Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Sirris manufacturing day 2013 LAB Motion Systems - Wim Van de Vijver
1. Contents of this talk
Not about LAB ( I’ll try… )
the Red Star Line
Production in FLANDERS
Our approach
Warning: blue = general , grey =
commercial
company presentation
1
2. “THE RED STAR LINE”
1820: first steamship
From 1820-1920 steep evolution
Diesel engines start a revolution
Fuel saving!
Speed!
Race in passenger transport : Race to make the
fastest ship!
London – New-York in 3 days and 6 hours!
company presentation
2
3. “THE RED STAR LINE”
The large investments in
early 20th century went to
ship transport
Investments were made to
make ships even faster, with
a goal to transfer the ocean
in 24 hours!
But: after WWII
PARADIGM SHIFT
A complete other technology
wins: air planes!
company presentation
3
4. Paradigm shifts
Keep focus on the real goal
Nice examples today: additive manufacturing!
But what about manufacturing today? WHAT ARE WE
CHASING AT?
Cut costs / lean manufacturing / high efficiency /
optimize material / …
company presentation
4
5. Product life cycle
Life cycle of a PRODUCTION PROCESS
1
2
3
1.
2.
3.
4.
Development
Early stage
Saturation
4
Decrease
OMZET
TOEGEVOEGDE WAARDE
Stretch out!
Keeping this short
in time!
company presentation
Time
5
6. PRODUCTION IN FLANDERS
WE (=european companies) typically reside at phase 1
and 2, when
Investment in development is done (beginning
life cycle)
When gross margin is highest
When turnover increases further, gross margin drops,
low-cost countries come-in, high-cost countries drop out
Remark: applicable at SME-level, but also within
multinationals
company presentation
6
7. Production in Flanders
What is happening today?
Life cycles get very short in time, so the integral under
the curve gets smaller!
Asian countries invest in production machines, so will
get phase 1&2 also!
We are purchasing in the same shop as Asian companies
With a smaller budget
With a smaller demand
company presentation
7
8. What is the shift here?
We need to be alone in phase 1 and 2 !
Instead of shopping for machines and technologies, we
have to make our machines !
Extending phase 2!
Sweat spot is where the gross margin is high and
turnover ramps up!
company presentation
8
9. How can we do this?
We need to be alone in phase 1 and 2 !
Instead of shopping for machines and technologies, we have
to make our machines !
Extending phase 2!
In Flanders: A lot of process knowledge available, but no
machine builders tradition!
Excellent knowledge network available
SIRRIS
FMTC
…
company presentation
9
10. How can we do this?
No classic machine tool
builders but new cooperation
model!
Build the machine like you
make a LEGO
Production process owner
takes part in machine
development
company presentation
10
11. Challenge
CORE PROCESS
- Turning
- Milling
- Lasercutting
- EDM
- Grinding
- …
PRECISION MOTION
SYSTEMS
- Gantries
- XY-stages
- Rotary stages
- Tilt stages
- Motion control
- …
PRODUCTION CONTROL
- CNC-control
- CAD/CAM
- Production planning
- …
company presentation
11
12. What do we do?
we make FAST
boats
we make air
bearings
We bring you
over the
ocean!
We make
motion
systems !
company presentation
12
13. What do we do?
- ‘flying’ machines: thin air film of 5µm
- frictionless
- precise and stiff!
- own motor development
- A µ-company !
13
20. Tool example
AMOS (Liège), builds
telescopes
Innovative indexing
stage for producing
Fresnel lenzes
Continuus number of
positions: 2.3 Million
stable angular
positions!
company presentation
20