WELCOME
to
BATAM
Batam Indonesia Free Zone Authority
(BIFZA)
Legal Platform Batam Free Trade Zone
Laws No 44 Year 2007
• FREE TRADE ZONE AND FREE PORT

Government Regulation No 46 Year 2007
• FREE TRADE ZONE AND FREE PORT IN BATAM

Presidential Decree No 9 Year 2008
• REGIONAL COUNCIL FOR FREE TRADE ZONE AND FREE PORT IN BATAM
Batam Indonesia Free Zone Authority
(BIFZA)
Strategic Location of Batam

20 km

Batam Indonesia Free Zone Authority
(BIFZA)
Mission
Trading

Transshipment

Services

Batam Indonesia Free Zone Authority
(BIFZA)
Master Plan BARELANG Batam-Rempang-Galang

Total Area : 715 km²

Batam Indonesia Free Zone Authority
Modern Infrastructure

Batam Indonesia Free Zone Authority
(BIFZA)
Sea & Cargo Port
1. Berth Capacity Port
Batu Ampar,
Berth Length
Depth
Open Storage
Warehouse

: 35,000 DWT
: 1,250 m (3,600 m)
: 6 - 12 m (14 m)
: 214,000 m² (230,950 TEUS)
: 19,500 m² ( 208,950 m²)

2. Sekupang, Port & Terminal
Berth Capacity
Berth Length
Depth
Open Storage
Warehouse

3. Berth Capacity
Kabil, Port

: 10,000 DWT ( 15,000 DWT)
: 177 m (1,200 m)
: 9 m (12 m)
: 116,100 m² (143,600 TEUS)
: 42,240 m² ( 92,000 m²)

6

1
8
2

7

5

9

: 35,000 DWT ( 150,000 DWT)
Berth Length
: 420 m (5,500 m)
Depth
: 12 m (18 m)
Open Storage
: 100,000 m² (2,500,000 TEUS)
4. Kabil Citranusa, Port
Warehouse
: 1,890 m²
Berth Capacity : 30,000 DWT
Berth Length
: 176 m
Depth
: 10 m
Open Storage
: 200,000 m²
Warehouse
: 10,000 m²

5. Teluk Senimba, International Terminal
6. Nongsapura, International Terminal
7. Batam Centre, International Terminal
8. Harbor Bay, International Termina
9. Telaga Punggur, Domestic Terminal

4
3

Batam Indonesia Free Zone Authority
(BIFZA)
Hang Nadim International Airport
DESCRIPTION
RUNWAY
APRON
TERMINAL
AIRCRAFT
TERMINAL CAPACITY
FREIGHT STORAGE
FUEL STORAGE

UNIT
Meters
M²
M²
Type 7
Passengers per Year
Tones
Kiloliter

EXISTING CONDITION
4025 X 45
110,541
27,065 (4 Pairs of Boarding Bridge)
B 747
3,300,000
16,230
52,000

ULTIMATE DESIGN
4025 X 45
170,000
88,000 (12 pairs of Boarding Bridge)
B 747
8,300,000
700,000
52,000

Batam Indonesia Free Zone Authority
(BIFZA)
Electricity, Roads, Telecommunication
Electrical Power Supply
1. State Owned Electrical Company Power Plant
2. Private Owned Power Plant
Total Capacity

127.932 MW
359.827 MW
509.632 MW

Source: PLN Batam

Roads
Arterial Road
Collector Road
Local Road

474.78 Km
352 Km
850 Km

Total Roads Constructed

1,676.78 Km

Telecommunication
Existing Capacity 111,768 Line Unit

Source: Telkom Batam
Batam Indonesia Free Zone Authority
(BIFZA)
Fresh Water Supply
VOLUME

WTP DESIGN CAPACITY

OPERATIONAL

3,600,000 m³

210 L/ SEC

212,96 L/ SEC

BALOI RESERVOIR

270,000 m³

30 L/ SEC

26,10 L/ SEC

SEI NONGSA RESERVOIR

720,000 m³

60 L/ SEC

85,64 L/ SEC

9,490,000 m³

240 L/ SEC

316,40 L/ SEC

MUKAKUNING RESERVOIR

12,270,000 m³

310 L/ SEC

333,52 L/ SEC

DURIANGKANG RESERVOIR
TEMBESI PLANNED
RESERVOIR
REMPANG RESERVOIR

78,180,000 m³

3,000 L/ SEC

1,368.72 L/ SEC

41,876,080 m³

540 L/ SEC

5,166,400 m³

-

RESERVOIR NAME
SEI HARAPAN RESERVOIR

SEI LADI RESERVOIR

SEI GONG RESERVOIR

TOTAL

109,696,400 m³

20 L/ SEC

4,102 L/ SEC

2,343.34 L/ SEC

Fresh Water Service
-Number Of InstallationTreatment Installation
Facility of Waste Water : 127 , 131 Installations
-Domestic Capacity : 33 Litre / sec
-Area of Industrial Toxic & Hazardous Wastes Treatment :19,7Ha
Batam Indonesia Free Zone Authority
(BIFZA)
Infrastructure of Information Technology

Batam Indonesia Free Zone Authority
(BIFZA)
Public Gas Facility

Gas from Grissik (Jambi) was established August 2003
Batam Indonesia Free Zone
Establish public gas network for households & commercials purposes Authority
(BIFZA)
Total Investment
USD 5.818 Billion
(Domestic Investment)

USD 3.367 Billion
(Government Investment)

Up to June 2013

USD 6.949 Billion
(Foreign Investment)

Ratio of Goverment & Private Invesment = 1:3.79
Government Investment

USD 3.367

20,87 %

Foreign Investment

USD 6.949

43,07 %

Domestic Investment
Total

USD 5.818
Batam Indonesia Free Zone Authority
(BIFZA)
USD 16 .135

36,06 %
100,00 %
Population
1,168,741

1,200,000
1,137,894

1,128,610

1,150,000

Up to June 2013

1,100,000
1,039,852
1,050,000
988,555
1,000,000
950,000
900,000
850,000
2009

2010

2011

Source: Batam Demography and Settlement Office

2012

2013

Batam Indonesia Free Zone Authority
(BIFZA)
Work Force
350,000

Indonesian

Foreign

Up to June 2013

333,592

320,892

313,544

288,318
300,000

267,862

250,000
200,000
150,000
100,000
50,000

5,108

4,495

5,820

5,510

5,970

0
2009

Source : Batam Labour Office

2010

2011

2012

2013
Batam Indonesia Free Zone Authority
Industrial Estates
Up to June 2013

22 Industrial Estates
990 Multinational Companies

Batam Indonesia Free Zone Authority
(BIFZA)
Some of Multinational Companies Operating in Batam

Batam Indonesia Free Zone Authority
(BIFZA)
Hotels and Resorts
64 Hotels
(one to four-star hotels)

2 Marinas

Batam Indonesia Free Zone Authority
(BIFZA)
Foreign Visitors
1,137,894

1,200,000
988,555

1,168,741

/ Thousand people

1,039,852

Up to June 2013

1,000,000

800,000

643,676

600,000

400,000

200,000

0
2009

2010

Source : Central Bureau of Batam

2011

2012

2013

Batam Indonesia Free Zone Authority
(BIFZA)
Forthcoming Infrastructure Projects

Batam Indonesia Free Zone Authority
(BIFZA)
Batu Ampar Cargo Port

Data

Existing

Phase 1

Ultimate

35,000
90,000

6th Generation
2,000,000

6th Generation
4,000,000

Berth Length (m)

600

1800

3000

Basin Depth (mLWS)

6-12

17

17

Berth Capacity (DWT)
- Ship (DWT)
- Container (TEUs

Foreign Investment in Batam : Prospects & Opportunities
Public Transportation and Toll Roads
Project Specification
Length : 25.00 km
Design Speed : 80.00 km/h
Number of Lane : 2x2 Lanes
Lane of Width : 3.60 m
Outer Shoulder Width : 3.00 m
Inner Shoulder Width : 1.50m
Median Width : N/A
Right of Way : 40.00 m (min.)
Expected Time of Implementation
Project Preparation
: 2010
Tender
: 2012
Contract Signing
: 2013
Construction
: 2013-2015
Operation
: 2016
Batam Indonesia Free Zone Authority
International Convention Centre

•
•
•
•
•
•

Conferences : 50,000 m 2
Art & Cultural Performances
Hotel (500 rooms)
Visitor Centre
Marina
Parks
Batam Indonesia Free Zone Authority
(BIFZA)
Wastewater Treatment System

Current Waste Production
Ultimate Design
Location

: 33 lt/sec
: 340 lt/sec
: Batu Ampar / Nagoya / Sekupang
Batam – Bintan Bridge

Structure : Combination
• Cable Stayed
• Double Box Girder
Total Length : 6,686.9 meters
Configurations :
• Cable Stayed (370-900-370) meters
• Double Box Girder
• 20-30 meters (part of cable stayed)
Pylon :
• Height 160 m above the sea level
Roads :
• Four lines

Batam Indonesia Free Zone Authority
(BIFZA)
Advantages in Batam

Batam Indonesia Free Zone Authority
(BIFZA)
Integrated Investment Service Unit
•

Under one-roof policy to simplify investment
licenses and permits both from the Indonesian
Central Government and local Government of
Batam, Bintan and Karimun

•

Officially launched on 25 July 2006 at Sumatera
Promotion Center ( SPC )

•

Institutions included :
- Investment Coordinating Board
- Ministry Of Finance
( Taxation and Customs & Excise )
- Ministry Of Manpower
- Ministry Of Laws & Human Rights
( Immigration )
- Batam Indonesia Free Zone Authority
- Municipality Of Batam
Batam Indonesia Free Zone Authority
(BIFZA)
Roadmap Batam Free Trade Zone
Investment Incentives
Exemption on Import/Export Tax

Exemption on Value Added Tax (VAT)

GSP Facility (Generalized System of Preferences)
Double Taxation Avoidance Agreement with

57 countries
Competitive Investment & Operation Cost

Batam Indonesia Free Zone Authority
(BIFZA)
Why Invest in Batam
Strategic Location
Modern Facilities
Free Trade Zone

Reliable Infrastructures
Clean & Health Environment
Safety and Security
Competitive Investment Cost
Government Support
Batam Indonesia Free Zone Authority
(BIFZA)
For Further Information :
Batam Head Office
BIDA Building
Batam Centre, Batam 29400
Tel. (62-778) 462047, 462048
Fax. (62-778) 462240, 462456
E-mail : inquiry@bpbatam.go.id
marketing@bpbatam.go.id

Jakarta Representative Office
Jl. DI Panjaitan Kav 24
Jakarta 13410
Tel : (62-21) 8580009, 8580010, 8580011
Fax : (62-21) 8580038
Japan BIDA Liaison Officer
Shinsabashi TOEI Building
7FI.4-12-22 Minami Semba
Chuo-ku, Osaka
Phone / Fax : (81-6) 6253-6133,
Fax (81-6) 6253-6134
Email : batamosaka@alpha.ocn.ne.jp
Singapore Liaison Officer

www.bpbatam.go.id

Mrs. Gloria Tan
111 North Bridge Road
Peninsula Plaza #21-01
Singapore 179098
Tel : (65) 67343411
Fax : (65) 62359959
E-mail: bidasin@yahoo.com ;
Batam Indonesia Free Zone Authority
gloria@batam.go.id
(BIFZA)
Thank You
Batam Indonesia Free Zone Authority
(BIFZA)

Weitere ähnliche Inhalte

Ähnlich wie BIFZA PRESENTATION

Boi Gen Presentation 2007 March
Boi Gen Presentation 2007 MarchBoi Gen Presentation 2007 March
Boi Gen Presentation 2007 Marchnihalsa
 
Sri Lanka - The hub of South Asia
Sri Lanka - The hub of South AsiaSri Lanka - The hub of South Asia
Sri Lanka - The hub of South AsiaenergiewaechterGmbH
 
Presentation 14.3.2012(bc) dawei
Presentation 14.3.2012(bc) daweiPresentation 14.3.2012(bc) dawei
Presentation 14.3.2012(bc) daweiAye Kywe
 
6 industry sector_ms yam kumari khatiwada
6 industry sector_ms yam kumari khatiwada6 industry sector_ms yam kumari khatiwada
6 industry sector_ms yam kumari khatiwadaNepalInvestment
 
Regional ports interregional trade flows of grain production of Indonesia
Regional ports interregional trade flows of grain production of IndonesiaRegional ports interregional trade flows of grain production of Indonesia
Regional ports interregional trade flows of grain production of IndonesiaEugene Tkachenko
 
Moya Group Profile Company (Moya Indonesia Holdings)
Moya Group Profile Company (Moya Indonesia Holdings)Moya Group Profile Company (Moya Indonesia Holdings)
Moya Group Profile Company (Moya Indonesia Holdings)ibadil haqqi
 
Management Presentation 2016_Update 1Q-16_v20
Management Presentation 2016_Update 1Q-16_v20Management Presentation 2016_Update 1Q-16_v20
Management Presentation 2016_Update 1Q-16_v20Adrianto Januri
 
LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...
LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...
LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...Setiono Winardi
 
Special Investment Regions (SIR) in Gujarat
Special Investment Regions (SIR) in GujaratSpecial Investment Regions (SIR) in Gujarat
Special Investment Regions (SIR) in GujaratVibrant Gujarat Summit
 
A financial analysis on Astro's performance 2014
A financial analysis on Astro's performance 2014A financial analysis on Astro's performance 2014
A financial analysis on Astro's performance 2014Roziana Mohammad
 
AAI bhubneshwar Project photograph
AAI bhubneshwar Project photographAAI bhubneshwar Project photograph
AAI bhubneshwar Project photographengineeringwatch
 
CTI-BUY-InitialValuationReport-29.06.2015
CTI-BUY-InitialValuationReport-29.06.2015CTI-BUY-InitialValuationReport-29.06.2015
CTI-BUY-InitialValuationReport-29.06.2015vinh nguyen
 

Ähnlich wie BIFZA PRESENTATION (20)

TRAIN 1, TRAIN 2 and fiscal incentives
TRAIN 1, TRAIN 2 and fiscal incentivesTRAIN 1, TRAIN 2 and fiscal incentives
TRAIN 1, TRAIN 2 and fiscal incentives
 
Boi Gen Presentation 2007 March
Boi Gen Presentation 2007 MarchBoi Gen Presentation 2007 March
Boi Gen Presentation 2007 March
 
Sri Lanka - The hub of South Asia
Sri Lanka - The hub of South AsiaSri Lanka - The hub of South Asia
Sri Lanka - The hub of South Asia
 
Presentation 14.3.2012(bc) dawei
Presentation 14.3.2012(bc) daweiPresentation 14.3.2012(bc) dawei
Presentation 14.3.2012(bc) dawei
 
Ind ii fgd (1) npmp presentation 9 august 2011 final
Ind ii fgd (1)  npmp presentation 9 august 2011 finalInd ii fgd (1)  npmp presentation 9 august 2011 final
Ind ii fgd (1) npmp presentation 9 august 2011 final
 
6 industry sector_ms yam kumari khatiwada
6 industry sector_ms yam kumari khatiwada6 industry sector_ms yam kumari khatiwada
6 industry sector_ms yam kumari khatiwada
 
Regional ports interregional trade flows of grain production of Indonesia
Regional ports interregional trade flows of grain production of IndonesiaRegional ports interregional trade flows of grain production of Indonesia
Regional ports interregional trade flows of grain production of Indonesia
 
TRAIN law vs Federalism, PPP
TRAIN law vs Federalism, PPPTRAIN law vs Federalism, PPP
TRAIN law vs Federalism, PPP
 
Laem Chabang Port Development Project
Laem Chabang Port Development ProjectLaem Chabang Port Development Project
Laem Chabang Port Development Project
 
Moya Group Profile Company (Moya Indonesia Holdings)
Moya Group Profile Company (Moya Indonesia Holdings)Moya Group Profile Company (Moya Indonesia Holdings)
Moya Group Profile Company (Moya Indonesia Holdings)
 
Management Presentation 2016_Update 1Q-16_v20
Management Presentation 2016_Update 1Q-16_v20Management Presentation 2016_Update 1Q-16_v20
Management Presentation 2016_Update 1Q-16_v20
 
Sudan Leather Industrial Estate
Sudan Leather Industrial Estate Sudan Leather Industrial Estate
Sudan Leather Industrial Estate
 
CBFEZ Brochure
CBFEZ BrochureCBFEZ Brochure
CBFEZ Brochure
 
LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...
LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...
LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...
 
Thailand Marine Destination of Asia
Thailand Marine Destination of AsiaThailand Marine Destination of Asia
Thailand Marine Destination of Asia
 
Special Investment Regions (SIR) in Gujarat
Special Investment Regions (SIR) in GujaratSpecial Investment Regions (SIR) in Gujarat
Special Investment Regions (SIR) in Gujarat
 
Lect 03 ppp kppip
Lect 03 ppp kppipLect 03 ppp kppip
Lect 03 ppp kppip
 
A financial analysis on Astro's performance 2014
A financial analysis on Astro's performance 2014A financial analysis on Astro's performance 2014
A financial analysis on Astro's performance 2014
 
AAI bhubneshwar Project photograph
AAI bhubneshwar Project photographAAI bhubneshwar Project photograph
AAI bhubneshwar Project photograph
 
CTI-BUY-InitialValuationReport-29.06.2015
CTI-BUY-InitialValuationReport-29.06.2015CTI-BUY-InitialValuationReport-29.06.2015
CTI-BUY-InitialValuationReport-29.06.2015
 

BIFZA PRESENTATION

  • 1. WELCOME to BATAM Batam Indonesia Free Zone Authority (BIFZA)
  • 2. Legal Platform Batam Free Trade Zone Laws No 44 Year 2007 • FREE TRADE ZONE AND FREE PORT Government Regulation No 46 Year 2007 • FREE TRADE ZONE AND FREE PORT IN BATAM Presidential Decree No 9 Year 2008 • REGIONAL COUNCIL FOR FREE TRADE ZONE AND FREE PORT IN BATAM Batam Indonesia Free Zone Authority (BIFZA)
  • 3. Strategic Location of Batam 20 km Batam Indonesia Free Zone Authority (BIFZA)
  • 5. Master Plan BARELANG Batam-Rempang-Galang Total Area : 715 km² Batam Indonesia Free Zone Authority
  • 6. Modern Infrastructure Batam Indonesia Free Zone Authority (BIFZA)
  • 7. Sea & Cargo Port 1. Berth Capacity Port Batu Ampar, Berth Length Depth Open Storage Warehouse : 35,000 DWT : 1,250 m (3,600 m) : 6 - 12 m (14 m) : 214,000 m² (230,950 TEUS) : 19,500 m² ( 208,950 m²) 2. Sekupang, Port & Terminal Berth Capacity Berth Length Depth Open Storage Warehouse 3. Berth Capacity Kabil, Port : 10,000 DWT ( 15,000 DWT) : 177 m (1,200 m) : 9 m (12 m) : 116,100 m² (143,600 TEUS) : 42,240 m² ( 92,000 m²) 6 1 8 2 7 5 9 : 35,000 DWT ( 150,000 DWT) Berth Length : 420 m (5,500 m) Depth : 12 m (18 m) Open Storage : 100,000 m² (2,500,000 TEUS) 4. Kabil Citranusa, Port Warehouse : 1,890 m² Berth Capacity : 30,000 DWT Berth Length : 176 m Depth : 10 m Open Storage : 200,000 m² Warehouse : 10,000 m² 5. Teluk Senimba, International Terminal 6. Nongsapura, International Terminal 7. Batam Centre, International Terminal 8. Harbor Bay, International Termina 9. Telaga Punggur, Domestic Terminal 4 3 Batam Indonesia Free Zone Authority (BIFZA)
  • 8. Hang Nadim International Airport DESCRIPTION RUNWAY APRON TERMINAL AIRCRAFT TERMINAL CAPACITY FREIGHT STORAGE FUEL STORAGE UNIT Meters M² M² Type 7 Passengers per Year Tones Kiloliter EXISTING CONDITION 4025 X 45 110,541 27,065 (4 Pairs of Boarding Bridge) B 747 3,300,000 16,230 52,000 ULTIMATE DESIGN 4025 X 45 170,000 88,000 (12 pairs of Boarding Bridge) B 747 8,300,000 700,000 52,000 Batam Indonesia Free Zone Authority (BIFZA)
  • 9. Electricity, Roads, Telecommunication Electrical Power Supply 1. State Owned Electrical Company Power Plant 2. Private Owned Power Plant Total Capacity 127.932 MW 359.827 MW 509.632 MW Source: PLN Batam Roads Arterial Road Collector Road Local Road 474.78 Km 352 Km 850 Km Total Roads Constructed 1,676.78 Km Telecommunication Existing Capacity 111,768 Line Unit Source: Telkom Batam Batam Indonesia Free Zone Authority (BIFZA)
  • 10. Fresh Water Supply VOLUME WTP DESIGN CAPACITY OPERATIONAL 3,600,000 m³ 210 L/ SEC 212,96 L/ SEC BALOI RESERVOIR 270,000 m³ 30 L/ SEC 26,10 L/ SEC SEI NONGSA RESERVOIR 720,000 m³ 60 L/ SEC 85,64 L/ SEC 9,490,000 m³ 240 L/ SEC 316,40 L/ SEC MUKAKUNING RESERVOIR 12,270,000 m³ 310 L/ SEC 333,52 L/ SEC DURIANGKANG RESERVOIR TEMBESI PLANNED RESERVOIR REMPANG RESERVOIR 78,180,000 m³ 3,000 L/ SEC 1,368.72 L/ SEC 41,876,080 m³ 540 L/ SEC 5,166,400 m³ - RESERVOIR NAME SEI HARAPAN RESERVOIR SEI LADI RESERVOIR SEI GONG RESERVOIR TOTAL 109,696,400 m³ 20 L/ SEC 4,102 L/ SEC 2,343.34 L/ SEC Fresh Water Service -Number Of InstallationTreatment Installation Facility of Waste Water : 127 , 131 Installations -Domestic Capacity : 33 Litre / sec -Area of Industrial Toxic & Hazardous Wastes Treatment :19,7Ha Batam Indonesia Free Zone Authority (BIFZA)
  • 11. Infrastructure of Information Technology Batam Indonesia Free Zone Authority (BIFZA)
  • 12. Public Gas Facility Gas from Grissik (Jambi) was established August 2003 Batam Indonesia Free Zone Establish public gas network for households & commercials purposes Authority (BIFZA)
  • 13. Total Investment USD 5.818 Billion (Domestic Investment) USD 3.367 Billion (Government Investment) Up to June 2013 USD 6.949 Billion (Foreign Investment) Ratio of Goverment & Private Invesment = 1:3.79 Government Investment USD 3.367 20,87 % Foreign Investment USD 6.949 43,07 % Domestic Investment Total USD 5.818 Batam Indonesia Free Zone Authority (BIFZA) USD 16 .135 36,06 % 100,00 %
  • 14. Population 1,168,741 1,200,000 1,137,894 1,128,610 1,150,000 Up to June 2013 1,100,000 1,039,852 1,050,000 988,555 1,000,000 950,000 900,000 850,000 2009 2010 2011 Source: Batam Demography and Settlement Office 2012 2013 Batam Indonesia Free Zone Authority (BIFZA)
  • 15. Work Force 350,000 Indonesian Foreign Up to June 2013 333,592 320,892 313,544 288,318 300,000 267,862 250,000 200,000 150,000 100,000 50,000 5,108 4,495 5,820 5,510 5,970 0 2009 Source : Batam Labour Office 2010 2011 2012 2013 Batam Indonesia Free Zone Authority
  • 16. Industrial Estates Up to June 2013 22 Industrial Estates 990 Multinational Companies Batam Indonesia Free Zone Authority (BIFZA)
  • 17. Some of Multinational Companies Operating in Batam Batam Indonesia Free Zone Authority (BIFZA)
  • 18. Hotels and Resorts 64 Hotels (one to four-star hotels) 2 Marinas Batam Indonesia Free Zone Authority (BIFZA)
  • 19. Foreign Visitors 1,137,894 1,200,000 988,555 1,168,741 / Thousand people 1,039,852 Up to June 2013 1,000,000 800,000 643,676 600,000 400,000 200,000 0 2009 2010 Source : Central Bureau of Batam 2011 2012 2013 Batam Indonesia Free Zone Authority (BIFZA)
  • 20. Forthcoming Infrastructure Projects Batam Indonesia Free Zone Authority (BIFZA)
  • 21. Batu Ampar Cargo Port Data Existing Phase 1 Ultimate 35,000 90,000 6th Generation 2,000,000 6th Generation 4,000,000 Berth Length (m) 600 1800 3000 Basin Depth (mLWS) 6-12 17 17 Berth Capacity (DWT) - Ship (DWT) - Container (TEUs Foreign Investment in Batam : Prospects & Opportunities
  • 22. Public Transportation and Toll Roads Project Specification Length : 25.00 km Design Speed : 80.00 km/h Number of Lane : 2x2 Lanes Lane of Width : 3.60 m Outer Shoulder Width : 3.00 m Inner Shoulder Width : 1.50m Median Width : N/A Right of Way : 40.00 m (min.) Expected Time of Implementation Project Preparation : 2010 Tender : 2012 Contract Signing : 2013 Construction : 2013-2015 Operation : 2016 Batam Indonesia Free Zone Authority
  • 23. International Convention Centre • • • • • • Conferences : 50,000 m 2 Art & Cultural Performances Hotel (500 rooms) Visitor Centre Marina Parks Batam Indonesia Free Zone Authority (BIFZA)
  • 24. Wastewater Treatment System Current Waste Production Ultimate Design Location : 33 lt/sec : 340 lt/sec : Batu Ampar / Nagoya / Sekupang
  • 25. Batam – Bintan Bridge Structure : Combination • Cable Stayed • Double Box Girder Total Length : 6,686.9 meters Configurations : • Cable Stayed (370-900-370) meters • Double Box Girder • 20-30 meters (part of cable stayed) Pylon : • Height 160 m above the sea level Roads : • Four lines Batam Indonesia Free Zone Authority (BIFZA)
  • 26. Advantages in Batam Batam Indonesia Free Zone Authority (BIFZA)
  • 27. Integrated Investment Service Unit • Under one-roof policy to simplify investment licenses and permits both from the Indonesian Central Government and local Government of Batam, Bintan and Karimun • Officially launched on 25 July 2006 at Sumatera Promotion Center ( SPC ) • Institutions included : - Investment Coordinating Board - Ministry Of Finance ( Taxation and Customs & Excise ) - Ministry Of Manpower - Ministry Of Laws & Human Rights ( Immigration ) - Batam Indonesia Free Zone Authority - Municipality Of Batam Batam Indonesia Free Zone Authority (BIFZA)
  • 28. Roadmap Batam Free Trade Zone
  • 29. Investment Incentives Exemption on Import/Export Tax Exemption on Value Added Tax (VAT) GSP Facility (Generalized System of Preferences) Double Taxation Avoidance Agreement with 57 countries Competitive Investment & Operation Cost Batam Indonesia Free Zone Authority (BIFZA)
  • 30. Why Invest in Batam Strategic Location Modern Facilities Free Trade Zone Reliable Infrastructures Clean & Health Environment Safety and Security Competitive Investment Cost Government Support Batam Indonesia Free Zone Authority (BIFZA)
  • 31. For Further Information : Batam Head Office BIDA Building Batam Centre, Batam 29400 Tel. (62-778) 462047, 462048 Fax. (62-778) 462240, 462456 E-mail : inquiry@bpbatam.go.id marketing@bpbatam.go.id Jakarta Representative Office Jl. DI Panjaitan Kav 24 Jakarta 13410 Tel : (62-21) 8580009, 8580010, 8580011 Fax : (62-21) 8580038 Japan BIDA Liaison Officer Shinsabashi TOEI Building 7FI.4-12-22 Minami Semba Chuo-ku, Osaka Phone / Fax : (81-6) 6253-6133, Fax (81-6) 6253-6134 Email : batamosaka@alpha.ocn.ne.jp Singapore Liaison Officer www.bpbatam.go.id Mrs. Gloria Tan 111 North Bridge Road Peninsula Plaza #21-01 Singapore 179098 Tel : (65) 67343411 Fax : (65) 62359959 E-mail: bidasin@yahoo.com ; Batam Indonesia Free Zone Authority gloria@batam.go.id (BIFZA)
  • 32. Thank You Batam Indonesia Free Zone Authority (BIFZA)