SCREA born on 12.12.2009 on the dias of Railway Institute, Bhoiguda in presence of about 300 engineers from all fronts of South Central Railway duly witnessed by Veteran Engineers from Civil, Mechanical, Electrical and S&T departments. Power point was presented by Ad-hoc General Secretary to explain the cause for formation of SCREA
Building redevelopment referencer 27-09-2015-protected
Inaugural Meet of SCREA 12_12_2009
1. Affiliated to: ALL INDIA RAILWAY ENGINEERS’ FEDERATION WELCOMES ITS RAIL ENGINEERS SOUTH CENTRAL RAILWAY ENGINEERS' ASSOCIATION
2. Dear Rail Engineers! Let us put a few questions and answer ourselves sincerely. No hypocrisy . 1. What made all of us to gather here on this auspicious day? 2. What harm is done to Rail Engineers economically and socially? 3. What is the solution to get rid of this suppression? 4. Is it required to form an Engineers’ Association at this juncture and at our South Central Railway Level? 5. How ‘SCREA’ can resolve issues to be dealt at Rly.Bd & Rly.Ministry? 6. Hitherto organizations such as DEAR, EAIR, TEAR etc., were formed but could not help much to Rail Engineers and what happened to those associations? 7. What are SCREA’s structure and its activities?
3. Need of this Gathering : To have a glance on the journey in our profession as a Rail Engineer and to confer the difficulties that we are facing socially, financially, physically and psychologically. After this small meeting, we would like to enlighten the feelings of all Engineers of South Central Railway to the Railway Board and Ministry of Railways through our Heads of Departments for justified treatment of the cadre.
4. II. What harm is done to Rail Engineers Economically and Socially? a. From day-1 of entering into Railway service, most of us have forgotten our family relations and became enemies to our own uncles, aunties, cousins etc., by not attending even to a very important function in our family. This is the very first slice of detachment of our social life. b. As we tied our knot to Railway service and dedicating our entire energies to our mother organization, we are unable to spare even few hours to our spouse and kids and thus failing as a good life partner or a good parent. This is the second slice of detachment to our family life.
5. What harm is done to Rail Engineers Economically and Socially (contd..) c. How many of us could able to avail all the Ten days casual leave per year, all the 03 sets of passes and 04 sets of PTOs given by the administration? To my knowledge, 95% of Engineers are unable to utilize their Casual leaves. Set aside the LAP. Question does not arise. Not able to cross the boundaries of our jurisdiction though we are entitled for passes valid over Indian Railways. This is the third slice of detachment to the Global life. d. Forfeiting all these, we are sincerely working with the hope that, “though I am suffering, at least my family should be happy and comfortable socially and economically. But, what is reality? Our hopes and desires are thumped into mud and administration made us a laughing stock of the Railways.
6. What harm is done to Rail Engineers Economically and Socially (contd..) e. In fact, no railway engineer is less than any business manager with an MBA. Every railway engineer is undertaking several managerial tasks in his daily duties. He is a material manager, manpower manager, and an interface manager apart from good event planner and executor for safe running of trains. In other professions, employee will undertake one job at a time. But, a Rail Engineer will handle multidisciplinary tasks at a time under intense stress and successfully completes the mission without any anticipation. f. No Rail engineer is envious of any other cadre of the Railways. We welcome the growth of our brothers’ and sisters’ of organization. Meanwhile our only plea is let Rail Engineers’ cadre also be elevated along with other cadres and give proper justification for the work squeezed from our sweat and blood.
7. What harm is done to Rail Engineers Economically and Socially (contd..) g. All of us are aware what the stature and respect our cadre of engineers are having prior to IV, V and VI pay commissions compared to other non-technical and non-safety related cadres who are working under comfortable and tension free conditions with limited & fixed working hours. During each Pay commission the cadre was downtrodden step by step and drilled the engineers to core. As per the Hours of Employment Regulations, for all cadres of Railways, periodical work study shall be done and as per the Work study, a roster to be made and duty hours to be fixed. But, all Rail Engineers are classified as “Excluded Category” and there is no work study, no roster, no duty hours and no rest hours. With this also, all Rail Engineers are shouldering the responsibility with utmost dedication. Ill fate is, this term “Excluded” is being applied every where including Pay revision, Cadre elevation etc.
8. What harm is done to Rail Engineers Economically and Socially (contd..) h. Similarly, in other Central Government Organizations and PSUs, the cadre of engineers is given time bound promotions and from a certain point, is treated as Gazetted cadre. The equivalent cadre of Rail Engineers is not being treated on par with the other engineers of CPWD or BSNL etc. For name sake, Indian Railway organization is a para-military organization. In fact, every Rail Engineer is working with military discipline, round the clock through out the year in his entire service without any notice and appraise and even loosing petty pleasures. These are only a few general points from an eagle’s eye, apart from the huge humiliation Rail Engineers are facing at every point. Most of the times, Rail Engineers’ are becoming the outlets to discharge the frustration of higher ups and source for whims and fancies of the superior cadres. Can I now say, injustice is being done to our cadre of Rail Engineers?
9.
10.
11. Some of us may aware of the recommendations by Justice Khanna Committee. Wherein it is recommended that “the Supervisors shall be barred from joining existing trade unions”. Like other issues, administration kept a blind eye over those recommendations. When it wants to further weaken the cadre or Rail Engineers, it may comfortably implement Khanna committee recommendations and even trade union leaders may also accept because of meager number of Rail Engineers or Supervisors in trade unions. That day, the cadre of Rail engineers will be the worst effected . being . a . scattered . cadre. You are all aware that other categories of Railway are already having their cadre organizations such as All India Station Masters’ Association, All India Guards’ Council, All India Loco Running Staff Association, All India Ministerial Staff Association etc. Even if the supervisors are dropped from the existing trade unions, these Associations will fight for their cadre. Unfortunately, the only cadre in Indian Railways un-amalgamated is “Rail Engineers”
12. Hence, it is essentially required to form an association to unite all Rail Engineers to fight for our own betterment and uplift. For better interaction with the cadre to root level and to negotiate categorical grievances of divisions/zone, it is essential to have an Association at Zonal Level having its representation from all fronts of Rail Engineers. At the same time, to represent cadre at Railway Board and Railway Ministry a mechanism should be available at National Level. Already Engineers’ Associations were formed by all other Zonal Railways and Production Units at respective Zones and all these associations are brought under the umbrella of All India Railway Engineers’ Federation at Nation level. This is the cause of birth to “ South Central Railway Engineers’ Association .”
13.
14.
15. (b) Committees at Division Level: Divisional General Body Divisional General Council Division Advisory Committee (General) Division Advisory Committee (Technical) Division Executive Committee Division Working Committee (c) Branch Level: Branch Working Committee will be functioning under the guide lines from ZEC through DWC. All these committees will function under the guidance of All India Railway Engineers’ Federation on Policy issues to be taken at Railway Board and Rail Ministry levels and on Zone/Division issues as per decisions of Zonal Advisory Committee.
16. CONSTITUTION OF ZONAL WORKING COMMITTEE: President 01 Working President 01 Sr.Vice President 01 Vice President 08 ( 01 post each for Divisional president by default, One post for Construction organization & One post shall be nominated as per discretion of Zonal President ) General Secretary 01 Joint General Secretary 01 Organizing Secretary 01 Additional Organizing Secretary 08 ( 01 post each for Divisional Secretary by default, one post for Construction organization & One post shall be nominated as per discretion of General Secretary ) Finance Secretary 01 Additional Finance Secretary 01 Zonal Working committee Members 15 Auditor 01
17. DIVISION WORKING COMMITTEE: Divisional President 01. Divisional Working President 01. Divisional Vice President (one for each dept.) 05. Divisional Secretary 01. Divisional Joint General Secretary 01. Divisional Organisation Secretary 01. Divisional Finance Secretary 01. Divisional Auditor 01. Divisional Advisor 01. Addl Divisional Finance Secretary 01 Executive Members 08.
18.
19. 4. Deriving innovative practices with optimum utilization of available resources and to keep SCR as best Railway among the Indian Railways. 5. Inculcation of brotherhood among all Rail Engineers so that the cadre stands united and strong. 6. Taking up social responsibilities as humans during distress occasions. 7. Making administration to organize periodical development training programs for Rail Engineers to up grade their technical skills and knowledge with progressing technology by innovative methods.
20. Let us see few Anomalies during 6 th CPC to Rail Engineers: Grade of XEN on time bound Scheme: Up gradation of non-technical cadres above JEs:
21. Upgradation of non technical cadres above Sec. Engineers What shall we do now? After seeing this also, can we still keep our mouths shut and allow the Railway administration to hammer our futures ? Just see this graphical representation and decide what to do further.
31. Distribution of Zonal Working Committee: Engineering (Open Line & CAO) P.Way : Sri A.Kannan (SSE/PW/HQ) (President) P.Way : Sri K.L.V.S.Viswanadham (Genl.Secy) Works(OL) : Sri P.Srinivasa Rao, SE/Wks ZWCM Works (Con) : Sri K.Nageswara Rao (JE/W/CAO) (Secy.Finance) Bridges : Sri Naveen Kumar (SE/Br/ZCETC) (ZWCM) Drawing : Sri chandrahas SSE/Drg (ZWCM) TM/EWS/FBW : Smt. DNMPT Devi (SSE/TM) (ZWCM)
32. Electrical Engineering Open Line(Maint) : Sri Kulakarni (SSE/Ele) (Org. Secy) TRD/PSI : (Vice presi-ZPN) Open Line : (ZWCM) Workshop : (ZWCM) Drawing : (ZWCM) OHE : (ZWCM) TRD/PSI : (ZWCM)
33. Mechanical Engineering: C&W : Sri M.Prabhucharan (VI/Mech) (Wkg.President) Workshops : Sri K.Venkata Ramana(SSE/WS) (Jt. Gnl. Secy) C&W : Sri M.A.Wahid Khan (Auditor) Drawing : Sri T.Ravi Babu (ZWCM) C&W : Sri S.V.S.N.Raju (ZWCM) Diesel : M.A.Rajasekhar Reddy (ZWCM)
34. Signal and Telecommunications: Open Line (Sig) : (Sr.Vice Presi) Open Line (Tele) : (Adl. Fin. Secy) Drawing : Sri Radhakrishna (Adl. Org. Secy-GSN) Microwave : (ZWCM) Signals : (ZWCM) Projects : (ZWCM)
35. Now let us peruse the constitution drafted to go ahead with our association and for the approval of the gathered Engineers: