3. Project Objective
• Control release of PCBs from Hangar 1 in accordance
with EE/CA (July 2008) and Action Memorandum
(December 2008)
Demolition of interior structures
Removal of contaminated siding
Application of weather-resistant coating to steel frame
3
4. Continued Monitoring and
Protection Measures
• No observed impacts to biological
activity
• Continued storm water and ground
surface protection
• Navy and NASA air monitoring data
demonstrates control of air emissions
4
6. Hangar 1 Interactive CD
• Delay in final production. CD will contain interactive
history and interviews but not 3-D tour.
• Navy and NASA
looking into a web
based version that
will be hosted by
NASA website and
will contain both the
interactive materials
and 3-D tour!
6
22. Fiber Board Removal
• Fiber boards surround
tracks of Clam Shell doors
• Recently sampled and
determined to contain
contamination
• Not structural
• Navy to remove boards
but keep rails in-place
• NASA to consider
replacement in re-use
22