Esri UC2013 .
2013 Esri International User Conference
July 8–12, 2013 | San Diego, California
Restoring the Chesapeake Bay
with ArcGIS
Tools for Planning Stormwater Treatment
Thomas Williams, EIT, LEED AP
AMEC Environment & Infrastructure
Esri UC2013 .
The Chesapeake Bay
• Largest Estuary in the US
• Drains over 64,000 mi2
- 6 States, plus Washington, DC
• 2009 Executive Order:
- Declared the Bay a National
Treasure
- Called for a renewed effort to
restore and protect the Bay
- Paved the way for the
Chesapeake Bay TMDL
Restoring the Chesapeake Bay with ArcGIS
Esri UC2013 .
The Chesapeake Bay TMDL
• What is a TMDL?
- Total Maximum Daily Load
- EPA-established “pollution diet.”
- Maximum amount of pollution a
water body can receive and still
remain healthy.
• The Chesapeake Bay TMDL
focuses on three pollutants:
- Nitrogen
- Phosphorus
- Sediment
Restoring the Chesapeake Bay with ArcGIS
Image Credit: 1
Esri UC2013 .
Urban Stormwater in the Bay Watershed
Restoring the Chesapeake Bay with ArcGIS
• Urban stormwater pollution is a major aspect
of the Chesapeake Bay TMDL.
• The Bay TMDL is affecting Municipal
Separate Storm Sewer System (MS4)
operators throughout the Bay Watershed.
• There are many existing tools for stormwater
planning, but most are non-spatial.
• How can we use GIS to…
• evaluate stormwater treatment options?
• track TMDL compliance?
• make watershed planning easier?
Image Credit: 2
Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS
ALERT
• AMEC developed a set of Python tools for ArcGIS, called
ALERT
• AMEC Load Estimation and Reduction Tracking
• Initially designed around Virginia’s draft regulations to
implement the Chesapeake Bay TMDL.
• ALERT framework has since been updated and expanded to
apply outside of Virginia and the Chesapeake Bay.
• Built to help communities:
• plan stormwater projects
• quickly evaluate different scenarios
• estimate the cost of compliance
!
Esri UC2013 .
ALERT Process Diagram
Restoring the Chesapeake Bay with ArcGIS
Water Quality Plan
Start / Finish
ArcGIS
Silverlight
Analyze
water
quality
scenarios
in ArcGIS
Estimate total
remaining effort
required to
achieve water
quality goals
Non-Spatial results
guide further GIS
analysis
Landuse Data
Calculate
Baseline Load
Develop
Projects
Calculate
Reduced Load
Non-Spatial
Analysis
Esri UC2013 .
ALERT Process: Calculate Baseline Loads
Restoring the Chesapeake Bay with ArcGIS
Calculate
Baseline Loads
Landuse Data
• Polygon layer attributed
with pollutant loading
and runoff information.
• lbs/ac/yr
(Loading Rates)
• mg/L
(Event Mean
Concentrations)
Baseline Loads
• Total annual pollutant
loads (lbs/yr) are
calculated.
• Simple Method
calculations consider:
• Impervious area
• Runoff coefficients
• Annual precipitation
either
Esri UC2013 .
ALERT Process: Develop Project Database
Restoring the Chesapeake Bay with ArcGIS
Project
Database
etc…
Water Quality Projects:
Pond Retrofit, 65 acres
Nitrogen Efficiency: 15%
Runoff Reduction: 0%
Cost: $275,000
Bioretention, 5 acres
Nitrogen Efficiency: 45%
Runoff Reduction: 20%
Cost: $110,000
Redevelopment, 10 acres
Nitrogen Efficiency: 50%
Runoff Reduction: 10%
Cost: Undetermined
Stormwater
BMPs
Landuse
Changes
• Treatment area
polygons
• Pollutant removal
and runoff reduction
efficiencies
• Other relevant
information
Esri UC2013 .
ALERT Process: Calculate Load Reductions
Restoring the Chesapeake Bay with ArcGIS
Iterates through
project database,
calculating and
tracking pollutant
and runoff
reductions.
Baseline Loads
Reduced Loads
(new polygon layer)
Detailed Results
(pollutant reductions
from each project)
Project
Database
Calculate
Load Reductions
Esri UC2013 .
ALERT Process: Calculate Load Reductions
Restoring the Chesapeake Bay with ArcGIS
Baseline Loads
Esri UC2013 .
ALERT Process: Calculate Load Reductions
Restoring the Chesapeake Bay with ArcGIS
Reduced Loads
Treatment
Area
Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS
Landuse
City of Alexandria, VA
Potomac River Basin
15.4 square miles
Population: 144,301 (2011)
Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS
Landuse (MS4)
Identified areas draining to the
City’s Municipal Separate Storm
Sewer System (MS4).
Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS
Baseline Loads
Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS
Baseline Loads BMPs
Proposed BMPs included pond
retrofits, new ponds, bioretention,
and projected redevelopment.
Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS
Reduced Loads BMPs
Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS
Reduced Loads
Esri UC2013 .
ALERT Process: Non-Spatial Analysis
Restoring the Chesapeake Bay with ArcGIS
Baseline Loads
Reduced Loads Reductions
Non-Spatial
Analysis
• Results from GIS analysis
can feed into a non-spatial
component.
• Non-spatial ALERT tools are
used to roughly estimate the
remaining effort needed to
meet water quality goals.
• Project needs
(acres of treatment)
• Capital and annual
maintenance costs
• Total area of required
additional treatment is back-
calculated based on pollutant
reduction targets.
Esri UC2013 .
ALERT Process: Non-Spatial Analysis
Restoring the Chesapeake Bay with ArcGIS
1. Project Mix % by Area
Bioretention 10%
Filtration 10%
New Ponds 30%
Pond Retrofits 50%
2. Target
Pollutant
Phosphorus
3. Results
Treatment Area 145 acres
Initial Cost $3.5 m
Annual Maint. $81,000
Baseline
Target
Reduced
Phosphorus
Baseline
Target
Reduced
Nitrogen
Baseline
Target
Reduced
Sediment
Pollutant Loads (lbs/yr)
Results are used to guide further GIS analysis.
Esri UC2013 .
Closing Thoughts
1. GIS tools make planning
stormwater treatment:
• Easier
• More cost-effective
• More reality-based
2. Non-spatial analysis can be
informative, but requires
verification.
• Results should be regarded
as approximations.
• Ouputs guide further GIS-
based planning.
Esri UC2013 .
Thomas Williams, EIT, LEED AP
Water Resources Engineer
AMEC Environment & Infrastructure
thomas.williams@amec.com
More Information:
Image Credits
1. http://www.flickr.com/photos/particlem/
3733639670/sizes/o/in/photostream/
2. http://www.flickr.com/photos/thirteenofclubs/
3383558429/sizes/o/in/photostream
…

Weitere ähnliche Inhalte

Was ist angesagt?

Estimation of phosphorus loss from agricultural land in the southern region o...
Estimation of phosphorus loss from agricultural land in the southern region o...Estimation of phosphorus loss from agricultural land in the southern region o...
Estimation of phosphorus loss from agricultural land in the southern region o...LPE Learning Center
 
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-1723 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17indiawrm
 
2011ppt dev hydrologydecisionsupporttool_final
2011ppt dev hydrologydecisionsupporttool_final2011ppt dev hydrologydecisionsupporttool_final
2011ppt dev hydrologydecisionsupporttool_finalbcogcommission
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015Fairfax County
 
Discharge and Sediment Transport Modeling Buck Creek Proposal
Discharge and Sediment Transport Modeling Buck Creek ProposalDischarge and Sediment Transport Modeling Buck Creek Proposal
Discharge and Sediment Transport Modeling Buck Creek ProposalJames Blumenschein
 
Phosphorus indices what is the water quality goal
Phosphorus indices what is the water quality goalPhosphorus indices what is the water quality goal
Phosphorus indices what is the water quality goalLPE Learning Center
 
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...Youn Sim, Ph.D., P.E.
 
Dnapl Recovery Strategy For Coal Tar Final
Dnapl Recovery Strategy For Coal Tar FinalDnapl Recovery Strategy For Coal Tar Final
Dnapl Recovery Strategy For Coal Tar FinalNeale Misquitta
 
Five-Year Review Report for Moffett Sites 1, 22, 26, and 28
Five-Year Review Report for Moffett Sites 1, 22, 26, and 28Five-Year Review Report for Moffett Sites 1, 22, 26, and 28
Five-Year Review Report for Moffett Sites 1, 22, 26, and 28Steve Williams
 
DSD-INT 2019 ShorelineS and future coastline modelling - Roelvink
DSD-INT 2019 ShorelineS and future coastline modelling - RoelvinkDSD-INT 2019 ShorelineS and future coastline modelling - Roelvink
DSD-INT 2019 ShorelineS and future coastline modelling - RoelvinkDeltares
 
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...Dhiraj Jhunjhunwala
 
DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti
DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - HendartiDSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti
DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - HendartiDeltares
 
Weekly and Monthly Groundwater Recharge Estimation in A Rural Piedmont Enviro...
Weekly and Monthly Groundwater Recharge Estimation in A Rural Piedmont Enviro...Weekly and Monthly Groundwater Recharge Estimation in A Rural Piedmont Enviro...
Weekly and Monthly Groundwater Recharge Estimation in A Rural Piedmont Enviro...Agriculture Journal IJOEAR
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28Steve Williams
 
Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...
Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...
Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...ExternalEvents
 
DSD-INT 2020 Lake Turnover Assessments using Delft3D and SOBEK - van Megchelen
DSD-INT 2020 Lake Turnover Assessments using Delft3D and SOBEK - van MegchelenDSD-INT 2020 Lake Turnover Assessments using Delft3D and SOBEK - van Megchelen
DSD-INT 2020 Lake Turnover Assessments using Delft3D and SOBEK - van MegchelenDeltares
 

Was ist angesagt? (20)

Estimation of phosphorus loss from agricultural land in the southern region o...
Estimation of phosphorus loss from agricultural land in the southern region o...Estimation of phosphorus loss from agricultural land in the southern region o...
Estimation of phosphorus loss from agricultural land in the southern region o...
 
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-1723 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
 
2011ppt dev hydrologydecisionsupporttool_final
2011ppt dev hydrologydecisionsupporttool_final2011ppt dev hydrologydecisionsupporttool_final
2011ppt dev hydrologydecisionsupporttool_final
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
 
Discharge and Sediment Transport Modeling Buck Creek Proposal
Discharge and Sediment Transport Modeling Buck Creek ProposalDischarge and Sediment Transport Modeling Buck Creek Proposal
Discharge and Sediment Transport Modeling Buck Creek Proposal
 
Phosphorus indices what is the water quality goal
Phosphorus indices what is the water quality goalPhosphorus indices what is the water quality goal
Phosphorus indices what is the water quality goal
 
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
 
Dnapl Recovery Strategy For Coal Tar Final
Dnapl Recovery Strategy For Coal Tar FinalDnapl Recovery Strategy For Coal Tar Final
Dnapl Recovery Strategy For Coal Tar Final
 
Bowen
BowenBowen
Bowen
 
Five-Year Review Report for Moffett Sites 1, 22, 26, and 28
Five-Year Review Report for Moffett Sites 1, 22, 26, and 28Five-Year Review Report for Moffett Sites 1, 22, 26, and 28
Five-Year Review Report for Moffett Sites 1, 22, 26, and 28
 
Abstrac1
Abstrac1Abstrac1
Abstrac1
 
DSD-INT 2019 ShorelineS and future coastline modelling - Roelvink
DSD-INT 2019 ShorelineS and future coastline modelling - RoelvinkDSD-INT 2019 ShorelineS and future coastline modelling - Roelvink
DSD-INT 2019 ShorelineS and future coastline modelling - Roelvink
 
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
 
DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti
DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - HendartiDSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti
DSD-INT 2017 Basin Water Resources Management Planning in Indonesia - Hendarti
 
Charting the Arctic
Charting the ArcticCharting the Arctic
Charting the Arctic
 
Weekly and Monthly Groundwater Recharge Estimation in A Rural Piedmont Enviro...
Weekly and Monthly Groundwater Recharge Estimation in A Rural Piedmont Enviro...Weekly and Monthly Groundwater Recharge Estimation in A Rural Piedmont Enviro...
Weekly and Monthly Groundwater Recharge Estimation in A Rural Piedmont Enviro...
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
 
Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...
Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...
Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...
 
DSD-INT 2020 Lake Turnover Assessments using Delft3D and SOBEK - van Megchelen
DSD-INT 2020 Lake Turnover Assessments using Delft3D and SOBEK - van MegchelenDSD-INT 2020 Lake Turnover Assessments using Delft3D and SOBEK - van Megchelen
DSD-INT 2020 Lake Turnover Assessments using Delft3D and SOBEK - van Megchelen
 
Swat model
Swat model Swat model
Swat model
 

Ähnlich wie ALERT Tools for Planning Chesapeake Bay Stormwater Treatment

9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...Environmental Protection Agency, Ireland
 
LIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work ExperienceLIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work ExperienceGeorge Liddle
 
Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone PresentationMattieRourk
 
Lake Accotink Dredging Public Meeting Presentation December 2020
Lake Accotink Dredging Public Meeting Presentation December 2020Lake Accotink Dredging Public Meeting Presentation December 2020
Lake Accotink Dredging Public Meeting Presentation December 2020Fairfax County
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseYourAlberta
 
3.3 everglades restoration plans
3.3 everglades restoration plans3.3 everglades restoration plans
3.3 everglades restoration plansascemiami-dade
 
The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...
The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...
The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...Dan Arthur
 
Presentation final
Presentation finalPresentation final
Presentation finalHudsonAdams
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationFairfax County
 
1 How to Overcome Public Perception Issues on Potable R.docx
1  How to Overcome Public Perception Issues on Potable R.docx1  How to Overcome Public Perception Issues on Potable R.docx
1 How to Overcome Public Perception Issues on Potable R.docxpoulterbarbara
 
1 How to Overcome Public Perception Issues on Potable R.docx
1  How to Overcome Public Perception Issues on Potable R.docx1  How to Overcome Public Perception Issues on Potable R.docx
1 How to Overcome Public Perception Issues on Potable R.docxjeremylockett77
 
Capstone presentation final
Capstone presentation finalCapstone presentation final
Capstone presentation finalMattieRourk
 
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...RachelMordovancey
 
Presentation final
Presentation finalPresentation final
Presentation finalRileyGarvey
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Fairfax County
 

Ähnlich wie ALERT Tools for Planning Chesapeake Bay Stormwater Treatment (20)

9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...
 
LIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work ExperienceLIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work Experience
 
Final Capstone Presentation
Final Capstone PresentationFinal Capstone Presentation
Final Capstone Presentation
 
Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone Presentation
 
Capstone
CapstoneCapstone
Capstone
 
Lake Accotink Dredging Public Meeting Presentation December 2020
Lake Accotink Dredging Public Meeting Presentation December 2020Lake Accotink Dredging Public Meeting Presentation December 2020
Lake Accotink Dredging Public Meeting Presentation December 2020
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt Machielse
 
3.3 everglades restoration plans
3.3 everglades restoration plans3.3 everglades restoration plans
3.3 everglades restoration plans
 
The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...
The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...
The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...
 
Presentation final
Presentation finalPresentation final
Presentation final
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
1 How to Overcome Public Perception Issues on Potable R.docx
1  How to Overcome Public Perception Issues on Potable R.docx1  How to Overcome Public Perception Issues on Potable R.docx
1 How to Overcome Public Perception Issues on Potable R.docx
 
1 How to Overcome Public Perception Issues on Potable R.docx
1  How to Overcome Public Perception Issues on Potable R.docx1  How to Overcome Public Perception Issues on Potable R.docx
1 How to Overcome Public Perception Issues on Potable R.docx
 
Capstone Final Powerpoint
Capstone Final PowerpointCapstone Final Powerpoint
Capstone Final Powerpoint
 
Capstone presentation final
Capstone presentation finalCapstone presentation final
Capstone presentation final
 
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
 
Presentation final
Presentation finalPresentation final
Presentation final
 
Coulton Sess6 101309
Coulton Sess6 101309Coulton Sess6 101309
Coulton Sess6 101309
 
Kansas rivermodel
Kansas rivermodelKansas rivermodel
Kansas rivermodel
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
 

Kürzlich hochgeladen

From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 

Kürzlich hochgeladen (20)

From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 

ALERT Tools for Planning Chesapeake Bay Stormwater Treatment

  • 1. Esri UC2013 . 2013 Esri International User Conference July 8–12, 2013 | San Diego, California Restoring the Chesapeake Bay with ArcGIS Tools for Planning Stormwater Treatment Thomas Williams, EIT, LEED AP AMEC Environment & Infrastructure
  • 2. Esri UC2013 . The Chesapeake Bay • Largest Estuary in the US • Drains over 64,000 mi2 - 6 States, plus Washington, DC • 2009 Executive Order: - Declared the Bay a National Treasure - Called for a renewed effort to restore and protect the Bay - Paved the way for the Chesapeake Bay TMDL Restoring the Chesapeake Bay with ArcGIS
  • 3. Esri UC2013 . The Chesapeake Bay TMDL • What is a TMDL? - Total Maximum Daily Load - EPA-established “pollution diet.” - Maximum amount of pollution a water body can receive and still remain healthy. • The Chesapeake Bay TMDL focuses on three pollutants: - Nitrogen - Phosphorus - Sediment Restoring the Chesapeake Bay with ArcGIS Image Credit: 1
  • 4. Esri UC2013 . Urban Stormwater in the Bay Watershed Restoring the Chesapeake Bay with ArcGIS • Urban stormwater pollution is a major aspect of the Chesapeake Bay TMDL. • The Bay TMDL is affecting Municipal Separate Storm Sewer System (MS4) operators throughout the Bay Watershed. • There are many existing tools for stormwater planning, but most are non-spatial. • How can we use GIS to… • evaluate stormwater treatment options? • track TMDL compliance? • make watershed planning easier? Image Credit: 2
  • 5. Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS ALERT • AMEC developed a set of Python tools for ArcGIS, called ALERT • AMEC Load Estimation and Reduction Tracking • Initially designed around Virginia’s draft regulations to implement the Chesapeake Bay TMDL. • ALERT framework has since been updated and expanded to apply outside of Virginia and the Chesapeake Bay. • Built to help communities: • plan stormwater projects • quickly evaluate different scenarios • estimate the cost of compliance !
  • 6. Esri UC2013 . ALERT Process Diagram Restoring the Chesapeake Bay with ArcGIS Water Quality Plan Start / Finish ArcGIS Silverlight Analyze water quality scenarios in ArcGIS Estimate total remaining effort required to achieve water quality goals Non-Spatial results guide further GIS analysis Landuse Data Calculate Baseline Load Develop Projects Calculate Reduced Load Non-Spatial Analysis
  • 7. Esri UC2013 . ALERT Process: Calculate Baseline Loads Restoring the Chesapeake Bay with ArcGIS Calculate Baseline Loads Landuse Data • Polygon layer attributed with pollutant loading and runoff information. • lbs/ac/yr (Loading Rates) • mg/L (Event Mean Concentrations) Baseline Loads • Total annual pollutant loads (lbs/yr) are calculated. • Simple Method calculations consider: • Impervious area • Runoff coefficients • Annual precipitation either
  • 8. Esri UC2013 . ALERT Process: Develop Project Database Restoring the Chesapeake Bay with ArcGIS Project Database etc… Water Quality Projects: Pond Retrofit, 65 acres Nitrogen Efficiency: 15% Runoff Reduction: 0% Cost: $275,000 Bioretention, 5 acres Nitrogen Efficiency: 45% Runoff Reduction: 20% Cost: $110,000 Redevelopment, 10 acres Nitrogen Efficiency: 50% Runoff Reduction: 10% Cost: Undetermined Stormwater BMPs Landuse Changes • Treatment area polygons • Pollutant removal and runoff reduction efficiencies • Other relevant information
  • 9. Esri UC2013 . ALERT Process: Calculate Load Reductions Restoring the Chesapeake Bay with ArcGIS Iterates through project database, calculating and tracking pollutant and runoff reductions. Baseline Loads Reduced Loads (new polygon layer) Detailed Results (pollutant reductions from each project) Project Database Calculate Load Reductions
  • 10. Esri UC2013 . ALERT Process: Calculate Load Reductions Restoring the Chesapeake Bay with ArcGIS Baseline Loads
  • 11. Esri UC2013 . ALERT Process: Calculate Load Reductions Restoring the Chesapeake Bay with ArcGIS Reduced Loads Treatment Area
  • 12. Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS Landuse City of Alexandria, VA Potomac River Basin 15.4 square miles Population: 144,301 (2011)
  • 13. Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS Landuse (MS4) Identified areas draining to the City’s Municipal Separate Storm Sewer System (MS4).
  • 14. Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS Baseline Loads
  • 15. Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS Baseline Loads BMPs Proposed BMPs included pond retrofits, new ponds, bioretention, and projected redevelopment.
  • 16. Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS Reduced Loads BMPs
  • 17. Esri UC2013 . Restoring the Chesapeake Bay with ArcGIS Reduced Loads
  • 18. Esri UC2013 . ALERT Process: Non-Spatial Analysis Restoring the Chesapeake Bay with ArcGIS Baseline Loads Reduced Loads Reductions Non-Spatial Analysis • Results from GIS analysis can feed into a non-spatial component. • Non-spatial ALERT tools are used to roughly estimate the remaining effort needed to meet water quality goals. • Project needs (acres of treatment) • Capital and annual maintenance costs • Total area of required additional treatment is back- calculated based on pollutant reduction targets.
  • 19. Esri UC2013 . ALERT Process: Non-Spatial Analysis Restoring the Chesapeake Bay with ArcGIS 1. Project Mix % by Area Bioretention 10% Filtration 10% New Ponds 30% Pond Retrofits 50% 2. Target Pollutant Phosphorus 3. Results Treatment Area 145 acres Initial Cost $3.5 m Annual Maint. $81,000 Baseline Target Reduced Phosphorus Baseline Target Reduced Nitrogen Baseline Target Reduced Sediment Pollutant Loads (lbs/yr) Results are used to guide further GIS analysis.
  • 20. Esri UC2013 . Closing Thoughts 1. GIS tools make planning stormwater treatment: • Easier • More cost-effective • More reality-based 2. Non-spatial analysis can be informative, but requires verification. • Results should be regarded as approximations. • Ouputs guide further GIS- based planning.
  • 21. Esri UC2013 . Thomas Williams, EIT, LEED AP Water Resources Engineer AMEC Environment & Infrastructure thomas.williams@amec.com More Information: Image Credits 1. http://www.flickr.com/photos/particlem/ 3733639670/sizes/o/in/photostream/ 2. http://www.flickr.com/photos/thirteenofclubs/ 3383558429/sizes/o/in/photostream …