Air Barrier Paper   Air Barrier Paper – a moisture resistant barrier that covers the sheathing and acts as a backup waterproofing to the siding that is applied over it. The barriers function is to control air from penetrating or escaping the building envelope.
Attic Ventilation Attic ventilation is needed to allow warm air to escape the roof area and also allow fresh air to circulate. Soffit Vent Soffit vents are used to allow air to flow into the attic or the space below the roof sheathing.
Attic Ventilation Ridge Vent Ridge vents allows air to circulate in and out of the roof at the ridge.
Attic Ventilation Gable Vent   Roof Turbine Gable vents  and Roof Turbines are use to exhaust excess heat and humidity from an attic.
Backhoe A backhoe is a piece of excavating equipment that has a bucket attached to a digging arm. Bucket Width on this particular backhoe was 16 inches across. This piece of equipment is used primarily for digging and excavating.
Batter Boards Batter Board are temporary frames built just outside the corner that aid in marking the boundaries and establish the level line of the structure.
Brick Arches Brick Arch #1 and #2 - both of these arches are Roman Arches.
Brick Arches Roman Brick arch with a keystone
Brick Arches Centering Centering is a temporary framework used for arch construction.
Brick Bonds Stack Bond  - brick work that is laid so that all joints align vertically. Running Bond – brickwork consisting entirely of stretchers. Stack Bond Running Bond Running Bond Stack Bond
Brick Bonds Soldiers, Headers, and Rowlock Soldiers Headers Rowlock Soldiers Headers Headers Rowlock
Brick Bonds Sailors
Brick Bonds Stretcher Rowlock (Shiners)
Brick Sizes Brick Size #1 – 3 ½ “ x 2 ¼ ” x 7 5/8 ” Modular Brick Size #2 – 3 5/8 “ x 3 5/8 ” x 11 5/8 ” Utility Brick Size #1 Brick Size #2 Brick Size #2 Brick Size #1
Bulldozer A piece of earth moving equipment that has a large plated front used to push soil. Bulldozers are primarily used for pushing soil.
Cladding Brick and EIFS Clad Structure EIFS Brick Brick EIFS
Cladding Stone Clad Structure Wood Board Clad Structure Random Rubble Pattern
Cladding Wood Shingle Clad Structure Shake – a shingle split from a block of wood. Shingle – a small unit of water resistant material installed in an overlapping fashion with many other units to render the wall water tight.
Code Requirements Egress window from a bedroom.  This window measured (per side) 2’6” x  5’, 12.5 Sqf total area, and is 2’6” AFF. IBC Requirements are minimum opening of 5.7 Sqft, minimum height  of 24”,  minimum width of 20” and less than or equal to 44 “ sill height AFF. Yes it meets IBC requirements.
Code Requirements of Stair Tread = 11 1/8” Riser = 7 7/16” IBC requirements are 7 ¾” maximum riser height and 11” minimum tread depth and no more than 3/8” overall deviation in riser heights. Yes the stair meets the IBC requirements.
Concrete Joints Control Joint is an intentional discontinuity in a structure designed to form a plane of weakness where cracking can occur.  So that cracking is minimized elsewhere.
Concrete Joints Isolation joints are used to relieve flexural stresses due to vertical movement of slab-on-grade applications that adjoin fixed foundation elements such as columns, building or machinery foundations, etc. In the photo the isolation joint separates the two concrete slabs isolating one slab from another.
Concrete Masonry Unit (CMU) 1 CMU=3 brick courses CMU or Concrete Masonry Unit is a block of hardened concrete, with or without hollow cores, designed to be laid in the same manner as a brick stone; a concrete block. ‘ Typical Dimensions are 7 5/8” X 15 5/8”
Concrete Masonry Unit 2 Different Size CMU 4” and 12” CMU  12”   4” 12”  4”
Decorative Concrete Masonry Units Split Block
Doors Exterior Flush Door
Doors Exterior Panel Door Top Rail Panel Lock rail Bottom Rail Top Rail Panel Lock rail Bottom Rail Stile Stile
Doors Transom and Side Lights Transom – a small window directly above a door. Side Light – a tall, narrow window beside a door. Transom Side Light Side Light Transom
Electrical Components Underground Transformer Box Transformer is an electrical device that changes the voltage of alternating current.
Electrical Components Service Head Service Head is the assembly by which electricity is conducted from outdoor lines to the meter base.
Electrical Components Meter A meter is a device that measures the quantity of electricity consumed.
Electrical Components Service Panel A service panel is the first point of entry beyond the meter where the electricity is distributed throughout to varying circuits.
Electrical Components Duplex Receptacle
Framing Elements #1 Anchor Bolt
Framing Elements #2 Sill Plate
Framing Element #3 Floor Joist
Framing Element #4 Subflooring
Framing Element #5 Sole Plate
Framing Element #6 Stud, #7 Top Plate, and #8 Ceiling Joist Ceiling Joist Top Plate Stud Ceiling Joist Top Plate Stud
Framing Element #9 Rafters and #10 Roof Decking Rafter Roof Decking Roof Decking Rafter
Framing Element #11 Sheathing
Framing Element #12 Stringer
Front End Loader    A front end loader is a piece of earth moving equipment that scoops or loads soil with it’s bucket.
Gypsum Board  Gypsum Board is an interior facing panel made of a gypsum core between two faces of paper.
Heat Pump  Advantage – One advantage is they save on energy thus generating lower energy bills. Disadvantage – In very cold climates a back up system may be needed to effectively heat the home. Compressor and Condenser The air conditioner compressor pumps cool refrigerant vapor from the air conditioner evaporator and compresses the vapor. The air conditioner condenser coils receive the hot vapor from the compressor and immediately the air conditioner compressor begins to condense the refrigerant into a liquid by removing heat from the hot vapor
Heat Pump  Air Handling Unit The Air Handling Unit circulates conditioned air throughout the home.
Insulation The purpose of insulation is to limit the transfer of heat. Blanket Insulation
Insulation Loose Fill
Insulation Foamed Insulation
Insulation Rigid Board Insulation
Lintel  A lintel is a beam that carries the load of a wall across an opening.
Mortar Mortar Joint #1 is on the exterior of a commercial office building.  It is a tooled joint, measures 3/8”, and is most likely Type N Mortar.
Mortar Mortar Joint #2 on the exterior wall of  home. This joint is troweled, measures ½”, and is probably Type N Mortar.
Oriented Strand Board  Oriented Strand  Board or OSB a building panel composed of long shreds of wood fiber oriented in specific directions and bonded together under pressure.  It is a non-veneered panel.
Plumbing Lavatory – 1 ½” pipe drain size
Plumbing Water Closet – drain piping size 3”
Plumbing  Tub set prior to gypsum board being installed
Plumbing Plumbing Roof Vent  The plumbing roof vent allows for the plumbing fixtures to drain freely by letting air into the drain system.
Plumbing Kitchen Sink Drop in
Plywood  Plywood is a wood panel composed of an odd number of layers of wood veneer bonded together under pressure. Veneer is a thin layer, sheet, or facing.
Rebar Size #4 = ½ inch diameter Deformations in the bars are in place to allow for the concrete to bond to the bars.
Steep Roof Drainage Gutter –  a channel that collects water at the eave of the roof. Down Spout – a vertical pipe for conducting water from a roof to a lower level. Splash Block – a small block of concrete or plastic used to divert water at the bottom of a downspout.  Gutter Down Spout Splash Block
Steep Roof Materials Underlayment Underlayment is a water resistant material that is placed directly beneath the exposed roofing material. The material protects the roof sheathing and the structure beneath it from the weather until the exposed roofing material is installed.
Steep Roof Materials Clay Tile Roof
Steep Roof Materials Slate Roof Shingle is a small unit of water-resistant material nailed in overlapping fashion with many other such units to render a wall or slopping roof water tight. Slate tile roof  Slate tile roof  Individual slate tiles left over from the roof installation.
Steep Roof Materials Metal Panel Roof Metal panel roofs are typically constructed from galvanized panels.
Steep Roof Shapes Gable and Gambrel Gambrel Gambrel Gable Gable
Steep Roof Shapes Hip Roof
Steep Roof Shapes Mansard
Steep Roof Terms Ridge Ridge is the level intersection of two roof planes.
Steep Roof Terms Valley Valley is a trough formed by the intersection of two roof slopes.
Steep Roof Terms Eave  and Rake Eave is the horizontal edge at the low side of a sloping roof. Rake is the sloping edge of a steep roof. Eave Eave Rake Rake
Steep Roof Terms Soffit and Fascia Soffit is the undersurface of a horizontal element of a building such as a roof overhang. Fascia is the exposed vertical face of an eave. Fascia Soffit Soffit Fascia
Steep Roof Terms Building without fascia
Stone Random Rubble Pattern
Stone Coursed Rubble Pattern
Stone Random Ashlar Pattern
Stone Coursed Ashlar Pattern
Vapor Retarder Vapor retarder placed on the face of a piece bat insulation. The vapor retarder is typically placed on the interior face of the bat insulation.
Water Proofing The waterproofing is applied to prevent water from flowing through the CMU wall. This is a Liquid Applied from of water proofing.
Weep Hole Allows for moisture to escape from behind the brick.
Welded Wire Fabric This is 4” x 4”
Window  Type #1 – This is an Outswing Casement because it is hinged along the inside of the window.  Type #2 –This is a Double Hung window because both sashes are able to moved up or down. Type #1 – Outswing Casement Type #2 – Double Hung Type #1 – Outswing Casement Type #2 – Double Hung
Window Type #3 – This is a Single Hung because only the bottom sash is capable of moving up or down.

Weitere ähnliche Inhalte

Was ist angesagt?

Visual Dictionary Monday update
Visual Dictionary Monday updateVisual Dictionary Monday update
Visual Dictionary Monday updateWallboard
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-BlockingBlocking
 
Visual Dictionary-workability
Visual Dictionary-workabilityVisual Dictionary-workability
Visual Dictionary-workabilityworkability
 
Visual Dictionary- Gauge
Visual Dictionary- GaugeVisual Dictionary- Gauge
Visual Dictionary- GaugeGauge1
 
Visual Dictionary- Zoning
Visual Dictionary- ZoningVisual Dictionary- Zoning
Visual Dictionary- ZoningZoning
 
Visual Dictionary-Anchorbolts
Visual Dictionary-AnchorboltsVisual Dictionary-Anchorbolts
Visual Dictionary-AnchorboltsAnchorbolts
 
Reshoring - use this one if it's up
Reshoring - use this one if it's upReshoring - use this one if it's up
Reshoring - use this one if it's upreshoring
 
Visual Dictionary - Anchorbolts
Visual Dictionary - AnchorboltsVisual Dictionary - Anchorbolts
Visual Dictionary - AnchorboltsAnchorbolts
 
Visual dictionary - Sp10knothole
Visual dictionary - Sp10knotholeVisual dictionary - Sp10knothole
Visual dictionary - Sp10knotholeSp10knothole
 
Visual Dictionary- Lighttransmitting
Visual Dictionary- LighttransmittingVisual Dictionary- Lighttransmitting
Visual Dictionary- Lighttransmittinglighttarnsmitting
 
Visual Dictionary Shores
Visual Dictionary ShoresVisual Dictionary Shores
Visual Dictionary Shoresguestac5b76
 
BSCI 2300
BSCI 2300BSCI 2300
BSCI 2300stucco1
 
Visual Dictionary (2)
Visual Dictionary (2)Visual Dictionary (2)
Visual Dictionary (2)Shawn Mancill
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionarymasonry
 
Visual Dictionary Day 3
Visual Dictionary Day 3Visual Dictionary Day 3
Visual Dictionary Day 3Sp10tyvex
 
Visual dictionary day 2
Visual dictionary day 2Visual dictionary day 2
Visual dictionary day 2Sp10tyvex
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual DictionaryVitreous
 

Was ist angesagt? (19)

Visual Dictionary Monday update
Visual Dictionary Monday updateVisual Dictionary Monday update
Visual Dictionary Monday update
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-Blocking
 
Visual Dictionary-workability
Visual Dictionary-workabilityVisual Dictionary-workability
Visual Dictionary-workability
 
Final bsci ppt
Final bsci pptFinal bsci ppt
Final bsci ppt
 
Sp10Lumber
Sp10LumberSp10Lumber
Sp10Lumber
 
Visual Dictionary- Gauge
Visual Dictionary- GaugeVisual Dictionary- Gauge
Visual Dictionary- Gauge
 
Visual Dictionary- Zoning
Visual Dictionary- ZoningVisual Dictionary- Zoning
Visual Dictionary- Zoning
 
Visual Dictionary-Anchorbolts
Visual Dictionary-AnchorboltsVisual Dictionary-Anchorbolts
Visual Dictionary-Anchorbolts
 
Reshoring - use this one if it's up
Reshoring - use this one if it's upReshoring - use this one if it's up
Reshoring - use this one if it's up
 
Visual Dictionary - Anchorbolts
Visual Dictionary - AnchorboltsVisual Dictionary - Anchorbolts
Visual Dictionary - Anchorbolts
 
Visual dictionary - Sp10knothole
Visual dictionary - Sp10knotholeVisual dictionary - Sp10knothole
Visual dictionary - Sp10knothole
 
Visual Dictionary- Lighttransmitting
Visual Dictionary- LighttransmittingVisual Dictionary- Lighttransmitting
Visual Dictionary- Lighttransmitting
 
Visual Dictionary Shores
Visual Dictionary ShoresVisual Dictionary Shores
Visual Dictionary Shores
 
BSCI 2300
BSCI 2300BSCI 2300
BSCI 2300
 
Visual Dictionary (2)
Visual Dictionary (2)Visual Dictionary (2)
Visual Dictionary (2)
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
Visual Dictionary Day 3
Visual Dictionary Day 3Visual Dictionary Day 3
Visual Dictionary Day 3
 
Visual dictionary day 2
Visual dictionary day 2Visual dictionary day 2
Visual dictionary day 2
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 

Ähnlich wie Visual Dictionary

Visual Dictionary - Chamfer
Visual Dictionary - ChamferVisual Dictionary - Chamfer
Visual Dictionary - ChamferChamfer
 
Visual dictionary
Visual dictionaryVisual dictionary
Visual dictionaryJosh Jordan
 
Visual Dictionary Shores
Visual Dictionary ShoresVisual Dictionary Shores
Visual Dictionary ShoresShores
 
Visual Dictionary - Plywood
Visual Dictionary - PlywoodVisual Dictionary - Plywood
Visual Dictionary - Plywoodplywood
 
Visual Dictionary - Damper
Visual Dictionary - DamperVisual Dictionary - Damper
Visual Dictionary - Damperdamper
 
Visual Dictionary-Underlayment
Visual Dictionary-UnderlaymentVisual Dictionary-Underlayment
Visual Dictionary-UnderlaymentUnderlayment
 
Visual Dictionary - Backsplash
Visual Dictionary - BacksplashVisual Dictionary - Backsplash
Visual Dictionary - BacksplashBacksplash
 
Visual Dictionary - Wythe
Visual Dictionary - WytheVisual Dictionary - Wythe
Visual Dictionary - Wythewythe
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionarylintel
 
Visual Dictionary- Cement1
Visual Dictionary- Cement1Visual Dictionary- Cement1
Visual Dictionary- Cement1cement1
 
Visual Dictionary- Admixture
Visual Dictionary- AdmixtureVisual Dictionary- Admixture
Visual Dictionary- Admixtureadmixture
 
Visual Dictionary- Travertine
Visual Dictionary- TravertineVisual Dictionary- Travertine
Visual Dictionary- TravertineTravertine
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual DictionaryTowercrane
 
Visual Dictionary-Cantilever
Visual Dictionary-CantileverVisual Dictionary-Cantilever
Visual Dictionary-CantileverCantilever
 
Visual Dictionary 2003
Visual Dictionary 2003Visual Dictionary 2003
Visual Dictionary 2003Morgan Bellows
 
Visual Dictionary- Reinforcement
Visual Dictionary- ReinforcementVisual Dictionary- Reinforcement
Visual Dictionary- ReinforcementReinforcement
 
Visual Dictionary-Substrate
Visual Dictionary-SubstrateVisual Dictionary-Substrate
Visual Dictionary-SubstrateSubstrate
 

Ähnlich wie Visual Dictionary (18)

Visual Dictionary - Chamfer
Visual Dictionary - ChamferVisual Dictionary - Chamfer
Visual Dictionary - Chamfer
 
Visual dictionary
Visual dictionaryVisual dictionary
Visual dictionary
 
Visual Dictionary Shores
Visual Dictionary ShoresVisual Dictionary Shores
Visual Dictionary Shores
 
Visual Dictionary - Plywood
Visual Dictionary - PlywoodVisual Dictionary - Plywood
Visual Dictionary - Plywood
 
Visual Dictionary - Damper
Visual Dictionary - DamperVisual Dictionary - Damper
Visual Dictionary - Damper
 
Visual Dictionary-Underlayment
Visual Dictionary-UnderlaymentVisual Dictionary-Underlayment
Visual Dictionary-Underlayment
 
Visual Dictionary - Backsplash
Visual Dictionary - BacksplashVisual Dictionary - Backsplash
Visual Dictionary - Backsplash
 
Visual Dictionary - Wythe
Visual Dictionary - WytheVisual Dictionary - Wythe
Visual Dictionary - Wythe
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
Visual Dictionary- Cement1
Visual Dictionary- Cement1Visual Dictionary- Cement1
Visual Dictionary- Cement1
 
Visual Dictionary- Admixture
Visual Dictionary- AdmixtureVisual Dictionary- Admixture
Visual Dictionary- Admixture
 
Visual Dictionary- Travertine
Visual Dictionary- TravertineVisual Dictionary- Travertine
Visual Dictionary- Travertine
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
Visual Dictionary-Cantilever
Visual Dictionary-CantileverVisual Dictionary-Cantilever
Visual Dictionary-Cantilever
 
Visual Dictionary 2003
Visual Dictionary 2003Visual Dictionary 2003
Visual Dictionary 2003
 
Visual Dictionary- Reinforcement
Visual Dictionary- ReinforcementVisual Dictionary- Reinforcement
Visual Dictionary- Reinforcement
 
fiber board
fiber boardfiber board
fiber board
 
Visual Dictionary-Substrate
Visual Dictionary-SubstrateVisual Dictionary-Substrate
Visual Dictionary-Substrate
 

Visual Dictionary

  • 1. Air Barrier Paper Air Barrier Paper – a moisture resistant barrier that covers the sheathing and acts as a backup waterproofing to the siding that is applied over it. The barriers function is to control air from penetrating or escaping the building envelope.
  • 2. Attic Ventilation Attic ventilation is needed to allow warm air to escape the roof area and also allow fresh air to circulate. Soffit Vent Soffit vents are used to allow air to flow into the attic or the space below the roof sheathing.
  • 3. Attic Ventilation Ridge Vent Ridge vents allows air to circulate in and out of the roof at the ridge.
  • 4. Attic Ventilation Gable Vent Roof Turbine Gable vents and Roof Turbines are use to exhaust excess heat and humidity from an attic.
  • 5. Backhoe A backhoe is a piece of excavating equipment that has a bucket attached to a digging arm. Bucket Width on this particular backhoe was 16 inches across. This piece of equipment is used primarily for digging and excavating.
  • 6. Batter Boards Batter Board are temporary frames built just outside the corner that aid in marking the boundaries and establish the level line of the structure.
  • 7. Brick Arches Brick Arch #1 and #2 - both of these arches are Roman Arches.
  • 8. Brick Arches Roman Brick arch with a keystone
  • 9. Brick Arches Centering Centering is a temporary framework used for arch construction.
  • 10. Brick Bonds Stack Bond - brick work that is laid so that all joints align vertically. Running Bond – brickwork consisting entirely of stretchers. Stack Bond Running Bond Running Bond Stack Bond
  • 11. Brick Bonds Soldiers, Headers, and Rowlock Soldiers Headers Rowlock Soldiers Headers Headers Rowlock
  • 13. Brick Bonds Stretcher Rowlock (Shiners)
  • 14. Brick Sizes Brick Size #1 – 3 ½ “ x 2 ¼ ” x 7 5/8 ” Modular Brick Size #2 – 3 5/8 “ x 3 5/8 ” x 11 5/8 ” Utility Brick Size #1 Brick Size #2 Brick Size #2 Brick Size #1
  • 15. Bulldozer A piece of earth moving equipment that has a large plated front used to push soil. Bulldozers are primarily used for pushing soil.
  • 16. Cladding Brick and EIFS Clad Structure EIFS Brick Brick EIFS
  • 17. Cladding Stone Clad Structure Wood Board Clad Structure Random Rubble Pattern
  • 18. Cladding Wood Shingle Clad Structure Shake – a shingle split from a block of wood. Shingle – a small unit of water resistant material installed in an overlapping fashion with many other units to render the wall water tight.
  • 19. Code Requirements Egress window from a bedroom. This window measured (per side) 2’6” x 5’, 12.5 Sqf total area, and is 2’6” AFF. IBC Requirements are minimum opening of 5.7 Sqft, minimum height of 24”, minimum width of 20” and less than or equal to 44 “ sill height AFF. Yes it meets IBC requirements.
  • 20. Code Requirements of Stair Tread = 11 1/8” Riser = 7 7/16” IBC requirements are 7 ¾” maximum riser height and 11” minimum tread depth and no more than 3/8” overall deviation in riser heights. Yes the stair meets the IBC requirements.
  • 21. Concrete Joints Control Joint is an intentional discontinuity in a structure designed to form a plane of weakness where cracking can occur. So that cracking is minimized elsewhere.
  • 22. Concrete Joints Isolation joints are used to relieve flexural stresses due to vertical movement of slab-on-grade applications that adjoin fixed foundation elements such as columns, building or machinery foundations, etc. In the photo the isolation joint separates the two concrete slabs isolating one slab from another.
  • 23. Concrete Masonry Unit (CMU) 1 CMU=3 brick courses CMU or Concrete Masonry Unit is a block of hardened concrete, with or without hollow cores, designed to be laid in the same manner as a brick stone; a concrete block. ‘ Typical Dimensions are 7 5/8” X 15 5/8”
  • 24. Concrete Masonry Unit 2 Different Size CMU 4” and 12” CMU 12” 4” 12” 4”
  • 25. Decorative Concrete Masonry Units Split Block
  • 27. Doors Exterior Panel Door Top Rail Panel Lock rail Bottom Rail Top Rail Panel Lock rail Bottom Rail Stile Stile
  • 28. Doors Transom and Side Lights Transom – a small window directly above a door. Side Light – a tall, narrow window beside a door. Transom Side Light Side Light Transom
  • 29. Electrical Components Underground Transformer Box Transformer is an electrical device that changes the voltage of alternating current.
  • 30. Electrical Components Service Head Service Head is the assembly by which electricity is conducted from outdoor lines to the meter base.
  • 31. Electrical Components Meter A meter is a device that measures the quantity of electricity consumed.
  • 32. Electrical Components Service Panel A service panel is the first point of entry beyond the meter where the electricity is distributed throughout to varying circuits.
  • 34. Framing Elements #1 Anchor Bolt
  • 35. Framing Elements #2 Sill Plate
  • 36. Framing Element #3 Floor Joist
  • 37. Framing Element #4 Subflooring
  • 38. Framing Element #5 Sole Plate
  • 39. Framing Element #6 Stud, #7 Top Plate, and #8 Ceiling Joist Ceiling Joist Top Plate Stud Ceiling Joist Top Plate Stud
  • 40. Framing Element #9 Rafters and #10 Roof Decking Rafter Roof Decking Roof Decking Rafter
  • 41. Framing Element #11 Sheathing
  • 43. Front End Loader A front end loader is a piece of earth moving equipment that scoops or loads soil with it’s bucket.
  • 44. Gypsum Board Gypsum Board is an interior facing panel made of a gypsum core between two faces of paper.
  • 45. Heat Pump Advantage – One advantage is they save on energy thus generating lower energy bills. Disadvantage – In very cold climates a back up system may be needed to effectively heat the home. Compressor and Condenser The air conditioner compressor pumps cool refrigerant vapor from the air conditioner evaporator and compresses the vapor. The air conditioner condenser coils receive the hot vapor from the compressor and immediately the air conditioner compressor begins to condense the refrigerant into a liquid by removing heat from the hot vapor
  • 46. Heat Pump Air Handling Unit The Air Handling Unit circulates conditioned air throughout the home.
  • 47. Insulation The purpose of insulation is to limit the transfer of heat. Blanket Insulation
  • 51. Lintel A lintel is a beam that carries the load of a wall across an opening.
  • 52. Mortar Mortar Joint #1 is on the exterior of a commercial office building. It is a tooled joint, measures 3/8”, and is most likely Type N Mortar.
  • 53. Mortar Mortar Joint #2 on the exterior wall of home. This joint is troweled, measures ½”, and is probably Type N Mortar.
  • 54. Oriented Strand Board Oriented Strand Board or OSB a building panel composed of long shreds of wood fiber oriented in specific directions and bonded together under pressure. It is a non-veneered panel.
  • 55. Plumbing Lavatory – 1 ½” pipe drain size
  • 56. Plumbing Water Closet – drain piping size 3”
  • 57. Plumbing Tub set prior to gypsum board being installed
  • 58. Plumbing Plumbing Roof Vent The plumbing roof vent allows for the plumbing fixtures to drain freely by letting air into the drain system.
  • 60. Plywood Plywood is a wood panel composed of an odd number of layers of wood veneer bonded together under pressure. Veneer is a thin layer, sheet, or facing.
  • 61. Rebar Size #4 = ½ inch diameter Deformations in the bars are in place to allow for the concrete to bond to the bars.
  • 62. Steep Roof Drainage Gutter – a channel that collects water at the eave of the roof. Down Spout – a vertical pipe for conducting water from a roof to a lower level. Splash Block – a small block of concrete or plastic used to divert water at the bottom of a downspout. Gutter Down Spout Splash Block
  • 63. Steep Roof Materials Underlayment Underlayment is a water resistant material that is placed directly beneath the exposed roofing material. The material protects the roof sheathing and the structure beneath it from the weather until the exposed roofing material is installed.
  • 64. Steep Roof Materials Clay Tile Roof
  • 65. Steep Roof Materials Slate Roof Shingle is a small unit of water-resistant material nailed in overlapping fashion with many other such units to render a wall or slopping roof water tight. Slate tile roof Slate tile roof Individual slate tiles left over from the roof installation.
  • 66. Steep Roof Materials Metal Panel Roof Metal panel roofs are typically constructed from galvanized panels.
  • 67. Steep Roof Shapes Gable and Gambrel Gambrel Gambrel Gable Gable
  • 68. Steep Roof Shapes Hip Roof
  • 69. Steep Roof Shapes Mansard
  • 70. Steep Roof Terms Ridge Ridge is the level intersection of two roof planes.
  • 71. Steep Roof Terms Valley Valley is a trough formed by the intersection of two roof slopes.
  • 72. Steep Roof Terms Eave and Rake Eave is the horizontal edge at the low side of a sloping roof. Rake is the sloping edge of a steep roof. Eave Eave Rake Rake
  • 73. Steep Roof Terms Soffit and Fascia Soffit is the undersurface of a horizontal element of a building such as a roof overhang. Fascia is the exposed vertical face of an eave. Fascia Soffit Soffit Fascia
  • 74. Steep Roof Terms Building without fascia
  • 79. Vapor Retarder Vapor retarder placed on the face of a piece bat insulation. The vapor retarder is typically placed on the interior face of the bat insulation.
  • 80. Water Proofing The waterproofing is applied to prevent water from flowing through the CMU wall. This is a Liquid Applied from of water proofing.
  • 81. Weep Hole Allows for moisture to escape from behind the brick.
  • 82. Welded Wire Fabric This is 4” x 4”
  • 83. Window Type #1 – This is an Outswing Casement because it is hinged along the inside of the window. Type #2 –This is a Double Hung window because both sashes are able to moved up or down. Type #1 – Outswing Casement Type #2 – Double Hung Type #1 – Outswing Casement Type #2 – Double Hung
  • 84. Window Type #3 – This is a Single Hung because only the bottom sash is capable of moving up or down.