SlideShare a Scribd company logo
1 of 63
Demand Driven, Service Oriented,
    CIOE Management framework for
 aligning Business Strategy Managers
with OPS & IT Managers in a Secure,
   Managed Outsourced; environment
Don’s Ideal World




2
But everyone knows Pigs
      don’t FLY !!




  3
What is Service
  Oriented
Architecture?
Restaurant Service Model




  5
Restaurant Service Model




  6
Restaurant Service Model




  7
Restaurant Service Model




  8
Restaurant Service Model




  9
CIO Enterprise Evolution
                                                                          Research Objective
        1. IT Group Role in the Corporation



Projects for    Project initiated   Pervasive         IT Delivery         IT Service Delivery
Specific Pain    by CEO / Exec      IT Tools         Organization            Organization
                                                  Reporting to Finance       Managed by
       2.Security & Reliability Risks to the Corporation                       COO-CIO



  Project        Project Teams     Espionage      Preceding Risks &        All Preceding risks
 Engineers      & Users Impact Virus, Impact       Malicious Intent,        With Impact on
Impact on       on Project areas    on some          Impact on             Business Ops and
Application                      Business Areas     Business Ops          Strategic Objectives
       3.Outsourcing – From doing it yourself to getting it done.



 Vendors    Small adhoc IT IT Mgr & Team         IT Delivery org         IT Service Mgmt Org
Working on Team managing Mini Computer, Managing application                   Managing
 Specific  applications for     LAN based    Life Cycle & Networks       Strategic Objectives
 projects Ac, Inventory, etc. Applications.      Outsourcing               with Non Core
                                              for Cost Arbitration       Activities Outsourced
Evolving ICT Focus to
     a Service Focus




11
The New World View –
Demand driven Service Delivery
                    Service Delivery
 Enterprise
 driven by          Enterprise driven by
                    the need to satisfy
 Technology
                    stated and implied
 Delivery
                    needs of customers,
     Based on
  Success factors
    of the Past
                    employees, owners
                    and society.
                          Based on
                           Success
                       indicators of the
       12                   future
Model Specs
• Scope
   – Aligning Business Strategy Managers with OPS & IT Managers in
     a managed; outsourced environment
• Application Values
   – Achieve operational objectives for business process where ICT
     is an enabler
   – IT Group fully aligned to Operations.
   – Security embedding into the fabric of the system for
     transparent and automatic compliance to International
     Standards and statutory compliance requirements
   – Collaboration between all stake holders in establishing a
     Managing/Working Partner pair Configuration; resulting in
     vibrant consumer-side and supplier-side markets
   – Unified culture, specific to the requirements of the CIO
     Enterprise, integrating Business managers, Users, In-sourced
     and out-sourced staff operational and ICT staff.
• Dimensions Addressed
   – People + Processes + Tools + Partnership
Using the ISO 20000
International Standard as a
    PDCA based, Capability
   Improvement, Engine for
          CIOE OCD & QM
Top 10 Concerns of IT
            Managers
1.    Aligning IT strategy with business strategy
2.    Meeting business and user needs
3.    Coping with change
4.    Dealing with senior management
5.    Managing costs, budgets and resources
6.    Keeping up with technology
7.    Recruiting and retaining staff
8.    Time and resource management
9.    Infrastructure management
10.   Maintaining skills and knowledge



      15
ISO 20000: 05 May be used
        by an organization which
       needs to Improve service
         through the effective
      application of processes to
      monitor and improve service
      quality. Section 1.e Scope
       ISO EC 20000-1:2005(E)




16
ISO 20000 based on
    “Best Practice”
• ISO
        • International Standards Organization
• BSI
        • British Standards Institute
• ITIL
        • IT Infrastructure Library
• Benefits
         independent (of systems and/or platforms)
         flexible (also applicable outside IT)
         applicable worldwide
         applicable in companies, institutions, government



   17
Service Management
         = The Objective Tree =
                                                    Quality
                            ORGANIZATION            Flexibility
                                                    Cost management



                             BUSINESS PROCESSES


                                   IT SERVICE PROVISION


         effective
        organization                       SERVICE MANAGEMENT
         efficient
                                                            ISO
         effective
     IT service provision
                                                           20000
         efficient


18
Demand Driven, Service Oriented,
    CIOE Management framework for
 aligning Business Strategy Managers
with OPS & IT Managers in a Secure,
   Managed Outsourced; environment
Toyota Service Delivery Model




   20
TML’s Integrated IT Landscape
Stake-
holders
                                                                                        Financial              Business
               Customers        Vendors            Dealers           Employees
                                                                                       Institutions            Partners

                                    COMMON HIGH SPEED NETWORK (WAN)
Processes
Processes
Enterprise
Enterprise




              Marketing                       Product          Mfg. Planning      Product Mfg.,        Product
             Intelligence    Strategic                                                                              Customer
                                           Concept Design        & Vendor          & Resource         Distributio
              & Analysis     Planning                                                                                Support
                                           & Development       Development        Management               n


Tools                       CAD/CAM
               CRM                           PDM             MPM        ERP          SRM              MES           WEB
                              KBE


                                                         Information & Analysis

                                          INTEGRATED PRODUCT & PROCESS DATABASE
Foundation
                                         IT SERVICE MANAGEMENT & IT INFRASTRUCTURE
TML Service Channels
                 CAD/CAM,                                                                       PLM –
                                   Crash, NVH,         PLM, KBE, Full   PLM, Advanced
Design           DMU, Durability
                                   PDM                 Vehicle DMU      CAE Simulation
                                                                                                Extended
                 CAE, PDM                                                                       Enterprise
                                   Sheet Metal
Manufacturing    Tool Design,
                                   Forming             GD&T             Digital Factory         Digital Factory
Planning         CNC Machining
                                   Simulation

Manufacturing    Plant Specific
                                   Distributed ERP     Single ERP
                                                                        MES, ERP,               MES, SCM,
Execution        Applications                                           SRM                     Telematics


Supply Chain                       Distributed ERP     Single ERP                               ERP, SRM,
                 VCM & Legacy                                           ERP, SRM
Management                         E-Sourcing          E-Sourcing                               SCM


Channel          VCM Dealers,
                                   VCM-Dealers,        CRM-DMS,         CRM-DMS &               CRM-DMS &
                 Legacy,
Management       Distributed ERP
                                   Distributed ERP     Single ERP       ERP                     ERP

Financial        Plant Specific                                         ERP,EVA                 ERP, SEM,
                                   Distributed ERP     Single ERP
Management       Application                                            Tracking, CFM           SOX

HR               Plant Specific                                         Single Intranet         Knowledge
                                   Single ERP          ERP & ESS
Management       Application                                            Portal                  management

Vehicle          Legacy            Legacy              Integrated ERP
                                                                        Online                  Vehicle
Financing                                                               Customer                Insurance, Up-
                 Systems           Systems             & CRM
                                                                        Financing               selling


                1998-2002                            2002-2005                            2005-2008
                22
Planning & Implementing New or Changed Srv
                         Planning & Implementing New or Changed Srv
                                Planning & Implementing Service Delivery
                                Planning & Implementing Service Delivery
Alignment Predictive Capacity
                                 OPS & IT Infrastructure
                                 Expense per transaction




                                                                                                                        Base Line Year Profit
                                                                 Predictive




                                                                                    Predictive




                                                                                                       Predictive
          Scalability Model




                                                                  Capacity




                                                                                     Capacity




                                                                                                        Capacity
                                                                   Plans




                                                                                      Plans




                                                                                                         Plans
Business Strategy




                                                                                                                        Center Revenue
                                                                                                 ICT Vision
                                                                                  ICT Vision
                                                                 ICT Vision




                                                                                                              Targets
                                                                                                              Interim
                                   Plan End Year Objectives
                                    in % of Revenue Growth




                                                                                                                               OPS & IT Infrastructure
                                                                                                                               Expense per transaction
                                                                                               Profit Center
                                                                                               Profit Center
                                                               Targets
                                                                                               Profit Center
                                                                                               Profit Center
                                                               Interim
                                                                                               Profit Center
                                                                                               Profit Center
                                                                              Profit Center
                                                                              Profit Center
                                                                              Profit Center
                                                                              Profit Center
                                                                              Profit Center
                                                                              Profit Center
                                                              ICT Enabled Business Process
                                                              ICT Enabled Business Process
Evolving ICT Focus to
     a Service Focus




24
Outsourcing Relationship




FlexMode aims for beneficial coexistence within an outsourced
   environment; owned, managed and controlled by the CIOE
CIOE & Supplier Relationship
        • Establishes roles, responsibilities and
          authorities for Managing/Working Partner
          configurations
        • Establishes clear ownership of Service
          Channel responsibilities in establishing and
          meeting Service Level Agreements
        • Sets and tracks performance objectives of
          Process Groups, Application Assembly
          Lines, Infrastructure Support Groups and
          Service Component providing suppliers
        • Demonstrates continual improvement in
          Quality, Reliability and Cost
        • Secures IT Assets in a
          systematic, effective and verifiable
          manner
        • Achieve effective ratio of Insourced to
          Outsourced employees to control
          Risks, Competency Availability and Cost
          Effectiveness, while arriving at a low head
          count of required core insourced roles
26
Evolving ICT Focus to
     a Service Focus




27
ISO 20000 ICT Service
     Management Proceses
                                      Information Security          Service
                                          Management         Continuity & Availability
                Capacity Management                               Management

          Budgeting &
         Accounting for                                                        Business Relationship
         for IT services                                                           Management

    Service Level
    Management
                                                                                          Supplier
                                                                                         Management
Service Reporting

                                      IT
                                Infrastructure
    Incident
  Management                                                               Release
                                                                         Management



        Problem Management
                                                      Change
                                 Configuration      Management
           28                    Management
The Process Driven
         Organisation

      Establish a Management Process
         Change new or improved service
        CAD CAM KBE
        CAD CAM KBE
        Incident Management Process
             Sustain the Service




                            MPM




                                            SRM
CRM




                      PDM




                                      ERP
        Problem Management Process
            Improve the Service


        Change Management Process
            Retire the Service



                            the processes decide
29
The Service Map
                                                        Print A/C
Business Process                                        Statement
                                                         Service

                                                    • Service Level Mgmt
                     Business User
                   Application Interface            • Capacity Mgmt
                                                    • Configuration Mgmt
                                                    • Availability Mgmt
                                                    • Incident Mgmt
                                 Service
                                Catalogue           • Problem Mgmt
                        SLA                         • Change Mgmt
                                                    • Release Mgmt
                                       CTI
                           CMDB                     • Service Reporting
                                                    • Security Mgmt
                                                    • Asset Mgmt
                          Control DB
                                                    • Budgeting &
                                                      Accounting
                                                    • BCP
                           Dedicated
    Shared                 DB Server         DAL
   App Comp                                  Comp



         30
CIOE Demand Driven SOA
                Profit Center                 Profit Center                      Profit Center                 Ops Support
Customer Side




                             The Service Desk – Single Point of Contact for IT users

                 Application Service Assembly Lines                        Work Place Services Assembly Lines
                                  Service Channel                     L1                     Service Channel                L1
Supply Side




                   App Supplier    A    A    A      App Supplier      L2      App Supplier    D         O App Supplier      L2
                                                                                                   E
                                   p    p    p                                                e         f
                                   p    p    p                        L3                      s         f                   L3
                                                 Infra Supplier                                    M
                 Infra Supplier                                             Infra Supplier    k         A Infra Supplier
                                                                                                   a
                                   S    S    S                                                T         u
                                                    Process support                                I
                Process support    r    r    r                             Process support    o         t Process support
                                                                                                   L
                                   v    v    v                                                p         o
                                                            Shared Infrastructure
                                                            Shared Network Infra
ISO 20K SOA Process Onion
                                                              Business, Supplier and People Relationship Process Owner


                                                       Strategic Planning, Quality and Compliance Process Owner


                                                                                                    Service Delivery Process Owner


                                                                                                   Change Management Process Owner

                                                                                                       Service Support Process Owner                                                           OPS Support




                                                                                                                                                                    Service Desk Process Mgr
                                                                                                                                                                    Service Desk Process Mgr
                                     B&A Process Mgr




                                                                                                       Core Banking                   Application
                                                                                                                                       Vendor
                  C&SA Process Mgr




                                                                                                        Service Channel
                                                                                                          A    P     A
                                                                                              App CI                       App CI                Infra                                         Profit Center
                                                                           INC Process Mgr




                                                                                                          p    R     p
                                                                                                          p    O     p                          Support
                                                       CMDB Process Mgr




                                                                                              Infra CI                    Infra CI               Group
                                                                                                               F
                                                                                                          S    I     S
                                                                                              Infra CI                    Infra CI
                                                                                                          r    L     r
                                                                                                          v    E     v
                                                                                                       Shared Infrastructure
                                                                                                                                        HW Service     SW Service
                                                                                                                                       Comp Vendor    Comp Vendor
                                     Sup Process Mgr




                                                                                                     Shared Network Infra                                                                      Profit Center
                  SR Process Mgr




                                                                              PB Process Mgr                      REL Process Mgr
BRM Process Mgr




                                                             CHG Process Mgr
                                                                                                                                                                                               Profit Center
                                     SLM Process Mgr                                             CAP Process Mgr             SC&A Process Mgr

                        ITS Process Mgr                                                      ISM Process Mgr              MS Process Mgr

    SRM Process Mgr                                                       PRM Process Mgr
Evolving ICT Focus to
     a Service Focus




33
BMC Remedy Architecture




  34
Where are We Today?




35
Business Service Mgmt
   Routes to Value




 36
Proactive Incident and
    Problem Mgmt




 37
Online Real Time Dashboards
     – Service Reporting
Online Real Time Dashboards –
   Incident Occurrence Trends
100

 80
                                           Jan
 60
                                           Feb
 40
                                           Mar
 20                                        Apr

  0
      Design   Mfg Plan   Mfg Exec   SCM
       39
Evolving ICT Focus to
     a Service Focus




40
A view of the SOA
configured in the CMDB
Service Agreement Flow

                                                                                  TML Biz User

                                         Senior Owner
                                                                                                                                                                     User X        User Y        User Z
                                                                                                                                                                    (Branch)       (RTO)          (HQ)




                                                                                            Expected Work Load
                                                                                                                         Retail




                              Business
                                                                                                                        Marketing




                                                                                                Availability




                                                                                                                                                                                   SLA
                                                                                                                                                                              A




                                                                                                                                                                                               SL
                                                                                                                                                                            SL




                                                                                                                                                                                                 A
                                                                       Application                                    Manufacturing
                                                                                                                       Wholesale
                                                                     Owner e.g. Profile




                                         Service Level Agreement
                                                                                                                                                                                                           CIOE
                                                                                                                                              TTL Exec
                                                                                                                      Operations
                                                                                                                       Finance                                                    Service Desk             SPOC
                                                                                                                           Service Desk
Managing Partner
Working Partner                                                                           SLA
                                                                                                                                                       UPC



                                                                         Service Level
                                                                           Manager
                                                                                                                    Service
                                                                                                                    Delivery
                                                                                                                    Manager
                                                                                                                                             Basis Pillar                              Incident
                                                                                                                                                                                      Coordinator


                                                                                                                                               Exec




                                                                                                                                                                               U ont
                                                                                                                                                                                nd ra
                                                                                                                                                                                C
           TML CIOE Exec                                                                                                                                                                             TTL App Assy




                                                                                                                                                                                  er ct
                                                                                                                                                                                    Pi (U
                                                                                                                                                                                      nn PC
                                                                                                                                                                                        in )
                                                                                                                                                                                                     & Support Mgr




                                                                                                                                                                                          g
                                                                                      System Application Manager
                                                                                            (Unix servers)

                                                                                                                 L1
                 Network
                              ITSMG




                                                                                                                       Incident
                                                                                                      L2               Manager
 Service                                                            L3 (ext.)   UPC

   Map          Pillar Exec                                        HW Support
                                                                                                                 MS Wintel support
                                                                    L3 (ext.)   UPC
                                                                   SW Support
                                                                                                                           L1                     Workplace Services
                                                                                                                                  Incident
                                                                                                                      L2          Manager



                 Pillar Mgr                                                                        UPC                      UPC
                                                                                                                                                       L2
                                                                                                                                                            L1
                                                                                                                                                                 Incident
                                                                                                                                                                 Manager
                                                                                                                                                                                            IBM Infra Sup
                                                                                                                                                                                              Pillar Exec
                                                                                                L3 (ext.)                    L3 (ext.)

                  L1 & L2                                                                      HW Support                   SW Support         UPC

                                                                                                                                                L3 (ext.)
                                                                                                                                                             UPC

                                                                                                                                                              L3 (ext.)
                                                                                                                                               HW Support    SW Support




           42                                                      3rd Pty Mgr L3
TML Remedy
Implementation
Proposed Milestone Plan
Plan Scope & Objective
• Establish a baseline implementation
  of Remedy BSM framework and
  associated tools, to Improve service
  through the effective application of
  processes to monitor and improve
  service quality



   44
Planning Methodology
• A lean approach has been adopted to ensure a
  very low time to market
• Establish an evolutionary implementation cycle
  that allows the stake holders to establish a
  baseline
• Improve the baseline in a cyclic steps; learning
  and consolidating lessons from each step

           ISO 20K used as the CIOE, Management
          Framework, Process Requirements Standard.

     45
Milestones Phase 1
               (2 months)
• 1a Application Service Channel Configuration
  – Establish Service List and Prioritize
  – Establish Prototype Configuration Team
  – Establish Supply Side Physical CI Map using Discovery and update
    CMDB
  – Identify Support Architecture and agreements for Prototype
    Service
  – Identify Problem Register for above
  – Configure Prototype Demonstrator and approve
  – Complete Process Plans and train other Service Channel Staff for
    filling templates
  – Repeat above for all Services (based on Priority)
  – Train users and roll out to production



      46
Phase 1 Value Realization
1a Application Service Channel Configuration Continued …………
      Deliverable                      Value Realized by Stakeholders
                           Establish a baseline of the Service and its underlying CI,
Accurate Visual View of
                           making visible interactions between people, Processes
the Service Map; Logical
                           framework, role based measurable objectives and mechanisms
and Physical CI
                           for monitoring and reporting.
                           Establish the relationships between workload characteristics
SLA between Application
                           and the predictive capacity plan for IT services and agree on
Owners and CIOE
                           the quality and cost of services provided.
                           Identify, Establish, Track and improve agreements between
UPC between Application
                           the Application Assembly lines and the service component
Service Assembly Lines
                           providing Lead Suppliers and their 3rd Party suppliers to
and Infrastructure
                           ensure that the CIOE can meet the expectations of users
Support Pillars
                           agreed to in respective SLAs.
                           Establish a baseline categorization that will act as a
                           foundation for associating the business user view of the
                           service to the components of the physical CI delivering a
                           service component.
Service and Product
Categorization Tree        Provide a framework for conducting root cause analysis. The
                           classification will be capable of isolating and highlighting
                           opportunities for establishing reducing trends in incident
                           occurrence, impacting on reduced costs, improved alignment
       47                  and service quality
Phase 1 Value Realization
1a Application Service Channel Configuration Continued …………
     Deliverable                     Value Realized by Stakeholders
                         Eliminate costs and management bandwidth required for
                         establishing traditional people based SPOC (Service Desk).

                         Replace manual routing desk with a Technology based (IVR)
                         system thereby eliminating the middleman between the
Service Desk with Tech
                         application assembly line incident co-coordinators and their
Support Desks as SPOC
                         end users.

                         Use the released capex and opex to establish a future proof
                         VOIP based communication network across all TML operational
                         locations
                         Integrate Remedy with the IVR to ensure automatic recording
                         and intelligent classification of Incident Tickets and Service
                         Requests.
Automated Incident
Mgmt Process Flow        Track the lifecycle of the tickets through multiple support
                         groups spanning multiple suppliers as applicable. Establish
                         mechanisms for collecting real-time data and publish
                         dashboards




       48
Phase 1 Value Realization
1a Application Service Channel Configuration Continued …………
     Deliverable                   Value Realized by Stakeholders
                       Establish a pro-active problem management culture in the
Automated Problem
                       application assembly lines by providing accurate data for
Management Process
                       identifying errors that will be taken up for error control and
Flow
                       identification of work-around and structural fixes.
Knowledge Management   Establish process and provide training to all stakeholders for
Process Framework in   creating, maintaining, improving and using knowledge captured
place                  during various incident and problem resolution actions.
                       Based on the thumb rule that 80% of the services are
                       provided by 20% of the Application services, the project will
                       establish real time dashboards for monitoring service delivery.
                       Additionally data analysis which will enable problem managers
80% of Services        to easily identify improvement areas of maximum input will be
Monitored              made available.

                       Standardized Review Reports will be provided.




       49
Milestones Phase 1
                 (2 months)
• 1b Work Place Service Channel Configuration
  –   Establish Service List and Prioritize
  –   Establish User CI Configuration Management Policies.
  –   Establish Project Team for Desk Top Services, E-Mail, etc,
  –   Establish Supply Side Physical CI Map using Discovery and update
      CMDB where applicable
  –   Identify Support Architecture and agreements
  –   Identify Problem Register for above
  –   Configure Prototype Demonstrator and approve
  –   Complete Process Plans and train other Service Channel Staff for
      filling templates
  –   Repeat above for all Services (based on Priority)
  –   Train users and roll out to production



        50
Phase 1 Value Realization
1b Work Place Service Channel Configuration Continued …………
       Deliverable                        Value Realized by Stakeholders
Service Maps for
                               Establish a baseline of the Service and its underlying CI,
applications supported under
                               making visible interactions between people, Processes
workplace services such as
                               framework, role based measurable objectives and
E-Mail and other Office
                               mechanisms for monitoring and reporting.
Automation Tools
                               Establish the relationships between workload
Service Level Agreements
                               characteristics and the predictive capacity plan for IT
and Service Catalogue for
                               services and agree on the quality and cost of services
Work Place Services
                               provided.
                               Identify, Establish, Track and improve agreements
Underpinning Contracts with
                               between infrastructure pillars and their 3rd Party suppliers
Service Component
                               to ensure that the CIOE can meet the expectations of
providers
                               users agreed to in respective SLAs.
Service Side Incident          User recognizable service side categorization which can be
Categorization mapped to       mapped to Product Component Related Categorization
Product Categorizations        leading to




        51
Phase 1 Value Realization
1b Work Place Service Channel Configuration Continued …………
       Deliverable                        Value Realized by Stakeholders

Automated Incident Flow
                               Track Incident lifecycle through multiple support groups /
process to track SLA and
                               3rd Party Vendors and raise relevant escalations.
UPC Compliance

Automated Problem              Identify improvement areas based on Incident Analysis,
Management Process flow to     prioritse and manage problems, demonstrate effectiveness
track Problem resolution and   of problem resolutions by establishing a reducing trend of
effectiveness                  incidents.
                               Establish process and provide training to all stakeholders
Knowledge Management           for creating, maintaining, improving and using knowledge
Process Framework in place     captured during various incident and problem resolution
                               actions.
                               Provide performance reports against SLA and support
                               delivery.
Service Reporting
                               Track and report compliance against contracts with lead
                               and 3rd Party suppliers.




       52
Milestones Phase 1
             (2 months)
• 1c Remedy Service Channel
  Establishment
 – Identify Development Environment and establish.
 – Identify Production Environment and establish
   infrastructure plan.
 – Prepare Sustenance plan and establish Application
   Support Group for Remedy.
 – Prepare Train the trainer material for End users,
   Technical Users and Management

    53
Phase 1 Value Realization
1c Remedy Service Channel Establishment
        Deliverable                     Value Realized by Stakeholders

Development and Test
Environment established and   Ready for Prototype Configuration and Testing
ready to use

Production Environment        Ready when prototype is completed for testing production
Established and ready         environment
Application Support Group
                              Establish sustainability for continued operations
for Remedy Established
                              Central service Desk providing Single Point of Contact for
Service Desk acting as
                              all services. Use of Technology Based SPOC routing tickets
Single Point of Contact
                              to technical service desks for Application and
Established.
                              Infrastructure support
Technical Support Groups
                              Technical Support Groups to provide Incident and Problem
for Application and
                              Co-ordination and management
Infrastructure Established
Train the Trainer Material
Ready and available           Train the trainer material available for End Users,
                              Technical Personal, 3rd Party suppliers and Managers.



        54
Milestones Phase 2
          (2 Months)
• 2a. Establishing Capacity and Availability
  Processes
   – Establish Work Load Characteristics and identify
     infrastructure Capacity Components
   – Establish Capacity Plans and Trivoli integration for a
     selected service and create a prototype
   – Repeat above for all services
   – Train Users and Roll out
   – Establish Change Management Process and update open
     change tickets for small Changes (Less than 1 man month
     effort) and Change Projects
   – Transition to Sustenance Remedy Support Group




    55
Phase 2 Value Realization
2a Establishing Change Process
      Deliverable                                      Value
Process and Policies for   Clarity in the change process, Prioritization and Approval
establishing Closed Loop   Mechanisms to establish and enhance business alignment and
Change                     continual improvement in costs and quality of services.
Small Change Ticket
                           Establish lifecycle, tracking and reporting for small changes
Lifecycle Management
Effective Impact           Improvements in Impact analysis provided by the Views
Analysis                   available through the SOA configured in the CMDB
Establish a Forward        Identify the Planned Shut down of services for maintenance
Schedule of Changes        and improve availability tracking
Service Desk with Tech
Support Desks as SPOC
Automated Incident
Mgmt Process Flow
Automated Problem
Management Process
Flow
80% of Services
                           Out of the Box reports
Monitored


       56
Phase 2 Value Realization
2a Establishing Capacity and Availability Management Process
      Deliverable                                        Value
Workload
                            Clarity on workload Characteristics their proposed growth, the
Characteristics and
                            requirements for CI related capacities and the Scaling Matrix
underlying CI Capacity
                            is available for prioritized services.
Requirements identified.
Tivoli integration and      Tivoli based CI monitoring is established for Key CI for above
automated monitoring of     services. System Generated Incident tickets and Service
critical CI                 Failure broadcasts are established.
                            Proactive Capacity Scaling plans are established to meet
Predictive Capacity Plans
                            growing business needs. The plan is tracked to ensure that
are established
                            planned activities are done proactively to avoid downtime.
                            Availability of services is tracked automatically giving accurate
Availability of Key CI is
                            availability statistics for key CI and the Application Services
tracked and reported
                            Provided through them.
                            Periodic reports on Capacity Planning and Availability are
Status Reporting
                            established and used in service reviews.




        57
Milestones Phase 2
         (2 Months)
• 2b. Establishing Change Management Process
  – Establish Change Management Process and update open
    change tickets for small Changes (Less than 1 man month
    effort)
  – Establish Process for Large Change Projects
  – Prepare Prototype and Approve for Selected Service.
  – Prepare Train the trainer Material
  – Roll out to all Application and Infra support groups
  – Transition to Sustenance Remedy Support Group




    58
Phase 2 Value Realization
2a Establishing Change Process
      Deliverable                                      Value
Process and Policies for   Clarity in the change process, Prioritization and Approval
establishing Closed Loop   Mechanisms to establish and enhance business alignment and
Change                     continual improvement in costs and quality of services.
Small Change Ticket
                           Establish lifecycle, tracking and reporting for small changes
Lifecycle Management
Effective Impact           Improvements in Impact analysis provided by the Views
Analysis                   available through the SOA configured in the CMDB
Establish a Forward        Identify the Planned Shut down of services for maintenance
Schedule of Changes        and improve availability tracking
Large Project              Establish Lifecycle models for project management and align
Management                 to the Closed Loop Change Management in Remedy
                           Create Small Changes and Project Status Dashboards, prepare
Status Reporting
                           management information reports.




       59
Milestones Phase 3
           (2 Months)
•   Finalise Organisational Frame work
•   Finalise Balance Score Card objectives
•   Establish Metrics Plan
•   Review out of the box service reports based on
    Pilot data
•   Establish final Report formats
•   Create Dashboards
•   Establish Service Review Processes
•   Close Project



      60
Phase 3 Value Realization
3 Establishing Objective tracking to ensure unified culture
     Deliverable                                      Value
                          Organizational framework required to manage IT services
Unified Organizational
                          integrating multiple vendors into a single cultural process
Framework in place
                          oriented framework will be established.
Measurable objectives
                          Measurable objectives for various processes to ensure
designed to focus on
                          continual improvement in Business Alignment, Costs and
Continual improvement
                          Service Quality are identified and established at the
integrated with Balance
                          corporate Balance Score Card Level
Score Card
Application Support and   Objective Tracking, reviewing and action plans are established
Infrastructure Support    for each of the service Channels, the Application Assembly
Channels draw from        Lines and the Infrastructure Support Pillars. All staff
corporate Balance Score   performance reviews regardless of Insourced or Outsourced
Card                      are done in a unified manner.
                          Performance Dashboards for tracking objectives is
Performance Dashboards
                          established along with review mechanisms
Reward and Recognition    Rewards and recognition schemes for outstanding performance
schemes                   is established.




        61
Where to from here
•   Establish App Services Core Team
•   Make a list of Services
•   Prioritise – 20% of services 80% value
•   Create a Service Map for the services
•   Identify service for Prototype
•   Service CTI and Product CTI for
    Prototype


      62
Thank You




63

More Related Content

What's hot

Managed Services
Managed ServicesManaged Services
Managed ServicesVenkat J
 
M2MSys BPM Executive Summary
M2MSys BPM Executive SummaryM2MSys BPM Executive Summary
M2MSys BPM Executive SummaryFilipe Pinto
 
Aggregating application, service, and portfolio demand using HP Project and P...
Aggregating application, service, and portfolio demand using HP Project and P...Aggregating application, service, and portfolio demand using HP Project and P...
Aggregating application, service, and portfolio demand using HP Project and P...bkniffen
 
IAPsolutions Corporate Presentation
IAPsolutions Corporate PresentationIAPsolutions Corporate Presentation
IAPsolutions Corporate PresentationIAPsolutions
 
Q3 2009 Small Business Specialist Pal Meeting February 2009 Final
Q3 2009 Small Business Specialist Pal Meeting February 2009 FinalQ3 2009 Small Business Specialist Pal Meeting February 2009 Final
Q3 2009 Small Business Specialist Pal Meeting February 2009 Finalvriyait
 
IAPsolutions' corporate presentation
IAPsolutions' corporate presentationIAPsolutions' corporate presentation
IAPsolutions' corporate presentationIAPsolutions
 
Britton final 112607
Britton final 112607Britton final 112607
Britton final 112607Referendo Org
 
Day 1 p3 - project and portfolio management
Day 1   p3 - project and portfolio managementDay 1   p3 - project and portfolio management
Day 1 p3 - project and portfolio managementLilian Schaffer
 
A Practical Approach to Introducing BPM into the Enterprise
A Practical Approach to Introducing BPM into the EnterpriseA Practical Approach to Introducing BPM into the Enterprise
A Practical Approach to Introducing BPM into the Enterprisejamieraut
 
IBM Rational Software Conference 2009: Modeling, Architecture & Construction ...
IBM Rational Software Conference 2009: Modeling, Architecture & Construction ...IBM Rational Software Conference 2009: Modeling, Architecture & Construction ...
IBM Rational Software Conference 2009: Modeling, Architecture & Construction ...Kathy (Kat) Mandelstein
 
Performance driven dashboards & role based portals d hill bmick arc orlando 2008
Performance driven dashboards & role based portals d hill bmick arc orlando 2008Performance driven dashboards & role based portals d hill bmick arc orlando 2008
Performance driven dashboards & role based portals d hill bmick arc orlando 2008ARC Advisory Group
 
Website Design and Development
Website Design and DevelopmentWebsite Design and Development
Website Design and DevelopmentGaurav Kumar
 
Chemical Supply Chain
Chemical Supply ChainChemical Supply Chain
Chemical Supply ChainNatashaS7
 
IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...
IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...
IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...Kathy (Kat) Mandelstein
 
Arc conceptsand models
Arc conceptsand modelsArc conceptsand models
Arc conceptsand modelsAlex Chatha
 
Rule and Event-based Processes June2010
Rule  and Event-based Processes June2010Rule  and Event-based Processes June2010
Rule and Event-based Processes June2010Paul Vincent
 

What's hot (20)

Electronic Business
Electronic BusinessElectronic Business
Electronic Business
 
eBusiness
eBusinesseBusiness
eBusiness
 
Managed Services
Managed ServicesManaged Services
Managed Services
 
M2MSys BPM Executive Summary
M2MSys BPM Executive SummaryM2MSys BPM Executive Summary
M2MSys BPM Executive Summary
 
Aggregating application, service, and portfolio demand using HP Project and P...
Aggregating application, service, and portfolio demand using HP Project and P...Aggregating application, service, and portfolio demand using HP Project and P...
Aggregating application, service, and portfolio demand using HP Project and P...
 
IAPsolutions Corporate Presentation
IAPsolutions Corporate PresentationIAPsolutions Corporate Presentation
IAPsolutions Corporate Presentation
 
Q3 2009 Small Business Specialist Pal Meeting February 2009 Final
Q3 2009 Small Business Specialist Pal Meeting February 2009 FinalQ3 2009 Small Business Specialist Pal Meeting February 2009 Final
Q3 2009 Small Business Specialist Pal Meeting February 2009 Final
 
IAPsolutions' corporate presentation
IAPsolutions' corporate presentationIAPsolutions' corporate presentation
IAPsolutions' corporate presentation
 
Britton final 112607
Britton final 112607Britton final 112607
Britton final 112607
 
Day 1 p3 - project and portfolio management
Day 1   p3 - project and portfolio managementDay 1   p3 - project and portfolio management
Day 1 p3 - project and portfolio management
 
Process Innovation for 2012
Process Innovation for 2012Process Innovation for 2012
Process Innovation for 2012
 
A Practical Approach to Introducing BPM into the Enterprise
A Practical Approach to Introducing BPM into the EnterpriseA Practical Approach to Introducing BPM into the Enterprise
A Practical Approach to Introducing BPM into the Enterprise
 
IBM Rational Software Conference 2009: Modeling, Architecture & Construction ...
IBM Rational Software Conference 2009: Modeling, Architecture & Construction ...IBM Rational Software Conference 2009: Modeling, Architecture & Construction ...
IBM Rational Software Conference 2009: Modeling, Architecture & Construction ...
 
Performance driven dashboards & role based portals d hill bmick arc orlando 2008
Performance driven dashboards & role based portals d hill bmick arc orlando 2008Performance driven dashboards & role based portals d hill bmick arc orlando 2008
Performance driven dashboards & role based portals d hill bmick arc orlando 2008
 
Website Design and Development
Website Design and DevelopmentWebsite Design and Development
Website Design and Development
 
Chemical Supply Chain
Chemical Supply ChainChemical Supply Chain
Chemical Supply Chain
 
IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...
IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...
IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...
 
Arc conceptsand models
Arc conceptsand modelsArc conceptsand models
Arc conceptsand models
 
Enterprise Directions
Enterprise DirectionsEnterprise Directions
Enterprise Directions
 
Rule and Event-based Processes June2010
Rule  and Event-based Processes June2010Rule  and Event-based Processes June2010
Rule and Event-based Processes June2010
 

Similar to Tml Deployment Strategy Overview V 1

Application Lifecycle Management & VSTS
Application Lifecycle Management & VSTSApplication Lifecycle Management & VSTS
Application Lifecycle Management & VSTSMicrosoft Iceland
 
Aras Ptpl Plm
Aras Ptpl PlmAras Ptpl Plm
Aras Ptpl Plmjayrajvh
 
Oracle bpm-suite-11g-overview-slide
Oracle bpm-suite-11g-overview-slideOracle bpm-suite-11g-overview-slide
Oracle bpm-suite-11g-overview-slideAericon
 
ReformIS Capability Statement
ReformIS Capability StatementReformIS Capability Statement
ReformIS Capability Statementjpmoynihan
 
SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...
SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...
SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...SilverStormSolutions
 
Information Management: Answering Today’s Enterprise Challenge
Information Management: Answering Today’s Enterprise ChallengeInformation Management: Answering Today’s Enterprise Challenge
Information Management: Answering Today’s Enterprise ChallengeBob Rhubart
 
Cordys presentation
Cordys presentationCordys presentation
Cordys presentationMans Jug
 
Aufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPMAufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPMDinesh Kumar P
 
Integrated it portfolio management using epm live's it engine app
Integrated it portfolio management using epm live's it engine appIntegrated it portfolio management using epm live's it engine app
Integrated it portfolio management using epm live's it engine appEPM Live
 
Skills Services Phoenix June2010
Skills Services Phoenix June2010Skills Services Phoenix June2010
Skills Services Phoenix June2010Mike Ryan
 
Net@Work Client Presentation with Security
Net@Work Client Presentation with Security Net@Work Client Presentation with Security
Net@Work Client Presentation with Security Ray Glass
 
Axcend Corporate Presentation
Axcend Corporate PresentationAxcend Corporate Presentation
Axcend Corporate Presentationvinodpandeyaxcend
 
Appstory Company Presentation
Appstory Company PresentationAppstory Company Presentation
Appstory Company PresentationPieter Vanhees
 
Rethink IT. Reinvent Business. - Dharanibalan Gurunathan
Rethink IT. Reinvent Business. - Dharanibalan GurunathanRethink IT. Reinvent Business. - Dharanibalan Gurunathan
Rethink IT. Reinvent Business. - Dharanibalan GurunathanJyothi Satyanathan
 
Future Focus Infotech
Future Focus InfotechFuture Focus Infotech
Future Focus InfotechLyf Ffi
 
The Future of Business Applications
The Future of Business ApplicationsThe Future of Business Applications
The Future of Business ApplicationsOrangeScape
 

Similar to Tml Deployment Strategy Overview V 1 (20)

Application Lifecycle Management & VSTS
Application Lifecycle Management & VSTSApplication Lifecycle Management & VSTS
Application Lifecycle Management & VSTS
 
Keynote Day 1 2009
Keynote Day 1 2009Keynote Day 1 2009
Keynote Day 1 2009
 
Aras Ptpl Plm
Aras Ptpl PlmAras Ptpl Plm
Aras Ptpl Plm
 
Oracle bpm-suite-11g-overview-slide
Oracle bpm-suite-11g-overview-slideOracle bpm-suite-11g-overview-slide
Oracle bpm-suite-11g-overview-slide
 
Company profile Metrasys
Company profile MetrasysCompany profile Metrasys
Company profile Metrasys
 
ReformIS Capability Statement
ReformIS Capability StatementReformIS Capability Statement
ReformIS Capability Statement
 
SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...
SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...
SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...
 
Information Management: Answering Today’s Enterprise Challenge
Information Management: Answering Today’s Enterprise ChallengeInformation Management: Answering Today’s Enterprise Challenge
Information Management: Answering Today’s Enterprise Challenge
 
Outside In Process - Chicago V3
Outside In Process - Chicago V3Outside In Process - Chicago V3
Outside In Process - Chicago V3
 
Cordys presentation
Cordys presentationCordys presentation
Cordys presentation
 
Aufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPMAufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPM
 
Integrated it portfolio management using epm live's it engine app
Integrated it portfolio management using epm live's it engine appIntegrated it portfolio management using epm live's it engine app
Integrated it portfolio management using epm live's it engine app
 
Skills Services Phoenix June2010
Skills Services Phoenix June2010Skills Services Phoenix June2010
Skills Services Phoenix June2010
 
Net@Work Client Presentation with Security
Net@Work Client Presentation with Security Net@Work Client Presentation with Security
Net@Work Client Presentation with Security
 
Pulse Executive Panel
Pulse Executive PanelPulse Executive Panel
Pulse Executive Panel
 
Axcend Corporate Presentation
Axcend Corporate PresentationAxcend Corporate Presentation
Axcend Corporate Presentation
 
Appstory Company Presentation
Appstory Company PresentationAppstory Company Presentation
Appstory Company Presentation
 
Rethink IT. Reinvent Business. - Dharanibalan Gurunathan
Rethink IT. Reinvent Business. - Dharanibalan GurunathanRethink IT. Reinvent Business. - Dharanibalan Gurunathan
Rethink IT. Reinvent Business. - Dharanibalan Gurunathan
 
Future Focus Infotech
Future Focus InfotechFuture Focus Infotech
Future Focus Infotech
 
The Future of Business Applications
The Future of Business ApplicationsThe Future of Business Applications
The Future of Business Applications
 

More from Sukumar Daniel

How to make 'Cupcakes'
How to make 'Cupcakes'How to make 'Cupcakes'
How to make 'Cupcakes'Sukumar Daniel
 
IT4IT Foundation for practitioners, Whats in it for you
IT4IT Foundation for practitioners, Whats in it for youIT4IT Foundation for practitioners, Whats in it for you
IT4IT Foundation for practitioners, Whats in it for youSukumar Daniel
 
Next Generation IT Operating Models and IT4IT
Next Generation IT Operating Models and IT4ITNext Generation IT Operating Models and IT4IT
Next Generation IT Operating Models and IT4ITSukumar Daniel
 
Architecting Next Generatio IT Operating Models Using IT4IT and SFIA
Architecting Next Generatio IT Operating Models Using IT4IT and SFIAArchitecting Next Generatio IT Operating Models Using IT4IT and SFIA
Architecting Next Generatio IT Operating Models Using IT4IT and SFIASukumar Daniel
 
Certificate Course in Practical IT Service Management Systems and Continual S...
Certificate Course in Practical IT Service Management Systems and Continual S...Certificate Course in Practical IT Service Management Systems and Continual S...
Certificate Course in Practical IT Service Management Systems and Continual S...Sukumar Daniel
 
Itsmf successful itsm transformation v 1 - 28-11-2013
Itsmf successful itsm transformation v 1 - 28-11-2013Itsmf successful itsm transformation v 1 - 28-11-2013
Itsmf successful itsm transformation v 1 - 28-11-2013Sukumar Daniel
 
Flex mode framework architectural overview v 2.1 19-08-2013
Flex mode framework   architectural overview v 2.1 19-08-2013Flex mode framework   architectural overview v 2.1 19-08-2013
Flex mode framework architectural overview v 2.1 19-08-2013Sukumar Daniel
 
ITSM Transformation Strategies V 2
ITSM Transformation Strategies V 2ITSM Transformation Strategies V 2
ITSM Transformation Strategies V 2Sukumar Daniel
 
Practical ITSMS Transformation Techniques Competency Building
Practical ITSMS Transformation Techniques Competency BuildingPractical ITSMS Transformation Techniques Competency Building
Practical ITSMS Transformation Techniques Competency BuildingSukumar Daniel
 
Tesco Architecture Excellence Award Application
Tesco Architecture Excellence Award ApplicationTesco Architecture Excellence Award Application
Tesco Architecture Excellence Award ApplicationSukumar Daniel
 
Using the Zachman’s Architecture framework to realise ITSM Transformation at ...
Using the Zachman’s Architecture framework to realise ITSM Transformation at ...Using the Zachman’s Architecture framework to realise ITSM Transformation at ...
Using the Zachman’s Architecture framework to realise ITSM Transformation at ...Sukumar Daniel
 
Paper Practical Itsm Transformation Qai V 1.0
Paper   Practical Itsm Transformation   Qai V 1.0Paper   Practical Itsm Transformation   Qai V 1.0
Paper Practical Itsm Transformation Qai V 1.0Sukumar Daniel
 

More from Sukumar Daniel (12)

How to make 'Cupcakes'
How to make 'Cupcakes'How to make 'Cupcakes'
How to make 'Cupcakes'
 
IT4IT Foundation for practitioners, Whats in it for you
IT4IT Foundation for practitioners, Whats in it for youIT4IT Foundation for practitioners, Whats in it for you
IT4IT Foundation for practitioners, Whats in it for you
 
Next Generation IT Operating Models and IT4IT
Next Generation IT Operating Models and IT4ITNext Generation IT Operating Models and IT4IT
Next Generation IT Operating Models and IT4IT
 
Architecting Next Generatio IT Operating Models Using IT4IT and SFIA
Architecting Next Generatio IT Operating Models Using IT4IT and SFIAArchitecting Next Generatio IT Operating Models Using IT4IT and SFIA
Architecting Next Generatio IT Operating Models Using IT4IT and SFIA
 
Certificate Course in Practical IT Service Management Systems and Continual S...
Certificate Course in Practical IT Service Management Systems and Continual S...Certificate Course in Practical IT Service Management Systems and Continual S...
Certificate Course in Practical IT Service Management Systems and Continual S...
 
Itsmf successful itsm transformation v 1 - 28-11-2013
Itsmf successful itsm transformation v 1 - 28-11-2013Itsmf successful itsm transformation v 1 - 28-11-2013
Itsmf successful itsm transformation v 1 - 28-11-2013
 
Flex mode framework architectural overview v 2.1 19-08-2013
Flex mode framework   architectural overview v 2.1 19-08-2013Flex mode framework   architectural overview v 2.1 19-08-2013
Flex mode framework architectural overview v 2.1 19-08-2013
 
ITSM Transformation Strategies V 2
ITSM Transformation Strategies V 2ITSM Transformation Strategies V 2
ITSM Transformation Strategies V 2
 
Practical ITSMS Transformation Techniques Competency Building
Practical ITSMS Transformation Techniques Competency BuildingPractical ITSMS Transformation Techniques Competency Building
Practical ITSMS Transformation Techniques Competency Building
 
Tesco Architecture Excellence Award Application
Tesco Architecture Excellence Award ApplicationTesco Architecture Excellence Award Application
Tesco Architecture Excellence Award Application
 
Using the Zachman’s Architecture framework to realise ITSM Transformation at ...
Using the Zachman’s Architecture framework to realise ITSM Transformation at ...Using the Zachman’s Architecture framework to realise ITSM Transformation at ...
Using the Zachman’s Architecture framework to realise ITSM Transformation at ...
 
Paper Practical Itsm Transformation Qai V 1.0
Paper   Practical Itsm Transformation   Qai V 1.0Paper   Practical Itsm Transformation   Qai V 1.0
Paper Practical Itsm Transformation Qai V 1.0
 

Tml Deployment Strategy Overview V 1

  • 1. Demand Driven, Service Oriented, CIOE Management framework for aligning Business Strategy Managers with OPS & IT Managers in a Secure, Managed Outsourced; environment
  • 3. But everyone knows Pigs don’t FLY !! 3
  • 4. What is Service Oriented Architecture?
  • 10. CIO Enterprise Evolution Research Objective 1. IT Group Role in the Corporation Projects for Project initiated Pervasive IT Delivery IT Service Delivery Specific Pain by CEO / Exec IT Tools Organization Organization Reporting to Finance Managed by 2.Security & Reliability Risks to the Corporation COO-CIO Project Project Teams Espionage Preceding Risks & All Preceding risks Engineers & Users Impact Virus, Impact Malicious Intent, With Impact on Impact on on Project areas on some Impact on Business Ops and Application Business Areas Business Ops Strategic Objectives 3.Outsourcing – From doing it yourself to getting it done. Vendors Small adhoc IT IT Mgr & Team IT Delivery org IT Service Mgmt Org Working on Team managing Mini Computer, Managing application Managing Specific applications for LAN based Life Cycle & Networks Strategic Objectives projects Ac, Inventory, etc. Applications. Outsourcing with Non Core for Cost Arbitration Activities Outsourced
  • 11. Evolving ICT Focus to a Service Focus 11
  • 12. The New World View – Demand driven Service Delivery Service Delivery Enterprise driven by Enterprise driven by the need to satisfy Technology stated and implied Delivery needs of customers, Based on Success factors of the Past employees, owners and society. Based on Success indicators of the 12 future
  • 13. Model Specs • Scope – Aligning Business Strategy Managers with OPS & IT Managers in a managed; outsourced environment • Application Values – Achieve operational objectives for business process where ICT is an enabler – IT Group fully aligned to Operations. – Security embedding into the fabric of the system for transparent and automatic compliance to International Standards and statutory compliance requirements – Collaboration between all stake holders in establishing a Managing/Working Partner pair Configuration; resulting in vibrant consumer-side and supplier-side markets – Unified culture, specific to the requirements of the CIO Enterprise, integrating Business managers, Users, In-sourced and out-sourced staff operational and ICT staff. • Dimensions Addressed – People + Processes + Tools + Partnership
  • 14. Using the ISO 20000 International Standard as a PDCA based, Capability Improvement, Engine for CIOE OCD & QM
  • 15. Top 10 Concerns of IT Managers 1. Aligning IT strategy with business strategy 2. Meeting business and user needs 3. Coping with change 4. Dealing with senior management 5. Managing costs, budgets and resources 6. Keeping up with technology 7. Recruiting and retaining staff 8. Time and resource management 9. Infrastructure management 10. Maintaining skills and knowledge 15
  • 16. ISO 20000: 05 May be used by an organization which needs to Improve service through the effective application of processes to monitor and improve service quality. Section 1.e Scope ISO EC 20000-1:2005(E) 16
  • 17. ISO 20000 based on “Best Practice” • ISO • International Standards Organization • BSI • British Standards Institute • ITIL • IT Infrastructure Library • Benefits independent (of systems and/or platforms) flexible (also applicable outside IT) applicable worldwide applicable in companies, institutions, government 17
  • 18. Service Management = The Objective Tree = Quality ORGANIZATION Flexibility Cost management BUSINESS PROCESSES IT SERVICE PROVISION effective organization SERVICE MANAGEMENT efficient ISO effective IT service provision 20000 efficient 18
  • 19. Demand Driven, Service Oriented, CIOE Management framework for aligning Business Strategy Managers with OPS & IT Managers in a Secure, Managed Outsourced; environment
  • 21. TML’s Integrated IT Landscape Stake- holders Financial Business Customers Vendors Dealers Employees Institutions Partners COMMON HIGH SPEED NETWORK (WAN) Processes Processes Enterprise Enterprise Marketing Product Mfg. Planning Product Mfg., Product Intelligence Strategic Customer Concept Design & Vendor & Resource Distributio & Analysis Planning Support & Development Development Management n Tools CAD/CAM CRM PDM MPM ERP SRM MES WEB KBE Information & Analysis INTEGRATED PRODUCT & PROCESS DATABASE Foundation IT SERVICE MANAGEMENT & IT INFRASTRUCTURE
  • 22. TML Service Channels CAD/CAM, PLM – Crash, NVH, PLM, KBE, Full PLM, Advanced Design DMU, Durability PDM Vehicle DMU CAE Simulation Extended CAE, PDM Enterprise Sheet Metal Manufacturing Tool Design, Forming GD&T Digital Factory Digital Factory Planning CNC Machining Simulation Manufacturing Plant Specific Distributed ERP Single ERP MES, ERP, MES, SCM, Execution Applications SRM Telematics Supply Chain Distributed ERP Single ERP ERP, SRM, VCM & Legacy ERP, SRM Management E-Sourcing E-Sourcing SCM Channel VCM Dealers, VCM-Dealers, CRM-DMS, CRM-DMS & CRM-DMS & Legacy, Management Distributed ERP Distributed ERP Single ERP ERP ERP Financial Plant Specific ERP,EVA ERP, SEM, Distributed ERP Single ERP Management Application Tracking, CFM SOX HR Plant Specific Single Intranet Knowledge Single ERP ERP & ESS Management Application Portal management Vehicle Legacy Legacy Integrated ERP Online Vehicle Financing Customer Insurance, Up- Systems Systems & CRM Financing selling 1998-2002 2002-2005 2005-2008 22
  • 23. Planning & Implementing New or Changed Srv Planning & Implementing New or Changed Srv Planning & Implementing Service Delivery Planning & Implementing Service Delivery Alignment Predictive Capacity OPS & IT Infrastructure Expense per transaction Base Line Year Profit Predictive Predictive Predictive Scalability Model Capacity Capacity Capacity Plans Plans Plans Business Strategy Center Revenue ICT Vision ICT Vision ICT Vision Targets Interim Plan End Year Objectives in % of Revenue Growth OPS & IT Infrastructure Expense per transaction Profit Center Profit Center Targets Profit Center Profit Center Interim Profit Center Profit Center Profit Center Profit Center Profit Center Profit Center Profit Center Profit Center ICT Enabled Business Process ICT Enabled Business Process
  • 24. Evolving ICT Focus to a Service Focus 24
  • 25. Outsourcing Relationship FlexMode aims for beneficial coexistence within an outsourced environment; owned, managed and controlled by the CIOE
  • 26. CIOE & Supplier Relationship • Establishes roles, responsibilities and authorities for Managing/Working Partner configurations • Establishes clear ownership of Service Channel responsibilities in establishing and meeting Service Level Agreements • Sets and tracks performance objectives of Process Groups, Application Assembly Lines, Infrastructure Support Groups and Service Component providing suppliers • Demonstrates continual improvement in Quality, Reliability and Cost • Secures IT Assets in a systematic, effective and verifiable manner • Achieve effective ratio of Insourced to Outsourced employees to control Risks, Competency Availability and Cost Effectiveness, while arriving at a low head count of required core insourced roles 26
  • 27. Evolving ICT Focus to a Service Focus 27
  • 28. ISO 20000 ICT Service Management Proceses Information Security Service Management Continuity & Availability Capacity Management Management Budgeting & Accounting for Business Relationship for IT services Management Service Level Management Supplier Management Service Reporting IT Infrastructure Incident Management Release Management Problem Management Change Configuration Management 28 Management
  • 29. The Process Driven Organisation Establish a Management Process Change new or improved service CAD CAM KBE CAD CAM KBE Incident Management Process Sustain the Service MPM SRM CRM PDM ERP Problem Management Process Improve the Service Change Management Process Retire the Service the processes decide 29
  • 30. The Service Map Print A/C Business Process Statement Service • Service Level Mgmt Business User Application Interface • Capacity Mgmt • Configuration Mgmt • Availability Mgmt • Incident Mgmt Service Catalogue • Problem Mgmt SLA • Change Mgmt • Release Mgmt CTI CMDB • Service Reporting • Security Mgmt • Asset Mgmt Control DB • Budgeting & Accounting • BCP Dedicated Shared DB Server DAL App Comp Comp 30
  • 31. CIOE Demand Driven SOA Profit Center Profit Center Profit Center Ops Support Customer Side The Service Desk – Single Point of Contact for IT users Application Service Assembly Lines Work Place Services Assembly Lines Service Channel L1 Service Channel L1 Supply Side App Supplier A A A App Supplier L2 App Supplier D O App Supplier L2 E p p p e f p p p L3 s f L3 Infra Supplier M Infra Supplier Infra Supplier k A Infra Supplier a S S S T u Process support I Process support r r r Process support o t Process support L v v v p o Shared Infrastructure Shared Network Infra
  • 32. ISO 20K SOA Process Onion Business, Supplier and People Relationship Process Owner Strategic Planning, Quality and Compliance Process Owner Service Delivery Process Owner Change Management Process Owner Service Support Process Owner OPS Support Service Desk Process Mgr Service Desk Process Mgr B&A Process Mgr Core Banking Application Vendor C&SA Process Mgr Service Channel A P A App CI App CI Infra Profit Center INC Process Mgr p R p p O p Support CMDB Process Mgr Infra CI Infra CI Group F S I S Infra CI Infra CI r L r v E v Shared Infrastructure HW Service SW Service Comp Vendor Comp Vendor Sup Process Mgr Shared Network Infra Profit Center SR Process Mgr PB Process Mgr REL Process Mgr BRM Process Mgr CHG Process Mgr Profit Center SLM Process Mgr CAP Process Mgr SC&A Process Mgr ITS Process Mgr ISM Process Mgr MS Process Mgr SRM Process Mgr PRM Process Mgr
  • 33. Evolving ICT Focus to a Service Focus 33
  • 35. Where are We Today? 35
  • 36. Business Service Mgmt Routes to Value 36
  • 37. Proactive Incident and Problem Mgmt 37
  • 38. Online Real Time Dashboards – Service Reporting
  • 39. Online Real Time Dashboards – Incident Occurrence Trends 100 80 Jan 60 Feb 40 Mar 20 Apr 0 Design Mfg Plan Mfg Exec SCM 39
  • 40. Evolving ICT Focus to a Service Focus 40
  • 41. A view of the SOA configured in the CMDB
  • 42. Service Agreement Flow TML Biz User Senior Owner User X User Y User Z (Branch) (RTO) (HQ) Expected Work Load Retail Business Marketing Availability SLA A SL SL A Application Manufacturing Wholesale Owner e.g. Profile Service Level Agreement CIOE TTL Exec Operations Finance Service Desk SPOC Service Desk Managing Partner Working Partner SLA UPC Service Level Manager Service Delivery Manager Basis Pillar Incident Coordinator Exec U ont nd ra C TML CIOE Exec TTL App Assy er ct Pi (U nn PC in ) & Support Mgr g System Application Manager (Unix servers) L1 Network ITSMG Incident L2 Manager Service L3 (ext.) UPC Map Pillar Exec HW Support MS Wintel support L3 (ext.) UPC SW Support L1 Workplace Services Incident L2 Manager Pillar Mgr UPC UPC L2 L1 Incident Manager IBM Infra Sup Pillar Exec L3 (ext.) L3 (ext.) L1 & L2 HW Support SW Support UPC L3 (ext.) UPC L3 (ext.) HW Support SW Support 42 3rd Pty Mgr L3
  • 44. Plan Scope & Objective • Establish a baseline implementation of Remedy BSM framework and associated tools, to Improve service through the effective application of processes to monitor and improve service quality 44
  • 45. Planning Methodology • A lean approach has been adopted to ensure a very low time to market • Establish an evolutionary implementation cycle that allows the stake holders to establish a baseline • Improve the baseline in a cyclic steps; learning and consolidating lessons from each step ISO 20K used as the CIOE, Management Framework, Process Requirements Standard. 45
  • 46. Milestones Phase 1 (2 months) • 1a Application Service Channel Configuration – Establish Service List and Prioritize – Establish Prototype Configuration Team – Establish Supply Side Physical CI Map using Discovery and update CMDB – Identify Support Architecture and agreements for Prototype Service – Identify Problem Register for above – Configure Prototype Demonstrator and approve – Complete Process Plans and train other Service Channel Staff for filling templates – Repeat above for all Services (based on Priority) – Train users and roll out to production 46
  • 47. Phase 1 Value Realization 1a Application Service Channel Configuration Continued ………… Deliverable Value Realized by Stakeholders Establish a baseline of the Service and its underlying CI, Accurate Visual View of making visible interactions between people, Processes the Service Map; Logical framework, role based measurable objectives and mechanisms and Physical CI for monitoring and reporting. Establish the relationships between workload characteristics SLA between Application and the predictive capacity plan for IT services and agree on Owners and CIOE the quality and cost of services provided. Identify, Establish, Track and improve agreements between UPC between Application the Application Assembly lines and the service component Service Assembly Lines providing Lead Suppliers and their 3rd Party suppliers to and Infrastructure ensure that the CIOE can meet the expectations of users Support Pillars agreed to in respective SLAs. Establish a baseline categorization that will act as a foundation for associating the business user view of the service to the components of the physical CI delivering a service component. Service and Product Categorization Tree Provide a framework for conducting root cause analysis. The classification will be capable of isolating and highlighting opportunities for establishing reducing trends in incident occurrence, impacting on reduced costs, improved alignment 47 and service quality
  • 48. Phase 1 Value Realization 1a Application Service Channel Configuration Continued ………… Deliverable Value Realized by Stakeholders Eliminate costs and management bandwidth required for establishing traditional people based SPOC (Service Desk). Replace manual routing desk with a Technology based (IVR) system thereby eliminating the middleman between the Service Desk with Tech application assembly line incident co-coordinators and their Support Desks as SPOC end users. Use the released capex and opex to establish a future proof VOIP based communication network across all TML operational locations Integrate Remedy with the IVR to ensure automatic recording and intelligent classification of Incident Tickets and Service Requests. Automated Incident Mgmt Process Flow Track the lifecycle of the tickets through multiple support groups spanning multiple suppliers as applicable. Establish mechanisms for collecting real-time data and publish dashboards 48
  • 49. Phase 1 Value Realization 1a Application Service Channel Configuration Continued ………… Deliverable Value Realized by Stakeholders Establish a pro-active problem management culture in the Automated Problem application assembly lines by providing accurate data for Management Process identifying errors that will be taken up for error control and Flow identification of work-around and structural fixes. Knowledge Management Establish process and provide training to all stakeholders for Process Framework in creating, maintaining, improving and using knowledge captured place during various incident and problem resolution actions. Based on the thumb rule that 80% of the services are provided by 20% of the Application services, the project will establish real time dashboards for monitoring service delivery. Additionally data analysis which will enable problem managers 80% of Services to easily identify improvement areas of maximum input will be Monitored made available. Standardized Review Reports will be provided. 49
  • 50. Milestones Phase 1 (2 months) • 1b Work Place Service Channel Configuration – Establish Service List and Prioritize – Establish User CI Configuration Management Policies. – Establish Project Team for Desk Top Services, E-Mail, etc, – Establish Supply Side Physical CI Map using Discovery and update CMDB where applicable – Identify Support Architecture and agreements – Identify Problem Register for above – Configure Prototype Demonstrator and approve – Complete Process Plans and train other Service Channel Staff for filling templates – Repeat above for all Services (based on Priority) – Train users and roll out to production 50
  • 51. Phase 1 Value Realization 1b Work Place Service Channel Configuration Continued ………… Deliverable Value Realized by Stakeholders Service Maps for Establish a baseline of the Service and its underlying CI, applications supported under making visible interactions between people, Processes workplace services such as framework, role based measurable objectives and E-Mail and other Office mechanisms for monitoring and reporting. Automation Tools Establish the relationships between workload Service Level Agreements characteristics and the predictive capacity plan for IT and Service Catalogue for services and agree on the quality and cost of services Work Place Services provided. Identify, Establish, Track and improve agreements Underpinning Contracts with between infrastructure pillars and their 3rd Party suppliers Service Component to ensure that the CIOE can meet the expectations of providers users agreed to in respective SLAs. Service Side Incident User recognizable service side categorization which can be Categorization mapped to mapped to Product Component Related Categorization Product Categorizations leading to 51
  • 52. Phase 1 Value Realization 1b Work Place Service Channel Configuration Continued ………… Deliverable Value Realized by Stakeholders Automated Incident Flow Track Incident lifecycle through multiple support groups / process to track SLA and 3rd Party Vendors and raise relevant escalations. UPC Compliance Automated Problem Identify improvement areas based on Incident Analysis, Management Process flow to prioritse and manage problems, demonstrate effectiveness track Problem resolution and of problem resolutions by establishing a reducing trend of effectiveness incidents. Establish process and provide training to all stakeholders Knowledge Management for creating, maintaining, improving and using knowledge Process Framework in place captured during various incident and problem resolution actions. Provide performance reports against SLA and support delivery. Service Reporting Track and report compliance against contracts with lead and 3rd Party suppliers. 52
  • 53. Milestones Phase 1 (2 months) • 1c Remedy Service Channel Establishment – Identify Development Environment and establish. – Identify Production Environment and establish infrastructure plan. – Prepare Sustenance plan and establish Application Support Group for Remedy. – Prepare Train the trainer material for End users, Technical Users and Management 53
  • 54. Phase 1 Value Realization 1c Remedy Service Channel Establishment Deliverable Value Realized by Stakeholders Development and Test Environment established and Ready for Prototype Configuration and Testing ready to use Production Environment Ready when prototype is completed for testing production Established and ready environment Application Support Group Establish sustainability for continued operations for Remedy Established Central service Desk providing Single Point of Contact for Service Desk acting as all services. Use of Technology Based SPOC routing tickets Single Point of Contact to technical service desks for Application and Established. Infrastructure support Technical Support Groups Technical Support Groups to provide Incident and Problem for Application and Co-ordination and management Infrastructure Established Train the Trainer Material Ready and available Train the trainer material available for End Users, Technical Personal, 3rd Party suppliers and Managers. 54
  • 55. Milestones Phase 2 (2 Months) • 2a. Establishing Capacity and Availability Processes – Establish Work Load Characteristics and identify infrastructure Capacity Components – Establish Capacity Plans and Trivoli integration for a selected service and create a prototype – Repeat above for all services – Train Users and Roll out – Establish Change Management Process and update open change tickets for small Changes (Less than 1 man month effort) and Change Projects – Transition to Sustenance Remedy Support Group 55
  • 56. Phase 2 Value Realization 2a Establishing Change Process Deliverable Value Process and Policies for Clarity in the change process, Prioritization and Approval establishing Closed Loop Mechanisms to establish and enhance business alignment and Change continual improvement in costs and quality of services. Small Change Ticket Establish lifecycle, tracking and reporting for small changes Lifecycle Management Effective Impact Improvements in Impact analysis provided by the Views Analysis available through the SOA configured in the CMDB Establish a Forward Identify the Planned Shut down of services for maintenance Schedule of Changes and improve availability tracking Service Desk with Tech Support Desks as SPOC Automated Incident Mgmt Process Flow Automated Problem Management Process Flow 80% of Services Out of the Box reports Monitored 56
  • 57. Phase 2 Value Realization 2a Establishing Capacity and Availability Management Process Deliverable Value Workload Clarity on workload Characteristics their proposed growth, the Characteristics and requirements for CI related capacities and the Scaling Matrix underlying CI Capacity is available for prioritized services. Requirements identified. Tivoli integration and Tivoli based CI monitoring is established for Key CI for above automated monitoring of services. System Generated Incident tickets and Service critical CI Failure broadcasts are established. Proactive Capacity Scaling plans are established to meet Predictive Capacity Plans growing business needs. The plan is tracked to ensure that are established planned activities are done proactively to avoid downtime. Availability of services is tracked automatically giving accurate Availability of Key CI is availability statistics for key CI and the Application Services tracked and reported Provided through them. Periodic reports on Capacity Planning and Availability are Status Reporting established and used in service reviews. 57
  • 58. Milestones Phase 2 (2 Months) • 2b. Establishing Change Management Process – Establish Change Management Process and update open change tickets for small Changes (Less than 1 man month effort) – Establish Process for Large Change Projects – Prepare Prototype and Approve for Selected Service. – Prepare Train the trainer Material – Roll out to all Application and Infra support groups – Transition to Sustenance Remedy Support Group 58
  • 59. Phase 2 Value Realization 2a Establishing Change Process Deliverable Value Process and Policies for Clarity in the change process, Prioritization and Approval establishing Closed Loop Mechanisms to establish and enhance business alignment and Change continual improvement in costs and quality of services. Small Change Ticket Establish lifecycle, tracking and reporting for small changes Lifecycle Management Effective Impact Improvements in Impact analysis provided by the Views Analysis available through the SOA configured in the CMDB Establish a Forward Identify the Planned Shut down of services for maintenance Schedule of Changes and improve availability tracking Large Project Establish Lifecycle models for project management and align Management to the Closed Loop Change Management in Remedy Create Small Changes and Project Status Dashboards, prepare Status Reporting management information reports. 59
  • 60. Milestones Phase 3 (2 Months) • Finalise Organisational Frame work • Finalise Balance Score Card objectives • Establish Metrics Plan • Review out of the box service reports based on Pilot data • Establish final Report formats • Create Dashboards • Establish Service Review Processes • Close Project 60
  • 61. Phase 3 Value Realization 3 Establishing Objective tracking to ensure unified culture Deliverable Value Organizational framework required to manage IT services Unified Organizational integrating multiple vendors into a single cultural process Framework in place oriented framework will be established. Measurable objectives Measurable objectives for various processes to ensure designed to focus on continual improvement in Business Alignment, Costs and Continual improvement Service Quality are identified and established at the integrated with Balance corporate Balance Score Card Level Score Card Application Support and Objective Tracking, reviewing and action plans are established Infrastructure Support for each of the service Channels, the Application Assembly Channels draw from Lines and the Infrastructure Support Pillars. All staff corporate Balance Score performance reviews regardless of Insourced or Outsourced Card are done in a unified manner. Performance Dashboards for tracking objectives is Performance Dashboards established along with review mechanisms Reward and Recognition Rewards and recognition schemes for outstanding performance schemes is established. 61
  • 62. Where to from here • Establish App Services Core Team • Make a list of Services • Prioritise – 20% of services 80% value • Create a Service Map for the services • Identify service for Prototype • Service CTI and Product CTI for Prototype 62