SlideShare ist ein Scribd-Unternehmen logo
1 von 53
           Round 9

   Presented by CTAP Region 8
Similar to other rounds
◦ District or direct funded charter that serves grades 4-8
◦ Rank within the top 1/3 percentage or number of
  students in the state living below the poverty line (http://
  www.census.gov/hhes/www/saipe/ )
◦ Current CDE approved technology plan
                             And...
1 or more schools identified for improvement or
   corrective action under No Child Left Behind
                           or
Technology     poverty defined as 10:1 student to
 computer –to-multimedia computer ratio or
 greater, or less that 50% of the classrooms
 connected to the Internet.
Eligiblility List
   http://www.cde.ca.gov/fg/fo/r5/eettc10rfa.asp
Significantly reduced from prior fiscal years 5.
  Awards based on $300 per 4th-8th grade
  ◦ See Eligible Schools List
      http://www.cde.ca.gov/fg/fo/r5/eettc10rfa.asp
 Projected funding for Regions is approximately $500,000

  ◦ Minimum district award is 25,000
  ◦ Max award about 300,000 (With no more than 60% of
    the regional funds allocated to that LEAs region.)
   File an annual report for each year on performance
    goals, objectives and benchmarks identified on form 3
   Edtech Profile pre and post test for each teacher
    participating in the professional development program
   Use of funds
   Increasing teacher effectiveness and addressing inequities in the
    distribution of effective teachers through high-quality professional
    development
   Using advanced technology systems to collect, manage, and analyze
    data in order to track student progress
   Implementing technology-enhanced strategies that support rigorous
    college- and career-ready, internationally benchmarked standards,
    supplemented with high-quality assessments that are valid and reliable
    for all students
   Districts that submitted the 2009 ARRA EETT C grant
    in Oct. 2009 may choose to substitute that score from
    that application for use in this Round 9 Grant
    ◦ LEAs will be required to submit Form 1-Application title Page
      and will be required to revise forms 2a, 3, 4, 5, and 6 if
      funded.
Category                              Max Score

A. Application Presentation           0

1. Program for Students               15
2. Professional Development           15
3. Expanded Access                    15
4. Communication & Collaboration      15
5. Evaluation & Project Mangagement   20
6. Program Sustainability             10
7. Projected Budget Narative          10
Total Score                           100
Minimum of 50 points
 Grouped into decile bands from scoring rubric
 ◦ (100-90, 89-80, 79-70, 69-60, 59-50)
Ranking  within decile by score
Small school districts will be provided priority
 ranking at the top of the percentage range in the
 decile they scored
Answer all project narrative questions in RFA
  Write to the “Strong” column of Appendix G
◦ Follow format
  Write to the rubric
   3 installments
    ◦ 40% after CDE receives grant award acceptance letter
    ◦ 40% after CDE receives LEAs Certification of Expenditure
      report and filling all required EETT C program performance
      reports
    ◦ 20% after CDE receives LEAs End of Period Expenditure
      Report certifying that the grant award was obligated or
      expended in compliance with the grant conditions.
Determine Target schools, teachers, and students
 Calculate total EETT C budget and set aside 25% for
 professional development
Review and select hardware, peripherals, electronic
 learning resources and productivity resources, and
 data collection tools needed to support the program
 ◦ Resources to help: http://ctap8.org/(administrator resources)
Assemble a planning/writing team
 Review RFA and Scoring criteria
Contact private schools in district to participate
Set Curriculum Goals

 Set timeline and divide responsibilities
  ◦ Deadline Feb. 1, 2011 on or before 5:00 PM (in Sacramento)
Identify curricular focus area(s)
  Gather baseline data
◦ Design a research-based EETT C program that will bridge the
  gap from where you are to where you want to be.
◦ Set S.M.A.R.T goals to be obtained
Form 1: Application Title Page
 Form 2: Project Summary (Best done last)
Form 2a: Program Profile & School data
Form 2b: Small School District Addendum (if applicable)
Project Narrative: 6 sections-25 page max, line
 numbers (not to exceed 36 lines per page) and pages
 must be numbered
Optional: Bibliography /Citation page
Form 3: Goals and Objectives and Data Collection
Form 4: Strategies and Timeline
Form 5: Projected Budget and Narrative
Form 6: Priority List of Schools
Form 7: Consortium and/or Partnership Applicants &
signed letters of support
Form 8: Competitive Application Checklist
4   Required EETT C Performance Goals

Goal 1: Increased Student Proficiency
Goal 2: Increased Teacher Proficiency
Goal 3: Expanded Access to Technology
Goal 4: Expanded School/Home/Community
Collaboration
Program Goals, Objectives, Benchmarks and Data Collection
◦Goals: CDE defined vision-not measured
◦Objectives: CDE defined measure-applicant defined growth
target during a specified timeframe. Growth targets may not be
modified.
◦Benchmarks: Applicants annual baseline data plus growth
target equals end of year growth projection.
Can not be modified after the application is approved
for funding.
EETT-C follow-up grant eligibility is contingent on
meeting 70% of district set growth targets for each
objective. (set realistic growth targets for each
objective)
Goals 1 and 2:
 LEA programs focus on the same target students or teachers
 in Year One and Year Two have two years to meet their
 identified growth targets.
 LEA programs focusing on different target students or
 teachers in Year One and Year Two must meet their identified
 growth targets annually and add text to form 3 to clarify.
Use data to establish baseline percentages, projected
growth targets, and define end of year percentages on
Form 3
 Write down formula used to determine growth %
   Establish consistent data instruments, items, and calculation
   methods for each objective
   Data for objectives measured by multiple instruments must be
   collected and aggregated to determine baseline figures and
   subsequent growth
Collect:
 Baseline data that needs to be collected:
 Target Students’ Tech Literacy Data -www.edtechprofile.com (student survey)
 Target Students’ Achievement Data - Benchmark assessment or Approved textbook benchmark
 assessments
 Target Teachers’ Tech Literacy Data - www.edtechprofile.com
 Target Teachers’ Curriculum Integration Data/C3
 Target Classroom Observation Data/C3
 Target Classroom Student to Computer Ratios- Previously from California State Technology
 Survey or a simple spreadsheet
 Communication & Collaboration Data - enter your own measurable objective (Aeries, SIS, % of
 teachers posting grades online, etc)
 Data for any additional objectives applicant includes
Form 4: Strategies & Timelines
 List specific strategies or actions that will be
 implemented to achieve each of the performance
 goals, objectives, and benchmarks specified on Form 3
 and in the project narrative.
 Include beginning and ending dates for the strategies
 or actions
  List the title of the person responsible
2 Year budget ($300 multiplied by 2008 4-8 CBEDS
 at all schools listed of form 6)
 ◦ Funding will not exceed 60% or approximately $300,000.
Specify   program budget for Year 1 and Year 2.
   10% or more change in spending requires LEA to submit a
   Budget Modification to the CDE for approval
Report the amount to be expended and describe in detail how
the funds will be allocated in each category.
  Include leveraged funding, if applicable
A minimum of 25% of the total 2 year grant must go to
high-quality professional development that is relevant to
the program.
Costs for teacher stipends for attending professional development outside of contract
hours.
Costs for substitute teachers
Costs for salaries and benefits, stipends, or contracts for PD trainers, facilitators, and
mentors
Costs for professional development workshops and conferences specified in the LEAs
grant application.
Costs for materials and supplies necessary to carry out the professional development
may be charged, consistent with established LEA policies and practices
Hardware
Infrastructure
Technical Support
CLRN reviewed Electronic Learning Resources
Supplies and Materials
Expenses related to fostering communication among parents,
students, teachers, and community
Grant management, coordination, evaluation,
and reporting
If partially funded, CDE will fund schools per order on
form 6
 Rank eligible applicant schools in order for funding
         
  
 
 
             
                  
    
   
        
       
 
 
       
                 
 
   

          
       
   
           
    
        
 
 
     
       
 
       
    
     
   
       
    
              

    
  
    
 
           
 
 
        
    
      
      
        
 
 
      
    
 
         
       
           

      
 
       
          
 
        
 
   
       
         
      
 

The CDE Encourages mutually beneficial program
 partnerships.
   Identify LEA partnerships
 ◦ If consortium appication list other LEAs and direct funded charter schools int eh
   consortium.
Include     a partnership letter on partner’s letterhead
Partnership applications are encouraged and receive a
competitive advantage in application scoring
Partnerships Requirements:
 Proven experience with technology literacy and curriculum
 integration
 Evidence the partnership will have a positive impact on
 student academic achievement
 Work, products, strategies or services are aligned with or
 based upon relevant research.
A consortium is a group of school districts and/or direct-
funded charter schools.
A minimum of one school district or direct funded
charter within the consortium must be eligible to apply
for the EETT C Grant and be the designated lead
agency.
Only students in grades 4-8 at eligible districts and
direct funded charters within a consortium are funded at
$300 per student.
Brief partnership letter (1 page) includes:
  written on partner’s letter head,
  summarizes the role of the partnership
  includes how the partnership supports the program
  states how the partnership is mutually beneficial to the partner and
  LEA
  Must be signed by the lead contact (consortiums identify the lead
  school district and all school districts and/or direct-funded charter
  schools within the consortium)
   The Project Narrative describes the research-based
    program, strategies, resources, evaluation and
    timelines outlined in the application forms.
    ◦ Provide a concise narrative description of the comprehensive
      EETT program you propose
       Site research to support the basis
     Number each Project Narrative page
       Maximum of 25 pages
     Pages must include line numbers
       No more than 36 lines per page.
Describe the LEA’s research-based Program for
 Students. Include relevant research citations.
 Describe the technology literacy and academic
 learning needs of target students.
Describe how the LEA’s research-based Program for
 Students will meet the students’ identified learning
 needs.
 Must include all six sections under separate headings
 and subheadings that match the rubric Scoring
 Criteria.
  Six Sections of the Project Narrative
1. Program for Students
2. Professional Development Program for Teachers
3. Expand Access to Technology and Provide Technology Support
4. Communication and Collaboration Among Home, School, and
   Community.
5. Evaluation and Program Management
6. Follow-up Grant & Sustainability
Describe the LEA’s research-based Program for
Students. Include relevant research citations.

Describe the technology literacy and academic learing
needs of target students

Describe how the LEA’s research-based Program for
Students will meet the students’ identified learning
needs.
LEA designs their own program for students using
research-based strategies and State Board of Education
approved publisher or CLRN reviewed electronic
learning resources.
LEA partners with an organization such as CTAP to
develop a comprehensive program suited to the
specific learning needs of targeted students.
All Electronic Learning Resources purchased with
EETT C funds must either be:
 California Learning Resource Network (CLRN) reviewed
 electronic learning resources that meet state standards
 Curriculum-based electronic learning resources that are part of
 an State Board of Education approved K-8 program
LEA partners with an established research-based student
program such as:
 GenYes
 ISTE NETS Aligned Programs
 Tech4Learning
 NetTrekker
Describe the LEA’s research-based Program for Teachers. Include
relevant research citations.
Describe the technology literacy and curriculum integration learning
needs of the teachers in the target group(s).
Describe how the LEA’s research-based Professional Development
Program will meet the target teachers’ identified learning needs.
LEA designs their own Professional Development program using
research-based strategies.
LEA partners with an organization such as CTAP to develop a
comprehensive Ed Tech integration program suited to their needs.
Identify the current student-to-computer ratio used by the students
and teachers in the target group.
Identify the new electronic learning resources, infrastructure,
hardware and peripherals to be acquired and describe how the new
resources will support the comprehensive program.
Describe how technology resources, either currently existing or to
be acquired, will be used to support data-driven decision-making.
Describe how adequate technical support will be provided to
support the district’s EETT Competitive program.
Describe how technology will be used to establish or improve
    communication and collaboration among home, school and
    community.
    Describe how students’ learning needs will be supported through the
    use of technology for communication and collaboration.
   Possible areas to establish or improve on:
   E-mail accounts, expanded web access for teachers, students, parents, and community promote
    communication and sharing.

   Developing communication channels for partners and stakeholders to support learning opportunities
   Using multiple media for school / class communications…i.e., school web postings, student grades and
    attendance online, informational e-mails, voice-mail, newsletters.

   Sponsoring parent/community events that promote involvement in student learning and technology
Describe the LEA’s evaluation plan.
Who? What? When? Why? and How? will the LEA measure, collect,
analyze, evaluate, and report on every required and optional objective on
Form 3? Reference SETDA’s Common Data Elements.
Describe the LEA’s program management or advisory group by job title,
roles, and responsibilities. How often will advisory group meet and how will
ongoing communications with stakeholders take place?
Describe the continuous data-driven
improvement process for monitoring the impact
the comprehensive program is having on all goals.
   Collected program data is used in Semi-annual and
    Annual Performance Reports to the CDE.
    Purpose: to evaluate progress in meeting annual benchmarks and
    program impact. Share outcomes with stakeholders.
    Submitted to CDE twice a year during both implementation years.
    The CDE will post the EETT C Round 8 semi-annual and annual
    reports on the CDE website by July 2009. Expected to be similar to
    Round 6 Performance Reports.
          http://www.cde.ca.gov/ls/et/ft/eettcomp.asp
Describe how the Follow-Up grant ($45 per student based on
original grant award) will be used to help sustain or expand the
EETT Competitive Round 8 program.

Describe other funding sources or partnerships that may contribute
to the sustainability or expansion of the EETT Competitive Round
8 program, at the conclusion of the two-year grant program.
Eligible applications will be prescreened for
completeness and compliance with CDE requirements
Must submit
 One signed (blue ink), unbound original print copy of
 application
 Three stapled print copies (must lay flat -no binders)
 One digital copy in MS Word or PDF format on CD labeled
 with LEA name (no signatures required)
Submit in print, single sided, 8 1/2 X 11 paper, portrait
  orientation (except forms), 1 inch margin, 12-point font.
  Submit all required forms, assurances and certifications,
  check for signatures. (Complete and include form 8
  checklist)
◦ Project narrative pages must be numbered (Max 25 pages)
  with heading and subheadings for the 6 sections.
◦ Pages must include line numbers (max 36 lines)
  Original copy signed in blue ink
A signed copy of the Certification Regarding
Lobbying, Debartment, Suspension, and other
Responsibility Matters, and Drug-Free Workplace
Requirements
Review and sign the EETT C Grant Conditions and
Assurances
Submit one original unbound, 3 print copies, and one
e-copy of application on CD
             Due: February 1, 2011 by 5 PM
 Possibility of later submittal date upon release of RFA
         California Department of Education
             Education Technology Office
             EETT-C Round 9 Application
              1430 N Street, Suite 6308
                Sacramento, CA 95814
Confirmation of delivery or receipt with date/time of
  delivery form mail or courier service recommended.
  Grants will not be excepted after deadline.
 Visit EETT-C Round 9 Webpage:
 http://www.cde.ca.gov/fg/fo/r5/eettc10rfa.asp
 Review EETT-C FAQs
 http://www.cde.ca.gov/ls/et/ft/eettcfaqs.asp
 Email:
 Kebergen@kern.org
 ststansberry@kern.org
                            www.CTAP8.org

Weitere ähnliche Inhalte

Was ist angesagt?

AoC Beacon Awards 2014-15 - How to Ppply
AoC Beacon Awards 2014-15 - How to PpplyAoC Beacon Awards 2014-15 - How to Ppply
AoC Beacon Awards 2014-15 - How to PpplyAssociation of Colleges
 
Nba & pre qualifier for accreditation
Nba & pre qualifier for accreditationNba & pre qualifier for accreditation
Nba & pre qualifier for accreditationmrinalmanik64
 
Accountability working group, identified issues
Accountability working group, identified issuesAccountability working group, identified issues
Accountability working group, identified issuesEducationNC
 
Reengineering the University
Reengineering the UniversityReengineering the University
Reengineering the UniversityBill Massy
 
$200M Strong Workforce Program: Final Trailer Bill Language
$200M Strong Workforce Program: Final Trailer Bill Language$200M Strong Workforce Program: Final Trailer Bill Language
$200M Strong Workforce Program: Final Trailer Bill LanguageStrong Workforce
 
Strong Workforce Task Force Overview - December 2015
Strong Workforce Task Force Overview - December 2015Strong Workforce Task Force Overview - December 2015
Strong Workforce Task Force Overview - December 2015Strong Workforce
 
Strategic-Alignment-of-the-DFATD-International-Scholarships-Program
Strategic-Alignment-of-the-DFATD-International-Scholarships-ProgramStrategic-Alignment-of-the-DFATD-International-Scholarships-Program
Strategic-Alignment-of-the-DFATD-International-Scholarships-ProgramChantal Bolduc
 
$200M Strong Workforce Program: Final Trailer Bill Language
$200M Strong Workforce Program: Final Trailer Bill Language$200M Strong Workforce Program: Final Trailer Bill Language
$200M Strong Workforce Program: Final Trailer Bill LanguageStrong Workforce
 
TOC Detailed - Edited Final
TOC Detailed - Edited FinalTOC Detailed - Edited Final
TOC Detailed - Edited FinalBill Massy
 
Successful SES application
Successful SES applicationSuccessful SES application
Successful SES applicationlillypad36502
 
Case study cats pilot project final 17.7.13
Case study   cats pilot project final 17.7.13Case study   cats pilot project final 17.7.13
Case study cats pilot project final 17.7.13Association of Colleges
 
Perkins 2009
Perkins 2009Perkins 2009
Perkins 2009jones105
 
Qualities of an NBA Accredited Program
Qualities of an NBA Accredited ProgramQualities of an NBA Accredited Program
Qualities of an NBA Accredited ProgramMurty Moguluru
 
Understanding Texas TEKs updates
Understanding Texas TEKs updatesUnderstanding Texas TEKs updates
Understanding Texas TEKs updatesJeff Allen
 
Preparing Libraries as per NAAC’s Revised Accreditation Framework
Preparing Libraries as per NAAC’s Revised Accreditation FrameworkPreparing Libraries as per NAAC’s Revised Accreditation Framework
Preparing Libraries as per NAAC’s Revised Accreditation FrameworkSantosh C. Hulagabali
 
The Westwood Review - Lab to Market Class
The Westwood Review - Lab to Market ClassThe Westwood Review - Lab to Market Class
The Westwood Review - Lab to Market Classoaivazia
 

Was ist angesagt? (20)

AoC Beacon Awards 2014-15 - How to Ppply
AoC Beacon Awards 2014-15 - How to PpplyAoC Beacon Awards 2014-15 - How to Ppply
AoC Beacon Awards 2014-15 - How to Ppply
 
Tuition funding draft 10-17-12.docx
Tuition funding draft 10-17-12.docxTuition funding draft 10-17-12.docx
Tuition funding draft 10-17-12.docx
 
Final Project Financial
Final Project Financial Final Project Financial
Final Project Financial
 
Preliminary Financial Analysis of K-12 Breakthrough School Models
Preliminary Financial Analysis of K-12 Breakthrough School ModelsPreliminary Financial Analysis of K-12 Breakthrough School Models
Preliminary Financial Analysis of K-12 Breakthrough School Models
 
Nba & pre qualifier for accreditation
Nba & pre qualifier for accreditationNba & pre qualifier for accreditation
Nba & pre qualifier for accreditation
 
Accountability working group, identified issues
Accountability working group, identified issuesAccountability working group, identified issues
Accountability working group, identified issues
 
Reengineering the University
Reengineering the UniversityReengineering the University
Reengineering the University
 
Learning gain in international perspective: Towards a more reliable model for...
Learning gain in international perspective: Towards a more reliable model for...Learning gain in international perspective: Towards a more reliable model for...
Learning gain in international perspective: Towards a more reliable model for...
 
$200M Strong Workforce Program: Final Trailer Bill Language
$200M Strong Workforce Program: Final Trailer Bill Language$200M Strong Workforce Program: Final Trailer Bill Language
$200M Strong Workforce Program: Final Trailer Bill Language
 
Strong Workforce Task Force Overview - December 2015
Strong Workforce Task Force Overview - December 2015Strong Workforce Task Force Overview - December 2015
Strong Workforce Task Force Overview - December 2015
 
Strategic-Alignment-of-the-DFATD-International-Scholarships-Program
Strategic-Alignment-of-the-DFATD-International-Scholarships-ProgramStrategic-Alignment-of-the-DFATD-International-Scholarships-Program
Strategic-Alignment-of-the-DFATD-International-Scholarships-Program
 
$200M Strong Workforce Program: Final Trailer Bill Language
$200M Strong Workforce Program: Final Trailer Bill Language$200M Strong Workforce Program: Final Trailer Bill Language
$200M Strong Workforce Program: Final Trailer Bill Language
 
TOC Detailed - Edited Final
TOC Detailed - Edited FinalTOC Detailed - Edited Final
TOC Detailed - Edited Final
 
Successful SES application
Successful SES applicationSuccessful SES application
Successful SES application
 
Case study cats pilot project final 17.7.13
Case study   cats pilot project final 17.7.13Case study   cats pilot project final 17.7.13
Case study cats pilot project final 17.7.13
 
Perkins 2009
Perkins 2009Perkins 2009
Perkins 2009
 
Qualities of an NBA Accredited Program
Qualities of an NBA Accredited ProgramQualities of an NBA Accredited Program
Qualities of an NBA Accredited Program
 
Understanding Texas TEKs updates
Understanding Texas TEKs updatesUnderstanding Texas TEKs updates
Understanding Texas TEKs updates
 
Preparing Libraries as per NAAC’s Revised Accreditation Framework
Preparing Libraries as per NAAC’s Revised Accreditation FrameworkPreparing Libraries as per NAAC’s Revised Accreditation Framework
Preparing Libraries as per NAAC’s Revised Accreditation Framework
 
The Westwood Review - Lab to Market Class
The Westwood Review - Lab to Market ClassThe Westwood Review - Lab to Market Class
The Westwood Review - Lab to Market Class
 

Andere mochten auch

Presentacion
PresentacionPresentacion
Presentacionkalukaci
 
Building land for sale
Building land for saleBuilding land for sale
Building land for saleCut and Fill
 
Izm n2 stb 1160 99
Izm n2 stb 1160 99Izm n2 stb 1160 99
Izm n2 stb 1160 99bogna_bakri
 
Unidad nº 1
Unidad nº 1Unidad nº 1
Unidad nº 1kiika22
 
He who took up arms against us
He who took up arms against usHe who took up arms against us
He who took up arms against usFAHIM AKTHAR ULLAL
 
Voice thread presentation
Voice thread presentationVoice thread presentation
Voice thread presentationJenna_Barton
 
MALLA CURRICULAR 2009 - Escuela de marketing y negocios internacionales
 MALLA CURRICULAR  2009 - Escuela de marketing y negocios internacionales MALLA CURRICULAR  2009 - Escuela de marketing y negocios internacionales
MALLA CURRICULAR 2009 - Escuela de marketing y negocios internacionalesCecilia Rivera Lopez
 
Export in russia 1912
Export in russia 1912Export in russia 1912
Export in russia 1912bogna_bakri
 
шинагулова даметай+оформление мероприятий+финальная презентация
шинагулова даметай+оформление мероприятий+финальная презентацияшинагулова даметай+оформление мероприятий+финальная презентация
шинагулова даметай+оформление мероприятий+финальная презентацияGauhar Gauhar
 
Participant Information Sheet for ASEAN-BAC 2011 Survey
Participant Information Sheet for ASEAN-BAC 2011 SurveyParticipant Information Sheet for ASEAN-BAC 2011 Survey
Participant Information Sheet for ASEAN-BAC 2011 Surveysheillaluciana
 
Презентація 3
Презентація 3Презентація 3
Презентація 3salger01
 
2009 ECNO Conference - Teaching Learning Critical Pathway
2009 ECNO Conference - Teaching Learning Critical Pathway2009 ECNO Conference - Teaching Learning Critical Pathway
2009 ECNO Conference - Teaching Learning Critical PathwayJohn Brighton
 
Інформаційні таблиці до Правил прийому до вищого навчального закладу у 2016 році
Інформаційні таблиці до Правил прийому до вищого навчального закладу у 2016 роціІнформаційні таблиці до Правил прийому до вищого навчального закладу у 2016 році
Інформаційні таблиці до Правил прийому до вищого навчального закладу у 2016 роціЛьвівська філія КНУКІМ
 
Skin Care at Every Age
Skin Care at Every AgeSkin Care at Every Age
Skin Care at Every AgeSummit Health
 

Andere mochten auch (18)

Presentacion
PresentacionPresentacion
Presentacion
 
Building land for sale
Building land for saleBuilding land for sale
Building land for sale
 
Izm n2 stb 1160 99
Izm n2 stb 1160 99Izm n2 stb 1160 99
Izm n2 stb 1160 99
 
Unidad nº 1
Unidad nº 1Unidad nº 1
Unidad nº 1
 
He who took up arms against us
He who took up arms against usHe who took up arms against us
He who took up arms against us
 
Lastingham Mill
Lastingham MillLastingham Mill
Lastingham Mill
 
En54 13
En54 13En54 13
En54 13
 
Voice thread presentation
Voice thread presentationVoice thread presentation
Voice thread presentation
 
MALLA CURRICULAR 2009 - Escuela de marketing y negocios internacionales
 MALLA CURRICULAR  2009 - Escuela de marketing y negocios internacionales MALLA CURRICULAR  2009 - Escuela de marketing y negocios internacionales
MALLA CURRICULAR 2009 - Escuela de marketing y negocios internacionales
 
International 69
International 69International 69
International 69
 
Export in russia 1912
Export in russia 1912Export in russia 1912
Export in russia 1912
 
шинагулова даметай+оформление мероприятий+финальная презентация
шинагулова даметай+оформление мероприятий+финальная презентацияшинагулова даметай+оформление мероприятий+финальная презентация
шинагулова даметай+оформление мероприятий+финальная презентация
 
Participant Information Sheet for ASEAN-BAC 2011 Survey
Participant Information Sheet for ASEAN-BAC 2011 SurveyParticipant Information Sheet for ASEAN-BAC 2011 Survey
Participant Information Sheet for ASEAN-BAC 2011 Survey
 
Презентація 3
Презентація 3Презентація 3
Презентація 3
 
2009 ECNO Conference - Teaching Learning Critical Pathway
2009 ECNO Conference - Teaching Learning Critical Pathway2009 ECNO Conference - Teaching Learning Critical Pathway
2009 ECNO Conference - Teaching Learning Critical Pathway
 
Інформаційні таблиці до Правил прийому до вищого навчального закладу у 2016 році
Інформаційні таблиці до Правил прийому до вищого навчального закладу у 2016 роціІнформаційні таблиці до Правил прийому до вищого навчального закладу у 2016 році
Інформаційні таблиці до Правил прийому до вищого навчального закладу у 2016 році
 
Revista El Prevencionista 11ava ed
Revista El Prevencionista 11ava edRevista El Prevencionista 11ava ed
Revista El Prevencionista 11ava ed
 
Skin Care at Every Age
Skin Care at Every AgeSkin Care at Every Age
Skin Care at Every Age
 

Ähnlich wie Round 9 EETT C Grant Application Overview

The national academy foundation student certification system, andrew bell and...
The national academy foundation student certification system, andrew bell and...The national academy foundation student certification system, andrew bell and...
The national academy foundation student certification system, andrew bell and...NAFCareerAcads
 
District Guide: Financing to Scale Blended Learning
District Guide: Financing to Scale Blended LearningDistrict Guide: Financing to Scale Blended Learning
District Guide: Financing to Scale Blended LearningLuis Taveras EMBA, MS
 
Federal Stimulus and OER
Federal Stimulus and OERFederal Stimulus and OER
Federal Stimulus and OERJonathan Lopez
 
GradNation Acceleration Grant Informational Webinar
GradNation Acceleration Grant Informational WebinarGradNation Acceleration Grant Informational Webinar
GradNation Acceleration Grant Informational WebinarAmerica's Promise Alliance
 
E rate presentation
E rate presentationE rate presentation
E rate presentationkhazarid
 
The new naf student certification system, andrew bell
The new naf student certification system, andrew bellThe new naf student certification system, andrew bell
The new naf student certification system, andrew bellNAFCareerAcads
 
The new naf student certification system, andrew bell
The new naf student certification system, andrew bellThe new naf student certification system, andrew bell
The new naf student certification system, andrew bellNAFCareerAcads
 
A Year of Transition
A Year of TransitionA Year of Transition
A Year of Transitioncelinstitute
 
AmeriCorps grant training presentation
AmeriCorps grant training presentationAmeriCorps grant training presentation
AmeriCorps grant training presentationKCCVS
 
Awareness on Accredidation and OBE
Awareness on Accredidation and OBEAwareness on Accredidation and OBE
Awareness on Accredidation and OBEDrSreeLatha
 

Ähnlich wie Round 9 EETT C Grant Application Overview (20)

Oct12 brtf webinardeckv2
Oct12 brtf webinardeckv2Oct12 brtf webinardeckv2
Oct12 brtf webinardeckv2
 
The national academy foundation student certification system, andrew bell and...
The national academy foundation student certification system, andrew bell and...The national academy foundation student certification system, andrew bell and...
The national academy foundation student certification system, andrew bell and...
 
District Guide: Financing to Scale Blended Learning
District Guide: Financing to Scale Blended LearningDistrict Guide: Financing to Scale Blended Learning
District Guide: Financing to Scale Blended Learning
 
COPR.PDF
COPR.PDFCOPR.PDF
COPR.PDF
 
Cefpi power point presentation revised
Cefpi power point presentation revisedCefpi power point presentation revised
Cefpi power point presentation revised
 
Federal Stimulus and OER
Federal Stimulus and OERFederal Stimulus and OER
Federal Stimulus and OER
 
GradNation Acceleration Grant Informational Webinar
GradNation Acceleration Grant Informational WebinarGradNation Acceleration Grant Informational Webinar
GradNation Acceleration Grant Informational Webinar
 
E rate presentation
E rate presentationE rate presentation
E rate presentation
 
The new naf student certification system, andrew bell
The new naf student certification system, andrew bellThe new naf student certification system, andrew bell
The new naf student certification system, andrew bell
 
The new naf student certification system, andrew bell
The new naf student certification system, andrew bellThe new naf student certification system, andrew bell
The new naf student certification system, andrew bell
 
Power point #1 e rate
Power point #1 e ratePower point #1 e rate
Power point #1 e rate
 
A Year of Transition
A Year of TransitionA Year of Transition
A Year of Transition
 
Ameri Corps Grant Training Presentation
Ameri Corps Grant Training PresentationAmeri Corps Grant Training Presentation
Ameri Corps Grant Training Presentation
 
AmeriCorps grant training presentation
AmeriCorps grant training presentationAmeriCorps grant training presentation
AmeriCorps grant training presentation
 
SIG Webinar NC
SIG Webinar NCSIG Webinar NC
SIG Webinar NC
 
Slideshow 062309
Slideshow 062309Slideshow 062309
Slideshow 062309
 
Tech Classroom
Tech ClassroomTech Classroom
Tech Classroom
 
Stateedtechgrants
StateedtechgrantsStateedtechgrants
Stateedtechgrants
 
Oct19 workingdraft brtf1dot3
Oct19 workingdraft brtf1dot3Oct19 workingdraft brtf1dot3
Oct19 workingdraft brtf1dot3
 
Awareness on Accredidation and OBE
Awareness on Accredidation and OBEAwareness on Accredidation and OBE
Awareness on Accredidation and OBE
 

Kürzlich hochgeladen

Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 

Kürzlich hochgeladen (20)

Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 

Round 9 EETT C Grant Application Overview

  • 1. Round 9  Presented by CTAP Region 8
  • 2. Similar to other rounds ◦ District or direct funded charter that serves grades 4-8 ◦ Rank within the top 1/3 percentage or number of students in the state living below the poverty line (http:// www.census.gov/hhes/www/saipe/ ) ◦ Current CDE approved technology plan  And...
  • 3. 1 or more schools identified for improvement or corrective action under No Child Left Behind or Technology poverty defined as 10:1 student to computer –to-multimedia computer ratio or greater, or less that 50% of the classrooms connected to the Internet. Eligiblility List http://www.cde.ca.gov/fg/fo/r5/eettc10rfa.asp
  • 4. Significantly reduced from prior fiscal years 5. Awards based on $300 per 4th-8th grade ◦ See Eligible Schools List http://www.cde.ca.gov/fg/fo/r5/eettc10rfa.asp  Projected funding for Regions is approximately $500,000 ◦ Minimum district award is 25,000 ◦ Max award about 300,000 (With no more than 60% of the regional funds allocated to that LEAs region.)
  • 5. File an annual report for each year on performance goals, objectives and benchmarks identified on form 3  Edtech Profile pre and post test for each teacher participating in the professional development program  Use of funds
  • 6. Increasing teacher effectiveness and addressing inequities in the distribution of effective teachers through high-quality professional development  Using advanced technology systems to collect, manage, and analyze data in order to track student progress  Implementing technology-enhanced strategies that support rigorous college- and career-ready, internationally benchmarked standards, supplemented with high-quality assessments that are valid and reliable for all students
  • 7. Districts that submitted the 2009 ARRA EETT C grant in Oct. 2009 may choose to substitute that score from that application for use in this Round 9 Grant ◦ LEAs will be required to submit Form 1-Application title Page and will be required to revise forms 2a, 3, 4, 5, and 6 if funded.
  • 8. Category Max Score A. Application Presentation 0 1. Program for Students 15 2. Professional Development 15 3. Expanded Access 15 4. Communication & Collaboration 15 5. Evaluation & Project Mangagement 20 6. Program Sustainability 10 7. Projected Budget Narative 10 Total Score 100
  • 9. Minimum of 50 points Grouped into decile bands from scoring rubric ◦ (100-90, 89-80, 79-70, 69-60, 59-50) Ranking within decile by score Small school districts will be provided priority ranking at the top of the percentage range in the decile they scored
  • 10. Answer all project narrative questions in RFA Write to the “Strong” column of Appendix G ◦ Follow format Write to the rubric
  • 11. 3 installments ◦ 40% after CDE receives grant award acceptance letter ◦ 40% after CDE receives LEAs Certification of Expenditure report and filling all required EETT C program performance reports ◦ 20% after CDE receives LEAs End of Period Expenditure Report certifying that the grant award was obligated or expended in compliance with the grant conditions.
  • 12. Determine Target schools, teachers, and students Calculate total EETT C budget and set aside 25% for professional development Review and select hardware, peripherals, electronic learning resources and productivity resources, and data collection tools needed to support the program ◦ Resources to help: http://ctap8.org/(administrator resources)
  • 13. Assemble a planning/writing team Review RFA and Scoring criteria Contact private schools in district to participate Set Curriculum Goals Set timeline and divide responsibilities ◦ Deadline Feb. 1, 2011 on or before 5:00 PM (in Sacramento)
  • 14. Identify curricular focus area(s) Gather baseline data ◦ Design a research-based EETT C program that will bridge the gap from where you are to where you want to be. ◦ Set S.M.A.R.T goals to be obtained
  • 15. Form 1: Application Title Page Form 2: Project Summary (Best done last) Form 2a: Program Profile & School data Form 2b: Small School District Addendum (if applicable) Project Narrative: 6 sections-25 page max, line numbers (not to exceed 36 lines per page) and pages must be numbered Optional: Bibliography /Citation page
  • 16. Form 3: Goals and Objectives and Data Collection Form 4: Strategies and Timeline Form 5: Projected Budget and Narrative Form 6: Priority List of Schools Form 7: Consortium and/or Partnership Applicants & signed letters of support Form 8: Competitive Application Checklist
  • 17.
  • 18. 4 Required EETT C Performance Goals Goal 1: Increased Student Proficiency Goal 2: Increased Teacher Proficiency Goal 3: Expanded Access to Technology Goal 4: Expanded School/Home/Community Collaboration
  • 19. Program Goals, Objectives, Benchmarks and Data Collection ◦Goals: CDE defined vision-not measured ◦Objectives: CDE defined measure-applicant defined growth target during a specified timeframe. Growth targets may not be modified. ◦Benchmarks: Applicants annual baseline data plus growth target equals end of year growth projection.
  • 20. Can not be modified after the application is approved for funding. EETT-C follow-up grant eligibility is contingent on meeting 70% of district set growth targets for each objective. (set realistic growth targets for each objective)
  • 21. Goals 1 and 2: LEA programs focus on the same target students or teachers in Year One and Year Two have two years to meet their identified growth targets. LEA programs focusing on different target students or teachers in Year One and Year Two must meet their identified growth targets annually and add text to form 3 to clarify.
  • 22. Use data to establish baseline percentages, projected growth targets, and define end of year percentages on Form 3 Write down formula used to determine growth % Establish consistent data instruments, items, and calculation methods for each objective Data for objectives measured by multiple instruments must be collected and aggregated to determine baseline figures and subsequent growth
  • 23. Collect: Baseline data that needs to be collected: Target Students’ Tech Literacy Data -www.edtechprofile.com (student survey) Target Students’ Achievement Data - Benchmark assessment or Approved textbook benchmark assessments Target Teachers’ Tech Literacy Data - www.edtechprofile.com Target Teachers’ Curriculum Integration Data/C3 Target Classroom Observation Data/C3 Target Classroom Student to Computer Ratios- Previously from California State Technology Survey or a simple spreadsheet Communication & Collaboration Data - enter your own measurable objective (Aeries, SIS, % of teachers posting grades online, etc) Data for any additional objectives applicant includes
  • 24. Form 4: Strategies & Timelines List specific strategies or actions that will be implemented to achieve each of the performance goals, objectives, and benchmarks specified on Form 3 and in the project narrative. Include beginning and ending dates for the strategies or actions List the title of the person responsible
  • 25. 2 Year budget ($300 multiplied by 2008 4-8 CBEDS at all schools listed of form 6) ◦ Funding will not exceed 60% or approximately $300,000. Specify program budget for Year 1 and Year 2. 10% or more change in spending requires LEA to submit a Budget Modification to the CDE for approval
  • 26. Report the amount to be expended and describe in detail how the funds will be allocated in each category. Include leveraged funding, if applicable A minimum of 25% of the total 2 year grant must go to high-quality professional development that is relevant to the program.
  • 27. Costs for teacher stipends for attending professional development outside of contract hours. Costs for substitute teachers Costs for salaries and benefits, stipends, or contracts for PD trainers, facilitators, and mentors Costs for professional development workshops and conferences specified in the LEAs grant application. Costs for materials and supplies necessary to carry out the professional development may be charged, consistent with established LEA policies and practices
  • 28. Hardware Infrastructure Technical Support CLRN reviewed Electronic Learning Resources Supplies and Materials Expenses related to fostering communication among parents, students, teachers, and community Grant management, coordination, evaluation, and reporting
  • 29. If partially funded, CDE will fund schools per order on form 6 Rank eligible applicant schools in order for funding 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

  • 30.
  • 31. The CDE Encourages mutually beneficial program partnerships. Identify LEA partnerships ◦ If consortium appication list other LEAs and direct funded charter schools int eh consortium. Include a partnership letter on partner’s letterhead
  • 32. Partnership applications are encouraged and receive a competitive advantage in application scoring Partnerships Requirements: Proven experience with technology literacy and curriculum integration Evidence the partnership will have a positive impact on student academic achievement Work, products, strategies or services are aligned with or based upon relevant research.
  • 33. A consortium is a group of school districts and/or direct- funded charter schools. A minimum of one school district or direct funded charter within the consortium must be eligible to apply for the EETT C Grant and be the designated lead agency. Only students in grades 4-8 at eligible districts and direct funded charters within a consortium are funded at $300 per student.
  • 34. Brief partnership letter (1 page) includes: written on partner’s letter head, summarizes the role of the partnership includes how the partnership supports the program states how the partnership is mutually beneficial to the partner and LEA Must be signed by the lead contact (consortiums identify the lead school district and all school districts and/or direct-funded charter schools within the consortium)
  • 35. The Project Narrative describes the research-based program, strategies, resources, evaluation and timelines outlined in the application forms. ◦ Provide a concise narrative description of the comprehensive EETT program you propose  Site research to support the basis Number each Project Narrative page  Maximum of 25 pages Pages must include line numbers  No more than 36 lines per page.
  • 36. Describe the LEA’s research-based Program for Students. Include relevant research citations. Describe the technology literacy and academic learning needs of target students. Describe how the LEA’s research-based Program for Students will meet the students’ identified learning needs. Must include all six sections under separate headings and subheadings that match the rubric Scoring Criteria.
  • 37.  Six Sections of the Project Narrative 1. Program for Students 2. Professional Development Program for Teachers 3. Expand Access to Technology and Provide Technology Support 4. Communication and Collaboration Among Home, School, and Community. 5. Evaluation and Program Management 6. Follow-up Grant & Sustainability
  • 38. Describe the LEA’s research-based Program for Students. Include relevant research citations. Describe the technology literacy and academic learing needs of target students Describe how the LEA’s research-based Program for Students will meet the students’ identified learning needs.
  • 39. LEA designs their own program for students using research-based strategies and State Board of Education approved publisher or CLRN reviewed electronic learning resources. LEA partners with an organization such as CTAP to develop a comprehensive program suited to the specific learning needs of targeted students.
  • 40. All Electronic Learning Resources purchased with EETT C funds must either be: California Learning Resource Network (CLRN) reviewed electronic learning resources that meet state standards Curriculum-based electronic learning resources that are part of an State Board of Education approved K-8 program
  • 41. LEA partners with an established research-based student program such as: GenYes ISTE NETS Aligned Programs Tech4Learning NetTrekker
  • 42. Describe the LEA’s research-based Program for Teachers. Include relevant research citations. Describe the technology literacy and curriculum integration learning needs of the teachers in the target group(s). Describe how the LEA’s research-based Professional Development Program will meet the target teachers’ identified learning needs. LEA designs their own Professional Development program using research-based strategies. LEA partners with an organization such as CTAP to develop a comprehensive Ed Tech integration program suited to their needs.
  • 43. Identify the current student-to-computer ratio used by the students and teachers in the target group. Identify the new electronic learning resources, infrastructure, hardware and peripherals to be acquired and describe how the new resources will support the comprehensive program. Describe how technology resources, either currently existing or to be acquired, will be used to support data-driven decision-making. Describe how adequate technical support will be provided to support the district’s EETT Competitive program.
  • 44. Describe how technology will be used to establish or improve communication and collaboration among home, school and community. Describe how students’ learning needs will be supported through the use of technology for communication and collaboration.  Possible areas to establish or improve on:  E-mail accounts, expanded web access for teachers, students, parents, and community promote communication and sharing.  Developing communication channels for partners and stakeholders to support learning opportunities  Using multiple media for school / class communications…i.e., school web postings, student grades and attendance online, informational e-mails, voice-mail, newsletters.  Sponsoring parent/community events that promote involvement in student learning and technology
  • 45. Describe the LEA’s evaluation plan. Who? What? When? Why? and How? will the LEA measure, collect, analyze, evaluate, and report on every required and optional objective on Form 3? Reference SETDA’s Common Data Elements. Describe the LEA’s program management or advisory group by job title, roles, and responsibilities. How often will advisory group meet and how will ongoing communications with stakeholders take place? Describe the continuous data-driven improvement process for monitoring the impact the comprehensive program is having on all goals.
  • 46. Collected program data is used in Semi-annual and Annual Performance Reports to the CDE. Purpose: to evaluate progress in meeting annual benchmarks and program impact. Share outcomes with stakeholders. Submitted to CDE twice a year during both implementation years. The CDE will post the EETT C Round 8 semi-annual and annual reports on the CDE website by July 2009. Expected to be similar to Round 6 Performance Reports. http://www.cde.ca.gov/ls/et/ft/eettcomp.asp
  • 47. Describe how the Follow-Up grant ($45 per student based on original grant award) will be used to help sustain or expand the EETT Competitive Round 8 program. Describe other funding sources or partnerships that may contribute to the sustainability or expansion of the EETT Competitive Round 8 program, at the conclusion of the two-year grant program.
  • 48. Eligible applications will be prescreened for completeness and compliance with CDE requirements
  • 49. Must submit One signed (blue ink), unbound original print copy of application Three stapled print copies (must lay flat -no binders) One digital copy in MS Word or PDF format on CD labeled with LEA name (no signatures required)
  • 50. Submit in print, single sided, 8 1/2 X 11 paper, portrait orientation (except forms), 1 inch margin, 12-point font. Submit all required forms, assurances and certifications, check for signatures. (Complete and include form 8 checklist) ◦ Project narrative pages must be numbered (Max 25 pages) with heading and subheadings for the 6 sections. ◦ Pages must include line numbers (max 36 lines) Original copy signed in blue ink
  • 51. A signed copy of the Certification Regarding Lobbying, Debartment, Suspension, and other Responsibility Matters, and Drug-Free Workplace Requirements Review and sign the EETT C Grant Conditions and Assurances Submit one original unbound, 3 print copies, and one e-copy of application on CD
  • 52. Due: February 1, 2011 by 5 PM  Possibility of later submittal date upon release of RFA  California Department of Education  Education Technology Office  EETT-C Round 9 Application  1430 N Street, Suite 6308  Sacramento, CA 95814 Confirmation of delivery or receipt with date/time of delivery form mail or courier service recommended. Grants will not be excepted after deadline.
  • 53.  Visit EETT-C Round 9 Webpage:  http://www.cde.ca.gov/fg/fo/r5/eettc10rfa.asp  Review EETT-C FAQs  http://www.cde.ca.gov/ls/et/ft/eettcfaqs.asp  Email:  Kebergen@kern.org  ststansberry@kern.org  www.CTAP8.org

Hinweis der Redaktion

  1. \n
  2. \n
  3. \n
  4. The amount of available funding for each region has been calculated based on CBEDS using grades four through eight enrollments in eligible schools within each region. Per AB 2706 (Berg), each region will be allocated a minimum of $500,000 or two percent of the available EETT C grant funds, whichever is greater. \nSo. . . \nSelect the number of eligible schools to include in the application and develop the program budget accordingly. \n
  5. \n
  6. \n
  7. 2009 ARRA EETT C applicants: An eligible applicant who submitted an application for the ARRA EETT C in October of 2009 may choose to substitute that score from that application for use in Round 9 of the EETT C. The scores from the October 2009 ARRA EETT C applications and the scores from new Round 9 applicants will be merged for ranking and awarding purposes. \n \nLEAs opting to use their October 2009 ARRA EETT C score are only required to submit Form 1- Application Title Page. If the LEA is awarded an EETT C grant, the LEA will be required to revise the following forms and file them along with the Grant Award Notification: \n \nForm 2a: Program Profile & School Data\nForm 3: Program Goals, Objectives, Benchmarks, and Data Collection\nForm 4: Strategies and Timeline\nForm 5: Projected Budget and Budget Narrative \nForm 6: Priority List of LEAs Applicant Schools \n
  8. \n
  9. \n
  10. \n
  11. \n
  12. Resources: Sets projects\n C3\n
  13. Writing team: District Stakeholders, Curriculum coordinator, Data collection person, categorical program coordinators, staff development coordinator, technology director, administrator & teacher from eligible 4-8 schools, private schools in district, \n
  14. Specific\nMeasurable\nAttainable\nRealistic \nTimely\n
  15. \n
  16. \n
  17. \n
  18. Goals 1, 2, and 3: Applicants enter the projected growth target for each objective and the annual benchmark data. The language has changed since Round 6- here they are asking for an average percentage (read objective 1a and b)\n\nGoal 4: Applicants enter their own measurable performance objective(s) and annual benchmarks as well as enter the projected growth target for the objective(s) and the annual benchmark data.\n.\nSet challenging yet realistic growth targets. The CDE will compare the projected LEA growth targets on Form 3 against the actual program growth reported in semi-annual and annual program performance reports. In order to qualify for a year three Follow-up EETT C grant award, LEAs must meet 70 percent of the projected growth targets* for each program objective as identified on Form 3. LEA programs focusing on the same target students or teachers in Year One and Year Two (e.g., fifth grade students in Year One and the same fifth grade students as sixth graders in Year Two) have two years to meet identified growth targets. LEA programs focusing on different target students or teachers in Year One and Year Two (e.g., eighth grade students in Year One and new incoming eighth grade students in Year Two) must meet identified growth targets annually. \n*(NOTE: Growth targets are defined as the difference between the baseline percentages and outcome percentages as stated in the benchmarks on Form 3.)\nThe LEA may need to add text to Form 3 to clarify a required objective or benchmark but LEAs may not change the original text or intent of the form. The example that follows indicates when and how text would need to be added to Form 3 to clarify a required objective. \nFOR EXAMPLE:\nIf the LEA chooses to focus on grades four and five during the two year EETT C program, the target students will be different in Year Two of the program. Specifically, the Year One fifth graders will no longer be included in the program targeting grades four and five in Year Two because they will be sixth graders in Year Two and new incoming fourth grade students will become part of the program in Year Two. \nIn cases such as this, you will need to add text to the Form 3, Goal 1 objectives. The underlined text in the example below indicates the additional text that would need to be added to the Form 3, Goal 1 objectives and benchmarks in the aforementioned scenario.\nRequired Program Objective 1a to be achieved by 6/30/10: Target students participating in the program for two years will increase grade-level technology literacy** by an average of 90% as specified in the standards-aligned Program for Students \nYear 1 Benchmark: 4th grade students in year one will increase from 2008 baseline of 10% to 70% proficient by June 30, 2009\nYear 2 Benchmark: Last year’s 4th grade students - now 5th grade students will increase from 2009 baseline of 70% to 100% proficient by June 30, 2010.\nAdditional Required Program Objective 1a to be achieved by 6/30/10: Target students* participating in the program for one year will increase grade-level proficiency with technology literacy** by an average of 60% as specified in the standards-aligned Program for Students.\nYear 1 Benchmark: 5th grade students in year one will increase from 2008 baseline of 10% to 70% proficient by June 30, 2009\nYear 2 Benchmark: Incoming 4th grade students in year two will increase from 2009 baseline of 10% to 70% proficient by June 30, 2010.\nX *Check here if the Year 2 Target Group is different from the Year 1 Target Group for this Objective.\nFor each objective listed under the EETT C goals, list the data collection information and instruments that will be used. \n(NOTE: On Form 3, the required objectives for Goals 1, 2, and 3 contain required data elements that cannot be altered. However, additional data collection information and instruments can be identified for each objective.)\nIf the LEA chooses to add any optional goals or objectives to the program, there must be a corresponding data instrument and collection schedule on Form 3 and in the Evaluation and Program Management Plan section of the Project Narrative. In addition, if the LEA chooses to add optional goals or objectives, they must be related to the required performance goals and to the purpose of the comprehensive EETT C program. Follow the existing Form 3 format to add any additional performance goals, objectives, benchmarks, and data elements as needed. \nForm 3 will be considered in the Scoring Criteria (Appendix F, page 71), but does not count as part of the 25-page Project Narrative maximum. \n
  19. \n
  20. \n
  21. For Goals 1 and 2: \nLEA programs focusing on the same target students or teachers in Year One and Year Two have two years to meet identified growth targets. (e.g., fifth grade students in Year One and the same fifth grade students as sixth graders in Year Two) \n\nLEA programs focusing on different target students or teachers in Year One and Year Two must meet identified growth targets annually and add text to Form 3 to clarify. (e.g., eighth grade students in Year One and new incoming eighth grade students in Year Two) \n\nThe CDE will compare the projected LEA growth targets on Form 3 against the actual program growth reported in semi-annual and annual program performance reports. In order to qualify for a year three Follow-up EETT C grant award, LEAs must meet 70 percent of the projected growth targets* for each program objective as identified on Form 3. \n\nIf the LEA chooses to add any optional goals or objectives to the program, there must be a corresponding data instrument and collection schedule on Form 3 and in the Evaluation and Program Management Plan section of the Project Narrative. In addition, if the LEA chooses to add optional goals or objectives, they must be related to the required performance goals and to the purpose of the comprehensive EETT C program. Follow the existing Form 3 format to add any additional performance goals, objectives, benchmarks, and data elements as needed. \n\nForm 3 will be considered in the Scoring Criteria (Appendix F, page 71), but does not count as part of the 25-page Project Narrative maximum. \n
  22. \n
  23. Form 3 is a summary of the project narrative section 5: Evaluation and program management So.. the two areas must be aligned (RFA pg 29)\n
  24. \n
  25. Base the program budget on $300 multiplied by the 2008-20019 CBEDS for grades four through eight at the eligible schools you list on the Priority List of LEA’s Applicant Schools (Form 6). Do not exceed 60% of regional allocation\nInclude, as appropriate, salaries, benefits, books, materials, supplies, contracts and services, travel, capital outlay, and other operating expenditures, to be acquired with grant funding. If indirect costs are taken, use the state-approved rate (http://www.cde.ca.gov/fg/ac/ic/). \nThe budget does not have to be expended equally in each of the two years (see Payment Schedule on page 13 for additional details). However, the rationale for the allocation of the budget between year one and year two must be aligned to the program implementation plan stated in the Project Narrative. \n.\n\n\nIn the Budget Narrative, provide a description of each Object of Expenditure in sufficient detail to give grant readers a complete picture of how funds will be allocated for each category for each year (See Budget Narrative examples attached to Form 5). In other words, relate what you are spending, when, and why. Include leveraged funding amounts, if applicable. A minimum of 25 percent of the total amount of the grant award must be allocated for high-quality professional development. In each applicable Object Code in the budget narrative, explain what expenditures will be allocated for the 25 percent minimum professional development requirement. \n
  26. In the Budget Narrative, provide a description of each Object of Expenditure in sufficient detail to give grant readers a complete picture of how funds will be allocated for each category for each year (See Budget Narrative examples attached to Form 5). In other words, relate what you are spending, when, and why. \n
  27. \n
  28. \n
  29. List eligible applicant schools in rank order for funding.\n(NOTE: This is a one-time implementation grant for eligible schools in a district. Therefore, if an individual school has received full funding in a prior EETT C Round, that school will not be funded in this EETT C Round)\n\nUse the 4-8 2008 CBEDS at schools listed on Form 6 to determine the program budget.\nIf the LEA’s application is partially funded or the LEA’s funded application exceeds 60 percent of the regional allotment, the CDE will fund schools in the order in which the LEA prioritizes them on Form 6.\n\nThe following information is required on Form 6: \nLEA CDS Code\nLEA name\nAn LEA ranked priority list of grant funding for eligible applicant schools \nApplicant schools’ CDS Codes\nApplicant schools’ names\nDistrict funded charter school identification (if applicable)\n
  30. \n
  31. \n
  32. \n
  33. \n
  34. \n
  35. \n
  36. The Project narrative and application Forms should be aligned where appropriate…\n\nCitations should be incorporated to provide evidence that the district’s EETT C program is based on relevant research. If a bibliography is included, it will not count as part of the 25-page maximum for the narrative. \n
  37. The Project narrative and application Forms should be aligned where appropriate…\n\nCitations should be incorporated to provide evidence that the district’s EETT C program is based on relevant research. If a bibliography is included, it will not count as part of the 25-page maximum for the narrative. \n
  38. \n
  39. \n
  40. \n
  41. \n
  42. \n
  43. \n
  44. \n
  45. \n
  46. Why all this evaluation & data???\n\nCollected program data is used in Semi-annual and Annual Performance Report to the CDE…. \nPurpose: to evaluate progress in meeting annual benchmarks and program impact. Share outcomes with stakeholders.(federal, state, and local) … tech enhances academic achievement…\nDisseminate best practices…\n\nSubmitted to CDE twice a year during both implementation years.\n
  47. \n
  48. If an application is incomplete not correctly formatted, it will not be read.\n\nIf you have more than 25 pages of narrative, anything past 25 won’t be read. You CAN include a bibliography page that will not count as part of the 25-page maximum.\n\nIf you have more than 36 lines on a page, the extra lines will be marked out and not read. \n\nIf any of the forms are missing, the application will not be read at all. \n\nUse the specified headings and sub headings in the Project Narrative section to make it easy for the readers to find the required information\n\n If charts, tables, or graphs are included, the number or lines of text on the page must be decreased to provide room for the charts, tables or graphs. Additionally, any charts or tables may not increase the word count for the page to exceed the number typically found on a page with 36 lines of text.\nAll six sections of Project Narrative must be addressed under separate headings.\n
  49. \n
  50. If an application is incomplete not correctly formatted, it will not be read.\n\nIf you have more than 25 pages of narrative, anything past 25 won’t be read. You CAN include a bibliography page that will not count as part of the 25-page maximum.\n\nIf you have more than 36 lines on a page, the extra lines will be marked out and not read. \n\nIf any of the forms are missing, the application will not be read at all. \n\nUse the specified headings and sub headings in the Project Narrative section to make it easy for the readers to find the required information\n\nKeep it neat and readable– one inch margins, 12 point font recommended.\nAll application pages must be submitted in print format on 8 ½ x 11 inch white paper, printed only on a single side, with one inch margins.\nAll eight required forms must be completed and included in the application set.\n\nIf the applicant lists partnerships on the Partnership and/or Consortium Applicants (Form 7), signed partnership support letters for each identified partner must be attached at the end of the application. Letters from Consortium members are not required.\nThe Project Narrative pages must be numbered and may be no more than 25 pages, including any appropriate charts, tables, or graphs, but excluding all required forms. A bibliography can be included and it will not count as part of the 25-page maximum. \nAll Project Narrative pages must include line numbers. Pages must be individually lined numbered with the first line on each page beginning with line one. \nAll Project Narrative pages may not contain more than 36 lines per page. If charts, tables, or graphs are included, the number or lines of text on the page must be decreased to provide room for the charts, tables or graphs. Additionally, any charts or tables may not increase the word count for the page to exceed the number typically found on a page with 36 lines of text.\nAll six sections of Project Narrative must be addressed under separate headings.\n\nLast year a district thought they sent it next day air, but it was sent two day air and NOT READ because it arrived one day late! \nSubmit the correct documents – have several individuals review the submission package – take the checklist in hand and check off each item\nGet it in on time – it has to be in Sacramento May 27th, not postmarked like many grants\n
  51. \n
  52. Recommend a minimum of 5 days for snail mail and 1-2 days for Fed Ex/UPS\n
  53. \n