Eurocodes for the assessment of the
existing structures.

RWS Managing Contractor
Agenda:
    1. Introduction
        Bridges
        Defects
        Proposed Solution
    2. Use of Eurocodes in Assessment.
        Lane arrangement
        Load Factors
        Reduction Factors




2
Introduction
       Joint Venture : Royal     Haskoning, Arup, Greisch
       Client :   Rijkwaterstaat
       8 Major bridges in the Netherlands fatigue and strength issues

       Renovation over an 8 year programme

       To give 30 yrs. further useful life.

       Concrete overlay already decided solution for fatigue




3
Bridges




4
• Waalbrug Ewijk




5
• Waalbrug Ewijk




6
Defects

       Orthotropic Decks



       Fatigue Problems




7
8
9
Proposed Solution




10
11
Eurocodes

     National   Design
     Annexes    Memos

12
Eurocodes used for the assessment:
        Eurocode 0: Basis of structural design               - NEN1990

        Eurocode 1: Action on the structures                 - NEN1991

        Eurocode 2: Design of concrete structures            - NEN1992

        Eurocode 3: Design of steel structures               - NEN1993

        Eurocode 4: Design of composite steel and concrete structures
                                                               - NEN1994




13
Lane arrangement on the bridge:




14
Lane arrangement on the bridge:


                         12.25 m                         12.25 m
           3.0 m    3.0 m    3.0 m   3.0 m   3.0 m   3.0 m    3.0 m   3.0 m




            3.0 m     3.0 m      3.0 m          3.0 m     3.0 m       3.0 m




15
Load Factors:




16
Load Factors:

 Action                Default values   Dutch National   Modified values for
                       from Eurocode    Annex            assessment

 Permanent Load               1.35             1.5          1.25 (6.10a)
                                                            1.10 (6.10b)

 Variable Traffic             1.35             1.5          1.10 (6.10a)
 Load                                                       1.25 (6.10b)

 Other Variable Load          1.5              1.65          1.2 (6.10a)
                                                             1.5 (6.10b)




17
Reduction factors.

        Shortening of the reference design life
        Trend reduction in load magnitude




18
Shortening of the reference design life:

                                           1.0

                0.96




                               Reference period   Reduction factor
                               100 years          1.00
                               15 years           0.95
                               1.0 years          0.88
                               Month              0.82



19
Trend reduction in live load magnitude:



       Influence 2000     2010     2020     2030     2040     2050
       length L
       [m]
       0           1.00     1.00     1.00     1.00     1.00     1.00
       20          0.89     0.91     0.93     0.96     0.98     1.00
       50          0.82     0.86     0.89     0.93     0.96     1.00
       75          0.78     0.83     0.87     0.91     0.96     1.00
       100         0.76     0.81     0.85     0.90     0.95     1.00
       150         0.75     0.80     0.85     0.90     0.95     1.00
       200         0.75     0.80     0.85     0.90     0.95     1.00




20
Trend reduction in live load magnitude:


                                     30 years
       Influence 2000     2010     2020     2030     2040     2050
       length L
       [m]
       0           1.00     1.00     1.00     1.00     1.00     1.00
       20          0.89     0.91     0.93     0.96     0.98     1.00
       50          0.82     0.86     0.89     0.93     0.96     1.00
       75          0.78     0.83     0.87     0.91     0.96     1.00
       100         0.76     0.81     0.85     0.90     0.95     1.00
       150         0.75     0.80     0.85     0.90     0.95     1.00
       200         0.75     0.80     0.85     0.90     0.95     1.00




21
Reduction factors.

        Shortening of the reference design life
        Trend reduction in load magnitude




               DL+0.96 x 0.95 x LL



22
Thank You




23

Weitere ähnliche Inhalte

Ähnlich wie Eurocodes for the assessment of the existing structures

Dr. mansour el bardisi -noise impact assessment for metro and railway
Dr. mansour el  bardisi -noise impact assessment for metro and railwayDr. mansour el  bardisi -noise impact assessment for metro and railway
Dr. mansour el bardisi -noise impact assessment for metro and railway
imadhammoud
 
Deutsche EuroShop | Company Presentation | 03/11
Deutsche EuroShop | Company Presentation | 03/11Deutsche EuroShop | Company Presentation | 03/11
Deutsche EuroShop | Company Presentation | 03/11
Deutsche EuroShop AG
 
Datasheet - Aerospace
Datasheet - AerospaceDatasheet - Aerospace
Datasheet - Aerospace
Gagan Sood
 
Som grower screw machine products
Som grower screw machine productsSom grower screw machine products
Som grower screw machine products
Rajendra Inani
 
211053940 mechanisms-for-projects-drawings-pr-pdf
211053940 mechanisms-for-projects-drawings-pr-pdf211053940 mechanisms-for-projects-drawings-pr-pdf
211053940 mechanisms-for-projects-drawings-pr-pdf
Trung Quoc Le
 
Deutsche EuroShop | Company Presentation | 04/11
Deutsche EuroShop | Company Presentation | 04/11Deutsche EuroShop | Company Presentation | 04/11
Deutsche EuroShop | Company Presentation | 04/11
Deutsche EuroShop AG
 
Epgp0 macr group assignment - term v - group 4
Epgp0 macr  group assignment - term v - group 4Epgp0 macr  group assignment - term v - group 4
Epgp0 macr group assignment - term v - group 4
Rajendra Inani
 
[Name Sponged] Consulting Project
[Name Sponged] Consulting Project[Name Sponged] Consulting Project
[Name Sponged] Consulting Project
Ryan Elder
 
Mmx webcast ingles 1 t12
Mmx webcast ingles 1 t12Mmx webcast ingles 1 t12
Mmx webcast ingles 1 t12
mmxriweb
 
Soheil Talebi General Talk Sep 2016
Soheil Talebi General Talk Sep 2016Soheil Talebi General Talk Sep 2016
Soheil Talebi General Talk Sep 2016
Soheil Talebi
 

Ähnlich wie Eurocodes for the assessment of the existing structures (20)

Dr. mansour el bardisi -noise impact assessment for metro and railway
Dr. mansour el  bardisi -noise impact assessment for metro and railwayDr. mansour el  bardisi -noise impact assessment for metro and railway
Dr. mansour el bardisi -noise impact assessment for metro and railway
 
Deutsche EuroShop | Company Presentation | 03/11
Deutsche EuroShop | Company Presentation | 03/11Deutsche EuroShop | Company Presentation | 03/11
Deutsche EuroShop | Company Presentation | 03/11
 
Datasheet - Aerospace
Datasheet - AerospaceDatasheet - Aerospace
Datasheet - Aerospace
 
Som grower screw machine products
Som grower screw machine productsSom grower screw machine products
Som grower screw machine products
 
Section 1-6
Section 1-6Section 1-6
Section 1-6
 
211053940 mechanisms-for-projects-drawings-pr-pdf
211053940 mechanisms-for-projects-drawings-pr-pdf211053940 mechanisms-for-projects-drawings-pr-pdf
211053940 mechanisms-for-projects-drawings-pr-pdf
 
Deutsche EuroShop | Company Presentation | 04/11
Deutsche EuroShop | Company Presentation | 04/11Deutsche EuroShop | Company Presentation | 04/11
Deutsche EuroShop | Company Presentation | 04/11
 
Rbcm coriolis mass flowmeter 2017
Rbcm coriolis mass flowmeter 2017Rbcm coriolis mass flowmeter 2017
Rbcm coriolis mass flowmeter 2017
 
Golden Quadrilateral Iip
Golden Quadrilateral IipGolden Quadrilateral Iip
Golden Quadrilateral Iip
 
Zerrin Lovett, Use of e-auctions
Zerrin Lovett, Use of e-auctionsZerrin Lovett, Use of e-auctions
Zerrin Lovett, Use of e-auctions
 
Muni
MuniMuni
Muni
 
Epgp0 macr group assignment - term v - group 4
Epgp0 macr  group assignment - term v - group 4Epgp0 macr  group assignment - term v - group 4
Epgp0 macr group assignment - term v - group 4
 
[Name Sponged] Consulting Project
[Name Sponged] Consulting Project[Name Sponged] Consulting Project
[Name Sponged] Consulting Project
 
Mmx webcast ingles 1 t12
Mmx webcast ingles 1 t12Mmx webcast ingles 1 t12
Mmx webcast ingles 1 t12
 
Soheil Talebi General Talk Sep 2016
Soheil Talebi General Talk Sep 2016Soheil Talebi General Talk Sep 2016
Soheil Talebi General Talk Sep 2016
 
Oil & Gas
Oil & GasOil & Gas
Oil & Gas
 
Pushover analysis of simply support concrete section beam subjected to increm...
Pushover analysis of simply support concrete section beam subjected to increm...Pushover analysis of simply support concrete section beam subjected to increm...
Pushover analysis of simply support concrete section beam subjected to increm...
 
Design of Wind Generated Structural Response of a Tall Building Situated in T...
Design of Wind Generated Structural Response of a Tall Building Situated in T...Design of Wind Generated Structural Response of a Tall Building Situated in T...
Design of Wind Generated Structural Response of a Tall Building Situated in T...
 
Rt1 sanles.s mercedes benz sl2
Rt1 sanles.s mercedes benz sl2Rt1 sanles.s mercedes benz sl2
Rt1 sanles.s mercedes benz sl2
 
Yellowing of cotton fabric due to softners -by Labeesh Kumar
Yellowing of cotton fabric due to softners -by Labeesh KumarYellowing of cotton fabric due to softners -by Labeesh Kumar
Yellowing of cotton fabric due to softners -by Labeesh Kumar
 

Kürzlich hochgeladen

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Kürzlich hochgeladen (20)

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 

Eurocodes for the assessment of the existing structures

  • 1. Eurocodes for the assessment of the existing structures. RWS Managing Contractor
  • 2. Agenda: 1. Introduction Bridges Defects Proposed Solution 2. Use of Eurocodes in Assessment. Lane arrangement Load Factors Reduction Factors 2
  • 3. Introduction Joint Venture : Royal Haskoning, Arup, Greisch Client : Rijkwaterstaat 8 Major bridges in the Netherlands fatigue and strength issues Renovation over an 8 year programme To give 30 yrs. further useful life. Concrete overlay already decided solution for fatigue 3
  • 7. Defects Orthotropic Decks Fatigue Problems 7
  • 8. 8
  • 9. 9
  • 11. 11
  • 12. Eurocodes National Design Annexes Memos 12
  • 13. Eurocodes used for the assessment: Eurocode 0: Basis of structural design - NEN1990 Eurocode 1: Action on the structures - NEN1991 Eurocode 2: Design of concrete structures - NEN1992 Eurocode 3: Design of steel structures - NEN1993 Eurocode 4: Design of composite steel and concrete structures - NEN1994 13
  • 14. Lane arrangement on the bridge: 14
  • 15. Lane arrangement on the bridge: 12.25 m 12.25 m 3.0 m 3.0 m 3.0 m 3.0 m 3.0 m 3.0 m 3.0 m 3.0 m 3.0 m 3.0 m 3.0 m 3.0 m 3.0 m 3.0 m 15
  • 17. Load Factors: Action Default values Dutch National Modified values for from Eurocode Annex assessment Permanent Load 1.35 1.5 1.25 (6.10a) 1.10 (6.10b) Variable Traffic 1.35 1.5 1.10 (6.10a) Load 1.25 (6.10b) Other Variable Load 1.5 1.65 1.2 (6.10a) 1.5 (6.10b) 17
  • 18. Reduction factors. Shortening of the reference design life Trend reduction in load magnitude 18
  • 19. Shortening of the reference design life: 1.0 0.96 Reference period Reduction factor 100 years 1.00 15 years 0.95 1.0 years 0.88 Month 0.82 19
  • 20. Trend reduction in live load magnitude: Influence 2000 2010 2020 2030 2040 2050 length L [m] 0 1.00 1.00 1.00 1.00 1.00 1.00 20 0.89 0.91 0.93 0.96 0.98 1.00 50 0.82 0.86 0.89 0.93 0.96 1.00 75 0.78 0.83 0.87 0.91 0.96 1.00 100 0.76 0.81 0.85 0.90 0.95 1.00 150 0.75 0.80 0.85 0.90 0.95 1.00 200 0.75 0.80 0.85 0.90 0.95 1.00 20
  • 21. Trend reduction in live load magnitude: 30 years Influence 2000 2010 2020 2030 2040 2050 length L [m] 0 1.00 1.00 1.00 1.00 1.00 1.00 20 0.89 0.91 0.93 0.96 0.98 1.00 50 0.82 0.86 0.89 0.93 0.96 1.00 75 0.78 0.83 0.87 0.91 0.96 1.00 100 0.76 0.81 0.85 0.90 0.95 1.00 150 0.75 0.80 0.85 0.90 0.95 1.00 200 0.75 0.80 0.85 0.90 0.95 1.00 21
  • 22. Reduction factors. Shortening of the reference design life Trend reduction in load magnitude DL+0.96 x 0.95 x LL 22