Team Foundation Server 2010

 BLENDING METHODS TO SUCCEED
               -
COMPARING PRINCE2’S AGILITY WITH
 SCRUM WITHIN THE TFS2010 ALM

                     Author : Vincent TAVONEKHAM
                         Website : www.Thavo.com
                              Date : 13 March 2011

                                                  1
TFS 2010 ALM AS A TOOL FOR PRINCE 2
                                                                                                       Team working
                                                                                               •Roles,
                                                                                               •Onshore, near/off shore,
                                                                                               •Doc. and code sharing,                    Following everything
                                                                                               •Centralizing information.
                                                                                                                                           With « Work Items »
                                                                                                                                      •User‟s requirements /
                                                               Request for change                                                      stories (Business Case),
                                                                                                                                      •Feedbacks or Bugs,
                                                        •Branching and merging                                                        •Request for change,
                                                        •Changeset and tracking.                                                      •Workflow for validating
PRINCE2 and TFS 2010 offers                                                                                                            the change...
similar “components” and workflow
of processes to lead to project
                                                           Configuration Management
success.                                                                                                                                        Planning
                                                          •Source control,
                                                          •Versioned and backed-up                                                    •Estimating,
                                                           documents,                                                                 •Reports,
                                                          •Reporting.                                                                 •Integrating / sharing with
                                                                                                                                       other tools.

                                                                                                 Risk and Quality management
                                                                                              •„Reporting Services‟,
                                                                                              •„Build‟ reports,
                                                                                              •Integrate additional tools (quality,
                                                                                               doc generation,…),
                                                                                              •Automating tasks and tests,
                                                                                              •Delivery automation.

 © 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text.                                      2
                                                                                                                                Course Version 4.1.0
OVERVIEW OF PRINCE 2                                                                                                     Best practices based
                                                                                                                            on thousands of
                                                                                                                          succeeding projects

Official OGC definition of PRINCE2

“PRINCE2 is a generic, tailorable, simple to follow project                                     Business Value
management method. It covers how to organise, manage and                                            Driven
control your projects. It is aimed at enabling you to                                            continuously                      Managed by
successfully deliver the right products, on time and within                                                                          stages
budget. As a Project manager you can apply the principles of
PRINCE2 and the associated training to any type of project. It
will help you to manage risk, control quality and change                                              Learning from
effectively, as well as make the most of challenging situations                                        experience                       No guarantee
and opportunities that arise within a project.
                                                                                                                                       to succeed, but
                                                                                                                                         fails quicker
• A PRINCE2 project has the following characteristics:
      • Continued business justification
      • Learning from experience                                                      Defined roles and
      • Defined roles and responsibilities                                             Responsability
      • Managed by stages                                                                                                       Generic and no tool
      • Managed by exception                                                                                                     recommendation
      • Focuses on products and their quality

Tailored to suit the particular product environment                                          Focused on product /
PRINCE2 does not cover all aspects of project                                                      Quality
management. Areas such as leadership and people
management skills, detailed coverage of project management                                                                        Managed by
tools and techniques are well covered by other existing and                                                                       tolerances
proven methods and are therefore excluded from PRINCE2.”


  © 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text.
                                                                                                                                  Course Version 4.1.0
PRINCE 2 AND TFS 2010
     Nikolaj Raahauge, PRINCE2 Practitioner and Approved Trainer (7 July 2009):
        “I'd very much like to point out that tailoring PRINCE2 to the individual project and
          organizational environment is far more important than going off the bureaucratic cliff and
          implementing PRINCE2 full scale”
        “in the case of Software Development projects, this is where SCRUM, XP or what not
          comes in”
     Martin van Borselaer, PRINCE2 Coach and Senior Project Manager,
      (White paper on PRINCE 2):
             “The new PRINCE2 2009 manual states explicitly that templates other than the official PRINCE2 ones
              can be used for reporting, as long as you report what is important to your customer. It is a good idea to
              use specific Scrum information like release planning based on Velocity and Product Backlog,
              Lessons Learned based on Sprint Retrospectives”
             “Within PRINCE2 the delivery process is a black
              box, (since it) is all about managing the project‟s
              process. The Scrum process is all about delivery.
               Fast and effective delivery is key.”
               “This makes Scrum a natural fit to the
              PRINCE2 „Managing Product Delivery‟ process”



© 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text.
                                                                                                                              Course Version 4.1.0
AGILITY IN PRINCE2 AND SCRUM (1/2)
     Usually people do not notice the large amount of similarities between PRINCE2
      and SCRUM. Rather than presenting them all in detail, here are some few
      examples:

             BY DEFINITION
                PRINCE2 and SCRUM are mature and based on practical feed backs of thousands of
                  successful project worldwide,
                Neither PRINCE2 nor SCRUM could be used alone, they have to be blended to other
                  technics,
                Neither PRINCE2 nor SCRUM should be fully used “from the book”, they have to be
                  adapted to the company,
             CONTROL
                [PRINCE2] Stage and decision boundaries  [SCRUM] Sprint iteration of fixed length
                  and Spring Review
                [PRINCE2] Driven by the Business' needs  [SCRUM] Driven by User Story and
                  prioritized by Business values
                Shall we carry on ?
                      [PRINCE2] End Stage Assessment  [SCRUM] Sprint iteration review
                Regular reports :
                      [PRINCE2] highlight reports {by Project manager} [SCRUM] Daily stand up
                        meeting {by the team + Scrum Master}
© 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text.
                                                                                                                              Course Version 4.1.0
AGILITY IN PRINCE2 AND SCRUM (2/2)
             TECHNIQUES
                 Assumes that changes will occur (detailed and big design up-front cannot predict
                  all)
                      [PRINCE2] Change Control  [SCRUM] Reprioritizing User Story before the
                       start of a sprint, and reprioritizing technical tasks during a sprint
                 Decompose user‟s needs to visualize the problem and feeds that back to the
                  users :
                      [PRINCE2] Product Break down structure [SCRUM] Epic (=Big User story)
                       > sub-User stories > related tasks > related sub-tasks
             PLANS
                 Quality boundaries : Agreed and strict tolerance at many levels

                      [PRINCE2] Project {program management}, stage {project board} and
                       product {project manager} [SCRUM] “Definition Of Done” : Program
                       {program management}, End of sprint iteration {project board}, User Story
                       {Product Owner}, Tasks {Team / Scrum Master}



© 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text.
                                                                                                                              Course Version 4.1.0
WHICH TOOL FITS PRINCE2 ?
     FAQ from http://www.prince2.com
             “PRINCE2 makes no recommendation on which tools you should use to assist you manage your projects
              but it does recognise that such tools are widely used. PRINCE2 will sit quite happily alongside a paper-
              based planning system or any other tool which you find to be effective in your environment”


                                                                            Based on “Work Items”, a solution to implement
                                                                             PRINCE2 could be TFS 2010. Indeed, it is flexible
                                                                             enough to handle the entire Application Life Cycle
                                                                             Management (ALM) of two opposite project
                                                                             process templates :
                                                                                    A lightweight project process template (Scrum,
                                                                                     Agile),
                                                                                    A heavy weight project process template (CMMI,
                                                                                     Sogeti TMAP process template certified, …)




© 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text.
                                                                                                                              Course Version 4.1.0
SOURCES AND REFERENCES

     Thoses slides are continiously getting improved; up to
      date information on TFS, PRINCE2, PMBook and AGILE
      on the author‟s blog
            www.Thavo.com (Vincent THAVONEKHAM)
            The author will further detail those slides into a
             whitepaper that will be freely available on this
             blog,
     PRINCE2 official Web site : http://www.ogc.gov.uk
     http://www.borselaer.org/index.php/2010/03/whiteboo
      k-prince2-combined-with-scrum/




                                                                                           You can freely use and modify
                                                                                            these slides, as long as you keep
                                                                                            the copyright footer mentioning
                                                                                            www.Thavo.com and Vincent
                                                                                            Thavonekham.
© 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text.                          8
                                                                                                                              Course Version 4.1.0

Weitere ähnliche Inhalte

Was ist angesagt?

Profile Of Manish Aggarwal
Profile Of Manish AggarwalProfile Of Manish Aggarwal
Profile Of Manish Aggarwalmanisherp
 
Open Air Corporate Overview
Open Air Corporate OverviewOpen Air Corporate Overview
Open Air Corporate OverviewMartin Powell
 
Mohamad Afshar Moving Beyond Project Level S O A V1
Mohamad  Afshar    Moving Beyond Project Level S O A V1Mohamad  Afshar    Moving Beyond Project Level S O A V1
Mohamad Afshar Moving Beyond Project Level S O A V1SOA Symposium
 
Oh, grow up – a look at share point and maturity 2012 final
Oh, grow up – a look at share point and maturity 2012 finalOh, grow up – a look at share point and maturity 2012 final
Oh, grow up – a look at share point and maturity 2012 finalNadir Kamdar
 
MSP Best Practice | Using Strategic IT Roadmaps to Get More Contracts
MSP Best Practice | Using Strategic IT Roadmaps to Get More ContractsMSP Best Practice | Using Strategic IT Roadmaps to Get More Contracts
MSP Best Practice | Using Strategic IT Roadmaps to Get More ContractsDavid Castro
 
Aras How To Think About Aras Integrations
Aras How To Think About Aras IntegrationsAras How To Think About Aras Integrations
Aras How To Think About Aras IntegrationsProdeos
 
Dev High Level Process Flow 0.7
Dev High Level Process Flow 0.7Dev High Level Process Flow 0.7
Dev High Level Process Flow 0.7Mark Bethel
 
IBM Rational - Från skriptbaserad ALM till "ALM as a Service" och ALM i Cloud...
IBM Rational - Från skriptbaserad ALM till "ALM as a Service" och ALM i Cloud...IBM Rational - Från skriptbaserad ALM till "ALM as a Service" och ALM i Cloud...
IBM Rational - Från skriptbaserad ALM till "ALM as a Service" och ALM i Cloud...IBM Sverige
 
Bridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineeringBridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineeringJordan Berkley, MBA,PMP,CSM
 
Business Process Improvement
Business Process ImprovementBusiness Process Improvement
Business Process ImprovementSimon Gough
 
SAUG 2010 EA101 Session
SAUG 2010 EA101 SessionSAUG 2010 EA101 Session
SAUG 2010 EA101 SessionPhil Gleadhill
 
Mainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3bMainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3bRobdeHeus
 
Architecture modeling break free
Architecture modeling   break freeArchitecture modeling   break free
Architecture modeling break freeRuss Gibfried
 
Peter Lanfermann Vodafone D2 LTE deployment in Germany
Peter Lanfermann Vodafone D2 LTE deployment in GermanyPeter Lanfermann Vodafone D2 LTE deployment in Germany
Peter Lanfermann Vodafone D2 LTE deployment in GermanyErwann Thomassain
 
Heizer om10 ch10-work design
Heizer om10 ch10-work designHeizer om10 ch10-work design
Heizer om10 ch10-work designRozaimi Mohd Saad
 
SaaS PPM - How Do You Know When It's Right For You? EPM Live Webinar Presenta...
SaaS PPM - How Do You Know When It's Right For You? EPM Live Webinar Presenta...SaaS PPM - How Do You Know When It's Right For You? EPM Live Webinar Presenta...
SaaS PPM - How Do You Know When It's Right For You? EPM Live Webinar Presenta...EPM Live
 
Gordon baisley - eircom - Introducing the EDM role with www.softtest.ie
Gordon baisley - eircom - Introducing the EDM role with www.softtest.ieGordon baisley - eircom - Introducing the EDM role with www.softtest.ie
Gordon baisley - eircom - Introducing the EDM role with www.softtest.ieDavid O'Dowd
 
Comarch Technology Review Magazine 2011/01
Comarch Technology Review Magazine 2011/01Comarch Technology Review Magazine 2011/01
Comarch Technology Review Magazine 2011/01Comarch
 

Was ist angesagt? (20)

Profile Of Manish Aggarwal
Profile Of Manish AggarwalProfile Of Manish Aggarwal
Profile Of Manish Aggarwal
 
Open Air Corporate Overview
Open Air Corporate OverviewOpen Air Corporate Overview
Open Air Corporate Overview
 
Mohamad Afshar Moving Beyond Project Level S O A V1
Mohamad  Afshar    Moving Beyond Project Level S O A V1Mohamad  Afshar    Moving Beyond Project Level S O A V1
Mohamad Afshar Moving Beyond Project Level S O A V1
 
Oh, grow up – a look at share point and maturity 2012 final
Oh, grow up – a look at share point and maturity 2012 finalOh, grow up – a look at share point and maturity 2012 final
Oh, grow up – a look at share point and maturity 2012 final
 
MSP Best Practice | Using Strategic IT Roadmaps to Get More Contracts
MSP Best Practice | Using Strategic IT Roadmaps to Get More ContractsMSP Best Practice | Using Strategic IT Roadmaps to Get More Contracts
MSP Best Practice | Using Strategic IT Roadmaps to Get More Contracts
 
Aras How To Think About Aras Integrations
Aras How To Think About Aras IntegrationsAras How To Think About Aras Integrations
Aras How To Think About Aras Integrations
 
Dev High Level Process Flow 0.7
Dev High Level Process Flow 0.7Dev High Level Process Flow 0.7
Dev High Level Process Flow 0.7
 
IBM Rational - Från skriptbaserad ALM till "ALM as a Service" och ALM i Cloud...
IBM Rational - Från skriptbaserad ALM till "ALM as a Service" och ALM i Cloud...IBM Rational - Från skriptbaserad ALM till "ALM as a Service" och ALM i Cloud...
IBM Rational - Från skriptbaserad ALM till "ALM as a Service" och ALM i Cloud...
 
Bridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineeringBridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineering
 
Business Process Improvement
Business Process ImprovementBusiness Process Improvement
Business Process Improvement
 
SAUG 2010 EA101 Session
SAUG 2010 EA101 SessionSAUG 2010 EA101 Session
SAUG 2010 EA101 Session
 
Mainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3bMainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3b
 
Architecture modeling break free
Architecture modeling   break freeArchitecture modeling   break free
Architecture modeling break free
 
Peter Lanfermann Vodafone D2 LTE deployment in Germany
Peter Lanfermann Vodafone D2 LTE deployment in GermanyPeter Lanfermann Vodafone D2 LTE deployment in Germany
Peter Lanfermann Vodafone D2 LTE deployment in Germany
 
Heizer om10 ch10-work design
Heizer om10 ch10-work designHeizer om10 ch10-work design
Heizer om10 ch10-work design
 
SaaS PPM - How Do You Know When It's Right For You? EPM Live Webinar Presenta...
SaaS PPM - How Do You Know When It's Right For You? EPM Live Webinar Presenta...SaaS PPM - How Do You Know When It's Right For You? EPM Live Webinar Presenta...
SaaS PPM - How Do You Know When It's Right For You? EPM Live Webinar Presenta...
 
Heizer om10 ch09-layout
Heizer om10 ch09-layoutHeizer om10 ch09-layout
Heizer om10 ch09-layout
 
Gordon baisley - eircom - Introducing the EDM role with www.softtest.ie
Gordon baisley - eircom - Introducing the EDM role with www.softtest.ieGordon baisley - eircom - Introducing the EDM role with www.softtest.ie
Gordon baisley - eircom - Introducing the EDM role with www.softtest.ie
 
Comarch Technology Review Magazine 2011/01
Comarch Technology Review Magazine 2011/01Comarch Technology Review Magazine 2011/01
Comarch Technology Review Magazine 2011/01
 
Heizer om10 ch01
Heizer om10 ch01Heizer om10 ch01
Heizer om10 ch01
 

Ähnlich wie Blending Methods To Succeed Comparing Prince2 S Agility With Scrum Within The Tfs2010 Alm

Ea Landscape Capabilities Summary Slides 2009 Share
Ea Landscape Capabilities Summary Slides 2009 ShareEa Landscape Capabilities Summary Slides 2009 Share
Ea Landscape Capabilities Summary Slides 2009 Shareskipboe910
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationAlithya
 
Advanced level planning and budgeting in Hyperion - Inge Prangel
Advanced level planning and budgeting in Hyperion - Inge PrangelAdvanced level planning and budgeting in Hyperion - Inge Prangel
Advanced level planning and budgeting in Hyperion - Inge PrangelORACLE USER GROUP ESTONIA
 
Microsoft Office 2010 by Mr. EJ Lopez
Microsoft Office 2010 by Mr. EJ LopezMicrosoft Office 2010 by Mr. EJ Lopez
Microsoft Office 2010 by Mr. EJ Lopezkristine1018
 
Begroten als het model = de applicatie = de documentatie - Gerard Ohm - NESMA...
Begroten als het model = de applicatie = de documentatie - Gerard Ohm - NESMA...Begroten als het model = de applicatie = de documentatie - Gerard Ohm - NESMA...
Begroten als het model = de applicatie = de documentatie - Gerard Ohm - NESMA...Nesma
 
IBM Collaborative Lifecycle Management
IBM Collaborative Lifecycle ManagementIBM Collaborative Lifecycle Management
IBM Collaborative Lifecycle ManagementAlan Kan
 
How to choose and implement wms
How to choose and implement wmsHow to choose and implement wms
How to choose and implement wmsSubhan Novianda
 
Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...
Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...
Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...Arvind Rajan
 
Clarify And Connect 4 12 10
Clarify And Connect 4 12 10Clarify And Connect 4 12 10
Clarify And Connect 4 12 10gomezgrp
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesLeanleaders.org
 
Lean & agile 101 for Astute Entrepreneurs
Lean & agile 101 for Astute EntrepreneursLean & agile 101 for Astute Entrepreneurs
Lean & agile 101 for Astute EntrepreneursClaudio Perrone
 
Acumen Fuse & Customer Case Study
Acumen Fuse & Customer Case StudyAcumen Fuse & Customer Case Study
Acumen Fuse & Customer Case StudyAcumen
 
Agile Analysis on an Enterprise Scale
Agile Analysis on an Enterprise ScaleAgile Analysis on an Enterprise Scale
Agile Analysis on an Enterprise ScaleIIBA UK Chapter
 
Collaborative Lifecycle Managmenent - an Introduction
Collaborative Lifecycle Managmenent - an IntroductionCollaborative Lifecycle Managmenent - an Introduction
Collaborative Lifecycle Managmenent - an IntroductionStrongback Consulting
 
Getting started with Sugar Best practices
Getting started with Sugar Best practicesGetting started with Sugar Best practices
Getting started with Sugar Best practicesSugarCRM
 

Ähnlich wie Blending Methods To Succeed Comparing Prince2 S Agility With Scrum Within The Tfs2010 Alm (20)

Camo
CamoCamo
Camo
 
Ea Landscape Capabilities Summary Slides 2009 Share
Ea Landscape Capabilities Summary Slides 2009 ShareEa Landscape Capabilities Summary Slides 2009 Share
Ea Landscape Capabilities Summary Slides 2009 Share
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
 
PeopleSoft HCM Leveraged for Global HR & Payroll Operations
PeopleSoft HCM Leveraged for Global HR & Payroll OperationsPeopleSoft HCM Leveraged for Global HR & Payroll Operations
PeopleSoft HCM Leveraged for Global HR & Payroll Operations
 
Advanced level planning and budgeting in Hyperion - Inge Prangel
Advanced level planning and budgeting in Hyperion - Inge PrangelAdvanced level planning and budgeting in Hyperion - Inge Prangel
Advanced level planning and budgeting in Hyperion - Inge Prangel
 
Microsoft Office 2010 by Mr. EJ Lopez
Microsoft Office 2010 by Mr. EJ LopezMicrosoft Office 2010 by Mr. EJ Lopez
Microsoft Office 2010 by Mr. EJ Lopez
 
Begroten als het model = de applicatie = de documentatie - Gerard Ohm - NESMA...
Begroten als het model = de applicatie = de documentatie - Gerard Ohm - NESMA...Begroten als het model = de applicatie = de documentatie - Gerard Ohm - NESMA...
Begroten als het model = de applicatie = de documentatie - Gerard Ohm - NESMA...
 
IBM Collaborative Lifecycle Management
IBM Collaborative Lifecycle ManagementIBM Collaborative Lifecycle Management
IBM Collaborative Lifecycle Management
 
Source ouest 20111003 english
Source ouest 20111003 englishSource ouest 20111003 english
Source ouest 20111003 english
 
How to choose and implement wms
How to choose and implement wmsHow to choose and implement wms
How to choose and implement wms
 
Sto 3 Day Course Presentation
Sto 3 Day Course PresentationSto 3 Day Course Presentation
Sto 3 Day Course Presentation
 
Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...
Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...
Astute Business Solutions - Fast Track Impact Analysis for PeopleSoft 9.2 Upg...
 
Clarify And Connect 4 12 10
Clarify And Connect 4 12 10Clarify And Connect 4 12 10
Clarify And Connect 4 12 10
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and Responsibilities
 
Lean & agile 101 for Astute Entrepreneurs
Lean & agile 101 for Astute EntrepreneursLean & agile 101 for Astute Entrepreneurs
Lean & agile 101 for Astute Entrepreneurs
 
Acumen Fuse & Customer Case Study
Acumen Fuse & Customer Case StudyAcumen Fuse & Customer Case Study
Acumen Fuse & Customer Case Study
 
Agile Analysis on an Enterprise Scale
Agile Analysis on an Enterprise ScaleAgile Analysis on an Enterprise Scale
Agile Analysis on an Enterprise Scale
 
Collaborative Lifecycle Managmenent - an Introduction
Collaborative Lifecycle Managmenent - an IntroductionCollaborative Lifecycle Managmenent - an Introduction
Collaborative Lifecycle Managmenent - an Introduction
 
Getting started with Sugar Best practices
Getting started with Sugar Best practicesGetting started with Sugar Best practices
Getting started with Sugar Best practices
 
Methodology
MethodologyMethodology
Methodology
 

Kürzlich hochgeladen

Uttoxeter & Cheadle Voice, Issue 122.pdf
Uttoxeter & Cheadle Voice, Issue 122.pdfUttoxeter & Cheadle Voice, Issue 122.pdf
Uttoxeter & Cheadle Voice, Issue 122.pdfNoel Sergeant
 
《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》
《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》
《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》rnrncn29
 
Virat Kohli Centuries In Career Age Awards and Facts.pdf
Virat Kohli Centuries In Career Age Awards and Facts.pdfVirat Kohli Centuries In Career Age Awards and Facts.pdf
Virat Kohli Centuries In Career Age Awards and Facts.pdfkigaya33
 
FUNDAMENTALS OF ARNIS ARNIS ARNIS ARNIS ARNIS
FUNDAMENTALS OF ARNIS ARNIS ARNIS ARNIS ARNISFUNDAMENTALS OF ARNIS ARNIS ARNIS ARNIS ARNIS
FUNDAMENTALS OF ARNIS ARNIS ARNIS ARNIS ARNISe98298697
 
8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway
8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway
8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar HealthywayAmit Kakkar Healthyway
 
83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...
83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...
83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...dollysharma2066
 
BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756
BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756
BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756dollysharma2066
 
Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝 97111⇛⇛47426
Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝  97111⇛⇛47426Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝  97111⇛⇛47426
Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝 97111⇛⇛47426jennyeacort
 
Dry and cracked heels foot cream in India
Dry and cracked heels foot cream in IndiaDry and cracked heels foot cream in India
Dry and cracked heels foot cream in IndiaUniqaya Lifestyle
 
8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr
8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr
8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncrdollysharma2066
 

Kürzlich hochgeladen (11)

Uttoxeter & Cheadle Voice, Issue 122.pdf
Uttoxeter & Cheadle Voice, Issue 122.pdfUttoxeter & Cheadle Voice, Issue 122.pdf
Uttoxeter & Cheadle Voice, Issue 122.pdf
 
《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》
《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》
《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》
 
Virat Kohli Centuries In Career Age Awards and Facts.pdf
Virat Kohli Centuries In Career Age Awards and Facts.pdfVirat Kohli Centuries In Career Age Awards and Facts.pdf
Virat Kohli Centuries In Career Age Awards and Facts.pdf
 
FUNDAMENTALS OF ARNIS ARNIS ARNIS ARNIS ARNIS
FUNDAMENTALS OF ARNIS ARNIS ARNIS ARNIS ARNISFUNDAMENTALS OF ARNIS ARNIS ARNIS ARNIS ARNIS
FUNDAMENTALS OF ARNIS ARNIS ARNIS ARNIS ARNIS
 
8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway
8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway
8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway
 
83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...
83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...
83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...
 
BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756
BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756
BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756
 
Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝 97111⇛⇛47426
Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝  97111⇛⇛47426Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝  97111⇛⇛47426
Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝 97111⇛⇛47426
 
Call Girls 9953525677 Call Girls In Delhi Call Girls 9953525677 Call Girls In...
Call Girls 9953525677 Call Girls In Delhi Call Girls 9953525677 Call Girls In...Call Girls 9953525677 Call Girls In Delhi Call Girls 9953525677 Call Girls In...
Call Girls 9953525677 Call Girls In Delhi Call Girls 9953525677 Call Girls In...
 
Dry and cracked heels foot cream in India
Dry and cracked heels foot cream in IndiaDry and cracked heels foot cream in India
Dry and cracked heels foot cream in India
 
8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr
8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr
8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr
 

Blending Methods To Succeed Comparing Prince2 S Agility With Scrum Within The Tfs2010 Alm

  • 1. Team Foundation Server 2010 BLENDING METHODS TO SUCCEED - COMPARING PRINCE2’S AGILITY WITH SCRUM WITHIN THE TFS2010 ALM Author : Vincent TAVONEKHAM Website : www.Thavo.com Date : 13 March 2011 1
  • 2. TFS 2010 ALM AS A TOOL FOR PRINCE 2 Team working •Roles, •Onshore, near/off shore, •Doc. and code sharing, Following everything •Centralizing information. With « Work Items » •User‟s requirements / Request for change stories (Business Case), •Feedbacks or Bugs, •Branching and merging •Request for change, •Changeset and tracking. •Workflow for validating PRINCE2 and TFS 2010 offers the change... similar “components” and workflow of processes to lead to project Configuration Management success. Planning •Source control, •Versioned and backed-up •Estimating, documents, •Reports, •Reporting. •Integrating / sharing with other tools. Risk and Quality management •„Reporting Services‟, •„Build‟ reports, •Integrate additional tools (quality, doc generation,…), •Automating tasks and tests, •Delivery automation. © 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text. 2 Course Version 4.1.0
  • 3. OVERVIEW OF PRINCE 2 Best practices based on thousands of succeeding projects Official OGC definition of PRINCE2 “PRINCE2 is a generic, tailorable, simple to follow project Business Value management method. It covers how to organise, manage and Driven control your projects. It is aimed at enabling you to continuously Managed by successfully deliver the right products, on time and within stages budget. As a Project manager you can apply the principles of PRINCE2 and the associated training to any type of project. It will help you to manage risk, control quality and change Learning from effectively, as well as make the most of challenging situations experience No guarantee and opportunities that arise within a project. to succeed, but fails quicker • A PRINCE2 project has the following characteristics: • Continued business justification • Learning from experience Defined roles and • Defined roles and responsibilities Responsability • Managed by stages Generic and no tool • Managed by exception recommendation • Focuses on products and their quality Tailored to suit the particular product environment Focused on product / PRINCE2 does not cover all aspects of project Quality management. Areas such as leadership and people management skills, detailed coverage of project management Managed by tools and techniques are well covered by other existing and tolerances proven methods and are therefore excluded from PRINCE2.” © 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text. Course Version 4.1.0
  • 4. PRINCE 2 AND TFS 2010  Nikolaj Raahauge, PRINCE2 Practitioner and Approved Trainer (7 July 2009):  “I'd very much like to point out that tailoring PRINCE2 to the individual project and organizational environment is far more important than going off the bureaucratic cliff and implementing PRINCE2 full scale”  “in the case of Software Development projects, this is where SCRUM, XP or what not comes in”  Martin van Borselaer, PRINCE2 Coach and Senior Project Manager, (White paper on PRINCE 2):  “The new PRINCE2 2009 manual states explicitly that templates other than the official PRINCE2 ones can be used for reporting, as long as you report what is important to your customer. It is a good idea to use specific Scrum information like release planning based on Velocity and Product Backlog, Lessons Learned based on Sprint Retrospectives”  “Within PRINCE2 the delivery process is a black box, (since it) is all about managing the project‟s process. The Scrum process is all about delivery. Fast and effective delivery is key.”  “This makes Scrum a natural fit to the PRINCE2 „Managing Product Delivery‟ process” © 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text. Course Version 4.1.0
  • 5. AGILITY IN PRINCE2 AND SCRUM (1/2)  Usually people do not notice the large amount of similarities between PRINCE2 and SCRUM. Rather than presenting them all in detail, here are some few examples:  BY DEFINITION  PRINCE2 and SCRUM are mature and based on practical feed backs of thousands of successful project worldwide,  Neither PRINCE2 nor SCRUM could be used alone, they have to be blended to other technics,  Neither PRINCE2 nor SCRUM should be fully used “from the book”, they have to be adapted to the company,  CONTROL  [PRINCE2] Stage and decision boundaries  [SCRUM] Sprint iteration of fixed length and Spring Review  [PRINCE2] Driven by the Business' needs  [SCRUM] Driven by User Story and prioritized by Business values  Shall we carry on ?  [PRINCE2] End Stage Assessment  [SCRUM] Sprint iteration review  Regular reports :  [PRINCE2] highlight reports {by Project manager} [SCRUM] Daily stand up meeting {by the team + Scrum Master} © 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text. Course Version 4.1.0
  • 6. AGILITY IN PRINCE2 AND SCRUM (2/2)  TECHNIQUES  Assumes that changes will occur (detailed and big design up-front cannot predict all)  [PRINCE2] Change Control  [SCRUM] Reprioritizing User Story before the start of a sprint, and reprioritizing technical tasks during a sprint  Decompose user‟s needs to visualize the problem and feeds that back to the users :  [PRINCE2] Product Break down structure [SCRUM] Epic (=Big User story) > sub-User stories > related tasks > related sub-tasks  PLANS  Quality boundaries : Agreed and strict tolerance at many levels  [PRINCE2] Project {program management}, stage {project board} and product {project manager} [SCRUM] “Definition Of Done” : Program {program management}, End of sprint iteration {project board}, User Story {Product Owner}, Tasks {Team / Scrum Master} © 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text. Course Version 4.1.0
  • 7. WHICH TOOL FITS PRINCE2 ?  FAQ from http://www.prince2.com  “PRINCE2 makes no recommendation on which tools you should use to assist you manage your projects but it does recognise that such tools are widely used. PRINCE2 will sit quite happily alongside a paper- based planning system or any other tool which you find to be effective in your environment”  Based on “Work Items”, a solution to implement PRINCE2 could be TFS 2010. Indeed, it is flexible enough to handle the entire Application Life Cycle Management (ALM) of two opposite project process templates :  A lightweight project process template (Scrum, Agile),  A heavy weight project process template (CMMI, Sogeti TMAP process template certified, …) © 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text. Course Version 4.1.0
  • 8. SOURCES AND REFERENCES  Thoses slides are continiously getting improved; up to date information on TFS, PRINCE2, PMBook and AGILE on the author‟s blog  www.Thavo.com (Vincent THAVONEKHAM)  The author will further detail those slides into a whitepaper that will be freely available on this blog,  PRINCE2 official Web site : http://www.ogc.gov.uk  http://www.borselaer.org/index.php/2010/03/whiteboo k-prince2-combined-with-scrum/  You can freely use and modify these slides, as long as you keep the copyright footer mentioning www.Thavo.com and Vincent Thavonekham. © 2011 Vincent THAVONEKHAM, www.Thavo.com. Please use / modify freely this presentation ONLY if you keep this line of text. 8 Course Version 4.1.0