Bolger Center PPT
1. Bolger Center
Tennis Court Renovation Project
Esther Han
Yen Loi
Sakura Shu
Yelena Simoen
Donnell Washington
2. Mission
Our goal is to create a premier venue
that will enhance the guests’ visit at the
Bolger Center. With the amount of
space the property has, our idea of
creating a luxurious tent will bring
memorable experiences to all guests.
3. Mission- Cont’d
•Theme and its importance to design
•How the space is utilized
•Mode of service challenges projected to
design
6. Construction Proposal
The inspiration of this proposal derives from our client’s preference of
utilizing the venue as a semi-outdoor meeting space and the flexibility of
using the venue as a seasonal alternative.
Due to the variation of outdoor tents, we are attaching two possible structures which the
client can determine which selection can more suitable for the Bolger Center.
7. Square Footage For Guests
Type of Dining
Spacious, Elegant
Restaurant, Cafeteria
Banquet, Institute
Sq. Ft Per Person
20
18
16
Type of Dining
Allowance For
Table, chair and full aisle
Table, chair and aisle
Table, chair and narrow
aisle
Number of Guest
Spacious, Elegant
250
Restaurant, Cafeteria
278
Banquet, Institute
312
11. Proposals
Temporary Frame
Semi-Permanent
VS
Dimensions: 50’ x 100’
Frame Material: Standing Aluminum
Pipe Structure
Tent Top Material: High Polish Laminate
Color Availability: White, Colored
Stripes*, Translucent*
Current Market Value: $12,760*
Warranty: 12 Months
Dimensions: 50’ x 100’
Frame Material: Aluminum Alloy
Tent Top Material: PVC Synthetic Fiber
Tarpaulin
Color Availability: Clear
Wind-Proof Ability: 80-100 kilometers/hour
Current Market Value: $1,143,000
Warranty: 24 Months
12.
13.
14. Financial Comparative Analysis
Proposal 1 Budget Forecast- Temporary
Proposal 2 Budget Forecast- Semi-Permanent
Footnotes
Budget
Plan
Footnotes
Budget
Plan
Landscaping
$ 400,000.00
Construction
$ 1,030,200.00
Landscaping
$ 400,000.00
Construction
Calculation based on
estimates on square
footage
$ 1,030,200.00
$ 1,430,200.00
Calculation based on
estimates on square
footage
$ 1,430,200.00
Fixtures
Fixtures
Tent
$
12,760.00
Temporary frame
Tent
Lighting
$
950.00
Floor Covers
$
HVAC
$
Heavy duty lighting*
Lighting
22,500.00
Faux Slate $4.50 per sq.
ft. *
Floor Covers
$
-
Included in tent
package
4,998.00
2 at $2,499 for coverage
of 5,000 sq. ft
HVAC
$
-
Included in tent
package
$
$ 1,143,000.00
$
Semi-permanent
950.00
41,208.00
Heavy duty lighting*
$ 1,143,950.00
Furnishing
Furnishing
Chairs &
Tables
$
9,500.00
Estimate for 300 chairs*
Chairs &
Tables
$
9,500.00
Décor
$
1,500.00
Estimate for 50 round
tables*
Décor
$
1,500.00
$
11,000.00
Estimate for 300
chairs*
Estimate for 50 round
tables*
$
Permits
11,000.00
Permits
Demolition
$
-
Construction
$
-
Demolition
$
-
Subtotal
$ 1,430,200.00
Total
$ 1,482,408.00
$
-
Construction
Tennis court and tent
set-up do not require
county permits
$
-
Tennis court and tent
set-up do not require
county permits
$
Does not include tables
and chairs
-
Subtotal
$ 1,430,200.00
Total
$ 2,585,150.00
Does not include
tables and chairs
15. Renovation Overall Process
Determine
Square Footage
Demolition
Construction
Building
Structure
Landscaping
Decor
Options
Obtain
Permits
Budget
Seating
Arrangement
Determine
Service Flow
Explain that we are using 5000 sq. ft as the guideline to search for tents.
Also talk about the advantages and disadvantages of each, which can be found in proposal.
Explain the original landscape
Explain changes: handicap walkways added, new stairs added, pushing the venue 6ft backwards and the construction of stage.
This is a financial comparison of the two proposals: left-temporary tent vs right- semi-permanent. As you can see, except for the furnishing category, every other expense group is constant; and this is due to the purchasing of different tents. So in proposal 1, the projected total renovation cost approximately $1.5M and proposal 2 has the projection of $2.5, which is $1M more extra than proposal 1. Despite semi-permanent tent is more expensive, it has the benefits of a more elegant appearance, the ability of utilizing it throughout all seasons, and generating more banquet revenues. Therefore if having this venue to be available year-round, the second proposal may be a more ideal selection for your return on investment. Talk about furnishings (purple):Due to our knowledge that the Bolger Center prefer renting equipments for special events, these numbers are just estimates of the potential cost of purchasing. Therefore at the bottom we have subtotals, which is everything minus furnishing costs.
This is an illustration of how we approached this project, more details please see the proposal I sent out.