PREFACE
Finance is the life blood and nerve centre of business just as circulation of blood is
essential for maintaining human life, without adequate finance a business can’t run
smoothly. Application of Management of Principles in all branches whether Production,
Personnel, Finance, Marketing etc results in more efficient and effective utilization of
available resources.
Now days the theory without practice is of little use. No doubt, theory provides the
fundamental stone for the Guidance of practice. Therefore a strong cooperation of
theory and practice is very essential to make a management student perfect.
As the project suggests that project report is all about knowing what is Store
management and its efficiency, its importance and its uses. The project report also
includes the type of financing NHPC has used recently in appraising its new project of
800MW generation at Parbati river at PARBATI PROJECT STAGE-2.The confidence of
an individual is boosted as one successfully completes the responsibilities shouldered
on him. The theoretical concepts only help us to gain Knowledge. However an
administrative skill, the pre-requirement for the completion of a success story comes
with experience.

Page 2 of 58
Page 3 of 58
ACKNOWLEDGEMENT
The successful completion of any task would be incomplete without
mentioning the people who have made it possible. So it`s with the gratitude that I
acknowledge the help, which crowned my efforts with success.
I would like to express my sincere thanks to the management of NHPC
who gave me the opportunity to work and study in such an esteemed
organization.
It is a matter of pride for me to acknowledge my profound gratitude to my
respected principal MRS.PARVEEN KAUR CHAWLA, who always facilitates me in
gaining practical knowledge.
MS.PRIYA AHUJA & MRS.MEENAKSHI BAJAJ for her valuable Cooperation
Guidance.
Last but not the least, I would like to thank all who supported me in this
study by way of sparing their precious time, providing relevant information and
sharing experience, I needed, without which the project would have been
incomplete.

LUDHIANA

Page 4 of 58

SWATI CHANDEL
TABLE OF CONTENT
CH.NO.

CONTENTS

1 INTRODUCTION TO THE TOPIC: STORE ACCOUNTING
2 COMPANY PROFILE
Introduction
Hydro scenario in India
Overview of organization
Vision of organization
Mission of organization
Core value
Objectives of the organization
Capital structure of NHPC
Current Scenario
SWOT Analysis

3 INTRODUCTION ABOUT PARBATI PROJECT II
Introduction
Parbati project2 :Profile
Benefits

4 PROJECT REPORT ON STORE ACCOUNTING W.R.T. PHEP-2
Research methodology
Inventory management system
Accounting guidelines
Procedure of store accounting
Interpretation and Analysis
5 FINDINGS AND LIMITATIONS
6

CONCLUSION AND RECOMMENDATIONS

7 BIBLIOGRAPHY /REFERENCE

Page 5 of 58

PAGE NO.
INTRODuCTION TO ThE TOPIC:

sTORE
ACCOuNTING

Page 6 of 58
A Store is virtual money that can be encashed. However, this money needs to be
properly counted or accounted for. STOCK ACCOUNTING is thus a systematic way of
assessing the money value of the items lying in stores as also the items under
transaction through stores.
Transactions, in terms of receipts and issues are a regular feature in any stores and
therefore Stock accounting process, in most of the cases, concentrates only on the
stock in hand, lying in Stores.
The most popular methods of accounting are, FIFO i.e. First In First Out and
LIFO, Last In First Out.
FIFO and LIFO Methods as accounting techniques are used in managing
inventory (Stock lying in Stores for future use) and financial matters involving the
amount of money a company has tied up within inventory of produced goods, raw
materials, parts, components, or feed stocks. These methods are used to manage
assumptions of cost flows related to inventory, stock repurchases (if purchased at
different prices), and various other accounting purposes.
FIFO standing for first-in, first-out, implies that the oldest inventory items are
recorded as sold first but do not necessarily mean that the exact oldest physical object
has been tracked and sold.
LIFO stands for last-in, first-out, meaning that the most recently produced items
are recorded as sold first. Since the 1970s, some U.S. companies shifted towards the
use of LIFO, which reduces their income taxes in times of inflation, but with International
Financial Reporting Standards banning the use of LIFO, more companies have gone
back to FIFO. LIFO is only used in Japan and the U.S.

Page 7 of 58
Store is a function of materials management in an organization. Hence it is generally
found that stores function reports to the materials manager.
But in some situations stores function reports to the production function.

Function of store
•

Storage

•

Issue

•

Record

•

Housekeeping

•

Control

•

Surplus management

•

Verification

•

Interaction & coordination

•

Receipt

 Inventory in a company includes stock of raw materials, work-in-progress,
finished & semi-finished products, spare components and by-products, etc
 Inventory control is an important feature of cost accounting system

Methods of stock valuation
 First-in-first-out(FIFO)
 Last-in-first-out(LIFO)
 Weight average cost (WAVCO)
 Specific identification/unit cost method

Page 8 of 58
COMPANY
PROFILE

NhPC LTD. (INDIA)

Page 9 of 58
ThE COMPANY

Type

Public company(BSE: 533098,NSE: NHPC)

Industry

Electric utility

Founded

November 7,1975

Headquarters

Faridabad, India

Key people

G.Sai Prasad (Chairman & MD)

Products

Electricity generation; energy trading(transmission and distribution)

Net profit(Q1)

Rs. 719 cr (31.7.2013)

Net income

Rs. 5,306.64 crore (march 2013)

Total employees

11,036+(2013)

Website

www.nhpcindia.com

Page 10 of 58
INTRODuCTION
National Hydroelectric Power Corporation (NHPC) was established in 1975.
NHPC is a schedule “A” Enterprise of the Government of India. With an authorized
capital of Rs 15000 Crore and an investment base of about Rs 25400 Crores, NHPC is
ranked as a premier organization in the country for development of Hydropower.
Accredited with ISO-9001:2000 & ISO 14001:2004 certificates for its quality
system and environment concerns, NHPC is a multi-disciplinary organization and has
acquired sufficient expertise and state-of-the-art technology for investigation , planning,
designing, and executing both small and large size hydro power projects. It has the
strength of highly qualified and experienced professionals in design and engineering,
geo-technical engineering, construction planning and construction management for
building hydroelectric projects. The technical and engineering proficiency and
experience of NHPC places it in a leading position in the field of hydropower
development in India and neighboring countries.
The Saga of NHPC is replete with many challenges. To begin with NHPC took
over three most difficult and almost abandoned projects in geological Weak Himalayan
Ranges. These Projects were the 180 MW Baira Siul in Himachal Pradesh, 105 MW
Loktak Project in Manipur and the 345 MW Salal stage-I in Jammu & Kashmir. The
successful commissioning of these projects in most difficult areas and their operation is
a testimony to NHPC’s success.
With the commissioning of 180 MW Baira Siul project in 1981, NHPC started
earning profit since 1982, the first year turnover was Rs 24 Crores and its Net Profit was
Rs 8 Crores. Since then the net profit of the corporation increases year after year. Net
profit of the corporation was Rs 2090.5 Crores during the year 2009-10 as against
2166.67 Crores during 2010-11. NHPC is planning to take projects in neighboring
countries like Nepal and Bhutan. NHPC has been conferred “MINI RATNA” status by
the Govt. of India.

Page 11 of 58
hYDRO sCENERIO IN INDIA

India is blessed with immense amount of hydro-electric potential and ranks 5th in terms
of exploitable hydro-potential on global scenario. As per assessment made by CEA
(Central Electricity Authority) is endowed with economically exploitable hydro-power
potential to the tune of 148700 MW of installed capacity. The basin wise assessed
potential is as underBasin/Rivers

Probable Installed Capacity (MW)

Indus Basin

33,832

Ganga Basin

20,711

Central Indian River system

4,152

Western Flowing Rivers of southern India

9,430

Eastern Flowing Rivers of southern India

14,511

Brahmaputra Basin

66,065

Total

1,48,70

In addition, 56 number of pumped storage projects have also been identified with
probable installed capacity of 94000 MW. In addition to this, hydro-potential from small,
mini & micro schemes has been estimated as 6782 MW from 1512 sites. Thus, in
totality India is endowed with hydro-potential of about 250000 MW. However,
exploitation of hydro-potential has not been up to the desired level due to various
constraints confronting the sector.

Page 12 of 58
hOW IT WORKs
So just how do we get electricity from water?
Actually, hydroelectric and coal-fired power plants produce electricity in a similar way.
In both cases a power source is used to turn a propeller-like piece called a turbine,
which then turns a metal shaft in an electric generator, which is the motor that
produces electricity. A coal-fired power plant uses steam to turn the turbine blades;
whereas a hydroelectric plant uses falling water to turn the turbine. The results are the
same.
Take a look at the diagram of a hydroelectric power plant to see the details:

The theory is to build a dam on a large river that has a large drop in elevation.
The dam stores lots of water behind it in the reservoir at FRL ( full reservoir level)and a
live storage of 1.98 Mcum . Near the bottom of the dam wall there is the water intake
.Gravity causes it to fall through the penstock inside the dam. At the end of the
penstock there is a turbine propeller, which is turned by the moving water. The surge
shaft (restrict the surges within the height of shaft) from the turbine goes up into the
generator, which produces the power. Power lines are connected to the generator that
carry electricity to your home and mine. The water continues past the propeller through
the tail race tunnel (TRT) into the river past the dam. By the way, it is not a good idea
to be playing in the water right below a dam when water is released.

Page 13 of 58
The diagram of a hydroelectric generator given below shows how generator
works:

"A hydraulic turbine converts the energy of flowing water into mechanical energy. A
hydroelectric generator converts this mechanical energy into electricity. The operation of
a generator is based on the principles discovered by Faraday. He found that when a
magnet is moved past a conductor, it causes electricity to flow. In a large generator,
electromagnets are made by circulating direct current through loops of wire wound
around stacks of magnetic steel laminations. These are called field poles, and are
mounted on the perimeter of the rotor. The rotor is attached to the turbine shaft, and
rotates at a fixed speed. When the rotor turns, it causes the field poles (the
electromagnets) to move past the conductors mounted in the stator. This, in turn,
causes electricity to flow and a voltage to develop at the generator output terminals."

Page 14 of 58
OVERVIEW OF ORGANIZATION

INTRODuCTION ABOuT NhPC

Page 15 of 58
NHPC has become the largest organization for hydropower development in India, with
capabilities to undertake all the activities from conceptualization to commissioning in
relation to setting up of hydro projects. Its capability includes complete spectrum of
hydro Power from concept to commissioning. Besides providing consultation services in
field of hydro-power, NHPC is also planning to take up Wind and Tidal power projects in
the country.

Page 16 of 58
CORPORATE VISION
A world class diversified & transnational organization for sustainable development of
Hydro power and water resources with strong environment conscience.

CORPORATE MISSION
 To achieve international standards of excellence in all aspects of hydro power and
diversified business.
 To execute and operate projects in a cost effective, environment friendly and socioeconomically responsive manner
 To foster competent trained and multi-disciplinary human capital
 To continually develop state-of-the-art technologies thru innovative R&D and adopt
best practices
 To adopt the best practices of corporate governance and institutionalize value based
management for a strong corporate identity.
 To maximize creation of wealth through generation of internal funds and effective
management of resources.

Page 17 of 58
CORE VALUE







Business Ethics
Customer Focus
Organizational & professional Pride
Mutual Respect and Trust
Innovation and Speed
Total Quality for Excellence

CORPORATE OBJECTIVES
 Development of vast hydro potential at faster pace and optimum cost elimination, time
and cost over-run.
 Completion of all ongoing projects within stipulated time frame.
 Ensure maximum utilization of installed capacity and help in better system stability.
 Generation of sufficient internal resources for expansion and setting up new projects.
 Corporate development along with simultaneous human resource development.

Page 18 of 58
CAPITAL STRUCTURE: FINANCIAL
PROFILE
Authorized Capital

Rs. 1,50,000 Million(31.03.2013)

Value of Assets

Rs.35,718.06 cr. App. (31.03.2013)

Paid Up Capital

Rs. 12,300.74 crore (31.03.2013)

Projects Completed

14 Nos. (5295 MW)

Projects Under Construction

10 Nos. (4502 MW)

Projects Awaiting Clearances

12 Nos. (9651 MW)

Projects Under Survey and Investigation Stage

7 Nos. (2485 MW)

Joint Venture Projects

7 Nos. (5206 MW)

Projects on Turnkey Basis

5 Nos. (89.35 MW)

In 2012-march ‘13
Energy Generated

18683 MUs

Sales turnover

5,654.69 crore

Net Profit

2,771.77 crore

Performance Rating

"excellent"

In 2011-‘12
Energy Generated

18,500 MUs

Sales turnover

4,225.25 crore

Net Profit

2,166.67 crore

Performance Rating

"Very Good"

Page 19 of 58
LOCATION OF NHPC

Page 20 of 58
SALES
The Bulk Power Consumers of NHPC Limited in North India are the power utility
belonging to the states of Haryana, Punjab, Himachal Pradesh, Uttar Pradesh,
Uttarkhand, Rajasthan, Delhi and J&K and Union Territory of Chandigarh. These states
are being supplied power from Baira Siul, Salal-I & II, Tanakpur, Chamera-I, ChameraII, Uri, Dhauliganga & Dulhasti Power Stations. In the Eastern Region, Rangit and
Teesta-V, Power Stations are supplying energy to the states of West Bengal, Sikkim,
Bihar, Jharkhand, Gridoo and Damodar Valley Corporation. In the North-Eastern
Region, Loktak Power Station is supplying energy to the states of Assam, Manipur,
Meghalaya, Tripura, Nagaland, Arunachal Pradesh and Mizoram
Since commencing of commercial generation in 1982, the Energy sales and
revenues of the corporation have grown significantly. The Energy sales from all
operating projects of the Corporation during the last 25 years has risen from Rs. 228.60
Million in the year 1982-83 to Rs. 50491 Million in the year 2012-2013.

Page 21 of 58
STRENgTHS and opportunities in the
sector












Abundant coal reserves (enough to last 200 years)
Vast hydroelectric potential (150,000 MW).
Large pool of highly skilled technical personnel.
Impressive power development in absolute terms (comparable in size to those of
Germany and UK).
Expertise in integrated and coordinated planning.
Emergence of strong and globally comparable central utilities
Wide outreach of state utilities.
Enabling framework for private investors.
Well laid out mechanisms for dispute resolution.
Political consensus on reforms.
Potentially, one of the largest power markets in the world.

CURRENT SCENARIO
POWER FOR ALL BY 2013
The Government of India has an ambitious mission of POWER FOR ALL BY 2013. This
mission would require that our installed generation capacity should be at least 200,000
MW by 2013 from the present level of 144,564.97 MW. Power requirement will double
by 2020 to 400,000MW.
OBJECTIVES
 Sufficient power to achieve GDP growth rate of 8%
 Reliable power
 Quality power
Page 22 of 58
 Optimum power cost
 Commercial viability of power industry
 Rural electrification

SWOT ANALYSIS
Strengths: 1. Good corporate Image.
2. Complete range of product for transmission & distribution.
3. Established brand name with executive oriented program.
4. Strong & wide networks of manpower across India.
5. Considered to be having technology & design ability.
Weakness: 1. The procurement process in the companies is cumbersome and subject to auditing.
2. Low exposure to the needs & dynamics of distribution business.
3. Role clarity on the requirement of being an equipment supplier or a solution provider.
As there are very few supplier of equipment manufacturing plant.
Opportunities: 1. Huge Investment leading to greater demand of goods and services.
2. Demand leading to Industry operating at full & over capacity.
3. Better Price realization.
4. Early birds to learn faster and thus achieve repeat orders. Policy to bid from ultra mega power
plant.
5. Vertical integration for supply chain management of coal by acquiring coal blogs.
Threats: 1. Purchases preference may be extended to distribution sector.
2. Increase in no. of small contractors leading to price war.
3. Emergence of competitors in the market like Schneider, Reliance, Tata etc.
4. Change in government policies for open trade or stock trading or energy trading.
Page 23 of 58
5. Reduce the time lag.

INTRODUCTION
The State of Himachal Pradesh is blessed with abundant water resources in its
five major rivers i.e. Chenab, Ravi, Beas, Satluj and Yamuna, which emanate from the
western Himalayas and flow through the State. These snow fed rivers and their
tributaries carry copious discharge all the year round and flow with sleep bed-slopes,
which can be exploited for power generation. The expeditious harnessing of this vast
and economically viable hydro-electric potential, estimated to be more than 20,000 MW,
is the only answer to the prevailing chronic and ever-growing power shortage in the
Northern region.
Page 24 of 58
In India, since independence, concerted efforts have been made to increase the
availability of power to various segments of Indian society. The hydropower
development in India has not taken place in a systematic manner since year 1950 till
date with more advantage to thermal / nuclear Station during the last 50 years, which
resulted in improper hydro-thermal mix of power generation.
As on date NHPC Limited has become the largest organization for hydropower
development in India, with capabilities to undertake all the activities from
conceptualization to commissioning in relation to setting up of hydro projects. NHPC
Limited is also planning to take Wind and Tidal wave projects in the country.
NHPC Limited presently has an installation base of 5295 MW from 14
hydropower stations on ownership basis including projects taken up in Joint Venture.
Considering the impediments faced during execution of these projects such as
unfavorable geological conditions, difficult law and order problems, inaccessible and
remote locations, the achievement so far is commendable. The generation performance
of these stations has been outstanding.
NHPC Limited is presently engaged in the construction of 10 projects aggregating
to a total installed capacity of 4502 MW. Given the renewed thrust on development of
hydro power in the country, NHPC Limited has drawn up a massive plan to add over
10,000 MW of hydropower capacity by the end of XII plan (year 2017).

PARBATI STAgE- II H.E. PROJECT

Page 25 of 58
Parbati Hydroelectric Project is a cascade development to be developed in 3 stages
with an aggregate generating capacity of 2070 MW. Stage-I is storage type of scheme
and situated in the mainly snow bound area having installed capacity as 750 MW.
Parbati Project Stage-II is a run of the river scheme and shall have installed capacity of
800MW. Parbati Project Stage-III development is downstream of Stage-II and shall have
installed capacity of 520 MW. Parbati Stage-II comprising of 83.7m high Concrete
Gravity Dam and 31.525 km long HRT shall be utilizing a gross head of 862 m. To
enhance the generating capacity of the Project 5 small streams shall also be trapped.
The project is of special importance as the longest reach of 9 km shall be excavated
with the use of TBM and 2 Nos inclined Pressure Shafts each about 1.546 km long is
also excavated with TBM. The total quantum of underground works involving tunneling
shall be about 57 km.

HYDEL DEVELOPMENT OF PARBATI PROJECTS

Page 26 of 58
The Beas valley in Himachal Pradesh has a vast potential for water resources
development and only a small part has been tapped during the past five decades of
planned development. Parbati River, Hurla nallah and Sainj River are major tributaries
of Beas River in Kullu valley. Parbati River is the northernmost left bank tributary of river
Beas in Kullu District of Himachal Pradesh. The river Parbati is a glacial and snow fed
river and it originates from Mantalai Lake from snow peaks at an elevation of 6300 m
and traverses in northerly direction and flows down as a small stream in a narrow valley.
After traversing 7 km from its origin it joins the Beas River at Bhuntar. The river in
general can be termed as a very fast flowing and ferocious one. The river valley is
located in high mountain ranges, which rises to more than 1,000 m on both the banks
over most of its stretch. The stream Dibi ka nallah and Tosh nallah, which join the river
Parbati, are the major tributaries of Parbati River. The total catchment area of Parbati
River at Pulga Dam site is 1155 sq km. This catchment has a large number of small and
big glaciers. Over 84% of the catchment of Parbati Stage II project i.e. about 971 sq km
is permanently snow covered. Further 45% of the catchment area is above an altitude of
5000 m above Mean Sea Level. The entire river catchment is located in the Himalayan
mountain ranges. The catchment area is sparsely populated because of snowing
condition, steeply sloping mountain ranges, remote location and inaccessibility.
PARBATI STAGE-II
The Parbati Hydroelectric Project (Stage-II) is a run-of-the-river scheme proposed to
harness hydro potential of lower reaches of the River Parbati. The proposed scheme is
'inter basin transfer' type. It is proposed to divert the river near Village Pulga in Parbati
valley & water shall be carried through a tunnel across Garsa valley to Sainj valley
where the Power House shall be located at village Suind. Thus, a gross head of 862 m
between Pulga and Suind will be utilized for generating 800 MW power. Diverting the
discharge of various nallas falling along the HRT alignment has further augmented the
diverted discharge of the river Parbati. An 83.7m high, 110 m long, concrete gravity dam
is proposed near village Pulga across Parbati River to divert 145 cumec of water. The
reservoir will have a gross storage capacity as 6.83 Mcum. This diurnal storage will be
sufficient to run power station at full capacity for 4 hours in a day even during lean flow
period. The spillway section consisting of three bays is designed to pass a maximum
probable flood of 1850 cumec.

Page 27 of 58
PARBATI PROJECT-II (A PROFILE)

LOCATION
NAME
DISTRICT
STATE
NEAREST RAIL HEAD

PARBATI HYDROELECTRIC PROJECT (STAGE -II)
KULLU
HIMACHAL PRADESH
KIRATPUR (190 KM FROM SAINJ, POWER HOUSE
SITE)
NEAREST AIRPORT
BHUNTER (35 KM FROM SAINJ, POWER HOUSE
SITE)
RIVER
PARBATI (A TRIBUTARY OF RIVER BEAS)
LOCATION
OF
DAM
& DIVERSION DAM ON RIVER PARBATI AT PULGA
POWERHOUSE
VILLAGE AND POWREHOUSE ON RIVER SAINJ
RIGHT BANK OF SUIND VILLAGE.
INSTALLED CAPACITY
4 X 200 (800 MW)
ANNUAL GENERATION
3108.66 MILLION UNITS
DATE OF CCEA APPROVAL
SEPTEMBER 2002
SCHEDULED
DATE
OF SEPTEMBER 2014
COMMISSIONING

Page 28 of 58
Hydrology
Four Catchments of the project are:
1.Parbati River
Catchment
Dam

Area

at

Diversion

1155Sq.km.

Snow Catchment

971Sq.km.

Maximum observed discharge

369.10Cumecs
2. Jigrai Nallah

Catchment Area at Diversion site

42Sq.km.

Snow Catchment

21Sq.km.
3. Hurla Nallah

Catchment Area at Diversion site

34Sq.km.

Snow Catchment

9.5Sq.km.
4. Jiwa Nallah

Catchment Area at Diversion site

180Sq.km.

Snow Catchment

54Sq.km.

Page 29 of 58
POWER HOUSE
The proposed surface power house is located on the right bank of River Sainj near
Village Sainj at about 200 m downstream of the confluence of River Sainj and Jiwa
Nallah. The power house shall have an installed capacity of 800 MW with four
generating units of 200 MW each. Short Tail Race Channels shall discharge the water
from Power House to river Sainj.

COST
The estimated cost for construction of Project is worked out to be Rs. 5607.66 crores at
August 2000 price level.

BENEFITS
The Project is planned to be operated as a peaking power station. A: 800 MW installed
capacity the Project will generate 3108.66 million units of Power in 90% dependable
year. The construction of the Project will bring social & economic development in the
region. Other facilities like infrastructure. Education Medical and employment will get
boost with the execution of the Project.

Page 30 of 58
Section I.1 Benefit to Himachal Pradesh
On completion, the project will provide 12% free power to the tune of
369.32 Million Units which will generate revenue of Rs. 140 crores per y
ear to Himachal Pradesh (at NHPC sale price). Construction of the project
will bring social & economic development in the region. Facilities like
infrastructure, education, medical and employment will get boost.

Revenue to HP Government due to construction of project
up to October 2004
Sales Tax
Royalty
Total

Rs. 589.75 Lakhs.
Rs.

49.17 Lakhs.

Rs. 638.92 Lakhs.

Education Facilities
A Kendriya Vidyalaya up to class XI is functional at Sainj, which is open to
local wards at nominal fees. Out of 202 students about 170 are local
children. Needy ones are being provided school uniform and requisite
stationary by NHPC Ladies Welfare Association.

Medical Facilities
A project Hospital at Sainj is functional for the welfare of employees and
their families, which also caters to the medical needs for the local
population. Hospital/dispensaries are also functional at Bhuntar, Garsa and
Nagwain to provide immediate medical assistance. NHPC Ladies Welfare
Association with the help of Project resources keeps on organizing free
medical camps at remote locations for the benefits of needy and local
inhabitants.

Page 31 of 58
Indirect Employment
Construction of the project has created scope for indirect employment by
way of business establishments. More than 150 new business
establishments have come up in Manikaran Valley, more than 150 in Garsa
Valley, more than 150 in Sainj Valley after the start of the project. Apart
from this a shopping complex has been constructed in Sainj Township.

Vehicles Taken on Hire Basis
Light Vehicles/Tractors belonging to locals are bin hired by NHPC as well as by
our major contactors.

Hired By

Inspection Vehicle

Tractor/Truck

NHPC

35 Nos.

11 Nos. (HRTC Buses)

HJV

4 Nos.

18 Nos.

Gammon

7 Nos.

7 Nos.

BJ Techno

5 Nos.

1 Nos.

Total

Page 32 of 58

51 Nos.

37 Nos.
Contract Given to Local Contractors
Details of work contract/work order given to various contractors of H.P. by Parbati
HE Project

Area

Total No. of works awarded

Total Amount

DAM Complex

219

Rs.9,05,67,980

HRT Complex

142

Rs.3,51,43,429

Township Complex

160

Rs.9,85,33,931

Power House Complex

180

Rs.9,64,18,802

JNW Complex

4

Rs.1,53,48,264

Total

705

Rs.33,60,12,406

Wild life protection
NHPC and GHNP (Great Himalayan National Park) have pooled their efforts
aimed at conservation of wildlife and environment in and around the GHNP comprising
754 sq. km. While executing the construction work of prestigious Parbati Hydroelectric
Project Stage-II emphasis has been made to conserve and preserve the rare wild life,
flora and fauna. Parbati Project Stage-II is committed to spend Rs. 35.40 crore for
habitat improvement and conservation of endangered species like Jujurana (Western
Tragopan).
Western Tragopan male is one of the world's most spectacular birds: black on
the head, a deep crimson on face and mantle and orange on breast, the black belly and
dark wings are spangled with star-like white specks. The female is dull brown. They
occur in dense forest with undergrowth of bamboo or shrubs from 2000-3500 m, solitary
in spring, but in family groups in fall: often seen in trees where they may eat leaf buds.
Males can be heard calling in spring and in October. Within the Park, the maximum
numbers of sightings have been in the forests of Basu, Shilt, Nada, and Chordwar in
Tirthan Valley.
In the villages close to GHNP, the local name of Western Tragopan is Jujurana
(Juju means bird and rana means king) i.e. the king of the birds. There is a local legend
that this pheasant was created by the "Lord" and all the birds in the universe donated a
feather each to give it color and unparalleled beauty.
Page 33 of 58
proJect report
on
Store AccoUntinG

Page 34 of 58
National Hydroelectric Power Corporation Limited (NHPC)

has several
units, which are engaged in operation of generating electricity or are under construction
stage. Various types of stores inventory need to be maintained to ensure smooth
running of these power stations and construction of the units. The purchase and stores
accounting procedures shall be subject to NHPC’s policy for procurement of stores,
delegation of powers and administrative instructions issued in this regard from time to
time. The stores inventory includes inventory for construction (like steel, cement, etc.)
as well as for operation purposes.

oBJectiVeS of StUdY
General objective:
•

To relate our theoretical knowledge about stores management with the actual
procedures being adopted in industries regarding their stores management.

Specific objective:
•

To study & analyze the stores management procedures of an under construction
project of NHPC i.e. of Parbati Project-II.

Page 35 of 58
reSeArcH MetHodoloGY
The subject of my research is to study the stores procedure being used by Parbati
project-II of NHPC. The data being collected is of following types: Primary Data
 Secondary Data
Primary data has been collected by personally interviewing the employees of stores
Department of Parbati Project-II. These interviews were of unstructured form. Few
questions asked are as:
Secondary data of both published & unpublished form has been collected from following
sources:•
•
•
•

NHPC’s manual on stores procedures.
News magazine of NHPC.
NHPC’s website “www.nhpcindia.com .”
Intranet Facility in PHEP-II.

Methods of stock valuation (Parbati stage 2)
1. First in first out (FIFO)
 This method assumes that the first stock to be received is the first to be sold
 The cost of materials used is based on the oldest prices
 The closing stock is valued at the most recent prices

2. Weighted average cost
 This method assumes that the cost of materials used and closing stock are
valued at the weighted average cost

Page 36 of 58
inVentorY MAnAGeMent SYSteM
NHPC may adopt various inventory management techniques for efficient and effective
inventory management as per their requirements. The generally used inventory
management techniques include the following:
• ABC Analysis
• VED Analysis
• FSN Analysis
• Stock levels
• Economic Order Quantity
A BRIEF WRITE UP ON INVENTORY MANAGEMENT SYSTEM
ABC ANALYSIS
 Efficient store keeping requires sufficient control over all items of stores. ABC
analysis is a basic analytical management tool, which enables top management
to place more effort where the result will be the greatest. The first step in the
inventory control process is classification of different types of inventories to
determine the type and degree of control required for each.
 The ABC system is widely used classification technique to identify various items
of inventory for purposes of inventory control. This technique is based on the
assumption that the organisation should not exercise same degree of control on
all items of inventory. The organization shall keep more rigorous control on items
that are most costly and/ or slow turning / expensive while items that are less
expensive should be given less control effort.
 ABC analysis is carried out by grouping items on the basis of their annual cost
volume consumption:
• ‘A’ group items are those, which have highest value of volume usage, generally
constituting around 70% of the value but around 15% of the number of items
• ’B’ with intermediate values and generally constituting around 20% of the value but
around 30% of the number of items
• ‘C’ group with the least value generally constituting around 10% of the value but
around 55% of the number of items

Page 37 of 58
 This grouping helps to identify items that enhance inventory performances when
properly controlled.
 Appropriate inventory management techniques are then used to manage items
according to their priority levels. Thus close attention is paid towards managing
‘A’ group inventories as they contribute significantly to high performance levels,
followed by ’B’ and ‘C’ group inventories. The ultimate goal of ABC analysis is to
closely supervise the items according to their share in the inventory investment.
This helps to reduce time and minimise efforts towards managing those items
which though are not properly taken care of, do not show noticeable effect on
inventory performance.
 Thus we can achieve effective inventory control by closely monitoring `A' class
items - watch waste, obsolescence and surplus. Review monthly. Whereas `B'
class items can be brought under routine follow up and `C' class should be kept
in good surplus to avoid frequent attention and production loss due to stock outs.
 While exercising control over stores, items of category A should be given the
maximum attention. Their levels of stock should be strictly controlled. In case of
items of category B, ordinary stores routine should be observed but rules
regarding levels of stock may not be so strictly adhered to as for the items in
category A. Items of category C do not require continues monitoring.
VED ANALYSIS
Under VED technique, items are classified into Vital, Essential and Desirable on the
basis of criticality of the item as perceived by the user department. Here the importance
to an item of material is given based on its criticality to the business rather than the
investment/ volume of consumption.
STOCK LEVELS
The benefits of fixation of stock levels include the following:
• It helps in avoiding unnecessary blocking up of funds in inventories
• Reduces likely losses on account of deterioration and obsolescence of materials, etc.
• Reduction in storage cost
• Better management of inventory

Page 38 of 58
REORDER LEVEL (ROL)
ROL is the level of inventory at which an order for procurement should be placed for
replenishing the current stock. The ROL should be decided taking into account the
following:
• Consumption in per unit of period (say consumption per week).
• Lead time (say in number of weeks) i.e. anticipated time lag between the order issuing/
indenting date and date of receipt of material.
• In order to take care of likely variations/ contingencies in the usage and lead time, the
maximum likely consumption and delivery period are considered.
For this purpose the past consumption and lead time pattern should be analyzed
ROL = Lead time (in no. of weeks) * Consumption (per week)
Minimum/Maximum level
Maximum level
The maximum level specifies the maximum inventory that should be in hand at point of
time. This is worked based on the following formula:
Maximum level =
ROL + Reorder quantity (-) (Minimum consumption per period * Minimum reorder
period)
Minimum level
Minimum level of inventory shall be maintained in hand at all times so that operations
are not stopped/ effected on account of non- availability of inventory.

The following parameters should be taken into consideration for fixing minimum level:
• Consumption value (ABC classification)
• Criticality (VED classification and also availability of substitutes)
• Reliability of suppliers. This is measured based on:
- Quality (Number of rejections)
- Variability in lead time of delivery
- Responsiveness (ability to dispatch material quickly in case of emergency orders)
Minimum level =
ROL (-) Average rate of consumption * Average time required to obtain delivery of fresh
supplies

Page 39 of 58
ECONOMIC ORDER QUANTITY
EOQ is essentially a technique/ formula that determine the point at which combination
of order costs and inventory carrying costs are the least. The result is most cost
effective quantity to order.
Annual Usage
Expressed in units, this is the forecasted annual/periodical usage.
Order Cost
This is the sum of the fixed costs that are incurred each time an item is ordered.
These costs are not associated with the quantity ordered but primarily with physical
activities required to process the order. These would include the costs relating to:
 processing of the purchase order and/or requisition,
 any approval steps,
 processing of the receipt,
 incoming inspection,
 Invoice processing and vendor payment.
It should be noted that these are costs associated with the frequency of the orders and
not the quantities ordered
Carrying cost
18 Carrying cost is the cost associated with having inventory on hand. It is primarily
made up of the costs associated with the inventory investment and storage costs. For
the purpose of the EOQ calculation, if any cost does not change based the quantity of
inventory on hand, it should not be included in carrying cost. In the EOQ formula,
carrying cost per unit is used. The primary components of carrying costs are as under:
• Interest
• Insurance
• Storage Costs

Page 40 of 58
Maintaining EOQ
The values for Order cost and Carrying cost should be evaluated at least once in a year
taking into account any changes in interest rates, storage costs and operational costs.
Basic formulas for EOQ
Notation
Q= quantity ordered (units)
D= annual demand (units per year)
C= carrying cost for one unit in inventory for one year (Rs. per unit per year)
S= order cost (for buying) in (Rs. per order)
TSC= total stocking costs (Rs. per year)
EOQ= economic order quantity (the quantity that minimizes TSC
Cost formulas
Annual carrying cost =Average Inventory*C = (Q/2)*C
Annual Ordering Cost=orders per year*S= (D/Q)*S
TSC= carrying cost plus order cost == (Q/2)*C + (D/Q)*S
_____
______________
EOQ = √ 2DS/C and for the EOQ the minimum TSC=√ 2DSC = C*EOQ
Example for the Basic Model
D=annual demand (units per year) = 10,000
C=carrying cost for one unit in inventory for one year (Rs. per unit per year)=Rs. 4
S= order cost=Rs. 50
______
_____________
Then, EOQ = √ 2DS/C = √ 2*10,000*50/4 = 500 units per order
_____
_____________
And TSC= =√ 2DSC =√ 2*10,000*50*4 =Rs. 2,000 per year

FSN ANALYSIS
FSN analysis is a tool used for bringing out the list of slow moving/ non-moving material.
This report is based on the ratio of movement, which is arrived at based on the total
issues during the period of a particular item to its stock in hand. FSN analyses facilitate
categorization of items into Fast, Slow-moving and Non-moving.

Page 41 of 58
DURABILITY OF STOCK
Stock depends upon various factors some stock is for one year and another for more
than one year for example Cement cannot be stored for more than one year and steel
and bricks can be stored for more than one year .The information about the stock was
not provided so we can tell this much only about the stock.

AccoUntinG GUidelineS
The accounting guidelines that NHPC follows for stores accounting are
provided below:

Receipts from suppliers
 All receipts shall be valued in the month in which the material is received and
accepted as per the GRN (goods receipt note) based on the bills received and
passed.
 In case the bills have not been received/ processed, the receipts shall be
provisionally valued at the Purchase Order rates. Adjustments, if any, to the
provisional value shall be done at the time of actual bill passing in the month in
which the bill is passed. The material value, on account for such adjustments,
shall be affected for the future issues.
 The purchases shall be valued at the landed cost i.e. basic price, excise duty,
sale tax, freight and other incidental expenses.
 In case of imports, the cost of material shall include the following:

Custom duty, in case a GRN contains several items with different custom
duty rates, the custom duty amount for each individual item shall be absorbed
at the applicable rates.
Page 42 of 58
Port charges, landing charges and clearing agent's commission.
Local transport charges.
Other incidental expenses and local taxes, if any.





 In case there is any amount payable by NHPC for freight and other incidental
expenses, it shall initially be debited to ‘Freight and incidental expenses on
inventory (foreign/ indigenous)’ on insurance of such expenses. This account
shall be adjusted in the manner given below:-

 The balance in the ‘Freight and incidental expenses on inventory
(foreign/indigenous)’ account is to be reviewed periodically and the
nominal balance that may remain unadjusted at the year-end shall be
charged off to the P&L account. Necessary provision shall be created at
the year-end for any pending bills.

 The following types of expenses shall be charged to the natural heads of
expenditure and shall not be included / loaded to the material purchase cost:
 Costs of running of departmental trucks (i.e. of NHPC) used for bringing
the bought out material to stores from the suppliers site /intermediary
transit location, keeping in view the materiality concept and simplicity in
accounting.
 Stores holding expenses / storage costs.

Receipts from other units
 All receipts from other units shall be valued in the month in which the material is
received.
 The stores transferred from other units shall be valued at the rate intimated in
the Inter Unit Advice (IUA) by the transferor unit.
 The Store Transfer Note (In) (STN (IN)) contains the provisional/ final value of
the material transferred and the materials shall be valued on the basis of the STN
(IN) in the month material is received. The difference, if any, in the above
provisional value and the inter unit advice shall be adjusted in the store value in
the month in which inter unit advice from the sending unit is accounted for.
 The cost of transport from the transferor store to the transferee store shall be
charged off to revenue expenditure.

Page 43 of 58
Returns out of material issued
 The material returned to stores shall be valued at the original issue rate.
 In case of return of material to stores after its use and such material being reusable (such as CGI Sheets, Steel, Timber etc.), the same shall be valued at a
price assessed by the concerned Engineer in consultation with the Purchase
Department and kept at a separate location from the good stores. However the
return price shall not exceed the current issue price of fresh material items as per
the PSL. The credit for such returns shall be given to the concerned account
head which was debited at the time of issue of material.

Physical Verification and Reconciliations
 The balances as per the various party wise ledgers shall be reconciled with the
control account in the General ledger on a monthly basis.

 The quantity balances as per the stock record of the Stores Department and
Price Ledger shall be reconciled periodically to ensure their accuracy.

 The physical verification of materials in stores shall be carried out at least once in
a year. The physical verification of material at site shall be carried out half-yearly
intervals. The obsolete and unserviceable items should also be identified during
the physical verification.

Material at Site Account
 As per NHPC systems for works, a numerical or quantity account called the
“Material at Site Account” of receipts, issues and balances have to be maintained
for all stores received in the consuming division, even through their value has
been debited to final Heads of Accounts; with a view to controlling the balances
efficiently until the stores are disposed off finally either by consumption or works
or otherwise. This Account is to be kept by the concerned Consuming Division.
Page 44 of 58
 The treatment of the unconsumed material at site shall be as follows: In respect of material issued for Operation and Maintenance purposes, the
expense Head shall be credited for the unconsumed material in hand at the
end of the year. The value of the unconsumed material at site shall be valued
at the prevailing PSL rate at the end of the year.
In respect of material issued for capital purposes, no accounting entry is required to be
passed at the end of the year.

PROCUREMENT PROCESS
Procurement order/ Contract is a backbone of any commercial activity. The Finance
plays an important role in the procurement/ contracts. The role of Finance in NHPC is a
staff function. It has the concurrence power and as such the Finance has to critically
examine every proposal coming up for concurrence. The Finance Executive examining
the proposals for various types of contracts for procurement should be fully conversant
with the latest developments in the statutes, market conditions (both National and
International), policies/ programs/ planning/ objectives and delegation of power of the
Corporation.

TYPES/ CONDITIONS OF CONTRACT
Now days, various types of contracts are entered into by NHPC through National
Competitive Building (NCB) as well as through International Competitive Bidding (ICB).
In order to have uniformity in the Contracts being entered in to by different Projects of
the Corporation, “Standard General Conditions of Contract (GCC)” for Civil Contract,
Supply Contract, as well as Supply cum Erection Contract have already been approved
by the Competent Authority and circulated. Any change in the standard clauses of the
General conditions, which become necessary due to the site conditions, past
experience, or due to other reasons are incorporated in the “Special Conditions of the
Page 45 of 58
Relevant Contract (SCC)” and got approved from the Competent Authority. These
General Conditions of Contract can however be used only in case of National
Competitive Bidding (NCB).

PRE-TENDERING PROCESS
 The procurement process is initiated based on the periodic procurement plan and
/ or purchase requisition in case of non- availability of any item in stores.
 All proposals for procurement are prepared in the form of estimates, by the
indenting department before any expenditure or liability is incurred thereon. The
basic prerequisites to be fulfilled before starting the process for finalizing a
purchase order are:
• Administrative approval
• Expenditure sanction
• Technical sanction
• Appropriation or re-appropriation of funds

TENDERING PROCESS
Pre-qualification of Bidders
 Tendering process starts only after the Competent Authority has approved the
PR. Normally the tenders are invited through Open Tender, Limited Tenders or
Single Tender. However, sometimes considering the estimated value/ nature/
technical requirement of the procurement, pre-qualification of the bidders are
resorted to whereby the capability of the probable bidder (both technical and
financial) is ascertained before one is allowed to bid for a particular procurement
tender. Pre-qualification of bidders is normally done to ensure selection of
resourceful, technically competent, and financially sound prospective bidders
with proven past performance for participation in the bidding process.
Page 46 of 58
 The criteria of financial capability of the applicant are fixed taking into account the
completion period of the proposed work, requirement of the monthly cash flow for
the work, etc. Keeping these facts in view the minimum qualifying criteria for the
following are generally considered:
• Average annual turnover of the applicant
• Net worth of the company
• Profitability of the applicant
• Working capital of the company: The cash credit facility enjoyed by the applicant
from any bank or Financial Institution can be considered.
 Once the bidders are selected on the basis of the PQ, tenders are invited only
from those pre-qualified bidders.

Vetting of tender documents
 Before the Competent Authority approves the tender documents, it is sent to
Finance Department for vetting/ checking. The tender documents should also be
sent to Law Division wherever a legal opinion is involved or if there are changes
from the typical format of the tender documents issued by NHPC.
 Generally, different types of contracts are executed depending on the nature of
the work to be executed. Examination of tender documents in Finance will
depend on the type of contract proposed therein.
 While examining the tender documents, the finance should keep the following in
mind:
• Guidelines, policies, circulars issued from time to time by NHPC or
GOI
• Relevant tax laws, EXIM policy of the GOI, taxation laws of the state in
which the work is to be executed, price preference/ purchase
preference policy of GOI, FEMA, etc.
 Any change in the approved terms and conditions should be examined critically
to see whether the proposed change is in the overall interest of NHPC.
Page 47 of 58
ISSUE OF TENDER DOCUMENT
 Once the Competent Authority approves the tender documents, the tender is
notified through Notice Inviting Tender (NIT) giving wide publicity either through
press advertisements or through other means depending on the estimated cost,
type of tender like open tender/ limited tender/ single tender, etc. as per the
policy of the corporation.
 The procurement department receives the request/application for the tender
documents from vendor (in response to the NIT). The tender fee is received in
form of cheque/ demand draft (DD) only, as per guidelines issues by NHPC from
time to time.
The procurement department forwards a summary of tender documents along
with the cheque/ DD to the finance department for necessary accounting and action

Tender opening
 Tender opening will be done by a Tender Opening Committee (TOC) constituted
by a Competent Authority in which one member is from Finance. The authorized
representatives of the bidders are also invited to be present at the Tender
Opening, if they wish so.
 Generally the bidders are asked to furnish EMD in a separate envelope which
shall be opened first. Techno-commercial/ price bids of only those bidders who
have submitted the requisite amount of EMD shall be opened and considered for
further evaluation.
 A spot report of the tender opening, indicating there in the following, shall be
prepared and signed by all the members of TOC:
• Number of tenders received.
• Name of the bidders.
Page 48 of 58
• Number of tenders received late and not considered.
• Amount of EMD/ bid security
• Rates of taxes and duties quoted by the bidder.
• Amount/ rate of discount, if any, offered by the bidder.

EVALUATION OF TENDERS
The evaluation of the Tenders is done by the duly approved Tender Evaluation
Committee (TEC). This evaluation is normally done in two stages. The first stage is
techno-commercial evaluation vide which the responsiveness to the technical
specifications laid down in the tender and the commercial terms and conditions are
seen.
The TEC at this stage obtains clarification and confirmations from the bidders if any
required. After the deliberations on the tender along with the clarifications by the bidders
the TEC recommends the bidders whose Price Bids are to be opened. The
recommendations of the TEC and the date of the opening of Price Bid is got approved
by the Competent Authority and the same is intimated to the bidders to enable their
representative to be present at the Price Bid Opening if they wish so.

Checking/ vetting of comparative statements
While checking the comparative statements in finance the following aspects have to be
verified:
1. The rates taken in the comparative statement are mentioned in the original price
schedule.
2. Wherever there is a variation between rates quoted in words as well as in figures,
the rates mentioned in words are taken for comparison.
3. If there is a variation between the rate of any individual item and the total amount
(i.e. quantity multiplied by rates) the unit rate is taken for comparison purpose
and accordingly the total will be corrected.
4. All arithmetical calculations are checked for accuracy.
After checking the comparative statement in Finance, the Finance Executive, should
record a certificate under his signature.
Page 49 of 58
The TEC then scrutinizes the comparative statement and after obtaining the approval of
the Competent Authority negotiates with the first lowest bidder if required. The
recommendations of the TEC are then put up to the Competent Authority (Board in the
case of Major Contracts) for approval and subsequently process for issue for letter of
award.

Vetting of letter of award
Vetting of letter of award to be issued to the successful tenderer (First lowest tenderer)
after approval of Competent Authority, is to be done in the Finance. The Finance will
check that:
• The particulars regarding quantity, quality and rates are clearly brought out.
• The particulars of the contracts providing payment terms, taxes and duties, price
variation clauses, performance guarantee, liquidated damages, delivery/
construction schedule, place of delivery, dispatch instruction, name of consignee,
penalty for delay, etc.
• No undue liability is imposed on NHPC due to omission of a necessary clause or
insertion of an unauthorized clause or by faulty wording of any conditions
• All the changes agreed to at the time of pre award discussion between the
supplier and the TEC and approved by the Competent Authority have been
incorporated suitably in the final agreement
Finance executive has to ensure that at every stage of tendering, approval of the
Competent Authority has been obtained.

PROCESSING OF PSL (PRICE STORE LEDGER)
This process deals with the procedure for valuation of material and Processing of Price
Store Ledger (PSL) by NHPC.
The following documents are used to record transactions in the PSL:
• Goods received note (GRN) for receipt of material from suppliers
• Material Return Note (MRN) for return of material with the unit
• Store Transfer Note- IN (STN-IN) for receipt of material from other units
• Material Issue Note (MIN) for issue of material to the indenting department within
the unit
Page 50 of 58
•
•

Store Transfer Note-OUT (STN-OUT) for issue of material to other units
Store Adjustment Note (SAN) for making any adjustment in the stores.

PROCEDURE OF STORES ACCOUNTING

WORK

SUPPLY
End-user

SERVICE

MR (material requisition)
Yes-MIN (material Issue
Note

Store division
No-NAC (non availability

End-user department

PR (purchase requisition)

P&C division (procurement and contract division)

Tendering (lowest bid)

P&C division – issues SO (supply order)

Page 51 of 58
Supplier – supply to store

Store division GRS (goods receipt sheet)

Inventory A/c
…..Dr.
To Store payment control A/c
End user MR (material requisition)
Store Division- yes (MIN)
Fixed asset ………… Dr.
To inventory

Invoicing

store division

Store Payment…… Dr.
To sundry creditors A/c
Payment

finance

Sundry creditor …..Dr.
To bank A/c

Page 52 of 58

finance division
INVENTORIES
(` in Crore)

Particular

As at 31st
march,’12

As at 31st
march,’11

(Valuation as per Accounting Policy No. 7)
64.38

57.46

i) Stores and spares
0.42

64.80 1.12

58.58

Stores in transit/ pending inspection
ii) Loose tools

1.45

1.38

iii) Scrap inventory

1.75

2.36

iv) Material issued to contractors/ fabricators

0.66

0.29

24.85

28.90

43.81

33.71

28.90

23.07

1.63

16.95

-

0.01

Amount used during the year

1.46

10.18

Amount reversed during the year

4.22

0.95

v) Less: Provision for obsolete store & spares *1

Provisions for obsolete store & spares *1
Opening Balance
Addition during the year

Adjustment during the year

Page 53 of 58
Closing balance
24.85

28.90

INTERPRETATION & ANALYSIS
 Valuation as per accounting•
•
•

As we have seen in table the inventories of PHEP 2 is increasing year by
year which tends to growth.
The decrease in Scrap inventory shows that in 2012 there is efficient
utilization of inventory as compared to 2011.
The figure of provision for obsolete store shows 4.05 crore difference ,
which reveals profitable ratio.

 Materials are procured by tendering process. In certain emergency situations of
shortage of materials, a committee is formed to perform market survey &
purchase the required materials through local purchase.
 Materials to be bought are either inspected at the supplier’s place or after
receiving at the stores of corporation.
 Issue of materials from stores is based upon the indent requisition & availability
of materials in stores.
 Rate of materials issued by the stores is determined by “Weighted average
method” in N.H.P.C.
 NHPC has bought a customized MMS (Materials Management System) package
from TCS for Rs. 14 lakhs to maintain the stores records & to connect this
system with other sites & Projects also.

Page 54 of 58
 But due to non-availability of basic infrastructure this system is not functioning
fully yet.
 In NHPC no specific method of inventory management is being employed.
 Orders of requisition are based upon the approximate consumption of materials
& the past experience of the department.

FINDINGS
 Hydro‐power projects typically require a long gestation period thus posing a risk
of delay in execution.
 Over all position of company is good but there is need to more improvement.
 Parbati Project Stage-II is committed to spend Rs. 35.40 crore for habitat
improvement and conservation of endangered species like Jujurana (Western
Tragopan) in GHNP(Great Himalayans National Park )
 Theoretical as well as practical knowledge is being adopted in PHEP-2 regarding
their stores management.

LIMITATIONS
 Inadequate power generation capacity;
 Lack of optimum utilization of the existing generation capacity;
 Inadequate inter-regional transmission links;

Page 55 of 58
 Inadequate and ageing sub-transmission & distribution network leading to power
cuts and local failures/faults;
 Large scale theft and skewed tariff structure;
 Slow pace of rural electrification;
 Inefficient use of electricity by the end consumer.
 Lack of grid discipline

CONCLUSION
NHPC Limited has several units, which are engaged in operation of generating
electricity or are under construction stage. Various types of stores inventory need to be
maintained to ensure smooth running of these power stations and construction of the
units under construction. The purchase and stores accounting procedures shall be
subject to NHPC’s policy for procurement of stores, delegation of powers and
administrative instructions issued in this regard from time to time. The stores inventory
includes inventory for construction (like steel, cement, etc.) as well as for operation
purposes. NHPC uses all the procedure and guidelines for the stores management
discussed in the report.

RECOMMENDATIONS

Page 56 of 58
Procurement of materials is based upon the requisitions being asked to each
department which in turn are based upon the past experiences and approximate
consumption of materials by the corporation.
This implies that there is no inventory method being employed by NHPC. No
re-order level is being determined so it sometimes may lead to shortages of materials at
worksites which lead to wastage of many valuable working hours and financial
resources.

BIBLIOGRAPHY/REFERENCES

BOOKS
•

Manual of N.H.P.C.

•

Hand book of N.H.P.C.

•

Magazines of N.H.P.C.

•

N.H.P.C. news

Page 57 of 58
WEBSITES
•

www.nhpcindia.com

•

Website of Parbati-II

•

Google .com

•

Moneycontrol.com

Page 58 of 58

Weitere ähnliche Inhalte

Was ist angesagt?

Summer internship report submitted to State Bank of India on the topic - “Yo...
Summer internship report submitted to State Bank of India on the topic -  “Yo...Summer internship report submitted to State Bank of India on the topic -  “Yo...
Summer internship report submitted to State Bank of India on the topic - “Yo...Deepanjan Das
 
Summer internship report
Summer internship reportSummer internship report
Summer internship reportAnchal Juneja
 
A PROJECT REPORT ON ANALYSIS OF FINANCIAL STATEMENTS OF NATIONAL THERMAL PO...
A PROJECT REPORT ON ANALYSIS OF FINANCIAL STATEMENTS  OF  NATIONAL THERMAL PO...A PROJECT REPORT ON ANALYSIS OF FINANCIAL STATEMENTS  OF  NATIONAL THERMAL PO...
A PROJECT REPORT ON ANALYSIS OF FINANCIAL STATEMENTS OF NATIONAL THERMAL PO...Rohit Kumar
 
The Bank of Punjab Latest Internship Report With Three Years Financial Data (...
The Bank of Punjab Latest Internship Report With Three Years Financial Data (...The Bank of Punjab Latest Internship Report With Three Years Financial Data (...
The Bank of Punjab Latest Internship Report With Three Years Financial Data (...Aamir Gill
 
Financial analysis of banks
Financial analysis of banksFinancial analysis of banks
Financial analysis of banksSahim Khan
 
Summer internship project on home loans
Summer internship project on home loansSummer internship project on home loans
Summer internship project on home loansSomendra Singh
 
Project report on working capital management
Project report on working capital managementProject report on working capital management
Project report on working capital managementProjects Kart
 
A Study of ratios as a Tool of Financial Statement Analysis GK Plastics Bhala...
A Study of ratios as a Tool of Financial Statement Analysis GK Plastics Bhala...A Study of ratios as a Tool of Financial Statement Analysis GK Plastics Bhala...
A Study of ratios as a Tool of Financial Statement Analysis GK Plastics Bhala...Avinash Labade
 
Dams and Hydropower Projects of Pakistan
Dams and Hydropower Projects of PakistanDams and Hydropower Projects of Pakistan
Dams and Hydropower Projects of PakistanRizwan Sarwar Awan
 
State bank of india Summer internship Report
State bank of india Summer internship ReportState bank of india Summer internship Report
State bank of india Summer internship ReportAbhishek Shrivastava
 
Presentation on summer internship project of bank
Presentation on summer internship project of bank Presentation on summer internship project of bank
Presentation on summer internship project of bank priyanka sarraf
 
State bank of pakistan
State bank of pakistanState bank of pakistan
State bank of pakistanAmber Memon
 
Financial Analysis of Axis Bank Services (MBA Finance)
Financial Analysis of Axis Bank Services (MBA Finance)Financial Analysis of Axis Bank Services (MBA Finance)
Financial Analysis of Axis Bank Services (MBA Finance)Avinash Labade
 
HDFC Bank : Fundamental Analysis (Text)
HDFC Bank : Fundamental Analysis (Text)HDFC Bank : Fundamental Analysis (Text)
HDFC Bank : Fundamental Analysis (Text)AJ Raina
 

Was ist angesagt? (20)

Summer internship report submitted to State Bank of India on the topic - “Yo...
Summer internship report submitted to State Bank of India on the topic -  “Yo...Summer internship report submitted to State Bank of India on the topic -  “Yo...
Summer internship report submitted to State Bank of India on the topic - “Yo...
 
BANK OF BARODA ppt
BANK OF BARODA pptBANK OF BARODA ppt
BANK OF BARODA ppt
 
Summer internship report
Summer internship reportSummer internship report
Summer internship report
 
A PROJECT REPORT ON ANALYSIS OF FINANCIAL STATEMENTS OF NATIONAL THERMAL PO...
A PROJECT REPORT ON ANALYSIS OF FINANCIAL STATEMENTS  OF  NATIONAL THERMAL PO...A PROJECT REPORT ON ANALYSIS OF FINANCIAL STATEMENTS  OF  NATIONAL THERMAL PO...
A PROJECT REPORT ON ANALYSIS OF FINANCIAL STATEMENTS OF NATIONAL THERMAL PO...
 
The Bank of Punjab Latest Internship Report With Three Years Financial Data (...
The Bank of Punjab Latest Internship Report With Three Years Financial Data (...The Bank of Punjab Latest Internship Report With Three Years Financial Data (...
The Bank of Punjab Latest Internship Report With Three Years Financial Data (...
 
Financial analysis of banks
Financial analysis of banksFinancial analysis of banks
Financial analysis of banks
 
Summer internship project on home loans
Summer internship project on home loansSummer internship project on home loans
Summer internship project on home loans
 
Project report on working capital management
Project report on working capital managementProject report on working capital management
Project report on working capital management
 
Internship Report BOP
Internship Report BOPInternship Report BOP
Internship Report BOP
 
A Study of ratios as a Tool of Financial Statement Analysis GK Plastics Bhala...
A Study of ratios as a Tool of Financial Statement Analysis GK Plastics Bhala...A Study of ratios as a Tool of Financial Statement Analysis GK Plastics Bhala...
A Study of ratios as a Tool of Financial Statement Analysis GK Plastics Bhala...
 
Dams and Hydropower Projects of Pakistan
Dams and Hydropower Projects of PakistanDams and Hydropower Projects of Pakistan
Dams and Hydropower Projects of Pakistan
 
State bank of india Summer internship Report
State bank of india Summer internship ReportState bank of india Summer internship Report
State bank of india Summer internship Report
 
Sip project report
Sip project reportSip project report
Sip project report
 
THE RAMCO CEMENT LTD.
THE RAMCO CEMENT LTD.THE RAMCO CEMENT LTD.
THE RAMCO CEMENT LTD.
 
Presentation on summer internship project of bank
Presentation on summer internship project of bank Presentation on summer internship project of bank
Presentation on summer internship project of bank
 
State bank of pakistan
State bank of pakistanState bank of pakistan
State bank of pakistan
 
Financial Analysis of Axis Bank Services (MBA Finance)
Financial Analysis of Axis Bank Services (MBA Finance)Financial Analysis of Axis Bank Services (MBA Finance)
Financial Analysis of Axis Bank Services (MBA Finance)
 
HDFC report
 HDFC report HDFC report
HDFC report
 
Yamaha internship
Yamaha internshipYamaha internship
Yamaha internship
 
HDFC Bank : Fundamental Analysis (Text)
HDFC Bank : Fundamental Analysis (Text)HDFC Bank : Fundamental Analysis (Text)
HDFC Bank : Fundamental Analysis (Text)
 

Andere mochten auch

Field project report nhpc
Field project report nhpcField project report nhpc
Field project report nhpcsahil286
 
Summer trainnig report at NHPC LIMITED
Summer trainnig report at NHPC LIMITEDSummer trainnig report at NHPC LIMITED
Summer trainnig report at NHPC LIMITEDVikas Rathore
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMIshant Gautam.
 
Investigatory project. yani gustilo
Investigatory project. yani gustiloInvestigatory project. yani gustilo
Investigatory project. yani gustiloyanireckless
 
Project Report (Marketing) At Hcl
Project Report (Marketing) At HclProject Report (Marketing) At Hcl
Project Report (Marketing) At Hclguest4a0c325
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgementferdzzz
 
Sample project -Marketing Management
Sample project -Marketing Management Sample project -Marketing Management
Sample project -Marketing Management Mamta Narula
 

Andere mochten auch (13)

Powerful parbati
Powerful parbatiPowerful parbati
Powerful parbati
 
Field project report nhpc
Field project report nhpcField project report nhpc
Field project report nhpc
 
REPORT-NHPC
REPORT-NHPCREPORT-NHPC
REPORT-NHPC
 
Summer trainnig report at NHPC LIMITED
Summer trainnig report at NHPC LIMITEDSummer trainnig report at NHPC LIMITED
Summer trainnig report at NHPC LIMITED
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
 
NHPC rambi
NHPC rambi NHPC rambi
NHPC rambi
 
Store Accounting
Store AccountingStore Accounting
Store Accounting
 
Investigatory project. yani gustilo
Investigatory project. yani gustiloInvestigatory project. yani gustilo
Investigatory project. yani gustilo
 
Project Report (Marketing) At Hcl
Project Report (Marketing) At HclProject Report (Marketing) At Hcl
Project Report (Marketing) At Hcl
 
Stores Management
Stores  ManagementStores  Management
Stores Management
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgement
 
Store management
Store managementStore management
Store management
 
Sample project -Marketing Management
Sample project -Marketing Management Sample project -Marketing Management
Sample project -Marketing Management
 

Ähnlich wie Nhpc project-parbati 2 on store accounting (finance)

Arpan Project Report on Working Capital Management
Arpan Project Report on Working Capital ManagementArpan Project Report on Working Capital Management
Arpan Project Report on Working Capital Managementarpan_rkl
 
Sreeniprjct autokast ltd final
Sreeniprjct autokast ltd finalSreeniprjct autokast ltd final
Sreeniprjct autokast ltd finalsreeni ak
 
Optcl (working capital management)
Optcl (working capital management)Optcl (working capital management)
Optcl (working capital management)Vikash Kumar Jha
 
Project on working_capital_of_optcl
Project on working_capital_of_optclProject on working_capital_of_optcl
Project on working_capital_of_optclMuhammad Sohail
 
Reportpart7 120309104040-phpapp01
Reportpart7 120309104040-phpapp01Reportpart7 120309104040-phpapp01
Reportpart7 120309104040-phpapp01Karan Devlikar
 
Working capital management
Working capital managementWorking capital management
Working capital managementSupa Buoy
 
Final report of summer training during MBA - REPORT ON MGVCL (Electricity Dis...
Final report of summer training during MBA - REPORT ON MGVCL (Electricity Dis...Final report of summer training during MBA - REPORT ON MGVCL (Electricity Dis...
Final report of summer training during MBA - REPORT ON MGVCL (Electricity Dis...CHARMI BRAHMBHATT
 
Jibu hmt working capital management project
Jibu hmt working capital management projectJibu hmt working capital management project
Jibu hmt working capital management projectJIBU AB
 
Summer_intern_NTPC
Summer_intern_NTPCSummer_intern_NTPC
Summer_intern_NTPCParag Goyal
 
A study on Working Capital Management for Aditya Birla Chemical Ltd.” Rehla J...
A study on Working Capital Management for Aditya Birla Chemical Ltd.” Rehla J...A study on Working Capital Management for Aditya Birla Chemical Ltd.” Rehla J...
A study on Working Capital Management for Aditya Birla Chemical Ltd.” Rehla J...Rahul Verma
 
Richa project (1)
Richa project (1)Richa project (1)
Richa project (1)Richa Sinha
 
A project report on ratio analysis 2016
A project report on ratio analysis 2016A project report on ratio analysis 2016
A project report on ratio analysis 2016Shakti Prasad Tiwari
 
A project report on estimation of working capital reqiurements krishna sugar ...
A project report on estimation of working capital reqiurements krishna sugar ...A project report on estimation of working capital reqiurements krishna sugar ...
A project report on estimation of working capital reqiurements krishna sugar ...Babasab Patil
 
Inventory Management at Pepsi Co India Holding Pvt Ltd
Inventory Management at Pepsi Co India Holding Pvt LtdInventory Management at Pepsi Co India Holding Pvt Ltd
Inventory Management at Pepsi Co India Holding Pvt LtdRashmi Gowda KM
 
A study of working capital management at shree someshwar co operative sugar...
A study of working capital management at shree someshwar co   operative sugar...A study of working capital management at shree someshwar co   operative sugar...
A study of working capital management at shree someshwar co operative sugar...Sushil Gaikwad
 
Reliance infra converted
Reliance infra convertedReliance infra converted
Reliance infra convertedKushagra Bansal
 
An analysis on inventory management at whirlpool of india limited
An analysis on inventory management at whirlpool of india limitedAn analysis on inventory management at whirlpool of india limited
An analysis on inventory management at whirlpool of india limitedjaspreetharpreet
 
NTPC SUMMER INTERNSHIP MBA FINANCE
NTPC SUMMER INTERNSHIP MBA FINANCENTPC SUMMER INTERNSHIP MBA FINANCE
NTPC SUMMER INTERNSHIP MBA FINANCENEHA GAUTAM
 

Ähnlich wie Nhpc project-parbati 2 on store accounting (finance) (20)

Arpan Project Report on Working Capital Management
Arpan Project Report on Working Capital ManagementArpan Project Report on Working Capital Management
Arpan Project Report on Working Capital Management
 
Sreeniprjct autokast ltd final
Sreeniprjct autokast ltd finalSreeniprjct autokast ltd final
Sreeniprjct autokast ltd final
 
Jay-Wcm
Jay-WcmJay-Wcm
Jay-Wcm
 
Optcl (working capital management)
Optcl (working capital management)Optcl (working capital management)
Optcl (working capital management)
 
Project on working_capital_of_optcl
Project on working_capital_of_optclProject on working_capital_of_optcl
Project on working_capital_of_optcl
 
Reportpart7 120309104040-phpapp01
Reportpart7 120309104040-phpapp01Reportpart7 120309104040-phpapp01
Reportpart7 120309104040-phpapp01
 
Working capital management
Working capital managementWorking capital management
Working capital management
 
Final report of summer training during MBA - REPORT ON MGVCL (Electricity Dis...
Final report of summer training during MBA - REPORT ON MGVCL (Electricity Dis...Final report of summer training during MBA - REPORT ON MGVCL (Electricity Dis...
Final report of summer training during MBA - REPORT ON MGVCL (Electricity Dis...
 
Jibu hmt working capital management project
Jibu hmt working capital management projectJibu hmt working capital management project
Jibu hmt working capital management project
 
Summer_intern_NTPC
Summer_intern_NTPCSummer_intern_NTPC
Summer_intern_NTPC
 
A study on Working Capital Management for Aditya Birla Chemical Ltd.” Rehla J...
A study on Working Capital Management for Aditya Birla Chemical Ltd.” Rehla J...A study on Working Capital Management for Aditya Birla Chemical Ltd.” Rehla J...
A study on Working Capital Management for Aditya Birla Chemical Ltd.” Rehla J...
 
Richa project (1)
Richa project (1)Richa project (1)
Richa project (1)
 
A project report on ratio analysis 2016
A project report on ratio analysis 2016A project report on ratio analysis 2016
A project report on ratio analysis 2016
 
Working capital ak
Working capital akWorking capital ak
Working capital ak
 
A project report on estimation of working capital reqiurements krishna sugar ...
A project report on estimation of working capital reqiurements krishna sugar ...A project report on estimation of working capital reqiurements krishna sugar ...
A project report on estimation of working capital reqiurements krishna sugar ...
 
Inventory Management at Pepsi Co India Holding Pvt Ltd
Inventory Management at Pepsi Co India Holding Pvt LtdInventory Management at Pepsi Co India Holding Pvt Ltd
Inventory Management at Pepsi Co India Holding Pvt Ltd
 
A study of working capital management at shree someshwar co operative sugar...
A study of working capital management at shree someshwar co   operative sugar...A study of working capital management at shree someshwar co   operative sugar...
A study of working capital management at shree someshwar co operative sugar...
 
Reliance infra converted
Reliance infra convertedReliance infra converted
Reliance infra converted
 
An analysis on inventory management at whirlpool of india limited
An analysis on inventory management at whirlpool of india limitedAn analysis on inventory management at whirlpool of india limited
An analysis on inventory management at whirlpool of india limited
 
NTPC SUMMER INTERNSHIP MBA FINANCE
NTPC SUMMER INTERNSHIP MBA FINANCENTPC SUMMER INTERNSHIP MBA FINANCE
NTPC SUMMER INTERNSHIP MBA FINANCE
 

Kürzlich hochgeladen

ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 

Kürzlich hochgeladen (20)

ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 

Nhpc project-parbati 2 on store accounting (finance)

  • 1. (A Government of India enterprise) PROJECT REPORT ON STORE ACCOUNTING WITH RESPECT TO N.H.P.C Submitted to Panjab University, Chandigarh in partial fulfillment for the Award of the degree of MBA CIT (Master in Business Administration commerce & IT) SUBMITTED BY: SWATI CHANDEL Roll No. –7605 Session –April, 2013 MASTER TARA SINGH MEMORIAL COLLEGE FOR WOMEN, LUDHIANA Page 1 of 58
  • 2. PREFACE Finance is the life blood and nerve centre of business just as circulation of blood is essential for maintaining human life, without adequate finance a business can’t run smoothly. Application of Management of Principles in all branches whether Production, Personnel, Finance, Marketing etc results in more efficient and effective utilization of available resources. Now days the theory without practice is of little use. No doubt, theory provides the fundamental stone for the Guidance of practice. Therefore a strong cooperation of theory and practice is very essential to make a management student perfect. As the project suggests that project report is all about knowing what is Store management and its efficiency, its importance and its uses. The project report also includes the type of financing NHPC has used recently in appraising its new project of 800MW generation at Parbati river at PARBATI PROJECT STAGE-2.The confidence of an individual is boosted as one successfully completes the responsibilities shouldered on him. The theoretical concepts only help us to gain Knowledge. However an administrative skill, the pre-requirement for the completion of a success story comes with experience. Page 2 of 58
  • 4. ACKNOWLEDGEMENT The successful completion of any task would be incomplete without mentioning the people who have made it possible. So it`s with the gratitude that I acknowledge the help, which crowned my efforts with success. I would like to express my sincere thanks to the management of NHPC who gave me the opportunity to work and study in such an esteemed organization. It is a matter of pride for me to acknowledge my profound gratitude to my respected principal MRS.PARVEEN KAUR CHAWLA, who always facilitates me in gaining practical knowledge. MS.PRIYA AHUJA & MRS.MEENAKSHI BAJAJ for her valuable Cooperation Guidance. Last but not the least, I would like to thank all who supported me in this study by way of sparing their precious time, providing relevant information and sharing experience, I needed, without which the project would have been incomplete. LUDHIANA Page 4 of 58 SWATI CHANDEL
  • 5. TABLE OF CONTENT CH.NO. CONTENTS 1 INTRODUCTION TO THE TOPIC: STORE ACCOUNTING 2 COMPANY PROFILE Introduction Hydro scenario in India Overview of organization Vision of organization Mission of organization Core value Objectives of the organization Capital structure of NHPC Current Scenario SWOT Analysis 3 INTRODUCTION ABOUT PARBATI PROJECT II Introduction Parbati project2 :Profile Benefits 4 PROJECT REPORT ON STORE ACCOUNTING W.R.T. PHEP-2 Research methodology Inventory management system Accounting guidelines Procedure of store accounting Interpretation and Analysis 5 FINDINGS AND LIMITATIONS 6 CONCLUSION AND RECOMMENDATIONS 7 BIBLIOGRAPHY /REFERENCE Page 5 of 58 PAGE NO.
  • 6. INTRODuCTION TO ThE TOPIC: sTORE ACCOuNTING Page 6 of 58
  • 7. A Store is virtual money that can be encashed. However, this money needs to be properly counted or accounted for. STOCK ACCOUNTING is thus a systematic way of assessing the money value of the items lying in stores as also the items under transaction through stores. Transactions, in terms of receipts and issues are a regular feature in any stores and therefore Stock accounting process, in most of the cases, concentrates only on the stock in hand, lying in Stores. The most popular methods of accounting are, FIFO i.e. First In First Out and LIFO, Last In First Out. FIFO and LIFO Methods as accounting techniques are used in managing inventory (Stock lying in Stores for future use) and financial matters involving the amount of money a company has tied up within inventory of produced goods, raw materials, parts, components, or feed stocks. These methods are used to manage assumptions of cost flows related to inventory, stock repurchases (if purchased at different prices), and various other accounting purposes. FIFO standing for first-in, first-out, implies that the oldest inventory items are recorded as sold first but do not necessarily mean that the exact oldest physical object has been tracked and sold. LIFO stands for last-in, first-out, meaning that the most recently produced items are recorded as sold first. Since the 1970s, some U.S. companies shifted towards the use of LIFO, which reduces their income taxes in times of inflation, but with International Financial Reporting Standards banning the use of LIFO, more companies have gone back to FIFO. LIFO is only used in Japan and the U.S. Page 7 of 58
  • 8. Store is a function of materials management in an organization. Hence it is generally found that stores function reports to the materials manager. But in some situations stores function reports to the production function. Function of store • Storage • Issue • Record • Housekeeping • Control • Surplus management • Verification • Interaction & coordination • Receipt  Inventory in a company includes stock of raw materials, work-in-progress, finished & semi-finished products, spare components and by-products, etc  Inventory control is an important feature of cost accounting system Methods of stock valuation  First-in-first-out(FIFO)  Last-in-first-out(LIFO)  Weight average cost (WAVCO)  Specific identification/unit cost method Page 8 of 58
  • 10. ThE COMPANY Type Public company(BSE: 533098,NSE: NHPC) Industry Electric utility Founded November 7,1975 Headquarters Faridabad, India Key people G.Sai Prasad (Chairman & MD) Products Electricity generation; energy trading(transmission and distribution) Net profit(Q1) Rs. 719 cr (31.7.2013) Net income Rs. 5,306.64 crore (march 2013) Total employees 11,036+(2013) Website www.nhpcindia.com Page 10 of 58
  • 11. INTRODuCTION National Hydroelectric Power Corporation (NHPC) was established in 1975. NHPC is a schedule “A” Enterprise of the Government of India. With an authorized capital of Rs 15000 Crore and an investment base of about Rs 25400 Crores, NHPC is ranked as a premier organization in the country for development of Hydropower. Accredited with ISO-9001:2000 & ISO 14001:2004 certificates for its quality system and environment concerns, NHPC is a multi-disciplinary organization and has acquired sufficient expertise and state-of-the-art technology for investigation , planning, designing, and executing both small and large size hydro power projects. It has the strength of highly qualified and experienced professionals in design and engineering, geo-technical engineering, construction planning and construction management for building hydroelectric projects. The technical and engineering proficiency and experience of NHPC places it in a leading position in the field of hydropower development in India and neighboring countries. The Saga of NHPC is replete with many challenges. To begin with NHPC took over three most difficult and almost abandoned projects in geological Weak Himalayan Ranges. These Projects were the 180 MW Baira Siul in Himachal Pradesh, 105 MW Loktak Project in Manipur and the 345 MW Salal stage-I in Jammu & Kashmir. The successful commissioning of these projects in most difficult areas and their operation is a testimony to NHPC’s success. With the commissioning of 180 MW Baira Siul project in 1981, NHPC started earning profit since 1982, the first year turnover was Rs 24 Crores and its Net Profit was Rs 8 Crores. Since then the net profit of the corporation increases year after year. Net profit of the corporation was Rs 2090.5 Crores during the year 2009-10 as against 2166.67 Crores during 2010-11. NHPC is planning to take projects in neighboring countries like Nepal and Bhutan. NHPC has been conferred “MINI RATNA” status by the Govt. of India. Page 11 of 58
  • 12. hYDRO sCENERIO IN INDIA India is blessed with immense amount of hydro-electric potential and ranks 5th in terms of exploitable hydro-potential on global scenario. As per assessment made by CEA (Central Electricity Authority) is endowed with economically exploitable hydro-power potential to the tune of 148700 MW of installed capacity. The basin wise assessed potential is as underBasin/Rivers Probable Installed Capacity (MW) Indus Basin 33,832 Ganga Basin 20,711 Central Indian River system 4,152 Western Flowing Rivers of southern India 9,430 Eastern Flowing Rivers of southern India 14,511 Brahmaputra Basin 66,065 Total 1,48,70 In addition, 56 number of pumped storage projects have also been identified with probable installed capacity of 94000 MW. In addition to this, hydro-potential from small, mini & micro schemes has been estimated as 6782 MW from 1512 sites. Thus, in totality India is endowed with hydro-potential of about 250000 MW. However, exploitation of hydro-potential has not been up to the desired level due to various constraints confronting the sector. Page 12 of 58
  • 13. hOW IT WORKs So just how do we get electricity from water? Actually, hydroelectric and coal-fired power plants produce electricity in a similar way. In both cases a power source is used to turn a propeller-like piece called a turbine, which then turns a metal shaft in an electric generator, which is the motor that produces electricity. A coal-fired power plant uses steam to turn the turbine blades; whereas a hydroelectric plant uses falling water to turn the turbine. The results are the same. Take a look at the diagram of a hydroelectric power plant to see the details: The theory is to build a dam on a large river that has a large drop in elevation. The dam stores lots of water behind it in the reservoir at FRL ( full reservoir level)and a live storage of 1.98 Mcum . Near the bottom of the dam wall there is the water intake .Gravity causes it to fall through the penstock inside the dam. At the end of the penstock there is a turbine propeller, which is turned by the moving water. The surge shaft (restrict the surges within the height of shaft) from the turbine goes up into the generator, which produces the power. Power lines are connected to the generator that carry electricity to your home and mine. The water continues past the propeller through the tail race tunnel (TRT) into the river past the dam. By the way, it is not a good idea to be playing in the water right below a dam when water is released. Page 13 of 58
  • 14. The diagram of a hydroelectric generator given below shows how generator works: "A hydraulic turbine converts the energy of flowing water into mechanical energy. A hydroelectric generator converts this mechanical energy into electricity. The operation of a generator is based on the principles discovered by Faraday. He found that when a magnet is moved past a conductor, it causes electricity to flow. In a large generator, electromagnets are made by circulating direct current through loops of wire wound around stacks of magnetic steel laminations. These are called field poles, and are mounted on the perimeter of the rotor. The rotor is attached to the turbine shaft, and rotates at a fixed speed. When the rotor turns, it causes the field poles (the electromagnets) to move past the conductors mounted in the stator. This, in turn, causes electricity to flow and a voltage to develop at the generator output terminals." Page 14 of 58
  • 15. OVERVIEW OF ORGANIZATION INTRODuCTION ABOuT NhPC Page 15 of 58
  • 16. NHPC has become the largest organization for hydropower development in India, with capabilities to undertake all the activities from conceptualization to commissioning in relation to setting up of hydro projects. Its capability includes complete spectrum of hydro Power from concept to commissioning. Besides providing consultation services in field of hydro-power, NHPC is also planning to take up Wind and Tidal power projects in the country. Page 16 of 58
  • 17. CORPORATE VISION A world class diversified & transnational organization for sustainable development of Hydro power and water resources with strong environment conscience. CORPORATE MISSION  To achieve international standards of excellence in all aspects of hydro power and diversified business.  To execute and operate projects in a cost effective, environment friendly and socioeconomically responsive manner  To foster competent trained and multi-disciplinary human capital  To continually develop state-of-the-art technologies thru innovative R&D and adopt best practices  To adopt the best practices of corporate governance and institutionalize value based management for a strong corporate identity.  To maximize creation of wealth through generation of internal funds and effective management of resources. Page 17 of 58
  • 18. CORE VALUE       Business Ethics Customer Focus Organizational & professional Pride Mutual Respect and Trust Innovation and Speed Total Quality for Excellence CORPORATE OBJECTIVES  Development of vast hydro potential at faster pace and optimum cost elimination, time and cost over-run.  Completion of all ongoing projects within stipulated time frame.  Ensure maximum utilization of installed capacity and help in better system stability.  Generation of sufficient internal resources for expansion and setting up new projects.  Corporate development along with simultaneous human resource development. Page 18 of 58
  • 19. CAPITAL STRUCTURE: FINANCIAL PROFILE Authorized Capital Rs. 1,50,000 Million(31.03.2013) Value of Assets Rs.35,718.06 cr. App. (31.03.2013) Paid Up Capital Rs. 12,300.74 crore (31.03.2013) Projects Completed 14 Nos. (5295 MW) Projects Under Construction 10 Nos. (4502 MW) Projects Awaiting Clearances 12 Nos. (9651 MW) Projects Under Survey and Investigation Stage 7 Nos. (2485 MW) Joint Venture Projects 7 Nos. (5206 MW) Projects on Turnkey Basis 5 Nos. (89.35 MW) In 2012-march ‘13 Energy Generated 18683 MUs Sales turnover 5,654.69 crore Net Profit 2,771.77 crore Performance Rating "excellent" In 2011-‘12 Energy Generated 18,500 MUs Sales turnover 4,225.25 crore Net Profit 2,166.67 crore Performance Rating "Very Good" Page 19 of 58
  • 21. SALES The Bulk Power Consumers of NHPC Limited in North India are the power utility belonging to the states of Haryana, Punjab, Himachal Pradesh, Uttar Pradesh, Uttarkhand, Rajasthan, Delhi and J&K and Union Territory of Chandigarh. These states are being supplied power from Baira Siul, Salal-I & II, Tanakpur, Chamera-I, ChameraII, Uri, Dhauliganga & Dulhasti Power Stations. In the Eastern Region, Rangit and Teesta-V, Power Stations are supplying energy to the states of West Bengal, Sikkim, Bihar, Jharkhand, Gridoo and Damodar Valley Corporation. In the North-Eastern Region, Loktak Power Station is supplying energy to the states of Assam, Manipur, Meghalaya, Tripura, Nagaland, Arunachal Pradesh and Mizoram Since commencing of commercial generation in 1982, the Energy sales and revenues of the corporation have grown significantly. The Energy sales from all operating projects of the Corporation during the last 25 years has risen from Rs. 228.60 Million in the year 1982-83 to Rs. 50491 Million in the year 2012-2013. Page 21 of 58
  • 22. STRENgTHS and opportunities in the sector            Abundant coal reserves (enough to last 200 years) Vast hydroelectric potential (150,000 MW). Large pool of highly skilled technical personnel. Impressive power development in absolute terms (comparable in size to those of Germany and UK). Expertise in integrated and coordinated planning. Emergence of strong and globally comparable central utilities Wide outreach of state utilities. Enabling framework for private investors. Well laid out mechanisms for dispute resolution. Political consensus on reforms. Potentially, one of the largest power markets in the world. CURRENT SCENARIO POWER FOR ALL BY 2013 The Government of India has an ambitious mission of POWER FOR ALL BY 2013. This mission would require that our installed generation capacity should be at least 200,000 MW by 2013 from the present level of 144,564.97 MW. Power requirement will double by 2020 to 400,000MW. OBJECTIVES  Sufficient power to achieve GDP growth rate of 8%  Reliable power  Quality power Page 22 of 58
  • 23.  Optimum power cost  Commercial viability of power industry  Rural electrification SWOT ANALYSIS Strengths: 1. Good corporate Image. 2. Complete range of product for transmission & distribution. 3. Established brand name with executive oriented program. 4. Strong & wide networks of manpower across India. 5. Considered to be having technology & design ability. Weakness: 1. The procurement process in the companies is cumbersome and subject to auditing. 2. Low exposure to the needs & dynamics of distribution business. 3. Role clarity on the requirement of being an equipment supplier or a solution provider. As there are very few supplier of equipment manufacturing plant. Opportunities: 1. Huge Investment leading to greater demand of goods and services. 2. Demand leading to Industry operating at full & over capacity. 3. Better Price realization. 4. Early birds to learn faster and thus achieve repeat orders. Policy to bid from ultra mega power plant. 5. Vertical integration for supply chain management of coal by acquiring coal blogs. Threats: 1. Purchases preference may be extended to distribution sector. 2. Increase in no. of small contractors leading to price war. 3. Emergence of competitors in the market like Schneider, Reliance, Tata etc. 4. Change in government policies for open trade or stock trading or energy trading. Page 23 of 58
  • 24. 5. Reduce the time lag. INTRODUCTION The State of Himachal Pradesh is blessed with abundant water resources in its five major rivers i.e. Chenab, Ravi, Beas, Satluj and Yamuna, which emanate from the western Himalayas and flow through the State. These snow fed rivers and their tributaries carry copious discharge all the year round and flow with sleep bed-slopes, which can be exploited for power generation. The expeditious harnessing of this vast and economically viable hydro-electric potential, estimated to be more than 20,000 MW, is the only answer to the prevailing chronic and ever-growing power shortage in the Northern region. Page 24 of 58
  • 25. In India, since independence, concerted efforts have been made to increase the availability of power to various segments of Indian society. The hydropower development in India has not taken place in a systematic manner since year 1950 till date with more advantage to thermal / nuclear Station during the last 50 years, which resulted in improper hydro-thermal mix of power generation. As on date NHPC Limited has become the largest organization for hydropower development in India, with capabilities to undertake all the activities from conceptualization to commissioning in relation to setting up of hydro projects. NHPC Limited is also planning to take Wind and Tidal wave projects in the country. NHPC Limited presently has an installation base of 5295 MW from 14 hydropower stations on ownership basis including projects taken up in Joint Venture. Considering the impediments faced during execution of these projects such as unfavorable geological conditions, difficult law and order problems, inaccessible and remote locations, the achievement so far is commendable. The generation performance of these stations has been outstanding. NHPC Limited is presently engaged in the construction of 10 projects aggregating to a total installed capacity of 4502 MW. Given the renewed thrust on development of hydro power in the country, NHPC Limited has drawn up a massive plan to add over 10,000 MW of hydropower capacity by the end of XII plan (year 2017). PARBATI STAgE- II H.E. PROJECT Page 25 of 58
  • 26. Parbati Hydroelectric Project is a cascade development to be developed in 3 stages with an aggregate generating capacity of 2070 MW. Stage-I is storage type of scheme and situated in the mainly snow bound area having installed capacity as 750 MW. Parbati Project Stage-II is a run of the river scheme and shall have installed capacity of 800MW. Parbati Project Stage-III development is downstream of Stage-II and shall have installed capacity of 520 MW. Parbati Stage-II comprising of 83.7m high Concrete Gravity Dam and 31.525 km long HRT shall be utilizing a gross head of 862 m. To enhance the generating capacity of the Project 5 small streams shall also be trapped. The project is of special importance as the longest reach of 9 km shall be excavated with the use of TBM and 2 Nos inclined Pressure Shafts each about 1.546 km long is also excavated with TBM. The total quantum of underground works involving tunneling shall be about 57 km. HYDEL DEVELOPMENT OF PARBATI PROJECTS Page 26 of 58
  • 27. The Beas valley in Himachal Pradesh has a vast potential for water resources development and only a small part has been tapped during the past five decades of planned development. Parbati River, Hurla nallah and Sainj River are major tributaries of Beas River in Kullu valley. Parbati River is the northernmost left bank tributary of river Beas in Kullu District of Himachal Pradesh. The river Parbati is a glacial and snow fed river and it originates from Mantalai Lake from snow peaks at an elevation of 6300 m and traverses in northerly direction and flows down as a small stream in a narrow valley. After traversing 7 km from its origin it joins the Beas River at Bhuntar. The river in general can be termed as a very fast flowing and ferocious one. The river valley is located in high mountain ranges, which rises to more than 1,000 m on both the banks over most of its stretch. The stream Dibi ka nallah and Tosh nallah, which join the river Parbati, are the major tributaries of Parbati River. The total catchment area of Parbati River at Pulga Dam site is 1155 sq km. This catchment has a large number of small and big glaciers. Over 84% of the catchment of Parbati Stage II project i.e. about 971 sq km is permanently snow covered. Further 45% of the catchment area is above an altitude of 5000 m above Mean Sea Level. The entire river catchment is located in the Himalayan mountain ranges. The catchment area is sparsely populated because of snowing condition, steeply sloping mountain ranges, remote location and inaccessibility. PARBATI STAGE-II The Parbati Hydroelectric Project (Stage-II) is a run-of-the-river scheme proposed to harness hydro potential of lower reaches of the River Parbati. The proposed scheme is 'inter basin transfer' type. It is proposed to divert the river near Village Pulga in Parbati valley & water shall be carried through a tunnel across Garsa valley to Sainj valley where the Power House shall be located at village Suind. Thus, a gross head of 862 m between Pulga and Suind will be utilized for generating 800 MW power. Diverting the discharge of various nallas falling along the HRT alignment has further augmented the diverted discharge of the river Parbati. An 83.7m high, 110 m long, concrete gravity dam is proposed near village Pulga across Parbati River to divert 145 cumec of water. The reservoir will have a gross storage capacity as 6.83 Mcum. This diurnal storage will be sufficient to run power station at full capacity for 4 hours in a day even during lean flow period. The spillway section consisting of three bays is designed to pass a maximum probable flood of 1850 cumec. Page 27 of 58
  • 28. PARBATI PROJECT-II (A PROFILE) LOCATION NAME DISTRICT STATE NEAREST RAIL HEAD PARBATI HYDROELECTRIC PROJECT (STAGE -II) KULLU HIMACHAL PRADESH KIRATPUR (190 KM FROM SAINJ, POWER HOUSE SITE) NEAREST AIRPORT BHUNTER (35 KM FROM SAINJ, POWER HOUSE SITE) RIVER PARBATI (A TRIBUTARY OF RIVER BEAS) LOCATION OF DAM & DIVERSION DAM ON RIVER PARBATI AT PULGA POWERHOUSE VILLAGE AND POWREHOUSE ON RIVER SAINJ RIGHT BANK OF SUIND VILLAGE. INSTALLED CAPACITY 4 X 200 (800 MW) ANNUAL GENERATION 3108.66 MILLION UNITS DATE OF CCEA APPROVAL SEPTEMBER 2002 SCHEDULED DATE OF SEPTEMBER 2014 COMMISSIONING Page 28 of 58
  • 29. Hydrology Four Catchments of the project are: 1.Parbati River Catchment Dam Area at Diversion 1155Sq.km. Snow Catchment 971Sq.km. Maximum observed discharge 369.10Cumecs 2. Jigrai Nallah Catchment Area at Diversion site 42Sq.km. Snow Catchment 21Sq.km. 3. Hurla Nallah Catchment Area at Diversion site 34Sq.km. Snow Catchment 9.5Sq.km. 4. Jiwa Nallah Catchment Area at Diversion site 180Sq.km. Snow Catchment 54Sq.km. Page 29 of 58
  • 30. POWER HOUSE The proposed surface power house is located on the right bank of River Sainj near Village Sainj at about 200 m downstream of the confluence of River Sainj and Jiwa Nallah. The power house shall have an installed capacity of 800 MW with four generating units of 200 MW each. Short Tail Race Channels shall discharge the water from Power House to river Sainj. COST The estimated cost for construction of Project is worked out to be Rs. 5607.66 crores at August 2000 price level. BENEFITS The Project is planned to be operated as a peaking power station. A: 800 MW installed capacity the Project will generate 3108.66 million units of Power in 90% dependable year. The construction of the Project will bring social & economic development in the region. Other facilities like infrastructure. Education Medical and employment will get boost with the execution of the Project. Page 30 of 58
  • 31. Section I.1 Benefit to Himachal Pradesh On completion, the project will provide 12% free power to the tune of 369.32 Million Units which will generate revenue of Rs. 140 crores per y ear to Himachal Pradesh (at NHPC sale price). Construction of the project will bring social & economic development in the region. Facilities like infrastructure, education, medical and employment will get boost. Revenue to HP Government due to construction of project up to October 2004 Sales Tax Royalty Total Rs. 589.75 Lakhs. Rs. 49.17 Lakhs. Rs. 638.92 Lakhs. Education Facilities A Kendriya Vidyalaya up to class XI is functional at Sainj, which is open to local wards at nominal fees. Out of 202 students about 170 are local children. Needy ones are being provided school uniform and requisite stationary by NHPC Ladies Welfare Association. Medical Facilities A project Hospital at Sainj is functional for the welfare of employees and their families, which also caters to the medical needs for the local population. Hospital/dispensaries are also functional at Bhuntar, Garsa and Nagwain to provide immediate medical assistance. NHPC Ladies Welfare Association with the help of Project resources keeps on organizing free medical camps at remote locations for the benefits of needy and local inhabitants. Page 31 of 58
  • 32. Indirect Employment Construction of the project has created scope for indirect employment by way of business establishments. More than 150 new business establishments have come up in Manikaran Valley, more than 150 in Garsa Valley, more than 150 in Sainj Valley after the start of the project. Apart from this a shopping complex has been constructed in Sainj Township. Vehicles Taken on Hire Basis Light Vehicles/Tractors belonging to locals are bin hired by NHPC as well as by our major contactors. Hired By Inspection Vehicle Tractor/Truck NHPC 35 Nos. 11 Nos. (HRTC Buses) HJV 4 Nos. 18 Nos. Gammon 7 Nos. 7 Nos. BJ Techno 5 Nos. 1 Nos. Total Page 32 of 58 51 Nos. 37 Nos.
  • 33. Contract Given to Local Contractors Details of work contract/work order given to various contractors of H.P. by Parbati HE Project Area Total No. of works awarded Total Amount DAM Complex 219 Rs.9,05,67,980 HRT Complex 142 Rs.3,51,43,429 Township Complex 160 Rs.9,85,33,931 Power House Complex 180 Rs.9,64,18,802 JNW Complex 4 Rs.1,53,48,264 Total 705 Rs.33,60,12,406 Wild life protection NHPC and GHNP (Great Himalayan National Park) have pooled their efforts aimed at conservation of wildlife and environment in and around the GHNP comprising 754 sq. km. While executing the construction work of prestigious Parbati Hydroelectric Project Stage-II emphasis has been made to conserve and preserve the rare wild life, flora and fauna. Parbati Project Stage-II is committed to spend Rs. 35.40 crore for habitat improvement and conservation of endangered species like Jujurana (Western Tragopan). Western Tragopan male is one of the world's most spectacular birds: black on the head, a deep crimson on face and mantle and orange on breast, the black belly and dark wings are spangled with star-like white specks. The female is dull brown. They occur in dense forest with undergrowth of bamboo or shrubs from 2000-3500 m, solitary in spring, but in family groups in fall: often seen in trees where they may eat leaf buds. Males can be heard calling in spring and in October. Within the Park, the maximum numbers of sightings have been in the forests of Basu, Shilt, Nada, and Chordwar in Tirthan Valley. In the villages close to GHNP, the local name of Western Tragopan is Jujurana (Juju means bird and rana means king) i.e. the king of the birds. There is a local legend that this pheasant was created by the "Lord" and all the birds in the universe donated a feather each to give it color and unparalleled beauty. Page 33 of 58
  • 35. National Hydroelectric Power Corporation Limited (NHPC) has several units, which are engaged in operation of generating electricity or are under construction stage. Various types of stores inventory need to be maintained to ensure smooth running of these power stations and construction of the units. The purchase and stores accounting procedures shall be subject to NHPC’s policy for procurement of stores, delegation of powers and administrative instructions issued in this regard from time to time. The stores inventory includes inventory for construction (like steel, cement, etc.) as well as for operation purposes. oBJectiVeS of StUdY General objective: • To relate our theoretical knowledge about stores management with the actual procedures being adopted in industries regarding their stores management. Specific objective: • To study & analyze the stores management procedures of an under construction project of NHPC i.e. of Parbati Project-II. Page 35 of 58
  • 36. reSeArcH MetHodoloGY The subject of my research is to study the stores procedure being used by Parbati project-II of NHPC. The data being collected is of following types: Primary Data  Secondary Data Primary data has been collected by personally interviewing the employees of stores Department of Parbati Project-II. These interviews were of unstructured form. Few questions asked are as: Secondary data of both published & unpublished form has been collected from following sources:• • • • NHPC’s manual on stores procedures. News magazine of NHPC. NHPC’s website “www.nhpcindia.com .” Intranet Facility in PHEP-II. Methods of stock valuation (Parbati stage 2) 1. First in first out (FIFO)  This method assumes that the first stock to be received is the first to be sold  The cost of materials used is based on the oldest prices  The closing stock is valued at the most recent prices 2. Weighted average cost  This method assumes that the cost of materials used and closing stock are valued at the weighted average cost Page 36 of 58
  • 37. inVentorY MAnAGeMent SYSteM NHPC may adopt various inventory management techniques for efficient and effective inventory management as per their requirements. The generally used inventory management techniques include the following: • ABC Analysis • VED Analysis • FSN Analysis • Stock levels • Economic Order Quantity A BRIEF WRITE UP ON INVENTORY MANAGEMENT SYSTEM ABC ANALYSIS  Efficient store keeping requires sufficient control over all items of stores. ABC analysis is a basic analytical management tool, which enables top management to place more effort where the result will be the greatest. The first step in the inventory control process is classification of different types of inventories to determine the type and degree of control required for each.  The ABC system is widely used classification technique to identify various items of inventory for purposes of inventory control. This technique is based on the assumption that the organisation should not exercise same degree of control on all items of inventory. The organization shall keep more rigorous control on items that are most costly and/ or slow turning / expensive while items that are less expensive should be given less control effort.  ABC analysis is carried out by grouping items on the basis of their annual cost volume consumption: • ‘A’ group items are those, which have highest value of volume usage, generally constituting around 70% of the value but around 15% of the number of items • ’B’ with intermediate values and generally constituting around 20% of the value but around 30% of the number of items • ‘C’ group with the least value generally constituting around 10% of the value but around 55% of the number of items Page 37 of 58
  • 38.  This grouping helps to identify items that enhance inventory performances when properly controlled.  Appropriate inventory management techniques are then used to manage items according to their priority levels. Thus close attention is paid towards managing ‘A’ group inventories as they contribute significantly to high performance levels, followed by ’B’ and ‘C’ group inventories. The ultimate goal of ABC analysis is to closely supervise the items according to their share in the inventory investment. This helps to reduce time and minimise efforts towards managing those items which though are not properly taken care of, do not show noticeable effect on inventory performance.  Thus we can achieve effective inventory control by closely monitoring `A' class items - watch waste, obsolescence and surplus. Review monthly. Whereas `B' class items can be brought under routine follow up and `C' class should be kept in good surplus to avoid frequent attention and production loss due to stock outs.  While exercising control over stores, items of category A should be given the maximum attention. Their levels of stock should be strictly controlled. In case of items of category B, ordinary stores routine should be observed but rules regarding levels of stock may not be so strictly adhered to as for the items in category A. Items of category C do not require continues monitoring. VED ANALYSIS Under VED technique, items are classified into Vital, Essential and Desirable on the basis of criticality of the item as perceived by the user department. Here the importance to an item of material is given based on its criticality to the business rather than the investment/ volume of consumption. STOCK LEVELS The benefits of fixation of stock levels include the following: • It helps in avoiding unnecessary blocking up of funds in inventories • Reduces likely losses on account of deterioration and obsolescence of materials, etc. • Reduction in storage cost • Better management of inventory Page 38 of 58
  • 39. REORDER LEVEL (ROL) ROL is the level of inventory at which an order for procurement should be placed for replenishing the current stock. The ROL should be decided taking into account the following: • Consumption in per unit of period (say consumption per week). • Lead time (say in number of weeks) i.e. anticipated time lag between the order issuing/ indenting date and date of receipt of material. • In order to take care of likely variations/ contingencies in the usage and lead time, the maximum likely consumption and delivery period are considered. For this purpose the past consumption and lead time pattern should be analyzed ROL = Lead time (in no. of weeks) * Consumption (per week) Minimum/Maximum level Maximum level The maximum level specifies the maximum inventory that should be in hand at point of time. This is worked based on the following formula: Maximum level = ROL + Reorder quantity (-) (Minimum consumption per period * Minimum reorder period) Minimum level Minimum level of inventory shall be maintained in hand at all times so that operations are not stopped/ effected on account of non- availability of inventory. The following parameters should be taken into consideration for fixing minimum level: • Consumption value (ABC classification) • Criticality (VED classification and also availability of substitutes) • Reliability of suppliers. This is measured based on: - Quality (Number of rejections) - Variability in lead time of delivery - Responsiveness (ability to dispatch material quickly in case of emergency orders) Minimum level = ROL (-) Average rate of consumption * Average time required to obtain delivery of fresh supplies Page 39 of 58
  • 40. ECONOMIC ORDER QUANTITY EOQ is essentially a technique/ formula that determine the point at which combination of order costs and inventory carrying costs are the least. The result is most cost effective quantity to order. Annual Usage Expressed in units, this is the forecasted annual/periodical usage. Order Cost This is the sum of the fixed costs that are incurred each time an item is ordered. These costs are not associated with the quantity ordered but primarily with physical activities required to process the order. These would include the costs relating to:  processing of the purchase order and/or requisition,  any approval steps,  processing of the receipt,  incoming inspection,  Invoice processing and vendor payment. It should be noted that these are costs associated with the frequency of the orders and not the quantities ordered Carrying cost 18 Carrying cost is the cost associated with having inventory on hand. It is primarily made up of the costs associated with the inventory investment and storage costs. For the purpose of the EOQ calculation, if any cost does not change based the quantity of inventory on hand, it should not be included in carrying cost. In the EOQ formula, carrying cost per unit is used. The primary components of carrying costs are as under: • Interest • Insurance • Storage Costs Page 40 of 58
  • 41. Maintaining EOQ The values for Order cost and Carrying cost should be evaluated at least once in a year taking into account any changes in interest rates, storage costs and operational costs. Basic formulas for EOQ Notation Q= quantity ordered (units) D= annual demand (units per year) C= carrying cost for one unit in inventory for one year (Rs. per unit per year) S= order cost (for buying) in (Rs. per order) TSC= total stocking costs (Rs. per year) EOQ= economic order quantity (the quantity that minimizes TSC Cost formulas Annual carrying cost =Average Inventory*C = (Q/2)*C Annual Ordering Cost=orders per year*S= (D/Q)*S TSC= carrying cost plus order cost == (Q/2)*C + (D/Q)*S _____ ______________ EOQ = √ 2DS/C and for the EOQ the minimum TSC=√ 2DSC = C*EOQ Example for the Basic Model D=annual demand (units per year) = 10,000 C=carrying cost for one unit in inventory for one year (Rs. per unit per year)=Rs. 4 S= order cost=Rs. 50 ______ _____________ Then, EOQ = √ 2DS/C = √ 2*10,000*50/4 = 500 units per order _____ _____________ And TSC= =√ 2DSC =√ 2*10,000*50*4 =Rs. 2,000 per year FSN ANALYSIS FSN analysis is a tool used for bringing out the list of slow moving/ non-moving material. This report is based on the ratio of movement, which is arrived at based on the total issues during the period of a particular item to its stock in hand. FSN analyses facilitate categorization of items into Fast, Slow-moving and Non-moving. Page 41 of 58
  • 42. DURABILITY OF STOCK Stock depends upon various factors some stock is for one year and another for more than one year for example Cement cannot be stored for more than one year and steel and bricks can be stored for more than one year .The information about the stock was not provided so we can tell this much only about the stock. AccoUntinG GUidelineS The accounting guidelines that NHPC follows for stores accounting are provided below: Receipts from suppliers  All receipts shall be valued in the month in which the material is received and accepted as per the GRN (goods receipt note) based on the bills received and passed.  In case the bills have not been received/ processed, the receipts shall be provisionally valued at the Purchase Order rates. Adjustments, if any, to the provisional value shall be done at the time of actual bill passing in the month in which the bill is passed. The material value, on account for such adjustments, shall be affected for the future issues.  The purchases shall be valued at the landed cost i.e. basic price, excise duty, sale tax, freight and other incidental expenses.  In case of imports, the cost of material shall include the following:  Custom duty, in case a GRN contains several items with different custom duty rates, the custom duty amount for each individual item shall be absorbed at the applicable rates. Page 42 of 58
  • 43. Port charges, landing charges and clearing agent's commission. Local transport charges. Other incidental expenses and local taxes, if any.     In case there is any amount payable by NHPC for freight and other incidental expenses, it shall initially be debited to ‘Freight and incidental expenses on inventory (foreign/ indigenous)’ on insurance of such expenses. This account shall be adjusted in the manner given below:-  The balance in the ‘Freight and incidental expenses on inventory (foreign/indigenous)’ account is to be reviewed periodically and the nominal balance that may remain unadjusted at the year-end shall be charged off to the P&L account. Necessary provision shall be created at the year-end for any pending bills.  The following types of expenses shall be charged to the natural heads of expenditure and shall not be included / loaded to the material purchase cost:  Costs of running of departmental trucks (i.e. of NHPC) used for bringing the bought out material to stores from the suppliers site /intermediary transit location, keeping in view the materiality concept and simplicity in accounting.  Stores holding expenses / storage costs. Receipts from other units  All receipts from other units shall be valued in the month in which the material is received.  The stores transferred from other units shall be valued at the rate intimated in the Inter Unit Advice (IUA) by the transferor unit.  The Store Transfer Note (In) (STN (IN)) contains the provisional/ final value of the material transferred and the materials shall be valued on the basis of the STN (IN) in the month material is received. The difference, if any, in the above provisional value and the inter unit advice shall be adjusted in the store value in the month in which inter unit advice from the sending unit is accounted for.  The cost of transport from the transferor store to the transferee store shall be charged off to revenue expenditure. Page 43 of 58
  • 44. Returns out of material issued  The material returned to stores shall be valued at the original issue rate.  In case of return of material to stores after its use and such material being reusable (such as CGI Sheets, Steel, Timber etc.), the same shall be valued at a price assessed by the concerned Engineer in consultation with the Purchase Department and kept at a separate location from the good stores. However the return price shall not exceed the current issue price of fresh material items as per the PSL. The credit for such returns shall be given to the concerned account head which was debited at the time of issue of material. Physical Verification and Reconciliations  The balances as per the various party wise ledgers shall be reconciled with the control account in the General ledger on a monthly basis.  The quantity balances as per the stock record of the Stores Department and Price Ledger shall be reconciled periodically to ensure their accuracy.  The physical verification of materials in stores shall be carried out at least once in a year. The physical verification of material at site shall be carried out half-yearly intervals. The obsolete and unserviceable items should also be identified during the physical verification. Material at Site Account  As per NHPC systems for works, a numerical or quantity account called the “Material at Site Account” of receipts, issues and balances have to be maintained for all stores received in the consuming division, even through their value has been debited to final Heads of Accounts; with a view to controlling the balances efficiently until the stores are disposed off finally either by consumption or works or otherwise. This Account is to be kept by the concerned Consuming Division. Page 44 of 58
  • 45.  The treatment of the unconsumed material at site shall be as follows: In respect of material issued for Operation and Maintenance purposes, the expense Head shall be credited for the unconsumed material in hand at the end of the year. The value of the unconsumed material at site shall be valued at the prevailing PSL rate at the end of the year. In respect of material issued for capital purposes, no accounting entry is required to be passed at the end of the year. PROCUREMENT PROCESS Procurement order/ Contract is a backbone of any commercial activity. The Finance plays an important role in the procurement/ contracts. The role of Finance in NHPC is a staff function. It has the concurrence power and as such the Finance has to critically examine every proposal coming up for concurrence. The Finance Executive examining the proposals for various types of contracts for procurement should be fully conversant with the latest developments in the statutes, market conditions (both National and International), policies/ programs/ planning/ objectives and delegation of power of the Corporation. TYPES/ CONDITIONS OF CONTRACT Now days, various types of contracts are entered into by NHPC through National Competitive Building (NCB) as well as through International Competitive Bidding (ICB). In order to have uniformity in the Contracts being entered in to by different Projects of the Corporation, “Standard General Conditions of Contract (GCC)” for Civil Contract, Supply Contract, as well as Supply cum Erection Contract have already been approved by the Competent Authority and circulated. Any change in the standard clauses of the General conditions, which become necessary due to the site conditions, past experience, or due to other reasons are incorporated in the “Special Conditions of the Page 45 of 58
  • 46. Relevant Contract (SCC)” and got approved from the Competent Authority. These General Conditions of Contract can however be used only in case of National Competitive Bidding (NCB). PRE-TENDERING PROCESS  The procurement process is initiated based on the periodic procurement plan and / or purchase requisition in case of non- availability of any item in stores.  All proposals for procurement are prepared in the form of estimates, by the indenting department before any expenditure or liability is incurred thereon. The basic prerequisites to be fulfilled before starting the process for finalizing a purchase order are: • Administrative approval • Expenditure sanction • Technical sanction • Appropriation or re-appropriation of funds TENDERING PROCESS Pre-qualification of Bidders  Tendering process starts only after the Competent Authority has approved the PR. Normally the tenders are invited through Open Tender, Limited Tenders or Single Tender. However, sometimes considering the estimated value/ nature/ technical requirement of the procurement, pre-qualification of the bidders are resorted to whereby the capability of the probable bidder (both technical and financial) is ascertained before one is allowed to bid for a particular procurement tender. Pre-qualification of bidders is normally done to ensure selection of resourceful, technically competent, and financially sound prospective bidders with proven past performance for participation in the bidding process. Page 46 of 58
  • 47.  The criteria of financial capability of the applicant are fixed taking into account the completion period of the proposed work, requirement of the monthly cash flow for the work, etc. Keeping these facts in view the minimum qualifying criteria for the following are generally considered: • Average annual turnover of the applicant • Net worth of the company • Profitability of the applicant • Working capital of the company: The cash credit facility enjoyed by the applicant from any bank or Financial Institution can be considered.  Once the bidders are selected on the basis of the PQ, tenders are invited only from those pre-qualified bidders. Vetting of tender documents  Before the Competent Authority approves the tender documents, it is sent to Finance Department for vetting/ checking. The tender documents should also be sent to Law Division wherever a legal opinion is involved or if there are changes from the typical format of the tender documents issued by NHPC.  Generally, different types of contracts are executed depending on the nature of the work to be executed. Examination of tender documents in Finance will depend on the type of contract proposed therein.  While examining the tender documents, the finance should keep the following in mind: • Guidelines, policies, circulars issued from time to time by NHPC or GOI • Relevant tax laws, EXIM policy of the GOI, taxation laws of the state in which the work is to be executed, price preference/ purchase preference policy of GOI, FEMA, etc.  Any change in the approved terms and conditions should be examined critically to see whether the proposed change is in the overall interest of NHPC. Page 47 of 58
  • 48. ISSUE OF TENDER DOCUMENT  Once the Competent Authority approves the tender documents, the tender is notified through Notice Inviting Tender (NIT) giving wide publicity either through press advertisements or through other means depending on the estimated cost, type of tender like open tender/ limited tender/ single tender, etc. as per the policy of the corporation.  The procurement department receives the request/application for the tender documents from vendor (in response to the NIT). The tender fee is received in form of cheque/ demand draft (DD) only, as per guidelines issues by NHPC from time to time. The procurement department forwards a summary of tender documents along with the cheque/ DD to the finance department for necessary accounting and action Tender opening  Tender opening will be done by a Tender Opening Committee (TOC) constituted by a Competent Authority in which one member is from Finance. The authorized representatives of the bidders are also invited to be present at the Tender Opening, if they wish so.  Generally the bidders are asked to furnish EMD in a separate envelope which shall be opened first. Techno-commercial/ price bids of only those bidders who have submitted the requisite amount of EMD shall be opened and considered for further evaluation.  A spot report of the tender opening, indicating there in the following, shall be prepared and signed by all the members of TOC: • Number of tenders received. • Name of the bidders. Page 48 of 58
  • 49. • Number of tenders received late and not considered. • Amount of EMD/ bid security • Rates of taxes and duties quoted by the bidder. • Amount/ rate of discount, if any, offered by the bidder. EVALUATION OF TENDERS The evaluation of the Tenders is done by the duly approved Tender Evaluation Committee (TEC). This evaluation is normally done in two stages. The first stage is techno-commercial evaluation vide which the responsiveness to the technical specifications laid down in the tender and the commercial terms and conditions are seen. The TEC at this stage obtains clarification and confirmations from the bidders if any required. After the deliberations on the tender along with the clarifications by the bidders the TEC recommends the bidders whose Price Bids are to be opened. The recommendations of the TEC and the date of the opening of Price Bid is got approved by the Competent Authority and the same is intimated to the bidders to enable their representative to be present at the Price Bid Opening if they wish so. Checking/ vetting of comparative statements While checking the comparative statements in finance the following aspects have to be verified: 1. The rates taken in the comparative statement are mentioned in the original price schedule. 2. Wherever there is a variation between rates quoted in words as well as in figures, the rates mentioned in words are taken for comparison. 3. If there is a variation between the rate of any individual item and the total amount (i.e. quantity multiplied by rates) the unit rate is taken for comparison purpose and accordingly the total will be corrected. 4. All arithmetical calculations are checked for accuracy. After checking the comparative statement in Finance, the Finance Executive, should record a certificate under his signature. Page 49 of 58
  • 50. The TEC then scrutinizes the comparative statement and after obtaining the approval of the Competent Authority negotiates with the first lowest bidder if required. The recommendations of the TEC are then put up to the Competent Authority (Board in the case of Major Contracts) for approval and subsequently process for issue for letter of award. Vetting of letter of award Vetting of letter of award to be issued to the successful tenderer (First lowest tenderer) after approval of Competent Authority, is to be done in the Finance. The Finance will check that: • The particulars regarding quantity, quality and rates are clearly brought out. • The particulars of the contracts providing payment terms, taxes and duties, price variation clauses, performance guarantee, liquidated damages, delivery/ construction schedule, place of delivery, dispatch instruction, name of consignee, penalty for delay, etc. • No undue liability is imposed on NHPC due to omission of a necessary clause or insertion of an unauthorized clause or by faulty wording of any conditions • All the changes agreed to at the time of pre award discussion between the supplier and the TEC and approved by the Competent Authority have been incorporated suitably in the final agreement Finance executive has to ensure that at every stage of tendering, approval of the Competent Authority has been obtained. PROCESSING OF PSL (PRICE STORE LEDGER) This process deals with the procedure for valuation of material and Processing of Price Store Ledger (PSL) by NHPC. The following documents are used to record transactions in the PSL: • Goods received note (GRN) for receipt of material from suppliers • Material Return Note (MRN) for return of material with the unit • Store Transfer Note- IN (STN-IN) for receipt of material from other units • Material Issue Note (MIN) for issue of material to the indenting department within the unit Page 50 of 58
  • 51. • • Store Transfer Note-OUT (STN-OUT) for issue of material to other units Store Adjustment Note (SAN) for making any adjustment in the stores. PROCEDURE OF STORES ACCOUNTING WORK SUPPLY End-user SERVICE MR (material requisition) Yes-MIN (material Issue Note Store division No-NAC (non availability End-user department PR (purchase requisition) P&C division (procurement and contract division) Tendering (lowest bid) P&C division – issues SO (supply order) Page 51 of 58
  • 52. Supplier – supply to store Store division GRS (goods receipt sheet) Inventory A/c …..Dr. To Store payment control A/c End user MR (material requisition) Store Division- yes (MIN) Fixed asset ………… Dr. To inventory Invoicing store division Store Payment…… Dr. To sundry creditors A/c Payment finance Sundry creditor …..Dr. To bank A/c Page 52 of 58 finance division
  • 53. INVENTORIES (` in Crore) Particular As at 31st march,’12 As at 31st march,’11 (Valuation as per Accounting Policy No. 7) 64.38 57.46 i) Stores and spares 0.42 64.80 1.12 58.58 Stores in transit/ pending inspection ii) Loose tools 1.45 1.38 iii) Scrap inventory 1.75 2.36 iv) Material issued to contractors/ fabricators 0.66 0.29 24.85 28.90 43.81 33.71 28.90 23.07 1.63 16.95 - 0.01 Amount used during the year 1.46 10.18 Amount reversed during the year 4.22 0.95 v) Less: Provision for obsolete store & spares *1 Provisions for obsolete store & spares *1 Opening Balance Addition during the year Adjustment during the year Page 53 of 58
  • 54. Closing balance 24.85 28.90 INTERPRETATION & ANALYSIS  Valuation as per accounting• • • As we have seen in table the inventories of PHEP 2 is increasing year by year which tends to growth. The decrease in Scrap inventory shows that in 2012 there is efficient utilization of inventory as compared to 2011. The figure of provision for obsolete store shows 4.05 crore difference , which reveals profitable ratio.  Materials are procured by tendering process. In certain emergency situations of shortage of materials, a committee is formed to perform market survey & purchase the required materials through local purchase.  Materials to be bought are either inspected at the supplier’s place or after receiving at the stores of corporation.  Issue of materials from stores is based upon the indent requisition & availability of materials in stores.  Rate of materials issued by the stores is determined by “Weighted average method” in N.H.P.C.  NHPC has bought a customized MMS (Materials Management System) package from TCS for Rs. 14 lakhs to maintain the stores records & to connect this system with other sites & Projects also. Page 54 of 58
  • 55.  But due to non-availability of basic infrastructure this system is not functioning fully yet.  In NHPC no specific method of inventory management is being employed.  Orders of requisition are based upon the approximate consumption of materials & the past experience of the department. FINDINGS  Hydro‐power projects typically require a long gestation period thus posing a risk of delay in execution.  Over all position of company is good but there is need to more improvement.  Parbati Project Stage-II is committed to spend Rs. 35.40 crore for habitat improvement and conservation of endangered species like Jujurana (Western Tragopan) in GHNP(Great Himalayans National Park )  Theoretical as well as practical knowledge is being adopted in PHEP-2 regarding their stores management. LIMITATIONS  Inadequate power generation capacity;  Lack of optimum utilization of the existing generation capacity;  Inadequate inter-regional transmission links; Page 55 of 58
  • 56.  Inadequate and ageing sub-transmission & distribution network leading to power cuts and local failures/faults;  Large scale theft and skewed tariff structure;  Slow pace of rural electrification;  Inefficient use of electricity by the end consumer.  Lack of grid discipline CONCLUSION NHPC Limited has several units, which are engaged in operation of generating electricity or are under construction stage. Various types of stores inventory need to be maintained to ensure smooth running of these power stations and construction of the units under construction. The purchase and stores accounting procedures shall be subject to NHPC’s policy for procurement of stores, delegation of powers and administrative instructions issued in this regard from time to time. The stores inventory includes inventory for construction (like steel, cement, etc.) as well as for operation purposes. NHPC uses all the procedure and guidelines for the stores management discussed in the report. RECOMMENDATIONS Page 56 of 58
  • 57. Procurement of materials is based upon the requisitions being asked to each department which in turn are based upon the past experiences and approximate consumption of materials by the corporation. This implies that there is no inventory method being employed by NHPC. No re-order level is being determined so it sometimes may lead to shortages of materials at worksites which lead to wastage of many valuable working hours and financial resources. BIBLIOGRAPHY/REFERENCES BOOKS • Manual of N.H.P.C. • Hand book of N.H.P.C. • Magazines of N.H.P.C. • N.H.P.C. news Page 57 of 58