SlideShare ist ein Scribd-Unternehmen logo
1 von 11
Business Strategy and Corporate
Planning
Presentation
Question 1

Presented By:
Nishant Kamal-251074
Siddhartha Kamat-251075
Gourav Kapoor-251076
Contents of the Presentation

• What is a Core Competence?

• Company Introduction

• Core Competencies of the Company

• Competency Cells-Embedding and Enhancing Skills


• Benchmarks-Global Standards
What is a Core Competence?
• “A core competence is the result of a specific set of skills or production

  techniques that deliver value to the customer. Such competences enable an

  organization to access a wide variety of markets”




• “Core competencies are developed through the process of continuous

  improvements over the period of time. To succeed in an emerging global

  market it is more important and required to build core competencies rather

  than vertical integration”
What is a Core Competence?
• Executives should develop a point of view on which core competencies can be

  built for the future to revitalize the process of new business creation.




• The key to future industry leadership is to develop an independent point of

  view about tomorrow's opportunities and build capabilities that exploit them.
Company Introduction
Larsen and Toubro
• Larsen & Toubro Limited (L&T) is a technology, engineering, construction and
  manufacturing company. It is one of the largest and most respected companies in
  India's private sector.

• Headquartered in Mumbai and Chairman is Mr. A. M. Naik

• Revenue: 12.34 Billion USD

• Employment: 45,117

•        Hydrocarbon
•        Heavy Engineering
•        L&T Construction
•        Power
•        Electrical & Automation
•        Machinery & Industrial Products
•        Information Technology
•        Financial Services
•        Shipbuilding
•        Railway Projects
L & T’s Core Competencies-1
• Process Technology: Cement and Mineral Process, Chemical Engineering, Material
  Science and Corrosion Engineering, Mechanical Engineering, Ocean Engineering
  and Water Technology.



• Basic and Detailed Engineering Services: Electrical and Instrumentation
  Engineering, Front-End Engineering and Design, and specialized SBUs for Oil and
  Gas Engineering services.



• Modular Fabrication: Through one of Asia‘s largest yards at Hazira, capable of
  manufacturing several modules simultaneously.



• Procurement: An extensive set of suppliers from around the globe, networked
  through an online procurement and an e-business platform.
L & T’s Core Competencies-2

• Project Management: L&T is one of the first companies in the world to implement
  the Enterprise Resource Planning (ERP) software SAP R/3 in E&C business. This
  integrates all the execution processes for the project and also provides to the project
  team unique access to information at all stages - from proposal to project handing
  over.



• Construction: Through ECC - executing comprehensive construction projects in
  areas of power, oil & gas exploration, refinery, fertilizer and petrochemicals,
  airports, townships, hotels, public buildings, bridges, transmission lines, water
  treatment plants, hydro-electric power stations and irrigation structures in various
  countries.
Competency Cells-Embedding and
Enhancing Skills
Well established competency cells in specialized trades focus on continuously
upgrading the technology, improving construction methods and imparting
relevant training and orientation to staff and workmen to attain seamless
execution of projects involving multi-disciplinary activities.


• Construction Methods Planning Cell
• Special Projects And Construction Methods
• Building Utilities Competency Cell
• Formwork Competency Cell For Execution
• Foundation Engineering Competency Cell
• Quality Management Competency Cell
• Concrete Technology Cell
• Building Finishes Competency Cell
Benchmarks-Global Standards
• ISO 9001/ISO 29001-Quality
   • This approval reflects L&T's capability to execute turnkey projects covering
      marketing, design, engineering, project
      management, procurement, manufacturing, erection, construction and
      commissioning of various plants & systems.



• ISO 14001-Environment
   • L&T's Engineering, Research & Development Centers are certified to ISO 14001 for its
      capability to design and engineer environmentally friendly plants.



• OHSAS 18001-Health and Safety



• ISO/IEC 27001-IT Security
   • L&T is the world's first company to be certified to ISO/IEC 27001 on the very first day
      of its publication.

• NBBI, ASME and API Accreditations for L&T’s Modular Fabrication Facilities
Thank You!

Weitere ähnliche Inhalte

Was ist angesagt?

Detergent Market in India as of 2015 (Surf Excel, Ariel, Nirma, Wheel, Tide, ...
Detergent Market in India as of 2015 (Surf Excel, Ariel, Nirma, Wheel, Tide, ...Detergent Market in India as of 2015 (Surf Excel, Ariel, Nirma, Wheel, Tide, ...
Detergent Market in India as of 2015 (Surf Excel, Ariel, Nirma, Wheel, Tide, ...Arjun Parekh
 
Project Marketing Tata steel
Project Marketing Tata steel Project Marketing Tata steel
Project Marketing Tata steel DilipRathnamJaya
 
Organizational Structure & Leadership Style in M/s Larsen & Toubro , ...
Organizational Structure & Leadership Style in M/s Larsen & Toubro , ...Organizational Structure & Leadership Style in M/s Larsen & Toubro , ...
Organizational Structure & Leadership Style in M/s Larsen & Toubro , ...Subhrajyoti Parida
 
Strategic management assignment wipro
Strategic management assignment wiproStrategic management assignment wipro
Strategic management assignment wipronisha_chandra
 
Final docDEMAND FORECASTING OF HUL
Final docDEMAND FORECASTING OF HULFinal docDEMAND FORECASTING OF HUL
Final docDEMAND FORECASTING OF HULYASHASWI RAJ
 
Jaguar Land Rover Acquisition by Tata MotorsJaguar land rover acquisition by ...
Jaguar Land Rover Acquisition by Tata MotorsJaguar land rover acquisition by ...Jaguar Land Rover Acquisition by Tata MotorsJaguar land rover acquisition by ...
Jaguar Land Rover Acquisition by Tata MotorsJaguar land rover acquisition by ...Percy Poonegar
 
Komatsu LTD. case study analysis
Komatsu LTD. case study analysisKomatsu LTD. case study analysis
Komatsu LTD. case study analysisASWIN NAMBURI
 
TATA STEEL - Symbiosis Institute of Management Studies
TATA STEEL - Symbiosis Institute of Management StudiesTATA STEEL - Symbiosis Institute of Management Studies
TATA STEEL - Symbiosis Institute of Management StudiesAnurag Upadhyay
 
Segmentation Targeting Positioning OF Hindustan Unilever limited
Segmentation Targeting Positioning OF Hindustan Unilever limitedSegmentation Targeting Positioning OF Hindustan Unilever limited
Segmentation Targeting Positioning OF Hindustan Unilever limitedPankajSultane
 
Larsen and toubro L&T.ppt
Larsen and toubro L&T.pptLarsen and toubro L&T.ppt
Larsen and toubro L&T.pptsaileshs0308
 
Tata corus case analysis
Tata corus case analysisTata corus case analysis
Tata corus case analysisSripRiya Iduri
 
Project Report Outlook (
Project Report Outlook (Project Report Outlook (
Project Report Outlook (Satyam Sharma
 
VRIO Analysis Tata.pptx
VRIO Analysis Tata.pptxVRIO Analysis Tata.pptx
VRIO Analysis Tata.pptxPalakSinha14
 
Marketing Strategy - TCS
Marketing Strategy - TCSMarketing Strategy - TCS
Marketing Strategy - TCSChetan Poojari
 
Itc - best selling products and competitors
Itc - best selling products and competitorsItc - best selling products and competitors
Itc - best selling products and competitorsAnkush Pani
 
Presentation on 'Competing on Resources', article by David J. Collins & Cynth...
Presentation on 'Competing on Resources', article by David J. Collins & Cynth...Presentation on 'Competing on Resources', article by David J. Collins & Cynth...
Presentation on 'Competing on Resources', article by David J. Collins & Cynth...Himanshu Arora
 

Was ist angesagt? (20)

Hul
HulHul
Hul
 
Detergent Market in India as of 2015 (Surf Excel, Ariel, Nirma, Wheel, Tide, ...
Detergent Market in India as of 2015 (Surf Excel, Ariel, Nirma, Wheel, Tide, ...Detergent Market in India as of 2015 (Surf Excel, Ariel, Nirma, Wheel, Tide, ...
Detergent Market in India as of 2015 (Surf Excel, Ariel, Nirma, Wheel, Tide, ...
 
Project Marketing Tata steel
Project Marketing Tata steel Project Marketing Tata steel
Project Marketing Tata steel
 
Organizational Structure & Leadership Style in M/s Larsen & Toubro , ...
Organizational Structure & Leadership Style in M/s Larsen & Toubro , ...Organizational Structure & Leadership Style in M/s Larsen & Toubro , ...
Organizational Structure & Leadership Style in M/s Larsen & Toubro , ...
 
Nirma case study
Nirma case studyNirma case study
Nirma case study
 
Strategic management assignment wipro
Strategic management assignment wiproStrategic management assignment wipro
Strategic management assignment wipro
 
Final docDEMAND FORECASTING OF HUL
Final docDEMAND FORECASTING OF HULFinal docDEMAND FORECASTING OF HUL
Final docDEMAND FORECASTING OF HUL
 
Jaguar Land Rover Acquisition by Tata MotorsJaguar land rover acquisition by ...
Jaguar Land Rover Acquisition by Tata MotorsJaguar land rover acquisition by ...Jaguar Land Rover Acquisition by Tata MotorsJaguar land rover acquisition by ...
Jaguar Land Rover Acquisition by Tata MotorsJaguar land rover acquisition by ...
 
Komatsu LTD. case study analysis
Komatsu LTD. case study analysisKomatsu LTD. case study analysis
Komatsu LTD. case study analysis
 
TATA STEEL - Symbiosis Institute of Management Studies
TATA STEEL - Symbiosis Institute of Management StudiesTATA STEEL - Symbiosis Institute of Management Studies
TATA STEEL - Symbiosis Institute of Management Studies
 
Segmentation Targeting Positioning OF Hindustan Unilever limited
Segmentation Targeting Positioning OF Hindustan Unilever limitedSegmentation Targeting Positioning OF Hindustan Unilever limited
Segmentation Targeting Positioning OF Hindustan Unilever limited
 
Larsen and toubro L&T.ppt
Larsen and toubro L&T.pptLarsen and toubro L&T.ppt
Larsen and toubro L&T.ppt
 
Tata corus case analysis
Tata corus case analysisTata corus case analysis
Tata corus case analysis
 
Project Report Outlook (
Project Report Outlook (Project Report Outlook (
Project Report Outlook (
 
L&T research report
L&T research reportL&T research report
L&T research report
 
VRIO Analysis Tata.pptx
VRIO Analysis Tata.pptxVRIO Analysis Tata.pptx
VRIO Analysis Tata.pptx
 
Marketing Strategy - TCS
Marketing Strategy - TCSMarketing Strategy - TCS
Marketing Strategy - TCS
 
P&G "TIDE"
P&G "TIDE"P&G "TIDE"
P&G "TIDE"
 
Itc - best selling products and competitors
Itc - best selling products and competitorsItc - best selling products and competitors
Itc - best selling products and competitors
 
Presentation on 'Competing on Resources', article by David J. Collins & Cynth...
Presentation on 'Competing on Resources', article by David J. Collins & Cynth...Presentation on 'Competing on Resources', article by David J. Collins & Cynth...
Presentation on 'Competing on Resources', article by David J. Collins & Cynth...
 

Ähnlich wie Business Strategy Core Competencies

CCS System - Presentation
CCS System - PresentationCCS System - Presentation
CCS System - PresentationPaulo Correia
 
AEC - Extended Profile
AEC - Extended ProfileAEC - Extended Profile
AEC - Extended ProfileRicky Huyser
 
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYGENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYBerr Industry
 
CV-Mechanical Engineer
CV-Mechanical EngineerCV-Mechanical Engineer
CV-Mechanical EngineerVishnu Mohan
 
Estes Group Capabilities Overview
Estes Group Capabilities OverviewEstes Group Capabilities Overview
Estes Group Capabilities OverviewBrandon_Haave
 
Estes Group Capabilities Overview
Estes Group Capabilities OverviewEstes Group Capabilities Overview
Estes Group Capabilities OverviewMatt_Thompson
 
Estes Group Capabilities Overview
Estes Group Capabilities OverviewEstes Group Capabilities Overview
Estes Group Capabilities OverviewCorinne_Smith
 
Estes Group Capabilities Overview
Estes Group Capabilities OverviewEstes Group Capabilities Overview
Estes Group Capabilities OverviewJohn_Koski
 
Estes Group Capabilities Overview
Estes Group Capabilities OverviewEstes Group Capabilities Overview
Estes Group Capabilities OverviewSean_Hallahan
 
Estes Group Capabilities Overview
Estes Group Capabilities OverviewEstes Group Capabilities Overview
Estes Group Capabilities OverviewBruce_Grant
 
CONSTRUCTION PROJECT MANAGEMENT - INTRODUCTION
CONSTRUCTION PROJECT MANAGEMENT - INTRODUCTIONCONSTRUCTION PROJECT MANAGEMENT - INTRODUCTION
CONSTRUCTION PROJECT MANAGEMENT - INTRODUCTIONpraveenphalani
 
Ne bc presentation
Ne bc presentationNe bc presentation
Ne bc presentationPetroLMI
 

Ähnlich wie Business Strategy Core Competencies (20)

CCS System - Presentation
CCS System - PresentationCCS System - Presentation
CCS System - Presentation
 
JESA_Presentation_2013
JESA_Presentation_2013JESA_Presentation_2013
JESA_Presentation_2013
 
Construction Oil and Gas Forum Jan 2015 Abu Dhabi Brochure
Construction Oil and Gas Forum Jan 2015 Abu Dhabi BrochureConstruction Oil and Gas Forum Jan 2015 Abu Dhabi Brochure
Construction Oil and Gas Forum Jan 2015 Abu Dhabi Brochure
 
AEC - Extended Profile
AEC - Extended ProfileAEC - Extended Profile
AEC - Extended Profile
 
INDUSTRIAL ENGINEERING SOLUTIONS
INDUSTRIAL ENGINEERING SOLUTIONSINDUSTRIAL ENGINEERING SOLUTIONS
INDUSTRIAL ENGINEERING SOLUTIONS
 
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYGENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
 
Final Report
Final ReportFinal Report
Final Report
 
CV-Mechanical Engineer
CV-Mechanical EngineerCV-Mechanical Engineer
CV-Mechanical Engineer
 
Estes Group Capabilities Overview
Estes Group Capabilities OverviewEstes Group Capabilities Overview
Estes Group Capabilities Overview
 
Estes Group Capabilities Overview
Estes Group Capabilities OverviewEstes Group Capabilities Overview
Estes Group Capabilities Overview
 
Estes Group Capabilities Overview
Estes Group Capabilities OverviewEstes Group Capabilities Overview
Estes Group Capabilities Overview
 
Estes Group Capabilities Overview
Estes Group Capabilities OverviewEstes Group Capabilities Overview
Estes Group Capabilities Overview
 
Estes Group Capabilities Overview
Estes Group Capabilities OverviewEstes Group Capabilities Overview
Estes Group Capabilities Overview
 
Estes Group Capabilities Overview
Estes Group Capabilities OverviewEstes Group Capabilities Overview
Estes Group Capabilities Overview
 
CONSTRUCTION PROJECT MANAGEMENT - INTRODUCTION
CONSTRUCTION PROJECT MANAGEMENT - INTRODUCTIONCONSTRUCTION PROJECT MANAGEMENT - INTRODUCTION
CONSTRUCTION PROJECT MANAGEMENT - INTRODUCTION
 
CCRG 2005 Alberta Assessors Association Conference Seminar
CCRG 2005 Alberta Assessors Association Conference SeminarCCRG 2005 Alberta Assessors Association Conference Seminar
CCRG 2005 Alberta Assessors Association Conference Seminar
 
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
 
Ne bc presentation
Ne bc presentationNe bc presentation
Ne bc presentation
 
Dawn Thompson
Dawn ThompsonDawn Thompson
Dawn Thompson
 
CV Max KM
CV Max KMCV Max KM
CV Max KM
 

Business Strategy Core Competencies

  • 1. Business Strategy and Corporate Planning Presentation Question 1 Presented By: Nishant Kamal-251074 Siddhartha Kamat-251075 Gourav Kapoor-251076
  • 2. Contents of the Presentation • What is a Core Competence? • Company Introduction • Core Competencies of the Company • Competency Cells-Embedding and Enhancing Skills • Benchmarks-Global Standards
  • 3. What is a Core Competence? • “A core competence is the result of a specific set of skills or production techniques that deliver value to the customer. Such competences enable an organization to access a wide variety of markets” • “Core competencies are developed through the process of continuous improvements over the period of time. To succeed in an emerging global market it is more important and required to build core competencies rather than vertical integration”
  • 4. What is a Core Competence? • Executives should develop a point of view on which core competencies can be built for the future to revitalize the process of new business creation. • The key to future industry leadership is to develop an independent point of view about tomorrow's opportunities and build capabilities that exploit them.
  • 6. Larsen and Toubro • Larsen & Toubro Limited (L&T) is a technology, engineering, construction and manufacturing company. It is one of the largest and most respected companies in India's private sector. • Headquartered in Mumbai and Chairman is Mr. A. M. Naik • Revenue: 12.34 Billion USD • Employment: 45,117 • Hydrocarbon • Heavy Engineering • L&T Construction • Power • Electrical & Automation • Machinery & Industrial Products • Information Technology • Financial Services • Shipbuilding • Railway Projects
  • 7. L & T’s Core Competencies-1 • Process Technology: Cement and Mineral Process, Chemical Engineering, Material Science and Corrosion Engineering, Mechanical Engineering, Ocean Engineering and Water Technology. • Basic and Detailed Engineering Services: Electrical and Instrumentation Engineering, Front-End Engineering and Design, and specialized SBUs for Oil and Gas Engineering services. • Modular Fabrication: Through one of Asia‘s largest yards at Hazira, capable of manufacturing several modules simultaneously. • Procurement: An extensive set of suppliers from around the globe, networked through an online procurement and an e-business platform.
  • 8. L & T’s Core Competencies-2 • Project Management: L&T is one of the first companies in the world to implement the Enterprise Resource Planning (ERP) software SAP R/3 in E&C business. This integrates all the execution processes for the project and also provides to the project team unique access to information at all stages - from proposal to project handing over. • Construction: Through ECC - executing comprehensive construction projects in areas of power, oil & gas exploration, refinery, fertilizer and petrochemicals, airports, townships, hotels, public buildings, bridges, transmission lines, water treatment plants, hydro-electric power stations and irrigation structures in various countries.
  • 9. Competency Cells-Embedding and Enhancing Skills Well established competency cells in specialized trades focus on continuously upgrading the technology, improving construction methods and imparting relevant training and orientation to staff and workmen to attain seamless execution of projects involving multi-disciplinary activities. • Construction Methods Planning Cell • Special Projects And Construction Methods • Building Utilities Competency Cell • Formwork Competency Cell For Execution • Foundation Engineering Competency Cell • Quality Management Competency Cell • Concrete Technology Cell • Building Finishes Competency Cell
  • 10. Benchmarks-Global Standards • ISO 9001/ISO 29001-Quality • This approval reflects L&T's capability to execute turnkey projects covering marketing, design, engineering, project management, procurement, manufacturing, erection, construction and commissioning of various plants & systems. • ISO 14001-Environment • L&T's Engineering, Research & Development Centers are certified to ISO 14001 for its capability to design and engineer environmentally friendly plants. • OHSAS 18001-Health and Safety • ISO/IEC 27001-IT Security • L&T is the world's first company to be certified to ISO/IEC 27001 on the very first day of its publication. • NBBI, ASME and API Accreditations for L&T’s Modular Fabrication Facilities