Civil Engineering Department                                                  NPIC




                                           matika
CMBUk I------------------------------------------------------------------ 4
sMPar³ ----------------------------------------------------------------- 4
MATERIAL ------------------------------------------------------------ 4

   1> kMe)arbUksuIm:g;B½rELn Portland Cement Plaster ----------------------------- 4
     1>1 tMrUvkarTUeTA General Requirement ------------------------------------ 4
     1>2 sMPar³ Material -------------------------------------------------- 5
     1>3 sMPar³suIm:g;t_ Cementitious Material` --------------------------------- 5
     1>4 fμbMEbk Aggregate ------------------------------------------------ 6
     1>5 kMe)ar Lime ------------------------------------------------------7
     1>6 Twk Water------------------------------------------------------- 9
     1>7 TwkfñaMKImI Admixture ----------------------------------------------- 9
CMBUk II----------------------------------------------------------------11
RbB½n§RTRTg;kMe)arbUknig ---------------------------------------------------11
Plaster Support System and Base -------------------------------------------11

   1> RbBn§½RTRTg; Support System ---------------------------------------- 11
     1>1 eRKagEdk nig Furring metal Framing And furring. --------------------- 12
     1>2 eRKageQI nig Furring wood framing and furring ----------------------- 12
     1>3 kMralkMe)arbUk Plaster Bas -----------------------------------------15
     1>4 ebtug nigdæ Concrete and Masonry----------------------------------15
     1>5 EdkBRgwg Metal Reinforcement -------------------------------------18
     1>6 Backing Paper ------------------------------------------------- 23
     1>7 pÞaMgmμagsila Gypsum Lath ----------------------------------------24
     1>8 eRKOgbnÞab;bnSMBIEdksMrab;karbUkkMe)ar Metal Plaster Accessories-----------25
     1>9 Flashing -------------------------------------------------------26

Plastering Work                                                                  1
Civil Engineering Department                                                      NPIC




CMBUk III ---------------------------------------------------------------27
karGnuvtþn_nUvkMe)arbUksuIm:g;t_Br½ELn------------------------------------------27
PORTLAND CEMENT PLASTER APPLICATION ---------------------------27

   1> l,aykMe)ar Mixed ------------------------------------------------- 27
     1>1 l,aysuIm:g;t_erobdæ nigsuIm:g;t_)øasÞik Masonry and plastic cement mixes -----28
     1>2 l,aysuIm:g;t_Br½ELn Portland Cement Mixes --------------------------29
   2> karGnuvtþn_ Application -----------------------------------------------29
     2>1 kargarbIRsTab; Three coat work ----------------------------------- 30
     2>2 kargarBIrRsTab; Two-coat work------------------------------------ 34
   3> karEfTMaTwk curing-------------------------------------------------- 35
CMBUk IV -------------------------------------------------------------- 37
]bkrN_ nigbrikça ------------------------------------------------------- 37
TOOL AND EQUIPMENT ---------------------------------------------- 37

   1> ]bkrN_ ---------------------------------------------------------- 37
     1>1 kþaRTkMe)ar Hawk ----------------------------------------------- 37
     1>2 søabRBakMe)ar Trowels ------------------------------------------- 38
     1>3 kþavI Floats ----------------------------------------------------- 40
     1>4 Paddle---------------------------------------------------------42
     1>5 Ck; Brush ----------------------------------------------------- 43
     1>6 ]bkrN_eFVIk,ac;rcna Ornamental Tools ------------------------------- 44
     1>7 BUefAéd Hatchet ------------------------------------------------- 45
     1>8 kUnRbeyal Plumb Bod ------------------------------------------- 45
     1>9 Em:RtsÞg; Level --------------------------------------------------46
     1>10 ké®nþkat;sMN tin snip -------------------------------------------47
     1>11 RbGb;ExSbnÞat; Chalk Box ----------------------------------------48

Plastering Work                                                                     2
Civil Engineering Department                                              NPIC




     1>12 Em:Rtbt;6-Foot Six-foot folding rule -----------------------------48
     1>13 rNar Saws ---------------------------------------------------48
     1>4 Em:RtEkg Stell Square--------------------------------------------- 49
     1>15 Joint Rod ----------------------------------------------------- 50
     1>16 rnas;qáÚt Scratcher ---------------------------------------------- 50
     1>17 Em:RtEdk Steel tape --------------------------------------------- 50
     1>18 Jiont Cutter---------------------------------------------------51
     1>19 dgáab; Nippers--------------------------------------------------51
     1>20 eRsamédC½r Rubber Groves ---------------------------------------52
     1>21 Combination Square (bevel square) --------------------------------52
     1>22 Coping Saw ------------------------------------------------- 53
     1>23 EdkecaH Prick Punch------------------------------------------- 53
     1>24 jBaYr Craw bammer -------------------------------------------- 54
     1>25 Em:Rt b¤bnÞat;eko Straightedge ------------------------------------- 54
     1>26 Featheredge --------------------------------------------------- 55
     1>27 Darby ------------------------------------------------------- 55
     1>28 Slicker -------------------------------------------------------56
     2> brikça Equimpments------------------------------------------------56
CMBUk V --------------------------------------------------------------- 58
karGnuvtþn_ ------------------------------------------------------------- 58
Practice --------------------------------------------------------------- 58

   1> karbUkkMe)ar Plastering -----------------------------------------------58
     1>1 kartMeLIg stucco Installating Stucco ------------------------------58
     1>2 karbUkkMe)arelIduMbøúk -----------------------------------------------60



Plastering Work                                                             3
Civil Engineering Department                                                              NPIC




CMBUk I
sMPar³
MATERIAL


1> kMe)arbUksuIm:g;t_B½rELn Portland Cement Plaster
         kMe)arsuIm:g;t_B½rELnRtUv)anykmkeRbITaMgxagkñúg nig xageRkACaTIkEnøgEdlvaRtUvrg
edaypÞal;nUvPaBeCaKCaMedayTwkb¤sMeNImy:agx<s;. sMrab;kargarbUkCBa¢aMgPaKeRcIn kMe)arbUk
suIm:g;Br½ELnEpñkxageRkARtUveKeGayeQμaHfa Stucco nig kMe)arbUksuIm:g;t_B½rELn Epñkxagkñúg
RtUv eKeGayeQμaHfa Simply plaster . eTaHCay:agenHk¾eday sMrab;tMbn;xøHCaBiessdUcCatam
beNþayeqñrxaglic West Coast TaMgkMe)arbUksuIm:g;t_Br½ELnTaMgxagkñúgnig xageRkAKWman
eQμaHdUcKña Stucco . kMe)ar bUksuIm:g;B½rELnk¾RtUv)aneKykmkeRbIdUcCaRsTab; Purging
BIelICBa¢aMgdæpgEdr. CaerOy² Parging RtUv)aneKeRbIsMrab;CBa¢aMgEdlsßitenABIeRkamdI edIm,I
begáInnUvPaBFn;nwgkarRCabénsMenImnig edIm,IedIrtYrCasarFatu)as nigRsTab;edayman épÞrab
esμIedIm,IkarBarPaBRCabTwknigsMeNIm.
         1>1 tMrUvkarTUeTA General Requirement
        kMe)arbUksuIm:g;t_Br½ELnsMrab;CBa¢aMgxageRkA nig CBa¢aMgxagkñúgsMrab;kEnøgxøHdUcCa bnÞb;Twk
GagcMhuy bnÞab;gUtTwkcMhuy bnÞb;e)akexaGav GaggUtTwkbiTCit c®gáan)ay nigkEnøg xøHeTot
Edl manlkçN³RsedogenHCYbRbTHnUveRKaHmhnþrayminFmμta ebIeRbobeFobeTAkEnøg epSg
eTot. eRKaHfñak;TaMgenaHrYmman PaBeRcaHénTwk EdlGacbgánUveRcHsuIEdk nigeRKOgbrikça bnÞab;
bnSMeFVIBIEdk nig Stress EdlbegáIteLIgedayPaBxusKñaénsItuNðPaBnig sMeNIm. sMrab; kEnøgNa
EdlCYbRbTHbBaðaxagelIeKtMrUveGaymankarGnuvtþn_ nigeFVIkarRbugytñ½xusKñabnþicbnþÜcBI karcaM)ac;
sMrab;kEnøgNaEdlmanbBaðatic.
         CakarBit RsTab;kMe)arbUksuIm:g;t_B½rELn KWCakMralebtugd¾esþIgEdleFVIeLIgCamYysMPar³
nigeRbIR)as;viFIbUkkMe)ar nigRtUvmansarFatupSMebtugcaM)ac;mYycMnYnpg. PñaskMe)arbUksuIm:g;t_
Plastering Work                                                                              4
Civil Engineering Department                                                           NPIC




B½rELn KWrwg nigGacrcna)an. vaGacbegáItrUbrag)any:ageRcInRbePT GacbiTedayépÞvaynPaB
y:ageRcInsn§wksn§ab; nigGaclabfñaMBN’. vaFn;nwgkarvayRbharedayGNþatePøIg GakasFatu
nigkarecjpSwt. va)anbgðajy:agc,as;nUvPaBCab;niwgkareRbIR)as;)anyUr ehIymanPaBsnSMsMéc
TaMgkñúgGakasFatuRtCak; nigekþA.
        1>2 sMPar³ Material
        smasFatusMrab;kMe)arbUksuIm:g;t_Br½ELn CaTUeTAdUcKñanwgebtugnigkMe)ar)ayGrsuIm:g;t_
B½rELn TaMgenaHrYmmanxSac;EdledIrtYCasarFatubMeBjnig pþl;nUvkMlaMgFn; suIm:g;t_edIrtYrCa
sarFatubnSúIP¢ab; TwkEdlpSMKñaCamYysuIm:g;t_begáItCafñaMs¥it² ehIyeFVIRbtikmμdMbUgedayP¢ab;xSac;
cUlKñabegáItCam:astan; nigTwkfñaMKImIEdlbegáInnUvPaByWt b¤PaBs¥iténl,ay b¤BnüWt b¤BenøÓn nUv
kareLIgkkrwg. kMe)arbUksuIm:g;t_Br½ELn tMrUveGayeRbInUveRKOgBRgwgedayEdk b¤eRKOgbnÞab;bnSM
EdleFVIBIEdksMrab;karBarCay nigeRbH.
          1>3 sMPar³suIm:g;t_ Cementitious Material
          sMPar³suIm:g;t_Edl eRbIsMrab;laykñugkMe)arbUksuIm:g;t_B½rELnrYmman suIm:gt_B½rELn
suIm:g;t_erobdæ (Masonry Cement) suIm:g;t_)aøsÞik(Plastic Cement) nigkMe)ar (Lime) .
          RsTab;bUkbegðIy (Finishes) EdllayedaysuiIm:g;t_)øasÞik b¤suIm:gt_erobdæ b¤
suIm:g;t_B½rEln CamYykMe)articCag 50° KitCamaD RtUv)aneKeGayeQμaHfa kMe)arbUk
suIm:g;t_B½rEln. enAeBl EdllayCamYynwgbrimaNkMe)areRcInCag 50° KitCamaD RtUv)aneK
eGayeQμaHfa suIm:g;t_kMe)ar (Lime-cement or Portland Cement-Lime plaster) . eKalkarN_nig
viFIEdlerobrab;xagelIenHGacykmkeRbITaMgxagkñúg nig xageRkAGaKar.
        suIm:g;t_B½rELn Portland Cement
        RbePTsuIm:g;t_B½rELnEdlGaceRbIsMrab;bUkk¾GaceRbIsMrab;layebtugEdr. suIm:g;t_B½rELn
RbePT1 ¬Fmμta¦ RtUv)aneRbIsMrab;kargarlaykMe)arbUksuIm:g;t_B½rELnPaKeRcIn. elIkElgEt
kEnøgxøHEdlmanlkçN³Biess tMrUv[eRbIRbePT I nigRbePT II. sMrab;suIm:g;t_B½rELnRbePT IA,
IIA, IIIA ¬begáItxül; Air- entraining ¦)anbegáItnUvPaBgayRsYleFVIkar        (Workability)




Plastering Work                                                                           5
Civil Engineering Department                                                              NPIC




PaBFn;nwg Bleeding ¬kMhab;énTwknig sarFatum:t;pg;enAelIépÞ¦ nigFn;nwgkareRKaHfñak;edaykar
eLIgkkénTwkkk.
       RbePT I manBN’RbepH nigBN’sFmμCati. BN’BitGacnwgeXIjenAelIRsTab;begðIyEdl
mankarpSMBN’KñaTaMgGs; b¤CaBN’rbs;xSac;enAeBleyIgeRbIsuIm:g;t_Br½ELnBN’s. vaman
sarFatubEnßmEdlFn;nwgsMeNIm edIm,IbegáInnUvPaBFn;nwgsMeNImEdlmanRsab;. plitplenH
RtUvEtmanbrimaNEdkGu‘ksIutticCagbTdæanénsuIm:g;t_Br½ELn.
       RbePT II ¬kMedAmFüm¦ manPaBFn;l¥CageTAnwgkarbMEbkFatuBIRbtikmμ s‘ulpatnigman
kMedATabCagBIRbtikmμGuIRdatkmμ. PaBFn;eTAnwgRbtikmμs‘ulpat KWCalkçN³d¾mansar³RbeyaCn_
enAeBl EdleKykkMe)arEdllabedaysuIm:g;t_RbePTenHeTAbUkelIdæ b¤dæebtugEdlman
sarFatus‘ulpat.
       RbePT III ¬PaBFn;eLIgx<s;muneBlkMNt;¦ begáInnUvPaBFn;énkMlaMgy:agelOnkñúg
ry³eBlb:unμanéf¶dMbUgbnÞab;BIeRbIR)as;va. dUecñHRbePT III GacnwgRtUvykeTAeRbIenAkñúg
GakasFatuRtCak;edIm,Ikat;bnßyeRKaHfñak;edayTwkeLIgkk niwgbegáInel,ÓnkñúgkarbUknUvRsTab;
CabnþbnÞab;.
        suIm:g;t_erobdæ nigsuIm:g;t_)øasÞik Masonry Cement and Plastic Cement
        suIm:g;t_erobdæ nigsuIm:g;t_)øasÞik manCaGaT× suIm:g;t_CamYynwgbrimaNsMPar³epSg²eTot
Ca eRcIndUcCa suIm:g;t_FmμCati fμkMe)arm:t; Pñμak;garbegáItBBuHxül; Plasticizer nigeBlxøH mankMe)ar
EdlkarbEnßm sarFatukMe)arenHmincaM)ac;RtUveFVI. enARbePTxøH eKeRbIR)as;y:agTUlaynUv
kMe)arbUksuIm:g;t_Br½ELnsMrab;RsTab;begðIyEdlmanRckCakBa©b;² Rsab;.
        1>4 fμbMEbk Aggregate
        fμbMEbksMrab;laypSMCakMe)arbUksuIm:g;t_Br½ELnmanbrimaNPaKeRcIn. sMrab;lay)an
brimaNkMe)arbUk 0.028m eKRtUveRbIfμbMEbk 0.027m nig sIum:g;t_ 0.007 eTA 0.009m .
                               3                        3                                        3



dUcenHfμbMEbkRtUvs¥at rwgnigmanlMdab;RtwmRtUvEdlTMhMRKab; fμbMEbkmanlMdab;BItUceLIg
dl;TMhMGtibrima 3>18 mm . lT§plénkarlayEdll¥bMputnig manRbsiT§PaBx<s; enAeBlEdl
TMhMRKab;fμbMEbkmansmamaRt GBa©wgehIytMrUvkarsuIm:g;t_nigTwk manbrimaNticedIm,I bnSúIRKYs

Plastering Work                                                                              6
Civil Engineering Department                                                           NPIC




xSac;cUlKña nigbMeBjrn§RbehagrvagRKab;fμbMEbk. fμbMEbkEdlmanRKab;RKYsrW PaBm:t;pg;eRcIn
eBk lT§plénkarlaynwgRtUvkarsuIm:g;t_eRcIn b¤TwkeRcInEdlvapþl;nUvPaBGnþraydl;RsTab;
begðIyénkMe)arbUksuIm:g;t_Br½ELn.
        xSac; Sand
        xSac;RKYssMrab;kMe)arbUksuIm:g;t_Br½ELn KYrCaRbePTxSac;FmμCati b¤sib,nimitEdls¥at
                                                                                  μ
RKab;nigKμansarFatudImanCICati dIdæ GMbilrlay nigsarFatuCIvsa®sþ. xSac;sMrab;kMe)arbUkPaK
eRcInmanRbPBBIFmμCatisUm,IxSac;)anmkBIkarbMEbkfμ EdlmanTMhMRtwmRtUvnig )anqøgkERBa¢gErg
RtwmRtUvk¾GaceRbIR)as;)anEdr. karmanCalMdab;fñak;énxSac; CYbnUvbBaðarn§xül;rvagRKab;nimYy²
énxSac;tictYc. xSac;KYrRtUvmanlMdab;fñak;taMgBITMhMGtibrma 3.2mm eTAtUcbMput. sMrab;xSac;Edl
manlMdab;fñak;Edll¥ KWsmasFatutUcrt;eTAbMeBjrn§Rbehag éncenøaHRKab;FMCagEdlvaCYyeGay
manrn§RbehagGb,brimabMput. sMrab;xSac;EdlmansarFatuxniC b¤sarFatuKImI vanwgbgáRbtikmμ
KImICamYynwgsuIm:g;t_. manEtxSac;Edl)anTTYlnUvkarbnSúT§tambTdæanRtwmRtUveT EdlGacyk
mkeRbIR)as;)an.
        fμbMEbkEdlmanTMgn;Rsal Lightweight Aggregate
        eBlxøHfμPaCn_ (Shale) dIdæ (Clay) silaqñÜn (Slate) nig kMeTcFüÚgfμ (Slag) GaceRbIsMrab;
CMnYsxSac;)ankñúgkrNI BuMmanxSac;eRbIkñúgtMbn;enaH. Vermiculite nig Perute RtUv)aneRbIR)as;kñúg
kMe)arbUksuIm:g;t_Br½ELn enAeBlEdlsarFatuTMng;Rsal GuIsULg; nigFn;nwgePøIgeRbICaktþacMbg.
smamaRténsarFatuTaMgenaHRtUvkMNt;edaykarBiesaFn_ b¤edayeFVIkarBiesaFn_elIkþa.
       1>5 kMe)ar Lime
       kMe)arRtUveRbITaMgkñúgmñagsila nigkMe)arbUksIum:g;t_Br½ELn. CaTUeTAva)anmkBIfμkMe)ar
EdlCasarFatuEr:FmμtaEdlmansarFatu kal;süÚmkabUNat (Calcite) nig ma:ej:süÚmkabUNat
(Dolomite) . edIm,IplitkMe)ar eKRtUvdutfμkMe)arbMEbkxül;eTACapHkñúgLedaysItuNðPaB 1993 C.     º



lkçN³rUb niglkçN³KImIrbs;kMe)arKWGaRs½yeTAnwgRbePTfμkMe)arEdl eyIgykmk bMElgva.
plitplkMe)arRtUv)anplitmkBIfμkMe)ar Dolomitic EdlCaFmμtamanbrimaNm:aejsüÚmkabUNat
eRcIn b¤plitplBIfμkMe)ar Calcilitic EdlmanbrimaNkal;süÚmkabUNatx<s;. enAeBlEdlfμ

Plastering Work                                                                           7
Civil Engineering Department                                                         NPIC




kMe)ar Dolomitic RtUv)andut[eTACapHkñúgcgVak;plitkmμvapþl;nUv ma:ej:süÚmG‘uksIut. G‘uksIutenH
begáItnUvkMeTcepHmanlkçN³ Plastic EdlCalkçN³RsYleFVIkarl¥ CagkMeTcepH EdlbegáIteday
kal;süÚmGu‘ksuIt EdlplitecjBIfμkMe)ar Calcilititic b:uEnþ m:aejsüÚ:mG‘uksuIt RtUvkareBlyUrCag
sMrab;karcUlrYmRbtikmμGuIRdatkmμ. plitplkMe)arRtUveK eGaycMNat;fñak; 2KW (1) quicklime nig
(2) hydrated lime.
        Quicklime
        kñúgdMeNIrkarplit fμkMe)ar)anbeBa©jecalnUv kabUnDIGuksuIt nigpøas;BIkabUNateTACa
kal;süÚmG‘uksuIt b¤m:aejsüÚmG‘uksuIt. Quicklime RtUv)aneKeRbICasarFatus¥itcMbgeKenAkñúg
kMe)arrab;ryqñaMmkehIy munnwgmankarENnaM[eRbInUvRbePTkMe)arbUkmñagsila Controlled-
Setting . munnwgeKyk quicklime eTAeRbIkñúgkMe)arbUk dMbUgeKRtUvykvaeTAlayTwk nigRtaMTuk

ry³eBlBI 1 eTA2GaTitü edIm,IeGayGu‘ksuIteFVIGuIRdatkmμCamYyTwk nigeFVIeGaykMeTcepHkMe)ar
Plastic GaceRbI CamYy)ayGr b¤kMe)arbUk)an. l,ayénkMe)arnigTwk KWCakareFVIRbtikmμKImI

dMbUgEdlbMElgBI Gu‘ksIuteTACa GuIRduksuItEdlmansßanPaBefr. RbePTvtßúFatuedImxøHmanT§iBl
elIdWeRk nigelOn énRbtikmμGuIRdatkmμkñúgGMLúgeBlénkarRtaMTwk. Quicklime RtUv)aneKsÁal;fa
CaRbePTfμkMe)ar Calcitic b¤mankal;süÚmx<s; KWmanRbtikmμGuIRdatkmμCamYyGu‘ksIutl¥Cag.
eKGnuBaØatieGayeRbI CamYykMe)arbUkkñúgkrNIEdleKdwgfavaCaRbePT Calcitic b¤kal;süÚmx<s; nig
kñúgkrNIEdleKlay CamYyTwk)anRtwmRtUv nig Gnuvtþn_tamkarENnaMrbs;plitkr. kñúgkrNIenH
Quicklime xøHRtUv)an eKlk;CaTMrg;em:SA b:uEnþ edIm,Ikat;bnßynUvdMNak;kal laynwgRtaMTwk

PaKeRcInRtUv)aneKeFVIdMNak;kalenHrYceRsckñúgeragcRk.
        Hydrated lime
         sMPar³EdlplitBIkareFVIRbtikmμGuIRdatkmμén Quicklime eRscenAeragcRkRtUv)aneKeGay
eQμaHfa Hydratedlime . karbEnßmTwkeTAelI hydratedlime eGaylT§plCa Limeputty TMrg;Ca
Plastic EdlCabnSMúrvagmñagsilanwgTwk edIm,IbegáItCaRsTab;bUkbegðIy. RbsinebIGu‘ksuIt min)an

eFVIRbtikmμG‘uksuItkmμsBVRKb;eT kñúgeBleKRtaMva b¤kñúgkarplit Hydrated lime enaHvanwgbgðajenA
kñúgkMe)arbUk. eRkamlkçxNÐénsMeNImx<s; G‘uksIiutTaMgenHnwigcUlrYmRbtikmμGuIRdatkmμkan;Et
eRcIneLIg bNþaleGaymansñameRbHenAelIkMe)arbUkrYckEnøgNaEdlmanva.

Plastering Work                                                                        8
Civil Engineering Department                                                          NPIC




dUcenHCaerOy² kMe)ar Dolomitic RtUv)aneGayeFVIGuIRdakmμeGayehIyenAeragcRk hydratedlime .
Hydrated Lime dlsmRsbsMrab;eRbI CakMe)arbUkbegðIy RtUvEtmanbrimaNG‘uksuItmin)an

eFVIGuIRdatkmμmineGayelIsBI 8°.
        1>6 Twk Water
        TwksMrab;lay nigsMrab;EfTaMKYrRtUvEts¥at minmansarFatuEdlpþl;nUvmhnþraydUcCa
eRbg GasuIt Gal;kalI GMbil nigsarFatuxniCEdlCHT§iBlminl¥dl;RbtikmμGuIRdatkmμ b¤bgánUv
eRcHsuIEdkeRKOgbgÁúM nigeRKOgbnÞab;bnSMBIEdk.
        vtþmanrbs;TwkKW CYyCMrujRbtikmμGuIRdatkmμénsuIm:g;t_B½rELn nigRbtikmμkabUNat
énkMe)ar EdlCaRbtikmμKImIEdlCYysMPar³eLIgrwg. EteTaHCay:agNak¾eday karbEnßmTwk
y:ageRcIneTA kñúgl,ayEdlelIsnUvtMrUvkar sMrab;RbtikmμGuIRdatkmμ b¤kabUNatKWRKan;EtedIm,I
CYyeGayl,ay mansPaBravgayRsYleRbIR)as;Etb:ueNÑaH. brimaNTwkEdlEfmsMrab;kar
gayRsYlKWGaRs½y eTAnwglkçN³rbs;suIm:g;t_cNat;fñak;RKYs xSac; karRsUbéneRKOgRTRTg;
                                              M
sMNg; niglkçx½NÐén karhYt.
         1>7 TwkfñaMKImI Admixture
         TwkfñaMKImI b¤ehAmü:ageTot Plasticizers dUcCaEr: stV bEnø b¤srésrsURtEm:Rt
RtUv)aneKyk mkbEnßmeTAelIl,ayénkMe)arbUkedIm,IbegáInnUv Plasticity rbs;vaeBlxøH.
Plasticizer enHk¾Gac bEnßmeTAelIRsTab;TI1 (Scratch) EdlCal,ayEdlRtUvkarPaBs¥itx<s;

sMrab;kEnøgxøHdUcCa                    Bidan                     nig                    Soffits

nigedIm,Ikat;bnßynUvbrimaNl,ayEdl)at;bg;edaysarPaBRbehagénEdkenAeBl
EdleKmineRbIRkdasbiTCBa¢aMg (Backing Paper) . sréssURteFVIBIEr:k¾GaceRbIsMrab;RsTab;dMbUg
EdleFVIeGaym:asuInedIm,IkarBarnUvkarbMEbkFatufμbMEbk nigedIm,Ipþl;nUvkardak;eRbgkñúgTueya.
         sréssURtRtUvEts¥at nigminmansarFatuGnþraydUcCa Gu‘ksIutminTan;eFVIGuIRdatkmμEdlb:H
Bal;dl;sarFatupSMénkMe)arbUk. eramstVnig sésbEnøKYrmanRbEvgBI 12.7 eTA 50.8mm nigmin
mansarFatuxøaj; eRbg nigsarFatuminsuT§epSgeTot.

Plastering Work                                                                          9
Civil Engineering Department                                                           NPIC




           TwkfñaMKImIepSgeTotmantYnaTIsMrab;BenøÓnb¤ BnüWtry³eBlkkrwg minRtUv)anENnaM[eRbIeT
b:uEnþeRbIR)as;)ansMrab;kEnøgNaEdlcaM)ac;RtUveRbIvab:ueNÑaH. enAeBleRbIR)as; fñaMKImIminRtUvkat;
bnßyPaB Fn;énkMlaMgsgát;énl,ayFMCag 15°énPaBFn;FmμtaEdl minmaneRbIR)as;fñaMKImI
lay.




Plastering Work                                                                           10
Civil Engineering Department                                                       NPIC




CMBUk II
RbB½n§RTRTg;kMe)arbUknigTMr
Plaster Support System and Base


    1> RbBn§½RTRTg; Support System
         munnwgbUknUvRsTab;begðIy eKcaM)ac;RtUveRCIserIs tMeLIg nigerobcMnUveRKOgRTRTg;sMNg;.
eRCIserIsnig tMeLIgnUvRsTab;sMrab;bUkkMe)ar. eRCIserIsnigtMeLIg nUveRKOgRTRTg;EdlRtwmRtUv.
         TaMgkMe)arbUksuIm:g;t_B½rELn nig mñagsilaGacykeTAbUkpÞal;BIelIépÞénCBa¢aMgebtug
nigdæ eRkamlkçx½NÐEdlGacTukcitþ)an. kñúgkrNIenH CBa¢aMgebtugnigdæedIrtYTaMgCaRbBn½§RTRTg;
nig RsTab;sMrab;bUk. eRKOgRTRTg;RtUvRTnUvbnÞúk Edl)anKitedaymineGaymanPaBdab
(Deflectoin) nigKμan Stress EdlbNþaleGayRsTab;bUkeLIgeRbH. karKNnaPaBdabén

BidanminRtUveGay elIsBI 1¼360 énElVg (Span) bnÞab;BIbUkkMe)arehIy. ebtugLaMgtU (Header
or Lintel) Edlman TMhMRKb;RKan;sMrab;dak;BIelIrn§Rbehag nigral;sMNg;TaMgGs;RtUvEtRtg;

nigesμIedayeRbIRbeyal b¤Em:RtsÞg;. eRKOgRTRTg;RtUvEtrwgnignwg b:uEnþk¾manlT§PaB
Gac[eRKOgsMNg;manclnaEdr. sMNg;BIebtug nigdæKYrmankarRKb;RKgnUvmuxtMNsMrab;karlUt
(Expansion Joint) Edl)ancg¥úl bgðajBIvisVkr. RKb;RKgmuxtMNedaykMe)arbUk KYrEtbUkeday

pÞal;BIelImuxtMNenABIelIeRKOgRTRTg;enaHnig kEnøgxøHeTot EdlRtUvkarbnßy Stress nig sñameRbH.




                  rUbPaB 2-1 karbUkkMe)arBIelIRsTab;bUkedaymñagsila


Plastering Work                                                                       11
Civil Engineering Department                                                         NPIC




         1>1 eRKagEdk nig Furring metal Framing And furring.
         GuIsULg;kMedA nigsMPar³Fn;nwgePøIgEdlmanlçN³CaRKYsTMgn;RsaldUcCa Perlite nig
Vermiculite RtUv)anCMrujeGayeRbIenAkñúgkMe)arbUksuIm:g;t_B½rELn sMrab;sMNg;nig viTüasßanCa

BiesssMrab;kEnøgNaEdlGRtaGKIÁP½yx<s;. eTaHbICa RKYsTMgn;RsalminRtUv)anENnaMeRbIsMrab;
kMe)arxageRkA dUcenHBYkvaRtUv)aneKeRbICaGaT×sMrab;RsTab; Backplaster enAelICBa¢aMgxageRkA nig
sMrab;karBarePøIg. TaMgkMe)arbUksuIm:g;t_Br½ELn nigmñagsilaRtUvRTRTg;edayeRKagEdknig furring
sMrab;TItaMgxagkñúg kEnøgEdlsMNg;KuNPaBx<s; (High-quality) rWtMrUvkarGRtaFn;nwgePøIg (Fire-
resistance) .


        1>2 eRKageQI nig Furring wood framing and furring
        TaMgkMe)armñagsila nigsuIm:gt_Br½ELnBIelIeRKageQI nig Furring . kMe)arbUkmñagsila
GacRtUvtMeLIgBIelIeRKageQI nig Furring edaymaneRKagmñagsila (Gypsum Lath) b¤q¥wgEdk
(Metal reinforcement) sMrab;kMe)arbUksuIm:gt_Br½ELn GactMeLIgBIelIeRKageQI nig Furring Gac

eRbIEtCamYyq¥wgEdkb:ueNÑaH. sMrab;sMNg;eRKageQIxageRkAmanBIrRbePTKW KμankþaCBa¢aMg
(Unsheathed b¤ Open-frame) nigmankþaCBa¢aMg (Sheathed) .

        sMNg;CBa¢aMgKμankþa Unsheathed Construction
        eRKagbgÁúMKYrmanCnÞl;RtwmRtUv edayCnÞl;EvgmanTMhM 25 x 100 mm sMrab;Tl;CalkçN³
Ggát;RTUg b¤edayviFIepSg² edIm,ITb;Tl;nwgkMlaMgRcan. RkdasBRgwgxñg (Paper-backed
reinforcement) GacRtUvtMeLIgedaypÞal;. RbsinebIRkdasRTab;xñgRtUvtMeLIgedaydac;BIKña Edk

Tn; TMhM 1>3 mm b¤ExSlYsEdkEdlmanTMgn;F¶n;bnþicKYrRtUvcgP¢ab;BIeQI Stud mçageTAmçageTot
tamTisedAedkRbEhlRbEvg 152.4 mmBIKña. EdklYsKYrTajeGaytwgedaye)aHEdkeKalP¢ab;
b¤Edkekobkibral;eQI Stud 5edImmþg bnÞab;mke)aHP¢ab;EdkeKalelIeQI Stud enAkNþalnig rwt
bnþwgedaybegáIn b¤bnßycMNg.




Plastering Work                                                                        12
Civil Engineering Department                                                       NPIC




        rUb 2-2 sMNg;KμanCBa¢aMgkþa ¬eqVg¦           sMNg;manCBa¢aMgkþa ¬sþaM¦

         bnÞab;mkRkdasRTab;xñgRtUvP¢ab;BIelIExSlYs edaymancugRCYsKñay:agtic 76.2mm edIm,I
karBarPaBrlugénRkdas nig edIm,IbegáItnUvkMras;énkMe)arbUksuIm:g;t_Br½ELn eGaymanlkçN³
ÉksNæanEdlkat;bnßynUvsñameRbH. eKKYreRbIR)as;nUvsMPar³BRgwgEdlGacbt;Ebn)an (Flexible
Reinforcement) cab;epþImeRbIy:agticeBjeQI Stud BIkac;RCug nigKYrbt;vaCuMvijedIm,Iecosvagmux

tMNenAkac;RCug. sMPar³BRgwgkac;RCugEdlplitRsab; (Prefabricated Corner Reinforcement) KYr
RtUveRbIenAeBlsMPar³BRgwgmanPaBrwgeBk edIm,IgayRsYlbt;. sMrab;CMnYsmuxTisedAedkKYrRtUv
cgedayExSlYsenAcenøaHeQI Stud nigminRtUv[FMCag 229mm BIcMnuckNþal. sMrab;mux
TisedAQrtUveFVIenABIelITMr. enABIeRkamkMralkMe)arbUkKYrRtUvbMBak;edaybnÞHEdkRT edIm,ICYyRT
kMe)arbUk nigGacbgðÚrTwkEdlRCabtamkMe)arbUk. enAeBlEdlkMe)arRtUv)anyk mkbUkeKeRbI
kMlaMgeTAelI sMPar³BRgwgedayRkdasRTab;xñgBIelIrn§RbehagenaH edIm,IFananUvkarRKb eday
sMPar³BRgwgenH y:agtic 90° . eBlxøHviFId¾éTeTot (Alternate Method) RtUvykmk
eRbIR)as;edIm,IFananUvkarRKb edaysMPar³BRgwg)aneBjelj edIm,Ikat;bnßynUvsMPar³
BRgwgRkdasRTab;xñg b¤kMe)arbUkRTab;xñg enAcenøaHeQI Stud . RsTab;kMe)arbUkRTab;xñg (Back-
Plaster Coat) KYrmankMras;y;agtic 9>5 mm nigKYrbUkenAeBlEdlRsTab; Scratch mansPaB

rwgRKb;RKan;dUcenH sMBaFminGacbMEbkKnøwHénkMe)arbUk)aneT. épÞCBa¢aMgRtUvEtesImsBVRKb;mun
nwgbUk nigRtUvrkSasMeNImy:agtic 24 em:ag bnÞab;BIbUkrYc.

Plastering Work                                                                      13
Civil Engineering Department                                                         NPIC




rUbPaB 2-3 kartMeLIgy:agRtwmRtUvnUvbnÞHEdkRT GacbgðÚrTwk nigbnßynUvkarRCabrbs;TwkcUl
CBa¢aMg¬rUbeqVg¦ RbsinebIbnÞHEdkminRtUv)aneKeRbI PaBs¥itrvagebtugnig kMe)arbUksuIm:g;t_Br½ELn
GacCalT§plkñúgkarbnßysMeNIm.

        sMNg;CBa¢aMgmankþar Sheathed Construction
         kþaeQI/ kþakug)øaek (Plywood) rWsMPar³epSgeToteFVIBIeQIRtUv)antMeLIgtamTiseTAedk nig
P¢ab;y:agFanaenAelI Stud nimYy². bnÞHkþaeQIEdleRbIsMrab;CBa¢aMgKYrkuMeGaymanTTwgFMCag
203mm nigRtUve)aHP¢ab;edayEdkeKalBIredImenAelI Stud mYyedIm,Ikat;bnßynUvkareLIge)arén

eQI. CBa¢aMgkþarKYrRtUvRKbedayRkdasRTab;xñg EdlCan;Kñay:agtic 76>2 mm Rtg;kEnøg RCYsKña.
bnÞab;mkRKbedaysMPar³BRgwgedayEdk¬sMNaj;¦edayP¢ab;eTAnwgCBa¢aMgtameRKageQI. sMPar³
BRgwgRkdasRTab;xñgGacRtUvRKbedaypÞal;BIelICBa¢aMgkþa. sMPar³BRgwgRtUvBT§½CuMvij kac;RCugy:ag
tic 152.4mm. CMnYsmuxtamTisedAQrRtUvP¢ab;eTAelIeRKageQI nigCMnYsmuxedkRtUvP¢ab;eday
EdkeKalb¤EdkekobenAcMgay 152.4mm BIkNþalenAelICBa¢aMg. elIkElgEtsMPar³BRgwgenaHCa
Self-furringeTEdlEdk ekobGaceRbI)ancMeBaHEdkeKaleRbIsMrab;RbePT Furring Fmμta.




Plastering Work                                                                        14
Civil Engineering Department                                                        NPIC




          1>3 kMralkMe)arbUk Plaster Base
          kMralbUkKWCa sMPar³sMNg;b¤ épÞEdlmanPaBs¥itRKb;RKan;sMrab;karbUkedaypÞal;nUvkMe)ar
BIelIva. PaBs¥itGacbegáItedayKnøwHemkanic b¤edaykarbWt.
          KnøwHemkanic KWCalT§plénkarcak;eRsHKña rvagl,aykMe)arbUkCamYynwgrn§Rbehag b¤kar
lyecjénépÞkMral ÉkarbWtbegáInnUvPaBs¥itedaykarbWt Catis¥iténkMe)arcUleTAkñúgrn§d¾
tUcbMputén épÞkMraledayskmμPaBRsUbtamsréstUc². enABIelIEdkBRgwg PaBs¥itRtUv)anbegáIn
edayKnwøH emkanic nigenAelIebtug nigCBa¢aMgdæ PaBs¥itRtUvbegáInedayKnøwHemkanic b¤karbWt
b¤TaMgBIrEtmþg.           TaMgkMe)arbUkmñagsila nigsuIm:g;t_BrELnGacykmkeRbIBIelIEdkBRgwg
nigedaypÞal;elI ebtug dæebtug nigdæ. kMe)arbUkmñagsilak¾GacykmkeRbI edaypÞal;elI
plitpl mñagsilamYycMnYneTotdUcCa CBa¢aMgbUkedaymñagsiladæeFVIBImñagsila nigcMerokmñag
sila b:uEnþkMralTaMgenH min)anpþl;nUvPaBs¥itRKb;RKan;sMrab;kMe)arbUksuIm:g;t_Br½ELneT.
sMNaj;EdkKYrRtUvtMeLIgBIelIépÞsMPar³xagelImun nwg ykkMe)arbUksuIm:g;t_B½rELnmkeRbITIkEnøg
xagkñúg. bnÞHkþabnÞHGuIsULg;nigpÞaMgsMBt;EdkminKYrRtUvykmkeRbIsMrab;CakMraleGaykMe)arbUk
suIm:g;t_B½rELn
        1>4 ebtug nigdæ Concrete and Masonry
        TaMgkMe)arbUkmñagsilanig suIm:g;t_B½rELnGacykmkeRbIedaypÞal;BIelIebtug BIelIdæ
ebtugnigdæEdlPaBs¥itmanRKb;RKan;. b:uEnþkMe)arbUkmñagsilaminGacykmkeRbIenAelIépÞxagkñúg
CBa¢aMgxageRkA b¤épÞQménCBa¢aMg b¤EpñkEdlRtUvhalsMeNImdUcCakEnøggUtTwkcMhuy bnÞb;Twk b¤
GagTwkbiTCit.
        ebtug
      munnwgbUkkMe)arelIépÞebtugedaypÞal;eKRtUv)aj;xSac;edIm,IlagsMGatépÞebtug BI Laitance
eRbgCab;Bum< nigsarFatuepSg² EdlGacbnßynUvPaBs¥it. PaBrelag nig PaBrGilenAelIépÞén
ebtugbNþalmkBIeRbgCab;Bum<ehIy EdlGacykecj)anedaysarkarlagTwksab‘Uy:agxøaMg²
ehIyhalépÞebtugeGays¶ÜtedIm,IvaGacbWt)an. dUcenHeRbglabelIBum<minKYreRbIeT enAeBl
EdleKRtUvbUkkMe)arBIelIebtugenaH. bnÞHkþareRKIm² GacRtUvykmkeRbIR)as;sMrab;eFVIBum<ebtug

Plastering Work                                                                       15
Civil Engineering Department                                                         NPIC




EdlRtUv karbUkkMe)ar b¤eKRtUv)aj;xSac;y:agesIþgPøam² eTAelIépÞebtugbnÞab;BIerIBum< ecjedIm,I
eFVIeGayépÞebtugmanPaBeRKIm. ebtugrwg ehIyrelagGacRtUverobcMy:agsMebImeTotdUcCa dab;
cuH² cak;Twk GasuIteGaykat;PaBrelag b¤eFVIeGayeRKImeday Bush Hammer . eRKagEdkBRgwg
GacRtUvyk mkeRbIenAeBlNaeKbUkkMe)armñagsilaBIelIebtugrelag EdleKmin)aneFVIva
eGayeRKIm. sarFatus¥it b¤ RsTab; Dash GacRtUveRbIenAeBlNaEdl kMe)ar
suIm:g;t_B½rELnRtUvykmkeRbI nig karmin)an eFVIeGayépÞeRKIm.
        RsTab; Dash Dash Coat
        enAeBlEdleKminR)akdfa kMe)arbUksuIm:g;t_B½rELnGacTTYl)anPaBs¥itl¥ CamYynwg
ebtug b¤dæ eBlxøHeKKYrEteRbIRsTab; Dash Bond EdlmanbrimaNsuIm:gt_B½rELn1PaK nig1b¤2
PaKénxSac;KitCamaD. eKGaceRbIGMe)ascMebIgtUc b¤Ck;EdlmaneramEvgeRcInRClk;kñúgl,ayrYc
eKaHeTAelICBa¢aMgedIm,IeGay)anduMBk² énkMe)ar)any:agelOn ¬rUb2-4¦. RsTab; Dash enHmin
RtUvkareRbIsøabRBakMe)arsMrab;):ateT nigeKRtUvGnuBaØati[duMBkénkMe)arenaHs¶Ütsin munnwgbUk
RsTab;kMralkMe)arbUk. RbsinebIeyIgmankarxkxankñúgkarbUkRsTab;kMral (Base Coat) cUrrkSa
sMeNImeGayRsTab; Dash rhUtdl;eBleyIgcab;epþImbUkRsTab;bnÞab;.




                               rUb2-4 karGnuvtþn_nUvRsTab; Dash Bond Coat

        Pñak;gars¥it Bonding Agent
        viFImYyeTotedIm,ITTYl)annUvPaBs¥itl¥elIépÞebtug nigdæKWlabnUvPñak;gars¥itkarBarCMrab
Twk EdlplitkrENnaMeGayeRbIsMrab;épÞxageRkA. épÞénTMr KWCaeRKagEdlmanlkçN³l¥ nigrwgmaM
nigKμansarFatu Laitance FUlIsarCatieRbg nigsarFatuepSgeTotEdlGacrlaykñúgTwkdUcCa
fñaMlabEdllayTwkCamUldæan b¤kav.
        karkat;PaBrelagedayTwkGasuIt Acid Etching

Plastering Work                                                                        16
Civil Engineering Department                                                          NPIC




        l,ayénGasuIt muriatic mYyPaKnigTwk 6PaKRtUveRbIsMrab;kat;PaBrelagénépÞCBa¢aMg
ebtugb¤ dæenAeBlEdl Dash Coat b¤Pñak;gars¥itminmanPaBs¥itl¥. munnwglabnUvl,ayGasuIt
enH eKKYrepSImCBa¢aMgTaMgGs;edIm,IeGayGasuIteFVIRbtikmμEtxagelIépÞ)anehIy. karGnuvtþn_
CaeRcIneTotGacCakarcaM)ac;. bnÞab;BIGnuvtþn_ehIy épÞebtugRtUvlagedayTwkedIm,IsMGatnUvsñam
TwkGasuItrYcehIyTukeGayvas¶Üt edIm,ITTYlmkvijnUvPaBbWt.
        CBa¢aMgerobdæ Masonry
        enAeBlEdleyIgcg;bUkedaypÞal;BIelICBa¢aMgerobdæ ral;muxtMNRtUvEteFVIeGayerobesμI
b¤edayras;tic². épÞénCBa¢aMgRtUvEts¥atmanlkçN³l¥ erobry nigKμanEsø Catixøaj; sarFatu
karBarCMrab fñaM b¤sarFatud¾éTeTotEdlrMxandl;karetags¥it. EsøeRbgnig sarFatuxøaj;Gaclag
sMGatedayl,ayGasuIt muriatic 10°kñúgTwk. RsTab;epSgeTot b¤sarFatuepSgeTot EdlCH
T§iBlminl¥dl;PaBs¥itRtUvykecjedaysarFaturlaysmRsb b¤edaylagsMGat. épÞdæEdl
mansPaBrwgCamFümnigmanTMgn;CabTdæan                    épÞbøk;ebtug              nigfμRbePTFM²
CaTUeTAmankarbWtTwkl¥                          nigCYnkalk¾mankars¥itCalkçN³emkanicpgEdr.
eKGacBiesaFn_PaBbWtrbs;épÞ                      énsMPar³)an                   eday)aj;Twks¥at
nigBinitüemIlel,ÓnénkarRsUbCatiTwk etIelOnbu:NÑa? RbsinebITwkRtUv RsUbeday
gayenaHCalT§pl                 KWsMPar³enaHmankarbWt)anl¥           pÞúyeTAvijTwkRtUvRsUbeday
TMrg;tMNk;tUc²enaH)ann½yfa épÞenaHminpþl;nUvPaBs¥ittamry³karbWteT KWtamry³lkçN³
emkanicvij. dUcenHva GacRtUveKeFVI[épÞmanlkçN³KeRKImedIm,IFananUvPaBs¥itrvag kMe)arbUk
edayKnøwHemkanic. dæEdllabfñaMrelagmanPaBrGilNas; b:uEnþdæebtugTMgn;bTdæan (Standard-
Weight CMU) manépÞeRKImRKb;RKan;.

        sMrab;épÞEdlRsUbsMeNImy:agelOndUcCadæFmμtaEdlTn;nig dæebtugTMgn;RsalenaH
kMe)arbUksuIm:g;t_nig qab;s¶ÜtEdlBi)akbUk[)anRtwmRtUv. karbWty:agelOnenHGacCMnH)aneday
kar)aj;TwkefIr² eTAelICBa¢aMgdæ ¬minEmnRtaM¦ eRcIndgeRcInsarPøam² munnwgkarbUknUvRsTab;
TI1. épÞCBa¢aMgRtUvmanlkçN³esIm minRtUvGt;manTwkesaHeTmunnwgbUkkMe)ar. enAeBlEdl



Plastering Work                                                                         17
Civil Engineering Department                                                         NPIC




RsTab; Stucco bUkedaym:asuIn (Machine-applied) eyIgmincaM)ac;epSImépÞCBa¢aMgeT eRBaHCaTUeTA
l,aykMe)armanCatiTwkeRcInCagkMe)arEdlbUkedayéd.
        dæEdldutkMedAxøaMg dæebtugEdllabfñaMrelag nigfμRbePTxøHeTotmanPaBs¥itminl¥ nig
minÉksNæan. RbsinebIénelIépÞénCBa¢aMgTaMgmUlkarbWtTwkmanlkçN³ minÉksNæanenaHvanwg
bWtsMeNImeRcInCagCBa¢aMgd¾éT ehIyépÞEdlbUkehIynwgeLIgsñamBN’. elIsBIenaHeTot
PaBs¥itminÉksNæanenHbgánUvsñameRbH BIeRBaHkMe)arbUknigcl½teTArkkMralTMrEdlmanPaBs¥it
¥ nigedayÉkraCüBIkEnøgBIkEnøgEdlmanPaBs¥itminl¥.
        RbsinebIépÞCBa¢aMgmanPaBs¥itminl¥ b¤minÉksNæan enaHeKerobcMsMPar³EdkBRgwg
RsTab; Dash b¤Pñak;gars¥itBIelIépÞenaH. enAeBlEdlEdkBRgwgRtUv)aneRbICamYykMe)arbUksuIm:g;t_
B½rELn RkdasRTab;xñgk¾RtUv )aneRbIsMrab;eFVICasnÞHxNнrvagPñaskMe)arbUk nigkMralCBa¢aMgedIm,I
karBarPaBbWtTwkmindUcKña. enAeBlEdlkMe)arRtUv)anbnþbUkbegðIy BIelIkMralrwgmindUcKña
sMPar³RtYtBinitümuxtMNr rW pÞaMgEdkBRgwgRtUvRKbBIelIkEnøgCYbKñaénsMPar³mindUcKñaenaH.
kMe)arbUkminRtUvbUk edaypÞal;BIelI bMBg;EpSgerobdæeT b:uEnþeKGacbUk)anBIelIEdk BRgwg. b:uEnþ
RkdasRTab;xñgminRtUv)aneRbIeT BIeRBaHkMedAbgánUvPaBkan;Ety:ab;eLIg. Flashing RtUv)aneRbI
enABIeRkambMBg;EpSg nigRtg;muxtMNrvagdMbUlnig bMBg;EpSgedIm,IkarBarkareRcaHTwk.
        1>5 EdkBRgwg Metal Reinforcement
        EdkBRgwgGacRtUvykmkeRbICMnYs[eRKagmñagsilasMrab;bUkkMe)arBIelI eQI b¤BIelIeRKag
Edk b¤ Furring . vak¾GaceRbICamYykMe)arbUkmñagsila sMrab;bUkBIelIépÞebtug b¤dæEdlmanPaB
s¥itminRKb;RKan;sMrab;karbUkedaypÞal;.
        EdkBRgwgk¾RtUv)aneRbIenAeBl EdleKRtUvbUkeTAelIsMNg;eRKageQI EdlmanCBa¢aMg
(Shealted) nigKμanCBa¢aMg (Unshealted) b¤BIelIeRKagEdk b¤BIelIebtug b¤BIelIdæEdlminmanPaB

s¥itRKb;RKan; nigenABIelI Flashing nigbMBg;EpSg.
        kMe)arbUkBIelIEdkBRgwgedIrtYdUcCakMralmanEdkd¾esþIg EdlRTedayeRKagsMNg;RkalBI
eRkamva. vaminmanPaBrwgmaMRKb;RKan;edIm,IRTnUv Stress EdlbMElgedaypÞal;. EdkBRgwgRtUvEt
cg eGay)anl¥rvagsMNg;RTRTg;nig TajeGayRtg;edIm,Ikat;bnßyPaBFUrrlg;. karcgEdlman

Plastering Work                                                                        18
Civil Engineering Department                                                      NPIC




PaBeFVsRbEhsCaTUeTAbgáeGaykMras;énkMe)arbUkmankMras;minesIμKña EdlkEnøgesþIgCageK
GacnwgbgásñameRbH. tMNy:agtic 4.6 mm RtUvrkSarvagEdkBRgwgnwig sMNg;RTRTg; edayeRbI
Furring Fastener b¤edayEdkBRgwg Self- furring ¬rUb2-5¦. EdkBRgwgRtUvEtCaRbePTsmRsb

nigman TMgn;smRsbeTAtamKMlaténeRKOgRTRTg;nig KYrEtcgedaydegáóbEdlENnaMsMrab;
eRKagRTRTg;Biess.




              rUb 2-5³ sMNaj;lYs Self-furring EdlmanRbEvg 75 mm Edkv½nþKña ¬eqVg¦
  sMNaj;nig RkdasRTab;xñgmanKMlat 6.4mm BIKñaedayeRbIKMlatBIelIEdkeKal furring ¬sþaM¦

        RbePT Type
         RbePTEdkBRgwgFmμtaPaKeRcInEdlmantMélsmrmüehIyGacrk)an KW expanded metal
lath nig wire lath. Rbehagén lath KYrEtmanTMhMFMlμmedIm,IeGayeKGacqáÚtBIelIRbehagenaH nig

edIm,Ibgáb;EdkBRgwgEdlkarBareRcHsuI.
        Expanded Metal lath
         RtUv)aneFVIBIpÞaMgEdk Light- au Edlkat;tamlMnaMeTogTat; nigTajsn§wgedIm,IeFVI[rn§
RbehagmanragCactuekaNesμI. TaMgpÞaMgEdkRClk;sgá½sIEdlTajsn§wg nigpÞaMgEdk cold-rolled
EdlsuT§EtmanRsTab;fñaMkarBareRcHRtUv)anykmkeRbI. sMNaj;ragctuekaNesμI RbePT Plain,
self-furring     nig paper-backed RtUv)anplitCaTMrg;pÞaMg. CaTUeTARbePT Plain
RtUv)antMeLIgCamYy                   ]bkrN_P¢ab;            furring            fastener.

sMNaj;EdlmanRbehagvagctuekaNesμIRtUv)anplitkñúgTMgn;BI 1.36 nig 1.84kg/m                 2



manEtsMNaj;EdlmanTMgn;F¶n;                      2
                                         1.84kg/m            eTEdlsmRsbsMrab;eRbICamYy

Plastering Work                                                                     19
Civil Engineering Department                                                           NPIC




kMe)arbUkCBa¢aMgxageRkA. RbePT Self-furring KWman]bkrN_epSgeTotsMrab;s‘kenAcenøaHvanwgépÞ
EdlvacgP¢ab;. ]brkN_enHRtUvdak;enABIxageRkaypÞaMgsMNaj;eGaymanKMlaty:agtic 6>4 mm
BIeRKagRTRTg;. Self- furring k¾Gace)aHP¢ab;edayEdkeKaledaypÞal;BIelIépÞd¾relagrbs;ebtug
dæ nigépÞtan;epSgeTotEdlRtUvkarbUkkMe)ar. sMrab;sMNaj;RbePT Paper-back manpÞaMgRkdas
P¢ab;enAEpñkxagxñgva RtUv)anpliteLIgsMrab;karbUkkMe)aredayeRbIma:suIn. eKRtUvrkSaKMlatrvag
pÞaMgRkdassMrab;P¢ab;eTAnwgeQI Stud b¤sMNg;RTRTg;epSgeTot.
         sMNaj; stucco KWCapÞaMgEdkEdlmanlkçN³RsedogKñaeTAnwgKMrUsMNaj;manRbehagrag
ctuekaNesμI b:uEnþmanrn§RbehagFMCag. vaRtUv)aneKplitCasMxan;sMrab;CakMralBIelIépÞtan;sMrab;
bUkkMe)ar. vaKYrRtUv)aneKtMeLIgCamYy backing paper nig furring fastener.
         Rib lath KWCaRbePT expanded metal lath EdlmanragCaq¥wgCMnIGkSr V EdlbegáIn[man

PaBrwgkan;Etl¥ nigkMlat pennit kan;EtTUlayBITMr.
         pÞaMgEdlmanq¥wgTMhM 3.2, 9.5 nig 19.1 RtUv)anplit. CaTUeTA rib lath TMhM 3>2 EdleK
ehAfa flat rib lath RtUvkar furring fastener nigGaceRbIsMrab;karGnuvtþn_bUkkMe)arPaKeRcIn. ehIy
TMgn;rbs;vaKW 1.49 nig 1.84kg/ b:uEnþmanEtTMgn;EdlF¶n;eTEdlsaksmnwgkareRbIR)as;sMrab;
                                 m
                                  2



CBa¢aMg xageRkAnigkarbUkedaykMe)arsuIm:gt_Br½ELn. Rib lath TMhM 9>5 mm mintMrUvkar furring eT
b:uEnþeKmin)an[eRbIR)as;cMeBaHGakasFatueRcInRbePTeT eRBaHvaBi)akniwgeRsab lath eTAkñúgkMe)ar
bUk. eTaHCay:agNaeKGaceRbIva)anenAkñúgGakasFatuEdlmanlkçN³RsTn; nigenAkñúgkEnøg
EdlkarBarsMeNImedaypÞal;dUcCaenA soffit . KuNsm,tiþd¾FMrbs;vaKWeyIgGaceRbIva sMrab;TMrEdl
mankMlatrhUtdl; 610mm BIkNþal.




Plastering Work                                                                          20
Civil Engineering Department                                                       NPIC




                                 rUb 2-6 RbePTEdkBRgwg
        Wire Lath
        Wire lath RtUv)anplitCakMNat;lYspSa b¤kMNat;lYst,aj. Wire lath KYrRtUvplitBIlYs
Edk Cold-drawn EdleRsabeday copper- bearing edaymanTMhMrn§RbehagsmRsb. vaRtUv)an
eKeRbICaTUeTAsMrab;CakMralénkMe)arbUkEpñkxageRkA.
        kMNat;lYst,aj ¬sMNaj; stucco ¦ KWCakMNat;lYsEdlt,ajmanrn§RbehagEdlman
6RCug)anmkBIkart,ajlYseGaymanRbehag 6RCugEdlmanTMhMRbehag 25>4 mm eTA 57.2mm
¬rUb 2-6¬3¦¦. RbePT Plain RtUv)ane)aHP¢ab;nwgsMNg;RTRTg;edayEdkeKal furring BI elI
backing paper. kMNat;lYst,ajenHk¾manRbePT self-furring Edredaymanb¤Kμan backing paper

edIm,Ikat;bnßynUvtMrUvkar furring fastener b¤tMeLIgedayELkBIKñaBI backing paper
edayGaRs½yeTAnwgRbePTén lath ykmkeRbI. TMhMsMNaj;EdltUcmanTMhM 25.4 mm KYrman
xñat18 TMhMlYs 1.3mm xñat 17 TMhMlYs 1.45mm TMhMRbehag 38 mm.
        kMNat;lYspSarEdl manRkLaRtUv)anpliteday karpSarlYsedaymanragkaerTMhM
25.4x25.4mm nig 50.8x50.8mm . vak¾mannUv backing paper nig stiffener wires nigRbePT self-

furring. kMNat;enHKYrEtmaneRsabsgá½sInig fñaMFn;nwgeRcHbnÞab;BIpSarYc b¤eFVIGMBIlYsEdleRsab




Plastering Work                                                                      21
Civil Engineering Department                                                          NPIC




sgá½sIEtmþg. sréslYsKYrmanxñat 16 TMhM 1>6 mm sMrab;plitkNat;EdlmanRbehag 50.8x
50.8 mm nigy:atticxñat 18 TMhM 1.3 mm sMrab;plitkMNat;EdlmanTMhMRbehag 25.4 x 25.4

mm.

        kartMeLIg Installation
         EdkBRgwgKYrRtUvP¢ab;nwgebtug b¤dæedayeRKOgP¢ab;smRsbEdlmanKMlat 152mm BIG½kS
kNþaltamTisedAQrRtUvFanaedayeRKOgP¢ab; b¤EdklYs 150mm BIG½kSkNþaltamTisedAedk.
TaMgCMnYsmuxtamTisedAedk nigTisedAQrRtUvFanaedayeRKOgP¢ab; b¤EdklYs 150mm
BIGkS½kNþal. EdkBRgwg self-furring GacRtUvP¢ab;eday powder-actuated fasteners b¤ concrete
stubnail . EdkBRgwg plain KYrRtUvP¢ab;eday Concrete furring nail. EdkeKal TaMgenHKYr

manRbEvglμmedIm,IeGay)anCMerA 9.5mm eTAkñúgebtug b¤dæ.
         CaTUeTAEdkBRgwgKYrRtUvtMeLIgBIelIeRKag b¤ furring EdlmanTMhMEvgEkgeTAnwgTMr nigxag
cugCMrYsmanPaBeRTteRTat edaybnþtMeLIgnUvBRgwgEdkBIelIépÞTaMgmUlEtmþg. Expanded Metal
lath KYrRtYtelIKña.12>7 mm enAxagnig 25>4 mm enAxagcugCayrbs; rib lath KYrEtRtYtKña.

Wire lath KYrEtRtYtKñaenAxagcugnigenAxaglic mYyRbelaHsMNaj;nigminRtUv tUcCag 25.4mm .

CaTUeTAsMrab;CMrYsedkpÞaMgxageRkamKYrRKbBIelIpÞaMgxagelI. b:uEnþEdkBRgwg Pater-backed KYrEt
eFVItamrebobepÞagpÞHedayCMrYs Sandwich-lapped pÞaMgxagelIBIelIpÞaMgxag eRkamedayEdk
elIEdk.
         CaTUeTAEdkeKalduMBnøiccUleTAkñúgTMrCBa¢aMgy:agtic 22.2mm nigeTAkñúgTMrBidany:agtic 35
mm . eKminGaceRbIEdkeKalGaluymIj:ÚmCamYyebtugBr½ELnraveT eRBaHvamanRbtikmμKImIrvag

Kña. sMrab;RbePTPaKeRcInénEdkBRgwg CaTUeTAEdkeKalP¢ab;enARtg; rib EtmþgEdkeKalEdlman
RbEvg 38mm nig 50.8mm RtUvENnaMeGayeRbIedIm,IFananUvkarTMluHcUly:agGb,brima sMrab;CBa¢aMg
nigBidan.
         EdkBRgwgKYrRtUv)anP¢ab;eTAnwgeRKagEdknig furring edayvIs b¤tem,ótxÞas;Edlb®gÁb;
edayvIs. sMrab;BidanBüÜr EdkBRgwgGacnwgcgP¢ab;eTAnwgeRKagBidan.



Plastering Work                                                                         22
Civil Engineering Department                                                        NPIC




                  rUb 2-7 RCugxageRkARtUvBRgwgedaykMNat;EdkEdlbt;CuMvijEkg ¬eqVg¦
                        RCugxageRkARtUvbegáIteday corner bead sgá½sI ¬sþaM¦

      enAeBlEdlGRtaPaBrwgmaM (Sound rating) RtUvkarcaM)ac;EdkBRgwg GacnwgP¢ab;eday
tem,ótxÞas;yWt.
      RCugxageRkAGacnwgRtUvbegáItCamYy cornerbead CamYyRCugBRgwgEdleFVIRsab; b¤edaybt;
EdkBRgwgCuMvijRCug ¬rUb 2-7¦. sMrab;RCugxagkñúgGacBRgwgedaysMNaj;EdkBRgwgRCugb¤ eday
EdkBRgwgxøÜnvaedaybt;eGayecjCaRCugtammuMEdleyIgcg;)an ¬rUb 2-8¦.




                  rUb 2-8 sMNaj;lYst,ajGacbt;CaRCugxagkñúgedayRsYl
        1>6 Backing Paper
        EdkBRgwgsMrab;kMe)arbUksuIm:g;t_Br½ELnKYrman Backing Paper sMrab;TIkEnøgxageRkA b¤
sMrab; kEnøgxageRkAEdlesIm nigenAeBlEdleKGnuvtþkarbUkkMe)aredaykar)aj;. Backing Paper
KWRtUvykmkeRbIsMrab; ³

Plastering Work                                                                       23
Civil Engineering Department                                                      NPIC




        1> CaPñasxN½ÐrvagsMNg;TMr nigkMe)arbUk
        2> karBarkar)at;bg;l,aykMe)artamrn§RbelaH Lath
        3> sMrYldl;karbgáb; lath )ansBVRKb;
        4> karBarCMrabTwktamsñamEbkeTAkñúgPñaskMe)arbUk
        Backing Paper min)aneRbIR)as;sMrab;karGnuvtþn_edayédeT enAelIépÞedkEdlRtUv)an

karBar BI sMeNImedaypÞal;. Backing Paper KYrmanRsTab;RCabedaycMhayy:agtic 5perm
edIm,IGnuBaØatieGaykMe)arbUks¶Üt nig karBarsMeNImEdl)anmkBIkñúgCBa¢aMgEtmþg. plitpl
karBar CMrabTwk nig vapor- permeable RtUv)aneRbIR)as;sMrab; Sheathing Paper dUcCa 8.14kg/m
                                                                                         2



asphalt-satviated roofing KWsmRsbkñúgkareRbIR)as;. Backing paper GacnwgP¢ab;edayeRscenA

eragcRkCamYynwg EdkBRgwg b¤GactMeLIgdac;edayELkBIKña. RkdasP¢ab;EdlmansPaB
RsUbCatiTwksMrab;Edk BRgwgxøHminEmnkarBarCMrabTwkeT nigminRtUvykeTAeRbIsMrab;kEnøg
xageRkAEdleKRtUvkarkarBar GakasFatu.
       1>7 pÞaMgmñagsila Gypsum Lath
       pÞaMgmñagsilaKYrRtUvP¢ab;eTAnwgCBa¢aMgeQInigeRKagBidan nig furring edayvIsEdlsmRsb
eTAnwgkarENnaMrbs;plitkr b¤edayEdkeKal. sMrab;P¢ab;eTAnwgeRKagEdk nig furring RtUveRbI
tem,ótxÞas;. enAeBlEdlGRtaPaBrwgmaM (soundrating) RtUvkarpÞaMgmñagsilaRtUvP¢ab;eday
tem,ótxÞas;ywt.




 rUb 2-9 karP¢ab;pÞaMgsilaeTAnwg stud EdkedayvIs edaytem,ótxÞas;sMrab;RCugnigmuxtMN.


Plastering Work                                                                     24
Civil Engineering Department                                                        NPIC




1>8 eRKOgbnÞab;bnSMBIEdksMrab;karbUkkMe)ar Metal Plaster Accessories
         sMrab;sMNg;eKhdæanPaKeRcInd¾dUcCa sMNg;GaKarEdr CaerOy²s‘umeQIRtUv)anbUkkMe)ar
EpñkxagCay². enAeBlEdls‘umeQImin)aneRbI ehIyCay²RtUvkarkarBarBIeRKaHfñak;dUcenHeK
RtUveRbI Metal casing bead . Control Joint )anbBa©ÚlnUvkEnøgEdlEbkFM² eTAkñúgbnÞHd¾tUc self-
contained nig drip screed RtUv)aneRbIsMrab;kMNt;bnÞat;enAxag)atCBa¢aMg. eRKOgbnÞab;bnSM

epSgeTot dUcCa strip lath nig conerite ¬rUb 2>10¦ RtUv)aneRbIsMrab;épÞrabesμI
nigRCugxagkñúgerogKña. CaerOy² RCugxageRkARtUv)anpþl;[CamYyKñanwgEdkBRgwgRCugenAeBlNa
EdlpÞaMgEdkminman sPaBrs;RKb;RKan;edIm,Ibt;)antamRCug.




                  rUb 2-10 RbePTeRKOgbnSMsMrab;kMe)arbUksuIm:gt_Br½ELn (Stucco)

EdkBRgwgRCugEdlKμan solid nosing RtUv)anplitedIm,IGnuBaØatieGaykarbgáb;EdkeTAkñúgkMe)arbUk.
eTaHCay:agNa corner bead EdleFVICamYy solid nosing GacRtUvykmkeRbIR)as; vaRtUv)anplit
BIsMelah³sgá½sIBN’s ¬99° sgá½sIsuT§¦ EdleRbIsMrab;kEnøgNaEdlRtUvhalxül; Casing bead

Plastering Work                                                                       25
Civil Engineering Department                                                        NPIC




KYrRtUvbegáItBIEdkEdlmanxñat24 ¬TMhM 0.70mm¦sMrab;eRKOgbnSMepSgeToty:agtUcxñat 26
¬0>55mm¦. sMrab;kMe)arbUkEdlRtUvhalsMeNImeRKOgbnSMEdkEdlykmkeRbI ¬Edlmin
bgáb;TaMgRsugeTAkñúgkMe)arbUk¦ KYrEtFn;nwgeRcHsuI dUcCasMelah³sgá½sIBN’s.
         1>9 Flashing
         Flashing       RtUv)antMeLIgy:agRtwmRtUvsMrab;karBarTwkEdlRCabcUlkñúgsMNg;CaBiessKW
Gayukal nigbMerIbMras;CaTIeBjcitþrbs;épÞkMe)arbUk. Flashing RtUv)anykeTAeRbIR)as;sMrab;
kEnøgNaEdlmanbBaðaTwkRCab. TwkEdlRCabcUlBIxageRkaykMe)arbUksuIm:g;t_GacbNþal[man
eRcHsuIEdkBRgwgnig eRKOgbnSMehIyCHTi§BleRKaHfñak;dl;épÞkMe)arpg.
         manEtsMPar³EdlFn;nwgeRcH dUcCaEdkeRsabsgá½sI (galvanized steel) EdkGuINUk
(stainless steel) nig)øasÞikEdlsmRsbGaceRbICa Flashing )an. EdkBRgwgKYrtMeLIgBIelI flashing

BIeRBaHsMPar³TaMgenHminmanPaBs¥itRKb;RKan;sMrab;kMe)arbUkeT.




Plastering Work                                                                       26
Civil Engineering Department                                                      NPIC




CMBUk    III

karGnuvtþn_nUvkMe)arbUksuIm:g;t_Br½ELn
PORTLAND CEMENT PLASTER APPLICATION


1> l,aykMe)ar Mixed
        kMe)arbUksuIm:gt_RtUv)aneRbITaMgkñúgnigeRkA. vak¾GaceRbIsMrab;kEnøgNaEdlhalsMeNIm
pgEdr.
        1 Cu l,aykMe)arbUksuIm:g;t_Br½ELn RtUvmanRKYsxüac;RbEhl 0.028m nigsuIm:g;t_BI0.007
                                                                        3



eTA 0.009 m . dUcenHfμbMEbkRtUvEts¥atrwgmaM nigmanlMdab;RKab;RtwmRtUv EdlTMhMRKab;RtUvman
               3



lMdab;BIm:t;eTAdl; TMhMGtibrma 3.3mm. sMrab;l,ayd¾l¥bMputTMhMfμbMEbkRtUvEtmansmamaRt
Edll,aysum:gt_TwkRtUvkary:agGb,brmasMrab;Cal,ays¥itrvagfμbMEbknig bMeBjeTAkñúgrn§
RbelaHfμbMEbknimYy². kñúgkarlayEdlfμbMEbkmanPaBm:t;eRcInhYs b¤RKYseRcInhYsdUcenH
vaRtUvkarsuIm:g;t_eRcInb¤TwkeRcInEdlCHTi§Blminl¥dl;kMe)arbUk.
kareRCIserIsTukCamunnUvtYGkSr )anbgðajy:agc,as;nUvRbePTrbs;l,ay.
        kareRCIserIsnUvl,ayEdlsmRsbsMrab;RsTab;Edl)anbgðajGaRs½yeTAelIPaBs¥it én
kMralkMe)arbUk. l,ayEdlmanbrimaNsuIm:gt_mYyPak ¬rYmTaMgkMe)arenAeBleRbI¦CamYynwgy:ag
tic3PaK nigmineGayelIs 5PaKKitCamaDénxSac;esIm. edaysarEtKuNPaB niglMdab;fñak;
xSac;manPaBxusKñaeRcIneTAtamkEnøg dUcenHkarEktMrUvsmamaRténxSac;nig suIm:gt_KYrEtkMNt;BI
karlayl,aysakl,g b¤ edayykbTBiesaFn_cas; EdlykfμbMEbkBIRbPBkñúgtMbn;enaH
mklay.
        RsTab;bUkbegðIyEdlmanGayukalEvgKW GaRs½ynwglMdab;fñak;énRKab;fμbMEbkBIm:t;
eTARKab;FM². enAeBlfμbMEbkmanPaBm:t;eRcInenaHl,ayTwksuIm:g;t_RtUvkareRcInCagGVI Edl
RtUvkarsMrab; etags¥itrvagRKab;RKYsEdlmanTMhMépÞFMCag. enAeBlEdlfμbMEbkmanRKab;RKYs
eRcInCagenaH l,aysIum:g;t_TwkRtUvkareRcInsMrab;bMeBjeTAnwgRbelaHénRKab; RKYs. karxVHl,ay
Plastering Work                                                                     27
Civil Engineering Department                                                         NPIC




suIm:g;t_TwkenAkñúgl,aykMe)arenaHvabNþal[eKBi)akeFVIkar b:uEnþkarbEnßmTwkeRcIneBk b¤suIm:g;t_
eRcInedIm,IPaBRsYleFVIkar vapþl;lT§pleGaykMe)arbUkeBls¶ÜtmankarRsk b¤ rYjx<s; nigman
sñameRbH. elIsBIenHeTotCaerOy² xSac;m:t;manPaKrydIdæ x<s;EdlnaMeGay manPaBRskxøaMg
enAeBls¶ÜtsMrab;xSac;RKYsFMbgánUvPaBlM)akkñúgkarlay nigkarbUk. dUcenH RKYs xSac;KYrRtUv
eRCIserIseGay)anm:t;ct; nigminRtUvepþkpþÜleTAelIKuNsm,tþid¾l¥énKuNPaB b¤ lMdab;fñak;
rbs;vaeT.
          l,ayEdllay)anl¥RtwmRtUvsMrYldl;kareFVIkar nigsMrYldl;karbUk. vasMEdgnUvPaB
Cab;s¥itenAelIpÞaMgkMral nigPaBs¥itRKb;RKan;enHehIy EdleFVIeGayl,ayminGacFøak;cuHtamTis
edAQrelIépÞ. enAeBlEdll,ayRtUv)ankMNt;nUvsmamaRténsMPar³y:agRtwmRtUvenaHral;elIk
énkarlaypþl;eGayeyIgnUvkar bWt nigBN’dUcKña.
          eyIgRtUvlaysMPar³pSMCalkçN³kMe)ars¶ÜteGaysBVmunnwg EfmTwk. bnÞab;mkbrimaN
TwkRKb;RKan;RtUv)anEfmedIm,IFanaPaBgayRsYleFVIkargar. m:asuInlaykMe)ar (Power Mixer) RtUv
ENnaMeGayeRbIsMrab;laysMPar³eGay)ansBVl¥. vaRtUvRbtibtþiy:agtic5naTI bnÞab;BIsMPar³pSM
TaMgGs;dak;cUlkñúgm:asuInRkLúk. sMPar³TaMgGs;KYrlaykñúgbrimaNEdlGaceRbIkñúgry³eBl 3
ema:gknøHb:ueNÑaH. karRcbUkeLIgvijedIm,IeGayPaB)øasÞikénl,aykMe)ar manPaBdUcedImRtUv)an
GnuBaØatib:uEnþkarbenßmTwkKWmin)an.
          enAeBlEdlkMe)arbUksuIm:g;t_Br½ELnRtUv)anGnuvtþedaym:asuIn eBlenaHbrimaNTwkKYrEt
eFVIkarEktMrUvedIm,I)annUvl,ayd¾RtwmRtUvsmRsbnwg RbEvgTueya sItuNðPaB lkçN³sMeNIm nig
RbePTénkMralEdlRtUvbUk. karvas; slump eday]bkrN_ekaNEdlmanTMhM 50.8 x102x152mm
KYrmanBI 63.5 nig 101.6mm l,ayBIm:asuInRkLúknigBI 50.8 eTA 82.6mm l,ayBIk,ayTueya.
RbEvgTueyaBIm:asuIneTAkEnøgeFVIkarKYrRtg; nigkan;EtxøIkan;eTl¥ ¬kuMeGayEvgCag 60.69m¦.
        1>1 l,aysuIm:g;t_erobdæ nigsuIm:g;t_)øasÞik Masonry and plastic cement mixes
        suIm:g;t_erobdæ nigsuIm:g;t_)øasÞikEdlplitecjBIeragcRkmanlaysarFatu Plasticizer
Rsab;dUcenHeKmincaM)ac;bEnßmkMe)arb¤ Plasticizer eTAkñúgl,ayEdllayeday suIm:g;t_enHeT.
dUcenHeKcaM)ac;bEnßmEtxSac;nigTwk)anehIy kñúgeBllayenAkñúgkEnøgeFVIkar. y:agNamij

Plastering Work                                                                        28
Civil Engineering Department                                                          NPIC




eKk¾GaclaybBa©ÚlrvagsuIm:g;t_erobdæ b¤ suIm:g;t_)øasÞik CamYysuIm:g;t_Br½ELnkñúgbrimaNmaD
esIμKñaenA eBlEdlPaBFn;nwgkMlaMgRtUvkarkan;Etx<s;. suIm:g;t_)øasÞik nig erobdæEtÉgb¤lay
bBa©ÚlKña CamYysuIm:g;t_Br½ELnGaceRbIsMrab;karbUkkMe)ar 3RsTab;.
        1>2 l,aysuIm:g;t_Br½ELn Portland Cement Mixes
        suIm:g;t_Br½ELnGaclaybEnßmedaykMe)ar suIm:g;t_)øasÞik b¤suIm:gt_erobdæedIm,IbegáInPaB
RsYldMeNIrkar nigPaB)øasÞikénl,ay. sMrab;RsTab;kMe)ardMbUg eKRtUvlaysuIm:g;t_B½rELn1PaK
CamYynwgkMe)ar 1¼ PaK rWsuIm:g;t_)øasÞik b¤suIm:g;t_erobdæmYyPaK. sMrab;RsTab;begðIy eKRtUv
laysuIm:g;t_Br½ELnmYyPaKCamYynwgsuIm:g;t_)øasÞik mYyPaK rWkMe)arBI ½ eTA2PaK. eKnwglay
CamYysuIm:g;t_Br½ELnBN’s nigxSac;EdlmanBN’esIþgenAkardæansMrab;RsTab;begðIy. Plasticizer
dUcCasarFatuEr: stV bEnø b¤kMNat;kBa©k;GacRtUvdak;bEnßmcUlkñúgl,aysMrab;RsTab;TI1 b:uEnþkñúg
brimaNRKb;RKan;edIm,ITTYlnUvPaB)øasÞik nigPaBs¥itEdleKcg;)an. RbePTnigbrimaNBitR)akd
énPñak;gar Plasticizer ERbRbYleTAtamRbePTénfμbMEbk kMralkMe)arbUk nigrebobGnuvtþn_.
brimaNkMNat;Er:sMrab;eRbIminRtUv[elIBI 3°énTMgn;suIm:g;t_eT. bnSMénsMPar³pSMd¾l¥bMput RtUv)an
kMNt;edaykarlaysakl,g (trial mix) .
        2> karGnuvtþn_ Application
         kMe)arbUksuIm:g;t_B½rELnminGacykmkGnuvtþsMrab;GakasFatuRtCak; b¤elIépÞEdlman
kMNkTwkkkeT. sItuNðPaBénl,ay kMe)arKYr sßitenAsItuNðPaB 10 C b¤elIsBIenHkñúgkMLúgeBl
                                                                  º



Rbtibtþinig y:agtic 48em:ag bnÞab;BIRsTab;begðIy)anbUk. enAeBlEdlsItuNðPaBFøak;cuHkMe)ar
bUksIum:gt_B½rELnRtUvkarBarBIFatuGakasRtCak;edaysMPar³pþl;kMedA edayh‘MueGayCit.
         karGnuvtþn_edayédnUvkMe)arbUksuIm:g;t_Br½ELnrYmman]bkrN_buraN
nigkarGnuvtþn_Edl )anbBa¢ak;nUveCaKCy½rab;stvtSmkehIy. eTaHCay:agNak¾eday
karGnuvtþn_edaym:asuInk¾man                                             KuNsm,tþirbs;vaEdr.
kMe)arravGacRtUvbBa¢ÚneLIgeTAelIedaysMBaFtamCnÞalsMrab;GakarEdl              maneRcInCan;.
karGnuvtþn_manel,ÓnelOnEtmuxtMN                 nigmuxCMrYsKña       emIleXIjc,as;eBlxøHeK

Plastering Work                                                                         29
Civil Engineering Department                                                          NPIC




Bi)aknwgeCosvagBIkarGnuvtþn_edayédNas; EtRtUvkat;bnßy. lT§plénkarGnuvtþn_edaym:asuInKW
manépÞÉksNæanCag nigBN’Rkem:Anig eRCACagkarGnuvtþn_edayéd.
         elIsBIenHeTot vaynPaBxøHdUcCa vaynPaBeRKImk¾GacTTYl)anedaykar)aj;. Cavi)ak
RsTab;begðIyEtgEtRtUvGnuvtþedaym:asuInBIelIRsTab;dMbUg EdlGnuvtþedayéd. CaTUeTAkMe)ar
bUksuIm:g;t_Br½ELnRtUv)anGnuvtþCa 2 b¤3 RsTab;GaRs½ynwgeRKOgTMr.
         2>1 kargarbUkbIRsTab; Three coat work
         karGnuvtþn_bIRsTab; KWtMrUveTAelIEdkBRgwg nigCYnkal bUkenAelIkMralEdlmansPaBrwg
maM. varYmmanRsTab; Scrath coat, brown coat nig finish coat srubTaMgGs;mankMras; 22.2 mm.
RsTab;nimYy² RtUvbUkeGaydac;edayELkBIKña nigRtUvTukeGayvas¶ÜtrwgedayELkBIKña. RsTab;
Scratch coat nig brown coat RtUv)ancat;TukCaRsTab; base coat .

         RsTab;TI1 (scratch coat) pþl;nUvKnøWemkanicCamYynwgeRKOgBRgwg nigCaRsTab;rwgmaMsMrab;
RsTab;bnþbnÞab;.
sMrab;BIelIkMralrwgmaM CYnkalRsTab; Dash bond coat RtUveRbICMnYsRsTab; scratch coat .
         RsTab;TI2 (Brown Coat) pþl;nUvkMras;bEnßmPaBrwgmaM nigFananUvPaBrabesμIénépÞCBa¢aMg
sMrab;karGnuvtþn_nUvRsTab;begðIyEdlCaRsTab;EtglMgr. RsTab;nimYy²RtUvEfrrkSasMeNImmun
nwgbUkRsTab;bnÞab;.
        Dash Bond Coat
       RsTab; dash bond coat KWpþl;nUvépÞeRKImEdleKmintMrUveGayras;kat;BIelI. RsTab;enHRtUv
EtEfsMeNImry³eBlBI 12 eTA 24 em:agmunnwgbUkRsTab; brown coat .
        RsTab; Scratch coat
        RsTab; Scratch coat KWCaRsTab;TI1 BIelIEdkBRgwgnig GacCaRsTab;TI1elIépÞrwgmaMEdl
manPaBs¥itRKb;RKan;edaymincaM)ac;eFVIRsTab; Dash Bond Coat. RsTab; Scratch coat RtUvman
kMras;y:agtic 9.5mm vas;BIépÞrwgmaM b¤BI backing paper. vaRtUvbUkeGayesμICamYynwgkMlaMgsMBaF
RKb;RKan;edIm,IeGaykMe)arkat;tamEdkBRgwgedIm,IbegáItCaKnøwHemkanic. KMlatrvagEdk nig
backing RtUvbMeBjeGay)ansBVdUcenHEdkRtUvbgáb;eBjelj. épÞEdlRtUvRKbKYrminRtUveGay




Plastering Work                                                                         30
Civil Engineering Department                                                         NPIC




elIsBI 10°énépÞBRgwgenAsl;BIkarbUk. enAeBlEdlRsTab; Scratch coat cab;epþImrwgépÞ
TaMgmUlrbs;vaRtUvqáÚtedayrnas;edIm,Ipþl;nUvPaBs¥itemkanicsMrab;RsTab; Brown coat cab;epþIm
rwgépÞTaMgmUlrbs;vaRtUvqáÚtedayrnas;edIm,Ipþl;nUvPaBs¥itemkanicsMrab;RsTab; Brown coat enA
elICBa¢aMg¬rUb 3>1¦. eK)anENnaMeGayqáÚttamTisedAedk.




                                rUb 3-1 RsTab; Scratch coat
           eTaHCakarGnuvtþn_enaHedayéd b¤edaym:asuInk¾edayEtkarqáÚtRtUveFVIedayéd.
        RsTab; Brown Coat
       RsTab; brown coat RtUv)anGnuvtþbnÞab;BIRsTab; Scratch Coat EdlrkSasMeNImnig rwg
RKb;RKan;sMrab;Tb;Tl;nwgTMgn;énRsTab;bnÞab;. enAeBlEdlRsTab; Scratch coat s¶ÜtvaRtUvepSIm
mþgeTotedIm,IRtYtBinitünUvkarbWtmunnwgRsTab; Brown coat RtUv)anGnuvtþ. RsTab; Brown coat KYr
mankMras;RbEhl 9.5mm srubénkMras;rbs;RsTab;TaMgBIrminticCag 19.1 mm ¬rUb 3>2 eqVg¦.
       RbsinebIGaceTA)an RsTab; brown coat KYrRtUvbUkeGayeBjépÞCBa¢aMgEtmþg edayKμan
Qb;. karbBaÄb;GaceFVI)anenAkEnøg Screed, control joints, RCug ssr Belt courses doorway rn§
RbelaH nigExSbnÞat;d¾éTeTotEdlbþÚrrUbsm,tþiEdlGacbgðajtamry³RsTab;begðIy ehIyeXIj
minc,as;. RsTab; Brown coat RtUveRbIEm:Rtekon nigkþavIedIm,IeGayépÞesμInigmanvaynPaBeRKIm
sBV.




Plastering Work                                                                        31
Civil Engineering Department                                                           NPIC




                                 rUb 3-2 RsTab; Brown coat

eTaHCaeyIgGnuvtþedaym:asuInk¾eday EtRtUveFVIeLIgvijeGaysMercedayédEdr ¬rUb 3-2kNþal¦.
RbePTkþavIdUcKña k¾RtUveRbIsMrab;vIeBjépÞCBa¢aMgedIm,IFananUvvaynPaBCaÉksNæan. sñamqáÚt Edl
eRCA b¤épÞEdlmankMhusRtUveFVIeGayrelageLIgvij BIeRBaHPaBmineTogTat;enH bNþaleGayman
karbWtminesμI b¤Gac[eyIgeXIjtamRsTab;begðIy. RCugxageRkARtUv)an pÁúMedayEm:RtekoenAeBl
EdleKmineRbIEdkBRgwgRCug ¬rUb3-2sþaM¦.
        bnÞab;BIkarrkSasMeNIm épÞKYrRtUvTukeGays¶Üt)ansBVRKb;munnwgGnuvtþnUvRsTab;begðIy.
        RsTab;begðIy Finish Coat
          RsTab; Brown coat RtUvepSImTaMgRsugenAeBlEdleKGnuvtþRsTab; finish coat edayéd.
b:uEnþsMrab;karGnuvtþn_edaym:asuIn eKminRtUvkarepSImTwkeT. RsTab;begðIyKYrmankMrasy:agtic
3.2mm srubTaMg3 RsTab;KW 22.2mm ¬rUb3>3eqVg¦.

          karGnuvtþn_edaym:asuInKWkar)aj;kMe)arbUkCaerOy² RtUveFVIeLIgeRcInCagBIrdgerogKña ¬rUb
3-3sþaM¦. kar)aj;elIkTI1 edaykMe)ary:agesþIgdMbUgedIm,Ipþl;eGayépÞénRsTab; Brown coat
TaMgRsug.




Plastering Work                                                                          32
Civil Engineering Department                                                      NPIC




                                rUbPaB 3-3 RsTab;begðIy

karGnuvtþn_bnþbnÞab;mankMras;Rkas;CagedIm,IbegáItnUvvaynPaBbegðIyEdleKcg;)an.
eragcRk )anplitnUv stucco finishes edIm,IFananUvBN’y:agl¥sMrab;RsTab; finish coat.
kartubEtgépÞ begðIyénkMe)arbUkEdlGnuvtþn_edaym:asuIn b¤edayédmanlkçN³epSgeTot²
¬rUb3-4¦RsTab; begðIy plain finish coat EdlRtUvlabfñaMKYrRtUvrkSasMeNIm. CaerOy² stucco
finish              manPñak;gar              rkSasMeNImdUcenHeKmincaM)ac;rkSasMeNImeToteT.
karBitplitkrxMRbwgbBaÄb;karplitCaBiess eRBaH vaeFVI[mansñamqáÚtEvg²elIépÞBN’.
RsTab;begðIyKYrRtUvEfTaMnUvsItuNðPaBeGay)an smRsby:agtic 48em:agbnÞab;BIbUkrYc.




                                rUb3-4 Rock Dash Finish

Plastering Work                                                                     33
Civil Engineering Department                                                      NPIC




       2>2 kargarbUkBIrRsTab; Two-coat work
       CYnkalkarGnuvtþn_karbUk 3RsTab;BIelIkMralebtug b¤dæCaBiesskEnøgEdlRtUvbegáIn
PaBFn;énkMlaMg b¤tMrUvkarénkMras;. b:uEnþCaFmμtakarbUkBIrRsTab;k¾pþl;nUvPaBRKb;RKan;Edr.
eKcg;)anPaBFn;énkMlaMg nigGayukalBIelIépÞtan;. sMrab;karGnuvtþn_2RsTab; base coat EtÉg
CMnYs [RsTab; Scratch Coat nig brown coat nigbEnßmedayRsTab;begðIy.
kMrassrubKYrminticCag 15.9mm .
        RsTab; Base coat
         elIkElgenAeBlEdlPñak;garPaBs¥itKImIRtUv)aneRbI épÞEdlRtUvbUkKYrepSImedIm,IFananUv
karbWtCaÉksNæan. bnÞab;mkGnuvtþnUvRsTab; Base coat kMras; 9.5mm .vaminRtUv)anqáÚtdUckar
Gnuvtþn_3RsTab;eT PaBs¥itemkanic sMrab;RsTab;begðIypþl;[edaykþavIeFVI[manlkçN³eRKIm
dUcKñaeTAnwgRsTab; Brown coat Edr¬rUb3-5¦. karGnuvtþn_edaym:asuInsMrab;RsTab; Base coat
KWeFVIeLIgedaykarGnuvtþCaeRcIn EdlRtUvbegðIyedayGnuvtþnUvEm:Rteko nigkþavIedayéd.




                                           rUb 3-5 2 RsTab;
        RsTab;begðIy finish coat
         RsTab;begðIy KYrmankMras; 6.4mm. vaGaceFVIvaynPaB)aneRcInRbePTedayéd b¤eday
m:asuIndUckarGnuvtþn_ 3RsTab;Edr.




Plastering Work                                                                     34
Civil Engineering Department                                                         NPIC




        3> karEfTMaTwk curing
         kMe)arsuIm:gt_Br½ELnRtUvkarbrimaNTwkRKb;RKan; nigsItuNðPaBsmrmüedIm,IsMrYldl;
dMeNIrkarGuIRdatkmμ EdlGac[vaTTYlnUvPaBFn;nwgkMlaMgnig eLIgkkrwgdUcCam:assUlIt. épÞ
halkan;EtFMTak;TgnwgmaDva EdlCMrujeGaykar)at;bg;sMeNImedaycMhay.
         TueyaFmμtamank,al)aj;GacEktMrUv)anGnuBaØatieGayeRbIsMrab;EfTaMTwkeday)aj;y:ag
esþIg². karEdlbgðÚrTwkdUcsÞwg hUrminecjGaceRcaHcUlkñúgépÞminGnuBaØatieGayeFVIeT.
         karEfTaMsMeNImmintMrUv[)aj;TwkedayyUr²mþgeT b:uEnþeKGaceFVIedayeTogTat;enAeBl
karBinitü nig)aj;TwkenAeBlEdlépÞemIleTAeLIgs¶Üt. enAeBlEdlrMhYtekIneLIgCamYynwg
clnaxül;ekIneLIg nigsItuNðPaBkan;Etx<s; dUcenHCaTUeTAkar)aj;TwktMrUveGaykan;Etjwkjab;
eLIgenAeBlEdlmanxül;rMehIy nigrdUvekþA. elIsBIenH windbreak b¤rnaMgRtUvkarcaM)ac;edIm,I
karBarkMe)ar suIm:g;t_Br½ELnBIxül;s¶ÜtekþA.
         bEnßmBIelIsMeNImRKb;RKan; GIuRdatkmμRtwmRtUveGayl,aykMe)arsuIm:g;t_Br½ELnnigRsTab;
nimYy² RtUv)anrkSakñúgsItuNðPaBy:agtic 10ºC . RsTab;begðIyKYrRtUvEfrkSaenAkñúgsItuNðPaB
enHy:agtic 48em:agbnÞab;BIeKbUkehIy. enAkñúgGakasFatuRtCak; vacaM)ac;RtUvkMedAl,ayTwk
nigpþl;nUvkMedAbiTCit CuMvijkEnøgeFVIkargar.
         enAeBleKpþl;nUvbrimaNTwkRKb;RKan;edIm,IFananUvGuIRdatkmμCaBiessedIm,IbegáItnUv kM)ar
bUksuIm:g;t_y:agmanKuNPaB vaKμankarÉkPaBKñaCaTUeTAkñúgdMeNIrkarEfTaMTwky:agBitR)akdeT.
karENnaMBIkarEfrTaMsMeNImpþl;[kñúgtarag 3-6 EdlQrelIeKalkarN_ dUcGVIEdl)anerobrab;
xagelIGMBIkarEfTaMsMeNImedIm,IFananUvrgVas;d¾l¥RbesIr EdleCaKC½yCagkarBwgEp¥kelIlkçN³
GMeNayplénGakasFatu b¤brimaNTwkEdlmankñúgl,ay.




           karGnuvtþn_                karEfTaMseM NIm               ry³eBlkkrwgsrub

Plastering Work                                                                        35
Civil Engineering Department                                                     NPIC




RsTab; Scratch coat          BI 12 eTA 24 em:ag             y:agtic 48m: ¬cenøaHRsTab;¦
RsTab; Brown coat            BI 12 eTA 24 em:ag             y:agtic 7éf¶ ¬cenøaHRsTab;¦
RsTab; Finish coat           BI 12 eTA 24 em:ag             y:agtic48 m: ¬bnÞab;BIGnuvtþ¦
                 tarag 3-6 taragEfrTaMsMeNImsMrab;kMe)arbUksuIm:g;t_Br½ELn

        enAtMbn;xøHénRbeTs min)ansMEdgBIkarEfTaMsMeNImeT RsTab;nimYy²RtUveGay)anelOn
enAeBlRsTab;mun)anrwgRKb;RKan;edIm,IRTRTg;va. viFIenHeBlxøHeK[eQμaHfa Doubling Back va
Tak;TgeTAnwg karkarBarCalkçN³FmμCatinUvRsTab;nimYy² eGaymansMeNImnigsMrYldl;kar
EfrTaM sMeNImdl;RsTab;eRkampg. karGnuvtþn_epSg²eTot EdlTak;TgnigkarGnuvtþn_énkar
bUkRsTab; min[ticCag24 em:ag cenøaHeBlKñaedaybnþrkSasMeNImrvagRsTab;nig eRkayeBl
EdlRsTab;begðIy)anbUkehIy.
        viFIEfTaMTwkEdl )aneRCIserIsKYrQrelIeKalkarN_énkarGnuvtþn_cMeBaHTIkEnøgEdlyl;
RsbEdlmankarbkRsayBIRbvtiþénkarGnuvtþn_CaTIKab;citþ. dMeNIrkarénkarEfTaMsMeNImTaMgGs;
KWBüayamedIm,IrkSa sMeNImÉksNæaneGayRsTab;mun b¤GnuBaØati[vakøayeTACas¶ÜtÉksNæan.
enHKWBitCaBiess sMrab;RsTab; Base ¬b¤ brown¦ coat BIeRBaHBN’CaÉksNæansMrab;RsTab;
begðIyKWGaRs½y nwgkarbWtesμIKñarbs;RsTab; Base coat .
        GMLúgry³eBlcaMyUrrvag Base nig finish coat dUcbgðajkñúgrUb3-6 FanaeGayRsTab;
brown coat s¶ÜtÉksNæan. enAeBlEdlcenøaHeBlenaH xøICagRtUv)anGnuBaØatiCaerOy² eKcaM)ac;

rkSaRsTab; base coat esImedaybnþrkSasMeNImrhUtdl;RsTab;begðIyRtUv)anbUk. elIkElgEt
enAeBlEdlEpnkarRbjab; karGnuvtþn_bnþbnÞab;RtUv)anTTYlyk tMrUvkarsMrab;rkSasMeNImGac
nwgRtUveKTamTarCakarENnaM[rkSasMeNImkñúgry³eBlxøIehIyBnüaeBlsMgYt.




Plastering Work                                                                     36
Civil Engineering Department                                                                NPIC




CMBUk    IV

]bkrN_ nigbrikça
TOOL AND EQUIPMENT


1> ]bkrN_
        kargarbUkkMe)arRtUvtMrUveRbInUv]bkrN_CaeRcInRbePT EdlxøHmanlkçN³BiessrYmman
sßabRBakMe)ar (trowels) / kþaRTkMe)ar (hawk) / kþavI (float) / Em:Rteko (straight) nig feather edge /
rnas; (scarifier) nigm:asuInbUkkMe)ar (Plastering machine) .

        1>1 kþaRTkMe)ar Hawk
        kþaRTkMe)armanragkaerCabnÞH EdkrabesμIRsalEdlmanédkan;cMkNþal ehIyQreRbI
sMrab;dak;)ayGrBIFug)ayGreTATIkEnøgEdlRtUvbUk. bnÞab;mk)ayGrRtUvykecjBIkþaRTeday
søabRBakMe)ar. TMhMrbs;kþaRTERbRbYlBI 25cm eTA 30cm . kþaRTGaceFVIedaysMPar³epSg²eTot
                                                2           2



EdlGaceFVI)anenAkardæan.




                                         rUb 4-1 RTkMe)ar



Plastering Work                                                                                37
Civil Engineering Department                                                        NPIC




        1>2 søabRBakMe)ar Trowels
        søabRBakMe)arRtUv)aneRbIedayCagkMe)arsMrab;):at bUk nwgvaseGayesμInUvkMe)arbUk. TMhM
rbs;søabRBaERbRbYleTAnwgkareRbI
nigeTAtamm:asuInEdleyIgcUlcitþeRbIdUcCasÞg;emIlkareRbI         ]bkrN_         nigPaBesμIKña.
søabRBakMe)armanbIEpñk rYmman kaMbitsMEb:t (Blade) dg (Mounting) nig éd (handle) .
EpñkkaMbitEb:tRtUveFVIedayEdklt;nigRtUvEtRtg;esμIl¥tex©aH. dgmanBIRbePTKW Edk
nigGaluymIj:Úm. dgKWCaEpñkEdltP¢ab;rvagkMbitsMEb:t nigéd. sBV éf¶CagkMe)ar
PaKeRcIneRbIdgGaluymIj:ÚmeRBaHvamanTMgn;Rsal. édrbs;vaeFVIBI eQICYnkalragRtg;
CYnkalragekag. tulüPaBénsøaRBakMe)armansarsMxan;Nas;Epñkemkanic EdleFVIeGayeyIg
manGarmμN_ gayRsYleRbIva.
        søabRBamuxRsYc Pointing Trowels
          søabRBamuxRsYcmanragdYcRtIekaN nig RsedogeTAnwgsøabRBaerobdæ. eKGacrkCav
va)ankñúgTMhMepSgKñaénkMbitsMEb:tEdlmanTMhMBI 7.63cm eTA 17.78cm. kMbitsMEb:tKYr
RtUveFVIBIEdklt; nigmandg (post ) nig tang k_)anbMEbgBIEdk. vamansarsMxan;EdlTaMgkMbit dg
nig édRtUv)aneFVIBIEdkduMEtmYy. dg nig tang EdlP¢ab;eTAnwgkaMbitedayrIev b¤karpSavagay nwg
dac;BIkaMbit.
          dgénsøabRBaRsYcKWCaEpñkmYyEdlQrRtg;eLIgelIBIelIkaMbitsMEb:t nigmanédP¢ab;eTA
nwgvaEdl pþl;nUvPaBgayRsYlkñúgkarkan;kþab;. Tang KWCaEpñkmYyénsøabRBar EdleRsab
xagKl;énédeQI.
          RsabRBamuxRsYcRtUv)aneRbIR)as;sMrab;eKalbMNgCaeRcIn.         vamanragRtUvlμmEdl
smRsb sMrab;kEnøgtUcEdlsøabRBaFMminGaceFVIeTA)an. vaRtUv)aneRbIedIm,IsMGat ]bkN_
nigRTnUv sMPar³ tUc²enAkñúgRbtibtþikarbUkkMe)ar.




Plastering Work                                                                       38
Civil Engineering Department                                                         NPIC




                                        rUb 4-2 søabRBamuxRsYc
søabRBa Margin Margin Trowels
         søabRBa margin manTMhMRsedogKña niwgsøabRBamuxRsYcEdr b:uEnþvamanmuxRCug. vaRtUv)an
eRbIR)as;sMrab;GnuvtþnwgbUk           eTAkEnøgtUcceg¥ótdUcCaenAcenøaHk,ac;Bum<EdlenAekok²Kña.
vak¾RtUv                   )aneRbIsMrab;TIFøatUcEmnETn                  CMnYs[søabRBaFmμta.
cugRCugrbs;søabRBavamankargayRsYlCag søabRBamuxRsYc.




                                    rUb 4-3 søabRBa margin
        søabRBa pipe      Pipe trowels

        søabRBa pipe KWCasøabRBamuxRsYcEvgBiessEdlRtUvykmkeRbIsMrab;kMe)arBIeRkaybMBg;
TIbnwgeKalbMNgepSgeTot KWkarBarb:Hrbs;søabRBaeTAelIépÞEdlRtUvbUk.
        CaTUeTAvamanTMhMTTwg 5cm nigRbEvg 25cm .
        søabRBamuM      Angle Trowels




Plastering Work                                                                        39
Civil Engineering Department                                                         NPIC




        sßabRBamuMRtUv)aneRbIsMrab;bUkbegðIynUvmuM nigRCugénbnÞb;. søabRBaenHmanrUbrag2sMrab;
eRbIR)as;. mYymankaMbitsMEb:tragCaGkSr U . édRtUv)anP¢ab;eTAnwgcugmçagénkaMbitsMEb:tdUc
søabRBa margin Edr. RbePTmYyeTotKW eFVIeLIgBIEdkmYybnÞHehIybt;CamuMEkgmanragCaGkSr V
Edlédrbs;vaRtUvdak;BIelIkaMbitsMEb:tenaHnigenABIelIxageRkaymuM.




                                       rUb 4-4 søaRBamuM
        søabRBaBiess Special Trowels
        søabRBaBiessRtUv)aneFVIecjBIsøabRBaFmμta. vaRtUveKkat;edIm,IsMrbsMrYleTAnwglkçx½NÐ
énkargarBitR)akdxøH. ]TahrN_ragrbs;kMbitsMEb:tCYnkalRtUveKkat;Caragekag. vaRtUv)aneK
eRbIsMrab;bUknUvépÞrag dUm Dome b¤rUbragRsedogekag.
        CaFmμtaeKeRcIneFVIsøabRBaBiessenHBIsøabRBaEdleRbIcas;².
         1>3 kþavI Floats
         kþavImaneRcInRbePTnig eRcInTMhMEdleKykmkeRbIR)as;eTAtamkaleTs. dUcEdleQμaH
va)anbBa¢ak; ]bkrN_enHRtUvrabesIμnwgRtUv GENþkenABIelIépÞénkargar.
         CaeKalkarN_ kþavIKWCa]bkrN_EdlRtg;esμI EdlRtUveRbIR)as;edayCagkMe)arsMrab;BRgab
ral;BMnUkkMe)ar nigRtUvbMeBjral;karxVHxateday]bkrN_epSg.
         vak¾RtUv)aneRbIR)as;sMrab;bgðab;kMe)arbUkeGayrelagrabesμI nigENn b¤k¾begáItnUv
vaynPaBeGayépÞCBa¢aMgpgEdr. RbePTCaeRcInénkþavIRtUv)anplitsMrab;karbUkelIépÞepSg².
         kþavImuM Angle Floats


Plastering Work                                                                        40
Civil Engineering Department                                                           NPIC




        kþavImuMGaluymIj:ÚmKWCa ]bkrN_EdlmanépÞrabesμÍ enACaysgxagman flange. TMrg;TUeTA
rbs;vamanragCaGkSr U . édeQIRtUv)anP¢ab;enAnwgkNþalcenøaH Flange enaH. ]bkrN_enH
RtUv)anrujcuHrujeLIgtamRCugmuMTaMgsgxag. eKalbMNgén]bkrN_enHKW tMrg;nigeFVImuMEkg.




                                         rUb 4-5 kþavImuM
        kþavIeQI Wood floats
         kþavIeQIRtUv)aneRbIR)as;sMrab;rMlIg nigbgðab;épÞrabesμI. TMhMénkþavIenHERbRbYl. CaTUeTA
kMras;rbs;vaKW 19 mm b:uEnþCagkMe)arxøHcUlcitþRbePTesIþgCagenH. CYnkaleKcUlcitþeRbIkþavI
RbePT cross-grained BIeRBaHvapþl;nUvlT§plkargarl¥Cagkñúgkarcl½tkMe)arcUleTAkñúgbnÞHkþaerob
esμInigvaminmankareLIge)ardUcRbePTkþavIeQIFmμtaeT.




                                       rUb 4-6 kþavIeQI
        Cork Floats
        eKalbMNgnigkareRbIR)as;rbs; Cork floats dUcKñanwgkþavIeQIEdr. vamanlkçN³d¾l¥2
y:ag KW PaBRsalnigRtg;l¥ vamanKuNvibtþid¾smBaØmYy KWRsYygay nigEbk.
        Carpet Floats




Plastering Work                                                                           41
Civil Engineering Department                                                               NPIC




                   RtUv)aneRbIR)as;sMrab;begáItnUvépÞEdlmanRKab;m:t; tMrUvsMrab;kargarbegðIy
        Carpet Floats

EdlmanxSac;l¥. carpet float RtUv)anplitBIkarRKbnUvkMNat;RBMENnEdlmancMNat;fñak;l¥BIelI
kþavIeQI.
        kþavICr½eGbug Sponge Ruber Floats
         kþavIC½reGb:ugCakþavITMenIbEdl)anmkBIkarvivDÆn_énkþavI Carpet Float . kareRbIkþavIenHsuIeBl
yUrCagkþavI carpte float b:uEnþpþl;lT§pl)anl¥Cag. vaminRtUv)anRsUbykCatikMe)ar b¤TwkBIkñúg
kMe)arbUkeT.
karykcitþTukdak;kñúgkareRbIR)as;kMralC½reGb:ugeGay)ansmRsbenaHeyIgGaceRbIva)anry³eBl
mYyEx. enAeBlEdlkargarRtUveFVIenARCug b¤muMbnÞHC½rRtUv)aneRbIedIm,IkarBarEdk EdlRtdus
elICBa¢aMg b¤Bidan.
         kþarvITaMgGs;eRbInUvRbePTédeQIdUcKña EdlGareGaysm nwgédrbs;eyIg. CaTUeTAédkan;
RtUv)anP¢ab;cugTaMgBIrrbs;vaCamYyeQIedayvIs.




                                                  rUb 4-7 kþarvIC½r
       1>4 Paddle
       Paddle RtUv)aneRbIR)as;edayCagkMe)arxøHsMrab;sMGat    nigkñúgkrNIxøHeRbIedIm,IbegðIy
kargareFVImuM b¤RCug bnÞab;BIkarvIedaykþavIehIy. Paddle RtUv)aneRbIR)as;sMrab;kargar
sMNg;eKhdæan BIeRBaHvapþl;[nUvkarbegðIykargareFVImuM)anelOnCag. eTaHbICay:agNak¾eday
lT§plbegðIymin GaceRbobeFobnwgkareRbIsøabRBabkMe)ard¾RtwmRtUvenaHeT.
       Paddle manTMrg;dUcGVIEdleK)anbBa¢ak;eQμaHeGayva. vamanragEpøEb:lkaerEdlxagcugva

RtUv)ansMrYcdUcesñót. vamanédkan;EvgEdlcl½tedaymankMras;. CaTUeTAvamanTMhMTTwgBI 6.5cm
eTA 7.5cm ¬xagcugrbs; Paddle¦. édkan;mankMras;CaTUeTA 2.2cm nigmanRbEvgBI 15 cm eTA
Plastering Work                                                                               42
Civil Engineering Department                                                          NPIC




20cm  vas;BIcugrbs; Paddle eTAcugénédkan;. Paddle RtUv)aneFVIBIsMPar³mYykñúgcMeNamsMPar³bI
xageRkamKW eQI GaluymIj:Úm b¤)øasÞik. CaTUeTA paddle eFViBIeQIRtUv)anP¢ab;edaysnÞHEdky:ag
EsþgenAcugxagmuxedIm,IkarBarPaBswk.
        1>5 Ck; Brush
        Ck;EdlCagkMe)areRbImanbIRbePT KW browing brush, finish brush nig tool brush
        Browing Brush
        browing                                                                         brush
RtUv)aneRbIsMrab;):atTwkeTAelIépÞénkMe)arbUkedIm,Ipþl;nUvPaBrGileGay ]bkrN_sMrab;rMlIgépÞkMe)
arenaH. tMrUvkard¾RbesIrbMputrbs;va KWvaGacpÞúk)anbrimaNTwkeRcIn.




                                   rUb 4-8 browing Brush
        Finish brush
       eKalbMNgénkareRbIR)as; finishing brush enHKWdUcKñanwg browing brush EdrEdleRbIsMrab;
labTwkeTAelIépÞbUkkMe)ar. eTaHCay:agenHk¾eday sMrab;RbtibtþikarN_enH TwkRtUvlabedaypÞal;
eTAelIépÞ. dUecñHvaRtUvEtmaneramGMe)aHEdlmanKuNPaBx<s; edIm,IkarBarépÞkMe)arbUkd¾Tn;kuMeGay
qáÚt. Finishing brush xøHGacrkCav)anedaymanKRmbeFVIEs,kgab;BT½§CuMvijeramGMe)aH EdlP¢ab;
eTAnwgédkan; edIm,IkarBarTwkhUrtamdgédkan;enAeBlEdlkMBugeRbIR)as;.




Plastering Work                                                                         43
Civil Engineering Department                                                         NPIC




                                  rUb 4-9 Finishing Brush
        Tool Brush
                RtUv)aneRbIsMrab;labTwkeTAelIkEnøgTIFøatUc² nige)asnUvFUlIBIk,ac;rcna.l.
        ToolBrush

Ck;labfñaMEdlmanKuNPaBl¥KW Ca]bkrN_EdlRbéBbMputsMrab;eRbICa Tool Brush .




                                    rUb 4-10 Tool Brush
        1>6 ]bkrN_eFVIk,ac;rcna Ornamental Tools
        ]bkrN_d¾tUcGaceRbIsMrab;kargark,ac;rcna. CYnkaleKGacehAfa ]bkrN_eFVIBum<
(modeling tools) b¤]bkrN_eFVIk,ac;rcna (ornamental tool) . ]bkrN_tUcRtUv)aneRbIsMrab;cg¥úlmux

tMNenAeBltMeLIgkargarBum<. vaRtUv)aneRbIsMrab;begðIykargarRtg;kEnøgkat;Kñaénk,aMgk,al
CBa¢aMg. vaRtUv)aneKeRbIsMrab;ral;kargarEdlRtUvkar]bkrN_EdlmanTMhMtUc.


Plastering Work                                                                        44
Civil Engineering Department                                                      NPIC




                               rUb 4-11 ]bkrN_eFVIk,ac;rcna
        1>7 BUefAéd Hatchet
        enAkñúgkargarenH eKmanBUefABIrRbePTKW Lathing hatchet nig half hatchet . lathing
hatchet KWCa]bkrN_EdlmanTMgn;Rsal EdlmanEpøkaMbitesþIgEvg. vaRtUv)anlt;y:agx<s;bMput.

karlt; EdkKWpþl;nUv kareRbIR)as;)anyUrGEgVg (long-lasting)muxmutRsYc (sharp-cutting edge).
CaTUeTA k,alBUefAenaHRtUvExVgedaycg¥Úr kñúgeKalbMNgsMrab;karBarPaBrGilénk,al EdkeKal
enAeBl                             duMBnøicva.                      édkan;rbs;vaCadgRkas;
vasMrYlenAeBlEdleKRtUv)aneRbIsMrab;kab;kMe)arEdleLIgrwg
nigRtUv)aneRbIsMrab;kargarF¶n;²epSgeTot.



                                         rUb 4-12 BUefA
         1>8 kUnRbeyal Plumb Bod
         kUnRbeyalKWCa duMsMN b¤Edk b¤Tg;EdgEdlmanTMgn;EdlP¢ab;eTAnwgExSrehIy
RtUv )aneRbIR)as;edayCagsMNg; b¤CagkMe)ar.l. vaRtUv)aneKeRbIsMrab;bgðajnig
RtYtBinitüTisedA Qr edIm,IFanafa TisedAQrbs;épÞmanPaBRtg; nigBitR)akd.
enAeBlEdlCagsMNg;niyayfa “CBa¢aMgRbeyalehIy ” (“Plumb Wall”) enaH)ann½yfa
CBa¢aMgenaHBitR)akdRtg;tamTisedAQr.
kUnRbeyalRtUv)ancat;lMdab;fñak;edayTMgn;CagedayTMhM.

Plastering Work                                                                     45
Civil Engineering Department                                                      NPIC




                                  rUb 4-13 kUnRbeyal
          1>9 Em:RtsÞg; Level
          Em:RtsÞg; KWfa]bkrN_mü:agEdleKsÁal;fa CaRbdab;cab;kMrit EdlvaRtUv)aneKeRbIsMrab;
kMNt;ExSedk. vabgðaj[eyIgeXIjfa EpñkNamYyénépÞedkmankMritkMBs;x<s;CagEpñkNamYy
eTot. EpñkBiessénEm:RtsÞg;man TIbEm:RtragekagbnþicEdlesÞIrEtbMeBjedayGal;kul b¤sar-
FatuepSgeTot. TIbEdlmanvtßúravenaHbiTCitehIymanduMBBuHxül;mYyEdlGaccl½t)an.
          enAeBlEdlduMBBuHxül;enaHenAcMkNþal vabgðajfaépÞEdkenaHmanPaBrabesIμl¥. duMBBuH
xül;KWgayRsYlcUlkNþal enAeBlEdlEm:RtsÞg;PaKeRcInmanExSbgðajelIEm:RtTIbEdlRbsin
ebIduMBBuHxül;sßitenAcMkNþalénExSenaH)ann½yfa épÞenaHrabesμI. enAeBlEdlEm:RtsÞg;enaHep¥óg
EtbnþiceTARCugNaenaH vanwgeFVI[BBuHxül;enaHcl½tecjBIGkS½kNþalenaHbgðajfaExSenaHmin
edk b¤minrabesμI.
          TIbEm:RtenaHRtUvkarBaredayEdk b¤eQIedaymanRbEvgb:unKña. RbEvgEm:RtsÞg;TUeTAEdl
eRbIedayCagkMe)arPaKeRcInKW 45cm nig 60cm nigGaceFVIedayeQI b¤GaluymIj:Úm. RbePTGaluy
mIj:ÚmCaRbePTsMPar³énEm:RtsÞg;EdleKcUlcitþeRbIeRBaH vaminekagnigminswkdUcRbePTeQIeT.
          sBVéf¶Em:RtsÞg;PaKeRcInEdlCavmanTIbEm:Rtdak;GgÁFaturaveRcInCag1. RbePTEdléfø
CageK KWRbePTEdlmanTIbenaHeRcInEdlGaceGayeKeRbIva)anRKb;viFI.
          Em:RtsÞg;PaKeRcInmanTIbEm:RtBIrRbePT KWmYyeRbIsMrab;kMNt;PaBrabesμIénépÞedk¬dUc
erobrab;xagelI¦ nigmYyeTotCaTUeTAenAxagcugedIm,IkMNt;TisedAQr. TIbEdleRbIsMrab;kMNt;

Plastering Work                                                                     46
Civil Engineering Department                                                      NPIC




PaBRtg;tamExSedk KWRtUveKdak;RsbnwgbeNþayénEm:RtsÞg; cMENkTIbEdleRbIsMrab;kMNt;PaB
Rtg;tamExSQr KWRtUveKdak;RsbeTAnwgTTwgénEm:RtsÞg;.




                                   rUb 4-14 Em:RtsÞg;
        1>10 ké®nþkat;sMN tin snip
        ké®nþkat;sMNRtUv)aneRbIsMrab;kat;kMNat;Edk. eKalbMNgd¾sMxan;rbs;vasMrab;CMnaj
CagkMe)arKW sMrab;eFVIBum<k,aMgk,alCBa¢aMg. ké®nþkat;sMNKWmanragRsedogKñaeTAké®nþFM. eKGac
rkCavva)anedayTMhMepSg² sMrab;eRbICamYyEdkEdlmankMras;epSg². CagkMe)arCaFmμtacUlcitþ
eRbInUvké®nþkat;sMNTMhM 30 cm. vamanmuxEpøké®nþRbEvg 7.5cm niggayRsYlkñúgkarkat;kMNat;
Edk. sMrab;ké®nþkat;sMNrkñúgkargarsMNg;eKeRcInrknUvEpøké®nþNaEdllt;eRBaHfa CacMNuc
sMxan;bMput.




                                     rUb 4-15 ké®nþ




Plastering Work                                                                     47
Civil Engineering Department                                                       NPIC




       1>11 RbGb;ExSbnÞat; Chalk Box
       RbGb;ExSbnÞab;KWCaExSEdlmanRbEvgEvgnigRtUvbMeBjedayFUlIdIs. vaRtUveRbIsMrab;
dak;ExSbnÞat;dwkRtg;enAelIkargar. ExSbnÞat;RtUvTajeGaytwgekoknwgépÞkargar nigdak;BIelIcMnuc
Edl)anedAehIy b¤pÞat;edayRmamédedIm,IbegáItCaExSbnÞat;.




                                 rUb 4-16 RbGb;ExSbnÞat;
       1>12 Em:Rtbt;6-Foot             Six-foot folding rule

       Em:Rtbt; 6 foot KWCaEm:Rtbt;EdlmanbTdæanRtUv)anlk;sMrab;bMerIbMras;TUeTA. enAeBl
Edlvabt;vamanRbEvgEt 15.24cm nigenAeBllaeGayGs;GacmanRbEvgdl; 180 cm . Em:RtenH
PaKeRcInRtUv)aneFVIeLIgBIsMPar³BIrRbePTKW eQI nigGaluymIj:Úm.




                                    rUb 4-17 Em:Rtbt;
       1>13 rNar Saws
       CagkMe)ar)aneRbInUvrNa 2RbePTkñúgkargarrbs;Kat;. Kat;eRbI      Handsaw    nigKat;eRbI
keyhole saw sMrab;GarvNÐvg;énBum< nigkagartUc².




Plastering Work                                                                       48
Civil Engineering Department                                                        NPIC




       CaTUeTA handsaw manRbEvgRbEhl 50cm eTA 60cm nigRsedogKñaeTAnwgrNaCageQI
EdlmaneFμjFM² nigeRKIm. eFμjrbs;rNaRtUvEtFM² edIm,IkargarBIkarbMeBjedaykMe)aresIμ nig
karBarBIkars¥itCab;éneFμjenAeBlEdlkMBg;Gar.




                                      rUb 4-18 rNa
         rNa keyhole saw KWmanRbCaRbiyPaBkñúgkargareFVIBum<. CagemkanicxøHcUlcitþeRbI coping
saw Cag keyhole saw . rNa coping saw manlkçN³l¥RbesIrkñúgkarGarCalkçN³rgVg;. b:uEnþmux

d¾tUcl¥itminGacbBaÄr)anRtg;sMrab;kargarepSgeTot.
         1>14 Em:RtEkg Stell Square
        CagkMe)areRbIEm:RtEkgsMrab;eFVI[manRCugRtg;. Em:RtEkgEdlmankarBareRcHKWCa]bkrN_
d¾l¥CageK sMrab;CagkMe)areRbIeRBaHeKEtgEteFVIkargarCamYynwgsMPar³esIm²tQb;Qr. Cag
kMe)arxøHcUlcitþeRbIEm:RtEkgEdlmanTMhMF. Em:RtEkgRtUvEckecjCa 3EpñkEdleKeGayeQμaHfa
                                         M
Tongue KWCaEpñkxøICageK Blade KWCaEpñkEvgCageK nig heel KWCaRbCuMénEpñkTaMgBIr.




                                    rUb 4-19 Em:RtEkg

Plastering Work                                                                       49
Civil Engineering Department                                                         NPIC




        1>15 Joint Rod
        Joint Rod RtUv)aneRbIsMrab;pÁúMnig P¢ab;muxtMNkñúgkargark,aMgk,alCBa¢aMg. kMe)ar)ayGr

Tn; RtUv)andak;BIelIkEnøgkat;Kñaénk,aMgk,alCBa¢aMgBIr rYcehIyeRbI]bkrN_enHedIm,IBat;nUv
kMe)ar)ayGrcUlkñugRbehagenaH b¤biTvaeGayCab;RCugKña. edaysarEtk,aMgk,alCBa¢aMgmanTMhM
ERbRbYl dUcenHRbEvgrbs; joint rod maneRcInRbePTtMrUvtamkMe)arbUk.
        1>16 rnas;qáÚt Scratcher
        rnas;qáÚt KWCa]bkrN_EdlmanédsmRsbnig maneFμjrnas;FM². rnas;qáÚtRtUv)an
eRbIR)as;sMrab;qáÚtRsTab;TI 1 énkMe)arbUkdUcenHRsTab;bnÞab;nigmanPaBs¥itedayemkanicl¥.




                                     rUb 4-20 rnas;qáÚt
       1>17 Em:RtEdk Steel tape
       Em:RtEdkRtUv)aneRbIR)as;sMrab;vas;RbEvgEdlEvg EdleyIgminGacvas;edayEm:Rtbt;
6foots. RbePTEdll¥CageK KWRbePTEdlmaneRsabRkUmkarBareRcH b¤labfñaM.




                                    rUb 4-21 Em:RtEdk

Plastering Work                                                                        50
Civil Engineering Department                                                            NPIC




        1>18 Jiont Cutter
        Joint cutter RtUv)aneRbIsMrab;kat;muxtMN b¤eFVIcg¥ÚrxagkñúgkMe)arbUk. sMrab;ral;kargarEdl

eFVIedaykMe)arTn; CaTUeTA cutter RtUveFVIBIEdkyWtesþIg. bnÞHEdkRtUveFVIeGaymanrag loop nigman
dak;édkan;. ]bkrN_EdkesþIgenH nigkat;cUlenAkñúgkMe)arTn; nigbegáItCamuxtMN b¤cg¥ÚrEdlTTwg
esμInwg loop nigCMerAeTAtamkarkMNt;rbs;emkanic. TMhMrbs;Edk loop kMNt;nUvTMhMrbs;mux
tMN.RbePT joint cutter enHRtUv)aneRbIsMrab;eFVIRtab;tamduMfμdæb¤ kar:U. RbePTsMPar³
kMe)ar )ayGrxøHRtUv)ankat;l¥enAeBlEdlvaeLIgrwg. sMrab;krNIdUcCa cutter esþIg EdlmaneFμj
dUcCa rNaeRcokRtUv)anykmkeRbI.
        vaRtUv)aneFVIBIEdk stock EdlmankMras;esμInwgTMhMmuxtMNr EdleKcg;)an. bnÞab;mkeFμj
én cutter RtUv)anqab.
        CaTUeTAépÞén cutter manRbEvg 10cm RtUv)anGnuBaØati. cutter RbePTenHGackat;RKb;
RbePTénkMe)arbUkrwg nigbegáInnUvT§iBlénmuxtMNr.




                                     rUb 4-22 Joint cutter
        1>19 dgáab; Nippers
        dgáab;EdlmandegáóbtUcRtUv)aneRbIsMrab;cab; bMEbknigkat;. dgáab;man2RbePTRtUv)an
eRbIR)as;. mYyRbePTenaHmanmuxdgáab;rwg. CagkMe)areRbIdgáab;edIm,ItMeLIg Plaster cast enAeBl
BYkeKcgP¢ab;lYsCamYynwg Plasterwad . dgáab;k¾RtUv)aneRbIR)as;sMrab;kargarTUeTAdUcCaEdkeKal
EdlduMelI miscellaneous lath RtUv)andkeday lather .


Plastering Work                                                                            51
Civil Engineering Department                                                         NPIC




                                      rUb 4-23 dgáab;
          1>20 eRsamédC½r Rubber Groves
          eRsamédC½rRtUv)aneRbIenAeBleyIgGnuvtþkargarkMe)arbUkRtg;k,aMgk,alCBa¢aMg nigkargar
eFVIk,ac;rcnaedaykMe)ar)ayGrepSgeTot. eRsamédkarBarédBIkareqHeraledaykMe)ar.
          vaGnuBaØatieGayCagkMe)arGackan;cab;kMe)arrav)an nigGac):atCaBum<k,aMgk,alCBa¢aMg
¬kargareFVIk,ac;rcna¦.         CaTUeTACagkMe)arcUlcitþeRbIRbePTRkas;eRBaHBak;RsYlnwggayedaH
ecj)an rh½s.




                                   rUb 4-24 eRsamédC½r
         1>21 Combination Square (bevel square)
         Bevel square KWCabnSúMrvagbnÞat;muMEkg nigmuM 45 . sNæanénbnÞat;KWragRtIekaN.RCugEkg
                                                       º



énRtIekaNbegáIt)anmuM 90 nig RCugBIrepSgeTotbegáIt)anmuM 45 . CagkMe)areRbI bevel square
                               º                              º



edIm,IP¢ab;RCugkat;nigedIm,IkMNt;bnÞab;RCug 45 nig 90 dUcEdleKcg;)an.
                                           º       º




Plastering Work                                                                        52
Civil Engineering Department                                                    NPIC




                               rUb 4-25 Combination Square

       1>22 Coping Saw
       rNa Copin saw mankaMbitrNaesþIgtUcEdlP¢ab;nwgdgGkSr U ehIyP¢ab;edayédkan;enA
mçagéndg. Coping saw RtUv)aneRbIsMrab;eFVInUvkargarekagesþIgRKb;RbePT.




                                  rUb 4-26 coping saw
        1>23 EdkecaH Prick Punch
        EdkecaH KWCaEdkEvgmUlEdlmancugmçagRsYcedIm,IecaHrn§tUc². vaRtUv)aneRbIsMrab;ecaH
rn§eTAelIbnÞHEdkEdleRbIsMrab;eFVI Profile . EdkecaHk¾RtUveRbI sMrab;KUsvasnUv Profile
tamry³kare)aHBum< blueprint eTAelIbnÞHEdkenAeBleFVIBum<k,aMgk,al CBa¢aMg.




Plastering Work                                                                   53
Civil Engineering Department                                                      NPIC




                                   rUb 4-27 EdkecaH
       1>24 jjÜr Craw bammer
       jjÜrFmμtarbs;CageQIRtUv)aneRbIedayCagkMe)arsMrab;Kas;EdkeKal        nigsMrab;eFVIBum<
RKb;RbePT template CnÞl; nigkargarRsedogenH.




                                        rUb 4-28 jBaYr
         1>25 Em:Rt b¤bnÞat;eko Straightedge
         ]bkrN_enHeRbIsMrab;eFVIeGayCBa¢Mgnig BidanmanépÞrabesμIl¥. RbEvgEm:RtekoPaKeRcIn
eRbIkñúgCMnajenHman 150cm, 180cm,210 cm nigedIm,IGnuvtþnUv Screed enaHCagkMe)ar)aneRbInUv
bnÞat;EdlmanRbEvgrhUtdl; 6m .




                                   ruUb 4- 29 Em:Rteko

Plastering Work                                                                      54
Civil Engineering Department                                                           NPIC




         1>26 Featheredge
         Featheredge RtUv)aneRbIsMrab;eFVIeGaymuM b¤RCugénCBa¢aMgmanPaBesIμl¥ sMrab;RsTab;begIðy

vak¾RtUv)aneRbIsMrab;begáIt Screed RsTab; Putty sMrab;kargark,aMgk,alCBa¢aMg. TMhMCaeKalén
Featheredge KWmanRbEvgBI 150cm eTA 240cm nigCaTUeTAmankMras; 2.5cm nigTTwg 13cm .




                                    rUb 4-30 Featheredge
       1>27 Darby
       Darby manRbEvgEvgesþIg sMEb:terobesμICaTUeTAmankMras; 12.5cm TTwg 9cm nigRbEvg

RbEhl 115cm . édkan;RtUv)anP¢ab;eTAnwgépÞmçagrbs;kaMbitsMEb:t. ]bkrN_enHRtUv)aneRbI
CamYy handsand TaMgBIrsMrab;vIBIelIkMe)ar Rodded Brown EdlenArav. skmμPaBenHbgðab;nig
rlIg)ayGreGaycUlkñúgkþavInigeFVIeGayépÞENn. Darby k¾RtUv)aneRbIsMrab;rMlIgRsTab; Putty-
coat nigeFVI[RsTab; Putty coat manPaBrabesμIEdlbUkBIelIRsTab; Brown Coat manPaB

minrabesμI.




                                        rUb 4-13 Darby


Plastering Work                                                                           55
Civil Engineering Department                                                         NPIC




        1>28 Slicker
        Slicker RtUv)aneRbIsMrab;CMnYs[ Darby sMrab;kargarsMNg;eKhdæan b¤enAeBlEdlpÞaMg

mñagsilaRtUveRbI. Slick RtUv)an eFVIBIeQIEdlmanmçagragTal dUcGVIEdleKeRbICa Sheath sMrab;
xageRkApÞH. CaTUeTAvamanRbEvgRbEhl 120cm nig TTwg 15cm rW 20cm . vaminmanédkaneT Et
vaRtUv)ankan;edayCaymçagEdlmankMras;Rkas;Cag. CagkMe)arxøHcUlcitþ eRbI slicker eRBaHvagay
RsYlbt;EbnenAeBlEdlEm:RtIvaelI)ayGr. edaysarEtPaBbt;Ebnrbs;va)ankMe)argayRsYl
nwg relagCagFmμta.




                                      rUb 4-32 slicker
         2> brikça Equimpments
         eKmanm:asuIn Plastering BIrRbePT KW Wet mix nig Dry mix. RbePTbUm Wet-mix bBa¢Ún
l,aykMe)arBIm:asuInRkLúkeTAdl;k,al)aj;Tueya. RbePTm:asuIn Dry-mix bBa¢Únl,aykMe)ars¶Üt
eTAdl;k,allayEdleRkamsMBaFTwkRtUv)anlayCamYynwgkMe)ars¶Ütnwg )aj;edaykMlaMgnUv
kMe)aresIm. m:asuIn Plastering PaKeRcInKW m:asuInbUm wet-mix . m:asuInb:Um Wet-mix GacCaRbePT
Worm-drive, piston-pump KWRbePT hand hopper. sMrab;RbePTm:asuIn worm-drive l,aykMe)ar

RtUv)ancak;cUleTAkñúg Hopper nigbBa¢ÚneTAk,al)aj;tamTueyaedayskmμPaBmYlvIsén rotor nig
stator EdlpÁúMenAnwgkr énm:asuIn. m:asuInRbePTenHman hoppe GacmanlT§PaBpÞúkl,aykMe)arBI

3eTA5 feet KIb nigGac bBa¢ÚnBI 0>5 eTA 2 feet KIbkñúg1TaTI. sMrab;RbePTm:asuIn Piston-pum
Edl Piston RbtibtþkarN_ tamlkçN³ hydraulic, air-operated b¤emkanicpþl;nUvfamBlsMrab;
bBa¢ÚnkMe)arrav. sMrab;m:asuIn hand-hopper l,aykMe)ars¶ÜtRtUv)andak;cUleTAkñúg hand-held
hopper EdlsßitenABIelIk,al)aj;. ehIyCaTUeTA hopper enHGacdak;kMe)ar)anRbEhl 1/10 feet




Plastering Work                                                                        56
Civil Engineering Department                                                         NPIC




KIb. m:asuInTaMgenHRtUv)aneRbIva sMxan;sMrab;kargarbUkbegðIy. karGnuvtþn_edayma:suIn kat;bnßy
nUvkareRbIR)as;kþaRT nigsøabRBa kMe)arsMrab;kargarbUkkMe)arCMh‘andMbUg. eTaHbICay:agNak¾eday
eKenAEteRbIral;]bkrN_Edl eRbIedayéddEdldUcCaEm:RtekosMrab;kargarGnuvtþn_edaym:asuIn.




Plastering Work                                                                        57
Civil Engineering Department                                                          NPIC




CMBUkV
karGnuvtþn_
Practice



1> karbUkkMe)ar Plastering
        1>1 kartMeLIg stucco            Installating Stucco

        dMeNIrkarRbtibtþi
                  1> e)aHP¢ab;   base strip   eTAnwgeCIgCBa¢aMg edaydak;RtYteTAelIExSbnÞat;dwk
Edl)anKUrrYc.




                  2> eRbIEdkeKaleRsabsgá½sIduMP¢ab;sMNaj;lYsBIelIépÞTaMgmUl lapping base nig
coner bead




Plastering Work                                                                         58
Civil Engineering Department                                                           NPIC




              3> eRbIsøabRBakMe)ar):at)ayGredaykMlaMgxøaMglμmedIm,Ibgáb;sMNaj;lYseTA
nigl,aysMrab;begáItRsTab; Base coat




                  4> qáÚtépÞénRsTab; base coat Cacg¥ÚredkedIm,IbegáItCaPaBs¥itrvagRsTab;.




                 5> bUknUvRsTab; brown coat EdlmankMras; 9cm. labfñaM b¤bEnßmRsTab; finish
        coat kMras; 3mm




Plastering Work                                                                             59
Civil Engineering Department                                                           NPIC




        1>2 karbUkkMe)arelIduMbøúk
        karbUkkMe)arKW CakargarbegðIycaM)ac;taMgBIburaNsMrab;CBa¢aMgrabedayduMbøúknig sMrab;Epñk
EdlCaRKwHénpÞH. vamankargayRsYlkñúgkarbUkkMe)arelIsMPar³Edltan;² CagBIelIeRKageQI
edaymanmUlehtuCaeRcIn TI1 duMbøúkKWrwg dUcenHeyIgmincaM)ac;bEnßmEdkBRgwgeT bu:EnþeyIgKYr
bEnßm base nig corner bead . dUcKñaEdrCaTUeTACBa¢aMgdæRtUvkarEt 2RsTab;eT KWRsTab;base b¤
scratch coat kMras; 9cm nig RsTab;begðIy finish coat kMras; 6mm . edayKμansMNaj;BRgwg GñkKYr

EterobcMCBa¢aMgcas;edayRcasEdk b¤Ck;. sMrab;PaBs¥itl¥elICBa¢aMgenaH GñkKYrbegáInPaBs¥it
edaylabnUvPJak;gars¥itmYy RsTab;edayr:UlUruj.
        dMeNIrkarRbtibtþi
        1>eRbInUvEdkdab; (cold shisel) nigjjYÜrF¶n;² dab;ecjnUvkMe)aEdlelIsecjBImuxtMN




        2> e)assMGatPaBkxVk; nigkMTickMTI dUcCaEsø edayRcasEdk




          3> rujedayr:UlUBIelICBa¢aMg dæEdlcas;edayPñak;gars¥itsMrab;begáInPaBs¥it. cMeBaH
CBa¢aMgbøúkfμI² mincaM)ac;labeT.


Plastering Work                                                                           60
Civil Engineering Department                                                            NPIC




         4> tMeLIgnUv base drip bead edIm,IbBaÄb;nUvRsTab;bUkbegðIy nigkat;tMnwmCayeGayputBI
dIy:agxøIbMput.




        5> eRbI corner bead CamYynwg mesh flange edIm,IeFVI tradition CuMvijRCugbøúk.




        6> eRbInUvfasdak;kMe)aredIm,IeFVIeGayl,aymanPaBgayRsYleFVIkarlμmrYc):atbUkEtmþg




Plastering Work                                                                           61
Civil Engineering Department                                                         NPIC




         7> eRbIsøabRBakMe)arbUkrujkMe)arBIeRkameLIgelIedIm,IbegáItCaRsTab;TI1. GñkGaceRbIkþa
vIsMrab;dak;kMe)areGay)aneRcInkñúgkarrujenH.




        8> munnwgRsTab;TI1 s¶Üt qáÚtCacg¥Úr. ]bkrN_qáÚtenHeFVIedayxøÜnÉgEmnEtmanRbsiT§PaB




        9> enAeBlEdl Scratch coat eLIgs¶Üt)aj;Twk eGayvaedIm,ICYycab;s¥itRsTab;begðIy.




Plastering Work                                                                        62
Civil Engineering Department                                                      NPIC




        10> bUknUvRsTab;begðIyedaysøabRBa BRgabnigrMlIgva eGaymankMras; 6mm




        11> sMGatnUvkMe)arEdlelIsecjBIRCugedayGUssøabRBatambeNþayCayén metal bead




        12> RKbCBa¢aMgedaypÞaMg)øasÞikedIm,IrkSasMeNImry³eBl 48em:ag nigGnuBaØatieGay
kMe)armansMeNIm.
        bUkelIeQI
       enAeBlEdleyIgbUkkMe)areTAelICBa¢aMgeRKageQI eyIgEtgEtCYbnUvvibtþiénkarrIkRsk
rbs; sac;eQItamlkçN³tUc² eTAtamrdUv vabNþaleGayeRbHnUvkMe)arsuIm:g;t_rwg.
eKmanvIFIBIrsMrab; Tb;Tl;bBaðaenH KWT1 eyIgRtUvsg;CBa¢aMgd¾rwg ]TahrN_ eday 2x6 CMnYs[ 2x4
                                     I

Plastering Work                                                                     63
Civil Engineering Department                                                                 NPIC




b¤y:agticeyIg             RtUvbEnßmCnÞl;edIm,IeGayeRKageQIkan;EtrwgmaM.            viFImü:ageTot
KWtMeLIgsMNaj;BRgwg ¬rYmTaMg corner nig base bead CamYynwg mesh flanges ¦
P¢ab;eTAnwgépÞCBa¢aMg. Gñkk¾RtUvkarBar tile sheathing pgEdrCamYynwgkardak;Can;KñanUv felt paper .
eyIgRtUvbUkkMe)ar 3Can;BIelIeRKageQI. cab;epþImeday scratch coat kMras;RbEhl 9mm
qáÚtedIm,IeGayRsTab;TI3 s¥itCab;CamYyRsTab; enH. RsTab;bnÞab; KW RsTab; brown coat
kMras;RbEvgRbEhl 6mm pþl;nUvépÞrabesμIÉksNæan. RsTab; 3 kMras;RbEhl 3mm
RtUv)aneKeGayeQμaHfa color coat edayeyIgGaclayBN’nig vaynPaBpgEdr.
        dMeNIrkarRbtibtþi
        1> kiwbP¢ab; felt paper eTAnwg sheathing biTB½T§RCugnwgpþl;nUv liveral Can;KñaenARCug.




        2> vayExSbnþat;BIelI felt paper EpñkxageRkamBIelIRKwHsMrab;CalMnaMeGay base bead .




        3> vas; mesh- edjed base bead nigkat;tMnwmvaeTAnwgRbEvgRtUvkaredaydgáab;.




Plastering Work                                                                                  64
Civil Engineering Department                                                   NPIC




      4> tMeLIg mesh flang tMrg;CamYynwgExSbnÞab;EdleyIg)anpÞat; nige)aHP¢ab; bead eday
EdkeKal roofing nail




        5> tMeLIgsMNaj;EdkCamYynwg EdkeKaleRsabsgá½sI b¤kwbP¢ab;edIm,IbegáItCaRsTab;RT
bnþbnÞab;.




        6> RKbRCugedaydkyk corner bead ecjedIm,IeFVICayrvagépÞCBa¢aMgmanlkçN³s¥at.




Plastering Work                                                                  65
Civil Engineering Department                                                         NPIC




       7> rujkMe)arbUkBIeRkameLIgelIedaysøabRBaedIm,Ibgáb;y:agENnnUv     lath   eTAkñúgRsTab;
TI1enH.




        8> qáÚtCacg¥ÚredkenAelIépÞ eRbInUv]bkrN_eFVIedayxøÜnÉgenH CabMENkén paint-straining
screen .




        9> epSImRsTab; Scratch coat enHmunnwgbUknUvRsTab;TI2 ehAfaRsTab; brown coats




Plastering Work                                                                        66
Civil Engineering Department                                                    NPIC




        10> eRbInUvkþavIEvgedIm,IbUknUvRsTab; brown coat enHenAelIépÞrabesμI.




         11> GñkGacbEnßmBN’eTAkñúgl,ay stucco edIm,IlabBN’sMrab;RsTab; Finish coat Rbsin
ebIcaM)ac;.




        12> bUknUvRsTab;cugeRkay edayrkSakMras; 3mm sMrab;RsTab; finish coat




Plastering Work                                                                   67

Weitere ähnliche Inhalte

Was ist angesagt?

Xii slender column
Xii slender columnXii slender column
Xii slender columnChhay Teng
 
Xv design for torsion
Xv design for torsionXv design for torsion
Xv design for torsionChhay Teng
 
Estimation and Confidence Intervals
Estimation and Confidence IntervalsEstimation and Confidence Intervals
Estimation and Confidence IntervalsTung Nget
 
2.analysis of statically determinate structure
2.analysis of statically determinate structure2.analysis of statically determinate structure
2.analysis of statically determinate structureChhay Teng
 
ពុទ្ធវង្សសង្ខេប
ពុទ្ធវង្សសង្ខេបពុទ្ធវង្សសង្ខេប
ពុទ្ធវង្សសង្ខេបVantha Kago
 
Xiv retaining walls
Xiv retaining wallsXiv retaining walls
Xiv retaining wallsChhay Teng
 
Pig production bb
Pig production bbPig production bb
Pig production bbsopheak93
 

Was ist angesagt? (9)

Xviii stairs
Xviii stairsXviii stairs
Xviii stairs
 
Xii slender column
Xii slender columnXii slender column
Xii slender column
 
Xv design for torsion
Xv design for torsionXv design for torsion
Xv design for torsion
 
Estimation and Confidence Intervals
Estimation and Confidence IntervalsEstimation and Confidence Intervals
Estimation and Confidence Intervals
 
2.analysis of statically determinate structure
2.analysis of statically determinate structure2.analysis of statically determinate structure
2.analysis of statically determinate structure
 
ពុទ្ធវង្សសង្ខេប
ពុទ្ធវង្សសង្ខេបពុទ្ធវង្សសង្ខេប
ពុទ្ធវង្សសង្ខេប
 
Xiv retaining walls
Xiv retaining wallsXiv retaining walls
Xiv retaining walls
 
Pig production bb
Pig production bbPig production bb
Pig production bb
 
Leadership1
Leadership1Leadership1
Leadership1
 

Andere mochten auch

13 beams and frames having nonprismatic members
13 beams and frames having nonprismatic members13 beams and frames having nonprismatic members
13 beams and frames having nonprismatic membersChhay Teng
 
Vi. indeterminate prestressed concrete structures
Vi. indeterminate prestressed concrete structuresVi. indeterminate prestressed concrete structures
Vi. indeterminate prestressed concrete structuresChhay Teng
 
Vii. camber, deflection, and crack control
Vii. camber, deflection, and crack controlVii. camber, deflection, and crack control
Vii. camber, deflection, and crack controlChhay Teng
 
Xix introduction to prestressed concrete
Xix introduction to prestressed concreteXix introduction to prestressed concrete
Xix introduction to prestressed concreteChhay Teng
 
9. deflection using energy method
9. deflection using energy method9. deflection using energy method
9. deflection using energy methodChhay Teng
 
3.tension members
3.tension members3.tension members
3.tension membersChhay Teng
 
7.simple connections
7.simple connections7.simple connections
7.simple connectionsChhay Teng
 
12. displacement method of analysis moment distribution
12. displacement method of analysis moment distribution12. displacement method of analysis moment distribution
12. displacement method of analysis moment distributionChhay Teng
 
Xii.lrfd and stan dard aastho design of concrete bridge
Xii.lrfd and stan dard aastho design of concrete bridgeXii.lrfd and stan dard aastho design of concrete bridge
Xii.lrfd and stan dard aastho design of concrete bridgeChhay Teng
 
V. shear and torsional strength design
V. shear and torsional strength designV. shear and torsional strength design
V. shear and torsional strength designChhay Teng
 
Xi members in compression and bending
Xi members in compression and bendingXi members in compression and bending
Xi members in compression and bendingChhay Teng
 

Andere mochten auch (20)

Cpac
CpacCpac
Cpac
 
វិធីតម្លើងប៉ូលីកាបូណាត
វិធីតម្លើងប៉ូលីកាបូណាតវិធីតម្លើងប៉ូលីកាបូណាត
វិធីតម្លើងប៉ូលីកាបូណាត
 
Japan hj
Japan hjJapan hj
Japan hj
 
Torsionprop
TorsionpropTorsionprop
Torsionprop
 
13 beams and frames having nonprismatic members
13 beams and frames having nonprismatic members13 beams and frames having nonprismatic members
13 beams and frames having nonprismatic members
 
Vi. indeterminate prestressed concrete structures
Vi. indeterminate prestressed concrete structuresVi. indeterminate prestressed concrete structures
Vi. indeterminate prestressed concrete structures
 
5.beams
5.beams5.beams
5.beams
 
Vii. camber, deflection, and crack control
Vii. camber, deflection, and crack controlVii. camber, deflection, and crack control
Vii. camber, deflection, and crack control
 
Xix introduction to prestressed concrete
Xix introduction to prestressed concreteXix introduction to prestressed concrete
Xix introduction to prestressed concrete
 
Appendix
AppendixAppendix
Appendix
 
9. deflection using energy method
9. deflection using energy method9. deflection using energy method
9. deflection using energy method
 
3.tension members
3.tension members3.tension members
3.tension members
 
7.simple connections
7.simple connections7.simple connections
7.simple connections
 
Euro sq
Euro sqEuro sq
Euro sq
 
12. displacement method of analysis moment distribution
12. displacement method of analysis moment distribution12. displacement method of analysis moment distribution
12. displacement method of analysis moment distribution
 
Xii.lrfd and stan dard aastho design of concrete bridge
Xii.lrfd and stan dard aastho design of concrete bridgeXii.lrfd and stan dard aastho design of concrete bridge
Xii.lrfd and stan dard aastho design of concrete bridge
 
V. shear and torsional strength design
V. shear and torsional strength designV. shear and torsional strength design
V. shear and torsional strength design
 
Xi members in compression and bending
Xi members in compression and bendingXi members in compression and bending
Xi members in compression and bending
 
Euro l
Euro lEuro l
Euro l
 
Appendix
AppendixAppendix
Appendix
 

Ähnlich wie Plastering

Construction general
Construction generalConstruction general
Construction generalChhay Teng
 
몽고디비사용자교육2일차 v0.5
몽고디비사용자교육2일차 v0.5몽고디비사용자교육2일차 v0.5
몽고디비사용자교육2일차 v0.5seung-hyun Park
 
Carpentering work
Carpentering work Carpentering work
Carpentering work Chhay Teng
 
GT4R4A1 Slurry for use on slurry shield TBM
GT4R4A1 Slurry for use on slurry shield TBMGT4R4A1 Slurry for use on slurry shield TBM
GT4R4A1 Slurry for use on slurry shield TBMBruno Demay
 
第5回CCMSハンズオン(ソフトウェア講習会): AkaiKKRチュートリアル 2. AkaiKKRの実習
第5回CCMSハンズオン(ソフトウェア講習会): AkaiKKRチュートリアル 2. AkaiKKRの実習第5回CCMSハンズオン(ソフトウェア講習会): AkaiKKRチュートリアル 2. AkaiKKRの実習
第5回CCMSハンズオン(ソフトウェア講習会): AkaiKKRチュートリアル 2. AkaiKKRの実習Computational Materials Science Initiative
 
Bittorrent Seminar Report by Shyam Prakash
Bittorrent Seminar Report by Shyam PrakashBittorrent Seminar Report by Shyam Prakash
Bittorrent Seminar Report by Shyam PrakashSanjeev Kumar Jaiswal
 
5th Sem IT - Shivani Suramwar - W21_0001.pdf
5th Sem IT - Shivani Suramwar - W21_0001.pdf5th Sem IT - Shivani Suramwar - W21_0001.pdf
5th Sem IT - Shivani Suramwar - W21_0001.pdfVikas Bhowate
 
Metadata Matters
Metadata MattersMetadata Matters
Metadata Mattersafa reg
 

Ähnlich wie Plastering (20)

Construction general
Construction generalConstruction general
Construction general
 
몽고디비사용자교육2일차 v0.5
몽고디비사용자교육2일차 v0.5몽고디비사용자교육2일차 v0.5
몽고디비사용자교육2일차 v0.5
 
SR618C6 Solar Water Heater Controller for Split Solar Water Heating System
SR618C6 Solar Water Heater Controller for Split Solar Water Heating SystemSR618C6 Solar Water Heater Controller for Split Solar Water Heating System
SR618C6 Solar Water Heater Controller for Split Solar Water Heating System
 
Carpentering work
Carpentering work Carpentering work
Carpentering work
 
Basicguide
BasicguideBasicguide
Basicguide
 
SR618C6-En20100813+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water...
SR618C6-En20100813+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water...SR618C6-En20100813+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water...
SR618C6-En20100813+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water...
 
GT4R4A1 Slurry for use on slurry shield TBM
GT4R4A1 Slurry for use on slurry shield TBMGT4R4A1 Slurry for use on slurry shield TBM
GT4R4A1 Slurry for use on slurry shield TBM
 
Cesmm
CesmmCesmm
Cesmm
 
第5回CCMSハンズオン(ソフトウェア講習会): AkaiKKRチュートリアル 2. AkaiKKRの実習
第5回CCMSハンズオン(ソフトウェア講習会): AkaiKKRチュートリアル 2. AkaiKKRの実習第5回CCMSハンズオン(ソフトウェア講習会): AkaiKKRチュートリアル 2. AkaiKKRの実習
第5回CCMSハンズオン(ソフトウェア講習会): AkaiKKRチュートリアル 2. AkaiKKRの実習
 
ترجمات عبرية ليوم 14 11-2010
ترجمات عبرية ليوم 14 11-2010ترجمات عبرية ليوم 14 11-2010
ترجمات عبرية ليوم 14 11-2010
 
Bittorrent Seminar Report by Shyam Prakash
Bittorrent Seminar Report by Shyam PrakashBittorrent Seminar Report by Shyam Prakash
Bittorrent Seminar Report by Shyam Prakash
 
chris pearce
chris pearcechris pearce
chris pearce
 
5th Sem IT - Shivani Suramwar - W21_0001.pdf
5th Sem IT - Shivani Suramwar - W21_0001.pdf5th Sem IT - Shivani Suramwar - W21_0001.pdf
5th Sem IT - Shivani Suramwar - W21_0001.pdf
 
Sa ak280-panasonic
Sa ak280-panasonicSa ak280-panasonic
Sa ak280-panasonic
 
CV
CVCV
CV
 
Metadata Matters
Metadata MattersMetadata Matters
Metadata Matters
 
SR868C8-EN-20110303+Ultisolar New Energy Co Ltd Solar Pump Station Solar Wate...
SR868C8-EN-20110303+Ultisolar New Energy Co Ltd Solar Pump Station Solar Wate...SR868C8-EN-20110303+Ultisolar New Energy Co Ltd Solar Pump Station Solar Wate...
SR868C8-EN-20110303+Ultisolar New Energy Co Ltd Solar Pump Station Solar Wate...
 
Sr530 c8+ultisolar new energy co ltd solar pump station solar water heater co...
Sr530 c8+ultisolar new energy co ltd solar pump station solar water heater co...Sr530 c8+ultisolar new energy co ltd solar pump station solar water heater co...
Sr530 c8+ultisolar new energy co ltd solar pump station solar water heater co...
 
BCM5C7.pdf
BCM5C7.pdfBCM5C7.pdf
BCM5C7.pdf
 
Contents
ContentsContents
Contents
 

Mehr von Chhay Teng

Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_studentsChhay Teng
 
Representative flower of asian countries
Representative flower of asian countriesRepresentative flower of asian countries
Representative flower of asian countriesChhay Teng
 
Composition of mix design
Composition of mix designComposition of mix design
Composition of mix designChhay Teng
 
2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines
2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines
2009 ncdd-csf-technical-manual-vol-i-study-design-guidelinesChhay Teng
 
Technical standard specification auto content
Technical standard specification auto contentTechnical standard specification auto content
Technical standard specification auto contentChhay Teng
 
Available steel-section-list-in-cam
Available steel-section-list-in-camAvailable steel-section-list-in-cam
Available steel-section-list-in-camChhay Teng
 
Concrete basics
Concrete basicsConcrete basics
Concrete basicsChhay Teng
 
Rebar arrangement and construction carryout
Rebar arrangement and construction carryoutRebar arrangement and construction carryout
Rebar arrangement and construction carryoutChhay Teng
 
1 dimension and properties table of w shapes
1 dimension and properties table of w shapes1 dimension and properties table of w shapes
1 dimension and properties table of w shapesChhay Teng
 
2 dimension and properties table of s shape
2 dimension and properties table of s shape2 dimension and properties table of s shape
2 dimension and properties table of s shapeChhay Teng
 
3 dimension and properties table of hp shape
3 dimension and properties table of hp shape3 dimension and properties table of hp shape
3 dimension and properties table of hp shapeChhay Teng
 
4 dimension and properties table c shape
4 dimension and properties table c shape4 dimension and properties table c shape
4 dimension and properties table c shapeChhay Teng
 
5 dimension and properties table l shape
5 dimension and properties table l shape5 dimension and properties table l shape
5 dimension and properties table l shapeChhay Teng
 
6 dimension and properties table of ipe shape
6 dimension and properties table of ipe shape6 dimension and properties table of ipe shape
6 dimension and properties table of ipe shapeChhay Teng
 
7 dimension and properties table ipn
7 dimension and properties table ipn7 dimension and properties table ipn
7 dimension and properties table ipnChhay Teng
 
8 dimension and properties table of equal leg angle
8 dimension and properties table of equal leg angle8 dimension and properties table of equal leg angle
8 dimension and properties table of equal leg angleChhay Teng
 
9 dimension and properties table of upe
9 dimension and properties table of upe9 dimension and properties table of upe
9 dimension and properties table of upeChhay Teng
 
10 dimension and properties table upn
10 dimension and properties table upn10 dimension and properties table upn
10 dimension and properties table upnChhay Teng
 

Mehr von Chhay Teng (20)

Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_students
 
Representative flower of asian countries
Representative flower of asian countriesRepresentative flower of asian countries
Representative flower of asian countries
 
Composition of mix design
Composition of mix designComposition of mix design
Composition of mix design
 
2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines
2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines
2009 ncdd-csf-technical-manual-vol-i-study-design-guidelines
 
Type of road
Type of roadType of road
Type of road
 
Technical standard specification auto content
Technical standard specification auto contentTechnical standard specification auto content
Technical standard specification auto content
 
Available steel-section-list-in-cam
Available steel-section-list-in-camAvailable steel-section-list-in-cam
Available steel-section-list-in-cam
 
Concrete basics
Concrete basicsConcrete basics
Concrete basics
 
Rebar arrangement and construction carryout
Rebar arrangement and construction carryoutRebar arrangement and construction carryout
Rebar arrangement and construction carryout
 
Mix design
Mix designMix design
Mix design
 
1 dimension and properties table of w shapes
1 dimension and properties table of w shapes1 dimension and properties table of w shapes
1 dimension and properties table of w shapes
 
2 dimension and properties table of s shape
2 dimension and properties table of s shape2 dimension and properties table of s shape
2 dimension and properties table of s shape
 
3 dimension and properties table of hp shape
3 dimension and properties table of hp shape3 dimension and properties table of hp shape
3 dimension and properties table of hp shape
 
4 dimension and properties table c shape
4 dimension and properties table c shape4 dimension and properties table c shape
4 dimension and properties table c shape
 
5 dimension and properties table l shape
5 dimension and properties table l shape5 dimension and properties table l shape
5 dimension and properties table l shape
 
6 dimension and properties table of ipe shape
6 dimension and properties table of ipe shape6 dimension and properties table of ipe shape
6 dimension and properties table of ipe shape
 
7 dimension and properties table ipn
7 dimension and properties table ipn7 dimension and properties table ipn
7 dimension and properties table ipn
 
8 dimension and properties table of equal leg angle
8 dimension and properties table of equal leg angle8 dimension and properties table of equal leg angle
8 dimension and properties table of equal leg angle
 
9 dimension and properties table of upe
9 dimension and properties table of upe9 dimension and properties table of upe
9 dimension and properties table of upe
 
10 dimension and properties table upn
10 dimension and properties table upn10 dimension and properties table upn
10 dimension and properties table upn
 

Kürzlich hochgeladen

Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 

Kürzlich hochgeladen (20)

Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 

Plastering

  • 1. Civil Engineering Department NPIC matika CMBUk I------------------------------------------------------------------ 4 sMPar³ ----------------------------------------------------------------- 4 MATERIAL ------------------------------------------------------------ 4 1> kMe)arbUksuIm:g;B½rELn Portland Cement Plaster ----------------------------- 4 1>1 tMrUvkarTUeTA General Requirement ------------------------------------ 4 1>2 sMPar³ Material -------------------------------------------------- 5 1>3 sMPar³suIm:g;t_ Cementitious Material` --------------------------------- 5 1>4 fμbMEbk Aggregate ------------------------------------------------ 6 1>5 kMe)ar Lime ------------------------------------------------------7 1>6 Twk Water------------------------------------------------------- 9 1>7 TwkfñaMKImI Admixture ----------------------------------------------- 9 CMBUk II----------------------------------------------------------------11 RbB½n§RTRTg;kMe)arbUknig ---------------------------------------------------11 Plaster Support System and Base -------------------------------------------11 1> RbBn§½RTRTg; Support System ---------------------------------------- 11 1>1 eRKagEdk nig Furring metal Framing And furring. --------------------- 12 1>2 eRKageQI nig Furring wood framing and furring ----------------------- 12 1>3 kMralkMe)arbUk Plaster Bas -----------------------------------------15 1>4 ebtug nigdæ Concrete and Masonry----------------------------------15 1>5 EdkBRgwg Metal Reinforcement -------------------------------------18 1>6 Backing Paper ------------------------------------------------- 23 1>7 pÞaMgmμagsila Gypsum Lath ----------------------------------------24 1>8 eRKOgbnÞab;bnSMBIEdksMrab;karbUkkMe)ar Metal Plaster Accessories-----------25 1>9 Flashing -------------------------------------------------------26 Plastering Work 1
  • 2. Civil Engineering Department NPIC CMBUk III ---------------------------------------------------------------27 karGnuvtþn_nUvkMe)arbUksuIm:g;t_Br½ELn------------------------------------------27 PORTLAND CEMENT PLASTER APPLICATION ---------------------------27 1> l,aykMe)ar Mixed ------------------------------------------------- 27 1>1 l,aysuIm:g;t_erobdæ nigsuIm:g;t_)øasÞik Masonry and plastic cement mixes -----28 1>2 l,aysuIm:g;t_Br½ELn Portland Cement Mixes --------------------------29 2> karGnuvtþn_ Application -----------------------------------------------29 2>1 kargarbIRsTab; Three coat work ----------------------------------- 30 2>2 kargarBIrRsTab; Two-coat work------------------------------------ 34 3> karEfTMaTwk curing-------------------------------------------------- 35 CMBUk IV -------------------------------------------------------------- 37 ]bkrN_ nigbrikça ------------------------------------------------------- 37 TOOL AND EQUIPMENT ---------------------------------------------- 37 1> ]bkrN_ ---------------------------------------------------------- 37 1>1 kþaRTkMe)ar Hawk ----------------------------------------------- 37 1>2 søabRBakMe)ar Trowels ------------------------------------------- 38 1>3 kþavI Floats ----------------------------------------------------- 40 1>4 Paddle---------------------------------------------------------42 1>5 Ck; Brush ----------------------------------------------------- 43 1>6 ]bkrN_eFVIk,ac;rcna Ornamental Tools ------------------------------- 44 1>7 BUefAéd Hatchet ------------------------------------------------- 45 1>8 kUnRbeyal Plumb Bod ------------------------------------------- 45 1>9 Em:RtsÞg; Level --------------------------------------------------46 1>10 ké®nþkat;sMN tin snip -------------------------------------------47 1>11 RbGb;ExSbnÞat; Chalk Box ----------------------------------------48 Plastering Work 2
  • 3. Civil Engineering Department NPIC 1>12 Em:Rtbt;6-Foot Six-foot folding rule -----------------------------48 1>13 rNar Saws ---------------------------------------------------48 1>4 Em:RtEkg Stell Square--------------------------------------------- 49 1>15 Joint Rod ----------------------------------------------------- 50 1>16 rnas;qáÚt Scratcher ---------------------------------------------- 50 1>17 Em:RtEdk Steel tape --------------------------------------------- 50 1>18 Jiont Cutter---------------------------------------------------51 1>19 dgáab; Nippers--------------------------------------------------51 1>20 eRsamédC½r Rubber Groves ---------------------------------------52 1>21 Combination Square (bevel square) --------------------------------52 1>22 Coping Saw ------------------------------------------------- 53 1>23 EdkecaH Prick Punch------------------------------------------- 53 1>24 jBaYr Craw bammer -------------------------------------------- 54 1>25 Em:Rt b¤bnÞat;eko Straightedge ------------------------------------- 54 1>26 Featheredge --------------------------------------------------- 55 1>27 Darby ------------------------------------------------------- 55 1>28 Slicker -------------------------------------------------------56 2> brikça Equimpments------------------------------------------------56 CMBUk V --------------------------------------------------------------- 58 karGnuvtþn_ ------------------------------------------------------------- 58 Practice --------------------------------------------------------------- 58 1> karbUkkMe)ar Plastering -----------------------------------------------58 1>1 kartMeLIg stucco Installating Stucco ------------------------------58 1>2 karbUkkMe)arelIduMbøúk -----------------------------------------------60 Plastering Work 3
  • 4. Civil Engineering Department NPIC CMBUk I sMPar³ MATERIAL 1> kMe)arbUksuIm:g;t_B½rELn Portland Cement Plaster kMe)arsuIm:g;t_B½rELnRtUv)anykmkeRbITaMgxagkñúg nig xageRkACaTIkEnøgEdlvaRtUvrg edaypÞal;nUvPaBeCaKCaMedayTwkb¤sMeNImy:agx<s;. sMrab;kargarbUkCBa¢aMgPaKeRcIn kMe)arbUk suIm:g;Br½ELnEpñkxageRkARtUveKeGayeQμaHfa Stucco nig kMe)arbUksuIm:g;t_B½rELn Epñkxagkñúg RtUv eKeGayeQμaHfa Simply plaster . eTaHCay:agenHk¾eday sMrab;tMbn;xøHCaBiessdUcCatam beNþayeqñrxaglic West Coast TaMgkMe)arbUksuIm:g;t_Br½ELnTaMgxagkñúgnig xageRkAKWman eQμaHdUcKña Stucco . kMe)ar bUksuIm:g;B½rELnk¾RtUv)aneKykmkeRbIdUcCaRsTab; Purging BIelICBa¢aMgdæpgEdr. CaerOy² Parging RtUv)aneKeRbIsMrab;CBa¢aMgEdlsßitenABIeRkamdI edIm,I begáInnUvPaBFn;nwgkarRCabénsMenImnig edIm,IedIrtYrCasarFatu)as nigRsTab;edayman épÞrab esμIedIm,IkarBarPaBRCabTwknigsMeNIm. 1>1 tMrUvkarTUeTA General Requirement kMe)arbUksuIm:g;t_Br½ELnsMrab;CBa¢aMgxageRkA nig CBa¢aMgxagkñúgsMrab;kEnøgxøHdUcCa bnÞb;Twk GagcMhuy bnÞab;gUtTwkcMhuy bnÞb;e)akexaGav GaggUtTwkbiTCit c®gáan)ay nigkEnøg xøHeTot Edl manlkçN³RsedogenHCYbRbTHnUveRKaHmhnþrayminFmμta ebIeRbobeFobeTAkEnøg epSg eTot. eRKaHfñak;TaMgenaHrYmman PaBeRcaHénTwk EdlGacbgánUveRcHsuIEdk nigeRKOgbrikça bnÞab; bnSMeFVIBIEdk nig Stress EdlbegáIteLIgedayPaBxusKñaénsItuNðPaBnig sMeNIm. sMrab; kEnøgNa EdlCYbRbTHbBaðaxagelIeKtMrUveGaymankarGnuvtþn_ nigeFVIkarRbugytñ½xusKñabnþicbnþÜcBI karcaM)ac; sMrab;kEnøgNaEdlmanbBaðatic. CakarBit RsTab;kMe)arbUksuIm:g;t_B½rELn KWCakMralebtugd¾esþIgEdleFVIeLIgCamYysMPar³ nigeRbIR)as;viFIbUkkMe)ar nigRtUvmansarFatupSMebtugcaM)ac;mYycMnYnpg. PñaskMe)arbUksuIm:g;t_ Plastering Work 4
  • 5. Civil Engineering Department NPIC B½rELn KWrwg nigGacrcna)an. vaGacbegáItrUbrag)any:ageRcInRbePT GacbiTedayépÞvaynPaB y:ageRcInsn§wksn§ab; nigGaclabfñaMBN’. vaFn;nwgkarvayRbharedayGNþatePøIg GakasFatu nigkarecjpSwt. va)anbgðajy:agc,as;nUvPaBCab;niwgkareRbIR)as;)anyUr ehIymanPaBsnSMsMéc TaMgkñúgGakasFatuRtCak; nigekþA. 1>2 sMPar³ Material smasFatusMrab;kMe)arbUksuIm:g;t_Br½ELn CaTUeTAdUcKñanwgebtugnigkMe)ar)ayGrsuIm:g;t_ B½rELn TaMgenaHrYmmanxSac;EdledIrtYCasarFatubMeBjnig pþl;nUvkMlaMgFn; suIm:g;t_edIrtYrCa sarFatubnSúIP¢ab; TwkEdlpSMKñaCamYysuIm:g;t_begáItCafñaMs¥it² ehIyeFVIRbtikmμdMbUgedayP¢ab;xSac; cUlKñabegáItCam:astan; nigTwkfñaMKImIEdlbegáInnUvPaByWt b¤PaBs¥iténl,ay b¤BnüWt b¤BenøÓn nUv kareLIgkkrwg. kMe)arbUksuIm:g;t_Br½ELn tMrUveGayeRbInUveRKOgBRgwgedayEdk b¤eRKOgbnÞab;bnSM EdleFVIBIEdksMrab;karBarCay nigeRbH. 1>3 sMPar³suIm:g;t_ Cementitious Material sMPar³suIm:g;t_Edl eRbIsMrab;laykñugkMe)arbUksuIm:g;t_B½rELnrYmman suIm:gt_B½rELn suIm:g;t_erobdæ (Masonry Cement) suIm:g;t_)aøsÞik(Plastic Cement) nigkMe)ar (Lime) . RsTab;bUkbegðIy (Finishes) EdllayedaysuiIm:g;t_)øasÞik b¤suIm:gt_erobdæ b¤ suIm:g;t_B½rEln CamYykMe)articCag 50° KitCamaD RtUv)aneKeGayeQμaHfa kMe)arbUk suIm:g;t_B½rEln. enAeBl EdllayCamYynwgbrimaNkMe)areRcInCag 50° KitCamaD RtUv)aneK eGayeQμaHfa suIm:g;t_kMe)ar (Lime-cement or Portland Cement-Lime plaster) . eKalkarN_nig viFIEdlerobrab;xagelIenHGacykmkeRbITaMgxagkñúg nig xageRkAGaKar. suIm:g;t_B½rELn Portland Cement RbePTsuIm:g;t_B½rELnEdlGaceRbIsMrab;bUkk¾GaceRbIsMrab;layebtugEdr. suIm:g;t_B½rELn RbePT1 ¬Fmμta¦ RtUv)aneRbIsMrab;kargarlaykMe)arbUksuIm:g;t_B½rELnPaKeRcIn. elIkElgEt kEnøgxøHEdlmanlkçN³Biess tMrUv[eRbIRbePT I nigRbePT II. sMrab;suIm:g;t_B½rELnRbePT IA, IIA, IIIA ¬begáItxül; Air- entraining ¦)anbegáItnUvPaBgayRsYleFVIkar (Workability) Plastering Work 5
  • 6. Civil Engineering Department NPIC PaBFn;nwg Bleeding ¬kMhab;énTwknig sarFatum:t;pg;enAelIépÞ¦ nigFn;nwgkareRKaHfñak;edaykar eLIgkkénTwkkk. RbePT I manBN’RbepH nigBN’sFmμCati. BN’BitGacnwgeXIjenAelIRsTab;begðIyEdl mankarpSMBN’KñaTaMgGs; b¤CaBN’rbs;xSac;enAeBleyIgeRbIsuIm:g;t_Br½ELnBN’s. vaman sarFatubEnßmEdlFn;nwgsMeNIm edIm,IbegáInnUvPaBFn;nwgsMeNImEdlmanRsab;. plitplenH RtUvEtmanbrimaNEdkGu‘ksIutticCagbTdæanénsuIm:g;t_Br½ELn. RbePT II ¬kMedAmFüm¦ manPaBFn;l¥CageTAnwgkarbMEbkFatuBIRbtikmμ s‘ulpatnigman kMedATabCagBIRbtikmμGuIRdatkmμ. PaBFn;eTAnwgRbtikmμs‘ulpat KWCalkçN³d¾mansar³RbeyaCn_ enAeBl EdleKykkMe)arEdllabedaysuIm:g;t_RbePTenHeTAbUkelIdæ b¤dæebtugEdlman sarFatus‘ulpat. RbePT III ¬PaBFn;eLIgx<s;muneBlkMNt;¦ begáInnUvPaBFn;énkMlaMgy:agelOnkñúg ry³eBlb:unμanéf¶dMbUgbnÞab;BIeRbIR)as;va. dUecñHRbePT III GacnwgRtUvykeTAeRbIenAkñúg GakasFatuRtCak;edIm,Ikat;bnßyeRKaHfñak;edayTwkeLIgkk niwgbegáInel,ÓnkñúgkarbUknUvRsTab; CabnþbnÞab;. suIm:g;t_erobdæ nigsuIm:g;t_)øasÞik Masonry Cement and Plastic Cement suIm:g;t_erobdæ nigsuIm:g;t_)øasÞik manCaGaT× suIm:g;t_CamYynwgbrimaNsMPar³epSg²eTot Ca eRcIndUcCa suIm:g;t_FmμCati fμkMe)arm:t; Pñμak;garbegáItBBuHxül; Plasticizer nigeBlxøH mankMe)ar EdlkarbEnßm sarFatukMe)arenHmincaM)ac;RtUveFVI. enARbePTxøH eKeRbIR)as;y:agTUlaynUv kMe)arbUksuIm:g;t_Br½ELnsMrab;RsTab;begðIyEdlmanRckCakBa©b;² Rsab;. 1>4 fμbMEbk Aggregate fμbMEbksMrab;laypSMCakMe)arbUksuIm:g;t_Br½ELnmanbrimaNPaKeRcIn. sMrab;lay)an brimaNkMe)arbUk 0.028m eKRtUveRbIfμbMEbk 0.027m nig sIum:g;t_ 0.007 eTA 0.009m . 3 3 3 dUcenHfμbMEbkRtUvs¥at rwgnigmanlMdab;RtwmRtUvEdlTMhMRKab; fμbMEbkmanlMdab;BItUceLIg dl;TMhMGtibrima 3>18 mm . lT§plénkarlayEdll¥bMputnig manRbsiT§PaBx<s; enAeBlEdl TMhMRKab;fμbMEbkmansmamaRt GBa©wgehIytMrUvkarsuIm:g;t_nigTwk manbrimaNticedIm,I bnSúIRKYs Plastering Work 6
  • 7. Civil Engineering Department NPIC xSac;cUlKña nigbMeBjrn§RbehagrvagRKab;fμbMEbk. fμbMEbkEdlmanRKab;RKYsrW PaBm:t;pg;eRcIn eBk lT§plénkarlaynwgRtUvkarsuIm:g;t_eRcIn b¤TwkeRcInEdlvapþl;nUvPaBGnþraydl;RsTab; begðIyénkMe)arbUksuIm:g;t_Br½ELn. xSac; Sand xSac;RKYssMrab;kMe)arbUksuIm:g;t_Br½ELn KYrCaRbePTxSac;FmμCati b¤sib,nimitEdls¥at μ RKab;nigKμansarFatudImanCICati dIdæ GMbilrlay nigsarFatuCIvsa®sþ. xSac;sMrab;kMe)arbUkPaK eRcInmanRbPBBIFmμCatisUm,IxSac;)anmkBIkarbMEbkfμ EdlmanTMhMRtwmRtUvnig )anqøgkERBa¢gErg RtwmRtUvk¾GaceRbIR)as;)anEdr. karmanCalMdab;fñak;énxSac; CYbnUvbBaðarn§xül;rvagRKab;nimYy² énxSac;tictYc. xSac;KYrRtUvmanlMdab;fñak;taMgBITMhMGtibrma 3.2mm eTAtUcbMput. sMrab;xSac;Edl manlMdab;fñak;Edll¥ KWsmasFatutUcrt;eTAbMeBjrn§Rbehag éncenøaHRKab;FMCagEdlvaCYyeGay manrn§RbehagGb,brimabMput. sMrab;xSac;EdlmansarFatuxniC b¤sarFatuKImI vanwgbgáRbtikmμ KImICamYynwgsuIm:g;t_. manEtxSac;Edl)anTTYlnUvkarbnSúT§tambTdæanRtwmRtUveT EdlGacyk mkeRbIR)as;)an. fμbMEbkEdlmanTMgn;Rsal Lightweight Aggregate eBlxøHfμPaCn_ (Shale) dIdæ (Clay) silaqñÜn (Slate) nig kMeTcFüÚgfμ (Slag) GaceRbIsMrab; CMnYsxSac;)ankñúgkrNI BuMmanxSac;eRbIkñúgtMbn;enaH. Vermiculite nig Perute RtUv)aneRbIR)as;kñúg kMe)arbUksuIm:g;t_Br½ELn enAeBlEdlsarFatuTMng;Rsal GuIsULg; nigFn;nwgePøIgeRbICaktþacMbg. smamaRténsarFatuTaMgenaHRtUvkMNt;edaykarBiesaFn_ b¤edayeFVIkarBiesaFn_elIkþa. 1>5 kMe)ar Lime kMe)arRtUveRbITaMgkñúgmñagsila nigkMe)arbUksIum:g;t_Br½ELn. CaTUeTAva)anmkBIfμkMe)ar EdlCasarFatuEr:FmμtaEdlmansarFatu kal;süÚmkabUNat (Calcite) nig ma:ej:süÚmkabUNat (Dolomite) . edIm,IplitkMe)ar eKRtUvdutfμkMe)arbMEbkxül;eTACapHkñúgLedaysItuNðPaB 1993 C. º lkçN³rUb niglkçN³KImIrbs;kMe)arKWGaRs½yeTAnwgRbePTfμkMe)arEdl eyIgykmk bMElgva. plitplkMe)arRtUv)anplitmkBIfμkMe)ar Dolomitic EdlCaFmμtamanbrimaNm:aejsüÚmkabUNat eRcIn b¤plitplBIfμkMe)ar Calcilitic EdlmanbrimaNkal;süÚmkabUNatx<s;. enAeBlEdlfμ Plastering Work 7
  • 8. Civil Engineering Department NPIC kMe)ar Dolomitic RtUv)andut[eTACapHkñúgcgVak;plitkmμvapþl;nUv ma:ej:süÚmG‘uksIut. G‘uksIutenH begáItnUvkMeTcepHmanlkçN³ Plastic EdlCalkçN³RsYleFVIkarl¥ CagkMeTcepH EdlbegáIteday kal;süÚmGu‘ksuIt EdlplitecjBIfμkMe)ar Calcilititic b:uEnþ m:aejsüÚ:mG‘uksuIt RtUvkareBlyUrCag sMrab;karcUlrYmRbtikmμGuIRdatkmμ. plitplkMe)arRtUveK eGaycMNat;fñak; 2KW (1) quicklime nig (2) hydrated lime. Quicklime kñúgdMeNIrkarplit fμkMe)ar)anbeBa©jecalnUv kabUnDIGuksuIt nigpøas;BIkabUNateTACa kal;süÚmG‘uksuIt b¤m:aejsüÚmG‘uksuIt. Quicklime RtUv)aneKeRbICasarFatus¥itcMbgeKenAkñúg kMe)arrab;ryqñaMmkehIy munnwgmankarENnaM[eRbInUvRbePTkMe)arbUkmñagsila Controlled- Setting . munnwgeKyk quicklime eTAeRbIkñúgkMe)arbUk dMbUgeKRtUvykvaeTAlayTwk nigRtaMTuk ry³eBlBI 1 eTA2GaTitü edIm,IeGayGu‘ksuIteFVIGuIRdatkmμCamYyTwk nigeFVIeGaykMeTcepHkMe)ar Plastic GaceRbI CamYy)ayGr b¤kMe)arbUk)an. l,ayénkMe)arnigTwk KWCakareFVIRbtikmμKImI dMbUgEdlbMElgBI Gu‘ksIuteTACa GuIRduksuItEdlmansßanPaBefr. RbePTvtßúFatuedImxøHmanT§iBl elIdWeRk nigelOn énRbtikmμGuIRdatkmμkñúgGMLúgeBlénkarRtaMTwk. Quicklime RtUv)aneKsÁal;fa CaRbePTfμkMe)ar Calcitic b¤mankal;süÚmx<s; KWmanRbtikmμGuIRdatkmμCamYyGu‘ksIutl¥Cag. eKGnuBaØatieGayeRbI CamYykMe)arbUkkñúgkrNIEdleKdwgfavaCaRbePT Calcitic b¤kal;süÚmx<s; nig kñúgkrNIEdleKlay CamYyTwk)anRtwmRtUv nig Gnuvtþn_tamkarENnaMrbs;plitkr. kñúgkrNIenH Quicklime xøHRtUv)an eKlk;CaTMrg;em:SA b:uEnþ edIm,Ikat;bnßynUvdMNak;kal laynwgRtaMTwk PaKeRcInRtUv)aneKeFVIdMNak;kalenHrYceRsckñúgeragcRk. Hydrated lime sMPar³EdlplitBIkareFVIRbtikmμGuIRdatkmμén Quicklime eRscenAeragcRkRtUv)aneKeGay eQμaHfa Hydratedlime . karbEnßmTwkeTAelI hydratedlime eGaylT§plCa Limeputty TMrg;Ca Plastic EdlCabnSMúrvagmñagsilanwgTwk edIm,IbegáItCaRsTab;bUkbegðIy. RbsinebIGu‘ksuIt min)an eFVIRbtikmμG‘uksuItkmμsBVRKb;eT kñúgeBleKRtaMva b¤kñúgkarplit Hydrated lime enaHvanwgbgðajenA kñúgkMe)arbUk. eRkamlkçxNÐénsMeNImx<s; G‘uksIiutTaMgenHnwigcUlrYmRbtikmμGuIRdatkmμkan;Et eRcIneLIg bNþaleGaymansñameRbHenAelIkMe)arbUkrYckEnøgNaEdlmanva. Plastering Work 8
  • 9. Civil Engineering Department NPIC dUcenHCaerOy² kMe)ar Dolomitic RtUv)aneGayeFVIGuIRdakmμeGayehIyenAeragcRk hydratedlime . Hydrated Lime dlsmRsbsMrab;eRbI CakMe)arbUkbegðIy RtUvEtmanbrimaNG‘uksuItmin)an eFVIGuIRdatkmμmineGayelIsBI 8°. 1>6 Twk Water TwksMrab;lay nigsMrab;EfTaMKYrRtUvEts¥at minmansarFatuEdlpþl;nUvmhnþraydUcCa eRbg GasuIt Gal;kalI GMbil nigsarFatuxniCEdlCHT§iBlminl¥dl;RbtikmμGuIRdatkmμ b¤bgánUv eRcHsuIEdkeRKOgbgÁúM nigeRKOgbnÞab;bnSMBIEdk. vtþmanrbs;TwkKW CYyCMrujRbtikmμGuIRdatkmμénsuIm:g;t_B½rELn nigRbtikmμkabUNat énkMe)ar EdlCaRbtikmμKImIEdlCYysMPar³eLIgrwg. EteTaHCay:agNak¾eday karbEnßmTwk y:ageRcIneTA kñúgl,ayEdlelIsnUvtMrUvkar sMrab;RbtikmμGuIRdatkmμ b¤kabUNatKWRKan;EtedIm,I CYyeGayl,ay mansPaBravgayRsYleRbIR)as;Etb:ueNÑaH. brimaNTwkEdlEfmsMrab;kar gayRsYlKWGaRs½y eTAnwglkçN³rbs;suIm:g;t_cNat;fñak;RKYs xSac; karRsUbéneRKOgRTRTg; M sMNg; niglkçx½NÐén karhYt. 1>7 TwkfñaMKImI Admixture TwkfñaMKImI b¤ehAmü:ageTot Plasticizers dUcCaEr: stV bEnø b¤srésrsURtEm:Rt RtUv)aneKyk mkbEnßmeTAelIl,ayénkMe)arbUkedIm,IbegáInnUv Plasticity rbs;vaeBlxøH. Plasticizer enHk¾Gac bEnßmeTAelIRsTab;TI1 (Scratch) EdlCal,ayEdlRtUvkarPaBs¥itx<s; sMrab;kEnøgxøHdUcCa Bidan nig Soffits nigedIm,Ikat;bnßynUvbrimaNl,ayEdl)at;bg;edaysarPaBRbehagénEdkenAeBl EdleKmineRbIRkdasbiTCBa¢aMg (Backing Paper) . sréssURteFVIBIEr:k¾GaceRbIsMrab;RsTab;dMbUg EdleFVIeGaym:asuInedIm,IkarBarnUvkarbMEbkFatufμbMEbk nigedIm,Ipþl;nUvkardak;eRbgkñúgTueya. sréssURtRtUvEts¥at nigminmansarFatuGnþraydUcCa Gu‘ksIutminTan;eFVIGuIRdatkmμEdlb:H Bal;dl;sarFatupSMénkMe)arbUk. eramstVnig sésbEnøKYrmanRbEvgBI 12.7 eTA 50.8mm nigmin mansarFatuxøaj; eRbg nigsarFatuminsuT§epSgeTot. Plastering Work 9
  • 10. Civil Engineering Department NPIC TwkfñaMKImIepSgeTotmantYnaTIsMrab;BenøÓnb¤ BnüWtry³eBlkkrwg minRtUv)anENnaM[eRbIeT b:uEnþeRbIR)as;)ansMrab;kEnøgNaEdlcaM)ac;RtUveRbIvab:ueNÑaH. enAeBleRbIR)as; fñaMKImIminRtUvkat; bnßyPaB Fn;énkMlaMgsgát;énl,ayFMCag 15°énPaBFn;FmμtaEdl minmaneRbIR)as;fñaMKImI lay. Plastering Work 10
  • 11. Civil Engineering Department NPIC CMBUk II RbB½n§RTRTg;kMe)arbUknigTMr Plaster Support System and Base 1> RbBn§½RTRTg; Support System munnwgbUknUvRsTab;begðIy eKcaM)ac;RtUveRCIserIs tMeLIg nigerobcMnUveRKOgRTRTg;sMNg;. eRCIserIsnig tMeLIgnUvRsTab;sMrab;bUkkMe)ar. eRCIserIsnigtMeLIg nUveRKOgRTRTg;EdlRtwmRtUv. TaMgkMe)arbUksuIm:g;t_B½rELn nig mñagsilaGacykeTAbUkpÞal;BIelIépÞénCBa¢aMgebtug nigdæ eRkamlkçx½NÐEdlGacTukcitþ)an. kñúgkrNIenH CBa¢aMgebtugnigdæedIrtYTaMgCaRbBn½§RTRTg; nig RsTab;sMrab;bUk. eRKOgRTRTg;RtUvRTnUvbnÞúk Edl)anKitedaymineGaymanPaBdab (Deflectoin) nigKμan Stress EdlbNþaleGayRsTab;bUkeLIgeRbH. karKNnaPaBdabén BidanminRtUveGay elIsBI 1¼360 énElVg (Span) bnÞab;BIbUkkMe)arehIy. ebtugLaMgtU (Header or Lintel) Edlman TMhMRKb;RKan;sMrab;dak;BIelIrn§Rbehag nigral;sMNg;TaMgGs;RtUvEtRtg; nigesμIedayeRbIRbeyal b¤Em:RtsÞg;. eRKOgRTRTg;RtUvEtrwgnignwg b:uEnþk¾manlT§PaB Gac[eRKOgsMNg;manclnaEdr. sMNg;BIebtug nigdæKYrmankarRKb;RKgnUvmuxtMNsMrab;karlUt (Expansion Joint) Edl)ancg¥úl bgðajBIvisVkr. RKb;RKgmuxtMNedaykMe)arbUk KYrEtbUkeday pÞal;BIelImuxtMNenABIelIeRKOgRTRTg;enaHnig kEnøgxøHeTot EdlRtUvkarbnßy Stress nig sñameRbH. rUbPaB 2-1 karbUkkMe)arBIelIRsTab;bUkedaymñagsila Plastering Work 11
  • 12. Civil Engineering Department NPIC 1>1 eRKagEdk nig Furring metal Framing And furring. GuIsULg;kMedA nigsMPar³Fn;nwgePøIgEdlmanlçN³CaRKYsTMgn;RsaldUcCa Perlite nig Vermiculite RtUv)anCMrujeGayeRbIenAkñúgkMe)arbUksuIm:g;t_B½rELn sMrab;sMNg;nig viTüasßanCa BiesssMrab;kEnøgNaEdlGRtaGKIÁP½yx<s;. eTaHbICa RKYsTMgn;RsalminRtUv)anENnaMeRbIsMrab; kMe)arxageRkA dUcenHBYkvaRtUv)aneKeRbICaGaT×sMrab;RsTab; Backplaster enAelICBa¢aMgxageRkA nig sMrab;karBarePøIg. TaMgkMe)arbUksuIm:g;t_Br½ELn nigmñagsilaRtUvRTRTg;edayeRKagEdknig furring sMrab;TItaMgxagkñúg kEnøgEdlsMNg;KuNPaBx<s; (High-quality) rWtMrUvkarGRtaFn;nwgePøIg (Fire- resistance) . 1>2 eRKageQI nig Furring wood framing and furring TaMgkMe)armñagsila nigsuIm:gt_Br½ELnBIelIeRKageQI nig Furring . kMe)arbUkmñagsila GacRtUvtMeLIgBIelIeRKageQI nig Furring edaymaneRKagmñagsila (Gypsum Lath) b¤q¥wgEdk (Metal reinforcement) sMrab;kMe)arbUksuIm:gt_Br½ELn GactMeLIgBIelIeRKageQI nig Furring Gac eRbIEtCamYyq¥wgEdkb:ueNÑaH. sMrab;sMNg;eRKageQIxageRkAmanBIrRbePTKW KμankþaCBa¢aMg (Unsheathed b¤ Open-frame) nigmankþaCBa¢aMg (Sheathed) . sMNg;CBa¢aMgKμankþa Unsheathed Construction eRKagbgÁúMKYrmanCnÞl;RtwmRtUv edayCnÞl;EvgmanTMhM 25 x 100 mm sMrab;Tl;CalkçN³ Ggát;RTUg b¤edayviFIepSg² edIm,ITb;Tl;nwgkMlaMgRcan. RkdasBRgwgxñg (Paper-backed reinforcement) GacRtUvtMeLIgedaypÞal;. RbsinebIRkdasRTab;xñgRtUvtMeLIgedaydac;BIKña Edk Tn; TMhM 1>3 mm b¤ExSlYsEdkEdlmanTMgn;F¶n;bnþicKYrRtUvcgP¢ab;BIeQI Stud mçageTAmçageTot tamTisedAedkRbEhlRbEvg 152.4 mmBIKña. EdklYsKYrTajeGaytwgedaye)aHEdkeKalP¢ab; b¤Edkekobkibral;eQI Stud 5edImmþg bnÞab;mke)aHP¢ab;EdkeKalelIeQI Stud enAkNþalnig rwt bnþwgedaybegáIn b¤bnßycMNg. Plastering Work 12
  • 13. Civil Engineering Department NPIC rUb 2-2 sMNg;KμanCBa¢aMgkþa ¬eqVg¦ sMNg;manCBa¢aMgkþa ¬sþaM¦ bnÞab;mkRkdasRTab;xñgRtUvP¢ab;BIelIExSlYs edaymancugRCYsKñay:agtic 76.2mm edIm,I karBarPaBrlugénRkdas nig edIm,IbegáItnUvkMras;énkMe)arbUksuIm:g;t_Br½ELn eGaymanlkçN³ ÉksNæanEdlkat;bnßynUvsñameRbH. eKKYreRbIR)as;nUvsMPar³BRgwgEdlGacbt;Ebn)an (Flexible Reinforcement) cab;epþImeRbIy:agticeBjeQI Stud BIkac;RCug nigKYrbt;vaCuMvijedIm,Iecosvagmux tMNenAkac;RCug. sMPar³BRgwgkac;RCugEdlplitRsab; (Prefabricated Corner Reinforcement) KYr RtUveRbIenAeBlsMPar³BRgwgmanPaBrwgeBk edIm,IgayRsYlbt;. sMrab;CMnYsmuxTisedAedkKYrRtUv cgedayExSlYsenAcenøaHeQI Stud nigminRtUv[FMCag 229mm BIcMnuckNþal. sMrab;mux TisedAQrtUveFVIenABIelITMr. enABIeRkamkMralkMe)arbUkKYrRtUvbMBak;edaybnÞHEdkRT edIm,ICYyRT kMe)arbUk nigGacbgðÚrTwkEdlRCabtamkMe)arbUk. enAeBlEdlkMe)arRtUv)anyk mkbUkeKeRbI kMlaMgeTAelI sMPar³BRgwgedayRkdasRTab;xñgBIelIrn§RbehagenaH edIm,IFananUvkarRKb eday sMPar³BRgwgenH y:agtic 90° . eBlxøHviFId¾éTeTot (Alternate Method) RtUvykmk eRbIR)as;edIm,IFananUvkarRKb edaysMPar³BRgwg)aneBjelj edIm,Ikat;bnßynUvsMPar³ BRgwgRkdasRTab;xñg b¤kMe)arbUkRTab;xñg enAcenøaHeQI Stud . RsTab;kMe)arbUkRTab;xñg (Back- Plaster Coat) KYrmankMras;y;agtic 9>5 mm nigKYrbUkenAeBlEdlRsTab; Scratch mansPaB rwgRKb;RKan;dUcenH sMBaFminGacbMEbkKnøwHénkMe)arbUk)aneT. épÞCBa¢aMgRtUvEtesImsBVRKb;mun nwgbUk nigRtUvrkSasMeNImy:agtic 24 em:ag bnÞab;BIbUkrYc. Plastering Work 13
  • 14. Civil Engineering Department NPIC rUbPaB 2-3 kartMeLIgy:agRtwmRtUvnUvbnÞHEdkRT GacbgðÚrTwk nigbnßynUvkarRCabrbs;TwkcUl CBa¢aMg¬rUbeqVg¦ RbsinebIbnÞHEdkminRtUv)aneKeRbI PaBs¥itrvagebtugnig kMe)arbUksuIm:g;t_Br½ELn GacCalT§plkñúgkarbnßysMeNIm. sMNg;CBa¢aMgmankþar Sheathed Construction kþaeQI/ kþakug)øaek (Plywood) rWsMPar³epSgeToteFVIBIeQIRtUv)antMeLIgtamTiseTAedk nig P¢ab;y:agFanaenAelI Stud nimYy². bnÞHkþaeQIEdleRbIsMrab;CBa¢aMgKYrkuMeGaymanTTwgFMCag 203mm nigRtUve)aHP¢ab;edayEdkeKalBIredImenAelI Stud mYyedIm,Ikat;bnßynUvkareLIge)arén eQI. CBa¢aMgkþarKYrRtUvRKbedayRkdasRTab;xñg EdlCan;Kñay:agtic 76>2 mm Rtg;kEnøg RCYsKña. bnÞab;mkRKbedaysMPar³BRgwgedayEdk¬sMNaj;¦edayP¢ab;eTAnwgCBa¢aMgtameRKageQI. sMPar³ BRgwgRkdasRTab;xñgGacRtUvRKbedaypÞal;BIelICBa¢aMgkþa. sMPar³BRgwgRtUvBT§½CuMvij kac;RCugy:ag tic 152.4mm. CMnYsmuxtamTisedAQrRtUvP¢ab;eTAelIeRKageQI nigCMnYsmuxedkRtUvP¢ab;eday EdkeKalb¤EdkekobenAcMgay 152.4mm BIkNþalenAelICBa¢aMg. elIkElgEtsMPar³BRgwgenaHCa Self-furringeTEdlEdk ekobGaceRbI)ancMeBaHEdkeKaleRbIsMrab;RbePT Furring Fmμta. Plastering Work 14
  • 15. Civil Engineering Department NPIC 1>3 kMralkMe)arbUk Plaster Base kMralbUkKWCa sMPar³sMNg;b¤ épÞEdlmanPaBs¥itRKb;RKan;sMrab;karbUkedaypÞal;nUvkMe)ar BIelIva. PaBs¥itGacbegáItedayKnøwHemkanic b¤edaykarbWt. KnøwHemkanic KWCalT§plénkarcak;eRsHKña rvagl,aykMe)arbUkCamYynwgrn§Rbehag b¤kar lyecjénépÞkMral ÉkarbWtbegáInnUvPaBs¥itedaykarbWt Catis¥iténkMe)arcUleTAkñúgrn§d¾ tUcbMputén épÞkMraledayskmμPaBRsUbtamsréstUc². enABIelIEdkBRgwg PaBs¥itRtUv)anbegáIn edayKnwøH emkanic nigenAelIebtug nigCBa¢aMgdæ PaBs¥itRtUvbegáInedayKnøwHemkanic b¤karbWt b¤TaMgBIrEtmþg. TaMgkMe)arbUkmñagsila nigsuIm:g;t_BrELnGacykmkeRbIBIelIEdkBRgwg nigedaypÞal;elI ebtug dæebtug nigdæ. kMe)arbUkmñagsilak¾GacykmkeRbI edaypÞal;elI plitpl mñagsilamYycMnYneTotdUcCa CBa¢aMgbUkedaymñagsiladæeFVIBImñagsila nigcMerokmñag sila b:uEnþkMralTaMgenH min)anpþl;nUvPaBs¥itRKb;RKan;sMrab;kMe)arbUksuIm:g;t_Br½ELneT. sMNaj;EdkKYrRtUvtMeLIgBIelIépÞsMPar³xagelImun nwg ykkMe)arbUksuIm:g;t_B½rELnmkeRbITIkEnøg xagkñúg. bnÞHkþabnÞHGuIsULg;nigpÞaMgsMBt;EdkminKYrRtUvykmkeRbIsMrab;CakMraleGaykMe)arbUk suIm:g;t_B½rELn 1>4 ebtug nigdæ Concrete and Masonry TaMgkMe)arbUkmñagsilanig suIm:g;t_B½rELnGacykmkeRbIedaypÞal;BIelIebtug BIelIdæ ebtugnigdæEdlPaBs¥itmanRKb;RKan;. b:uEnþkMe)arbUkmñagsilaminGacykmkeRbIenAelIépÞxagkñúg CBa¢aMgxageRkA b¤épÞQménCBa¢aMg b¤EpñkEdlRtUvhalsMeNImdUcCakEnøggUtTwkcMhuy bnÞb;Twk b¤ GagTwkbiTCit. ebtug munnwgbUkkMe)arelIépÞebtugedaypÞal;eKRtUv)aj;xSac;edIm,IlagsMGatépÞebtug BI Laitance eRbgCab;Bum< nigsarFatuepSg² EdlGacbnßynUvPaBs¥it. PaBrelag nig PaBrGilenAelIépÞén ebtugbNþalmkBIeRbgCab;Bum<ehIy EdlGacykecj)anedaysarkarlagTwksab‘Uy:agxøaMg² ehIyhalépÞebtugeGays¶ÜtedIm,IvaGacbWt)an. dUcenHeRbglabelIBum<minKYreRbIeT enAeBl EdleKRtUvbUkkMe)arBIelIebtugenaH. bnÞHkþareRKIm² GacRtUvykmkeRbIR)as;sMrab;eFVIBum<ebtug Plastering Work 15
  • 16. Civil Engineering Department NPIC EdlRtUv karbUkkMe)ar b¤eKRtUv)aj;xSac;y:agesIþgPøam² eTAelIépÞebtugbnÞab;BIerIBum< ecjedIm,I eFVIeGayépÞebtugmanPaBeRKIm. ebtugrwg ehIyrelagGacRtUverobcMy:agsMebImeTotdUcCa dab; cuH² cak;Twk GasuIteGaykat;PaBrelag b¤eFVIeGayeRKImeday Bush Hammer . eRKagEdkBRgwg GacRtUvyk mkeRbIenAeBlNaeKbUkkMe)armñagsilaBIelIebtugrelag EdleKmin)aneFVIva eGayeRKIm. sarFatus¥it b¤ RsTab; Dash GacRtUveRbIenAeBlNaEdl kMe)ar suIm:g;t_B½rELnRtUvykmkeRbI nig karmin)an eFVIeGayépÞeRKIm. RsTab; Dash Dash Coat enAeBlEdleKminR)akdfa kMe)arbUksuIm:g;t_B½rELnGacTTYl)anPaBs¥itl¥ CamYynwg ebtug b¤dæ eBlxøHeKKYrEteRbIRsTab; Dash Bond EdlmanbrimaNsuIm:gt_B½rELn1PaK nig1b¤2 PaKénxSac;KitCamaD. eKGaceRbIGMe)ascMebIgtUc b¤Ck;EdlmaneramEvgeRcInRClk;kñúgl,ayrYc eKaHeTAelICBa¢aMgedIm,IeGay)anduMBk² énkMe)ar)any:agelOn ¬rUb2-4¦. RsTab; Dash enHmin RtUvkareRbIsøabRBakMe)arsMrab;):ateT nigeKRtUvGnuBaØati[duMBkénkMe)arenaHs¶Ütsin munnwgbUk RsTab;kMralkMe)arbUk. RbsinebIeyIgmankarxkxankñúgkarbUkRsTab;kMral (Base Coat) cUrrkSa sMeNImeGayRsTab; Dash rhUtdl;eBleyIgcab;epþImbUkRsTab;bnÞab;. rUb2-4 karGnuvtþn_nUvRsTab; Dash Bond Coat Pñak;gars¥it Bonding Agent viFImYyeTotedIm,ITTYl)annUvPaBs¥itl¥elIépÞebtug nigdæKWlabnUvPñak;gars¥itkarBarCMrab Twk EdlplitkrENnaMeGayeRbIsMrab;épÞxageRkA. épÞénTMr KWCaeRKagEdlmanlkçN³l¥ nigrwgmaM nigKμansarFatu Laitance FUlIsarCatieRbg nigsarFatuepSgeTotEdlGacrlaykñúgTwkdUcCa fñaMlabEdllayTwkCamUldæan b¤kav. karkat;PaBrelagedayTwkGasuIt Acid Etching Plastering Work 16
  • 17. Civil Engineering Department NPIC l,ayénGasuIt muriatic mYyPaKnigTwk 6PaKRtUveRbIsMrab;kat;PaBrelagénépÞCBa¢aMg ebtugb¤ dæenAeBlEdl Dash Coat b¤Pñak;gars¥itminmanPaBs¥itl¥. munnwglabnUvl,ayGasuIt enH eKKYrepSImCBa¢aMgTaMgGs;edIm,IeGayGasuIteFVIRbtikmμEtxagelIépÞ)anehIy. karGnuvtþn_ CaeRcIneTotGacCakarcaM)ac;. bnÞab;BIGnuvtþn_ehIy épÞebtugRtUvlagedayTwkedIm,IsMGatnUvsñam TwkGasuItrYcehIyTukeGayvas¶Üt edIm,ITTYlmkvijnUvPaBbWt. CBa¢aMgerobdæ Masonry enAeBlEdleyIgcg;bUkedaypÞal;BIelICBa¢aMgerobdæ ral;muxtMNRtUvEteFVIeGayerobesμI b¤edayras;tic². épÞénCBa¢aMgRtUvEts¥atmanlkçN³l¥ erobry nigKμanEsø Catixøaj; sarFatu karBarCMrab fñaM b¤sarFatud¾éTeTotEdlrMxandl;karetags¥it. EsøeRbgnig sarFatuxøaj;Gaclag sMGatedayl,ayGasuIt muriatic 10°kñúgTwk. RsTab;epSgeTot b¤sarFatuepSgeTot EdlCH T§iBlminl¥dl;PaBs¥itRtUvykecjedaysarFaturlaysmRsb b¤edaylagsMGat. épÞdæEdl mansPaBrwgCamFümnigmanTMgn;CabTdæan épÞbøk;ebtug nigfμRbePTFM² CaTUeTAmankarbWtTwkl¥ nigCYnkalk¾mankars¥itCalkçN³emkanicpgEdr. eKGacBiesaFn_PaBbWtrbs;épÞ énsMPar³)an eday)aj;Twks¥at nigBinitüemIlel,ÓnénkarRsUbCatiTwk etIelOnbu:NÑa? RbsinebITwkRtUv RsUbeday gayenaHCalT§pl KWsMPar³enaHmankarbWt)anl¥ pÞúyeTAvijTwkRtUvRsUbeday TMrg;tMNk;tUc²enaH)ann½yfa épÞenaHminpþl;nUvPaBs¥ittamry³karbWteT KWtamry³lkçN³ emkanicvij. dUcenHva GacRtUveKeFVI[épÞmanlkçN³KeRKImedIm,IFananUvPaBs¥itrvag kMe)arbUk edayKnøwHemkanic. dæEdllabfñaMrelagmanPaBrGilNas; b:uEnþdæebtugTMgn;bTdæan (Standard- Weight CMU) manépÞeRKImRKb;RKan;. sMrab;épÞEdlRsUbsMeNImy:agelOndUcCadæFmμtaEdlTn;nig dæebtugTMgn;RsalenaH kMe)arbUksuIm:g;t_nig qab;s¶ÜtEdlBi)akbUk[)anRtwmRtUv. karbWty:agelOnenHGacCMnH)aneday kar)aj;TwkefIr² eTAelICBa¢aMgdæ ¬minEmnRtaM¦ eRcIndgeRcInsarPøam² munnwgkarbUknUvRsTab; TI1. épÞCBa¢aMgRtUvmanlkçN³esIm minRtUvGt;manTwkesaHeTmunnwgbUkkMe)ar. enAeBlEdl Plastering Work 17
  • 18. Civil Engineering Department NPIC RsTab; Stucco bUkedaym:asuIn (Machine-applied) eyIgmincaM)ac;epSImépÞCBa¢aMgeT eRBaHCaTUeTA l,aykMe)armanCatiTwkeRcInCagkMe)arEdlbUkedayéd. dæEdldutkMedAxøaMg dæebtugEdllabfñaMrelag nigfμRbePTxøHeTotmanPaBs¥itminl¥ nig minÉksNæan. RbsinebIénelIépÞénCBa¢aMgTaMgmUlkarbWtTwkmanlkçN³ minÉksNæanenaHvanwg bWtsMeNImeRcInCagCBa¢aMgd¾éT ehIyépÞEdlbUkehIynwgeLIgsñamBN’. elIsBIenaHeTot PaBs¥itminÉksNæanenHbgánUvsñameRbH BIeRBaHkMe)arbUknigcl½teTArkkMralTMrEdlmanPaBs¥it ¥ nigedayÉkraCüBIkEnøgBIkEnøgEdlmanPaBs¥itminl¥. RbsinebIépÞCBa¢aMgmanPaBs¥itminl¥ b¤minÉksNæan enaHeKerobcMsMPar³EdkBRgwg RsTab; Dash b¤Pñak;gars¥itBIelIépÞenaH. enAeBlEdlEdkBRgwgRtUv)aneRbICamYykMe)arbUksuIm:g;t_ B½rELn RkdasRTab;xñgk¾RtUv )aneRbIsMrab;eFVICasnÞHxNнrvagPñaskMe)arbUk nigkMralCBa¢aMgedIm,I karBarPaBbWtTwkmindUcKña. enAeBlEdlkMe)arRtUv)anbnþbUkbegðIy BIelIkMralrwgmindUcKña sMPar³RtYtBinitümuxtMNr rW pÞaMgEdkBRgwgRtUvRKbBIelIkEnøgCYbKñaénsMPar³mindUcKñaenaH. kMe)arbUkminRtUvbUk edaypÞal;BIelI bMBg;EpSgerobdæeT b:uEnþeKGacbUk)anBIelIEdk BRgwg. b:uEnþ RkdasRTab;xñgminRtUv)aneRbIeT BIeRBaHkMedAbgánUvPaBkan;Ety:ab;eLIg. Flashing RtUv)aneRbI enABIeRkambMBg;EpSg nigRtg;muxtMNrvagdMbUlnig bMBg;EpSgedIm,IkarBarkareRcaHTwk. 1>5 EdkBRgwg Metal Reinforcement EdkBRgwgGacRtUvykmkeRbICMnYs[eRKagmñagsilasMrab;bUkkMe)arBIelI eQI b¤BIelIeRKag Edk b¤ Furring . vak¾GaceRbICamYykMe)arbUkmñagsila sMrab;bUkBIelIépÞebtug b¤dæEdlmanPaB s¥itminRKb;RKan;sMrab;karbUkedaypÞal;. EdkBRgwgk¾RtUv)aneRbIenAeBl EdleKRtUvbUkeTAelIsMNg;eRKageQI EdlmanCBa¢aMg (Shealted) nigKμanCBa¢aMg (Unshealted) b¤BIelIeRKagEdk b¤BIelIebtug b¤BIelIdæEdlminmanPaB s¥itRKb;RKan; nigenABIelI Flashing nigbMBg;EpSg. kMe)arbUkBIelIEdkBRgwgedIrtYdUcCakMralmanEdkd¾esþIg EdlRTedayeRKagsMNg;RkalBI eRkamva. vaminmanPaBrwgmaMRKb;RKan;edIm,IRTnUv Stress EdlbMElgedaypÞal;. EdkBRgwgRtUvEt cg eGay)anl¥rvagsMNg;RTRTg;nig TajeGayRtg;edIm,Ikat;bnßyPaBFUrrlg;. karcgEdlman Plastering Work 18
  • 19. Civil Engineering Department NPIC PaBeFVsRbEhsCaTUeTAbgáeGaykMras;énkMe)arbUkmankMras;minesIμKña EdlkEnøgesþIgCageK GacnwgbgásñameRbH. tMNy:agtic 4.6 mm RtUvrkSarvagEdkBRgwgnwig sMNg;RTRTg; edayeRbI Furring Fastener b¤edayEdkBRgwg Self- furring ¬rUb2-5¦. EdkBRgwgRtUvEtCaRbePTsmRsb nigman TMgn;smRsbeTAtamKMlaténeRKOgRTRTg;nig KYrEtcgedaydegáóbEdlENnaMsMrab; eRKagRTRTg;Biess. rUb 2-5³ sMNaj;lYs Self-furring EdlmanRbEvg 75 mm Edkv½nþKña ¬eqVg¦ sMNaj;nig RkdasRTab;xñgmanKMlat 6.4mm BIKñaedayeRbIKMlatBIelIEdkeKal furring ¬sþaM¦ RbePT Type RbePTEdkBRgwgFmμtaPaKeRcInEdlmantMélsmrmüehIyGacrk)an KW expanded metal lath nig wire lath. Rbehagén lath KYrEtmanTMhMFMlμmedIm,IeGayeKGacqáÚtBIelIRbehagenaH nig edIm,Ibgáb;EdkBRgwgEdlkarBareRcHsuI. Expanded Metal lath RtUv)aneFVIBIpÞaMgEdk Light- au Edlkat;tamlMnaMeTogTat; nigTajsn§wgedIm,IeFVI[rn§ RbehagmanragCactuekaNesμI. TaMgpÞaMgEdkRClk;sgá½sIEdlTajsn§wg nigpÞaMgEdk cold-rolled EdlsuT§EtmanRsTab;fñaMkarBareRcHRtUv)anykmkeRbI. sMNaj;ragctuekaNesμI RbePT Plain, self-furring nig paper-backed RtUv)anplitCaTMrg;pÞaMg. CaTUeTARbePT Plain RtUv)antMeLIgCamYy ]bkrN_P¢ab; furring fastener. sMNaj;EdlmanRbehagvagctuekaNesμIRtUv)anplitkñúgTMgn;BI 1.36 nig 1.84kg/m 2 manEtsMNaj;EdlmanTMgn;F¶n; 2 1.84kg/m eTEdlsmRsbsMrab;eRbICamYy Plastering Work 19
  • 20. Civil Engineering Department NPIC kMe)arbUkCBa¢aMgxageRkA. RbePT Self-furring KWman]bkrN_epSgeTotsMrab;s‘kenAcenøaHvanwgépÞ EdlvacgP¢ab;. ]brkN_enHRtUvdak;enABIxageRkaypÞaMgsMNaj;eGaymanKMlaty:agtic 6>4 mm BIeRKagRTRTg;. Self- furring k¾Gace)aHP¢ab;edayEdkeKaledaypÞal;BIelIépÞd¾relagrbs;ebtug dæ nigépÞtan;epSgeTotEdlRtUvkarbUkkMe)ar. sMrab;sMNaj;RbePT Paper-back manpÞaMgRkdas P¢ab;enAEpñkxagxñgva RtUv)anpliteLIgsMrab;karbUkkMe)aredayeRbIma:suIn. eKRtUvrkSaKMlatrvag pÞaMgRkdassMrab;P¢ab;eTAnwgeQI Stud b¤sMNg;RTRTg;epSgeTot. sMNaj; stucco KWCapÞaMgEdkEdlmanlkçN³RsedogKñaeTAnwgKMrUsMNaj;manRbehagrag ctuekaNesμI b:uEnþmanrn§RbehagFMCag. vaRtUv)aneKplitCasMxan;sMrab;CakMralBIelIépÞtan;sMrab; bUkkMe)ar. vaKYrRtUv)aneKtMeLIgCamYy backing paper nig furring fastener. Rib lath KWCaRbePT expanded metal lath EdlmanragCaq¥wgCMnIGkSr V EdlbegáIn[man PaBrwgkan;Etl¥ nigkMlat pennit kan;EtTUlayBITMr. pÞaMgEdlmanq¥wgTMhM 3.2, 9.5 nig 19.1 RtUv)anplit. CaTUeTA rib lath TMhM 3>2 EdleK ehAfa flat rib lath RtUvkar furring fastener nigGaceRbIsMrab;karGnuvtþn_bUkkMe)arPaKeRcIn. ehIy TMgn;rbs;vaKW 1.49 nig 1.84kg/ b:uEnþmanEtTMgn;EdlF¶n;eTEdlsaksmnwgkareRbIR)as;sMrab; m 2 CBa¢aMg xageRkAnigkarbUkedaykMe)arsuIm:gt_Br½ELn. Rib lath TMhM 9>5 mm mintMrUvkar furring eT b:uEnþeKmin)an[eRbIR)as;cMeBaHGakasFatueRcInRbePTeT eRBaHvaBi)akniwgeRsab lath eTAkñúgkMe)ar bUk. eTaHCay:agNaeKGaceRbIva)anenAkñúgGakasFatuEdlmanlkçN³RsTn; nigenAkñúgkEnøg EdlkarBarsMeNImedaypÞal;dUcCaenA soffit . KuNsm,tiþd¾FMrbs;vaKWeyIgGaceRbIva sMrab;TMrEdl mankMlatrhUtdl; 610mm BIkNþal. Plastering Work 20
  • 21. Civil Engineering Department NPIC rUb 2-6 RbePTEdkBRgwg Wire Lath Wire lath RtUv)anplitCakMNat;lYspSa b¤kMNat;lYst,aj. Wire lath KYrRtUvplitBIlYs Edk Cold-drawn EdleRsabeday copper- bearing edaymanTMhMrn§RbehagsmRsb. vaRtUv)an eKeRbICaTUeTAsMrab;CakMralénkMe)arbUkEpñkxageRkA. kMNat;lYst,aj ¬sMNaj; stucco ¦ KWCakMNat;lYsEdlt,ajmanrn§RbehagEdlman 6RCug)anmkBIkart,ajlYseGaymanRbehag 6RCugEdlmanTMhMRbehag 25>4 mm eTA 57.2mm ¬rUb 2-6¬3¦¦. RbePT Plain RtUv)ane)aHP¢ab;nwgsMNg;RTRTg;edayEdkeKal furring BI elI backing paper. kMNat;lYst,ajenHk¾manRbePT self-furring Edredaymanb¤Kμan backing paper edIm,Ikat;bnßynUvtMrUvkar furring fastener b¤tMeLIgedayELkBIKñaBI backing paper edayGaRs½yeTAnwgRbePTén lath ykmkeRbI. TMhMsMNaj;EdltUcmanTMhM 25.4 mm KYrman xñat18 TMhMlYs 1.3mm xñat 17 TMhMlYs 1.45mm TMhMRbehag 38 mm. kMNat;lYspSarEdl manRkLaRtUv)anpliteday karpSarlYsedaymanragkaerTMhM 25.4x25.4mm nig 50.8x50.8mm . vak¾mannUv backing paper nig stiffener wires nigRbePT self- furring. kMNat;enHKYrEtmaneRsabsgá½sInig fñaMFn;nwgeRcHbnÞab;BIpSarYc b¤eFVIGMBIlYsEdleRsab Plastering Work 21
  • 22. Civil Engineering Department NPIC sgá½sIEtmþg. sréslYsKYrmanxñat 16 TMhM 1>6 mm sMrab;plitkNat;EdlmanRbehag 50.8x 50.8 mm nigy:atticxñat 18 TMhM 1.3 mm sMrab;plitkMNat;EdlmanTMhMRbehag 25.4 x 25.4 mm. kartMeLIg Installation EdkBRgwgKYrRtUvP¢ab;nwgebtug b¤dæedayeRKOgP¢ab;smRsbEdlmanKMlat 152mm BIG½kS kNþaltamTisedAQrRtUvFanaedayeRKOgP¢ab; b¤EdklYs 150mm BIG½kSkNþaltamTisedAedk. TaMgCMnYsmuxtamTisedAedk nigTisedAQrRtUvFanaedayeRKOgP¢ab; b¤EdklYs 150mm BIGkS½kNþal. EdkBRgwg self-furring GacRtUvP¢ab;eday powder-actuated fasteners b¤ concrete stubnail . EdkBRgwg plain KYrRtUvP¢ab;eday Concrete furring nail. EdkeKal TaMgenHKYr manRbEvglμmedIm,IeGay)anCMerA 9.5mm eTAkñúgebtug b¤dæ. CaTUeTAEdkBRgwgKYrRtUvtMeLIgBIelIeRKag b¤ furring EdlmanTMhMEvgEkgeTAnwgTMr nigxag cugCMrYsmanPaBeRTteRTat edaybnþtMeLIgnUvBRgwgEdkBIelIépÞTaMgmUlEtmþg. Expanded Metal lath KYrRtYtelIKña.12>7 mm enAxagnig 25>4 mm enAxagcugCayrbs; rib lath KYrEtRtYtKña. Wire lath KYrEtRtYtKñaenAxagcugnigenAxaglic mYyRbelaHsMNaj;nigminRtUv tUcCag 25.4mm . CaTUeTAsMrab;CMrYsedkpÞaMgxageRkamKYrRKbBIelIpÞaMgxagelI. b:uEnþEdkBRgwg Pater-backed KYrEt eFVItamrebobepÞagpÞHedayCMrYs Sandwich-lapped pÞaMgxagelIBIelIpÞaMgxag eRkamedayEdk elIEdk. CaTUeTAEdkeKalduMBnøiccUleTAkñúgTMrCBa¢aMgy:agtic 22.2mm nigeTAkñúgTMrBidany:agtic 35 mm . eKminGaceRbIEdkeKalGaluymIj:ÚmCamYyebtugBr½ELnraveT eRBaHvamanRbtikmμKImIrvag Kña. sMrab;RbePTPaKeRcInénEdkBRgwg CaTUeTAEdkeKalP¢ab;enARtg; rib EtmþgEdkeKalEdlman RbEvg 38mm nig 50.8mm RtUvENnaMeGayeRbIedIm,IFananUvkarTMluHcUly:agGb,brima sMrab;CBa¢aMg nigBidan. EdkBRgwgKYrRtUv)anP¢ab;eTAnwgeRKagEdknig furring edayvIs b¤tem,ótxÞas;Edlb®gÁb; edayvIs. sMrab;BidanBüÜr EdkBRgwgGacnwgcgP¢ab;eTAnwgeRKagBidan. Plastering Work 22
  • 23. Civil Engineering Department NPIC rUb 2-7 RCugxageRkARtUvBRgwgedaykMNat;EdkEdlbt;CuMvijEkg ¬eqVg¦ RCugxageRkARtUvbegáIteday corner bead sgá½sI ¬sþaM¦ enAeBlEdlGRtaPaBrwgmaM (Sound rating) RtUvkarcaM)ac;EdkBRgwg GacnwgP¢ab;eday tem,ótxÞas;yWt. RCugxageRkAGacnwgRtUvbegáItCamYy cornerbead CamYyRCugBRgwgEdleFVIRsab; b¤edaybt; EdkBRgwgCuMvijRCug ¬rUb 2-7¦. sMrab;RCugxagkñúgGacBRgwgedaysMNaj;EdkBRgwgRCugb¤ eday EdkBRgwgxøÜnvaedaybt;eGayecjCaRCugtammuMEdleyIgcg;)an ¬rUb 2-8¦. rUb 2-8 sMNaj;lYst,ajGacbt;CaRCugxagkñúgedayRsYl 1>6 Backing Paper EdkBRgwgsMrab;kMe)arbUksuIm:g;t_Br½ELnKYrman Backing Paper sMrab;TIkEnøgxageRkA b¤ sMrab; kEnøgxageRkAEdlesIm nigenAeBlEdleKGnuvtþkarbUkkMe)aredaykar)aj;. Backing Paper KWRtUvykmkeRbIsMrab; ³ Plastering Work 23
  • 24. Civil Engineering Department NPIC 1> CaPñasxN½ÐrvagsMNg;TMr nigkMe)arbUk 2> karBarkar)at;bg;l,aykMe)artamrn§RbelaH Lath 3> sMrYldl;karbgáb; lath )ansBVRKb; 4> karBarCMrabTwktamsñamEbkeTAkñúgPñaskMe)arbUk Backing Paper min)aneRbIR)as;sMrab;karGnuvtþn_edayédeT enAelIépÞedkEdlRtUv)an karBar BI sMeNImedaypÞal;. Backing Paper KYrmanRsTab;RCabedaycMhayy:agtic 5perm edIm,IGnuBaØatieGaykMe)arbUks¶Üt nig karBarsMeNImEdl)anmkBIkñúgCBa¢aMgEtmþg. plitpl karBar CMrabTwk nig vapor- permeable RtUv)aneRbIR)as;sMrab; Sheathing Paper dUcCa 8.14kg/m 2 asphalt-satviated roofing KWsmRsbkñúgkareRbIR)as;. Backing paper GacnwgP¢ab;edayeRscenA eragcRkCamYynwg EdkBRgwg b¤GactMeLIgdac;edayELkBIKña. RkdasP¢ab;EdlmansPaB RsUbCatiTwksMrab;Edk BRgwgxøHminEmnkarBarCMrabTwkeT nigminRtUvykeTAeRbIsMrab;kEnøg xageRkAEdleKRtUvkarkarBar GakasFatu. 1>7 pÞaMgmñagsila Gypsum Lath pÞaMgmñagsilaKYrRtUvP¢ab;eTAnwgCBa¢aMgeQInigeRKagBidan nig furring edayvIsEdlsmRsb eTAnwgkarENnaMrbs;plitkr b¤edayEdkeKal. sMrab;P¢ab;eTAnwgeRKagEdk nig furring RtUveRbI tem,ótxÞas;. enAeBlEdlGRtaPaBrwgmaM (soundrating) RtUvkarpÞaMgmñagsilaRtUvP¢ab;eday tem,ótxÞas;ywt. rUb 2-9 karP¢ab;pÞaMgsilaeTAnwg stud EdkedayvIs edaytem,ótxÞas;sMrab;RCugnigmuxtMN. Plastering Work 24
  • 25. Civil Engineering Department NPIC 1>8 eRKOgbnÞab;bnSMBIEdksMrab;karbUkkMe)ar Metal Plaster Accessories sMrab;sMNg;eKhdæanPaKeRcInd¾dUcCa sMNg;GaKarEdr CaerOy²s‘umeQIRtUv)anbUkkMe)ar EpñkxagCay². enAeBlEdls‘umeQImin)aneRbI ehIyCay²RtUvkarkarBarBIeRKaHfñak;dUcenHeK RtUveRbI Metal casing bead . Control Joint )anbBa©ÚlnUvkEnøgEdlEbkFM² eTAkñúgbnÞHd¾tUc self- contained nig drip screed RtUv)aneRbIsMrab;kMNt;bnÞat;enAxag)atCBa¢aMg. eRKOgbnÞab;bnSM epSgeTot dUcCa strip lath nig conerite ¬rUb 2>10¦ RtUv)aneRbIsMrab;épÞrabesμI nigRCugxagkñúgerogKña. CaerOy² RCugxageRkARtUv)anpþl;[CamYyKñanwgEdkBRgwgRCugenAeBlNa EdlpÞaMgEdkminman sPaBrs;RKb;RKan;edIm,Ibt;)antamRCug. rUb 2-10 RbePTeRKOgbnSMsMrab;kMe)arbUksuIm:gt_Br½ELn (Stucco) EdkBRgwgRCugEdlKμan solid nosing RtUv)anplitedIm,IGnuBaØatieGaykarbgáb;EdkeTAkñúgkMe)arbUk. eTaHCay:agNa corner bead EdleFVICamYy solid nosing GacRtUvykmkeRbIR)as; vaRtUv)anplit BIsMelah³sgá½sIBN’s ¬99° sgá½sIsuT§¦ EdleRbIsMrab;kEnøgNaEdlRtUvhalxül; Casing bead Plastering Work 25
  • 26. Civil Engineering Department NPIC KYrRtUvbegáItBIEdkEdlmanxñat24 ¬TMhM 0.70mm¦sMrab;eRKOgbnSMepSgeToty:agtUcxñat 26 ¬0>55mm¦. sMrab;kMe)arbUkEdlRtUvhalsMeNImeRKOgbnSMEdkEdlykmkeRbI ¬Edlmin bgáb;TaMgRsugeTAkñúgkMe)arbUk¦ KYrEtFn;nwgeRcHsuI dUcCasMelah³sgá½sIBN’s. 1>9 Flashing Flashing RtUv)antMeLIgy:agRtwmRtUvsMrab;karBarTwkEdlRCabcUlkñúgsMNg;CaBiessKW Gayukal nigbMerIbMras;CaTIeBjcitþrbs;épÞkMe)arbUk. Flashing RtUv)anykeTAeRbIR)as;sMrab; kEnøgNaEdlmanbBaðaTwkRCab. TwkEdlRCabcUlBIxageRkaykMe)arbUksuIm:g;t_GacbNþal[man eRcHsuIEdkBRgwgnig eRKOgbnSMehIyCHTi§BleRKaHfñak;dl;épÞkMe)arpg. manEtsMPar³EdlFn;nwgeRcH dUcCaEdkeRsabsgá½sI (galvanized steel) EdkGuINUk (stainless steel) nig)øasÞikEdlsmRsbGaceRbICa Flashing )an. EdkBRgwgKYrtMeLIgBIelI flashing BIeRBaHsMPar³TaMgenHminmanPaBs¥itRKb;RKan;sMrab;kMe)arbUkeT. Plastering Work 26
  • 27. Civil Engineering Department NPIC CMBUk III karGnuvtþn_nUvkMe)arbUksuIm:g;t_Br½ELn PORTLAND CEMENT PLASTER APPLICATION 1> l,aykMe)ar Mixed kMe)arbUksuIm:gt_RtUv)aneRbITaMgkñúgnigeRkA. vak¾GaceRbIsMrab;kEnøgNaEdlhalsMeNIm pgEdr. 1 Cu l,aykMe)arbUksuIm:g;t_Br½ELn RtUvmanRKYsxüac;RbEhl 0.028m nigsuIm:g;t_BI0.007 3 eTA 0.009 m . dUcenHfμbMEbkRtUvEts¥atrwgmaM nigmanlMdab;RKab;RtwmRtUv EdlTMhMRKab;RtUvman 3 lMdab;BIm:t;eTAdl; TMhMGtibrma 3.3mm. sMrab;l,ayd¾l¥bMputTMhMfμbMEbkRtUvEtmansmamaRt Edll,aysum:gt_TwkRtUvkary:agGb,brmasMrab;Cal,ays¥itrvagfμbMEbknig bMeBjeTAkñúgrn§ RbelaHfμbMEbknimYy². kñúgkarlayEdlfμbMEbkmanPaBm:t;eRcInhYs b¤RKYseRcInhYsdUcenH vaRtUvkarsuIm:g;t_eRcInb¤TwkeRcInEdlCHTi§Blminl¥dl;kMe)arbUk. kareRCIserIsTukCamunnUvtYGkSr )anbgðajy:agc,as;nUvRbePTrbs;l,ay. kareRCIserIsnUvl,ayEdlsmRsbsMrab;RsTab;Edl)anbgðajGaRs½yeTAelIPaBs¥it én kMralkMe)arbUk. l,ayEdlmanbrimaNsuIm:gt_mYyPak ¬rYmTaMgkMe)arenAeBleRbI¦CamYynwgy:ag tic3PaK nigmineGayelIs 5PaKKitCamaDénxSac;esIm. edaysarEtKuNPaB niglMdab;fñak; xSac;manPaBxusKñaeRcIneTAtamkEnøg dUcenHkarEktMrUvsmamaRténxSac;nig suIm:gt_KYrEtkMNt;BI karlayl,aysakl,g b¤ edayykbTBiesaFn_cas; EdlykfμbMEbkBIRbPBkñúgtMbn;enaH mklay. RsTab;bUkbegðIyEdlmanGayukalEvgKW GaRs½ynwglMdab;fñak;énRKab;fμbMEbkBIm:t; eTARKab;FM². enAeBlfμbMEbkmanPaBm:t;eRcInenaHl,ayTwksuIm:g;t_RtUvkareRcInCagGVI Edl RtUvkarsMrab; etags¥itrvagRKab;RKYsEdlmanTMhMépÞFMCag. enAeBlEdlfμbMEbkmanRKab;RKYs eRcInCagenaH l,aysIum:g;t_TwkRtUvkareRcInsMrab;bMeBjeTAnwgRbelaHénRKab; RKYs. karxVHl,ay Plastering Work 27
  • 28. Civil Engineering Department NPIC suIm:g;t_TwkenAkñúgl,aykMe)arenaHvabNþal[eKBi)akeFVIkar b:uEnþkarbEnßmTwkeRcIneBk b¤suIm:g;t_ eRcInedIm,IPaBRsYleFVIkar vapþl;lT§pleGaykMe)arbUkeBls¶ÜtmankarRsk b¤ rYjx<s; nigman sñameRbH. elIsBIenHeTotCaerOy² xSac;m:t;manPaKrydIdæ x<s;EdlnaMeGay manPaBRskxøaMg enAeBls¶ÜtsMrab;xSac;RKYsFMbgánUvPaBlM)akkñúgkarlay nigkarbUk. dUcenH RKYs xSac;KYrRtUv eRCIserIseGay)anm:t;ct; nigminRtUvepþkpþÜleTAelIKuNsm,tþid¾l¥énKuNPaB b¤ lMdab;fñak; rbs;vaeT. l,ayEdllay)anl¥RtwmRtUvsMrYldl;kareFVIkar nigsMrYldl;karbUk. vasMEdgnUvPaB Cab;s¥itenAelIpÞaMgkMral nigPaBs¥itRKb;RKan;enHehIy EdleFVIeGayl,ayminGacFøak;cuHtamTis edAQrelIépÞ. enAeBlEdll,ayRtUv)ankMNt;nUvsmamaRténsMPar³y:agRtwmRtUvenaHral;elIk énkarlaypþl;eGayeyIgnUvkar bWt nigBN’dUcKña. eyIgRtUvlaysMPar³pSMCalkçN³kMe)ars¶ÜteGaysBVmunnwg EfmTwk. bnÞab;mkbrimaN TwkRKb;RKan;RtUv)anEfmedIm,IFanaPaBgayRsYleFVIkargar. m:asuInlaykMe)ar (Power Mixer) RtUv ENnaMeGayeRbIsMrab;laysMPar³eGay)ansBVl¥. vaRtUvRbtibtþiy:agtic5naTI bnÞab;BIsMPar³pSM TaMgGs;dak;cUlkñúgm:asuInRkLúk. sMPar³TaMgGs;KYrlaykñúgbrimaNEdlGaceRbIkñúgry³eBl 3 ema:gknøHb:ueNÑaH. karRcbUkeLIgvijedIm,IeGayPaB)øasÞikénl,aykMe)ar manPaBdUcedImRtUv)an GnuBaØatib:uEnþkarbenßmTwkKWmin)an. enAeBlEdlkMe)arbUksuIm:g;t_Br½ELnRtUv)anGnuvtþedaym:asuIn eBlenaHbrimaNTwkKYrEt eFVIkarEktMrUvedIm,I)annUvl,ayd¾RtwmRtUvsmRsbnwg RbEvgTueya sItuNðPaB lkçN³sMeNIm nig RbePTénkMralEdlRtUvbUk. karvas; slump eday]bkrN_ekaNEdlmanTMhM 50.8 x102x152mm KYrmanBI 63.5 nig 101.6mm l,ayBIm:asuInRkLúknigBI 50.8 eTA 82.6mm l,ayBIk,ayTueya. RbEvgTueyaBIm:asuIneTAkEnøgeFVIkarKYrRtg; nigkan;EtxøIkan;eTl¥ ¬kuMeGayEvgCag 60.69m¦. 1>1 l,aysuIm:g;t_erobdæ nigsuIm:g;t_)øasÞik Masonry and plastic cement mixes suIm:g;t_erobdæ nigsuIm:g;t_)øasÞikEdlplitecjBIeragcRkmanlaysarFatu Plasticizer Rsab;dUcenHeKmincaM)ac;bEnßmkMe)arb¤ Plasticizer eTAkñúgl,ayEdllayeday suIm:g;t_enHeT. dUcenHeKcaM)ac;bEnßmEtxSac;nigTwk)anehIy kñúgeBllayenAkñúgkEnøgeFVIkar. y:agNamij Plastering Work 28
  • 29. Civil Engineering Department NPIC eKk¾GaclaybBa©ÚlrvagsuIm:g;t_erobdæ b¤ suIm:g;t_)øasÞik CamYysuIm:g;t_Br½ELnkñúgbrimaNmaD esIμKñaenA eBlEdlPaBFn;nwgkMlaMgRtUvkarkan;Etx<s;. suIm:g;t_)øasÞik nig erobdæEtÉgb¤lay bBa©ÚlKña CamYysuIm:g;t_Br½ELnGaceRbIsMrab;karbUkkMe)ar 3RsTab;. 1>2 l,aysuIm:g;t_Br½ELn Portland Cement Mixes suIm:g;t_Br½ELnGaclaybEnßmedaykMe)ar suIm:g;t_)øasÞik b¤suIm:gt_erobdæedIm,IbegáInPaB RsYldMeNIrkar nigPaB)øasÞikénl,ay. sMrab;RsTab;kMe)ardMbUg eKRtUvlaysuIm:g;t_B½rELn1PaK CamYynwgkMe)ar 1¼ PaK rWsuIm:g;t_)øasÞik b¤suIm:g;t_erobdæmYyPaK. sMrab;RsTab;begðIy eKRtUv laysuIm:g;t_Br½ELnmYyPaKCamYynwgsuIm:g;t_)øasÞik mYyPaK rWkMe)arBI ½ eTA2PaK. eKnwglay CamYysuIm:g;t_Br½ELnBN’s nigxSac;EdlmanBN’esIþgenAkardæansMrab;RsTab;begðIy. Plasticizer dUcCasarFatuEr: stV bEnø b¤kMNat;kBa©k;GacRtUvdak;bEnßmcUlkñúgl,aysMrab;RsTab;TI1 b:uEnþkñúg brimaNRKb;RKan;edIm,ITTYlnUvPaB)øasÞik nigPaBs¥itEdleKcg;)an. RbePTnigbrimaNBitR)akd énPñak;gar Plasticizer ERbRbYleTAtamRbePTénfμbMEbk kMralkMe)arbUk nigrebobGnuvtþn_. brimaNkMNat;Er:sMrab;eRbIminRtUv[elIBI 3°énTMgn;suIm:g;t_eT. bnSMénsMPar³pSMd¾l¥bMput RtUv)an kMNt;edaykarlaysakl,g (trial mix) . 2> karGnuvtþn_ Application kMe)arbUksuIm:g;t_B½rELnminGacykmkGnuvtþsMrab;GakasFatuRtCak; b¤elIépÞEdlman kMNkTwkkkeT. sItuNðPaBénl,ay kMe)arKYr sßitenAsItuNðPaB 10 C b¤elIsBIenHkñúgkMLúgeBl º Rbtibtþinig y:agtic 48em:ag bnÞab;BIRsTab;begðIy)anbUk. enAeBlEdlsItuNðPaBFøak;cuHkMe)ar bUksIum:gt_B½rELnRtUvkarBarBIFatuGakasRtCak;edaysMPar³pþl;kMedA edayh‘MueGayCit. karGnuvtþn_edayédnUvkMe)arbUksuIm:g;t_Br½ELnrYmman]bkrN_buraN nigkarGnuvtþn_Edl )anbBa¢ak;nUveCaKCy½rab;stvtSmkehIy. eTaHCay:agNak¾eday karGnuvtþn_edaym:asuInk¾man KuNsm,tþirbs;vaEdr. kMe)arravGacRtUvbBa¢ÚneLIgeTAelIedaysMBaFtamCnÞalsMrab;GakarEdl maneRcInCan;. karGnuvtþn_manel,ÓnelOnEtmuxtMN nigmuxCMrYsKña emIleXIjc,as;eBlxøHeK Plastering Work 29
  • 30. Civil Engineering Department NPIC Bi)aknwgeCosvagBIkarGnuvtþn_edayédNas; EtRtUvkat;bnßy. lT§plénkarGnuvtþn_edaym:asuInKW manépÞÉksNæanCag nigBN’Rkem:Anig eRCACagkarGnuvtþn_edayéd. elIsBIenHeTot vaynPaBxøHdUcCa vaynPaBeRKImk¾GacTTYl)anedaykar)aj;. Cavi)ak RsTab;begðIyEtgEtRtUvGnuvtþedaym:asuInBIelIRsTab;dMbUg EdlGnuvtþedayéd. CaTUeTAkMe)ar bUksuIm:g;t_Br½ELnRtUv)anGnuvtþCa 2 b¤3 RsTab;GaRs½ynwgeRKOgTMr. 2>1 kargarbUkbIRsTab; Three coat work karGnuvtþn_bIRsTab; KWtMrUveTAelIEdkBRgwg nigCYnkal bUkenAelIkMralEdlmansPaBrwg maM. varYmmanRsTab; Scrath coat, brown coat nig finish coat srubTaMgGs;mankMras; 22.2 mm. RsTab;nimYy² RtUvbUkeGaydac;edayELkBIKña nigRtUvTukeGayvas¶ÜtrwgedayELkBIKña. RsTab; Scratch coat nig brown coat RtUv)ancat;TukCaRsTab; base coat . RsTab;TI1 (scratch coat) pþl;nUvKnøWemkanicCamYynwgeRKOgBRgwg nigCaRsTab;rwgmaMsMrab; RsTab;bnþbnÞab;. sMrab;BIelIkMralrwgmaM CYnkalRsTab; Dash bond coat RtUveRbICMnYsRsTab; scratch coat . RsTab;TI2 (Brown Coat) pþl;nUvkMras;bEnßmPaBrwgmaM nigFananUvPaBrabesμIénépÞCBa¢aMg sMrab;karGnuvtþn_nUvRsTab;begðIyEdlCaRsTab;EtglMgr. RsTab;nimYy²RtUvEfrrkSasMeNImmun nwgbUkRsTab;bnÞab;. Dash Bond Coat RsTab; dash bond coat KWpþl;nUvépÞeRKImEdleKmintMrUveGayras;kat;BIelI. RsTab;enHRtUv EtEfsMeNImry³eBlBI 12 eTA 24 em:agmunnwgbUkRsTab; brown coat . RsTab; Scratch coat RsTab; Scratch coat KWCaRsTab;TI1 BIelIEdkBRgwgnig GacCaRsTab;TI1elIépÞrwgmaMEdl manPaBs¥itRKb;RKan;edaymincaM)ac;eFVIRsTab; Dash Bond Coat. RsTab; Scratch coat RtUvman kMras;y:agtic 9.5mm vas;BIépÞrwgmaM b¤BI backing paper. vaRtUvbUkeGayesμICamYynwgkMlaMgsMBaF RKb;RKan;edIm,IeGaykMe)arkat;tamEdkBRgwgedIm,IbegáItCaKnøwHemkanic. KMlatrvagEdk nig backing RtUvbMeBjeGay)ansBVdUcenHEdkRtUvbgáb;eBjelj. épÞEdlRtUvRKbKYrminRtUveGay Plastering Work 30
  • 31. Civil Engineering Department NPIC elIsBI 10°énépÞBRgwgenAsl;BIkarbUk. enAeBlEdlRsTab; Scratch coat cab;epþImrwgépÞ TaMgmUlrbs;vaRtUvqáÚtedayrnas;edIm,Ipþl;nUvPaBs¥itemkanicsMrab;RsTab; Brown coat cab;epþIm rwgépÞTaMgmUlrbs;vaRtUvqáÚtedayrnas;edIm,Ipþl;nUvPaBs¥itemkanicsMrab;RsTab; Brown coat enA elICBa¢aMg¬rUb 3>1¦. eK)anENnaMeGayqáÚttamTisedAedk. rUb 3-1 RsTab; Scratch coat eTaHCakarGnuvtþn_enaHedayéd b¤edaym:asuInk¾edayEtkarqáÚtRtUveFVIedayéd. RsTab; Brown Coat RsTab; brown coat RtUv)anGnuvtþbnÞab;BIRsTab; Scratch Coat EdlrkSasMeNImnig rwg RKb;RKan;sMrab;Tb;Tl;nwgTMgn;énRsTab;bnÞab;. enAeBlEdlRsTab; Scratch coat s¶ÜtvaRtUvepSIm mþgeTotedIm,IRtYtBinitünUvkarbWtmunnwgRsTab; Brown coat RtUv)anGnuvtþ. RsTab; Brown coat KYr mankMras;RbEhl 9.5mm srubénkMras;rbs;RsTab;TaMgBIrminticCag 19.1 mm ¬rUb 3>2 eqVg¦. RbsinebIGaceTA)an RsTab; brown coat KYrRtUvbUkeGayeBjépÞCBa¢aMgEtmþg edayKμan Qb;. karbBaÄb;GaceFVI)anenAkEnøg Screed, control joints, RCug ssr Belt courses doorway rn§ RbelaH nigExSbnÞat;d¾éTeTotEdlbþÚrrUbsm,tþiEdlGacbgðajtamry³RsTab;begðIy ehIyeXIj minc,as;. RsTab; Brown coat RtUveRbIEm:Rtekon nigkþavIedIm,IeGayépÞesμInigmanvaynPaBeRKIm sBV. Plastering Work 31
  • 32. Civil Engineering Department NPIC rUb 3-2 RsTab; Brown coat eTaHCaeyIgGnuvtþedaym:asuInk¾eday EtRtUveFVIeLIgvijeGaysMercedayédEdr ¬rUb 3-2kNþal¦. RbePTkþavIdUcKña k¾RtUveRbIsMrab;vIeBjépÞCBa¢aMgedIm,IFananUvvaynPaBCaÉksNæan. sñamqáÚt Edl eRCA b¤épÞEdlmankMhusRtUveFVIeGayrelageLIgvij BIeRBaHPaBmineTogTat;enH bNþaleGayman karbWtminesμI b¤Gac[eyIgeXIjtamRsTab;begðIy. RCugxageRkARtUv)an pÁúMedayEm:RtekoenAeBl EdleKmineRbIEdkBRgwgRCug ¬rUb3-2sþaM¦. bnÞab;BIkarrkSasMeNIm épÞKYrRtUvTukeGays¶Üt)ansBVRKb;munnwgGnuvtþnUvRsTab;begðIy. RsTab;begðIy Finish Coat RsTab; Brown coat RtUvepSImTaMgRsugenAeBlEdleKGnuvtþRsTab; finish coat edayéd. b:uEnþsMrab;karGnuvtþn_edaym:asuIn eKminRtUvkarepSImTwkeT. RsTab;begðIyKYrmankMrasy:agtic 3.2mm srubTaMg3 RsTab;KW 22.2mm ¬rUb3>3eqVg¦. karGnuvtþn_edaym:asuInKWkar)aj;kMe)arbUkCaerOy² RtUveFVIeLIgeRcInCagBIrdgerogKña ¬rUb 3-3sþaM¦. kar)aj;elIkTI1 edaykMe)ary:agesþIgdMbUgedIm,Ipþl;eGayépÞénRsTab; Brown coat TaMgRsug. Plastering Work 32
  • 33. Civil Engineering Department NPIC rUbPaB 3-3 RsTab;begðIy karGnuvtþn_bnþbnÞab;mankMras;Rkas;CagedIm,IbegáItnUvvaynPaBbegðIyEdleKcg;)an. eragcRk )anplitnUv stucco finishes edIm,IFananUvBN’y:agl¥sMrab;RsTab; finish coat. kartubEtgépÞ begðIyénkMe)arbUkEdlGnuvtþn_edaym:asuIn b¤edayédmanlkçN³epSgeTot² ¬rUb3-4¦RsTab; begðIy plain finish coat EdlRtUvlabfñaMKYrRtUvrkSasMeNIm. CaerOy² stucco finish manPñak;gar rkSasMeNImdUcenHeKmincaM)ac;rkSasMeNImeToteT. karBitplitkrxMRbwgbBaÄb;karplitCaBiess eRBaH vaeFVI[mansñamqáÚtEvg²elIépÞBN’. RsTab;begðIyKYrRtUvEfTaMnUvsItuNðPaBeGay)an smRsby:agtic 48em:agbnÞab;BIbUkrYc. rUb3-4 Rock Dash Finish Plastering Work 33
  • 34. Civil Engineering Department NPIC 2>2 kargarbUkBIrRsTab; Two-coat work CYnkalkarGnuvtþn_karbUk 3RsTab;BIelIkMralebtug b¤dæCaBiesskEnøgEdlRtUvbegáIn PaBFn;énkMlaMg b¤tMrUvkarénkMras;. b:uEnþCaFmμtakarbUkBIrRsTab;k¾pþl;nUvPaBRKb;RKan;Edr. eKcg;)anPaBFn;énkMlaMg nigGayukalBIelIépÞtan;. sMrab;karGnuvtþn_2RsTab; base coat EtÉg CMnYs [RsTab; Scratch Coat nig brown coat nigbEnßmedayRsTab;begðIy. kMrassrubKYrminticCag 15.9mm . RsTab; Base coat elIkElgenAeBlEdlPñak;garPaBs¥itKImIRtUv)aneRbI épÞEdlRtUvbUkKYrepSImedIm,IFananUv karbWtCaÉksNæan. bnÞab;mkGnuvtþnUvRsTab; Base coat kMras; 9.5mm .vaminRtUv)anqáÚtdUckar Gnuvtþn_3RsTab;eT PaBs¥itemkanic sMrab;RsTab;begðIypþl;[edaykþavIeFVI[manlkçN³eRKIm dUcKñaeTAnwgRsTab; Brown coat Edr¬rUb3-5¦. karGnuvtþn_edaym:asuInsMrab;RsTab; Base coat KWeFVIeLIgedaykarGnuvtþCaeRcIn EdlRtUvbegðIyedayGnuvtþnUvEm:Rteko nigkþavIedayéd. rUb 3-5 2 RsTab; RsTab;begðIy finish coat RsTab;begðIy KYrmankMras; 6.4mm. vaGaceFVIvaynPaB)aneRcInRbePTedayéd b¤eday m:asuIndUckarGnuvtþn_ 3RsTab;Edr. Plastering Work 34
  • 35. Civil Engineering Department NPIC 3> karEfTMaTwk curing kMe)arsuIm:gt_Br½ELnRtUvkarbrimaNTwkRKb;RKan; nigsItuNðPaBsmrmüedIm,IsMrYldl; dMeNIrkarGuIRdatkmμ EdlGac[vaTTYlnUvPaBFn;nwgkMlaMgnig eLIgkkrwgdUcCam:assUlIt. épÞ halkan;EtFMTak;TgnwgmaDva EdlCMrujeGaykar)at;bg;sMeNImedaycMhay. TueyaFmμtamank,al)aj;GacEktMrUv)anGnuBaØatieGayeRbIsMrab;EfTaMTwkeday)aj;y:ag esþIg². karEdlbgðÚrTwkdUcsÞwg hUrminecjGaceRcaHcUlkñúgépÞminGnuBaØatieGayeFVIeT. karEfTaMsMeNImmintMrUv[)aj;TwkedayyUr²mþgeT b:uEnþeKGaceFVIedayeTogTat;enAeBl karBinitü nig)aj;TwkenAeBlEdlépÞemIleTAeLIgs¶Üt. enAeBlEdlrMhYtekIneLIgCamYynwg clnaxül;ekIneLIg nigsItuNðPaBkan;Etx<s; dUcenHCaTUeTAkar)aj;TwktMrUveGaykan;Etjwkjab; eLIgenAeBlEdlmanxül;rMehIy nigrdUvekþA. elIsBIenH windbreak b¤rnaMgRtUvkarcaM)ac;edIm,I karBarkMe)ar suIm:g;t_Br½ELnBIxül;s¶ÜtekþA. bEnßmBIelIsMeNImRKb;RKan; GIuRdatkmμRtwmRtUveGayl,aykMe)arsuIm:g;t_Br½ELnnigRsTab; nimYy² RtUv)anrkSakñúgsItuNðPaBy:agtic 10ºC . RsTab;begðIyKYrRtUvEfrkSaenAkñúgsItuNðPaB enHy:agtic 48em:agbnÞab;BIeKbUkehIy. enAkñúgGakasFatuRtCak; vacaM)ac;RtUvkMedAl,ayTwk nigpþl;nUvkMedAbiTCit CuMvijkEnøgeFVIkargar. enAeBleKpþl;nUvbrimaNTwkRKb;RKan;edIm,IFananUvGuIRdatkmμCaBiessedIm,IbegáItnUv kM)ar bUksuIm:g;t_y:agmanKuNPaB vaKμankarÉkPaBKñaCaTUeTAkñúgdMeNIrkarEfTaMTwky:agBitR)akdeT. karENnaMBIkarEfrTaMsMeNImpþl;[kñúgtarag 3-6 EdlQrelIeKalkarN_ dUcGVIEdl)anerobrab; xagelIGMBIkarEfTaMsMeNImedIm,IFananUvrgVas;d¾l¥RbesIr EdleCaKC½yCagkarBwgEp¥kelIlkçN³ GMeNayplénGakasFatu b¤brimaNTwkEdlmankñúgl,ay. karGnuvtþn_ karEfTaMseM NIm ry³eBlkkrwgsrub Plastering Work 35
  • 36. Civil Engineering Department NPIC RsTab; Scratch coat BI 12 eTA 24 em:ag y:agtic 48m: ¬cenøaHRsTab;¦ RsTab; Brown coat BI 12 eTA 24 em:ag y:agtic 7éf¶ ¬cenøaHRsTab;¦ RsTab; Finish coat BI 12 eTA 24 em:ag y:agtic48 m: ¬bnÞab;BIGnuvtþ¦ tarag 3-6 taragEfrTaMsMeNImsMrab;kMe)arbUksuIm:g;t_Br½ELn enAtMbn;xøHénRbeTs min)ansMEdgBIkarEfTaMsMeNImeT RsTab;nimYy²RtUveGay)anelOn enAeBlRsTab;mun)anrwgRKb;RKan;edIm,IRTRTg;va. viFIenHeBlxøHeK[eQμaHfa Doubling Back va Tak;TgeTAnwg karkarBarCalkçN³FmμCatinUvRsTab;nimYy² eGaymansMeNImnigsMrYldl;kar EfrTaM sMeNImdl;RsTab;eRkampg. karGnuvtþn_epSg²eTot EdlTak;TgnigkarGnuvtþn_énkar bUkRsTab; min[ticCag24 em:ag cenøaHeBlKñaedaybnþrkSasMeNImrvagRsTab;nig eRkayeBl EdlRsTab;begðIy)anbUkehIy. viFIEfTaMTwkEdl )aneRCIserIsKYrQrelIeKalkarN_énkarGnuvtþn_cMeBaHTIkEnøgEdlyl; RsbEdlmankarbkRsayBIRbvtiþénkarGnuvtþn_CaTIKab;citþ. dMeNIrkarénkarEfTaMsMeNImTaMgGs; KWBüayamedIm,IrkSa sMeNImÉksNæaneGayRsTab;mun b¤GnuBaØati[vakøayeTACas¶ÜtÉksNæan. enHKWBitCaBiess sMrab;RsTab; Base ¬b¤ brown¦ coat BIeRBaHBN’CaÉksNæansMrab;RsTab; begðIyKWGaRs½y nwgkarbWtesμIKñarbs;RsTab; Base coat . GMLúgry³eBlcaMyUrrvag Base nig finish coat dUcbgðajkñúgrUb3-6 FanaeGayRsTab; brown coat s¶ÜtÉksNæan. enAeBlEdlcenøaHeBlenaH xøICagRtUv)anGnuBaØatiCaerOy² eKcaM)ac; rkSaRsTab; base coat esImedaybnþrkSasMeNImrhUtdl;RsTab;begðIyRtUv)anbUk. elIkElgEt enAeBlEdlEpnkarRbjab; karGnuvtþn_bnþbnÞab;RtUv)anTTYlyk tMrUvkarsMrab;rkSasMeNImGac nwgRtUveKTamTarCakarENnaM[rkSasMeNImkñúgry³eBlxøIehIyBnüaeBlsMgYt. Plastering Work 36
  • 37. Civil Engineering Department NPIC CMBUk IV ]bkrN_ nigbrikça TOOL AND EQUIPMENT 1> ]bkrN_ kargarbUkkMe)arRtUvtMrUveRbInUv]bkrN_CaeRcInRbePT EdlxøHmanlkçN³BiessrYmman sßabRBakMe)ar (trowels) / kþaRTkMe)ar (hawk) / kþavI (float) / Em:Rteko (straight) nig feather edge / rnas; (scarifier) nigm:asuInbUkkMe)ar (Plastering machine) . 1>1 kþaRTkMe)ar Hawk kþaRTkMe)armanragkaerCabnÞH EdkrabesμIRsalEdlmanédkan;cMkNþal ehIyQreRbI sMrab;dak;)ayGrBIFug)ayGreTATIkEnøgEdlRtUvbUk. bnÞab;mk)ayGrRtUvykecjBIkþaRTeday søabRBakMe)ar. TMhMrbs;kþaRTERbRbYlBI 25cm eTA 30cm . kþaRTGaceFVIedaysMPar³epSg²eTot 2 2 EdlGaceFVI)anenAkardæan. rUb 4-1 RTkMe)ar Plastering Work 37
  • 38. Civil Engineering Department NPIC 1>2 søabRBakMe)ar Trowels søabRBakMe)arRtUv)aneRbIedayCagkMe)arsMrab;):at bUk nwgvaseGayesμInUvkMe)arbUk. TMhM rbs;søabRBaERbRbYleTAnwgkareRbI nigeTAtamm:asuInEdleyIgcUlcitþeRbIdUcCasÞg;emIlkareRbI ]bkrN_ nigPaBesμIKña. søabRBakMe)armanbIEpñk rYmman kaMbitsMEb:t (Blade) dg (Mounting) nig éd (handle) . EpñkkaMbitEb:tRtUveFVIedayEdklt;nigRtUvEtRtg;esμIl¥tex©aH. dgmanBIRbePTKW Edk nigGaluymIj:Úm. dgKWCaEpñkEdltP¢ab;rvagkMbitsMEb:t nigéd. sBV éf¶CagkMe)ar PaKeRcIneRbIdgGaluymIj:ÚmeRBaHvamanTMgn;Rsal. édrbs;vaeFVIBI eQICYnkalragRtg; CYnkalragekag. tulüPaBénsøaRBakMe)armansarsMxan;Nas;Epñkemkanic EdleFVIeGayeyIg manGarmμN_ gayRsYleRbIva. søabRBamuxRsYc Pointing Trowels søabRBamuxRsYcmanragdYcRtIekaN nig RsedogeTAnwgsøabRBaerobdæ. eKGacrkCav va)ankñúgTMhMepSgKñaénkMbitsMEb:tEdlmanTMhMBI 7.63cm eTA 17.78cm. kMbitsMEb:tKYr RtUveFVIBIEdklt; nigmandg (post ) nig tang k_)anbMEbgBIEdk. vamansarsMxan;EdlTaMgkMbit dg nig édRtUv)aneFVIBIEdkduMEtmYy. dg nig tang EdlP¢ab;eTAnwgkaMbitedayrIev b¤karpSavagay nwg dac;BIkaMbit. dgénsøabRBaRsYcKWCaEpñkmYyEdlQrRtg;eLIgelIBIelIkaMbitsMEb:t nigmanédP¢ab;eTA nwgvaEdl pþl;nUvPaBgayRsYlkñúgkarkan;kþab;. Tang KWCaEpñkmYyénsøabRBar EdleRsab xagKl;énédeQI. RsabRBamuxRsYcRtUv)aneRbIR)as;sMrab;eKalbMNgCaeRcIn. vamanragRtUvlμmEdl smRsb sMrab;kEnøgtUcEdlsøabRBaFMminGaceFVIeTA)an. vaRtUv)aneRbIedIm,IsMGat ]bkN_ nigRTnUv sMPar³ tUc²enAkñúgRbtibtþikarbUkkMe)ar. Plastering Work 38
  • 39. Civil Engineering Department NPIC rUb 4-2 søabRBamuxRsYc søabRBa Margin Margin Trowels søabRBa margin manTMhMRsedogKña niwgsøabRBamuxRsYcEdr b:uEnþvamanmuxRCug. vaRtUv)an eRbIR)as;sMrab;GnuvtþnwgbUk eTAkEnøgtUcceg¥ótdUcCaenAcenøaHk,ac;Bum<EdlenAekok²Kña. vak¾RtUv )aneRbIsMrab;TIFøatUcEmnETn CMnYs[søabRBaFmμta. cugRCugrbs;søabRBavamankargayRsYlCag søabRBamuxRsYc. rUb 4-3 søabRBa margin søabRBa pipe Pipe trowels søabRBa pipe KWCasøabRBamuxRsYcEvgBiessEdlRtUvykmkeRbIsMrab;kMe)arBIeRkaybMBg; TIbnwgeKalbMNgepSgeTot KWkarBarb:Hrbs;søabRBaeTAelIépÞEdlRtUvbUk. CaTUeTAvamanTMhMTTwg 5cm nigRbEvg 25cm . søabRBamuM Angle Trowels Plastering Work 39
  • 40. Civil Engineering Department NPIC sßabRBamuMRtUv)aneRbIsMrab;bUkbegðIynUvmuM nigRCugénbnÞb;. søabRBaenHmanrUbrag2sMrab; eRbIR)as;. mYymankaMbitsMEb:tragCaGkSr U . édRtUv)anP¢ab;eTAnwgcugmçagénkaMbitsMEb:tdUc søabRBa margin Edr. RbePTmYyeTotKW eFVIeLIgBIEdkmYybnÞHehIybt;CamuMEkgmanragCaGkSr V Edlédrbs;vaRtUvdak;BIelIkaMbitsMEb:tenaHnigenABIelIxageRkaymuM. rUb 4-4 søaRBamuM søabRBaBiess Special Trowels søabRBaBiessRtUv)aneFVIecjBIsøabRBaFmμta. vaRtUveKkat;edIm,IsMrbsMrYleTAnwglkçx½NÐ énkargarBitR)akdxøH. ]TahrN_ragrbs;kMbitsMEb:tCYnkalRtUveKkat;Caragekag. vaRtUv)aneK eRbIsMrab;bUknUvépÞrag dUm Dome b¤rUbragRsedogekag. CaFmμtaeKeRcIneFVIsøabRBaBiessenHBIsøabRBaEdleRbIcas;². 1>3 kþavI Floats kþavImaneRcInRbePTnig eRcInTMhMEdleKykmkeRbIR)as;eTAtamkaleTs. dUcEdleQμaH va)anbBa¢ak; ]bkrN_enHRtUvrabesIμnwgRtUv GENþkenABIelIépÞénkargar. CaeKalkarN_ kþavIKWCa]bkrN_EdlRtg;esμI EdlRtUveRbIR)as;edayCagkMe)arsMrab;BRgab ral;BMnUkkMe)ar nigRtUvbMeBjral;karxVHxateday]bkrN_epSg. vak¾RtUv)aneRbIR)as;sMrab;bgðab;kMe)arbUkeGayrelagrabesμI nigENn b¤k¾begáItnUv vaynPaBeGayépÞCBa¢aMgpgEdr. RbePTCaeRcInénkþavIRtUv)anplitsMrab;karbUkelIépÞepSg². kþavImuM Angle Floats Plastering Work 40
  • 41. Civil Engineering Department NPIC kþavImuMGaluymIj:ÚmKWCa ]bkrN_EdlmanépÞrabesμÍ enACaysgxagman flange. TMrg;TUeTA rbs;vamanragCaGkSr U . édeQIRtUv)anP¢ab;enAnwgkNþalcenøaH Flange enaH. ]bkrN_enH RtUv)anrujcuHrujeLIgtamRCugmuMTaMgsgxag. eKalbMNgén]bkrN_enHKW tMrg;nigeFVImuMEkg. rUb 4-5 kþavImuM kþavIeQI Wood floats kþavIeQIRtUv)aneRbIR)as;sMrab;rMlIg nigbgðab;épÞrabesμI. TMhMénkþavIenHERbRbYl. CaTUeTA kMras;rbs;vaKW 19 mm b:uEnþCagkMe)arxøHcUlcitþRbePTesIþgCagenH. CYnkaleKcUlcitþeRbIkþavI RbePT cross-grained BIeRBaHvapþl;nUvlT§plkargarl¥Cagkñúgkarcl½tkMe)arcUleTAkñúgbnÞHkþaerob esμInigvaminmankareLIge)ardUcRbePTkþavIeQIFmμtaeT. rUb 4-6 kþavIeQI Cork Floats eKalbMNgnigkareRbIR)as;rbs; Cork floats dUcKñanwgkþavIeQIEdr. vamanlkçN³d¾l¥2 y:ag KW PaBRsalnigRtg;l¥ vamanKuNvibtþid¾smBaØmYy KWRsYygay nigEbk. Carpet Floats Plastering Work 41
  • 42. Civil Engineering Department NPIC RtUv)aneRbIR)as;sMrab;begáItnUvépÞEdlmanRKab;m:t; tMrUvsMrab;kargarbegðIy Carpet Floats EdlmanxSac;l¥. carpet float RtUv)anplitBIkarRKbnUvkMNat;RBMENnEdlmancMNat;fñak;l¥BIelI kþavIeQI. kþavICr½eGbug Sponge Ruber Floats kþavIC½reGb:ugCakþavITMenIbEdl)anmkBIkarvivDÆn_énkþavI Carpet Float . kareRbIkþavIenHsuIeBl yUrCagkþavI carpte float b:uEnþpþl;lT§pl)anl¥Cag. vaminRtUv)anRsUbykCatikMe)ar b¤TwkBIkñúg kMe)arbUkeT. karykcitþTukdak;kñúgkareRbIR)as;kMralC½reGb:ugeGay)ansmRsbenaHeyIgGaceRbIva)anry³eBl mYyEx. enAeBlEdlkargarRtUveFVIenARCug b¤muMbnÞHC½rRtUv)aneRbIedIm,IkarBarEdk EdlRtdus elICBa¢aMg b¤Bidan. kþarvITaMgGs;eRbInUvRbePTédeQIdUcKña EdlGareGaysm nwgédrbs;eyIg. CaTUeTAédkan; RtUv)anP¢ab;cugTaMgBIrrbs;vaCamYyeQIedayvIs. rUb 4-7 kþarvIC½r 1>4 Paddle Paddle RtUv)aneRbIR)as;edayCagkMe)arxøHsMrab;sMGat nigkñúgkrNIxøHeRbIedIm,IbegðIy kargareFVImuM b¤RCug bnÞab;BIkarvIedaykþavIehIy. Paddle RtUv)aneRbIR)as;sMrab;kargar sMNg;eKhdæan BIeRBaHvapþl;[nUvkarbegðIykargareFVImuM)anelOnCag. eTaHbICay:agNak¾eday lT§plbegðIymin GaceRbobeFobnwgkareRbIsøabRBabkMe)ard¾RtwmRtUvenaHeT. Paddle manTMrg;dUcGVIEdleK)anbBa¢ak;eQμaHeGayva. vamanragEpøEb:lkaerEdlxagcugva RtUv)ansMrYcdUcesñót. vamanédkan;EvgEdlcl½tedaymankMras;. CaTUeTAvamanTMhMTTwgBI 6.5cm eTA 7.5cm ¬xagcugrbs; Paddle¦. édkan;mankMras;CaTUeTA 2.2cm nigmanRbEvgBI 15 cm eTA Plastering Work 42
  • 43. Civil Engineering Department NPIC 20cm vas;BIcugrbs; Paddle eTAcugénédkan;. Paddle RtUv)aneFVIBIsMPar³mYykñúgcMeNamsMPar³bI xageRkamKW eQI GaluymIj:Úm b¤)øasÞik. CaTUeTA paddle eFViBIeQIRtUv)anP¢ab;edaysnÞHEdky:ag EsþgenAcugxagmuxedIm,IkarBarPaBswk. 1>5 Ck; Brush Ck;EdlCagkMe)areRbImanbIRbePT KW browing brush, finish brush nig tool brush Browing Brush browing brush RtUv)aneRbIsMrab;):atTwkeTAelIépÞénkMe)arbUkedIm,Ipþl;nUvPaBrGileGay ]bkrN_sMrab;rMlIgépÞkMe) arenaH. tMrUvkard¾RbesIrbMputrbs;va KWvaGacpÞúk)anbrimaNTwkeRcIn. rUb 4-8 browing Brush Finish brush eKalbMNgénkareRbIR)as; finishing brush enHKWdUcKñanwg browing brush EdrEdleRbIsMrab; labTwkeTAelIépÞbUkkMe)ar. eTaHCay:agenHk¾eday sMrab;RbtibtþikarN_enH TwkRtUvlabedaypÞal; eTAelIépÞ. dUecñHvaRtUvEtmaneramGMe)aHEdlmanKuNPaBx<s; edIm,IkarBarépÞkMe)arbUkd¾Tn;kuMeGay qáÚt. Finishing brush xøHGacrkCav)anedaymanKRmbeFVIEs,kgab;BT½§CuMvijeramGMe)aH EdlP¢ab; eTAnwgédkan; edIm,IkarBarTwkhUrtamdgédkan;enAeBlEdlkMBugeRbIR)as;. Plastering Work 43
  • 44. Civil Engineering Department NPIC rUb 4-9 Finishing Brush Tool Brush RtUv)aneRbIsMrab;labTwkeTAelIkEnøgTIFøatUc² nige)asnUvFUlIBIk,ac;rcna.l. ToolBrush Ck;labfñaMEdlmanKuNPaBl¥KW Ca]bkrN_EdlRbéBbMputsMrab;eRbICa Tool Brush . rUb 4-10 Tool Brush 1>6 ]bkrN_eFVIk,ac;rcna Ornamental Tools ]bkrN_d¾tUcGaceRbIsMrab;kargark,ac;rcna. CYnkaleKGacehAfa ]bkrN_eFVIBum< (modeling tools) b¤]bkrN_eFVIk,ac;rcna (ornamental tool) . ]bkrN_tUcRtUv)aneRbIsMrab;cg¥úlmux tMNenAeBltMeLIgkargarBum<. vaRtUv)aneRbIsMrab;begðIykargarRtg;kEnøgkat;Kñaénk,aMgk,al CBa¢aMg. vaRtUv)aneKeRbIsMrab;ral;kargarEdlRtUvkar]bkrN_EdlmanTMhMtUc. Plastering Work 44
  • 45. Civil Engineering Department NPIC rUb 4-11 ]bkrN_eFVIk,ac;rcna 1>7 BUefAéd Hatchet enAkñúgkargarenH eKmanBUefABIrRbePTKW Lathing hatchet nig half hatchet . lathing hatchet KWCa]bkrN_EdlmanTMgn;Rsal EdlmanEpøkaMbitesþIgEvg. vaRtUv)anlt;y:agx<s;bMput. karlt; EdkKWpþl;nUv kareRbIR)as;)anyUrGEgVg (long-lasting)muxmutRsYc (sharp-cutting edge). CaTUeTA k,alBUefAenaHRtUvExVgedaycg¥Úr kñúgeKalbMNgsMrab;karBarPaBrGilénk,al EdkeKal enAeBl duMBnøicva. édkan;rbs;vaCadgRkas; vasMrYlenAeBlEdleKRtUv)aneRbIsMrab;kab;kMe)arEdleLIgrwg nigRtUv)aneRbIsMrab;kargarF¶n;²epSgeTot. rUb 4-12 BUefA 1>8 kUnRbeyal Plumb Bod kUnRbeyalKWCa duMsMN b¤Edk b¤Tg;EdgEdlmanTMgn;EdlP¢ab;eTAnwgExSrehIy RtUv )aneRbIR)as;edayCagsMNg; b¤CagkMe)ar.l. vaRtUv)aneKeRbIsMrab;bgðajnig RtYtBinitüTisedA Qr edIm,IFanafa TisedAQrbs;épÞmanPaBRtg; nigBitR)akd. enAeBlEdlCagsMNg;niyayfa “CBa¢aMgRbeyalehIy ” (“Plumb Wall”) enaH)ann½yfa CBa¢aMgenaHBitR)akdRtg;tamTisedAQr. kUnRbeyalRtUv)ancat;lMdab;fñak;edayTMgn;CagedayTMhM. Plastering Work 45
  • 46. Civil Engineering Department NPIC rUb 4-13 kUnRbeyal 1>9 Em:RtsÞg; Level Em:RtsÞg; KWfa]bkrN_mü:agEdleKsÁal;fa CaRbdab;cab;kMrit EdlvaRtUv)aneKeRbIsMrab; kMNt;ExSedk. vabgðaj[eyIgeXIjfa EpñkNamYyénépÞedkmankMritkMBs;x<s;CagEpñkNamYy eTot. EpñkBiessénEm:RtsÞg;man TIbEm:RtragekagbnþicEdlesÞIrEtbMeBjedayGal;kul b¤sar- FatuepSgeTot. TIbEdlmanvtßúravenaHbiTCitehIymanduMBBuHxül;mYyEdlGaccl½t)an. enAeBlEdlduMBBuHxül;enaHenAcMkNþal vabgðajfaépÞEdkenaHmanPaBrabesIμl¥. duMBBuH xül;KWgayRsYlcUlkNþal enAeBlEdlEm:RtsÞg;PaKeRcInmanExSbgðajelIEm:RtTIbEdlRbsin ebIduMBBuHxül;sßitenAcMkNþalénExSenaH)ann½yfa épÞenaHrabesμI. enAeBlEdlEm:RtsÞg;enaHep¥óg EtbnþiceTARCugNaenaH vanwgeFVI[BBuHxül;enaHcl½tecjBIGkS½kNþalenaHbgðajfaExSenaHmin edk b¤minrabesμI. TIbEm:RtenaHRtUvkarBaredayEdk b¤eQIedaymanRbEvgb:unKña. RbEvgEm:RtsÞg;TUeTAEdl eRbIedayCagkMe)arPaKeRcInKW 45cm nig 60cm nigGaceFVIedayeQI b¤GaluymIj:Úm. RbePTGaluy mIj:ÚmCaRbePTsMPar³énEm:RtsÞg;EdleKcUlcitþeRbIeRBaH vaminekagnigminswkdUcRbePTeQIeT. sBVéf¶Em:RtsÞg;PaKeRcInEdlCavmanTIbEm:Rtdak;GgÁFaturaveRcInCag1. RbePTEdléfø CageK KWRbePTEdlmanTIbenaHeRcInEdlGaceGayeKeRbIva)anRKb;viFI. Em:RtsÞg;PaKeRcInmanTIbEm:RtBIrRbePT KWmYyeRbIsMrab;kMNt;PaBrabesμIénépÞedk¬dUc erobrab;xagelI¦ nigmYyeTotCaTUeTAenAxagcugedIm,IkMNt;TisedAQr. TIbEdleRbIsMrab;kMNt; Plastering Work 46
  • 47. Civil Engineering Department NPIC PaBRtg;tamExSedk KWRtUveKdak;RsbnwgbeNþayénEm:RtsÞg; cMENkTIbEdleRbIsMrab;kMNt;PaB Rtg;tamExSQr KWRtUveKdak;RsbeTAnwgTTwgénEm:RtsÞg;. rUb 4-14 Em:RtsÞg; 1>10 ké®nþkat;sMN tin snip ké®nþkat;sMNRtUv)aneRbIsMrab;kat;kMNat;Edk. eKalbMNgd¾sMxan;rbs;vasMrab;CMnaj CagkMe)arKW sMrab;eFVIBum<k,aMgk,alCBa¢aMg. ké®nþkat;sMNKWmanragRsedogKñaeTAké®nþFM. eKGac rkCavva)anedayTMhMepSg² sMrab;eRbICamYyEdkEdlmankMras;epSg². CagkMe)arCaFmμtacUlcitþ eRbInUvké®nþkat;sMNTMhM 30 cm. vamanmuxEpøké®nþRbEvg 7.5cm niggayRsYlkñúgkarkat;kMNat; Edk. sMrab;ké®nþkat;sMNrkñúgkargarsMNg;eKeRcInrknUvEpøké®nþNaEdllt;eRBaHfa CacMNuc sMxan;bMput. rUb 4-15 ké®nþ Plastering Work 47
  • 48. Civil Engineering Department NPIC 1>11 RbGb;ExSbnÞat; Chalk Box RbGb;ExSbnÞab;KWCaExSEdlmanRbEvgEvgnigRtUvbMeBjedayFUlIdIs. vaRtUveRbIsMrab; dak;ExSbnÞat;dwkRtg;enAelIkargar. ExSbnÞat;RtUvTajeGaytwgekoknwgépÞkargar nigdak;BIelIcMnuc Edl)anedAehIy b¤pÞat;edayRmamédedIm,IbegáItCaExSbnÞat;. rUb 4-16 RbGb;ExSbnÞat; 1>12 Em:Rtbt;6-Foot Six-foot folding rule Em:Rtbt; 6 foot KWCaEm:Rtbt;EdlmanbTdæanRtUv)anlk;sMrab;bMerIbMras;TUeTA. enAeBl Edlvabt;vamanRbEvgEt 15.24cm nigenAeBllaeGayGs;GacmanRbEvgdl; 180 cm . Em:RtenH PaKeRcInRtUv)aneFVIeLIgBIsMPar³BIrRbePTKW eQI nigGaluymIj:Úm. rUb 4-17 Em:Rtbt; 1>13 rNar Saws CagkMe)ar)aneRbInUvrNa 2RbePTkñúgkargarrbs;Kat;. Kat;eRbI Handsaw nigKat;eRbI keyhole saw sMrab;GarvNÐvg;énBum< nigkagartUc². Plastering Work 48
  • 49. Civil Engineering Department NPIC CaTUeTA handsaw manRbEvgRbEhl 50cm eTA 60cm nigRsedogKñaeTAnwgrNaCageQI EdlmaneFμjFM² nigeRKIm. eFμjrbs;rNaRtUvEtFM² edIm,IkargarBIkarbMeBjedaykMe)aresIμ nig karBarBIkars¥itCab;éneFμjenAeBlEdlkMBg;Gar. rUb 4-18 rNa rNa keyhole saw KWmanRbCaRbiyPaBkñúgkargareFVIBum<. CagemkanicxøHcUlcitþeRbI coping saw Cag keyhole saw . rNa coping saw manlkçN³l¥RbesIrkñúgkarGarCalkçN³rgVg;. b:uEnþmux d¾tUcl¥itminGacbBaÄr)anRtg;sMrab;kargarepSgeTot. 1>14 Em:RtEkg Stell Square CagkMe)areRbIEm:RtEkgsMrab;eFVI[manRCugRtg;. Em:RtEkgEdlmankarBareRcHKWCa]bkrN_ d¾l¥CageK sMrab;CagkMe)areRbIeRBaHeKEtgEteFVIkargarCamYynwgsMPar³esIm²tQb;Qr. Cag kMe)arxøHcUlcitþeRbIEm:RtEkgEdlmanTMhMF. Em:RtEkgRtUvEckecjCa 3EpñkEdleKeGayeQμaHfa M Tongue KWCaEpñkxøICageK Blade KWCaEpñkEvgCageK nig heel KWCaRbCuMénEpñkTaMgBIr. rUb 4-19 Em:RtEkg Plastering Work 49
  • 50. Civil Engineering Department NPIC 1>15 Joint Rod Joint Rod RtUv)aneRbIsMrab;pÁúMnig P¢ab;muxtMNkñúgkargark,aMgk,alCBa¢aMg. kMe)ar)ayGr Tn; RtUv)andak;BIelIkEnøgkat;Kñaénk,aMgk,alCBa¢aMgBIr rYcehIyeRbI]bkrN_enHedIm,IBat;nUv kMe)ar)ayGrcUlkñugRbehagenaH b¤biTvaeGayCab;RCugKña. edaysarEtk,aMgk,alCBa¢aMgmanTMhM ERbRbYl dUcenHRbEvgrbs; joint rod maneRcInRbePTtMrUvtamkMe)arbUk. 1>16 rnas;qáÚt Scratcher rnas;qáÚt KWCa]bkrN_EdlmanédsmRsbnig maneFμjrnas;FM². rnas;qáÚtRtUv)an eRbIR)as;sMrab;qáÚtRsTab;TI 1 énkMe)arbUkdUcenHRsTab;bnÞab;nigmanPaBs¥itedayemkanicl¥. rUb 4-20 rnas;qáÚt 1>17 Em:RtEdk Steel tape Em:RtEdkRtUv)aneRbIR)as;sMrab;vas;RbEvgEdlEvg EdleyIgminGacvas;edayEm:Rtbt; 6foots. RbePTEdll¥CageK KWRbePTEdlmaneRsabRkUmkarBareRcH b¤labfñaM. rUb 4-21 Em:RtEdk Plastering Work 50
  • 51. Civil Engineering Department NPIC 1>18 Jiont Cutter Joint cutter RtUv)aneRbIsMrab;kat;muxtMN b¤eFVIcg¥ÚrxagkñúgkMe)arbUk. sMrab;ral;kargarEdl eFVIedaykMe)arTn; CaTUeTA cutter RtUveFVIBIEdkyWtesþIg. bnÞHEdkRtUveFVIeGaymanrag loop nigman dak;édkan;. ]bkrN_EdkesþIgenH nigkat;cUlenAkñúgkMe)arTn; nigbegáItCamuxtMN b¤cg¥ÚrEdlTTwg esμInwg loop nigCMerAeTAtamkarkMNt;rbs;emkanic. TMhMrbs;Edk loop kMNt;nUvTMhMrbs;mux tMN.RbePT joint cutter enHRtUv)aneRbIsMrab;eFVIRtab;tamduMfμdæb¤ kar:U. RbePTsMPar³ kMe)ar )ayGrxøHRtUv)ankat;l¥enAeBlEdlvaeLIgrwg. sMrab;krNIdUcCa cutter esþIg EdlmaneFμj dUcCa rNaeRcokRtUv)anykmkeRbI. vaRtUv)aneFVIBIEdk stock EdlmankMras;esμInwgTMhMmuxtMNr EdleKcg;)an. bnÞab;mkeFμj én cutter RtUv)anqab. CaTUeTAépÞén cutter manRbEvg 10cm RtUv)anGnuBaØati. cutter RbePTenHGackat;RKb; RbePTénkMe)arbUkrwg nigbegáInnUvT§iBlénmuxtMNr. rUb 4-22 Joint cutter 1>19 dgáab; Nippers dgáab;EdlmandegáóbtUcRtUv)aneRbIsMrab;cab; bMEbknigkat;. dgáab;man2RbePTRtUv)an eRbIR)as;. mYyRbePTenaHmanmuxdgáab;rwg. CagkMe)areRbIdgáab;edIm,ItMeLIg Plaster cast enAeBl BYkeKcgP¢ab;lYsCamYynwg Plasterwad . dgáab;k¾RtUv)aneRbIR)as;sMrab;kargarTUeTAdUcCaEdkeKal EdlduMelI miscellaneous lath RtUv)andkeday lather . Plastering Work 51
  • 52. Civil Engineering Department NPIC rUb 4-23 dgáab; 1>20 eRsamédC½r Rubber Groves eRsamédC½rRtUv)aneRbIenAeBleyIgGnuvtþkargarkMe)arbUkRtg;k,aMgk,alCBa¢aMg nigkargar eFVIk,ac;rcnaedaykMe)ar)ayGrepSgeTot. eRsamédkarBarédBIkareqHeraledaykMe)ar. vaGnuBaØatieGayCagkMe)arGackan;cab;kMe)arrav)an nigGac):atCaBum<k,aMgk,alCBa¢aMg ¬kargareFVIk,ac;rcna¦. CaTUeTACagkMe)arcUlcitþeRbIRbePTRkas;eRBaHBak;RsYlnwggayedaH ecj)an rh½s. rUb 4-24 eRsamédC½r 1>21 Combination Square (bevel square) Bevel square KWCabnSúMrvagbnÞat;muMEkg nigmuM 45 . sNæanénbnÞat;KWragRtIekaN.RCugEkg º énRtIekaNbegáIt)anmuM 90 nig RCugBIrepSgeTotbegáIt)anmuM 45 . CagkMe)areRbI bevel square º º edIm,IP¢ab;RCugkat;nigedIm,IkMNt;bnÞab;RCug 45 nig 90 dUcEdleKcg;)an. º º Plastering Work 52
  • 53. Civil Engineering Department NPIC rUb 4-25 Combination Square 1>22 Coping Saw rNa Copin saw mankaMbitrNaesþIgtUcEdlP¢ab;nwgdgGkSr U ehIyP¢ab;edayédkan;enA mçagéndg. Coping saw RtUv)aneRbIsMrab;eFVInUvkargarekagesþIgRKb;RbePT. rUb 4-26 coping saw 1>23 EdkecaH Prick Punch EdkecaH KWCaEdkEvgmUlEdlmancugmçagRsYcedIm,IecaHrn§tUc². vaRtUv)aneRbIsMrab;ecaH rn§eTAelIbnÞHEdkEdleRbIsMrab;eFVI Profile . EdkecaHk¾RtUveRbI sMrab;KUsvasnUv Profile tamry³kare)aHBum< blueprint eTAelIbnÞHEdkenAeBleFVIBum<k,aMgk,al CBa¢aMg. Plastering Work 53
  • 54. Civil Engineering Department NPIC rUb 4-27 EdkecaH 1>24 jjÜr Craw bammer jjÜrFmμtarbs;CageQIRtUv)aneRbIedayCagkMe)arsMrab;Kas;EdkeKal nigsMrab;eFVIBum< RKb;RbePT template CnÞl; nigkargarRsedogenH. rUb 4-28 jBaYr 1>25 Em:Rt b¤bnÞat;eko Straightedge ]bkrN_enHeRbIsMrab;eFVIeGayCBa¢Mgnig BidanmanépÞrabesμIl¥. RbEvgEm:RtekoPaKeRcIn eRbIkñúgCMnajenHman 150cm, 180cm,210 cm nigedIm,IGnuvtþnUv Screed enaHCagkMe)ar)aneRbInUv bnÞat;EdlmanRbEvgrhUtdl; 6m . ruUb 4- 29 Em:Rteko Plastering Work 54
  • 55. Civil Engineering Department NPIC 1>26 Featheredge Featheredge RtUv)aneRbIsMrab;eFVIeGaymuM b¤RCugénCBa¢aMgmanPaBesIμl¥ sMrab;RsTab;begIðy vak¾RtUv)aneRbIsMrab;begáIt Screed RsTab; Putty sMrab;kargark,aMgk,alCBa¢aMg. TMhMCaeKalén Featheredge KWmanRbEvgBI 150cm eTA 240cm nigCaTUeTAmankMras; 2.5cm nigTTwg 13cm . rUb 4-30 Featheredge 1>27 Darby Darby manRbEvgEvgesþIg sMEb:terobesμICaTUeTAmankMras; 12.5cm TTwg 9cm nigRbEvg RbEhl 115cm . édkan;RtUv)anP¢ab;eTAnwgépÞmçagrbs;kaMbitsMEb:t. ]bkrN_enHRtUv)aneRbI CamYy handsand TaMgBIrsMrab;vIBIelIkMe)ar Rodded Brown EdlenArav. skmμPaBenHbgðab;nig rlIg)ayGreGaycUlkñúgkþavInigeFVIeGayépÞENn. Darby k¾RtUv)aneRbIsMrab;rMlIgRsTab; Putty- coat nigeFVI[RsTab; Putty coat manPaBrabesμIEdlbUkBIelIRsTab; Brown Coat manPaB minrabesμI. rUb 4-13 Darby Plastering Work 55
  • 56. Civil Engineering Department NPIC 1>28 Slicker Slicker RtUv)aneRbIsMrab;CMnYs[ Darby sMrab;kargarsMNg;eKhdæan b¤enAeBlEdlpÞaMg mñagsilaRtUveRbI. Slick RtUv)an eFVIBIeQIEdlmanmçagragTal dUcGVIEdleKeRbICa Sheath sMrab; xageRkApÞH. CaTUeTAvamanRbEvgRbEhl 120cm nig TTwg 15cm rW 20cm . vaminmanédkaneT Et vaRtUv)ankan;edayCaymçagEdlmankMras;Rkas;Cag. CagkMe)arxøHcUlcitþ eRbI slicker eRBaHvagay RsYlbt;EbnenAeBlEdlEm:RtIvaelI)ayGr. edaysarEtPaBbt;Ebnrbs;va)ankMe)argayRsYl nwg relagCagFmμta. rUb 4-32 slicker 2> brikça Equimpments eKmanm:asuIn Plastering BIrRbePT KW Wet mix nig Dry mix. RbePTbUm Wet-mix bBa¢Ún l,aykMe)arBIm:asuInRkLúkeTAdl;k,al)aj;Tueya. RbePTm:asuIn Dry-mix bBa¢Únl,aykMe)ars¶Üt eTAdl;k,allayEdleRkamsMBaFTwkRtUv)anlayCamYynwgkMe)ars¶Ütnwg )aj;edaykMlaMgnUv kMe)aresIm. m:asuIn Plastering PaKeRcInKW m:asuInbUm wet-mix . m:asuInb:Um Wet-mix GacCaRbePT Worm-drive, piston-pump KWRbePT hand hopper. sMrab;RbePTm:asuIn worm-drive l,aykMe)ar RtUv)ancak;cUleTAkñúg Hopper nigbBa¢ÚneTAk,al)aj;tamTueyaedayskmμPaBmYlvIsén rotor nig stator EdlpÁúMenAnwgkr énm:asuIn. m:asuInRbePTenHman hoppe GacmanlT§PaBpÞúkl,aykMe)arBI 3eTA5 feet KIb nigGac bBa¢ÚnBI 0>5 eTA 2 feet KIbkñúg1TaTI. sMrab;RbePTm:asuIn Piston-pum Edl Piston RbtibtþkarN_ tamlkçN³ hydraulic, air-operated b¤emkanicpþl;nUvfamBlsMrab; bBa¢ÚnkMe)arrav. sMrab;m:asuIn hand-hopper l,aykMe)ars¶ÜtRtUv)andak;cUleTAkñúg hand-held hopper EdlsßitenABIelIk,al)aj;. ehIyCaTUeTA hopper enHGacdak;kMe)ar)anRbEhl 1/10 feet Plastering Work 56
  • 57. Civil Engineering Department NPIC KIb. m:asuInTaMgenHRtUv)aneRbIva sMxan;sMrab;kargarbUkbegðIy. karGnuvtþn_edayma:suIn kat;bnßy nUvkareRbIR)as;kþaRT nigsøabRBa kMe)arsMrab;kargarbUkkMe)arCMh‘andMbUg. eTaHbICay:agNak¾eday eKenAEteRbIral;]bkrN_Edl eRbIedayéddEdldUcCaEm:RtekosMrab;kargarGnuvtþn_edaym:asuIn. Plastering Work 57
  • 58. Civil Engineering Department NPIC CMBUkV karGnuvtþn_ Practice 1> karbUkkMe)ar Plastering 1>1 kartMeLIg stucco Installating Stucco dMeNIrkarRbtibtþi 1> e)aHP¢ab; base strip eTAnwgeCIgCBa¢aMg edaydak;RtYteTAelIExSbnÞat;dwk Edl)anKUrrYc. 2> eRbIEdkeKaleRsabsgá½sIduMP¢ab;sMNaj;lYsBIelIépÞTaMgmUl lapping base nig coner bead Plastering Work 58
  • 59. Civil Engineering Department NPIC 3> eRbIsøabRBakMe)ar):at)ayGredaykMlaMgxøaMglμmedIm,Ibgáb;sMNaj;lYseTA nigl,aysMrab;begáItRsTab; Base coat 4> qáÚtépÞénRsTab; base coat Cacg¥ÚredkedIm,IbegáItCaPaBs¥itrvagRsTab;. 5> bUknUvRsTab; brown coat EdlmankMras; 9cm. labfñaM b¤bEnßmRsTab; finish coat kMras; 3mm Plastering Work 59
  • 60. Civil Engineering Department NPIC 1>2 karbUkkMe)arelIduMbøúk karbUkkMe)arKW CakargarbegðIycaM)ac;taMgBIburaNsMrab;CBa¢aMgrabedayduMbøúknig sMrab;Epñk EdlCaRKwHénpÞH. vamankargayRsYlkñúgkarbUkkMe)arelIsMPar³Edltan;² CagBIelIeRKageQI edaymanmUlehtuCaeRcIn TI1 duMbøúkKWrwg dUcenHeyIgmincaM)ac;bEnßmEdkBRgwgeT bu:EnþeyIgKYr bEnßm base nig corner bead . dUcKñaEdrCaTUeTACBa¢aMgdæRtUvkarEt 2RsTab;eT KWRsTab;base b¤ scratch coat kMras; 9cm nig RsTab;begðIy finish coat kMras; 6mm . edayKμansMNaj;BRgwg GñkKYr EterobcMCBa¢aMgcas;edayRcasEdk b¤Ck;. sMrab;PaBs¥itl¥elICBa¢aMgenaH GñkKYrbegáInPaBs¥it edaylabnUvPJak;gars¥itmYy RsTab;edayr:UlUruj. dMeNIrkarRbtibtþi 1>eRbInUvEdkdab; (cold shisel) nigjjYÜrF¶n;² dab;ecjnUvkMe)aEdlelIsecjBImuxtMN 2> e)assMGatPaBkxVk; nigkMTickMTI dUcCaEsø edayRcasEdk 3> rujedayr:UlUBIelICBa¢aMg dæEdlcas;edayPñak;gars¥itsMrab;begáInPaBs¥it. cMeBaH CBa¢aMgbøúkfμI² mincaM)ac;labeT. Plastering Work 60
  • 61. Civil Engineering Department NPIC 4> tMeLIgnUv base drip bead edIm,IbBaÄb;nUvRsTab;bUkbegðIy nigkat;tMnwmCayeGayputBI dIy:agxøIbMput. 5> eRbI corner bead CamYynwg mesh flange edIm,IeFVI tradition CuMvijRCugbøúk. 6> eRbInUvfasdak;kMe)aredIm,IeFVIeGayl,aymanPaBgayRsYleFVIkarlμmrYc):atbUkEtmþg Plastering Work 61
  • 62. Civil Engineering Department NPIC 7> eRbIsøabRBakMe)arbUkrujkMe)arBIeRkameLIgelIedIm,IbegáItCaRsTab;TI1. GñkGaceRbIkþa vIsMrab;dak;kMe)areGay)aneRcInkñúgkarrujenH. 8> munnwgRsTab;TI1 s¶Üt qáÚtCacg¥Úr. ]bkrN_qáÚtenHeFVIedayxøÜnÉgEmnEtmanRbsiT§PaB 9> enAeBlEdl Scratch coat eLIgs¶Üt)aj;Twk eGayvaedIm,ICYycab;s¥itRsTab;begðIy. Plastering Work 62
  • 63. Civil Engineering Department NPIC 10> bUknUvRsTab;begðIyedaysøabRBa BRgabnigrMlIgva eGaymankMras; 6mm 11> sMGatnUvkMe)arEdlelIsecjBIRCugedayGUssøabRBatambeNþayCayén metal bead 12> RKbCBa¢aMgedaypÞaMg)øasÞikedIm,IrkSasMeNImry³eBl 48em:ag nigGnuBaØatieGay kMe)armansMeNIm. bUkelIeQI enAeBlEdleyIgbUkkMe)areTAelICBa¢aMgeRKageQI eyIgEtgEtCYbnUvvibtþiénkarrIkRsk rbs; sac;eQItamlkçN³tUc² eTAtamrdUv vabNþaleGayeRbHnUvkMe)arsuIm:g;t_rwg. eKmanvIFIBIrsMrab; Tb;Tl;bBaðaenH KWT1 eyIgRtUvsg;CBa¢aMgd¾rwg ]TahrN_ eday 2x6 CMnYs[ 2x4 I Plastering Work 63
  • 64. Civil Engineering Department NPIC b¤y:agticeyIg RtUvbEnßmCnÞl;edIm,IeGayeRKageQIkan;EtrwgmaM. viFImü:ageTot KWtMeLIgsMNaj;BRgwg ¬rYmTaMg corner nig base bead CamYynwg mesh flanges ¦ P¢ab;eTAnwgépÞCBa¢aMg. Gñkk¾RtUvkarBar tile sheathing pgEdrCamYynwgkardak;Can;KñanUv felt paper . eyIgRtUvbUkkMe)ar 3Can;BIelIeRKageQI. cab;epþImeday scratch coat kMras;RbEhl 9mm qáÚtedIm,IeGayRsTab;TI3 s¥itCab;CamYyRsTab; enH. RsTab;bnÞab; KW RsTab; brown coat kMras;RbEvgRbEhl 6mm pþl;nUvépÞrabesμIÉksNæan. RsTab; 3 kMras;RbEhl 3mm RtUv)aneKeGayeQμaHfa color coat edayeyIgGaclayBN’nig vaynPaBpgEdr. dMeNIrkarRbtibtþi 1> kiwbP¢ab; felt paper eTAnwg sheathing biTB½T§RCugnwgpþl;nUv liveral Can;KñaenARCug. 2> vayExSbnþat;BIelI felt paper EpñkxageRkamBIelIRKwHsMrab;CalMnaMeGay base bead . 3> vas; mesh- edjed base bead nigkat;tMnwmvaeTAnwgRbEvgRtUvkaredaydgáab;. Plastering Work 64
  • 65. Civil Engineering Department NPIC 4> tMeLIg mesh flang tMrg;CamYynwgExSbnÞab;EdleyIg)anpÞat; nige)aHP¢ab; bead eday EdkeKal roofing nail 5> tMeLIgsMNaj;EdkCamYynwg EdkeKaleRsabsgá½sI b¤kwbP¢ab;edIm,IbegáItCaRsTab;RT bnþbnÞab;. 6> RKbRCugedaydkyk corner bead ecjedIm,IeFVICayrvagépÞCBa¢aMgmanlkçN³s¥at. Plastering Work 65
  • 66. Civil Engineering Department NPIC 7> rujkMe)arbUkBIeRkameLIgelIedaysøabRBaedIm,Ibgáb;y:agENnnUv lath eTAkñúgRsTab; TI1enH. 8> qáÚtCacg¥ÚredkenAelIépÞ eRbInUv]bkrN_eFVIedayxøÜnÉgenH CabMENkén paint-straining screen . 9> epSImRsTab; Scratch coat enHmunnwgbUknUvRsTab;TI2 ehAfaRsTab; brown coats Plastering Work 66
  • 67. Civil Engineering Department NPIC 10> eRbInUvkþavIEvgedIm,IbUknUvRsTab; brown coat enHenAelIépÞrabesμI. 11> GñkGacbEnßmBN’eTAkñúgl,ay stucco edIm,IlabBN’sMrab;RsTab; Finish coat Rbsin ebIcaM)ac;. 12> bUknUvRsTab;cugeRkay edayrkSakMras; 3mm sMrab;RsTab; finish coat Plastering Work 67