SlideShare ist ein Scribd-Unternehmen logo
1 von 19
Downloaden Sie, um offline zu lesen
Benchmarking
                     Roger Young
Executive Director, www.FacilityMastersOnline.com
         roger@facilitymastersonline.com
                    978‐886‐6093
Simple Truths

       •High Expectations
            Internal/External

       • More with Less

       • Demonstrate Success

       • Be Credible
How to Maintain Credibility
Demonstrate  … quantitative measuring

Show … results

Develop standards and set expectations

Demonstrate effectiveness
Strategy
Understand the Expectations

Know the Key Questions

Identify the Metrics

Collect Data as Part of the Process

Compare Metrics Over Time 

Benchmark With Others
Expectations
Properly Maintaining School Facilities

Energy Efficiency

Maximize Resources

Minimize Risk

Environmental Safety
Properly Maintain School 
Facilities
Key Questions/Metrics –

  – What is being done?
     • Completed work orders by type (routine, PM, emergency), 
       trade, system, use of PM templates, cost

  – How well is it being done?
     • Time to complete, run time, emergencies, staff survey

  – What needs to be done?
     • Deferred work orders, life cycle analysis, capital needs and 
       renewal, facility audit
Properly Maintain School 
Facilities
Collect Data (Timely, Comparable, Accurate)

   –   Work order, date initiated, date completed
   –   Type of work (PM, emergency, routine), location 
   –   Category (HVAC, roof, electrical, plumbing, grounds)
   –   Cost, labor time
   –   Type and condition of equipment

Part of Process – Maintenance Management System 
  such as SchoolDude.com
Maintenance Program
Number of Work Orders
Backlog
Status of Budget
Emergency Work Orders
Days to Complete Work Orders
PM Hours
Quality Assurance
Examples …
Surveys…
Energy Management …
Consumption
Conservation
Accomplishments
Data:


  • BTU’s             • Comparison Over 
  • Sq Ft Buildings     Time
  • Degree Days       • Types of Energy
Convert all units to K BTU to benchmark/rank schools according 
          to how much energy they use per square foot. 

                      Energy Conversion Factors
          1 kWh = 3.412 kBtu          1 Gal Propane = 91.6 kBtu
          1 CCF = 103 kBtu             1 Gal #2 Fuel Oil = 139 kBtu
SchoolDude UtilityDirect Energy Cost/Sq Ft Report
KPI: Custodial
SF / custodian
Overall cost in $/SF
Custodial materials cost in $/SF
Overtime
Satisfaction Survey
KPI: Personnel
Turnover
% of staff replaced
Change in staff size
Attendance rates
Average cost of pay and benefits per person
KPI: Environmental Safety
•   Student injuries
•   Number of inspections
•   Respiratory complaints with nurse
•   State and federal reporting
•   IPM complaints
•   Life safety inspections
Strategy
Understand the Expectations

Know the Key Questions

Identify the Metrics

Collect Data as Part of the Process

Compare Metrics Over Time 

Benchmark With Others
Thank You

Weitere ähnliche Inhalte

Was ist angesagt?

Quality kpi examples
Quality kpi examplesQuality kpi examples
Quality kpi examples
gallasbrows
 
Fixed assets accountant kpi
Fixed assets accountant kpiFixed assets accountant kpi
Fixed assets accountant kpi
iricador
 
Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...
Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...
Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...
Northwest Analytics
 
Emergency room nurse kpi
Emergency room nurse kpiEmergency room nurse kpi
Emergency room nurse kpi
ratasjommi
 
Key Performance Indicator
Key Performance IndicatorKey Performance Indicator
Key Performance Indicator
Charis Joy Mayo
 
Hvac service manager kpi
Hvac service manager kpiHvac service manager kpi
Hvac service manager kpi
gesfasri
 
Mds nurse kpi
Mds nurse kpiMds nurse kpi
Mds nurse kpi
jomfurite
 
Theatre nurse kpi
Theatre nurse kpiTheatre nurse kpi
Theatre nurse kpi
asfoskenfur
 
Hospital hostess kpi
Hospital hostess kpiHospital hostess kpi
Hospital hostess kpi
feriporet
 
Software Quality KPI
Software Quality KPISoftware Quality KPI
Software Quality KPI
cherapa
 
Hospital dispatcher kpi
Hospital dispatcher kpiHospital dispatcher kpi
Hospital dispatcher kpi
feriporet
 
Product marketing manager kpi
Product marketing manager kpiProduct marketing manager kpi
Product marketing manager kpi
iavanrita
 
Critical care nurse kpi
Critical care nurse kpiCritical care nurse kpi
Critical care nurse kpi
kenfurasfos
 
Web development manager kpi
Web development manager kpiWeb development manager kpi
Web development manager kpi
naritejom
 

Was ist angesagt? (20)

Quality kpi examples
Quality kpi examplesQuality kpi examples
Quality kpi examples
 
Kpi quality assurance
Kpi quality assuranceKpi quality assurance
Kpi quality assurance
 
Testing kpi
Testing kpiTesting kpi
Testing kpi
 
Fixed assets accountant kpi
Fixed assets accountant kpiFixed assets accountant kpi
Fixed assets accountant kpi
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...
Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...
Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...
 
Emergency room nurse kpi
Emergency room nurse kpiEmergency room nurse kpi
Emergency room nurse kpi
 
Kpi for dummies
Kpi for dummiesKpi for dummies
Kpi for dummies
 
Vet nurse kpi
Vet nurse kpiVet nurse kpi
Vet nurse kpi
 
Key Performance Indicator
Key Performance IndicatorKey Performance Indicator
Key Performance Indicator
 
Hvac service manager kpi
Hvac service manager kpiHvac service manager kpi
Hvac service manager kpi
 
Mds nurse kpi
Mds nurse kpiMds nurse kpi
Mds nurse kpi
 
Theatre nurse kpi
Theatre nurse kpiTheatre nurse kpi
Theatre nurse kpi
 
Hospital hostess kpi
Hospital hostess kpiHospital hostess kpi
Hospital hostess kpi
 
Maintenance Metrics
Maintenance MetricsMaintenance Metrics
Maintenance Metrics
 
Software Quality KPI
Software Quality KPISoftware Quality KPI
Software Quality KPI
 
Hospital dispatcher kpi
Hospital dispatcher kpiHospital dispatcher kpi
Hospital dispatcher kpi
 
Product marketing manager kpi
Product marketing manager kpiProduct marketing manager kpi
Product marketing manager kpi
 
Critical care nurse kpi
Critical care nurse kpiCritical care nurse kpi
Critical care nurse kpi
 
Web development manager kpi
Web development manager kpiWeb development manager kpi
Web development manager kpi
 

Ähnlich wie Key Performance Indicators for Facility Operations (from ASBO MD & DC Savings Summit)

commissioning-PEG Engineering profile.pdf
commissioning-PEG Engineering profile.pdfcommissioning-PEG Engineering profile.pdf
commissioning-PEG Engineering profile.pdf
Vincent Bui
 
Using eam to avoid the consequences of missing preventative maintenance
Using eam to avoid the consequences of missing preventative maintenanceUsing eam to avoid the consequences of missing preventative maintenance
Using eam to avoid the consequences of missing preventative maintenance
Projetech
 
MANIKANDAN_ENERGY ENGINEER_Detailed Resume
MANIKANDAN_ENERGY ENGINEER_Detailed ResumeMANIKANDAN_ENERGY ENGINEER_Detailed Resume
MANIKANDAN_ENERGY ENGINEER_Detailed Resume
Manikandan Sudalaimani
 
Intro Imms Final
Intro Imms FinalIntro Imms Final
Intro Imms Final
hcrawford64
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
grubinm
 
Seven Habits of Highly Effective Energy Managers
Seven Habits of Highly Effective Energy ManagersSeven Habits of Highly Effective Energy Managers
Seven Habits of Highly Effective Energy Managers
TNenergy
 

Ähnlich wie Key Performance Indicators for Facility Operations (from ASBO MD & DC Savings Summit) (20)

Developing A Facilities Vision - Savings Summit 2013
Developing A Facilities Vision - Savings Summit 2013Developing A Facilities Vision - Savings Summit 2013
Developing A Facilities Vision - Savings Summit 2013
 
BPM Presentation WTcomments
BPM Presentation WTcommentsBPM Presentation WTcomments
BPM Presentation WTcomments
 
commissioning-PEG Engineering profile.pdf
commissioning-PEG Engineering profile.pdfcommissioning-PEG Engineering profile.pdf
commissioning-PEG Engineering profile.pdf
 
Using eam to avoid the consequences of missing preventative maintenance
Using eam to avoid the consequences of missing preventative maintenanceUsing eam to avoid the consequences of missing preventative maintenance
Using eam to avoid the consequences of missing preventative maintenance
 
Using Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM WorkUsing Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM Work
 
Measuring Long-Run and Nonfinancial Organizational Performance
Measuring Long-Run and Nonfinancial Organizational PerformanceMeasuring Long-Run and Nonfinancial Organizational Performance
Measuring Long-Run and Nonfinancial Organizational Performance
 
Process choice and layout decisions in manufacturing and services
Process choice and layout decisions in manufacturing and servicesProcess choice and layout decisions in manufacturing and services
Process choice and layout decisions in manufacturing and services
 
Process choice and layout decisions in manufacturing and services
Process choice and layout decisions in manufacturing and servicesProcess choice and layout decisions in manufacturing and services
Process choice and layout decisions in manufacturing and services
 
Minnesota's Guaranteed Energy Savings Program
Minnesota's Guaranteed Energy Savings ProgramMinnesota's Guaranteed Energy Savings Program
Minnesota's Guaranteed Energy Savings Program
 
Manikandan Energy Engineer
Manikandan Energy EngineerManikandan Energy Engineer
Manikandan Energy Engineer
 
MANIKANDAN_ENERGY ENGINEER_Detailed Resume
MANIKANDAN_ENERGY ENGINEER_Detailed ResumeMANIKANDAN_ENERGY ENGINEER_Detailed Resume
MANIKANDAN_ENERGY ENGINEER_Detailed Resume
 
capacity planning and Forecasting.pptx
capacity planning and Forecasting.pptxcapacity planning and Forecasting.pptx
capacity planning and Forecasting.pptx
 
Creating Efficiency and Business Value Through Smart Energy and Water Management
Creating Efficiency and Business Value Through Smart Energy and Water ManagementCreating Efficiency and Business Value Through Smart Energy and Water Management
Creating Efficiency and Business Value Through Smart Energy and Water Management
 
Get the Green Light to Go Greener
Get the Green Light to Go GreenerGet the Green Light to Go Greener
Get the Green Light to Go Greener
 
Intro Imms Final
Intro Imms FinalIntro Imms Final
Intro Imms Final
 
Energy Management And Cost Control Fall2008
Energy Management And Cost Control Fall2008Energy Management And Cost Control Fall2008
Energy Management And Cost Control Fall2008
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
 
Automation Strategies For Efficiency - California Savings Summit 2013
Automation Strategies For Efficiency - California Savings Summit 2013Automation Strategies For Efficiency - California Savings Summit 2013
Automation Strategies For Efficiency - California Savings Summit 2013
 
Emvc enviromonitoring 2013
Emvc enviromonitoring 2013Emvc enviromonitoring 2013
Emvc enviromonitoring 2013
 
Seven Habits of Highly Effective Energy Managers
Seven Habits of Highly Effective Energy ManagersSeven Habits of Highly Effective Energy Managers
Seven Habits of Highly Effective Energy Managers
 

Mehr von SchoolDude

Success Strategies in School Capital Planning
Success Strategies in School Capital PlanningSuccess Strategies in School Capital Planning
Success Strategies in School Capital Planning
SchoolDude
 
Small Schools IT Webcast
Small Schools IT WebcastSmall Schools IT Webcast
Small Schools IT Webcast
SchoolDude
 

Mehr von SchoolDude (20)

2016 Look Ahead
2016 Look Ahead2016 Look Ahead
2016 Look Ahead
 
Setting up for Success: Planning Ahead
Setting up for Success: Planning AheadSetting up for Success: Planning Ahead
Setting up for Success: Planning Ahead
 
Hidden Threats: Legionella and Managing Risk through PM
Hidden Threats: Legionella and Managing Risk through PMHidden Threats: Legionella and Managing Risk through PM
Hidden Threats: Legionella and Managing Risk through PM
 
Setting up for Success: Reactive meets Preventive
Setting up for Success: Reactive meets PreventiveSetting up for Success: Reactive meets Preventive
Setting up for Success: Reactive meets Preventive
 
Setting up for Success: Unlocking Events
Setting up for Success: Unlocking EventsSetting up for Success: Unlocking Events
Setting up for Success: Unlocking Events
 
Setting up for Success: School Technology
Setting up for Success: School TechnologySetting up for Success: School Technology
Setting up for Success: School Technology
 
Facility Scheduling Automation
Facility Scheduling AutomationFacility Scheduling Automation
Facility Scheduling Automation
 
How to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramHow to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance Program
 
Energy Management Best Practices - SchoolDude
Energy Management Best Practices - SchoolDudeEnergy Management Best Practices - SchoolDude
Energy Management Best Practices - SchoolDude
 
Jump Start your PM Program
Jump Start your PM ProgramJump Start your PM Program
Jump Start your PM Program
 
Success Strategies in School Capital Planning
Success Strategies in School Capital PlanningSuccess Strategies in School Capital Planning
Success Strategies in School Capital Planning
 
Disaster & Emergency Preparedness
Disaster & Emergency PreparednessDisaster & Emergency Preparedness
Disaster & Emergency Preparedness
 
To Change or Not to Change - How to Develop a Facilities Vision - Wisconsin S...
To Change or Not to Change - How to Develop a Facilities Vision - Wisconsin S...To Change or Not to Change - How to Develop a Facilities Vision - Wisconsin S...
To Change or Not to Change - How to Develop a Facilities Vision - Wisconsin S...
 
Power4Schools and SchoolDude
Power4Schools and SchoolDude Power4Schools and SchoolDude
Power4Schools and SchoolDude
 
Small Schools IT Webcast
Small Schools IT WebcastSmall Schools IT Webcast
Small Schools IT Webcast
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013
 
The Efficient Event - California Savings Summit 2013
The Efficient Event - California Savings Summit 2013The Efficient Event - California Savings Summit 2013
The Efficient Event - California Savings Summit 2013
 
Developing A Facilities Vision - California Savings Summit 2013
Developing A Facilities Vision - California Savings Summit 2013Developing A Facilities Vision - California Savings Summit 2013
Developing A Facilities Vision - California Savings Summit 2013
 
The Efficient Event - Savings Summit 2013
The Efficient Event - Savings Summit 2013The Efficient Event - Savings Summit 2013
The Efficient Event - Savings Summit 2013
 
Effective Energy Management - Savings Summit 2013
Effective Energy Management - Savings Summit 2013Effective Energy Management - Savings Summit 2013
Effective Energy Management - Savings Summit 2013
 

Key Performance Indicators for Facility Operations (from ASBO MD & DC Savings Summit)