SlideShare ist ein Scribd-Unternehmen logo
1 von 8
Downloaden Sie, um offline zu lesen
We specilize in reducing the energy consumption of

            Industrial and Commercial Facilites
  Energy costs and demand are on the rise, Pepco Energy Solutions is here to lend a helping hand.
Through the installation of our technologies we can produce savings that average from 10%-20% off
                     of your energy bills reducing your facilities operating costs.


 Pepco Solutions is not a power management firm, we utilize passive technologies that reduce the
       kWh consumption of our clients facilities while their electrical loads are in operation.



                      www.pepcosolutions.com
Pepco Solutions
        We are here to dramatically reduce your facilities operating and maintenance costs.




We save you money!
Utilizing proven technologies, Pepco Solutions is able to reduce your facilities electrical bills by an average of
10%-20%!

We design and install custom energy conservation systems proven to:
•   Reduce electrical energy consumption
•   Decrease greenhouse gas emissions
•   Improve power quality, power factor and voltage
•   Increase electrical system capacity
•   Reduce unnecessary heat
•   Improve cooling capacity of air conditioning and refrigeration
•   Lengthen lives of motors, lights, air conditioning and refrigeration


Our savings percentages are backed by a third party insurance company!
After Pepco solutions has had the opportunity to move forward with an Energy Study and Project Engineering
on your facility, we will establish a base minimum guaranteed savings percentage; this savings percentage is
then backed by a third party insurance company, which is currently The Lloyds of London Insurance Co.




                                                       Page 2
Pepco Solutions Leadership
  President: Jim Pepin
  Jim’s main focus as President is Field Operations. With the industry skills, that he brings to the
  table, Jim is able to quickly identify cost effective solutions for our clients not only from a field
  and installation standpoint, but from a product knowledge standpoint as well.




  Background:
  Jim has worked as a project manager in construction
  and land development for 18 years with experience
  working with engineers, contractors and governing
  agencies to improve infrastructure in Central Ohio. With
  present day challenges for companies to operate at the
  highest level of efficiency, Jim has teamed up with
  Energy Automation Systems, Inc. with the vision of
  helping businesses reduce operating costs and improve
  their overall profitability through electrical efficiency.



  Executive Vice President: Scott Graham, CSI
  Scott is responsible for business development, sales, marketing as well as sales force
  development. His background in the industrial and commercial construction industry coupled
  with his sales and teaching experience enables him to reach out to organizations that can
  benefit from Pepco Solutions assistance.




  Background
  Scott has been employed in architecture, engineering
  and construction for over ten years. He spent four of the
  ten years building commercial and industrial facilities
  nationally and most recently managing the electrical
  construction in power generation facilities nation-
  wide. He recently resigned from teaching construction
  management at a college local to Columbus, Ohio and
  served on The Board of Directors for The Construction Specifications
  Institute of Columbus Ohio. Scott is determined and anxious to educate
  companies on how Pepco Solutions can reduce their operating costs
  through the installation of our energy saving technologies.


                                   Page 3
Reduce Maintenance Costs / Increase the Life of Your Equipment
Industrial equipment, motors, lighting, and many other electrical devices rely on electricity to operate; however poor electric
quality can be damaging to these types of equipment as well. Through the installation of our systems we are able to reduce
the maintenance on and prolong the life of your electrical equipment, motors, lighting and much more.



Previous EASI System Installation Results
Tepro Molding Plant (Tennessee)                          Tempur-Pedic (Virginia)
Minimum Guaranteed savings at 11.29%                     Minimum Guaranteed savings at 15.2%

Actual Savings averages 33.7%                            Actual Savings averages 20.6%

Cost of installation recouped in 8 months.               Also eliminated motor failure through improved power quality.



Pepsi Cola Bottling Plant (Maryland)                     British Aerospace (Tennessee)
Minimum Guaranteed savings at 13.46%                     Minimum Guaranteed savings at 13.60%

Actual Savings averages 14.65%                           Actual Savings averages 15.2%

                                                         Installed 12,800 pieces of equipment in a 5000 acre facility.




                                                                                                                          Page 4
Pepco Solution’s state of the art money and energy saving technologies
Located below are just a few of the state of the art technologies manufactured bin Nashville Tennessee that we at
               Pepco Solutions may suggest to install in your facility to reduce kilowatt hour consumption.




Easiliner                                                            EuroLiner
Motorized pieces of equipment are historically inefficient users     The EuroLiner provides predictable lighting cost
of electricity. Unnecessarily high electrical bills and              savings with either electronic ballast fluorescent or HID
maintenance costs result from the conversion of the reactive         lighting. Designed for use on circuits where measured
current. The EasiLiner provides the benefits of reactive power       load amperage is less than 20 amperes at any voltage
correction while virtually eliminating the risks associated with     from 100V to 347V, the EuroLiner modernizes your
traditional correction methods. Increased motor functionality        lighting equipment and air conditioning by lessening
means lower energy costs from reduced current draw.                  the heat load added by your lights.




PowerLiner                                                           Multiliner
EASI’s PowerLiner meets the need to reduce energy costs              The MultiLiner is EASI’s product solution for gaining
associated with nonlinear electrical equipment. By canceling a       cost-effective savings on groups of loads unpredictably
portion of the harmonic current normally drawn by such loads,        used, or that switch on and off in irregular patterns.This
the PowerLiner reduces kilowatt-hour consumption and can             energy cost-saving solution requires no user
alleviate many problems associated with harmful harmonics.           adjustment and lowers energy costs by extending the
                                                                     life of motors and equipment, improving facility volt-
                                                                     age and increasing electrical capacity.




IllumiLiner                                                          LVR
The IllumiLiner units are entirely solid-state with                  EASI’s Lighting Voltage Regulator (LVR) reduces the
microprocessors that continually monitor and modify the AC           energy used in industrial lighting systems, allowing
sine wave. The IllumiLiner controls entire lighting circuits from    them to run cooler and longer with small reduction
the lighting panel, providing circuit-by-circuit flexibility and     of lighting levels. It provides you with an energy cost
generally a high return on investment. The ventilated cabinet is     savings ofbetween 15 and 30%. Compatible with most
made of sturdy, heavy gauge metal with a mar-resistant, epoxy        modern magnetic ballasts found in fluorescent, high
finish to withstand industrial environments. The IllumiLiner         intensity, and all types of incandescent lighting fixtures,
improves the lighting performance and provides for control-          the LVR can control many types of lighting products
lable illumination distribution.                                     without changing internal jumpers or switch settings.
                                                            Page 5
THE PEPCO SOLUTIONS PROCESS
                        FROM FIRST CONTACT TO PROJECT COMPLETION

Step 1: Initial Technology Demonstration and Presentation
In this initial step Pepco Solutions introduces you to our technologies, we like to
discuss your facilities power usage and average monthly energy costs. One or more of
our well qualified representatives will be present during this visit to educate you on
how our power saving systems operate.




                                            Step 2: Facility Walkthrough
                                            This step enables Pepco Solutions to learn more about your facilities unique needs, Pepco
                                            Solutions will conduct a walkthrough of your facility with the person who best understands
                                            its electrical system. During the walkthrough, our representative gathers information about:

                                            •      Electrical system
                                            •      Equipment operations
                                            •      Electrical billing issues and history
                                            •      Power quality challenges
                                            •      Electrical maintenance challenges


                                                (Note: Pepco Solutions will need 12 months electrical billing history in-order to proceed to Step 3)




Step 3: Energy Study Proposal
Pepco Solutions hand delivers an energy study proposal to you and explains our
planned approach at saving your facility money and energy.

In a written statement we will tell you:
•    A minimum guaranteed power cost savings.
•    The charges for performing the energy study and project design.
•    Your estimated return on investment.

(Note: The cost of the Energy Study will be credited towards the cost of installation.)




                                                Step 4: Energy Study
                                                The energy study step involves the documentation of each and every electrical load in
                                                your facility, a team of experienced electricians along with a Pepco Solutions Site
                                                Superintendent will be present on-site to retrieve this information from your facilities
                                                electrical devices. As soon as Pepco Solutions has completed gathering all of the data we
                                                are in need of, Pepco Solutions immediately begins the project design/engineering phase.
                                                The size and number of your facilities dictate the amount of time we spend on this step.




                                                                  Page 6
Step 5: Installation Proposal
                                           Engineering is complete, we now have a minimum guaranteed savings and rate of
                                           return on your investment established due to our energy study and project design/
                                           engineering. Your Pepco Solutions representative returns to you with a well planned
                                           out construction time line, scope of work and proposal. The information included also
                                           emcompases a detailed list of technology to be installed in your facility and
                                           information regarding the positive environmental impact this project will have.

                                           (Note: Please feel free to ask for a sample installation proposal.)




Step 6: Equipment Installation
We execute our carefully designed installation plan for electrical system improvements
and adjustments that are specifically engineered for the power conservation needs of
your facility(s):

•   The addition and installation of power conservation technologies to the electric
    devices/motors targeted from our in-depth energy study.

•   A precise round of maintenance and upgrade work to your lighting systems that
    may include retrofitting, harmonics correction, or ballast or even whole fixture
    replacement.




                                        Step 7: Measurement and Verification
                                        ”Before” and “after” data will be captured as the system is being installed. A Pepco
                                        Solutions representative follows up regularly to verify the savings and make sure you are
                                        satisfied with the results. We measure and verify a system’s performance using methods
                                        in compliance with the International Performance Measurement and Verification
                                        Protocol (IPMVP).

                                        (Note: The IPMVP was established by a network of energy professional and organizations
                                        from more than 25 countries to standardize the methods by which energy conservation
                                        projects are measured and verified.)




Secondary Installation Benefits:
•   Elimination of power factor penalties
•   Lower KVA or KVAR penalties
•   Improved voltage
•   Increased capacity of electrical system: 5%-15%, in some cases 20%
•   Cooler panels, wiring and circuit breakers
•   Increased power factor (efficiency of your electricity)
•   Reduced fire and arc flash hazard
•   Power conditioning (Reduced harmonics, fluctuations and other interference on your power lines)
•   More cooling capacity from A/C.
•   More cooling capacity from refrigeration.
•   Less heat to be removed by A/C.
•   Reduced downtime on equipment & production.
•   Lower labor cost because of reduced maintenance.
                                                            Page 7
Pepco Solutions, LLC.
10898 Snyder Church Road
  Baltimore, Ohio 43105
  Phone: (614) 593-2868
   Fax (614) 416-0550
www.pepcosolutions.com


 © Pepco Solutions, LLC. 2009-2010

Weitere ähnliche Inhalte

Was ist angesagt?

Ambicales Solar Profile
Ambicales Solar ProfileAmbicales Solar Profile
Ambicales Solar ProfileAmbicales
 
HPB Presentation DFS 11 Sep 12
HPB Presentation DFS 11 Sep 12HPB Presentation DFS 11 Sep 12
HPB Presentation DFS 11 Sep 12agreengarrett
 
Emcs overview v0.4
Emcs overview v0.4Emcs overview v0.4
Emcs overview v0.4sanjaya1984
 
Reducing Energy Consumption from the Core to the Edge: The JouleX and Cisco E...
Reducing Energy Consumption from the Core to the Edge: The JouleX and Cisco E...Reducing Energy Consumption from the Core to the Edge: The JouleX and Cisco E...
Reducing Energy Consumption from the Core to the Edge: The JouleX and Cisco E...JouleX
 
Light Control Solutions for Daylit Spaces
Light Control Solutions for Daylit SpacesLight Control Solutions for Daylit Spaces
Light Control Solutions for Daylit Spacesmichaeljmack
 
Covis Sdn bhd_Company Profile 2016
Covis Sdn bhd_Company Profile 2016Covis Sdn bhd_Company Profile 2016
Covis Sdn bhd_Company Profile 2016Miss Nurul Hidayah
 
Improved efficiency & reliability for servers using immersion cooling technology
Improved efficiency & reliability for servers using immersion cooling technologyImproved efficiency & reliability for servers using immersion cooling technology
Improved efficiency & reliability for servers using immersion cooling technologyASQ Reliability Division
 
Ener Noc Manufacturing Spotlight
Ener Noc Manufacturing SpotlightEner Noc Manufacturing Spotlight
Ener Noc Manufacturing SpotlightDavid
 
Benchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data CenterBenchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data CenterAFCOM
 
[Case study] Green Mountain Power: Reducing the duration of outages
[Case study] Green Mountain Power: Reducing the duration of outages[Case study] Green Mountain Power: Reducing the duration of outages
[Case study] Green Mountain Power: Reducing the duration of outagesSchneider Electric
 
[Case study] Maine Fiber: Smart Grid solution offers precise GIS capabilities...
[Case study] Maine Fiber: Smart Grid solution offers precise GIS capabilities...[Case study] Maine Fiber: Smart Grid solution offers precise GIS capabilities...
[Case study] Maine Fiber: Smart Grid solution offers precise GIS capabilities...Schneider Electric
 
Business report & product recommendations
Business report & product recommendationsBusiness report & product recommendations
Business report & product recommendationsadambcarney
 
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...Living Online
 
The Evolution of SSL Lighting Controls - Presented by: Tony Parisi - SEMS
The Evolution of SSL Lighting Controls - Presented by: Tony Parisi - SEMSThe Evolution of SSL Lighting Controls - Presented by: Tony Parisi - SEMS
The Evolution of SSL Lighting Controls - Presented by: Tony Parisi - SEMSCindy Foster-Warthen
 

Was ist angesagt? (20)

ICEpower_brochure
ICEpower_brochureICEpower_brochure
ICEpower_brochure
 
Ambicales Solar Profile
Ambicales Solar ProfileAmbicales Solar Profile
Ambicales Solar Profile
 
HPB Presentation DFS 11 Sep 12
HPB Presentation DFS 11 Sep 12HPB Presentation DFS 11 Sep 12
HPB Presentation DFS 11 Sep 12
 
Emcs overview v0.4
Emcs overview v0.4Emcs overview v0.4
Emcs overview v0.4
 
Reducing Energy Consumption from the Core to the Edge: The JouleX and Cisco E...
Reducing Energy Consumption from the Core to the Edge: The JouleX and Cisco E...Reducing Energy Consumption from the Core to the Edge: The JouleX and Cisco E...
Reducing Energy Consumption from the Core to the Edge: The JouleX and Cisco E...
 
Light Control Solutions for Daylit Spaces
Light Control Solutions for Daylit SpacesLight Control Solutions for Daylit Spaces
Light Control Solutions for Daylit Spaces
 
Covis Sdn bhd_Company Profile 2016
Covis Sdn bhd_Company Profile 2016Covis Sdn bhd_Company Profile 2016
Covis Sdn bhd_Company Profile 2016
 
Improved efficiency & reliability for servers using immersion cooling technology
Improved efficiency & reliability for servers using immersion cooling technologyImproved efficiency & reliability for servers using immersion cooling technology
Improved efficiency & reliability for servers using immersion cooling technology
 
UEL Presentation
UEL PresentationUEL Presentation
UEL Presentation
 
Ener Noc Manufacturing Spotlight
Ener Noc Manufacturing SpotlightEner Noc Manufacturing Spotlight
Ener Noc Manufacturing Spotlight
 
Asq rd webinar immersion oil cooling
Asq rd webinar immersion oil coolingAsq rd webinar immersion oil cooling
Asq rd webinar immersion oil cooling
 
Benchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data CenterBenchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data Center
 
[Case study] Green Mountain Power: Reducing the duration of outages
[Case study] Green Mountain Power: Reducing the duration of outages[Case study] Green Mountain Power: Reducing the duration of outages
[Case study] Green Mountain Power: Reducing the duration of outages
 
RhiZone Energy Solutions
RhiZone Energy SolutionsRhiZone Energy Solutions
RhiZone Energy Solutions
 
[Case study] Maine Fiber: Smart Grid solution offers precise GIS capabilities...
[Case study] Maine Fiber: Smart Grid solution offers precise GIS capabilities...[Case study] Maine Fiber: Smart Grid solution offers precise GIS capabilities...
[Case study] Maine Fiber: Smart Grid solution offers precise GIS capabilities...
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
Business report & product recommendations
Business report & product recommendationsBusiness report & product recommendations
Business report & product recommendations
 
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
 
The Evolution of SSL Lighting Controls - Presented by: Tony Parisi - SEMS
The Evolution of SSL Lighting Controls - Presented by: Tony Parisi - SEMSThe Evolution of SSL Lighting Controls - Presented by: Tony Parisi - SEMS
The Evolution of SSL Lighting Controls - Presented by: Tony Parisi - SEMS
 
Falkonry overview deck
Falkonry overview deckFalkonry overview deck
Falkonry overview deck
 

Ähnlich wie (B) pepco energy solutions overview document email

Switch Genie Sales
Switch Genie SalesSwitch Genie Sales
Switch Genie Salesbizbroker
 
Forum_Enviro_Brch_VPO
Forum_Enviro_Brch_VPOForum_Enviro_Brch_VPO
Forum_Enviro_Brch_VPOChris Forrest
 
Power factor solution,presentation
Power factor solution,presentationPower factor solution,presentation
Power factor solution,presentationAmol Chande
 
Pepco presentation intro
Pepco presentation   introPepco presentation   intro
Pepco presentation introsgraham007
 
PATENTED AND PROVEN ENERGY OPTIMIZATION SYSTEM WITH 8-12 % IMMEDIATE ENER...
PATENTED  AND PROVEN  ENERGY OPTIMIZATION  SYSTEM WITH  8-12 % IMMEDIATE ENER...PATENTED  AND PROVEN  ENERGY OPTIMIZATION  SYSTEM WITH  8-12 % IMMEDIATE ENER...
PATENTED AND PROVEN ENERGY OPTIMIZATION SYSTEM WITH 8-12 % IMMEDIATE ENER...Andrew Dmitrev
 
WorkTric Business Overview (EN)
WorkTric Business Overview (EN)WorkTric Business Overview (EN)
WorkTric Business Overview (EN)LeninMartinez32
 
Saving with Energy: NO CAPITAL Energy Solutions
Saving with Energy: NO CAPITAL Energy SolutionsSaving with Energy: NO CAPITAL Energy Solutions
Saving with Energy: NO CAPITAL Energy SolutionsThomas Mort
 
Infrastructure Solutions for Commercial Properties and Developers
Infrastructure Solutions for Commercial Properties and DevelopersInfrastructure Solutions for Commercial Properties and Developers
Infrastructure Solutions for Commercial Properties and DevelopersMestizo Enterprises
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016Dennis Cody
 
Energy storage fauzan kurnia
Energy storage fauzan kurniaEnergy storage fauzan kurnia
Energy storage fauzan kurniafznkurnia
 
Solar PV for farmers - Sam Usiskin (Segen)
Solar PV for farmers - Sam Usiskin (Segen)Solar PV for farmers - Sam Usiskin (Segen)
Solar PV for farmers - Sam Usiskin (Segen)Farming Futures
 
Bernie Kotlier - Energy Efficiency
Bernie Kotlier - Energy EfficiencyBernie Kotlier - Energy Efficiency
Bernie Kotlier - Energy EfficiencyContract Cities
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxSchneider Electric
 
Nautilus Outdoor Lighting Powerpoint
Nautilus Outdoor Lighting PowerpointNautilus Outdoor Lighting Powerpoint
Nautilus Outdoor Lighting PowerpointSurfersteve79
 

Ähnlich wie (B) pepco energy solutions overview document email (20)

Switch Genie Sales
Switch Genie SalesSwitch Genie Sales
Switch Genie Sales
 
Forum_Enviro_Brch_VPO
Forum_Enviro_Brch_VPOForum_Enviro_Brch_VPO
Forum_Enviro_Brch_VPO
 
Power factor solution,presentation
Power factor solution,presentationPower factor solution,presentation
Power factor solution,presentation
 
Gc going green step by step
Gc going green step by stepGc going green step by step
Gc going green step by step
 
Pepco presentation intro
Pepco presentation   introPepco presentation   intro
Pepco presentation intro
 
PATENTED AND PROVEN ENERGY OPTIMIZATION SYSTEM WITH 8-12 % IMMEDIATE ENER...
PATENTED  AND PROVEN  ENERGY OPTIMIZATION  SYSTEM WITH  8-12 % IMMEDIATE ENER...PATENTED  AND PROVEN  ENERGY OPTIMIZATION  SYSTEM WITH  8-12 % IMMEDIATE ENER...
PATENTED AND PROVEN ENERGY OPTIMIZATION SYSTEM WITH 8-12 % IMMEDIATE ENER...
 
WorkTric Business Overview (EN)
WorkTric Business Overview (EN)WorkTric Business Overview (EN)
WorkTric Business Overview (EN)
 
Saving with Energy: NO CAPITAL Energy Solutions
Saving with Energy: NO CAPITAL Energy SolutionsSaving with Energy: NO CAPITAL Energy Solutions
Saving with Energy: NO CAPITAL Energy Solutions
 
Infrastructure Solutions for Commercial Properties and Developers
Infrastructure Solutions for Commercial Properties and DevelopersInfrastructure Solutions for Commercial Properties and Developers
Infrastructure Solutions for Commercial Properties and Developers
 
ELOHIM INDUSTRIAL SALES INC
ELOHIM INDUSTRIAL SALES INCELOHIM INDUSTRIAL SALES INC
ELOHIM INDUSTRIAL SALES INC
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016
 
CMOS Data Sheet
CMOS Data SheetCMOS Data Sheet
CMOS Data Sheet
 
LCOE_2015_2_pager_US
LCOE_2015_2_pager_USLCOE_2015_2_pager_US
LCOE_2015_2_pager_US
 
Energy storage fauzan kurnia
Energy storage fauzan kurniaEnergy storage fauzan kurnia
Energy storage fauzan kurnia
 
profile
profileprofile
profile
 
Solar PV for farmers - Sam Usiskin (Segen)
Solar PV for farmers - Sam Usiskin (Segen)Solar PV for farmers - Sam Usiskin (Segen)
Solar PV for farmers - Sam Usiskin (Segen)
 
Benefits of Solar Energy - Sri Lanka
Benefits of Solar Energy - Sri LankaBenefits of Solar Energy - Sri Lanka
Benefits of Solar Energy - Sri Lanka
 
Bernie Kotlier - Energy Efficiency
Bernie Kotlier - Energy EfficiencyBernie Kotlier - Energy Efficiency
Bernie Kotlier - Energy Efficiency
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
Nautilus Outdoor Lighting Powerpoint
Nautilus Outdoor Lighting PowerpointNautilus Outdoor Lighting Powerpoint
Nautilus Outdoor Lighting Powerpoint
 

Kürzlich hochgeladen

VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 

Kürzlich hochgeladen (20)

VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 

(B) pepco energy solutions overview document email

  • 1. We specilize in reducing the energy consumption of Industrial and Commercial Facilites Energy costs and demand are on the rise, Pepco Energy Solutions is here to lend a helping hand. Through the installation of our technologies we can produce savings that average from 10%-20% off of your energy bills reducing your facilities operating costs. Pepco Solutions is not a power management firm, we utilize passive technologies that reduce the kWh consumption of our clients facilities while their electrical loads are in operation. www.pepcosolutions.com
  • 2. Pepco Solutions We are here to dramatically reduce your facilities operating and maintenance costs. We save you money! Utilizing proven technologies, Pepco Solutions is able to reduce your facilities electrical bills by an average of 10%-20%! We design and install custom energy conservation systems proven to: • Reduce electrical energy consumption • Decrease greenhouse gas emissions • Improve power quality, power factor and voltage • Increase electrical system capacity • Reduce unnecessary heat • Improve cooling capacity of air conditioning and refrigeration • Lengthen lives of motors, lights, air conditioning and refrigeration Our savings percentages are backed by a third party insurance company! After Pepco solutions has had the opportunity to move forward with an Energy Study and Project Engineering on your facility, we will establish a base minimum guaranteed savings percentage; this savings percentage is then backed by a third party insurance company, which is currently The Lloyds of London Insurance Co. Page 2
  • 3. Pepco Solutions Leadership President: Jim Pepin Jim’s main focus as President is Field Operations. With the industry skills, that he brings to the table, Jim is able to quickly identify cost effective solutions for our clients not only from a field and installation standpoint, but from a product knowledge standpoint as well. Background: Jim has worked as a project manager in construction and land development for 18 years with experience working with engineers, contractors and governing agencies to improve infrastructure in Central Ohio. With present day challenges for companies to operate at the highest level of efficiency, Jim has teamed up with Energy Automation Systems, Inc. with the vision of helping businesses reduce operating costs and improve their overall profitability through electrical efficiency. Executive Vice President: Scott Graham, CSI Scott is responsible for business development, sales, marketing as well as sales force development. His background in the industrial and commercial construction industry coupled with his sales and teaching experience enables him to reach out to organizations that can benefit from Pepco Solutions assistance. Background Scott has been employed in architecture, engineering and construction for over ten years. He spent four of the ten years building commercial and industrial facilities nationally and most recently managing the electrical construction in power generation facilities nation- wide. He recently resigned from teaching construction management at a college local to Columbus, Ohio and served on The Board of Directors for The Construction Specifications Institute of Columbus Ohio. Scott is determined and anxious to educate companies on how Pepco Solutions can reduce their operating costs through the installation of our energy saving technologies. Page 3
  • 4. Reduce Maintenance Costs / Increase the Life of Your Equipment Industrial equipment, motors, lighting, and many other electrical devices rely on electricity to operate; however poor electric quality can be damaging to these types of equipment as well. Through the installation of our systems we are able to reduce the maintenance on and prolong the life of your electrical equipment, motors, lighting and much more. Previous EASI System Installation Results Tepro Molding Plant (Tennessee) Tempur-Pedic (Virginia) Minimum Guaranteed savings at 11.29% Minimum Guaranteed savings at 15.2% Actual Savings averages 33.7% Actual Savings averages 20.6% Cost of installation recouped in 8 months. Also eliminated motor failure through improved power quality. Pepsi Cola Bottling Plant (Maryland) British Aerospace (Tennessee) Minimum Guaranteed savings at 13.46% Minimum Guaranteed savings at 13.60% Actual Savings averages 14.65% Actual Savings averages 15.2% Installed 12,800 pieces of equipment in a 5000 acre facility. Page 4
  • 5. Pepco Solution’s state of the art money and energy saving technologies Located below are just a few of the state of the art technologies manufactured bin Nashville Tennessee that we at Pepco Solutions may suggest to install in your facility to reduce kilowatt hour consumption. Easiliner EuroLiner Motorized pieces of equipment are historically inefficient users The EuroLiner provides predictable lighting cost of electricity. Unnecessarily high electrical bills and savings with either electronic ballast fluorescent or HID maintenance costs result from the conversion of the reactive lighting. Designed for use on circuits where measured current. The EasiLiner provides the benefits of reactive power load amperage is less than 20 amperes at any voltage correction while virtually eliminating the risks associated with from 100V to 347V, the EuroLiner modernizes your traditional correction methods. Increased motor functionality lighting equipment and air conditioning by lessening means lower energy costs from reduced current draw. the heat load added by your lights. PowerLiner Multiliner EASI’s PowerLiner meets the need to reduce energy costs The MultiLiner is EASI’s product solution for gaining associated with nonlinear electrical equipment. By canceling a cost-effective savings on groups of loads unpredictably portion of the harmonic current normally drawn by such loads, used, or that switch on and off in irregular patterns.This the PowerLiner reduces kilowatt-hour consumption and can energy cost-saving solution requires no user alleviate many problems associated with harmful harmonics. adjustment and lowers energy costs by extending the life of motors and equipment, improving facility volt- age and increasing electrical capacity. IllumiLiner LVR The IllumiLiner units are entirely solid-state with EASI’s Lighting Voltage Regulator (LVR) reduces the microprocessors that continually monitor and modify the AC energy used in industrial lighting systems, allowing sine wave. The IllumiLiner controls entire lighting circuits from them to run cooler and longer with small reduction the lighting panel, providing circuit-by-circuit flexibility and of lighting levels. It provides you with an energy cost generally a high return on investment. The ventilated cabinet is savings ofbetween 15 and 30%. Compatible with most made of sturdy, heavy gauge metal with a mar-resistant, epoxy modern magnetic ballasts found in fluorescent, high finish to withstand industrial environments. The IllumiLiner intensity, and all types of incandescent lighting fixtures, improves the lighting performance and provides for control- the LVR can control many types of lighting products lable illumination distribution. without changing internal jumpers or switch settings. Page 5
  • 6. THE PEPCO SOLUTIONS PROCESS FROM FIRST CONTACT TO PROJECT COMPLETION Step 1: Initial Technology Demonstration and Presentation In this initial step Pepco Solutions introduces you to our technologies, we like to discuss your facilities power usage and average monthly energy costs. One or more of our well qualified representatives will be present during this visit to educate you on how our power saving systems operate. Step 2: Facility Walkthrough This step enables Pepco Solutions to learn more about your facilities unique needs, Pepco Solutions will conduct a walkthrough of your facility with the person who best understands its electrical system. During the walkthrough, our representative gathers information about: • Electrical system • Equipment operations • Electrical billing issues and history • Power quality challenges • Electrical maintenance challenges (Note: Pepco Solutions will need 12 months electrical billing history in-order to proceed to Step 3) Step 3: Energy Study Proposal Pepco Solutions hand delivers an energy study proposal to you and explains our planned approach at saving your facility money and energy. In a written statement we will tell you: • A minimum guaranteed power cost savings. • The charges for performing the energy study and project design. • Your estimated return on investment. (Note: The cost of the Energy Study will be credited towards the cost of installation.) Step 4: Energy Study The energy study step involves the documentation of each and every electrical load in your facility, a team of experienced electricians along with a Pepco Solutions Site Superintendent will be present on-site to retrieve this information from your facilities electrical devices. As soon as Pepco Solutions has completed gathering all of the data we are in need of, Pepco Solutions immediately begins the project design/engineering phase. The size and number of your facilities dictate the amount of time we spend on this step. Page 6
  • 7. Step 5: Installation Proposal Engineering is complete, we now have a minimum guaranteed savings and rate of return on your investment established due to our energy study and project design/ engineering. Your Pepco Solutions representative returns to you with a well planned out construction time line, scope of work and proposal. The information included also emcompases a detailed list of technology to be installed in your facility and information regarding the positive environmental impact this project will have. (Note: Please feel free to ask for a sample installation proposal.) Step 6: Equipment Installation We execute our carefully designed installation plan for electrical system improvements and adjustments that are specifically engineered for the power conservation needs of your facility(s): • The addition and installation of power conservation technologies to the electric devices/motors targeted from our in-depth energy study. • A precise round of maintenance and upgrade work to your lighting systems that may include retrofitting, harmonics correction, or ballast or even whole fixture replacement. Step 7: Measurement and Verification ”Before” and “after” data will be captured as the system is being installed. A Pepco Solutions representative follows up regularly to verify the savings and make sure you are satisfied with the results. We measure and verify a system’s performance using methods in compliance with the International Performance Measurement and Verification Protocol (IPMVP). (Note: The IPMVP was established by a network of energy professional and organizations from more than 25 countries to standardize the methods by which energy conservation projects are measured and verified.) Secondary Installation Benefits: • Elimination of power factor penalties • Lower KVA or KVAR penalties • Improved voltage • Increased capacity of electrical system: 5%-15%, in some cases 20% • Cooler panels, wiring and circuit breakers • Increased power factor (efficiency of your electricity) • Reduced fire and arc flash hazard • Power conditioning (Reduced harmonics, fluctuations and other interference on your power lines) • More cooling capacity from A/C. • More cooling capacity from refrigeration. • Less heat to be removed by A/C. • Reduced downtime on equipment & production. • Lower labor cost because of reduced maintenance. Page 7
  • 8. Pepco Solutions, LLC. 10898 Snyder Church Road Baltimore, Ohio 43105 Phone: (614) 593-2868 Fax (614) 416-0550 www.pepcosolutions.com © Pepco Solutions, LLC. 2009-2010