SlideShare ist ein Scribd-Unternehmen logo
1 von 25
AIRCRAFT Maintenance Programme  S P Singh
General The MP is an important feature of the airworthiness management process. Ref. CAR M 302 Definition Information Control Approval component
Abbriviation MPD : maintenance planning document CMM : component maintenance manual SB       : service bulletin SIL      : service information letter AMP   : Aircraft Maintenance  Programme CAM   : Continuing Airworthiness Manager
Contains 1. what is maintenance programme ? 2. Information for AMP 3. Approval of AMP 4. personnel 5. Component 6. AMP specialist 7. Optimization
Contains 8.Review 9.Task 10.Task card 11.Training 12.Responsibilities of CAM 13.Conclusion
Definition What is a Maintenance Programme? A Maintenance Programme is comprised of a schedule of maintenance tasks with documented management procedures which describe how the scheduled maintenance will be managed. The scheduled tasks are initially developed from the TCH/STCH/OEM schedule recommendations Each aircraft may require individual task development as each aircraft service history develops –e.g. corrosion, repairs, modifications
 Information  Information may come from a range of documents MPD CMM Repair approval instructions SB, SIL STC
Control of AMP Provision for the control of Maintenance Programme or Schedule Amendments is contained in Part M.A.302  – Maintenance Programme Approval by Sub part G organisation (see also appendix 1 to AMC M.A.302)
Approval of AMP Approval may be issued to Sub Part G approved organisation with approved procedures in CAME Approval may be used for control of ‘In House’ Programmes / Schedules Contracted Operators Ultimate Responsibility for effectiveness of Programme / Schedule (Part M.A.301) remains with operator
Personnel Nominated Post holder  to liaise with dgca and ‘manage’ control of Programme In-House Sufficient numbers of trained and competent personnel with knowledge of Reliability Centred Maintenance MSG Analysis and MRB Procedures (as applicable)
AMP component Type Certification Requirements Aircraft or System or Component (Type) Organisation Procedures relating to Schedule or Programme Amendment Control Requirements applicable to control of Schedules / Programmes including Powerplant and Structures Programmes
AMP specialist The MP is an important feature of the airworthiness management process. In order to manage the MP the operator will need to employ specialists related to Systems Weight Control Power plant Structures Maintenance Programme Management Reliability Programme management
The role of the specialists Assessment of ICAW –SB, SIL, MPD, AD, CMM Continuing Review of fleet performance –reliability, MP effectiveness, ASR/MOR, strip reports, check findings, function check reports, corrosion findings Planning MOR Action/follow up to MOR/ASR/SDR Raise Engineering Orders as necessary
The role of the specialists-cont. Liaison with TCH/OEM/DGCA Liaison with operations Liaison/oversight of service providers –e.g. maintenance, ground operations Review of operator technical instructions MEL/ADD rates Trend monitoring reports Preparation of work scopes –esp. Powerplant
specialists require In order to fulfill the function associated with maintenance programme management the specialists require Specialised technical training/qualifications Familiarity with the TCH procedures Knowledge of MP management processes
organisation structure There is no idealised organisation structure for the management of maintenance programmes – the organisation should have the following features Independent Quality Audit Sufficient numbers of qualified specialists Appropriate level of management Reporting lines within the airworthiness management structure Applicable and effective procedures to ensure appropriate liaison and decision making
Optimization Optimization could result in the following changes to the Scheduled Maintenance Programme; Change to compliance interval category (FH, FC, Calendar, Check etc) Escalation or reduction of compliance interval• Revision of task or process (insp, CK, FC, OPC, CM, OC, HT etc) Revision of accomplishment instructions Deletion of Task or Process Revision of work scope Addition of tasks
Optimization Procedures to be adopted Reliability Monitoring (Part M.A.302 (d) – AMC M.A.302 (d)) Task escalation and adjustment SB Policy, Review and Assessment MP / MS Review and Revision Independent Quality Audit Component Equipment & Structures In- Service Programme Review Programme Rules
Review Maintenance Procedures effectiveness Review and Amendment MPD Review and Assessment Quality Audit Variation Procedures Operator / Maintenance Liaison Sub-Contractor and Supplier Evaluation Training
Reliability Procedure Reliability Procedures - Reliability review must additionally take account of Maintenance Standards Operating Rules Aircraft Age SB / Mod. Standard Utilisation Maintenance Procedures
Task The scheduled maintenance tasks are often transcribed on to Task Cards The task cards are then used by the maintenance supplier to control the maintenance at the point of delivery – hangar, line etc.
Task Card The task card contains the Inspection Standard – General Visual Inspection The definition of General Visual Inspection is in the MPD programme rules – not on the task card!
Task Card Task Card Development Process In accordance with approved procedures subject to independent audit ensure traceability in each case Ensure that any additional data e.g. inspection standards – are included
Responsibility of the CAM It is the responsibility of the operator CAM – to ensure that the inspection standards are advised to the maintenance supplier – the task card will not do this It is the responsibility of the maintenance supplier to ensure that the Inspectors are suitably trained in the inspection standards
In conclusion: A maintenance programme is a combination of management procedures as well as scheduled maintenance tasks In order to be applicable and effective a maintenance programme requires an integrated organisational structure and qualified personnel to manage the scheduled maintenance The management process is of primary importance –what is scheduled is meaningless without the management process

Weitere ähnliche Inhalte

Was ist angesagt?

Aircraft ground handling
Aircraft ground handlingAircraft ground handling
Aircraft ground handlingkrackerbrandon
 
Aircraft Maintenance practices introduction
Aircraft Maintenance practices introduction Aircraft Maintenance practices introduction
Aircraft Maintenance practices introduction Gaurav Garv
 
Aircraft maintenance program enhancement badawood mamdooh
Aircraft maintenance program enhancement  badawood mamdoohAircraft maintenance program enhancement  badawood mamdooh
Aircraft maintenance program enhancement badawood mamdoohbmamdooh
 
Aviation safety management
Aviation safety managementAviation safety management
Aviation safety managementS P Singh
 
Aircraft maintenance and manuals week 2
Aircraft maintenance and manuals week 2Aircraft maintenance and manuals week 2
Aircraft maintenance and manuals week 2Jairo Gutierrez
 
Continuing airworthiness management organisation
Continuing airworthiness management organisationContinuing airworthiness management organisation
Continuing airworthiness management organisationS P Singh
 
Learn how to Manage Aircraft Records
Learn how to Manage Aircraft RecordsLearn how to Manage Aircraft Records
Learn how to Manage Aircraft RecordsJeanette Erazo
 
Ramp safety
Ramp safetyRamp safety
Ramp safetymahchu12
 
Aircraft maintenance package methods
Aircraft maintenance package methodsAircraft maintenance package methods
Aircraft maintenance package methodsSuhartono Raharjo
 
Airworthiness review
Airworthiness reviewAirworthiness review
Airworthiness reviewS P Singh
 
Ramp safety officer
Ramp safety officerRamp safety officer
Ramp safety officerAd Suryana
 

Was ist angesagt? (20)

Aircraft Certification and Type of Certificates 3-9-13
Aircraft Certification and Type of Certificates 3-9-13Aircraft Certification and Type of Certificates 3-9-13
Aircraft Certification and Type of Certificates 3-9-13
 
Airworthiness: Preventive Maintenance
Airworthiness:  Preventive MaintenanceAirworthiness:  Preventive Maintenance
Airworthiness: Preventive Maintenance
 
Aircraft ground handling
Aircraft ground handlingAircraft ground handling
Aircraft ground handling
 
Aircraft Maintenance practices introduction
Aircraft Maintenance practices introduction Aircraft Maintenance practices introduction
Aircraft Maintenance practices introduction
 
CAR 66
 CAR 66  CAR 66
CAR 66
 
Aircraft maintenance program enhancement badawood mamdooh
Aircraft maintenance program enhancement  badawood mamdoohAircraft maintenance program enhancement  badawood mamdooh
Aircraft maintenance program enhancement badawood mamdooh
 
Aircraft Maintenance
Aircraft MaintenanceAircraft Maintenance
Aircraft Maintenance
 
Car m
Car mCar m
Car m
 
Airside Safety
Airside SafetyAirside Safety
Airside Safety
 
Aviation safety management
Aviation safety managementAviation safety management
Aviation safety management
 
Aircraft maintenance and manuals week 2
Aircraft maintenance and manuals week 2Aircraft maintenance and manuals week 2
Aircraft maintenance and manuals week 2
 
Continuing airworthiness management organisation
Continuing airworthiness management organisationContinuing airworthiness management organisation
Continuing airworthiness management organisation
 
Part145 Slides
Part145 SlidesPart145 Slides
Part145 Slides
 
Learn how to Manage Aircraft Records
Learn how to Manage Aircraft RecordsLearn how to Manage Aircraft Records
Learn how to Manage Aircraft Records
 
Ramp safety
Ramp safetyRamp safety
Ramp safety
 
Aircraft maintenance package methods
Aircraft maintenance package methodsAircraft maintenance package methods
Aircraft maintenance package methods
 
Airworthiness review
Airworthiness reviewAirworthiness review
Airworthiness review
 
Landing gear
Landing gearLanding gear
Landing gear
 
Ramp safety officer
Ramp safety officerRamp safety officer
Ramp safety officer
 
Airside Hazards And Risks
Airside Hazards And RisksAirside Hazards And Risks
Airside Hazards And Risks
 

Ähnlich wie Aircraft maintenance programme

Airworthiness Management Camo
Airworthiness Management CamoAirworthiness Management Camo
Airworthiness Management CamoS P Singh
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e bookjericfreimuth
 
Core Competence Framework for CAMO Personnel
Core Competence Framework for CAMO PersonnelCore Competence Framework for CAMO Personnel
Core Competence Framework for CAMO PersonnelWing Engineering Limited
 
Development of instructions for continuing airworthiness and aircraft logisti...
Development of instructions for continuing airworthiness and aircraft logisti...Development of instructions for continuing airworthiness and aircraft logisti...
Development of instructions for continuing airworthiness and aircraft logisti...Andrey Petrov
 
Work Project 1-latest
Work Project 1-latestWork Project 1-latest
Work Project 1-latestRanjit David
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.Hal Frohreich
 
Condition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaCondition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaRajuGupta88
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenanceHashim V tkmce
 
Aircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti Bala
Aircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti BalaAircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti Bala
Aircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti BalaMalay Kanti Bala
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systemsAnil Mohindru
 
Modernizing complex MRO processes
Modernizing complex MRO processesModernizing complex MRO processes
Modernizing complex MRO processesTIP Technologies
 
1. ENGINE MANAGEMENT SYSTEM.pdf
1. ENGINE MANAGEMENT SYSTEM.pdf1. ENGINE MANAGEMENT SYSTEM.pdf
1. ENGINE MANAGEMENT SYSTEM.pdfafiqahnasir8
 

Ähnlich wie Aircraft maintenance programme (20)

Airworthiness Management Camo
Airworthiness Management CamoAirworthiness Management Camo
Airworthiness Management Camo
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 
CAM
CAMCAM
CAM
 
Core Competence Framework for CAMO Personnel
Core Competence Framework for CAMO PersonnelCore Competence Framework for CAMO Personnel
Core Competence Framework for CAMO Personnel
 
mp singh 15 12 2014
mp singh 15 12 2014mp singh 15 12 2014
mp singh 15 12 2014
 
Development of instructions for continuing airworthiness and aircraft logisti...
Development of instructions for continuing airworthiness and aircraft logisti...Development of instructions for continuing airworthiness and aircraft logisti...
Development of instructions for continuing airworthiness and aircraft logisti...
 
Work Project 1-latest
Work Project 1-latestWork Project 1-latest
Work Project 1-latest
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.
 
Cmr
CmrCmr
Cmr
 
Condition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaCondition Based Asset Management R K Gupta
Condition Based Asset Management R K Gupta
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenance
 
Aircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti Bala
Aircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti BalaAircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti Bala
Aircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti Bala
 
Truck service manual
Truck service manualTruck service manual
Truck service manual
 
Machinery Maintenance
Machinery MaintenanceMachinery Maintenance
Machinery Maintenance
 
TYRONE WILLIAMS
TYRONE WILLIAMSTYRONE WILLIAMS
TYRONE WILLIAMS
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
Modernizing complex MRO processes
Modernizing complex MRO processesModernizing complex MRO processes
Modernizing complex MRO processes
 
1. ENGINE MANAGEMENT SYSTEM.pdf
1. ENGINE MANAGEMENT SYSTEM.pdf1. ENGINE MANAGEMENT SYSTEM.pdf
1. ENGINE MANAGEMENT SYSTEM.pdf
 
Report on Engineering Services
Report on Engineering ServicesReport on Engineering Services
Report on Engineering Services
 

Mehr von S P Singh

0903 Social Psychology
0903 Social Psychology0903 Social Psychology
0903 Social PsychologyS P Singh
 
Car 66 issue2 rev.2 170904
Car 66 issue2 rev.2 170904Car 66 issue2 rev.2 170904
Car 66 issue2 rev.2 170904S P Singh
 
AAC No. 02 of 2018
AAC No. 02 of 2018AAC No. 02 of 2018
AAC No. 02 of 2018S P Singh
 
Car 145 issue 2, rev. 3 170614
Car 145 issue 2, rev. 3 170614Car 145 issue 2, rev. 3 170614
Car 145 issue 2, rev. 3 170614S P Singh
 
Car 147 MTO Type Training
Car 147 MTO Type TrainingCar 147 MTO Type Training
Car 147 MTO Type TrainingS P Singh
 
SSP Circular No. 02 of 2018
SSP Circular No. 02 of 2018SSP Circular No. 02 of 2018
SSP Circular No. 02 of 2018S P Singh
 
CAR Sec 1 Series C
CAR Sec 1 Series CCAR Sec 1 Series C
CAR Sec 1 Series CS P Singh
 
Safety Management System Manual
Safety Management System ManualSafety Management System Manual
Safety Management System ManualS P Singh
 
Car 147 Basic
Car 147 Basic  Car 147 Basic
Car 147 Basic S P Singh
 
Car 66 medical cerificate
Car 66 medical cerificateCar 66 medical cerificate
Car 66 medical cerificateS P Singh
 
Flying training organisation
Flying training organisationFlying training organisation
Flying training organisationS P Singh
 
Happy aviation day
Happy aviation dayHappy aviation day
Happy aviation dayS P Singh
 
Aircraft rules 2012
Aircraft rules 2012Aircraft rules 2012
Aircraft rules 2012S P Singh
 
Sms ii implemention
Sms ii implementionSms ii implemention
Sms ii implementionS P Singh
 
हिन्दी अँग्रेज़ी सब्दावली English hindi glossary
हिन्दी अँग्रेज़ी सब्दावली English hindi glossaryहिन्दी अँग्रेज़ी सब्दावली English hindi glossary
हिन्दी अँग्रेज़ी सब्दावली English hindi glossaryS P Singh
 
Instructor refresher 2013 HIET
 Instructor refresher 2013 HIET Instructor refresher 2013 HIET
Instructor refresher 2013 HIETS P Singh
 
Safety Quotes
Safety QuotesSafety Quotes
Safety QuotesS P Singh
 
Sms overview
Sms overview Sms overview
Sms overview S P Singh
 

Mehr von S P Singh (20)

0903 Social Psychology
0903 Social Psychology0903 Social Psychology
0903 Social Psychology
 
MTOE
MTOEMTOE
MTOE
 
Car 66 issue2 rev.2 170904
Car 66 issue2 rev.2 170904Car 66 issue2 rev.2 170904
Car 66 issue2 rev.2 170904
 
AAC No. 02 of 2018
AAC No. 02 of 2018AAC No. 02 of 2018
AAC No. 02 of 2018
 
Car 145 issue 2, rev. 3 170614
Car 145 issue 2, rev. 3 170614Car 145 issue 2, rev. 3 170614
Car 145 issue 2, rev. 3 170614
 
Car 147 MTO Type Training
Car 147 MTO Type TrainingCar 147 MTO Type Training
Car 147 MTO Type Training
 
SSP Circular No. 02 of 2018
SSP Circular No. 02 of 2018SSP Circular No. 02 of 2018
SSP Circular No. 02 of 2018
 
CAR Sec 1 Series C
CAR Sec 1 Series CCAR Sec 1 Series C
CAR Sec 1 Series C
 
Safety Management System Manual
Safety Management System ManualSafety Management System Manual
Safety Management System Manual
 
Car 147 Basic
Car 147 Basic  Car 147 Basic
Car 147 Basic
 
Car 66 medical cerificate
Car 66 medical cerificateCar 66 medical cerificate
Car 66 medical cerificate
 
Flying training organisation
Flying training organisationFlying training organisation
Flying training organisation
 
Happy aviation day
Happy aviation dayHappy aviation day
Happy aviation day
 
Car 147
Car 147Car 147
Car 147
 
Aircraft rules 2012
Aircraft rules 2012Aircraft rules 2012
Aircraft rules 2012
 
Sms ii implemention
Sms ii implementionSms ii implemention
Sms ii implemention
 
हिन्दी अँग्रेज़ी सब्दावली English hindi glossary
हिन्दी अँग्रेज़ी सब्दावली English hindi glossaryहिन्दी अँग्रेज़ी सब्दावली English hindi glossary
हिन्दी अँग्रेज़ी सब्दावली English hindi glossary
 
Instructor refresher 2013 HIET
 Instructor refresher 2013 HIET Instructor refresher 2013 HIET
Instructor refresher 2013 HIET
 
Safety Quotes
Safety QuotesSafety Quotes
Safety Quotes
 
Sms overview
Sms overview Sms overview
Sms overview
 

Kürzlich hochgeladen

Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbuapidays
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusZilliz
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 

Kürzlich hochgeladen (20)

Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 

Aircraft maintenance programme

  • 2. General The MP is an important feature of the airworthiness management process. Ref. CAR M 302 Definition Information Control Approval component
  • 3. Abbriviation MPD : maintenance planning document CMM : component maintenance manual SB : service bulletin SIL : service information letter AMP : Aircraft Maintenance Programme CAM : Continuing Airworthiness Manager
  • 4. Contains 1. what is maintenance programme ? 2. Information for AMP 3. Approval of AMP 4. personnel 5. Component 6. AMP specialist 7. Optimization
  • 5. Contains 8.Review 9.Task 10.Task card 11.Training 12.Responsibilities of CAM 13.Conclusion
  • 6. Definition What is a Maintenance Programme? A Maintenance Programme is comprised of a schedule of maintenance tasks with documented management procedures which describe how the scheduled maintenance will be managed. The scheduled tasks are initially developed from the TCH/STCH/OEM schedule recommendations Each aircraft may require individual task development as each aircraft service history develops –e.g. corrosion, repairs, modifications
  • 7. Information Information may come from a range of documents MPD CMM Repair approval instructions SB, SIL STC
  • 8. Control of AMP Provision for the control of Maintenance Programme or Schedule Amendments is contained in Part M.A.302 – Maintenance Programme Approval by Sub part G organisation (see also appendix 1 to AMC M.A.302)
  • 9. Approval of AMP Approval may be issued to Sub Part G approved organisation with approved procedures in CAME Approval may be used for control of ‘In House’ Programmes / Schedules Contracted Operators Ultimate Responsibility for effectiveness of Programme / Schedule (Part M.A.301) remains with operator
  • 10. Personnel Nominated Post holder to liaise with dgca and ‘manage’ control of Programme In-House Sufficient numbers of trained and competent personnel with knowledge of Reliability Centred Maintenance MSG Analysis and MRB Procedures (as applicable)
  • 11. AMP component Type Certification Requirements Aircraft or System or Component (Type) Organisation Procedures relating to Schedule or Programme Amendment Control Requirements applicable to control of Schedules / Programmes including Powerplant and Structures Programmes
  • 12. AMP specialist The MP is an important feature of the airworthiness management process. In order to manage the MP the operator will need to employ specialists related to Systems Weight Control Power plant Structures Maintenance Programme Management Reliability Programme management
  • 13. The role of the specialists Assessment of ICAW –SB, SIL, MPD, AD, CMM Continuing Review of fleet performance –reliability, MP effectiveness, ASR/MOR, strip reports, check findings, function check reports, corrosion findings Planning MOR Action/follow up to MOR/ASR/SDR Raise Engineering Orders as necessary
  • 14. The role of the specialists-cont. Liaison with TCH/OEM/DGCA Liaison with operations Liaison/oversight of service providers –e.g. maintenance, ground operations Review of operator technical instructions MEL/ADD rates Trend monitoring reports Preparation of work scopes –esp. Powerplant
  • 15. specialists require In order to fulfill the function associated with maintenance programme management the specialists require Specialised technical training/qualifications Familiarity with the TCH procedures Knowledge of MP management processes
  • 16. organisation structure There is no idealised organisation structure for the management of maintenance programmes – the organisation should have the following features Independent Quality Audit Sufficient numbers of qualified specialists Appropriate level of management Reporting lines within the airworthiness management structure Applicable and effective procedures to ensure appropriate liaison and decision making
  • 17. Optimization Optimization could result in the following changes to the Scheduled Maintenance Programme; Change to compliance interval category (FH, FC, Calendar, Check etc) Escalation or reduction of compliance interval• Revision of task or process (insp, CK, FC, OPC, CM, OC, HT etc) Revision of accomplishment instructions Deletion of Task or Process Revision of work scope Addition of tasks
  • 18. Optimization Procedures to be adopted Reliability Monitoring (Part M.A.302 (d) – AMC M.A.302 (d)) Task escalation and adjustment SB Policy, Review and Assessment MP / MS Review and Revision Independent Quality Audit Component Equipment & Structures In- Service Programme Review Programme Rules
  • 19. Review Maintenance Procedures effectiveness Review and Amendment MPD Review and Assessment Quality Audit Variation Procedures Operator / Maintenance Liaison Sub-Contractor and Supplier Evaluation Training
  • 20. Reliability Procedure Reliability Procedures - Reliability review must additionally take account of Maintenance Standards Operating Rules Aircraft Age SB / Mod. Standard Utilisation Maintenance Procedures
  • 21. Task The scheduled maintenance tasks are often transcribed on to Task Cards The task cards are then used by the maintenance supplier to control the maintenance at the point of delivery – hangar, line etc.
  • 22. Task Card The task card contains the Inspection Standard – General Visual Inspection The definition of General Visual Inspection is in the MPD programme rules – not on the task card!
  • 23. Task Card Task Card Development Process In accordance with approved procedures subject to independent audit ensure traceability in each case Ensure that any additional data e.g. inspection standards – are included
  • 24. Responsibility of the CAM It is the responsibility of the operator CAM – to ensure that the inspection standards are advised to the maintenance supplier – the task card will not do this It is the responsibility of the maintenance supplier to ensure that the Inspectors are suitably trained in the inspection standards
  • 25. In conclusion: A maintenance programme is a combination of management procedures as well as scheduled maintenance tasks In order to be applicable and effective a maintenance programme requires an integrated organisational structure and qualified personnel to manage the scheduled maintenance The management process is of primary importance –what is scheduled is meaningless without the management process