SlideShare ist ein Scribd-Unternehmen logo
1 von 69
PRESENTATION FOR THE COURSE
CURRENT AFFAIRS
WORKSHOP




EMPLOYMENT
GUARANTEE AND
THE RIGHT TO WORK




SHIVRAJ SINGH NEGI
KOMMU VENKATA RAVI SHANKAR
S. DEEPUK
   4/20/2009                  1
The India State Hunger Index 2008 by the

    International Food Policy Research Institute.       Percent of population living under
                                                    
    Punjab has the best nutritional                     the poverty line, which is 356.35
    situation, whereas malnutrition in Madhya
                                                        rupees or around $7 a month in rural
    Pradesh is worse than in Ethiopia or Sudan.
                                                        areas.




    4/20/2009                                                                                  2
The Employment Guarantee Act is a
    step towards the right to work, as
    an aspect of the fundamental right
    to live with dignity



4/20/2009                                3
The “right to life” is a fundamental right of all

     citizens under Article 21 of the Indian
     Constitution.
     “Right to life… includes the right to live with

     human dignity, it would include all these
     aspects which would make life
     meaningful, complete and living.” (Supreme
     Court)

4/20/2009                                                4
“The State shall… direct its policy towards

     securing that the citizen, men and women
     equally, have the right to an adequate means
     of livelihood…” (Article 39A)
     “The State shall … make effective provision

     for securing the right to work…” (Article 41)



4/20/2009                                            5
The National Rural Employment Guarantee Act
2005 is a law whereby:
any adult who is willing to do unskilled manual
work at the minimum wage
is entitled to being employed on local public
works within 15 days of applying.



4/20/2009                                         6
Each State has to launch an
   

   “employment guarantee scheme”
   within six months of the Act
   coming into force.



4/20/2009                          7
Block is the basic unit of implementation.

     In each Block, a “Programme Officer” is to

     coordinate the implementation of EGS
     Gram Panchayats are the main implementing

     agencies.
     Accountability to Gram Sabhas.





4/20/2009                                         8
Gram Panchayats (half of EGS works)

     Other Panchayati Raj Institutions (PRIs)

     Line departments (PWD, Forest Dept.)

     NGOs.



Note: Private contractors are banned.



4/20/2009                                       9
Programme Officer to maintain shelf of

     projects, based on proposals from the
     implementing agencies.

     Gram Panchayats also supposed to prepare a

     shelf of works based on the
     recommendations of the Gram Sabha.


4/20/2009                                         10
 Minor irrigation
  Water conservation, drought
  proofing, desilting of tanks, flood
  control, etc.
  Land development
  Rural roads
  “Any other work which may be notified by
  the Central Government in consultation with
  the State Government”

4/20/2009                                       11
Employment to be provided on

     demand, within 15 days.
     Programme Officer sanctions projects to

     ensure that all applicants get work.
     Programme Officer to arrange payment of

     unemployment allowance to those who don’t
     get work.


4/20/2009                                        12
Step 1 (Registration): Gram Panchayat to
  “register” interested households, to facilitate
  advance planning.

Step 2 (Application): Adult members of
     registered households apply for work.



4/20/2009                                           13
Unit of registration is the household.

  Gram Panchayat to issue a “job card” to

  each applicant.
 Special meeting of Gram Sabha to be
  held to invite applications.



4/20/2009                                   14
Any adult member of a registered

  household can apply for work at any
  time.
 Applications should be for at least 14
  days of continuous work.
 Advance applications are allowed.



4/20/2009                                  15
 Wage-material ratio should not be
  less than 60:40
 Wages of skilled and semi-skilled
  labourers to be included in material
  costs


4/20/2009                                16
Central Government to pay for:

      wage costs,
      75% of material costs, and
      some administrative costs.
     State governments to pay for:

      25% of material costs
      other administrative costs,
      unemployment allowance.

4/20/2009                             17
Registration for Employment.

    The adult member of every

    House hold who –
     Reside in rural area ; and
     Are willing to do unskilled
       manual work may apply for
       registration of their household
       for issuance of Job Card.


4/20/2009                                19
Within 15 days of receipt of

  an application and within a
  radius of 5 kms. from their
  place of residence
             AND
 If Employment is not
  provided within 15 days of
  receipt of his application
  he shall be entitled to a daily
  Unemployment allowance.


4/20/2009                           20
One fourth of the wage
                                
      For First 30 days
 
                                    rate.
      For the remaining
 
                                    Not less than one half
                                
      period of the Financial
                                    of the wage rate
      year

      Employment wage +
                                    Equal to the wages for
                                
      Unemployment                  100 days of work in a
       allowance                    financial year


4/20/2009                                                     21
A person working for 7 hours

  would normally earn a wage
  equal to a wage rate
 Minimum wage fixed by the
  state Government under
  section 3 of the minimum
  wage Act,1948
 Wage rate is fixed by the
  Central Govt.
 Shall not be at a rate of less
  than Sixty rupees per day .

4/20/2009                          22
 Water conservation and Water
  harvesting
 Drought proofing(Aforestation
  and tree plantation)
 Irrigation canals
 Provision of irrigation facility to
  land owned by
  SC/ST/beneficiaries under Indira
  AawasYozna
 Renovation of traditional water
  bodies
 De-silting of tanks
 Land development

4/20/2009                               23
 Flood control and
  protection works
  including drainage in
  water logged areas
 Rural connectivity to
  provide all weather
  access
 Other works notified by
  the Central/State
  Government
4/20/2009                   24
Sarpanch/ward panch          At Gram panchayat
                                
                                   Level
      Programme Officer           At Block/Tehsil /Taluka
 
                                   Level (appointed
                                   specially for this
                                   scheme)
        GP/PO shall be bound to accept the valid
    
        applications and to issue a dated receipt to the
        applicant .

4/20/2009                                                    25
 Gram Panchayat will issue
  a Job Card after
  registration
 Job card containing the
  details of adult members
  of household such as ;
  Names ,age ,address and
  photographs.
 Registration will be made
  for five years and may be
  renewed from time to
  time.
4/20/2009                     26
 Applicants will be
  intimated by written letter
  and a public notice will be
  displayed at the office of
  GP and PO.
 Priority shall be given to
  women and in such a way
  that at least one third of
  the beneficiaries shall be
  women.
4/20/2009                       27
 Employment shall be provided
  within a radius of 5 Kms. from
  their residence.
 If Employment is provided
  outside 5 Kms., it must be
  provided within Block with 10 %
  extra wage to meet additional
  transportation and living
  expenses.
4/20/2009                           28
 Safe drinking water
 Shade for children and
  periods of rest
 First-aid Box for
  emergency treatment and
  minor injuries
 Health hazards connected
  with work to be provided

4/20/2009                    29
 Depute one woman worker
     to look after five or more
     children below the age of six
     years of women laborers

 Deputed woman shall be
     paid wage rate


4/20/2009                            30
 Equal wages for women and men in
  all circumstances.
 No gender discrimination of any
  kind.
 Priority for women in the allocation
  of work: at least 33% of labourers
  should be women.
4/20/2009                                31
If any person employed under the scheme is or child

     accompanying any person injured ; he/she shall be entitled to
     free of charge medical treatment
     During the period of hospitalization of injured worker

      Accommodation, treatment and medicines
      Half of the wage per day to be paid to injured person




4/20/2009                                                            32
If a person employed under a scheme

      dies or
      becomes permanent disabled by the accident at
        site
       The legal heirs of the deceased or the disabled
        shall be paid an ex gratia payment at the rate of
        Rs.25000 By the Central government.




4/20/2009                                                   33
The wage under a scheme may be paid

      either wholly in cash
      or, in cash and kind
       But at least one fourth of the wages shall be paid in cash only
     All payment of wages in cash and UA shall be made to

     concerns in the presence of independent persons of the
     community on pre-announced dates.




4/20/2009                                                                34
The disbursement of daily
 
      wages
      Weekly basis or in any case not
 
      later than a fort night specified
      under the scheme.

      Laborers shall be entitled to
 
      receive payment of
      compensation as per the
      provisions of payment of wages
      Act,1936




4/20/2009                                 35
Identification of projects in
                                 
      The Gram Panchayat shall
 
                                     the GP area and prepare a
      be responsible for
                                     development plan as
                                     recommended by Gram
                                     Sabha and ward Sabha




4/20/2009                                                            36
Gram Panchayat shall     Maintain a shelf of
                              
                                 possible works to be
                                 taken up as and when
                                 demand for work
                                 arises
                                Execution and
                                 supervision of such
                                 works




4/20/2009                                               37
GP shall forward its
                                       
      Programme officer (Not
 
                                           proposals in the order of
      below the rank of BDO at block
                                           priority to PO for approvals
      level)
                                           PO shall allot at least 50%
                                       
                                           works in terms of cost to be
                                           implemented through GP
                                           PO shall supply each GP
                                       
                                            MRs for the works
                                            A list of employment
                                             opportunities.



4/20/2009                                                                 38
All NREGA-related documents to be available

     for public scrutiny.
     Copies of documents to be made available at

     nominal cost.
     Muster rolls to be pro-actively displayed at

     Panchayat Bhawan.
     Documents can also be obtained under the

     Right to Information Act.

4/20/2009                                           39
The Gram Panchayat       Shall make available all relevant
                            
 
                              documents;MRs,bills,vouchers,MB
                              s, Sanction orders and other books
                              of accounts and Paper to the Gram
                              Sabha for the purpose of social
                              Audit.
Gram Sabhas to conduct social audits of all works taken up
within Gram Panchayat

All relevant documents to be provided to the Gram Sabha by
 the Gram Panchayat and other implementing agencies


 4/20/2009                                                    40
The Gram Sabha       Shall monitor the
                      
                           execution of works within
                           the GP
                           Shall conduct regular social
                       
                           audit of all the works done
                           by GP




4/20/2009                                                 41
All efforts should be made to ensure

    transparency and accountability

    All accounts and records relating to

    work shall be made for public scrutiny

    A copy of Muster Rolls of every work

    shall be made available in the office of
    PO and GP for inspection by any
    person after paying such fee


4/20/2009                                      42
The DPO, PO and GP shall prepare

     annually report containing the facts and
     figures and achievements relating to
     scheme within its jurisdiction

     All the above documents shall be made

     available to the public on demand and on
     payment of prescribed fees.




4/20/2009                                       43
The Scheme shall not permit

     engaging any contractor for
     implementation the project under
     this scheme

     Works under this schemes shall be

     performed by using manual labor
     and not by machines




4/20/2009                                44
The State Government shall makes rules and
 
      regulations to deal with any complaint at block
      and the District level

      If any dispute or complaint arises the scheme by
 
      GP the matter shall be referred to PO

      The PO shall enter every complaint in a
 
      complaint register and shall dispose the disputes
      and complaints within 7 days of its receipt.



4/20/2009                                                 45
4/20/2009   46
Employment on demand.

  Legal right.

 Universal entitlement.
 Participatory approach.
 Accountability to PRIs.
 Full transparency.



4/20/2009                   47
Employment within 15 days of application.

     Unemployment allowance.

     Work within 5 kilometres.

     Minimum wages.

     Payment within 15 days.

     No gender discrimination.

     Basic worksite facilities.





4/20/2009                                        48
Total:                    90 crore person-days


     Per job card:             24 person-days


     Per rural household:      17 person-days


     Minimum “requirement”:a   200 crore person-days


a NAC estimate, 2004.




4/20/2009                                              49
Total:                                     Rs. 8,813 crores



     Per district:                                      Rs. 44.06

     crores

     Estimated requirement for 200 districts:    Rs. 20,000 crores


     Budget allocation for 2007-8 (330 districts): Rs. 13,000 crores





4/20/2009                                                              50
Taken up:                 8.3 lakh



     Completed:                3.8 lakh



     In progress:              4.5 lakh



  Approximate number of

villages in NREGA districts:   2 lakh

4/20/2009                                 51
Rajasthan                77        Uttar Pradesh            11
                   Assam                    70        Andhra Pradesh           10
                   Madhya Pradesh           56        Haryana                   9
                   North-Easta               45       Tamil Nadu                9
                   Chhattisgarh             34        Bihar                     8
                   Orissa                   21        Gujarat                   7
                   Himachal Pradesh 20                Punjab                    7
                   Uttarakhand              20        West Bengal              6
                   Karnataka               17         Maharashtra               4
                   Jharkhand               14         Kerala                    3
                   Jammu & Kashmir 13                 INDIA                    17

            a   Except Assam (approximate figure, based on incomplete data).
4/20/2009                                                                           52
4/20/2009   53
Women:                   40%
            


                Scheduled Tribes (ST):   36%
            


                Scheduled Castes (SC):   26%
            


                SC/ST Combined:          62%
            



4/20/2009                                      54
National average:         40%


     Highest shares:           Tamil Nadu         81%

                               Rajasthan          67%
                               Kerala             66%
                               Andhra Pradesh     55%

     Lowest shares:             Bihar             17%

                         Uttar Pradesh      17%
                         Himachal Pradesh   12%
                         Jammu & Kashmir    4%


4/20/2009                                               55
4/20/2009   56
Average Expenditure per Person-Day     Rs. 98


     Share of Wages in Total Expenditurea   66%


     Average Wage Cost per Person-Daya      Rs. 64


 aUnskilled   labour only.




4/20/2009                                            57
Kerala                 121           Jammu & Kashmir 69
            Maharashtra            104           Assam              67
            Haryana                 97           Karnataka          67
                                                 North-Easta
            Punjab                  94                              63
            Andhra Pradesh          86           Chhattisgarh       63
            Jharkhand               80           Madhya Pradesh     59
            Tamil Nadu              80           Uttar Pradesh      56
            Uttarakhand             72           Gujarat            56
            Bihar                   70           Orissa             53
            West Bengal            70            Rajasthan          51
            Himachal Pradesh       69            INDIA              64

 a   Except Assam (approximate figure, based on incomplete data).
4/20/2009                                                                58
140


                      120
 Wage rate (Rs/day)




                      100


                       80


                       60


                       40


                       20


                        0
                            0   10      20    30    40    50     60    70      80   90

                                     Person-days of work per rural household

4/20/2009                                                                           59
A field survey of NREGA was recently conducted by the

     Centre for Development Economics (CDE) and the Institute
     of Human Development (IHD), with students from Delhi
     University and Jawaharlal Nehru University.

     Date:                          May-June 2007

     Survey Districts:              Ranchi (Jharkhand)

                                    Surguja (Chhattisgarh)
  Number of Gram Panchayats:        23

 Number of worksites:              47



4/20/2009                                                       60
Most families have a     Most of the works are
      job card.                productive.
      Awareness levels         Corruption levels have
      have improved.           gone down.
      Employment on a         Where there is
      massive scale.           work, NREGA is a
      Minimum wages are        lifeline for the rural
      being paid.              poor.
      Contractors have        Massive progress
      disappeared.             compared with earlier
                               years!

4/20/2009                                               61
Work is not “demand-driven”.

     Long delays in wage payments.

     Shortage of staff at all levels.

     Poor worksite facilities (e.g. creches).

     Violations of the transparency safeguards.

     Corruption persists.





4/20/2009                                         62
Were most labourers at this worksite employed
 in response to an application for work?

                    Ranchi           Surguja
Yes                 4%               11%

No                  96%              89%


4/20/2009                                       63
Proportion (%) of worksites where:
                                       Ranchi        Surguja
Most labourers earned
the minimum wage                       n/a           84
Wages were paid in front
of the labourersa                      54            79
Wages were paid within 15 days         32            16
Labourers had complaints
about wage payments                             71         90
a Excluding   payments through Banks




4/20/2009                                                       64
Proportion (%) of worksites with the following
  facilities:
                                   Ranchi        Surguja
Drinking water                     64              100
Shade for periods of resta         68              (16)
“Medicine kit”                              68             59
Crèche                                      4              11
a   Not including natural shade.


4/20/2009                                                       65
Proportion (%) of worksites with:
                                     Ranchi   Surguja
     Vigilance committee                 89       84
     Active vigilance committee          11       21




4/20/2009                                               66
Earlier surveys:
Dungarpur, April 2006:         (negligible)
Garhwa, October 2006:          85%
CDE-IHD survey:
Ranchi                         33%
Surgujaa                       5%
 a Gram     Panchayat works.




4/20/2009                                     67
Activating the work application process.

     Implementation of transparency safeguards

      Timely wage payments.

     Need for a wage policy.

     Women’s participation.

     Redressal systems!





4/20/2009                                        68
4/20/2009   69
4/20/2009   70

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Poverty in india
Poverty in indiaPoverty in india
Poverty in india
 
MGNREGA
MGNREGAMGNREGA
MGNREGA
 
National population policy detail
National population policy detailNational population policy detail
National population policy detail
 
MGNAREGA
MGNAREGAMGNAREGA
MGNAREGA
 
Mgnrega
MgnregaMgnrega
Mgnrega
 
Planning comission
Planning comissionPlanning comission
Planning comission
 
Mgnrega
MgnregaMgnrega
Mgnrega
 
Rural self employment training institutes (rseti)
Rural self employment training institutes (rseti)Rural self employment training institutes (rseti)
Rural self employment training institutes (rseti)
 
Poverty alleviation programs
Poverty alleviation programsPoverty alleviation programs
Poverty alleviation programs
 
Women welfare
Women welfareWomen welfare
Women welfare
 
Final Nrega Ppt
Final Nrega PptFinal Nrega Ppt
Final Nrega Ppt
 
GENDER BUDGETING
GENDER BUDGETINGGENDER BUDGETING
GENDER BUDGETING
 
Poverty
PovertyPoverty
Poverty
 
Poverty in india
Poverty in indiaPoverty in india
Poverty in india
 
Poverty in india
Poverty in indiaPoverty in india
Poverty in india
 
Women and child development ppt
Women and child development pptWomen and child development ppt
Women and child development ppt
 
MGNREGA SCHEME
MGNREGA SCHEMEMGNREGA SCHEME
MGNREGA SCHEME
 
Five year plans of india
Five year plans of indiaFive year plans of india
Five year plans of india
 
Causes or- reasons of low per capita By Mr Allah Dad Khan Specialist INRM FA...
Causes  or- reasons of low per capita By Mr Allah Dad Khan Specialist INRM FA...Causes  or- reasons of low per capita By Mr Allah Dad Khan Specialist INRM FA...
Causes or- reasons of low per capita By Mr Allah Dad Khan Specialist INRM FA...
 
Ujjwala yojna
Ujjwala yojnaUjjwala yojna
Ujjwala yojna
 

Ähnlich wie NREGA: THE SCHEME AND ITS CURRENT STATUS

Compliance Forms Under Important Labour Laws.pdf
Compliance Forms Under Important Labour Laws.pdfCompliance Forms Under Important Labour Laws.pdf
Compliance Forms Under Important Labour Laws.pdfPrem Kumar Soni
 
EPF & MPF act 1952
EPF & MPF act 1952EPF & MPF act 1952
EPF & MPF act 1952kishorgm4u
 
FALLSEM2022-23_BMT2012_TH_VL2022230101938_Reference_Material_I_15-09-2022_Pay...
FALLSEM2022-23_BMT2012_TH_VL2022230101938_Reference_Material_I_15-09-2022_Pay...FALLSEM2022-23_BMT2012_TH_VL2022230101938_Reference_Material_I_15-09-2022_Pay...
FALLSEM2022-23_BMT2012_TH_VL2022230101938_Reference_Material_I_15-09-2022_Pay...NaveenR90477
 
Study of income tax reference n definition of house property n other sources...
Study of income tax reference  n definition of house property n other sources...Study of income tax reference  n definition of house property n other sources...
Study of income tax reference n definition of house property n other sources...Rajpal Saipogu
 
GIP Memorandum of agreement
GIP Memorandum of agreementGIP Memorandum of agreement
GIP Memorandum of agreementSamanthasheeran
 
VIETNAM’S SOLAR MARKET – MARKET STATUS, POTENTIAL AND KEY TO SUCCESSFUL PROJECTS
VIETNAM’S SOLAR MARKET – MARKET STATUS, POTENTIAL AND KEY TO SUCCESSFUL PROJECTSVIETNAM’S SOLAR MARKET – MARKET STATUS, POTENTIAL AND KEY TO SUCCESSFUL PROJECTS
VIETNAM’S SOLAR MARKET – MARKET STATUS, POTENTIAL AND KEY TO SUCCESSFUL PROJECTSDr. Oliver Massmann
 

Ähnlich wie NREGA: THE SCHEME AND ITS CURRENT STATUS (14)

Dijo15
Dijo15Dijo15
Dijo15
 
Compliance Forms Under Important Labour Laws.pdf
Compliance Forms Under Important Labour Laws.pdfCompliance Forms Under Important Labour Laws.pdf
Compliance Forms Under Important Labour Laws.pdf
 
Dijo
DijoDijo
Dijo
 
EPF & MPF act 1952
EPF & MPF act 1952EPF & MPF act 1952
EPF & MPF act 1952
 
6554103 Pf Act
6554103 Pf Act6554103 Pf Act
6554103 Pf Act
 
FALLSEM2022-23_BMT2012_TH_VL2022230101938_Reference_Material_I_15-09-2022_Pay...
FALLSEM2022-23_BMT2012_TH_VL2022230101938_Reference_Material_I_15-09-2022_Pay...FALLSEM2022-23_BMT2012_TH_VL2022230101938_Reference_Material_I_15-09-2022_Pay...
FALLSEM2022-23_BMT2012_TH_VL2022230101938_Reference_Material_I_15-09-2022_Pay...
 
B U D G E T
B U D G E TB U D G E T
B U D G E T
 
Budget 2008
Budget 2008Budget 2008
Budget 2008
 
B U D G E T
B U D G E TB U D G E T
B U D G E T
 
The Code on Wages, 2019 - Part I
The Code on Wages, 2019 - Part IThe Code on Wages, 2019 - Part I
The Code on Wages, 2019 - Part I
 
Study of income tax reference n definition of house property n other sources...
Study of income tax reference  n definition of house property n other sources...Study of income tax reference  n definition of house property n other sources...
Study of income tax reference n definition of house property n other sources...
 
Nrega (2)
Nrega (2)Nrega (2)
Nrega (2)
 
GIP Memorandum of agreement
GIP Memorandum of agreementGIP Memorandum of agreement
GIP Memorandum of agreement
 
VIETNAM’S SOLAR MARKET – MARKET STATUS, POTENTIAL AND KEY TO SUCCESSFUL PROJECTS
VIETNAM’S SOLAR MARKET – MARKET STATUS, POTENTIAL AND KEY TO SUCCESSFUL PROJECTSVIETNAM’S SOLAR MARKET – MARKET STATUS, POTENTIAL AND KEY TO SUCCESSFUL PROJECTS
VIETNAM’S SOLAR MARKET – MARKET STATUS, POTENTIAL AND KEY TO SUCCESSFUL PROJECTS
 

Mehr von shivraj negi

Ultra mega power projects
Ultra mega power projectsUltra mega power projects
Ultra mega power projectsshivraj negi
 
Indian electricity sector
Indian electricity sectorIndian electricity sector
Indian electricity sectorshivraj negi
 
Groundwater externalities and strategies
Groundwater externalities and strategiesGroundwater externalities and strategies
Groundwater externalities and strategiesshivraj negi
 
Built environment study
Built environment studyBuilt environment study
Built environment studyshivraj negi
 
Shivraj singhnegi bes
Shivraj singhnegi besShivraj singhnegi bes
Shivraj singhnegi besshivraj negi
 
Gender And Politics
Gender And PoliticsGender And Politics
Gender And Politicsshivraj negi
 
China, human rights and international relations 1
China, human rights and international relations 1China, human rights and international relations 1
China, human rights and international relations 1shivraj negi
 
Demand estimation and forecasting
Demand estimation and forecastingDemand estimation and forecasting
Demand estimation and forecastingshivraj negi
 
Acharya Vinoba Bhave, Bhoodan and Gandhi
Acharya Vinoba Bhave, Bhoodan and GandhiAcharya Vinoba Bhave, Bhoodan and Gandhi
Acharya Vinoba Bhave, Bhoodan and Gandhishivraj negi
 
Historical novel: Study of the genre
Historical novel: Study of the genreHistorical novel: Study of the genre
Historical novel: Study of the genreshivraj negi
 
Backpacks and back pain
Backpacks and back painBackpacks and back pain
Backpacks and back painshivraj negi
 
What indians think about world on google
What indians think about world on googleWhat indians think about world on google
What indians think about world on googleshivraj negi
 
Gandhian economics
Gandhian economicsGandhian economics
Gandhian economicsshivraj negi
 
Gandhian economics
Gandhian economicsGandhian economics
Gandhian economicsshivraj negi
 
Demand estimation and forecasting
Demand estimation and forecastingDemand estimation and forecasting
Demand estimation and forecastingshivraj negi
 
Lefebvre and Space
Lefebvre and SpaceLefebvre and Space
Lefebvre and Spaceshivraj negi
 
Peace Conflict and Development
Peace Conflict and DevelopmentPeace Conflict and Development
Peace Conflict and Developmentshivraj negi
 
Language and Social Change: A case study of Hindi Film Lyrics
Language and Social Change: A case study of Hindi Film LyricsLanguage and Social Change: A case study of Hindi Film Lyrics
Language and Social Change: A case study of Hindi Film Lyricsshivraj negi
 
Power Sectors Reforms in Delhi: Implications, Promises, and the road ahead
Power Sectors Reforms in Delhi: Implications, Promises, and the road aheadPower Sectors Reforms in Delhi: Implications, Promises, and the road ahead
Power Sectors Reforms in Delhi: Implications, Promises, and the road aheadshivraj negi
 

Mehr von shivraj negi (20)

Ultra mega power projects
Ultra mega power projectsUltra mega power projects
Ultra mega power projects
 
Indian electricity sector
Indian electricity sectorIndian electricity sector
Indian electricity sector
 
Groundwater externalities and strategies
Groundwater externalities and strategiesGroundwater externalities and strategies
Groundwater externalities and strategies
 
Built environment study
Built environment studyBuilt environment study
Built environment study
 
Shivraj singhnegi bes
Shivraj singhnegi besShivraj singhnegi bes
Shivraj singhnegi bes
 
Gender And Politics
Gender And PoliticsGender And Politics
Gender And Politics
 
Right to food ppt
Right to food pptRight to food ppt
Right to food ppt
 
China, human rights and international relations 1
China, human rights and international relations 1China, human rights and international relations 1
China, human rights and international relations 1
 
Demand estimation and forecasting
Demand estimation and forecastingDemand estimation and forecasting
Demand estimation and forecasting
 
Acharya Vinoba Bhave, Bhoodan and Gandhi
Acharya Vinoba Bhave, Bhoodan and GandhiAcharya Vinoba Bhave, Bhoodan and Gandhi
Acharya Vinoba Bhave, Bhoodan and Gandhi
 
Historical novel: Study of the genre
Historical novel: Study of the genreHistorical novel: Study of the genre
Historical novel: Study of the genre
 
Backpacks and back pain
Backpacks and back painBackpacks and back pain
Backpacks and back pain
 
What indians think about world on google
What indians think about world on googleWhat indians think about world on google
What indians think about world on google
 
Gandhian economics
Gandhian economicsGandhian economics
Gandhian economics
 
Gandhian economics
Gandhian economicsGandhian economics
Gandhian economics
 
Demand estimation and forecasting
Demand estimation and forecastingDemand estimation and forecasting
Demand estimation and forecasting
 
Lefebvre and Space
Lefebvre and SpaceLefebvre and Space
Lefebvre and Space
 
Peace Conflict and Development
Peace Conflict and DevelopmentPeace Conflict and Development
Peace Conflict and Development
 
Language and Social Change: A case study of Hindi Film Lyrics
Language and Social Change: A case study of Hindi Film LyricsLanguage and Social Change: A case study of Hindi Film Lyrics
Language and Social Change: A case study of Hindi Film Lyrics
 
Power Sectors Reforms in Delhi: Implications, Promises, and the road ahead
Power Sectors Reforms in Delhi: Implications, Promises, and the road aheadPower Sectors Reforms in Delhi: Implications, Promises, and the road ahead
Power Sectors Reforms in Delhi: Implications, Promises, and the road ahead
 

Kürzlich hochgeladen

Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 

Kürzlich hochgeladen (20)

Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 

NREGA: THE SCHEME AND ITS CURRENT STATUS

  • 1. PRESENTATION FOR THE COURSE CURRENT AFFAIRS WORKSHOP EMPLOYMENT GUARANTEE AND THE RIGHT TO WORK SHIVRAJ SINGH NEGI KOMMU VENKATA RAVI SHANKAR S. DEEPUK 4/20/2009 1
  • 2. The India State Hunger Index 2008 by the  International Food Policy Research Institute. Percent of population living under  Punjab has the best nutritional the poverty line, which is 356.35 situation, whereas malnutrition in Madhya rupees or around $7 a month in rural Pradesh is worse than in Ethiopia or Sudan. areas. 4/20/2009 2
  • 3. The Employment Guarantee Act is a step towards the right to work, as an aspect of the fundamental right to live with dignity 4/20/2009 3
  • 4. The “right to life” is a fundamental right of all  citizens under Article 21 of the Indian Constitution. “Right to life… includes the right to live with  human dignity, it would include all these aspects which would make life meaningful, complete and living.” (Supreme Court) 4/20/2009 4
  • 5. “The State shall… direct its policy towards  securing that the citizen, men and women equally, have the right to an adequate means of livelihood…” (Article 39A) “The State shall … make effective provision  for securing the right to work…” (Article 41) 4/20/2009 5
  • 6. The National Rural Employment Guarantee Act 2005 is a law whereby: any adult who is willing to do unskilled manual work at the minimum wage is entitled to being employed on local public works within 15 days of applying. 4/20/2009 6
  • 7. Each State has to launch an  “employment guarantee scheme” within six months of the Act coming into force. 4/20/2009 7
  • 8. Block is the basic unit of implementation.  In each Block, a “Programme Officer” is to  coordinate the implementation of EGS Gram Panchayats are the main implementing  agencies. Accountability to Gram Sabhas.  4/20/2009 8
  • 9. Gram Panchayats (half of EGS works)  Other Panchayati Raj Institutions (PRIs)  Line departments (PWD, Forest Dept.)  NGOs.  Note: Private contractors are banned. 4/20/2009 9
  • 10. Programme Officer to maintain shelf of  projects, based on proposals from the implementing agencies. Gram Panchayats also supposed to prepare a  shelf of works based on the recommendations of the Gram Sabha. 4/20/2009 10
  • 11.  Minor irrigation  Water conservation, drought proofing, desilting of tanks, flood control, etc.  Land development  Rural roads  “Any other work which may be notified by the Central Government in consultation with the State Government” 4/20/2009 11
  • 12. Employment to be provided on  demand, within 15 days. Programme Officer sanctions projects to  ensure that all applicants get work. Programme Officer to arrange payment of  unemployment allowance to those who don’t get work. 4/20/2009 12
  • 13. Step 1 (Registration): Gram Panchayat to “register” interested households, to facilitate advance planning. Step 2 (Application): Adult members of registered households apply for work. 4/20/2009 13
  • 14. Unit of registration is the household.  Gram Panchayat to issue a “job card” to  each applicant.  Special meeting of Gram Sabha to be held to invite applications. 4/20/2009 14
  • 15. Any adult member of a registered  household can apply for work at any time.  Applications should be for at least 14 days of continuous work.  Advance applications are allowed. 4/20/2009 15
  • 16.  Wage-material ratio should not be less than 60:40  Wages of skilled and semi-skilled labourers to be included in material costs 4/20/2009 16
  • 17. Central Government to pay for:   wage costs,  75% of material costs, and  some administrative costs. State governments to pay for:   25% of material costs  other administrative costs,  unemployment allowance. 4/20/2009 17
  • 18. Registration for Employment.  The adult member of every  House hold who –  Reside in rural area ; and  Are willing to do unskilled manual work may apply for registration of their household for issuance of Job Card. 4/20/2009 19
  • 19. Within 15 days of receipt of  an application and within a radius of 5 kms. from their place of residence AND  If Employment is not provided within 15 days of receipt of his application he shall be entitled to a daily Unemployment allowance. 4/20/2009 20
  • 20. One fourth of the wage  For First 30 days  rate. For the remaining  Not less than one half  period of the Financial of the wage rate year Employment wage +  Equal to the wages for  Unemployment 100 days of work in a allowance financial year 4/20/2009 21
  • 21. A person working for 7 hours  would normally earn a wage equal to a wage rate  Minimum wage fixed by the state Government under section 3 of the minimum wage Act,1948  Wage rate is fixed by the Central Govt.  Shall not be at a rate of less than Sixty rupees per day . 4/20/2009 22
  • 22.  Water conservation and Water harvesting  Drought proofing(Aforestation and tree plantation)  Irrigation canals  Provision of irrigation facility to land owned by SC/ST/beneficiaries under Indira AawasYozna  Renovation of traditional water bodies  De-silting of tanks  Land development 4/20/2009 23
  • 23.  Flood control and protection works including drainage in water logged areas  Rural connectivity to provide all weather access  Other works notified by the Central/State Government 4/20/2009 24
  • 24. Sarpanch/ward panch At Gram panchayat   Level Programme Officer  At Block/Tehsil /Taluka  Level (appointed specially for this scheme) GP/PO shall be bound to accept the valid  applications and to issue a dated receipt to the applicant . 4/20/2009 25
  • 25.  Gram Panchayat will issue a Job Card after registration  Job card containing the details of adult members of household such as ; Names ,age ,address and photographs.  Registration will be made for five years and may be renewed from time to time. 4/20/2009 26
  • 26.  Applicants will be intimated by written letter and a public notice will be displayed at the office of GP and PO.  Priority shall be given to women and in such a way that at least one third of the beneficiaries shall be women. 4/20/2009 27
  • 27.  Employment shall be provided within a radius of 5 Kms. from their residence.  If Employment is provided outside 5 Kms., it must be provided within Block with 10 % extra wage to meet additional transportation and living expenses. 4/20/2009 28
  • 28.  Safe drinking water  Shade for children and periods of rest  First-aid Box for emergency treatment and minor injuries  Health hazards connected with work to be provided 4/20/2009 29
  • 29.  Depute one woman worker to look after five or more children below the age of six years of women laborers  Deputed woman shall be paid wage rate 4/20/2009 30
  • 30.  Equal wages for women and men in all circumstances.  No gender discrimination of any kind.  Priority for women in the allocation of work: at least 33% of labourers should be women. 4/20/2009 31
  • 31. If any person employed under the scheme is or child  accompanying any person injured ; he/she shall be entitled to free of charge medical treatment During the period of hospitalization of injured worker   Accommodation, treatment and medicines  Half of the wage per day to be paid to injured person 4/20/2009 32
  • 32. If a person employed under a scheme   dies or  becomes permanent disabled by the accident at site The legal heirs of the deceased or the disabled shall be paid an ex gratia payment at the rate of Rs.25000 By the Central government. 4/20/2009 33
  • 33. The wage under a scheme may be paid   either wholly in cash  or, in cash and kind But at least one fourth of the wages shall be paid in cash only All payment of wages in cash and UA shall be made to  concerns in the presence of independent persons of the community on pre-announced dates. 4/20/2009 34
  • 34. The disbursement of daily  wages Weekly basis or in any case not  later than a fort night specified under the scheme. Laborers shall be entitled to  receive payment of compensation as per the provisions of payment of wages Act,1936 4/20/2009 35
  • 35. Identification of projects in  The Gram Panchayat shall  the GP area and prepare a be responsible for development plan as recommended by Gram Sabha and ward Sabha 4/20/2009 36
  • 36. Gram Panchayat shall Maintain a shelf of   possible works to be taken up as and when demand for work arises  Execution and supervision of such works 4/20/2009 37
  • 37. GP shall forward its  Programme officer (Not  proposals in the order of below the rank of BDO at block priority to PO for approvals level) PO shall allot at least 50%  works in terms of cost to be implemented through GP PO shall supply each GP   MRs for the works  A list of employment opportunities. 4/20/2009 38
  • 38. All NREGA-related documents to be available  for public scrutiny. Copies of documents to be made available at  nominal cost. Muster rolls to be pro-actively displayed at  Panchayat Bhawan. Documents can also be obtained under the  Right to Information Act. 4/20/2009 39
  • 39. The Gram Panchayat Shall make available all relevant   documents;MRs,bills,vouchers,MB s, Sanction orders and other books of accounts and Paper to the Gram Sabha for the purpose of social Audit. Gram Sabhas to conduct social audits of all works taken up within Gram Panchayat All relevant documents to be provided to the Gram Sabha by the Gram Panchayat and other implementing agencies 4/20/2009 40
  • 40. The Gram Sabha Shall monitor the   execution of works within the GP Shall conduct regular social  audit of all the works done by GP 4/20/2009 41
  • 41. All efforts should be made to ensure  transparency and accountability All accounts and records relating to  work shall be made for public scrutiny A copy of Muster Rolls of every work  shall be made available in the office of PO and GP for inspection by any person after paying such fee 4/20/2009 42
  • 42. The DPO, PO and GP shall prepare  annually report containing the facts and figures and achievements relating to scheme within its jurisdiction All the above documents shall be made  available to the public on demand and on payment of prescribed fees. 4/20/2009 43
  • 43. The Scheme shall not permit  engaging any contractor for implementation the project under this scheme Works under this schemes shall be  performed by using manual labor and not by machines 4/20/2009 44
  • 44. The State Government shall makes rules and  regulations to deal with any complaint at block and the District level If any dispute or complaint arises the scheme by  GP the matter shall be referred to PO The PO shall enter every complaint in a  complaint register and shall dispose the disputes and complaints within 7 days of its receipt. 4/20/2009 45
  • 45. 4/20/2009 46
  • 46. Employment on demand.  Legal right.   Universal entitlement.  Participatory approach.  Accountability to PRIs.  Full transparency. 4/20/2009 47
  • 47. Employment within 15 days of application.  Unemployment allowance.  Work within 5 kilometres.  Minimum wages.  Payment within 15 days.  No gender discrimination.  Basic worksite facilities.  4/20/2009 48
  • 48. Total: 90 crore person-days  Per job card: 24 person-days  Per rural household: 17 person-days  Minimum “requirement”:a 200 crore person-days  a NAC estimate, 2004. 4/20/2009 49
  • 49. Total: Rs. 8,813 crores  Per district: Rs. 44.06  crores Estimated requirement for 200 districts: Rs. 20,000 crores  Budget allocation for 2007-8 (330 districts): Rs. 13,000 crores  4/20/2009 50
  • 50. Taken up: 8.3 lakh  Completed: 3.8 lakh  In progress: 4.5 lakh  Approximate number of  villages in NREGA districts: 2 lakh 4/20/2009 51
  • 51. Rajasthan 77 Uttar Pradesh 11 Assam 70 Andhra Pradesh 10 Madhya Pradesh 56 Haryana 9 North-Easta 45 Tamil Nadu 9 Chhattisgarh 34 Bihar 8 Orissa 21 Gujarat 7 Himachal Pradesh 20 Punjab 7 Uttarakhand 20 West Bengal 6 Karnataka 17 Maharashtra 4 Jharkhand 14 Kerala 3 Jammu & Kashmir 13 INDIA 17 a Except Assam (approximate figure, based on incomplete data). 4/20/2009 52
  • 52. 4/20/2009 53
  • 53. Women: 40%  Scheduled Tribes (ST): 36%  Scheduled Castes (SC): 26%  SC/ST Combined: 62%  4/20/2009 54
  • 54. National average: 40%  Highest shares: Tamil Nadu 81%  Rajasthan 67% Kerala 66% Andhra Pradesh 55% Lowest shares: Bihar 17%  Uttar Pradesh 17% Himachal Pradesh 12% Jammu & Kashmir 4% 4/20/2009 55
  • 55. 4/20/2009 56
  • 56. Average Expenditure per Person-Day Rs. 98  Share of Wages in Total Expenditurea 66%  Average Wage Cost per Person-Daya Rs. 64  aUnskilled labour only. 4/20/2009 57
  • 57. Kerala 121 Jammu & Kashmir 69 Maharashtra 104 Assam 67 Haryana 97 Karnataka 67 North-Easta Punjab 94 63 Andhra Pradesh 86 Chhattisgarh 63 Jharkhand 80 Madhya Pradesh 59 Tamil Nadu 80 Uttar Pradesh 56 Uttarakhand 72 Gujarat 56 Bihar 70 Orissa 53 West Bengal 70 Rajasthan 51 Himachal Pradesh 69 INDIA 64 a Except Assam (approximate figure, based on incomplete data). 4/20/2009 58
  • 58. 140 120 Wage rate (Rs/day) 100 80 60 40 20 0 0 10 20 30 40 50 60 70 80 90 Person-days of work per rural household 4/20/2009 59
  • 59. A field survey of NREGA was recently conducted by the  Centre for Development Economics (CDE) and the Institute of Human Development (IHD), with students from Delhi University and Jawaharlal Nehru University. Date: May-June 2007  Survey Districts: Ranchi (Jharkhand)  Surguja (Chhattisgarh) Number of Gram Panchayats: 23   Number of worksites: 47 4/20/2009 60
  • 60. Most families have a Most of the works are job card. productive. Awareness levels Corruption levels have have improved. gone down. Employment on a  Where there is massive scale. work, NREGA is a Minimum wages are lifeline for the rural being paid. poor. Contractors have  Massive progress disappeared. compared with earlier years! 4/20/2009 61
  • 61. Work is not “demand-driven”.  Long delays in wage payments.  Shortage of staff at all levels.  Poor worksite facilities (e.g. creches).  Violations of the transparency safeguards.  Corruption persists.  4/20/2009 62
  • 62. Were most labourers at this worksite employed in response to an application for work? Ranchi Surguja Yes 4% 11% No 96% 89% 4/20/2009 63
  • 63. Proportion (%) of worksites where: Ranchi Surguja Most labourers earned the minimum wage n/a 84 Wages were paid in front of the labourersa 54 79 Wages were paid within 15 days 32 16 Labourers had complaints about wage payments 71 90 a Excluding payments through Banks 4/20/2009 64
  • 64. Proportion (%) of worksites with the following facilities: Ranchi Surguja Drinking water 64 100 Shade for periods of resta 68 (16) “Medicine kit” 68 59 Crèche 4 11 a Not including natural shade. 4/20/2009 65
  • 65. Proportion (%) of worksites with: Ranchi Surguja Vigilance committee 89 84 Active vigilance committee 11 21 4/20/2009 66
  • 66. Earlier surveys: Dungarpur, April 2006: (negligible) Garhwa, October 2006: 85% CDE-IHD survey: Ranchi 33% Surgujaa 5% a Gram Panchayat works. 4/20/2009 67
  • 67. Activating the work application process.  Implementation of transparency safeguards  Timely wage payments.  Need for a wage policy.  Women’s participation.  Redressal systems!  4/20/2009 68
  • 68. 4/20/2009 69
  • 69. 4/20/2009 70