OF AN

7 Pitfalls

ORACLE E-BUSINESS
SUITE UPGRADE
& HOW TO AVOID THEM

TOP 3 FACTORS
DRIVING ERP
CHANGES

65%

Oracle E-Business Suite is a mission-critical
application that could turn your investment into
revenue in a very short period of time. But,
with any complex application, considerable time
and attention should be devoted to
maintaining, improving, and optimization to
ensure your organization is realizing value.
Let’s evaluate the 7 most common pitfalls in an
Oracle E-Business Suite Upgrade and how to
avoid them.

Regulatory
requirements

75%

Reorganization
or restructuring

80%

New/changed
business process
1. POOR DOCUMENTATION
Many skilled internal teams start their
project planning and implementation
process with good documentation
practices, but don’t understand the full
scope and the end goals to complete the
documentation in the final stages.

INCOMPLETE
DOCUMENTATION

PROPER
DOCUMENTATION
IS IMPERATIVE FOR
TRACKING:

IS TYPICALLY THE RESULT OF:

LACK OF
UNDERSTANDING
INTO THE FULL
SCOPE OF WORK

‱ The current state of your ERP
‱ Decisions made during an
upgrade & justification
for changes
‱ Changes to scope of work
‱ Successful post-launch usage

LACK OF VISION
TOWARDS
CORPORATE END
GOALS

‱ Opportunities for greater
efficiency

START

FINISH

Create a standard for
documentation at the start of
your project, and hold team
members accountable for
completing documentation
requirements, as well as keeping
them at and above the standards
required.
2. UNREALISTIC BUDGETS OR TIMELINES

Your organization requires a major
Oracle EBS improvement project.
Even if that project has already been
funded, doesn’t mean that all
required budgets have been
adequately identified and secured.

TOO OFTEN BUDGETS
DO NOT ACCOUNT FOR:
‱ Full scope of work
‱ Resources allocated
‱ Outside assistance
‱ Realistic deadlines &
time to complete projects

Underfunded budgets could
force you to cut corners (like
shortening or eliminating test
phases) that could increase the
risk of error and unintended
outcomes.

“

Many project managers
are successful in
estimating hard dollar
costs of their projects,
but they may overlook
identifying the “soft”
costs, made up primarily
of allocations of internal
resources.

GO OVER ALL
EXPENDITURES

”
3. LACK OF TRAINING

INADEQUATE TRAINING
IN A PARTICULAR EBS
FEATURE OR FUNCTION
ARE OFTEN THE CAUSE
OF IMPLEMENTATION
ERRORS.
One week of training will not only help users with
new features but will improve overall business
efficiencies. Training may include multi-media
presentations, live demos, and hands-on practice
to get users familiar with the day-to-day and
periodic tasks they will be required to execute
moving forward.
RAMP UP YOUR TEAM AND AVOID ERRORS.

A VARIETY OF TRAINING
METHODS ARE AVAILABLE:

MULTI-MEDIA
PRESENTATIONS

LIVE
DEMOS

HANDS-ON
PRACTICE

USER PRODUCTIVITY
KIT (UPK)
4. THE RIGHT RESOURCES AREN’T ASSIGNED

Before the beginning the
project, define what internal
resources are required for
execution. This includes
people, infrastructure,
hardware, and software.

z
66%

BE REALISTIC
WHEN ASSIGNING
PROJECT
RESPONSIBILITIES

OR 2 OF 3 OF U.S.
WORKERS CLAIMED
TO FEEL OVERWORKED

Recognize when external resources
specializing in R12 implementations
and upgrades would be more efficient
even though the cost might be higher.
For example, hiring resources for the
upgrade to R12 may seem more
expensive than having your DBA
perform it internally, but consultants
who manage upgrades day-after-day
develop a variety of “lessons-learned”
and ways to streamline the process.
5. TRYING TO IMPLEMENT OVERLY COMPLEX
SOLUTIONS

It is tempting in many Oracle EBS
implementations or upgrades to
over-engineer solutions, especially
when unique business needs and
requirements are involved.
One thing to keep in mind is that:

CUSTOMIZATIONS
LESS CORE
FUNCTIONALITY
OF EBS

For example, many companies end up
with multiple instances that are either
separately managed or tied together
through complex, custom bridge systems
and reporting tools.

=

MORE
COMPLICATED
IMPLEMENTATION

Instead of spending time and
resources implementing third-party
reporting, consider consolidating
multiple instances, moving to a
global chart of accounts (CoA),
and/or standardizing on a
consistent calendar.
6. LACK OF ADEQUATE TESTING

PROBLEMS WILL
ALWAYS OCCUR IF
YOU DIDN’T 


‱ Define your use cases

TEST

‱ Involve those who will be
using the software
on a regular basis
‱ Adequately test periodic
activities

Be sure to build a test plan that includes
both the day-to-day activities and the
periodic activities – financial reporting,
period close; patch application so that
ongoing product support and success
isn’t compromised.

Ensure that your testing includes
reports, upstream and downstream
interfaces, customizations,
enhancements, and workflows. Be
sure to budget for testing resources
in your up-front planning and
resource allocations as well.
7. NOT UNDERSTANDING THE BUSINESS
DRIVERS FOR CHANGE
Too often, IT projects become a
standard part of doing business
(especially in large organizations)
without being rooted in business
drivers and objectives.

TAKE THE TIME UP FRONT:
‱ Understand why you are upgrading
‱ Understand what do you hope to achieve
‱ Engage business users

Operational changes often necessitate new
processes for complying with regulatory
requirements, additional procedures for
governance of shared data, and mitigation of
new risk factors.
+
Include governance, risk, and compliance
management as part of the project plan.

LASTLY REMEMBER TO
CELEBRATE THE SUCCESS
OF THE UPGRADE OR
REIMPLEMENTATION!

Don’t focus on defects,
failures, or small cost
over-runs without looking
at the big picture and the
ultimate accomplishment.

CONTENT SOURCES: Top 3 Factors Driving ERP changes: (http://cloud.unit4.com/corp/docs/IDC%20%20Cost%20of%20Change%202013.pdf ) Survey: 1 In 3 Employees Are Stressed Out, Underpaid And
Overworkedhttp://jobs.aol.com/articles/2013/03/06/americans-stressed-underpaid-overworked-survey/

CONTACT US: info@biztech.com | 610.592.0600 | 1150 First Avenue, King of Prussia, PA 19406
Copyright © 2013, Business Technology Services Inc, All rights reserved. Trademarks: Products mentioned herin are trademarks or registered marks of
their respective owners. This document is provided for information purposes only and the contents hereof are subject to change without notice.

Weitere Àhnliche Inhalte

Was ist angesagt?

ERP Implementation-Critical Success Factors and Management Influence
ERP Implementation-Critical Success Factors and Management InfluenceERP Implementation-Critical Success Factors and Management Influence
ERP Implementation-Critical Success Factors and Management Influence
Matthew Pirie
 
Business Manager 3
Business Manager 3Business Manager 3
Business Manager 3
Jim Book, MBA
 
Erp ipmlemetation life cycle
Erp ipmlemetation life cycleErp ipmlemetation life cycle
Erp ipmlemetation life cycle
Rahul Hande
 

Was ist angesagt? (20)

ERP Implementation Overview
ERP Implementation OverviewERP Implementation Overview
ERP Implementation Overview
 
ERP Implementation challenges
 ERP Implementation challenges ERP Implementation challenges
ERP Implementation challenges
 
ERP implementation
ERP implementationERP implementation
ERP implementation
 
ERP Implementation Challenges and Package Selection
ERP Implementation Challenges and Package SelectionERP Implementation Challenges and Package Selection
ERP Implementation Challenges and Package Selection
 
Erp implementation
Erp implementation Erp implementation
Erp implementation
 
ERP Implementation-Critical Success Factors and Management Influence
ERP Implementation-Critical Success Factors and Management InfluenceERP Implementation-Critical Success Factors and Management Influence
ERP Implementation-Critical Success Factors and Management Influence
 
Business Manager 3
Business Manager 3Business Manager 3
Business Manager 3
 
Just another erp presentation
Just another erp presentationJust another erp presentation
Just another erp presentation
 
Agile meets Enterprise ERP
Agile meets Enterprise ERPAgile meets Enterprise ERP
Agile meets Enterprise ERP
 
Shift left shift-right performance testing for superior end-user by Arun Dutta
Shift left shift-right performance testing for superior end-user by Arun DuttaShift left shift-right performance testing for superior end-user by Arun Dutta
Shift left shift-right performance testing for superior end-user by Arun Dutta
 
Objectives of erp implementation
Objectives of erp implementationObjectives of erp implementation
Objectives of erp implementation
 
A paradigm shift for testing - how to increase productivity 10x!
A paradigm shift for testing - how to increase productivity 10x!A paradigm shift for testing - how to increase productivity 10x!
A paradigm shift for testing - how to increase productivity 10x!
 
4 Keys to successful project management software implementation in big organ...
4 Keys to successful project management software implementation  in big organ...4 Keys to successful project management software implementation  in big organ...
4 Keys to successful project management software implementation in big organ...
 
ERP Implementation - Tips for successful ERP implementation
ERP Implementation - Tips for successful ERP implementationERP Implementation - Tips for successful ERP implementation
ERP Implementation - Tips for successful ERP implementation
 
Post ERP-Implementation-Vendors, Consultants and Employees
Post ERP-Implementation-Vendors, Consultants and EmployeesPost ERP-Implementation-Vendors, Consultants and Employees
Post ERP-Implementation-Vendors, Consultants and Employees
 
SRE-iously! Defining the Principles, Habits, and Practices of Site Reliabilit...
SRE-iously! Defining the Principles, Habits, and Practices of Site Reliabilit...SRE-iously! Defining the Principles, Habits, and Practices of Site Reliabilit...
SRE-iously! Defining the Principles, Habits, and Practices of Site Reliabilit...
 
Integration Golden Rules
Integration Golden RulesIntegration Golden Rules
Integration Golden Rules
 
Erp ipmlemetation life cycle
Erp ipmlemetation life cycleErp ipmlemetation life cycle
Erp ipmlemetation life cycle
 
Consultants role in ERP implementations in SME
Consultants role in ERP implementations in SMEConsultants role in ERP implementations in SME
Consultants role in ERP implementations in SME
 
Workflow Process Optimization for Telecom
Workflow Process Optimization for TelecomWorkflow Process Optimization for Telecom
Workflow Process Optimization for Telecom
 

Andere mochten auch (6)

Bios 275: Kim Dailey: Isgrigg
Bios 275: Kim Dailey: IsgriggBios 275: Kim Dailey: Isgrigg
Bios 275: Kim Dailey: Isgrigg
 
http://izhtc.ru Đ‘Đ°ĐœĐ”Ń€ ĐŽĐ»Ń ĐżĐ”Ń€Đ”Ń…ĐŸĐŽĐ° с 1.6 ĐœĐ° 2.0
http://izhtc.ru Đ‘Đ°ĐœĐ”Ń€ ĐŽĐ»Ń ĐżĐ”Ń€Đ”Ń…ĐŸĐŽĐ° с 1.6 ĐœĐ° 2.0http://izhtc.ru Đ‘Đ°ĐœĐ”Ń€ ĐŽĐ»Ń ĐżĐ”Ń€Đ”Ń…ĐŸĐŽĐ° с 1.6 ĐœĐ° 2.0
http://izhtc.ru Đ‘Đ°ĐœĐ”Ń€ ĐŽĐ»Ń ĐżĐ”Ń€Đ”Ń…ĐŸĐŽĐ° с 1.6 ĐœĐ° 2.0
 
Malone r12 upgrade-versus-reimplementation
Malone r12 upgrade-versus-reimplementationMalone r12 upgrade-versus-reimplementation
Malone r12 upgrade-versus-reimplementation
 
JFCS Inspiration and Concepts
JFCS Inspiration and ConceptsJFCS Inspiration and Concepts
JFCS Inspiration and Concepts
 
Words Are Free Early Concepts
Words Are Free Early ConceptsWords Are Free Early Concepts
Words Are Free Early Concepts
 
The Designers Duty
The Designers DutyThe Designers Duty
The Designers Duty
 

Ähnlich wie 7 pitfalls of an oracle ebs upgrade biz tech[1]

Successfully Implementing an Aggregate Spend Solution
Successfully Implementing an Aggregate Spend SolutionSuccessfully Implementing an Aggregate Spend Solution
Successfully Implementing an Aggregate Spend Solution
Huron Consulting Group
 

Ähnlich wie 7 pitfalls of an oracle ebs upgrade biz tech[1] (20)

Maximize your Oracle Cloud Investment and Drive Innovation
 Maximize your Oracle Cloud Investment and Drive Innovation Maximize your Oracle Cloud Investment and Drive Innovation
Maximize your Oracle Cloud Investment and Drive Innovation
 
11 Reasons Oracle E-Business Suite projects fail and how to fix them
11 Reasons Oracle E-Business Suite projects fail and how to fix them11 Reasons Oracle E-Business Suite projects fail and how to fix them
11 Reasons Oracle E-Business Suite projects fail and how to fix them
 
Software Product Development for Startups.pdf
Software Product Development for Startups.pdfSoftware Product Development for Startups.pdf
Software Product Development for Startups.pdf
 
Delivering applications at the pace of business
Delivering applications at the pace of businessDelivering applications at the pace of business
Delivering applications at the pace of business
 
Agility Beyond the Development Team
Agility Beyond the Development TeamAgility Beyond the Development Team
Agility Beyond the Development Team
 
build-for-speed-brochure
build-for-speed-brochurebuild-for-speed-brochure
build-for-speed-brochure
 
Erp implementation lifecycle
Erp implementation lifecycleErp implementation lifecycle
Erp implementation lifecycle
 
Erp 20090521
Erp 20090521Erp 20090521
Erp 20090521
 
APM Center of Excellence Drives Improved Business Results at Itau Unibanco
APM Center of Excellence Drives Improved Business Results at Itau UnibancoAPM Center of Excellence Drives Improved Business Results at Itau Unibanco
APM Center of Excellence Drives Improved Business Results at Itau Unibanco
 
The Power of Business Process Improvement
The Power of Business Process ImprovementThe Power of Business Process Improvement
The Power of Business Process Improvement
 
ERP Key Success Factors Series 2
ERP Key Success Factors Series 2ERP Key Success Factors Series 2
ERP Key Success Factors Series 2
 
Successfully Implementing an Aggregate Spend Solution
Successfully Implementing an Aggregate Spend SolutionSuccessfully Implementing an Aggregate Spend Solution
Successfully Implementing an Aggregate Spend Solution
 
Starting a SPC project blog series
Starting a SPC project blog seriesStarting a SPC project blog series
Starting a SPC project blog series
 
Lect2 conventional software management
Lect2 conventional software managementLect2 conventional software management
Lect2 conventional software management
 
Dev ops
Dev opsDev ops
Dev ops
 
Enterprise DevOps
Enterprise DevOps Enterprise DevOps
Enterprise DevOps
 
How To Build A Credible Performance Measurement Baseline
How To Build A Credible Performance Measurement BaselineHow To Build A Credible Performance Measurement Baseline
How To Build A Credible Performance Measurement Baseline
 
How To Build A Credible Performance Measurement Baseline
How To Build A Credible Performance Measurement BaselineHow To Build A Credible Performance Measurement Baseline
How To Build A Credible Performance Measurement Baseline
 
Change management apty
Change management   aptyChange management   apty
Change management apty
 
Erp Implementation: Your 12 step Implementation Stratergy
Erp Implementation: Your 12 step Implementation StratergyErp Implementation: Your 12 step Implementation Stratergy
Erp Implementation: Your 12 step Implementation Stratergy
 

KĂŒrzlich hochgeladen

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

KĂŒrzlich hochgeladen (20)

Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Navi Mumbai Call Girls đŸ„° 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls đŸ„° 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls đŸ„° 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls đŸ„° 8617370543 Service Offer VIP Hot Model
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 

7 pitfalls of an oracle ebs upgrade biz tech[1]

  • 1. OF AN 7 Pitfalls ORACLE E-BUSINESS SUITE UPGRADE & HOW TO AVOID THEM TOP 3 FACTORS DRIVING ERP CHANGES 65% Oracle E-Business Suite is a mission-critical application that could turn your investment into revenue in a very short period of time. But, with any complex application, considerable time and attention should be devoted to maintaining, improving, and optimization to ensure your organization is realizing value. Let’s evaluate the 7 most common pitfalls in an Oracle E-Business Suite Upgrade and how to avoid them. Regulatory requirements 75% Reorganization or restructuring 80% New/changed business process
  • 2. 1. POOR DOCUMENTATION Many skilled internal teams start their project planning and implementation process with good documentation practices, but don’t understand the full scope and the end goals to complete the documentation in the final stages. INCOMPLETE DOCUMENTATION PROPER DOCUMENTATION IS IMPERATIVE FOR TRACKING: IS TYPICALLY THE RESULT OF: LACK OF UNDERSTANDING INTO THE FULL SCOPE OF WORK ‱ The current state of your ERP ‱ Decisions made during an upgrade & justification for changes ‱ Changes to scope of work ‱ Successful post-launch usage LACK OF VISION TOWARDS CORPORATE END GOALS ‱ Opportunities for greater efficiency START FINISH Create a standard for documentation at the start of your project, and hold team members accountable for completing documentation requirements, as well as keeping them at and above the standards required.
  • 3. 2. UNREALISTIC BUDGETS OR TIMELINES Your organization requires a major Oracle EBS improvement project. Even if that project has already been funded, doesn’t mean that all required budgets have been adequately identified and secured. TOO OFTEN BUDGETS DO NOT ACCOUNT FOR: ‱ Full scope of work ‱ Resources allocated ‱ Outside assistance ‱ Realistic deadlines & time to complete projects Underfunded budgets could force you to cut corners (like shortening or eliminating test phases) that could increase the risk of error and unintended outcomes. “ Many project managers are successful in estimating hard dollar costs of their projects, but they may overlook identifying the “soft” costs, made up primarily of allocations of internal resources. GO OVER ALL EXPENDITURES ”
  • 4. 3. LACK OF TRAINING INADEQUATE TRAINING IN A PARTICULAR EBS FEATURE OR FUNCTION ARE OFTEN THE CAUSE OF IMPLEMENTATION ERRORS. One week of training will not only help users with new features but will improve overall business efficiencies. Training may include multi-media presentations, live demos, and hands-on practice to get users familiar with the day-to-day and periodic tasks they will be required to execute moving forward. RAMP UP YOUR TEAM AND AVOID ERRORS. A VARIETY OF TRAINING METHODS ARE AVAILABLE: MULTI-MEDIA PRESENTATIONS LIVE DEMOS HANDS-ON PRACTICE USER PRODUCTIVITY KIT (UPK)
  • 5. 4. THE RIGHT RESOURCES AREN’T ASSIGNED Before the beginning the project, define what internal resources are required for execution. This includes people, infrastructure, hardware, and software. z 66% BE REALISTIC WHEN ASSIGNING PROJECT RESPONSIBILITIES OR 2 OF 3 OF U.S. WORKERS CLAIMED TO FEEL OVERWORKED Recognize when external resources specializing in R12 implementations and upgrades would be more efficient even though the cost might be higher. For example, hiring resources for the upgrade to R12 may seem more expensive than having your DBA perform it internally, but consultants who manage upgrades day-after-day develop a variety of “lessons-learned” and ways to streamline the process.
  • 6. 5. TRYING TO IMPLEMENT OVERLY COMPLEX SOLUTIONS It is tempting in many Oracle EBS implementations or upgrades to over-engineer solutions, especially when unique business needs and requirements are involved. One thing to keep in mind is that: CUSTOMIZATIONS LESS CORE FUNCTIONALITY OF EBS For example, many companies end up with multiple instances that are either separately managed or tied together through complex, custom bridge systems and reporting tools. = MORE COMPLICATED IMPLEMENTATION Instead of spending time and resources implementing third-party reporting, consider consolidating multiple instances, moving to a global chart of accounts (CoA), and/or standardizing on a consistent calendar.
  • 7. 6. LACK OF ADEQUATE TESTING PROBLEMS WILL ALWAYS OCCUR IF YOU DIDN’T 
 ‱ Define your use cases TEST ‱ Involve those who will be using the software on a regular basis ‱ Adequately test periodic activities Be sure to build a test plan that includes both the day-to-day activities and the periodic activities – financial reporting, period close; patch application so that ongoing product support and success isn’t compromised. Ensure that your testing includes reports, upstream and downstream interfaces, customizations, enhancements, and workflows. Be sure to budget for testing resources in your up-front planning and resource allocations as well.
  • 8. 7. NOT UNDERSTANDING THE BUSINESS DRIVERS FOR CHANGE Too often, IT projects become a standard part of doing business (especially in large organizations) without being rooted in business drivers and objectives. TAKE THE TIME UP FRONT: ‱ Understand why you are upgrading ‱ Understand what do you hope to achieve ‱ Engage business users Operational changes often necessitate new processes for complying with regulatory requirements, additional procedures for governance of shared data, and mitigation of new risk factors. + Include governance, risk, and compliance management as part of the project plan. LASTLY REMEMBER TO CELEBRATE THE SUCCESS OF THE UPGRADE OR REIMPLEMENTATION! Don’t focus on defects, failures, or small cost over-runs without looking at the big picture and the ultimate accomplishment. CONTENT SOURCES: Top 3 Factors Driving ERP changes: (http://cloud.unit4.com/corp/docs/IDC%20%20Cost%20of%20Change%202013.pdf ) Survey: 1 In 3 Employees Are Stressed Out, Underpaid And Overworkedhttp://jobs.aol.com/articles/2013/03/06/americans-stressed-underpaid-overworked-survey/ CONTACT US: info@biztech.com | 610.592.0600 | 1150 First Avenue, King of Prussia, PA 19406 Copyright © 2013, Business Technology Services Inc, All rights reserved. Trademarks: Products mentioned herin are trademarks or registered marks of their respective owners. This document is provided for information purposes only and the contents hereof are subject to change without notice.