
 
Operational Maneuver from the Air_Schenck
Operational Maneuver from the Air_SchenckOperational Maneuver from the Air_Schenck
Operational Maneuver from the Air_SchenckJohn Schenck, PMP
 
2017 U.S. Marine Corps Aviation Plan
2017 U.S. Marine Corps Aviation Plan2017 U.S. Marine Corps Aviation Plan
2017 U.S. Marine Corps Aviation PlanTom "Blad" Lindblad
 
Carnival splendor
Carnival splendorCarnival splendor
Carnival splendorJomonJohny5
 
The Navy’s Amphibious Warfare Force: Change Under Fiscal Constraints
The Navy’s Amphibious Warfare Force: Change Under Fiscal ConstraintsThe Navy’s Amphibious Warfare Force: Change Under Fiscal Constraints
The Navy’s Amphibious Warfare Force: Change Under Fiscal ConstraintsCongressional Budget Office
 
Navy Constellation Class Frigate Program Background & Issues
Navy Constellation Class Frigate Program Background & IssuesNavy Constellation Class Frigate Program Background & Issues
Navy Constellation Class Frigate Program Background & IssuesBreakerODay
 
Perspectives on the Navy’s 2024 Shipbuilding Plan
Perspectives on the Navy’s 2024 Shipbuilding PlanPerspectives on the Navy’s 2024 Shipbuilding Plan
Perspectives on the Navy’s 2024 Shipbuilding PlanCongressional Budget Office
 
The Capacity of the Navy’s Shipyards to Maintain Its Submarines
The Capacity of the Navy’s Shipyards to Maintain Its SubmarinesThe Capacity of the Navy’s Shipyards to Maintain Its Submarines
The Capacity of the Navy’s Shipyards to Maintain Its SubmarinesCongressional Budget Office
 
Navy Shipbuilding: Searching for a Path to a Larger and More Distributed Fleet
Navy Shipbuilding: Searching for a Path to a Larger and More Distributed FleetNavy Shipbuilding: Searching for a Path to a Larger and More Distributed Fleet
Navy Shipbuilding: Searching for a Path to a Larger and More Distributed FleetCongressional Budget Office
 
B 08 Mpf(F) Ship Studies
B 08 Mpf(F) Ship StudiesB 08 Mpf(F) Ship Studies
B 08 Mpf(F) Ship Studiesguest9455a7
 
Eye on Defense March 2015
Eye on Defense March 2015Eye on Defense March 2015
Eye on Defense March 2015Ankur Gupta
 

Ähnlich wie CRS Report on Marine Corps Amphibious Combat Vehicle and MPC (Jan 2014) (20)

GAO - Surface Ships: Status of the Navy’s Phased Modernization Plan
GAO - Surface Ships: Status of the Navy’s Phased Modernization PlanGAO - Surface Ships: Status of the Navy’s Phased Modernization Plan
GAO - Surface Ships: Status of the Navy’s Phased Modernization Plan
 
Comparing the Costs of Submarine Maintenance at Public and Private Shipyards
Comparing the Costs of Submarine Maintenance at Public and Private ShipyardsComparing the Costs of Submarine Maintenance at Public and Private Shipyards
Comparing the Costs of Submarine Maintenance at Public and Private Shipyards
 
Alternatives to Blount Island
Alternatives to Blount IslandAlternatives to Blount Island
Alternatives to Blount Island
 
Operational Maneuver from the Air_Schenck
Operational Maneuver from the Air_SchenckOperational Maneuver from the Air_Schenck
Operational Maneuver from the Air_Schenck
 
2017 U.S. Marine Corps Aviation Plan
2017 U.S. Marine Corps Aviation Plan2017 U.S. Marine Corps Aviation Plan
2017 U.S. Marine Corps Aviation Plan
 
The 2020 Outlook for Navy Shipbuilding
The 2020 Outlook for Navy ShipbuildingThe 2020 Outlook for Navy Shipbuilding
The 2020 Outlook for Navy Shipbuilding
 
The 2018 Outlook for Navy Shipbuilding
The 2018 Outlook for Navy ShipbuildingThe 2018 Outlook for Navy Shipbuilding
The 2018 Outlook for Navy Shipbuilding
 
Carnival splendor
Carnival splendorCarnival splendor
Carnival splendor
 
KStevensonGNINuclearPower
KStevensonGNINuclearPowerKStevensonGNINuclearPower
KStevensonGNINuclearPower
 
The Navy’s Amphibious Warfare Force: Change Under Fiscal Constraints
The Navy’s Amphibious Warfare Force: Change Under Fiscal ConstraintsThe Navy’s Amphibious Warfare Force: Change Under Fiscal Constraints
The Navy’s Amphibious Warfare Force: Change Under Fiscal Constraints
 
Reserve force weekly 3 october 2011
Reserve force weekly 3 october 2011Reserve force weekly 3 october 2011
Reserve force weekly 3 october 2011
 
Navy Constellation Class Frigate Program Background & Issues
Navy Constellation Class Frigate Program Background & IssuesNavy Constellation Class Frigate Program Background & Issues
Navy Constellation Class Frigate Program Background & Issues
 
Perspectives on the Navy’s 2024 Shipbuilding Plan
Perspectives on the Navy’s 2024 Shipbuilding PlanPerspectives on the Navy’s 2024 Shipbuilding Plan
Perspectives on the Navy’s 2024 Shipbuilding Plan
 
The Capacity of the Navy’s Shipyards to Maintain Its Submarines
The Capacity of the Navy’s Shipyards to Maintain Its SubmarinesThe Capacity of the Navy’s Shipyards to Maintain Its Submarines
The Capacity of the Navy’s Shipyards to Maintain Its Submarines
 
Navy Shipbuilding: Searching for a Path to a Larger and More Distributed Fleet
Navy Shipbuilding: Searching for a Path to a Larger and More Distributed FleetNavy Shipbuilding: Searching for a Path to a Larger and More Distributed Fleet
Navy Shipbuilding: Searching for a Path to a Larger and More Distributed Fleet
 
Necc news 25 jan for web
Necc news 25 jan for webNecc news 25 jan for web
Necc news 25 jan for web
 
B 08 Mpf(F) Ship Studies
B 08 Mpf(F) Ship StudiesB 08 Mpf(F) Ship Studies
B 08 Mpf(F) Ship Studies
 
3732 2803-1-pb
3732 2803-1-pb3732 2803-1-pb
3732 2803-1-pb
 
NAVAIRNewsStory-6070
NAVAIRNewsStory-6070NAVAIRNewsStory-6070
NAVAIRNewsStory-6070
 
Eye on Defense March 2015
Eye on Defense March 2015Eye on Defense March 2015
Eye on Defense March 2015
 

Mehr von Tom "Blad" Lindblad

CSBA - FY-2016 Weapon Systems Factbook
CSBA - FY-2016  Weapon Systems FactbookCSBA - FY-2016  Weapon Systems Factbook
CSBA - FY-2016 Weapon Systems FactbookTom "Blad" Lindblad
 
The Tustin Hangars - Titans of History
The Tustin Hangars - Titans of HistoryThe Tustin Hangars - Titans of History
The Tustin Hangars - Titans of HistoryTom "Blad" Lindblad
 
Commanant Marine Corps' Planning 2015 Planning Guidance
Commanant Marine Corps' Planning 2015 Planning GuidanceCommanant Marine Corps' Planning 2015 Planning Guidance
Commanant Marine Corps' Planning 2015 Planning GuidanceTom "Blad" Lindblad
 
Updated Commandant USMC Planning Guidance
Updated Commandant USMC Planning GuidanceUpdated Commandant USMC Planning Guidance
Updated Commandant USMC Planning GuidanceTom "Blad" Lindblad
 
Sec Def Military Decorations and Awards Review
Sec Def  Military Decorations and Awards Review Sec Def  Military Decorations and Awards Review
Sec Def Military Decorations and Awards Review Tom "Blad" Lindblad
 
MCRP 5-12D Organization of United States Marine Corps 26 Aug15
MCRP 5-12D Organization of United States Marine Corps 26 Aug15MCRP 5-12D Organization of United States Marine Corps 26 Aug15
MCRP 5-12D Organization of United States Marine Corps 26 Aug15Tom "Blad" Lindblad
 
Rand Reforming Military Retirement July 2015
Rand Reforming Military Retirement July 2015Rand Reforming Military Retirement July 2015
Rand Reforming Military Retirement July 2015Tom "Blad" Lindblad
 
DOD 2015 China Military Power Report
DOD 2015 China Military Power ReportDOD 2015 China Military Power Report
DOD 2015 China Military Power ReportTom "Blad" Lindblad
 
Doing Business with DHS (Feb 2015)
Doing Business with DHS  (Feb 2015)Doing Business with DHS  (Feb 2015)
Doing Business with DHS (Feb 2015)Tom "Blad" Lindblad
 
USMC UAS Family of Systems (April 2015)
USMC UAS Family of Systems (April 2015)USMC UAS Family of Systems (April 2015)
USMC UAS Family of Systems (April 2015)Tom "Blad" Lindblad
 
USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)
USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)
USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)Tom "Blad" Lindblad
 
Commandant of Marine Corps Posture Statement_2015 to Congress
Commandant of Marine Corps Posture Statement_2015 to CongressCommandant of Marine Corps Posture Statement_2015 to Congress
Commandant of Marine Corps Posture Statement_2015 to CongressTom "Blad" Lindblad
 
FY2016 Army PRESBUD Highlights (Feb 2015)
FY2016 Army PRESBUD Highlights (Feb 2015)FY2016 Army PRESBUD Highlights (Feb 2015)
FY2016 Army PRESBUD Highlights (Feb 2015)Tom "Blad" Lindblad
 
US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015
US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015
US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015Tom "Blad" Lindblad
 
Report of the Military Compensation and Retirement Modernization Commission-2...
Report of the Military Compensation and Retirement Modernization Commission-2...Report of the Military Compensation and Retirement Modernization Commission-2...
Report of the Military Compensation and Retirement Modernization Commission-2...Tom "Blad" Lindblad
 
Joint Capabilities Integration and Development System
Joint Capabilities Integration and Development SystemJoint Capabilities Integration and Development System
Joint Capabilities Integration and Development SystemTom "Blad" Lindblad
 
CRS Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...
CRS  Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...CRS  Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...
CRS Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...Tom "Blad" Lindblad
 
CBO Long-Term Implications of FY2015 FYDP Nov 2014
CBO Long-Term Implications of FY2015 FYDP Nov 2014CBO Long-Term Implications of FY2015 FYDP Nov 2014
CBO Long-Term Implications of FY2015 FYDP Nov 2014Tom "Blad" Lindblad
 
2014 Defense Security Cooperation Agency (DSCA) Strategic Plan Vision 2020
2014 Defense Security Cooperation Agency (DSCA) Strategic Plan   Vision 20202014 Defense Security Cooperation Agency (DSCA) Strategic Plan   Vision 2020
2014 Defense Security Cooperation Agency (DSCA) Strategic Plan Vision 2020Tom "Blad" Lindblad
 

Mehr von Tom "Blad" Lindblad (20)

CSBA - FY-2016 Weapon Systems Factbook
CSBA - FY-2016  Weapon Systems FactbookCSBA - FY-2016  Weapon Systems Factbook
CSBA - FY-2016 Weapon Systems Factbook
 
The Tustin Hangars - Titans of History
The Tustin Hangars - Titans of HistoryThe Tustin Hangars - Titans of History
The Tustin Hangars - Titans of History
 
Commanant Marine Corps' Planning 2015 Planning Guidance
Commanant Marine Corps' Planning 2015 Planning GuidanceCommanant Marine Corps' Planning 2015 Planning Guidance
Commanant Marine Corps' Planning 2015 Planning Guidance
 
Updated Commandant USMC Planning Guidance
Updated Commandant USMC Planning GuidanceUpdated Commandant USMC Planning Guidance
Updated Commandant USMC Planning Guidance
 
Sec Def Military Decorations and Awards Review
Sec Def  Military Decorations and Awards Review Sec Def  Military Decorations and Awards Review
Sec Def Military Decorations and Awards Review
 
MCRP 5-12D Organization of United States Marine Corps 26 Aug15
MCRP 5-12D Organization of United States Marine Corps 26 Aug15MCRP 5-12D Organization of United States Marine Corps 26 Aug15
MCRP 5-12D Organization of United States Marine Corps 26 Aug15
 
Rand Reforming Military Retirement July 2015
Rand Reforming Military Retirement July 2015Rand Reforming Military Retirement July 2015
Rand Reforming Military Retirement July 2015
 
DOD 2015 China Military Power Report
DOD 2015 China Military Power ReportDOD 2015 China Military Power Report
DOD 2015 China Military Power Report
 
Doing Business with DHS (Feb 2015)
Doing Business with DHS  (Feb 2015)Doing Business with DHS  (Feb 2015)
Doing Business with DHS (Feb 2015)
 
USMC UAS Family of Systems (April 2015)
USMC UAS Family of Systems (April 2015)USMC UAS Family of Systems (April 2015)
USMC UAS Family of Systems (April 2015)
 
USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)
USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)
USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)
 
Commandant of Marine Corps Posture Statement_2015 to Congress
Commandant of Marine Corps Posture Statement_2015 to CongressCommandant of Marine Corps Posture Statement_2015 to Congress
Commandant of Marine Corps Posture Statement_2015 to Congress
 
FY2016 Army PRESBUD Highlights (Feb 2015)
FY2016 Army PRESBUD Highlights (Feb 2015)FY2016 Army PRESBUD Highlights (Feb 2015)
FY2016 Army PRESBUD Highlights (Feb 2015)
 
US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015
US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015
US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015
 
Report of the Military Compensation and Retirement Modernization Commission-2...
Report of the Military Compensation and Retirement Modernization Commission-2...Report of the Military Compensation and Retirement Modernization Commission-2...
Report of the Military Compensation and Retirement Modernization Commission-2...
 
Joint Capabilities Integration and Development System
Joint Capabilities Integration and Development SystemJoint Capabilities Integration and Development System
Joint Capabilities Integration and Development System
 
CRS Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...
CRS  Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...CRS  Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...
CRS Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...
 
CBO Long-Term Implications of FY2015 FYDP Nov 2014
CBO Long-Term Implications of FY2015 FYDP Nov 2014CBO Long-Term Implications of FY2015 FYDP Nov 2014
CBO Long-Term Implications of FY2015 FYDP Nov 2014
 
2014 Defense Security Cooperation Agency (DSCA) Strategic Plan Vision 2020
2014 Defense Security Cooperation Agency (DSCA) Strategic Plan   Vision 20202014 Defense Security Cooperation Agency (DSCA) Strategic Plan   Vision 2020
2014 Defense Security Cooperation Agency (DSCA) Strategic Plan Vision 2020
 
2015 Marine Corps Aviation Plan
2015 Marine Corps Aviation Plan2015 Marine Corps Aviation Plan
2015 Marine Corps Aviation Plan
 

Kürzlich hochgeladen

ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxruthvilladarez
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 

Kürzlich hochgeladen (20)

ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 

CRS Report on Marine Corps Amphibious Combat Vehicle and MPC (Jan 2014)

  • 1. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC): Background and Issues for Congress Andrew Feickert Specialist in Military Ground Forces January 15, 2014 Congressional Research Service 7-5700 www.crs.gov R42723
  • 2. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC) Summary On January 6, 2011, after spending approximately $3 billion in developmental funding, the Marine Corps cancelled the Expeditionary Fighting Vehicle (EFV) program due to poor reliability demonstrated during operational testing and excessive cost growth. Because the EFV was intended to replace the 40-year-old Amphibious Assault Vehicle (AAV), the Pentagon pledged to move quickly to develop a “more affordable and sustainable” vehicle to replace the EFV. The Amphibious Combat Vehicle (ACV) is intended to replace the AAV, incorporating some EFV capabilities but in a more practical and cost-efficient manner. In concert with the ACV, the Marines were developing the Marine Personnel Carrier (MPC) to serve as a survivable and mobile platform to transport Marines when ashore. The MPC was not intended to be amphibious like an AAV, EFV, or the ACV but instead would be required to have a swim capability for inland waterways such as rivers, lakes, and other water obstacles such as shore-to-shore operations in the littorals. Both vehicles are intended to play a central role in future Marine amphibious operation. The ACV is scheduled to enter service between FY2020 and FY2022 and the Marines currently plan on acquiring 573 ACVs. Total program and per vehicle costs have not yet been made public, with the Marines citing ongoing affordability and vehicle mix studies as the primary reason why definitive costs are not yet available. On June 14, 2013, it was reported that Marine leadership had put the MPC program “on ice” due to budgetary pressures but the program might be resurrected some 10 years down the road. The Marines reportedly will continue to communicate with defense industry, so if the decision is made to restart the MPC program, it can be done in an expeditious and cost-efficient manner. Both the House and Senate Armed Services Committees have recommended fully funding the Administration’s FY2014 ACV Budget Request of $136.967 million in Research, Development, Test & Evaluation (RDT&E) funding. The House Appropriations Committee recommended a $14 million cut to the Administration’s request due to program delay. Potential issues for Congress include the possible operational impact of the deferment of the MPC as well as how feasible will it be to restart the MPC program after an extended delay? Another issue is the possible delay of the ACV program—either due to immature high water speed technology or the effects of sequestration. This report will be updated. Congressional Research Service
  • 3. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC) Contents Background ...................................................................................................................................... 1 Significance for Congress ................................................................................................................ 2 Why the Marines Want These Vehicles ........................................................................................... 2 ACV........................................................................................................................................... 2 MPC........................................................................................................................................... 2 Intended Operational Capabilities ................................................................................................... 3 ACV........................................................................................................................................... 3 MPC........................................................................................................................................... 3 Is There a Need for a Marine Corps Amphibious Assault Capability? ............................................ 4 Program Information........................................................................................................................ 5 ACV Acquisition ...................................................................................................................... 5 How Many ACVs Do the Marines Intend to Procure? .............................................................. 6 When Is the ACV Scheduled to Enter Service?......................................................................... 6 What Are the Estimated Total Program and Per Vehicle Costs?................................................ 6 High Speed ACV ....................................................................................................................... 6 Possible ACV Program Delay ................................................................................................... 7 Congressional Activity..................................................................................................................... 7 The Administration’s FY2014 Budget Request ......................................................................... 7 National Defense Authorization Act for FY2014 (H.R. 1960) .................................................. 7 Section 251—Annual Comptroller General Report on the Amphibious Combat Vehicle Acquisition Program............................................................................................ 7 National Defense Authorization Act for FY2014 (S. 1197) ...................................................... 7 Department of Defense Appropriations Bill, 2014 .................................................................... 8 Potential Issues for Congress ........................................................................................................... 8 Operational Impact of the Deferment of the MPC .................................................................... 8 How Feasible Will It Be to Restart the MPC Program? ............................................................ 8 Clarification on Possible Delay of the ACV Program ............................................................... 8 Contacts Author Contact Information............................................................................................................. 9 Congressional Research Service
  • 4. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC) Background U.S. Code, Title 10, Section 5063, United States Marine Corps: Composition and Functions, dated October 1, 1986, states: The Marine Corps will be organized, trained and equipped to provide an amphibious and land operations capability to seize advanced naval bases and to conduct naval land campaigns. In this regard, the Marines are required by law to have the necessary equipment to conduct amphibious operations and land operations. The ACV and MPC are considered integral systems by the Department of Defense (DOD) and Marine Corps to meet this legal requirement. On January 6, 2011, after spending approximately $3 billion in developmental funding, the Marine Corps—with “encouragement” from DOD—cancelled the Expeditionary Fighting Vehicle (EFV) program. The EFV was intended to replace the 40-year-old Amphibious Assault Vehicle (AAV), which currently transports Marines from ships to shore under hostile conditions. The EFV was cancelled due to excessive cost growth and poor performance in operational testing. Recognizing the need to replace the AAV, the Pentagon pledged to move quickly to develop a “more affordable and sustainable” vehicle to take the place of the EFV. The Amphibious Combat Vehicle (ACV) is intended to replace the AAV, incorporating some EFV capabilities but in a more practical and cost-efficient manner. In concert with the ACV, the Marines were developing the Marine Personnel Carrier (MPC) to serve as a survivable and mobile platform to transport Marines when ashore. At present, the Marines do not have a wheeled armored fighting vehicle that can operate as a dedicated infantry carrier with Marine maneuver forces inland. The MPC was not intended to be amphibious like an AAV, EFV, or the ACV but instead would be required to have a swim capability for inland waterways such as rivers, lakes, and other water obstacles such as shore-to-shore operations in the littorals. Because of a perceived amphibious “redundancy,” some have questioned the need for both the ACV and MPC. In June 2013, citing budgetary pressures, the Marines reportedly put the MPC program “on ice” and suggested that it might not be resurrected for about 10 years.1 With the Marines involved in decades-long land conflicts in Iraq and Afghanistan and proliferating anti-access technologies such as guided missiles, some analysts questioned if the Marines would ever again be called on to conduct a large-scale amphibious assault operation. In response to these questions and the perceived need to examine the post-Iraq and Afghanistan Marine Corps, the Department of the Navy and DOD studied the requirement to conduct largescale amphibious operations and in early 2012 released a strategic vision for how amphibious operations will be conducted in the future. The primary assertion of this study is that the Marine Corps’ and Navy’s amphibious capabilities serve a central role in the defense of the global interests of a maritime nation. The need to maintain an amphibious assault capability is viewed by Marine Corps leadership as establishing the requirement for the ACV and MPC. 1 Lee Hudson, “Marines Put Marine Personnel Carrier on Shelf Due to Budget Constraints,” InsideDefense.com, June 14, 2013. Congressional Research Service 1
  • 5. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC) Significance for Congress Congress is responsible for authorizing and appropriating funds for all weapon systems programs, including the ACV and the MPC. In its oversight role, Congress is concerned about how the ACV and MPC would enable the Marines to conduct not only amphibious operations but also operations ashore. Given past problems associated with EFV development, as well as current and future budgetary constraints, Congress is actively looking at the necessity, viability, and affordability of both programs. Why the Marines Want These Vehicles ACV At present, the Marines use the AAV-7A1 series amphibious assault vehicle to move Marines from ship to shore. The Marines have used the AAV since 1971 and will continue to use it until replaced by the ACV or a similar vehicle. Over the years, the Marines claim the AAV has become increasingly difficult to operate, maintain, and sustain. As weapons technology and threat capabilities have evolved over the preceding four decades, the AAV—despite upgrades—is viewed as having capabilities shortfalls in the areas of water and land mobility performance, lethality, protection, and network capability. The AAV’s two-mile ship-to-shore range is viewed by many as a significant survivability issue not only for the vehicle itself but also for naval amphibious forces. MPC While the AAV has some armor protection and can operate inland to a limited extent, it is not intended for use as an infantry combat vehicle. The Marines do have the LAV-25, Light Armored Vehicle-25, an eight-wheeled armored vehicle that carries a crew of three and six additional Marines. The LAV-25 is armed with a 25 mm chain gun and a 7.62 mm machine gun and is not fully amphibious as it cannot cross a surf zone and would get to the beach via some type of connector such as the Landing Craft, Air Cushioned (LCAC). The LAV-25 has been in service since 1983. According to the Marine Program Executive Office (PEO) Land Systems, the LAV is not employed as an armored personnel carrier and usually carries a four-person Marine scout/reconnaissance team in addition to its crew.2 In this regard, the MPC was viewed as necessary by Marine leadership for the transport and enhanced armor protection of Marine infantry forces. 2 Program Executive Office (PEO) Land Systems Marine Personnel Carrier Fact Sheet, 2010. Congressional Research Service 2
  • 6. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC) Intended Operational Capabilities ACV3 The Marines’ Request for Information (RFI)4 to industry provides an overview of the operational requirements for the ACV. These requirements include the following: • The proposed vehicle must be able to self-deploy from amphibious shipping and deliver a reinforced Marine infantry squad (17 Marines) from a launch distance at or beyond 12 miles with a speed of not less than 8 knots in seas with 1-foot significant wave height and must be able to operate in seas up to 3-foot significant wave height. • The vehicle must be able to maneuver with the mechanized task force for sustained operations ashore in all types of terrain. The vehicle’s road and crosscountry speed as well as its range should be greater than or equal to the M-1A1 Tank. • The vehicle’s protection characteristics should be able to protect against direct and indirect fire and mines and improvised explosive device (IED) threats. • The vehicle should be able to accommodate command and control (C2) systems that permit it to operate both at sea and on land. The vehicle, at a minimum, should have a stabilized machine gun in order to engage enemy infantry and light vehicles. MPC5 The Marine Corps’ Request for Information (RFI)6 to industry provided an overview of the operational requirements for the MPC. These requirements included the following: • The vehicle must accommodate nine Marines and two crew members and have a “robust tactical swim capability (shore-to-shore [not designed to embark from an amphibious ship]) and be capable of operating at 6 knots in a fully developed sea.”7 3 Unless otherwise noted, information in this section is taken from the Amphibious Vehicle Request for Information (RFI) issued by the Marine Corps Systems Command on February 11, 2011. 4 The Federal Acquisition Regulation defines an RFI as “a document used to obtain price, delivery, other market information, or capabilities for planning purposes when the Government does not presently intend to issue a solicitation. [FAR 15.202(e)].” 5 Unless otherwise noted, information in this section is taken from Annex A: Marine Personnel Carrier (MPC) Family of Vehicles (FOV) Requirements Set to the Marine Personnel Carrier Request for Information (RFI), February 17, 2011. 6 The Federal Acquisition Regulation defines an RFI as “a document used to obtain price, delivery, other market information, or capabilities for planning purposes when the Government does not presently intend to issue a solicitation. [FAR 15.202(e)].” 7 Annex A: Marine Personnel Carrier (MPC) Family of Vehicles (FOV) Requirements Set to the Marine Personnel Carrier Request for Information (RFI), February 17, 2011. Congressional Research Service 3
  • 7. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC) • The vehicle must be able to operate on land with M-1A1 Tanks in mechanized task forces across the Marine Corps’ mission profile. • The vehicle shall provide protection for the occupants from the blasts, fragments, and incapacitating effects of attack from kinetic threats, indirect fire, and improvised explosive devices and mines. • The vehicle shall be capable of firing existing Marine anti-structure and antiarmor missiles and should be able to accommodate existing command and control (C2) systems. Is There a Need for a Marine Corps Amphibious Assault Capability? As previously noted, Title 10 requires the Marines to have an amphibious and land operations capability. Marine involvement in protracted land campaigns in Iraq and Afghanistan and the growing acquisition of anti-access technologies, such as guided missiles, by both state and nonstate actors, led some influential military thinkers to question if the Marines would ever again be called upon to conduct large-scale amphibious assault operations.8 In a May 2010 speech, then Secretary of Defense Robert Gates noted rogue nations and non-state movements such as Hezbollah possessed sophisticated anti-ship guided missiles, such as the Chinese-designed C-802, which could destroy naval ships and force them to stay far off shore, thereby making an amphibious assault by Marines highly dangerous.9 These and similar pronouncements by some defense analysts led to questioning the need for dedicated amphibious assault capabilities in light of growing “anti-access” technologies and weapon systems available to both hostile nations and non-state actors. This debate resulted in a series of DOD and academic studies examining the need for an amphibious assault capability. In early 2012, DOD began publishing the results of studies and supporting concepts that it asserted affirmed the need for the Marine Corps to maintain an amphibious assault capability. In March 2012, the Army and Marine Corps issued Gaining and Maintaining Access: An ArmyMarine Corps Concept, which expressed the views of the two services on how they would project and sustain military power world-wide in the face of growing challenges to access and entry.10 The two services note: Marine Corps forces embarked on amphibious shipping are specifically designed to provide multi-domain capabilities that are employed from the sea. U.S. Army forces may also operate from the sea in some scenarios. Sea-based forces utilize littoral maneuver (via surface and/or vertical means) to exploit gaps and seams in enemy defenses, deceive adversaries, and maneuver directly to key objectives ashore.11 8 Tony Perry and Julian E. Barnes, “U.S. Rethinks a Marine Corps Specialty: Storming Beaches,” Los Angeles Times, June 21, 2010. 9 Ibid. 10 Information in this section was taken from “Gaining and Maintaining Access: An Army-Marine Corps Concept,” authored by the United States Army’s Army Capabilities Integration Center and the United States Marine Corps Marine Corps Combat Development Command, March 2012. 11 Ibid., pp 9-10. Congressional Research Service 4
  • 8. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC) In April 2012, the Marine Corps published the results of an Amphibious Capabilities Working Group study on naval amphibious capability. The study, Naval Amphibious Capability in the 21st Century: Strategic Opportunity and a Vision for Change, contends the United States is a maritime nation with critical maritime interests, noting 90% of global commerce that travels by sea is most vulnerable where sea meets land in the littorals.12 The study further finds “for a maritime nation with global interests, a minimal two brigade amphibious force represents a sound investment in ensuring access for the rest of the joint force.”13 While the study did not explicitly call for the development of the ACV or MPC—the study recommendations are characterized as resourceinformed, program-neutral—the ACV and MPC are used in the study for evaluating the ability to project power ashore. While large-scale, World War II-type amphibious operations might no longer be the norm, the study suggests there are other roles for the ACV and MPC. Noting that emerging battlefield capabilities could mean that small teams might now have the ability to generate effects once associated with larger forces, the Marines propose that company landing teams (CLTs) might now be a more appropriately sized force for most amphibious operations.14 CLTs are viewed as being small enough to be inserted in a single wave but large enough to provide a capable force immediately. Another alternative to large scale amphibious operations are small-scale amphibious raids described as “an historical forte of the Marine Corps.”15 These raid forces go ashore only for the duration of the operation and then return to the sea. These raids could be useful in denying terrorist sanctuary, securing potential weapons of mass destruction (WMD) sites, destroying pirate safe havens, or destroying threat capabilities in port.16 In this sense, Naval Amphibious Capability in the 21st Century: Strategic Opportunity and a Vision for Change might be viewed as redefining thinking about the role of amphibious operations and making an argument for the need for the ACV and MPC. Program Information ACV Acquisition17 The ACV is currently in the Material Solution Analysis (MSA)18 phase of development. DOD notes: The ACV provides the Marine Corps with an assault amphibian capability that is able to transition from forcible entry operations to sustained operations ashore. It will deliver 12 Information in this section was taken from “Naval Amphibious Capability in the 21st Century: Strategic Opportunity and a Vision for Change,” a report of the Amphibious Capabilities Working Group, April 27, 2012. 13 Ibid., p. 12. 14 Ibid., p. 48. 15 Ibid., p. 49. 16 Ibid. 17 Information in this section is taken from Department of Defense, FY2014 Program Acquisition Costs by Weapon System, April 2013, p. 3-8. 18 According to the Defense Acquisition University Glossary of Defense Acquisition Acronyms and Terms, 15th Edition, December 2012, MSA is the first phase of the Defense Acquisition Management System as defined and established by Department of Defense Instruction 5000.02. The purpose of this phase is to analyze and recommend materiel solutions for the capability need identified in the Initial Capabilities Document (ICD). During this phase, an Analysis of Alternatives (AoA) will be conducted and a Technology Development Strategy (TDS) and draft Capability Development Document (CDD) will be formulated. Congressional Research Service 5
  • 9. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC) Marine Infantry from ship to shore and then maneuver with other combat vehicles in Marine Air Ground Task Force operations. The ACV will provide the Marine landing force with armored mobility from ship to objective for traditional warfare and other employment capabilities across the range of military operations. It will self-deploy from amphibious ships, deliver a 17 Marine Infantry squad from a launch distance of at least 12 miles from shore and transition from water to ground operations without tactical pause.19 How Many ACVs Do the Marines Intend to Procure? According to Marine officials, the Marines intend to procure 573 ACVs. When Is the ACV Scheduled to Enter Service? The ACV is scheduled to achieve Initial Operating Capability (IOC)20 between FY2020 and FY2022, depending on the outcome of the Analysis of Alternatives (AoA)21 and final acquisition plans. What Are the Estimated Total Program and Per Vehicle Costs? According to Marine officials, “Per vehicle and total program costs will be informed by the cost studies conducted as part of the recently completed Analyses of Alternatives (AoA). There are various affordability courses that are being looked at as part of the Marine Corps overall combat vehicle mix. Those analyses are all pre-decisional and have not yet been briefed to senior officials.”22 High Speed ACV23 Reports suggest the Marines might possibly “shelve” the ACV program if technology needed to develop a high water speed ACV is not sufficiently mature. The Marines view high water speed as an important factor in both protecting Marines embarked on ACVs from hostile fire as well as for offshore Navy vessels transporting the Marines. Marine leadership was reportedly briefed on the technological feasibility and cost of high-speed ACVs in late December 2013 but no decision on the future direction of the GCV was made, with Marine spokesman stating the Commandant of the Marine Corps would make his decision “soon” and that the ACV remained his number one 19 Ibid. IOC is attained when some units and/or organizations in the force structure scheduled to receive a system have received it and have the ability to employ and maintain it. Defense Acquisition University Glossary of Defense Acquisition Acronyms and Terms, 13th Edition, November 2009. 21 The AoA assesses potential materiel solutions to satisfy the capability need documented in the approved Initial Capabilities Document (ICD). It focuses on identification and analysis of alternatives, measures of effectiveness (MOEs), cost, schedule, concepts of operations, and overall risk, including the sensitivity of each alternative to possible changes in key assumptions or variables. Defense Acquisition University Glossary of Defense Acquisition Acronyms and Terms, 13th Edition, November 2009. 22 From an e-mail to CRS from the Marine Corps Office of the Program Manager for Advanced Amphibious Assault. 23 Christopher J. Castelli, “General: Marine Corps Could Shelve Development of High-Speed ACV,” InsideDefense.com, October 25, 2013 and Paul McLeary, “Marines Tread Carefully in Search for New Amphibious Vehicle,” Defense News, September 20, 2013. 20 Congressional Research Service 6
  • 10. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC) acquisition priority.24 The Marines have reportedly extended a series of ACV trade studies by six months, possibly in part to examine the high water speed ACV in more detail. Possible ACV Program Delay25 Reports suggest that Marine leadership has indicated that many programs will be slowed because of sequestration-related cuts and that the ACV could possibly be delayed by up to three years. It is not known how the Bipartisan Budget Act of 2013 (H.J.Res. 59) will affect the Marines spending plans and if the possibility of a three-year delay to the ACV program is still valid. Congressional Activity The Administration’s FY2014 Budget Request26 The Administration’s FY2014 Budget Request for the ACV was $136.967 million in Research, Development, Test & Evaluation (RDT&E) funding. National Defense Authorization Act for FY2014 (H.R. 1960)27 The House recommended fully funding the Administration’s FY2014 ACV Budget Request and also included the following provision: Section 251—Annual Comptroller General Report on the Amphibious Combat Vehicle Acquisition Program This section would require the Comptroller General of the United States to conduct an annual review of the Amphibious Combat Vehicle acquisition program and provide the results of the review to the congressional defense committees by March 1, 2014, and annually thereafter through 2018.28 National Defense Authorization Act for FY2014 (S. 1197)29 The Senate recommended fully funding the Administration’s FY2014 ACV Budget Request. 24 Lee Hudson, “ACV Team Briefed by Commandant in Late December, Awaiting Feedback,” InsideDefense.com, January 10, 2014. 25 Lee Hudson, “Stackley: ACV Might Be Delayed Up to Three Years Under Sequestration,” InsideDefense.com, October 25, 2013. 26 Information in this section is taken from Department of Defense, FY2014 Program Acquisition Costs by Weapon System, April 2013, p. 3-8. 27 H.Rept. 113-102, National Defense Authorization Act for Fiscal Year 2014, Report of the Committee on Armed Services House of Representatives on H.R. 1960, June 7, 2013. 28 Ibid., p. 110. 29 S.Rept. 113-44 Report, National Defense Authorization Act for Fiscal Year 2014, Report to Accompany S. 1197, Committee on Armed Services, United States Senate, June 20, 2013, p. 337. Congressional Research Service 7
  • 11. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC) Department of Defense Appropriations Bill, 201430 The House recommended funding the FY2014 ACV Budget Request at $122.967 million—a $14 million decrease due to program delay. Potential Issues for Congress Operational Impact of the Deferment of the MPC In various discussions about the future of Marine Corps operations, the MPC has featured prominently in terms of both amphibious operations and Marine operations ashore. Given the possibility that it might be another decade before MPC development efforts are restarted and a number of years after that before the vehicle reaches the force, Congress might wish to further explore the operational implications of the MPC deferment. How will the Marine Corps compensate during this period for not having the MPC? Will the Marines need to acquire additional vehicles, such as the Joint Light Tactical Vehicle (JLTV),31 to fill the void created by not acquiring 579 MPCs? Another potential issue for examination could be if additional vehicles are not acquired to compensate for the MPCs, will the Marines need to modify how they conduct amphibious and ground operations? How Feasible Will It Be to Restart the MPC Program? Reports suggest the Marines will maintain close contact with defense industry should the budgetary situation improve to the point where the Marines can restart the program. While this might be achievable over the course over the next couple years, Congress might wish to examine the feasibility of restarting the MPC program after a prolonged deferment such as 5 to 10 years. Given technological advancements as well as emerging threat weapons systems and the constantly changing geo-strategic environment, it is difficult to imagine that current MPC developmental requirements would be valid or relevant 5 to 10 years from now and that a complete program restart would be required. Given this possibility, it might be prudent to establish some guidelines on restarting the program, perhaps establishing criteria on when it would be necessary to initiate a new MPC program as opposed to simply restating the existing program. Clarification on Possible Delay of the ACV Program Given the Marines extension of the of ACV trade studies and earlier statements about a possible three-year program delay, Congress might choose to obtain a more definitive commitment from the Marines on the ACV’s future. If the ACV is to be delayed—either due to lack of a high water speed capability or budgetary resources—there are both operational and cost ramifications that need to be fully examined and taken into account by defense planners. 30 Report 113-xxx, Department of Defense Appropriations Bill, 2014, Report of the Committee on Appropriations, June 7, 2013, p. 221. 31 For additional information on the JLTV see CRS Report RS22942, Joint Light Tactical Vehicle (JLTV): Background and Issues for Congress, by Andrew Feickert. Congressional Research Service 8
  • 12. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC) Author Contact Information Andrew Feickert Specialist in Military Ground Forces afeickert@crs.loc.gov, 7-7673 Congressional Research Service 9