How to Never Miss
a Deadline Again
How to Never Miss a Deadline Again


      Why Projects are Late
      Many projects are delivered late and over-budget. In some organizations people take it as a given that any decent-
      sized project will run late, as though preemptively lowering expectations eliminates the problem.

      More often than not, a project is doomed to be late from conception because of the flawed assumptions and
      estimates of the people managing it, and this is because the vast majority of people tasked with managing projects
      in their organizations don't have any successful method or process to rely upon. Many project managers simply "wing
      it" and the result is late projects.

      The process incorporated into this solution is very effective when utilized properly. However, let's contrast what
      project planners should do with what project planners actually do:




      The objective of this solution is to provide end-users with quick, easy-to-implement project planning and scheduling
      methodology which is made possible only through the use of visuals.

      Where project managers go wrong
      Here's what an optimal project planning process looks like:




      Here are some of the biggest problems with not planning and managing projects systematically:

      Coarsely defined tasks lead to inaccurate deadlines

      Unsuccessful project managers plan projects like this: identify a few broad, coarse tasks and arbitrarily produce an
      estimate based upon how long they think it takes. They do it this way because it's quick and easy, but the result is
      project timelines and estimates aren't realistic.




2   www.smartdraw.com 1-858-225-3300 ©2011 Copyright SmartDraw, LLC. All rights reserved.
How to Never Miss a Deadline Again


      Failure to recognize dependencies between tasks results in delays
      A dependent task is defined as "a task that depends on the output of another task." A dependent task cannot be
      started before the task it depends on is completed. For instance, if your project was a construction project, you
      couldn't order building materials without having the architects' blueprints and specifications. Failure to recognize
      these dependencies on the part of the project manager means that the project will inevitably be delayed.

      Assuming unfettered access to resources results in delays
      Most projects depend on shared resources. For a project manager to assume that he or she will have full access to
      those resources in the course of planning a project is wishful thinking at best. Inevitably, there will be times when
      project team members aren't available and when equipment is booked elsewhere, yet many project managers do not
      sufficiently account for these scenarios.

      Estimating a project's progress based on "guts" and "intuition" leads to inaccurate deadlines
      The failure to accurately define and track project milestones is another pitfall. Many project managers use only one
      milestone: the completion of the entire project. Milestones should be used to mark the prospective dates for when
      major objectives are met or delivered. If your project is to improve the efficiency of your customer service team then
      perhaps your first milestone is the date when the customer service operations team is able to answer 100% of all
      email inquiries within 24 hours.

      The solution to all of these project planning and scheduling problems is to use a simple system that replaces off-the-
      cuff assumptions with facts and data.




      How to Accurately Estimate a Project's Completion Date
      Many projects are delivered late—one of the
      key reasons being that the tasks assigned to
      team members are too broad or vague.

      A good example of a broad task is "design a
      new email campaign to sell a new product
      offering to existing customers." So, how long
      would it take a team to complete this task?
      Two days? Three days? Two weeks? Without
      digging into the specifics of what's involved,
      nobody can provide a truly sufficient answer.
      And that's where the trouble begins with most
      projects: the project manager doesn't
      decompose his or her project into small
      enough details in order to get a really clear
      idea of how long it will actually take.

      Most projects are late largely because of these broad tasks, and the estimated timeline from inception to
      delivery is typically unrealistically short. Thus, the solution is to decompose these broad tasks into a
      number of smaller subtasks. It's easier to determine how long it will take you or your team to accomplish
      a smaller task as opposed to a larger one.

      Consider these two groups of questions:

                1. How long will it take you to develop and execute a new email marketing campaign to existing
                   customers offering a new product in your company's line?
                2. How long will it take you to do the following:



3   www.smartdraw.com 1-858-225-3300 ©2011 Copyright SmartDraw, LLC. All rights reserved.
How to Never Miss a Deadline Again


                                a.    Have   your   copywriter produce original copy for a single offer email?
                                b.    Have   your   graphic designer develop a sleek layout for a single email?
                                c.    Have   your   technical writer proofread a single email?
                                d.    Have   your   web development team format a single email into HTML?

      Is it easier to provide comfortably specific answers for the first or second set of questions? Most honest
      people would say that it's almost impossible to give an accurate answer to the question, whereas it's
      much more feasible to provide some reasonable answers for the second group of questions. Thus if you
      actually had to build a project based off of these estimates, you could use the sum of all of the times
      required for each small task to determine how long it will take you and your team to accomplish a much
      larger task.

      And that's where this project management process begins-by using mind maps to take a project and
      break down its tasks into smaller, more specific tasks which you can more easily estimate and roll up into
      a more accurate delivery deadline for the project as a whole.

      In the subsequent project management steps in this process you will use your delivery estimates for
      these smaller, specific tasks help you to create more realistic, accurate project schedules and deliver your
      projects on time and on budget. Click here to watch a video on how do this with SmartDraw.


      How to Set a Project Schedule
      The first step in this project management process consisted of breaking down large tasks into a number of smaller
      tasks, estimating the completion dates of those smaller tasks, and rolling those tasks up into estimates for larger
      tasks until you have a set of estimates for the entire project.

      The next step in the process is to actually determine the order in which these tasks are to be completed using a
      project chart. There are two things to bear in mind when determining the order of your project's tasks:

             ď‚· Dependent tasks - tasks that depend on the outcome of other tasks are "dependent" tasks because they
               cannot be completed until the tasks upon which they depend are completed first. Project managers must
               account for these in their project schedule or prepare to face numerous delays.
             ď‚· Co-tasks - Tasks which don't use any overlapping or exclusive resources and don't have any outstanding
               dependencies, meaning either the dependencies have already been satisfied or there are none, can be co-
               tasks. Co-tasks are usually done in parallel with each other because it uses resources that are already
               available without requiring any extra time. Identify as many of these as possible.


      The video below will show you how to convert your mind map into a project chart and how to identify both co-tasks
      and dependent tasks in your project schedule. In subsequent steps in the process you will learn to schedule around
      resource contentions and how to set milestones so you can properly monitor your project's progress.

      Click here to watch a video on how to do this with SmartDraw.




      How to Measure a Project's Progress
      The final step in this project management process is to determine how to accurately measure the progress made on
      your project. It's one of the weakest areas for most project managers-how many times have you been in a meeting
      where someone was asked "how far are you along with project X?" and the answer was "Oh, uhhh, I'd say maybe
      50%, 60% done." Answers like those are not definitive ones-they're guesses at best.




4   www.smartdraw.com 1-858-225-3300 ©2011 Copyright SmartDraw, LLC. All rights reserved.
How to Never Miss a Deadline Again


      That's what's wrong with most progress
      measurement-most project managers rely on
      broad estimates rather than definitive answers.

      There is a cure that will help project managers see
      clearly through the fog and it's called "milestones."
      A milestone is a well-defined, solid achievement
      that is met at some point through the course of a
      project. The word "milestone" takes its name from
      the placeholders used to indicate how far travelers
      had progressed along the roads built by the
      Romans; every time you passed a milestone, it was
      another indication that you were that much closer
      to reaching some destination.

      The analogy accurately describes what project
      managers try to do: they want to define clear indicators that show how close they are to reaching their project's
      goals. Take a look at some sample milestones for a software engineering project:

             ď‚· Milestone 1 - All of the design specifications and the design specification documents are complete.
             ď‚· Milestone 2 - All members of the development team have individual assignments and set deadlines. Work on
                                     the software itself can begin.
             ď‚·   Milestone   3   -   Data layer is complete. Testing is ongoing.
             ď‚·   Milestone   4   -   Business layer is complete. Testing is ongoing.
             ď‚·   Milestone   5   -   Presentation layer is complete. Testing is ongoing.
             ď‚·   Milestone   6   -   All major errors and bugs are resolved. Minor bug fixing and testing is ongoing.
             ď‚·   Milestone   7   -   Project ships.


      Even though these milestones are broad, these are good milestones in that they are very definitive. For instance, the
      data layer is complete when all of the functionality defined for it in the project's requirements is fully implemented
      and tested for its correctness. A good, definitive milestone is one that every team member recognizes once it has
      been met. Compare this to the old approach, which is that a milestone has been met only when the project manager
      thinks it has been met.

      The value of having these definitive milestones is thus: when asked "how far along are you on your project?" you can
      safely answer, "we've reached four of our seven milestones so progress is coming along smoothly; following the
      schedule set on our project chart, we expect to have reached our final milestone by mid-January."

      Click here to watch a video on how to do this with SmartDraw.




      This document describes one of the Visual Solutions that successful managers and companies use every day to be
      more effective, productive, and profitable.

      For more Visual Solution articles, or to download a free trial of SmartDraw, visit www.smartdraw.com.




5   www.smartdraw.com 1-858-225-3300 ©2011 Copyright SmartDraw, LLC. All rights reserved.

Weitere ähnliche Inhalte

Mehr von SmartDraw Software

How To Get Things Done and Go Home Early
How To Get Things Done and Go Home EarlyHow To Get Things Done and Go Home Early
How To Get Things Done and Go Home EarlySmartDraw Software
 
How to Create Visual Presentations with SmartDraw
How to Create Visual Presentations with SmartDrawHow to Create Visual Presentations with SmartDraw
How to Create Visual Presentations with SmartDrawSmartDraw Software
 
How to Manage Projects with SmartDraw
How to Manage Projects with SmartDrawHow to Manage Projects with SmartDraw
How to Manage Projects with SmartDrawSmartDraw Software
 
How to Create Org Charts with SmartDraw
How to Create Org Charts with SmartDrawHow to Create Org Charts with SmartDraw
How to Create Org Charts with SmartDrawSmartDraw Software
 
How to Create Mind Maps with SmartDraw
How to Create Mind Maps with SmartDrawHow to Create Mind Maps with SmartDraw
How to Create Mind Maps with SmartDrawSmartDraw Software
 
Visual Process Management (VPM)
Visual Process Management (VPM)Visual Process Management (VPM)
Visual Process Management (VPM)SmartDraw Software
 
Getting Started with SmartDraw VP
Getting Started with SmartDraw VPGetting Started with SmartDraw VP
Getting Started with SmartDraw VPSmartDraw Software
 
L+L Printing Company Customer Profile
L+L Printing Company Customer ProfileL+L Printing Company Customer Profile
L+L Printing Company Customer ProfileSmartDraw Software
 
Visual Process Management (VPM)
Visual Process Management (VPM)Visual Process Management (VPM)
Visual Process Management (VPM)SmartDraw Software
 
Develop a Winning Strategy
Develop a Winning StrategyDevelop a Winning Strategy
Develop a Winning StrategySmartDraw Software
 
SmartDraw VP Reviewer's Guide
SmartDraw VP Reviewer's GuideSmartDraw VP Reviewer's Guide
SmartDraw VP Reviewer's GuideSmartDraw Software
 
How To Elminate Errors and Increase Efficiency
How To Elminate Errors and Increase EfficiencyHow To Elminate Errors and Increase Efficiency
How To Elminate Errors and Increase EfficiencySmartDraw Software
 
Visual Strategic Planning
Visual Strategic PlanningVisual Strategic Planning
Visual Strategic PlanningSmartDraw Software
 
Why You Should Communicate Visually with SmartDraw VP
Why You Should Communicate Visually with SmartDraw VPWhy You Should Communicate Visually with SmartDraw VP
Why You Should Communicate Visually with SmartDraw VPSmartDraw Software
 

Mehr von SmartDraw Software (16)

How To Get Things Done and Go Home Early
How To Get Things Done and Go Home EarlyHow To Get Things Done and Go Home Early
How To Get Things Done and Go Home Early
 
How to Create Visual Presentations with SmartDraw
How to Create Visual Presentations with SmartDrawHow to Create Visual Presentations with SmartDraw
How to Create Visual Presentations with SmartDraw
 
How to Manage Projects with SmartDraw
How to Manage Projects with SmartDrawHow to Manage Projects with SmartDraw
How to Manage Projects with SmartDraw
 
How to Create Org Charts with SmartDraw
How to Create Org Charts with SmartDrawHow to Create Org Charts with SmartDraw
How to Create Org Charts with SmartDraw
 
How to Create Mind Maps with SmartDraw
How to Create Mind Maps with SmartDrawHow to Create Mind Maps with SmartDraw
How to Create Mind Maps with SmartDraw
 
Visual Grammar
Visual GrammarVisual Grammar
Visual Grammar
 
Visual Process Management (VPM)
Visual Process Management (VPM)Visual Process Management (VPM)
Visual Process Management (VPM)
 
Getting Started with SmartDraw VP
Getting Started with SmartDraw VPGetting Started with SmartDraw VP
Getting Started with SmartDraw VP
 
L+L Printing Company Customer Profile
L+L Printing Company Customer ProfileL+L Printing Company Customer Profile
L+L Printing Company Customer Profile
 
Visual Process Management (VPM)
Visual Process Management (VPM)Visual Process Management (VPM)
Visual Process Management (VPM)
 
Develop a Winning Strategy
Develop a Winning StrategyDevelop a Winning Strategy
Develop a Winning Strategy
 
SmartDraw VP Reviewer's Guide
SmartDraw VP Reviewer's GuideSmartDraw VP Reviewer's Guide
SmartDraw VP Reviewer's Guide
 
How To Elminate Errors and Increase Efficiency
How To Elminate Errors and Increase EfficiencyHow To Elminate Errors and Increase Efficiency
How To Elminate Errors and Increase Efficiency
 
SmartDraw VP User Guide
SmartDraw VP User GuideSmartDraw VP User Guide
SmartDraw VP User Guide
 
Visual Strategic Planning
Visual Strategic PlanningVisual Strategic Planning
Visual Strategic Planning
 
Why You Should Communicate Visually with SmartDraw VP
Why You Should Communicate Visually with SmartDraw VPWhy You Should Communicate Visually with SmartDraw VP
Why You Should Communicate Visually with SmartDraw VP
 

KĂĽrzlich hochgeladen

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 

KĂĽrzlich hochgeladen (20)

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 

Never Miss a Deadline Again

  • 1. How to Never Miss a Deadline Again
  • 2. How to Never Miss a Deadline Again Why Projects are Late Many projects are delivered late and over-budget. In some organizations people take it as a given that any decent- sized project will run late, as though preemptively lowering expectations eliminates the problem. More often than not, a project is doomed to be late from conception because of the flawed assumptions and estimates of the people managing it, and this is because the vast majority of people tasked with managing projects in their organizations don't have any successful method or process to rely upon. Many project managers simply "wing it" and the result is late projects. The process incorporated into this solution is very effective when utilized properly. However, let's contrast what project planners should do with what project planners actually do: The objective of this solution is to provide end-users with quick, easy-to-implement project planning and scheduling methodology which is made possible only through the use of visuals. Where project managers go wrong Here's what an optimal project planning process looks like: Here are some of the biggest problems with not planning and managing projects systematically: Coarsely defined tasks lead to inaccurate deadlines Unsuccessful project managers plan projects like this: identify a few broad, coarse tasks and arbitrarily produce an estimate based upon how long they think it takes. They do it this way because it's quick and easy, but the result is project timelines and estimates aren't realistic. 2 www.smartdraw.com 1-858-225-3300 ©2011 Copyright SmartDraw, LLC. All rights reserved.
  • 3. How to Never Miss a Deadline Again Failure to recognize dependencies between tasks results in delays A dependent task is defined as "a task that depends on the output of another task." A dependent task cannot be started before the task it depends on is completed. For instance, if your project was a construction project, you couldn't order building materials without having the architects' blueprints and specifications. Failure to recognize these dependencies on the part of the project manager means that the project will inevitably be delayed. Assuming unfettered access to resources results in delays Most projects depend on shared resources. For a project manager to assume that he or she will have full access to those resources in the course of planning a project is wishful thinking at best. Inevitably, there will be times when project team members aren't available and when equipment is booked elsewhere, yet many project managers do not sufficiently account for these scenarios. Estimating a project's progress based on "guts" and "intuition" leads to inaccurate deadlines The failure to accurately define and track project milestones is another pitfall. Many project managers use only one milestone: the completion of the entire project. Milestones should be used to mark the prospective dates for when major objectives are met or delivered. If your project is to improve the efficiency of your customer service team then perhaps your first milestone is the date when the customer service operations team is able to answer 100% of all email inquiries within 24 hours. The solution to all of these project planning and scheduling problems is to use a simple system that replaces off-the- cuff assumptions with facts and data. How to Accurately Estimate a Project's Completion Date Many projects are delivered late—one of the key reasons being that the tasks assigned to team members are too broad or vague. A good example of a broad task is "design a new email campaign to sell a new product offering to existing customers." So, how long would it take a team to complete this task? Two days? Three days? Two weeks? Without digging into the specifics of what's involved, nobody can provide a truly sufficient answer. And that's where the trouble begins with most projects: the project manager doesn't decompose his or her project into small enough details in order to get a really clear idea of how long it will actually take. Most projects are late largely because of these broad tasks, and the estimated timeline from inception to delivery is typically unrealistically short. Thus, the solution is to decompose these broad tasks into a number of smaller subtasks. It's easier to determine how long it will take you or your team to accomplish a smaller task as opposed to a larger one. Consider these two groups of questions: 1. How long will it take you to develop and execute a new email marketing campaign to existing customers offering a new product in your company's line? 2. How long will it take you to do the following: 3 www.smartdraw.com 1-858-225-3300 ©2011 Copyright SmartDraw, LLC. All rights reserved.
  • 4. How to Never Miss a Deadline Again a. Have your copywriter produce original copy for a single offer email? b. Have your graphic designer develop a sleek layout for a single email? c. Have your technical writer proofread a single email? d. Have your web development team format a single email into HTML? Is it easier to provide comfortably specific answers for the first or second set of questions? Most honest people would say that it's almost impossible to give an accurate answer to the question, whereas it's much more feasible to provide some reasonable answers for the second group of questions. Thus if you actually had to build a project based off of these estimates, you could use the sum of all of the times required for each small task to determine how long it will take you and your team to accomplish a much larger task. And that's where this project management process begins-by using mind maps to take a project and break down its tasks into smaller, more specific tasks which you can more easily estimate and roll up into a more accurate delivery deadline for the project as a whole. In the subsequent project management steps in this process you will use your delivery estimates for these smaller, specific tasks help you to create more realistic, accurate project schedules and deliver your projects on time and on budget. Click here to watch a video on how do this with SmartDraw. How to Set a Project Schedule The first step in this project management process consisted of breaking down large tasks into a number of smaller tasks, estimating the completion dates of those smaller tasks, and rolling those tasks up into estimates for larger tasks until you have a set of estimates for the entire project. The next step in the process is to actually determine the order in which these tasks are to be completed using a project chart. There are two things to bear in mind when determining the order of your project's tasks: ď‚· Dependent tasks - tasks that depend on the outcome of other tasks are "dependent" tasks because they cannot be completed until the tasks upon which they depend are completed first. Project managers must account for these in their project schedule or prepare to face numerous delays. ď‚· Co-tasks - Tasks which don't use any overlapping or exclusive resources and don't have any outstanding dependencies, meaning either the dependencies have already been satisfied or there are none, can be co- tasks. Co-tasks are usually done in parallel with each other because it uses resources that are already available without requiring any extra time. Identify as many of these as possible. The video below will show you how to convert your mind map into a project chart and how to identify both co-tasks and dependent tasks in your project schedule. In subsequent steps in the process you will learn to schedule around resource contentions and how to set milestones so you can properly monitor your project's progress. Click here to watch a video on how to do this with SmartDraw. How to Measure a Project's Progress The final step in this project management process is to determine how to accurately measure the progress made on your project. It's one of the weakest areas for most project managers-how many times have you been in a meeting where someone was asked "how far are you along with project X?" and the answer was "Oh, uhhh, I'd say maybe 50%, 60% done." Answers like those are not definitive ones-they're guesses at best. 4 www.smartdraw.com 1-858-225-3300 ©2011 Copyright SmartDraw, LLC. All rights reserved.
  • 5. How to Never Miss a Deadline Again That's what's wrong with most progress measurement-most project managers rely on broad estimates rather than definitive answers. There is a cure that will help project managers see clearly through the fog and it's called "milestones." A milestone is a well-defined, solid achievement that is met at some point through the course of a project. The word "milestone" takes its name from the placeholders used to indicate how far travelers had progressed along the roads built by the Romans; every time you passed a milestone, it was another indication that you were that much closer to reaching some destination. The analogy accurately describes what project managers try to do: they want to define clear indicators that show how close they are to reaching their project's goals. Take a look at some sample milestones for a software engineering project: ď‚· Milestone 1 - All of the design specifications and the design specification documents are complete. ď‚· Milestone 2 - All members of the development team have individual assignments and set deadlines. Work on the software itself can begin. ď‚· Milestone 3 - Data layer is complete. Testing is ongoing. ď‚· Milestone 4 - Business layer is complete. Testing is ongoing. ď‚· Milestone 5 - Presentation layer is complete. Testing is ongoing. ď‚· Milestone 6 - All major errors and bugs are resolved. Minor bug fixing and testing is ongoing. ď‚· Milestone 7 - Project ships. Even though these milestones are broad, these are good milestones in that they are very definitive. For instance, the data layer is complete when all of the functionality defined for it in the project's requirements is fully implemented and tested for its correctness. A good, definitive milestone is one that every team member recognizes once it has been met. Compare this to the old approach, which is that a milestone has been met only when the project manager thinks it has been met. The value of having these definitive milestones is thus: when asked "how far along are you on your project?" you can safely answer, "we've reached four of our seven milestones so progress is coming along smoothly; following the schedule set on our project chart, we expect to have reached our final milestone by mid-January." Click here to watch a video on how to do this with SmartDraw. This document describes one of the Visual Solutions that successful managers and companies use every day to be more effective, productive, and profitable. For more Visual Solution articles, or to download a free trial of SmartDraw, visit www.smartdraw.com. 5 www.smartdraw.com 1-858-225-3300 ©2011 Copyright SmartDraw, LLC. All rights reserved.