DDAs Building Bylaws
Download link: MSWORD

Addition(s) Alteration(s) Allowed in DDA Flats
The Ministry of Urban Development and Poverty Alleviation, Government
ofIndia has allowed certain addition(s)/alteration(s) in DDA flats. These
areapplicable to all flats built and allotted by DDA irrespective of whether these
arelocated in notified and denotified areas. The addition/alteration(s) allowed are
categorized in three categories:

Condonable:
These are minor addition /alteration(s)which do not require structural changes and can
be carried out by the owner(s) without any prior intimation/permission of
DDA/MCD.

Permitted with intimation/permission:
These addition(s) / alteration(s) are of major nature which may require structural
changes, changes in the service lines and additional coverage.

Additional coverage permitted with prior permission.
The details of all the categories of addition / alterations which have been approved by
Ministry of Urban Development & Poverty Alleviation by various orders by various
orders are given below:

Condonable Items:
* To convert existing barsati into room provided the wall is made of only 115 mm
thick.

* Grills and glazing in verandah with proper fixing arrangement.

* Raising height of front and rear courtyard wall upto 7′ height by putting up
jali/fencing.

* Providing door in courtyard wherever not provided.
* Providing sunshades on doors and windows wherever not provided with proper
fixing arrangements.

* Closing the door.

* If the bathroom or WC are not having roof, these may be treated as open urinals and
allowed. 8. Raising the wall of balcony/terrace parapet with grill or glazing upto 5′
height.

* Construction of open staircase (cat ladder) where no staircase has been provided for
approach to the terrace.

* To put provide additional PVC water tank at ground floor area without disturbing
the common passage.

* To provide an additional PVC water tank in the scooter/car garage at the surface
level.

* To provide loft /shelf in the rooms without chase in the walls.

* To change the flooring with water proofing treatment.

* To remove half (41/2) brick wall.

* To make a ramp at front gate without disturbing the common passage /storm water
drain.

* To provide sunshades or the outer windows upto 2′wide projection.

* To provide false ceiling in rooms.

* To make an opening of maximum size of 2′6″ x1′9″ for exhaust fan or air-
conditioner in existing walls.

* Fixing of door in back and front courtyard.

* Converting of window into Almirah subject to availability of light and ventilation as
per building byelaws provided that no structural elements are disturbed and there is no
projection extending beyond the external wall.

* Shifting of water storage tank/raising of parapet wall upto 5′ height and putting
additional water storage tank. Wherever the existing water storage tank capacity is
less than 500 ltrs in a flat, a 500 ltrs tank can either replace the existing water storage
tank or if possible the additional tank can be added so as to make the total storage
capacity upto 550 ltrs. However, such replacement/provision of additional tank will be
done only on the locations specified for such tanks and the supporting beams will be
required to be strengthened suitably. Parapet wall around terrace can be increased to a
height of 5′.
* To shift the front glazing, rooms/windows upto existing chajja.

Addition/Alteration(s) Permitted With Prior Intimation / Permission:
Following addition(s) / alteration(s) can be carried out with prior
intimation/permission of the concerned agency i.e. DDA/MCD as per the prescribed
procedure:

* Interchange the position of kitchen,bathroom & WC with proper connectionssubject
to structure safety. To carryout this interchange, all the allottees of one vertical stack
will have to apply jointly to the concerned agency.

* Construction of bath room and WC in the rear courtyard.

* Covering of open terrace with sloping roofs upto 9′ height with light weight material
e.g. fibre glass / AC sheets / GI sheets with pipes and standard angle iron section etc.
and enclosing with glazing.

* Removal of original structure and reconstruction with due permission in the case of
single storeyed built up flats only subject to the satisfaction of building bye-laws and
prior approval of the local authority.

Additional Coverage Permitted With Prior Permission:
* Covering of courtyard and floor level terraces is allowed subject to fulfillment of
building byelaws and structural safety. In three or four storeyed flats the owners at
upper floor shall have the right to cover the area available as a result of coverage of
courtyard /terrace of floor below. In such cases the residents of DDA flats in a vertical
stack served by the same staircase should give their consent and jointly apply for
permission.

* In two storeyed flats the allottee at first floor wil have no right of construction above
the courtyard built by ground floor allottee. The upper floor allottee of two storeyed
flat can use the roof terrace for extra coverage as permissible.

* A barsati on the roof terrace of the top floor in addition to mumty is allowed. This
barsati should preferably be adjoining to the mumty and equivalent to the size of the
room below so that construction of wall over is ensured at terrace level. This will be
subject to the provision of access to the residents of the block for maintenance of
water tank, plumbing system,fixing of TV/Cable antennas etc. All the
addition/alteration(s) and additional coverage will be governed by 5 basic principals:

* There is no encroachment on the public land.

* Structural stability of the building is ensured.

* Light and ventilation of the habitable rooms is ensured as per the building byelaws.

* There is no infringement of other’s rights.

* The service elements such as manhole, rainwater fittings, sanitary fittings etc. are
not disturbed and remain exposed for periodical inspection and maintenance. The
owner(s) will be allowed to cover additional space with prior permission of the
concerned agency i.e DDA/MCD as per the prescribed procedure. The existing
additional covered area and addition(s)/alteration(s) can also be get regularized by the
owner(s) of DDA flats if the same are within the prescribed norms following the same
procedure. Procedure of Permission.

* Additions/alterations in DDA flats in the Development Areas of the DDA shall be
permitted by DDA and in other areas by MCD.

* An Architect registered with Council of Architecture under Architects Act 1972
shall have the authority to certify plans for their correctness regarding original
construction as well as proposals being in conformity with building byelaws and to
the guidelines of addition (s) /alteration(s). Once the plans with all the documents
certified by the Architect, structural Engineer and fee are submitted to DDA/MCD,
these will be taken on record and treated as permitted.

* The person(s) who has / have already carried out or intend to make addition(s)/
alteration(s) in the flat(s), shall intimate in writing in the prescribed form and such
intimation shall be accompanied alongwith the documents as given in Para 3. The
form is to be filled up and jointly certified by the owner(s) and Registered Architect
which contains the statement of the proposal and amount deposited. The proposal with
all requisite information/documents and certification shall be accepted by DDA/MCD
and one coy of the proposal will be certified /stamped and returned to the applicant.
Incomplete proposal shall not be accepted.

* In cases where permission is required for interchanging the position of kitchen,
bathroom & WC or for additional coverage in courtyard and terraces, all the owner(s)
of one vertical block will jointly submit the proposal to DDA/MCD. In case, where all
the owner(s) of one vertical block are not interested to carry out the addition/
alteration but one or two of them are interested, they will have to obtain no Objection
Certificate from the remaining owner(s).

* The Architect(s) may draw the original plan of the flat(s) by measurements and
satisfy themselves about their correctness. If need be, they can obtain a certified copy
of original plan of the flat from Housing and Urban Projects Wing, DDA on
prescribed payment. Building Plan Fee And Additional Floor Area Charges A
building plan fee of Rs. 200/- will be charged for processing the plans irrespective of
covered area involved. In addition to this, a charge of Rs. 450/- per sqm. Will be
levied for additional covered area proposed to be constructed. The rate of Rs. 450/-
per sqm. is in accordance with the rate given by the Ministry vide order dated
25.09.1998 (Annexure -E) for additional FAR in group housing pockets. Provision of
Test Check DDA/MCD reserves the right to test check the proposal / completion
submitted to it and in case it is found that the proposal / completion is not in
conformity with building bye-laws / given guidelines for addition(s)/alteration(s) in
DDA flats, the permission will be revoked and action will be taken against the
Architect as per Rules and Regulations, and the construction which is not in
conformity with building bye-laws and guidelines will be removed as per provisions
of Delhi Development Act/ DMC Act. Documents to be Submitted.

* Application form in prescribed proforma.

* 4 (four) Registered with Council of Architecture under the Architects Act 1972
indicating his / her name, address, telephone number, clearly showing original
construction in blue colour and proposed construction/construction to be regularized
in red colour at a scale not less than 1: 100.

* Certificate of supervision by Architect and structural Engineer alongwith a copy of
their valid registration and qualification certificate.

* Certificate of supervision by Plumber if changes in wet areas i.e.
kitchen,bath,WC/Toilet are proposed or the services are being affected in any way
alongwith copy of valid registration certificate of Plumber.

* Proof of ownership documents: Lease deed / conveyance deed shall be taken as
documents for the proof of ownership. Registered sale deed or general Power of
Attorney /Agreement to sale shall be accepted as the proof of ownership only after the
property has been converted into freehold by DDA. This will also be required from
the owner(s) who have given NOC only.

* Certificate by owner(s) and structural Engineer for safety from natural hazard as per
the proforma prescribed by Ministry.
* Indemnity Bond for structural stability on a non-judicial stamp paper of Rs. 100/-
duly attested by 1st Class Magistrate/Notary Public. This Indemnity Bond will have to
be given individually by all the owners of the vertical stack of flats. This will not be
required from those owner(s) who have given NOC only.

The above bylaws have been obtained from Govt. of NCT of Delhi website.

Weitere ähnliche Inhalte

Was ist angesagt?

Site Planning and Design Principles - اساسيات تخطيط وتصميم المواقع
Site Planning and Design Principles - اساسيات تخطيط وتصميم المواقعSite Planning and Design Principles - اساسيات تخطيط وتصميم المواقع
Site Planning and Design Principles - اساسيات تخطيط وتصميم المواقعGalala University
 
F.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsF.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsAr. Md Shahroz Alam
 
THESIS REPORT ON CENTRAL BUSINESS DISRTICT
THESIS REPORT ON CENTRAL BUSINESS DISRTICTTHESIS REPORT ON CENTRAL BUSINESS DISRTICT
THESIS REPORT ON CENTRAL BUSINESS DISRTICTMokshika Balana
 
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREPREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREShivangi Saini
 
Raj Rewal Asian games village case study
Raj Rewal Asian games village case studyRaj Rewal Asian games village case study
Raj Rewal Asian games village case studyRadhikaJadhav8
 
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Sumaiya Islam
 
Contemporary Architecture (1950-1960) Indian Context
Contemporary Architecture (1950-1960) Indian ContextContemporary Architecture (1950-1960) Indian Context
Contemporary Architecture (1950-1960) Indian ContextRizwan ul Abidin
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case studySimi Sayed
 
British council,Charles Correa- Case study
British council,Charles Correa- Case studyBritish council,Charles Correa- Case study
British council,Charles Correa- Case studyShruthiE4
 
Chandigarh City Planning
Chandigarh City Planning Chandigarh City Planning
Chandigarh City Planning SandeEp VeRma
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case studyARYAN GUPTA
 
Role of Indian Institute of Architects as a professional body in India
Role of Indian Institute of Architects as a professional body in IndiaRole of Indian Institute of Architects as a professional body in India
Role of Indian Institute of Architects as a professional body in IndiaKrittika Walia
 
Architectural case study of Apartments
Architectural case study of ApartmentsArchitectural case study of Apartments
Architectural case study of ApartmentsTanzil Faraz
 
Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadOnal Kothari
 
India habitat centre observations by architect student
India habitat centre observations by architect studentIndia habitat centre observations by architect student
India habitat centre observations by architect studentShailja km
 
Parking System analysis
Parking System analysisParking System analysis
Parking System analysisKaiserin Tania
 
Amanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case StudyAmanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case StudyAjinkya Randive
 

Was ist angesagt? (20)

Site Planning and Design Principles - اساسيات تخطيط وتصميم المواقع
Site Planning and Design Principles - اساسيات تخطيط وتصميم المواقعSite Planning and Design Principles - اساسيات تخطيط وتصميم المواقع
Site Planning and Design Principles - اساسيات تخطيط وتصميم المواقع
 
F.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsF.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye Laws
 
THESIS REPORT ON CENTRAL BUSINESS DISRTICT
THESIS REPORT ON CENTRAL BUSINESS DISRTICTTHESIS REPORT ON CENTRAL BUSINESS DISRTICT
THESIS REPORT ON CENTRAL BUSINESS DISRTICT
 
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREPREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
 
Raj Rewal Asian games village case study
Raj Rewal Asian games village case studyRaj Rewal Asian games village case study
Raj Rewal Asian games village case study
 
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
 
Contemporary Architecture (1950-1960) Indian Context
Contemporary Architecture (1950-1960) Indian ContextContemporary Architecture (1950-1960) Indian Context
Contemporary Architecture (1950-1960) Indian Context
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
 
British council,Charles Correa- Case study
British council,Charles Correa- Case studyBritish council,Charles Correa- Case study
British council,Charles Correa- Case study
 
Literature ; shopping mall
Literature ; shopping mallLiterature ; shopping mall
Literature ; shopping mall
 
Chandigarh City Planning
Chandigarh City Planning Chandigarh City Planning
Chandigarh City Planning
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
Role of Indian Institute of Architects as a professional body in India
Role of Indian Institute of Architects as a professional body in IndiaRole of Indian Institute of Architects as a professional body in India
Role of Indian Institute of Architects as a professional body in India
 
Architectural case study of Apartments
Architectural case study of ApartmentsArchitectural case study of Apartments
Architectural case study of Apartments
 
Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM Ahemdabad
 
The interlace singapore
The interlace singaporeThe interlace singapore
The interlace singapore
 
India habitat centre observations by architect student
India habitat centre observations by architect studentIndia habitat centre observations by architect student
India habitat centre observations by architect student
 
FRENCH INFLUENCE IN PONDICHERRY
FRENCH INFLUENCE IN PONDICHERRYFRENCH INFLUENCE IN PONDICHERRY
FRENCH INFLUENCE IN PONDICHERRY
 
Parking System analysis
Parking System analysisParking System analysis
Parking System analysis
 
Amanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case StudyAmanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case Study
 

Andere mochten auch

Building codes and byelaws for duplex house
Building codes and byelaws for duplex houseBuilding codes and byelaws for duplex house
Building codes and byelaws for duplex houseChaitanya Korra
 
Building bye laws
Building bye lawsBuilding bye laws
Building bye lawsZaid Ansari
 
Building Bye Laws by Mukesh Mittal
Building Bye Laws by Mukesh MittalBuilding Bye Laws by Mukesh Mittal
Building Bye Laws by Mukesh MittalMukesh Mittal
 
Architecture Thesis Recreation center
Architecture Thesis Recreation centerArchitecture Thesis Recreation center
Architecture Thesis Recreation centerRohit Digra
 
Outdoor recreational activities
Outdoor recreational activitiesOutdoor recreational activities
Outdoor recreational activitiesjayson bagaoi
 
Indoor Recreational Activities
Indoor Recreational ActivitiesIndoor Recreational Activities
Indoor Recreational ActivitiesMariyah Ayoniv
 
Building bye laws CIVIL ENGINEERING DRAWING
Building bye laws CIVIL ENGINEERING DRAWINGBuilding bye laws CIVIL ENGINEERING DRAWING
Building bye laws CIVIL ENGINEERING DRAWINGjay231287
 
Recreational Activities
Recreational ActivitiesRecreational Activities
Recreational ActivitiesRodel Sinamban
 
national builiding codes
national builiding codesnational builiding codes
national builiding codesShourya Puri
 
Recreational activities...
Recreational activities...Recreational activities...
Recreational activities...April Centes
 

Andere mochten auch (13)

Building codes and byelaws for duplex house
Building codes and byelaws for duplex houseBuilding codes and byelaws for duplex house
Building codes and byelaws for duplex house
 
Bye laws
Bye lawsBye laws
Bye laws
 
Building bye laws
Building bye lawsBuilding bye laws
Building bye laws
 
Building Bye Laws by Mukesh Mittal
Building Bye Laws by Mukesh MittalBuilding Bye Laws by Mukesh Mittal
Building Bye Laws by Mukesh Mittal
 
WHY BUILDING BYELAW VIOLATIONS?
WHY BUILDING BYELAW VIOLATIONS?WHY BUILDING BYELAW VIOLATIONS?
WHY BUILDING BYELAW VIOLATIONS?
 
Climate of delhi
Climate of delhi   Climate of delhi
Climate of delhi
 
Architecture Thesis Recreation center
Architecture Thesis Recreation centerArchitecture Thesis Recreation center
Architecture Thesis Recreation center
 
Outdoor recreational activities
Outdoor recreational activitiesOutdoor recreational activities
Outdoor recreational activities
 
Indoor Recreational Activities
Indoor Recreational ActivitiesIndoor Recreational Activities
Indoor Recreational Activities
 
Building bye laws CIVIL ENGINEERING DRAWING
Building bye laws CIVIL ENGINEERING DRAWINGBuilding bye laws CIVIL ENGINEERING DRAWING
Building bye laws CIVIL ENGINEERING DRAWING
 
Recreational Activities
Recreational ActivitiesRecreational Activities
Recreational Activities
 
national builiding codes
national builiding codesnational builiding codes
national builiding codes
 
Recreational activities...
Recreational activities...Recreational activities...
Recreational activities...
 

Ähnlich wie DDA Building Bylaws Guide

Building permit 2
Building permit 2Building permit 2
Building permit 2Lumbad 1989
 
Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...
Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...
Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...Fairfax County
 
Ontario's Building Regulations for Designers
Ontario's Building Regulations for DesignersOntario's Building Regulations for Designers
Ontario's Building Regulations for DesignersAnthony Boyko
 
Design approval procedure
Design approval procedureDesign approval procedure
Design approval procedureIqbál Ãzàm
 
Realtor power point presentation long as of 060412
Realtor power point presentation long as of 060412Realtor power point presentation long as of 060412
Realtor power point presentation long as of 060412TJRWORKS
 
Realtor power point presentation long as of 060412
Realtor power point presentation long as of 060412Realtor power point presentation long as of 060412
Realtor power point presentation long as of 060412TJRWORKS
 
Manufactured Housing Ordinance
Manufactured Housing OrdinanceManufactured Housing Ordinance
Manufactured Housing Ordinancegscplanning
 
City of Salina Brochure-Finishing Your Basement
City of Salina Brochure-Finishing Your BasementCity of Salina Brochure-Finishing Your Basement
City of Salina Brochure-Finishing Your BasementCity of Salina
 
City of Salina Brochure-Finishing Your Basement
City of Salina Brochure-Finishing Your Basement City of Salina Brochure-Finishing Your Basement
City of Salina Brochure-Finishing Your Basement City of Salina
 
Item # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge OvalItem # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge Ovalahcitycouncil
 
zMOD: Proposed Minor Modification Amendment
zMOD: Proposed Minor Modification AmendmentzMOD: Proposed Minor Modification Amendment
zMOD: Proposed Minor Modification AmendmentFairfax County
 
Item # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance ReviewItem # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance Reviewahcitycouncil
 
Coffer dams 01
Coffer dams 01Coffer dams 01
Coffer dams 01juwes
 
Item #s 3.4 - Contractor Compliance Regulations
Item #s 3.4 - Contractor Compliance RegulationsItem #s 3.4 - Contractor Compliance Regulations
Item #s 3.4 - Contractor Compliance Regulationsahcitycouncil
 
Item # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. ReviewItem # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. Reviewahcitycouncil
 
MINI TEST- MARIETTE ROSE 201109044.pptx
MINI TEST- MARIETTE ROSE 201109044.pptxMINI TEST- MARIETTE ROSE 201109044.pptx
MINI TEST- MARIETTE ROSE 201109044.pptxMarietteGeorge2
 
Basement finish package
Basement finish packageBasement finish package
Basement finish packageStan Perlinski
 

Ähnlich wie DDA Building Bylaws Guide (20)

Building permit 2
Building permit 2Building permit 2
Building permit 2
 
Building code2
Building code2Building code2
Building code2
 
Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...
Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...
Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...
 
Ontario's Building Regulations for Designers
Ontario's Building Regulations for DesignersOntario's Building Regulations for Designers
Ontario's Building Regulations for Designers
 
Design approval procedure
Design approval procedureDesign approval procedure
Design approval procedure
 
Realtor power point presentation long as of 060412
Realtor power point presentation long as of 060412Realtor power point presentation long as of 060412
Realtor power point presentation long as of 060412
 
Realtor power point presentation long as of 060412
Realtor power point presentation long as of 060412Realtor power point presentation long as of 060412
Realtor power point presentation long as of 060412
 
Manufactured Housing Ordinance
Manufactured Housing OrdinanceManufactured Housing Ordinance
Manufactured Housing Ordinance
 
City of Salina Brochure-Finishing Your Basement
City of Salina Brochure-Finishing Your BasementCity of Salina Brochure-Finishing Your Basement
City of Salina Brochure-Finishing Your Basement
 
City of Salina Brochure-Finishing Your Basement
City of Salina Brochure-Finishing Your Basement City of Salina Brochure-Finishing Your Basement
City of Salina Brochure-Finishing Your Basement
 
Item # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge OvalItem # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge Oval
 
zMOD: Proposed Minor Modification Amendment
zMOD: Proposed Minor Modification AmendmentzMOD: Proposed Minor Modification Amendment
zMOD: Proposed Minor Modification Amendment
 
Permits
PermitsPermits
Permits
 
Permits
PermitsPermits
Permits
 
Item # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance ReviewItem # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance Review
 
Coffer dams 01
Coffer dams 01Coffer dams 01
Coffer dams 01
 
Item #s 3.4 - Contractor Compliance Regulations
Item #s 3.4 - Contractor Compliance RegulationsItem #s 3.4 - Contractor Compliance Regulations
Item #s 3.4 - Contractor Compliance Regulations
 
Item # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. ReviewItem # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. Review
 
MINI TEST- MARIETTE ROSE 201109044.pptx
MINI TEST- MARIETTE ROSE 201109044.pptxMINI TEST- MARIETTE ROSE 201109044.pptx
MINI TEST- MARIETTE ROSE 201109044.pptx
 
Basement finish package
Basement finish packageBasement finish package
Basement finish package
 

Mehr von Ar. Md Shahroz Alam

Fire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptx
Fire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptxFire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptx
Fire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptxAr. Md Shahroz Alam
 
Plastics: An Economical Synthesis of Aesthetics and Function
Plastics: An Economical Synthesis of Aesthetics and FunctionPlastics: An Economical Synthesis of Aesthetics and Function
Plastics: An Economical Synthesis of Aesthetics and FunctionAr. Md Shahroz Alam
 
Urban Areas: Policy, Planning and Zoning Recommendations
Urban Areas: Policy, Planning and Zoning RecommendationsUrban Areas: Policy, Planning and Zoning Recommendations
Urban Areas: Policy, Planning and Zoning RecommendationsAr. Md Shahroz Alam
 
Architectural Bye-Laws For Hotels
Architectural Bye-Laws For HotelsArchitectural Bye-Laws For Hotels
Architectural Bye-Laws For HotelsAr. Md Shahroz Alam
 
Punjab Bye Laws For Commercial Buildings
Punjab Bye Laws For Commercial BuildingsPunjab Bye Laws For Commercial Buildings
Punjab Bye Laws For Commercial BuildingsAr. Md Shahroz Alam
 
General Terms, Conditions & Application Format For Project Approval At Projec...
General Terms, Conditions & Application Format For Project Approval At Projec...General Terms, Conditions & Application Format For Project Approval At Projec...
General Terms, Conditions & Application Format For Project Approval At Projec...Ar. Md Shahroz Alam
 
Guidelines For Approval Of Guest Houses
Guidelines For Approval Of Guest HousesGuidelines For Approval Of Guest Houses
Guidelines For Approval Of Guest HousesAr. Md Shahroz Alam
 
Delhi Development Authority Notification 2011 related to Architectural Buildi...
Delhi Development Authority Notification 2011 related to Architectural Buildi...Delhi Development Authority Notification 2011 related to Architectural Buildi...
Delhi Development Authority Notification 2011 related to Architectural Buildi...Ar. Md Shahroz Alam
 
Architectural Level Risk Analysis for UML Dynamic Specification
Architectural Level Risk Analysis for UML Dynamic SpecificationArchitectural Level Risk Analysis for UML Dynamic Specification
Architectural Level Risk Analysis for UML Dynamic SpecificationAr. Md Shahroz Alam
 
Soundproofing Door - Installation Instruction
Soundproofing Door - Installation InstructionSoundproofing Door - Installation Instruction
Soundproofing Door - Installation InstructionAr. Md Shahroz Alam
 
Soundproof Interior & Exterior Doors
Soundproof Interior & Exterior DoorsSoundproof Interior & Exterior Doors
Soundproof Interior & Exterior DoorsAr. Md Shahroz Alam
 
Soundproof Interior & Exterior Doors
Soundproof Interior & Exterior DoorsSoundproof Interior & Exterior Doors
Soundproof Interior & Exterior DoorsAr. Md Shahroz Alam
 

Mehr von Ar. Md Shahroz Alam (20)

Fire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptx
Fire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptxFire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptx
Fire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptx
 
Plastics: An Economical Synthesis of Aesthetics and Function
Plastics: An Economical Synthesis of Aesthetics and FunctionPlastics: An Economical Synthesis of Aesthetics and Function
Plastics: An Economical Synthesis of Aesthetics and Function
 
Urban Areas: Policy, Planning and Zoning Recommendations
Urban Areas: Policy, Planning and Zoning RecommendationsUrban Areas: Policy, Planning and Zoning Recommendations
Urban Areas: Policy, Planning and Zoning Recommendations
 
Architectural Bye-Laws For Hotels
Architectural Bye-Laws For HotelsArchitectural Bye-Laws For Hotels
Architectural Bye-Laws For Hotels
 
Punjab Bye Laws For Commercial Buildings
Punjab Bye Laws For Commercial BuildingsPunjab Bye Laws For Commercial Buildings
Punjab Bye Laws For Commercial Buildings
 
5 Star Hotel Project
5 Star Hotel Project5 Star Hotel Project
5 Star Hotel Project
 
Origins of the term Hotel
Origins of the term HotelOrigins of the term Hotel
Origins of the term Hotel
 
General Terms, Conditions & Application Format For Project Approval At Projec...
General Terms, Conditions & Application Format For Project Approval At Projec...General Terms, Conditions & Application Format For Project Approval At Projec...
General Terms, Conditions & Application Format For Project Approval At Projec...
 
Guidelines For Approval Of Guest Houses
Guidelines For Approval Of Guest HousesGuidelines For Approval Of Guest Houses
Guidelines For Approval Of Guest Houses
 
Group Housing Bye Laws
Group Housing Bye LawsGroup Housing Bye Laws
Group Housing Bye Laws
 
Delhi Development Authority Notification 2011 related to Architectural Buildi...
Delhi Development Authority Notification 2011 related to Architectural Buildi...Delhi Development Authority Notification 2011 related to Architectural Buildi...
Delhi Development Authority Notification 2011 related to Architectural Buildi...
 
Architectural Level Risk Analysis for UML Dynamic Specification
Architectural Level Risk Analysis for UML Dynamic SpecificationArchitectural Level Risk Analysis for UML Dynamic Specification
Architectural Level Risk Analysis for UML Dynamic Specification
 
Soundproofing Door - Installation Instruction
Soundproofing Door - Installation InstructionSoundproofing Door - Installation Instruction
Soundproofing Door - Installation Instruction
 
Soundproof Interior Doors
Soundproof Interior DoorsSoundproof Interior Doors
Soundproof Interior Doors
 
Soundproof Interior & Exterior Doors
Soundproof Interior & Exterior DoorsSoundproof Interior & Exterior Doors
Soundproof Interior & Exterior Doors
 
Soundproof Interior Doors
Soundproof Interior DoorsSoundproof Interior Doors
Soundproof Interior Doors
 
Sectional Steel Door Systems
Sectional Steel Door SystemsSectional Steel Door Systems
Sectional Steel Door Systems
 
Door Seal
Door SealDoor Seal
Door Seal
 
Soundproof Interior & Exterior Doors
Soundproof Interior & Exterior DoorsSoundproof Interior & Exterior Doors
Soundproof Interior & Exterior Doors
 
IsoDamp Soundproofing System
IsoDamp Soundproofing SystemIsoDamp Soundproofing System
IsoDamp Soundproofing System
 

DDA Building Bylaws Guide

  • 1. Architectural Building Bylaws of Delhi Posted by Shahroz Alam DDAs Building Bylaws Download link: MSWORD Addition(s) Alteration(s) Allowed in DDA Flats The Ministry of Urban Development and Poverty Alleviation, Government ofIndia has allowed certain addition(s)/alteration(s) in DDA flats. These areapplicable to all flats built and allotted by DDA irrespective of whether these arelocated in notified and denotified areas. The addition/alteration(s) allowed are categorized in three categories: Condonable: These are minor addition /alteration(s)which do not require structural changes and can be carried out by the owner(s) without any prior intimation/permission of DDA/MCD. Permitted with intimation/permission: These addition(s) / alteration(s) are of major nature which may require structural changes, changes in the service lines and additional coverage. Additional coverage permitted with prior permission. The details of all the categories of addition / alterations which have been approved by Ministry of Urban Development & Poverty Alleviation by various orders by various orders are given below: Condonable Items: * To convert existing barsati into room provided the wall is made of only 115 mm thick. * Grills and glazing in verandah with proper fixing arrangement. * Raising height of front and rear courtyard wall upto 7′ height by putting up jali/fencing. * Providing door in courtyard wherever not provided.
  • 2. * Providing sunshades on doors and windows wherever not provided with proper fixing arrangements. * Closing the door. * If the bathroom or WC are not having roof, these may be treated as open urinals and allowed. 8. Raising the wall of balcony/terrace parapet with grill or glazing upto 5′ height. * Construction of open staircase (cat ladder) where no staircase has been provided for approach to the terrace. * To put provide additional PVC water tank at ground floor area without disturbing the common passage. * To provide an additional PVC water tank in the scooter/car garage at the surface level. * To provide loft /shelf in the rooms without chase in the walls. * To change the flooring with water proofing treatment. * To remove half (41/2) brick wall. * To make a ramp at front gate without disturbing the common passage /storm water drain. * To provide sunshades or the outer windows upto 2′wide projection. * To provide false ceiling in rooms. * To make an opening of maximum size of 2′6″ x1′9″ for exhaust fan or air- conditioner in existing walls. * Fixing of door in back and front courtyard. * Converting of window into Almirah subject to availability of light and ventilation as per building byelaws provided that no structural elements are disturbed and there is no projection extending beyond the external wall. * Shifting of water storage tank/raising of parapet wall upto 5′ height and putting additional water storage tank. Wherever the existing water storage tank capacity is less than 500 ltrs in a flat, a 500 ltrs tank can either replace the existing water storage
  • 3. tank or if possible the additional tank can be added so as to make the total storage capacity upto 550 ltrs. However, such replacement/provision of additional tank will be done only on the locations specified for such tanks and the supporting beams will be required to be strengthened suitably. Parapet wall around terrace can be increased to a height of 5′. * To shift the front glazing, rooms/windows upto existing chajja. Addition/Alteration(s) Permitted With Prior Intimation / Permission: Following addition(s) / alteration(s) can be carried out with prior intimation/permission of the concerned agency i.e. DDA/MCD as per the prescribed procedure: * Interchange the position of kitchen,bathroom & WC with proper connectionssubject to structure safety. To carryout this interchange, all the allottees of one vertical stack will have to apply jointly to the concerned agency. * Construction of bath room and WC in the rear courtyard. * Covering of open terrace with sloping roofs upto 9′ height with light weight material e.g. fibre glass / AC sheets / GI sheets with pipes and standard angle iron section etc. and enclosing with glazing. * Removal of original structure and reconstruction with due permission in the case of single storeyed built up flats only subject to the satisfaction of building bye-laws and prior approval of the local authority. Additional Coverage Permitted With Prior Permission: * Covering of courtyard and floor level terraces is allowed subject to fulfillment of building byelaws and structural safety. In three or four storeyed flats the owners at upper floor shall have the right to cover the area available as a result of coverage of courtyard /terrace of floor below. In such cases the residents of DDA flats in a vertical stack served by the same staircase should give their consent and jointly apply for permission. * In two storeyed flats the allottee at first floor wil have no right of construction above the courtyard built by ground floor allottee. The upper floor allottee of two storeyed flat can use the roof terrace for extra coverage as permissible. * A barsati on the roof terrace of the top floor in addition to mumty is allowed. This barsati should preferably be adjoining to the mumty and equivalent to the size of the room below so that construction of wall over is ensured at terrace level. This will be subject to the provision of access to the residents of the block for maintenance of
  • 4. water tank, plumbing system,fixing of TV/Cable antennas etc. All the addition/alteration(s) and additional coverage will be governed by 5 basic principals: * There is no encroachment on the public land. * Structural stability of the building is ensured. * Light and ventilation of the habitable rooms is ensured as per the building byelaws. * There is no infringement of other’s rights. * The service elements such as manhole, rainwater fittings, sanitary fittings etc. are not disturbed and remain exposed for periodical inspection and maintenance. The owner(s) will be allowed to cover additional space with prior permission of the concerned agency i.e DDA/MCD as per the prescribed procedure. The existing additional covered area and addition(s)/alteration(s) can also be get regularized by the owner(s) of DDA flats if the same are within the prescribed norms following the same procedure. Procedure of Permission. * Additions/alterations in DDA flats in the Development Areas of the DDA shall be permitted by DDA and in other areas by MCD. * An Architect registered with Council of Architecture under Architects Act 1972 shall have the authority to certify plans for their correctness regarding original construction as well as proposals being in conformity with building byelaws and to the guidelines of addition (s) /alteration(s). Once the plans with all the documents certified by the Architect, structural Engineer and fee are submitted to DDA/MCD, these will be taken on record and treated as permitted. * The person(s) who has / have already carried out or intend to make addition(s)/ alteration(s) in the flat(s), shall intimate in writing in the prescribed form and such intimation shall be accompanied alongwith the documents as given in Para 3. The form is to be filled up and jointly certified by the owner(s) and Registered Architect which contains the statement of the proposal and amount deposited. The proposal with all requisite information/documents and certification shall be accepted by DDA/MCD and one coy of the proposal will be certified /stamped and returned to the applicant. Incomplete proposal shall not be accepted. * In cases where permission is required for interchanging the position of kitchen, bathroom & WC or for additional coverage in courtyard and terraces, all the owner(s) of one vertical block will jointly submit the proposal to DDA/MCD. In case, where all the owner(s) of one vertical block are not interested to carry out the addition/
  • 5. alteration but one or two of them are interested, they will have to obtain no Objection Certificate from the remaining owner(s). * The Architect(s) may draw the original plan of the flat(s) by measurements and satisfy themselves about their correctness. If need be, they can obtain a certified copy of original plan of the flat from Housing and Urban Projects Wing, DDA on prescribed payment. Building Plan Fee And Additional Floor Area Charges A building plan fee of Rs. 200/- will be charged for processing the plans irrespective of covered area involved. In addition to this, a charge of Rs. 450/- per sqm. Will be levied for additional covered area proposed to be constructed. The rate of Rs. 450/- per sqm. is in accordance with the rate given by the Ministry vide order dated 25.09.1998 (Annexure -E) for additional FAR in group housing pockets. Provision of Test Check DDA/MCD reserves the right to test check the proposal / completion submitted to it and in case it is found that the proposal / completion is not in conformity with building bye-laws / given guidelines for addition(s)/alteration(s) in DDA flats, the permission will be revoked and action will be taken against the Architect as per Rules and Regulations, and the construction which is not in conformity with building bye-laws and guidelines will be removed as per provisions of Delhi Development Act/ DMC Act. Documents to be Submitted. * Application form in prescribed proforma. * 4 (four) Registered with Council of Architecture under the Architects Act 1972 indicating his / her name, address, telephone number, clearly showing original construction in blue colour and proposed construction/construction to be regularized in red colour at a scale not less than 1: 100. * Certificate of supervision by Architect and structural Engineer alongwith a copy of their valid registration and qualification certificate. * Certificate of supervision by Plumber if changes in wet areas i.e. kitchen,bath,WC/Toilet are proposed or the services are being affected in any way alongwith copy of valid registration certificate of Plumber. * Proof of ownership documents: Lease deed / conveyance deed shall be taken as documents for the proof of ownership. Registered sale deed or general Power of Attorney /Agreement to sale shall be accepted as the proof of ownership only after the property has been converted into freehold by DDA. This will also be required from the owner(s) who have given NOC only. * Certificate by owner(s) and structural Engineer for safety from natural hazard as per the proforma prescribed by Ministry.
  • 6. * Indemnity Bond for structural stability on a non-judicial stamp paper of Rs. 100/- duly attested by 1st Class Magistrate/Notary Public. This Indemnity Bond will have to be given individually by all the owners of the vertical stack of flats. This will not be required from those owner(s) who have given NOC only. The above bylaws have been obtained from Govt. of NCT of Delhi website.