Transaction Management in Database Management System
Clase altimetria
1.
2.
3.
4.
5.
6.
7.
8. PROYECTO : Docencia TRAMO : A -1 OPERADOR : Juan Núñez C.
PUNTO
ATRAS INTERMEDIA ADELANTE INSTRUMENTO TERRENO
PR A 0.193 100.193 100.000
P 1 1.879 98.314
P 2 2.815 97.378
PC 1 1.189 3.673 97.709 96.520
P 3 2.051 95.658
PC 2 3.484 0.433 100.760 97.276
P 4 1.107 99.653
P 5 1.475 99.285
PC 3 0.387 3.303 97.844 97.457
PR B 1.099 2.314 96.629 95.530
PC 4 2.112 0.538 98.203 96.091
PC 5 3.069 0.688 100.584 97.515
PR A 0.578 100.006
11.533 11.527
11.527
0.006
Y CROQUIS
R E G I S T R O D E N I V E L A C I O N
LECTURAS COTAS OBSERVACION