SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Downloaden Sie, um offline zu lesen
UNIVERSITY AT BUFFALO




                                 Project 02
                    Solid Modeling Assignment 02
                                              Ryan R. Bierl
                                               9/23/2009




Project 02 in an extension of Project 01. This project taught us more advanced skills in Pro Engineer.
Some skills included creating an assembly and a helical sweep.
Table of Contents
1     Introduction .......................................................................................................................................... 3
2     Requirements ........................................................................................................................................ 3
3     Results ................................................................................................................................................... 3
    3.1      Part A............................................................................................................................................. 3
    3.2      Part B ............................................................................................................................................. 3
    3.3      Part C ............................................................................................................................................. 4
    3.4      Part E ............................................................................................................................................. 4
    3.5      Part F ............................................................................................................................................. 5
4     Discussion.............................................................................................................................................. 6
5     Conclusion ............................................................................................................................................. 6
6     References ............................................................................................................................................ 6




                                                                               2
1 Introduction
Project 02 served as an extension of Project 01, increasing the skill level to create each part. The parts
created in Project 02 were more complex than the parts created in Project 01. With the aid of the
tutorial and Multimedia CD we were able to learn more advanced skills to create and manage models in
the Pro Engineer program.


2 Requirements
There are five parts to Project 02. To create the five different parts we were required to use the Tutorial
and Multimedia CD.


3 Results
3.1 Part A
When creating this part we had one constraint. We were only allowed to use one solid protrusion and
one cut. At first this seemed to difficult for someone with my skill level in Pro Engineer, but after further
inspection the steps needed to complete the part became very clear. The figure in the Tutorial did not
give a good representation of the actual part, in that it did not clearly show that the two tall sections of
the part were symmetrical. Knowing this made the creation of the part much easier.




                             (a)                                                             (b)
Figure 1 (a) The CAD model of the block in Part A; and (b) the same CAD model of Part A at a different view.

3.2 Part B
In Part B we had to create a Phillips Head Screw.The screw in Part B was very easy to create. The only
problem that I encountered was when creating the slots in the head of the screw. A few times after
creating the first extrusion, when attempting to apply a patter, the pattern resulted in asymmetrical
slots in the screw head. I had to edit my sketch to solve this problem.




                                                              3
(a)                                                              (b)
Figure 2 (a) The CAD model of the screw in Part B; and (b) the same CAD model of Part B at a different view.




3.3 Part C
This section required us to create a spring by creating a Helical Sweep in Pro Engineer. At first I was
unable to create the spring based on the “Helical Sweep Tutorial by DiCorso”. It was unclear when
instructing us to draw a section of the spring, in that I had no idea that it mean just to draw a circle. I
was forced to research the procedure on how to create a spring. I was able to find a good step by step
guide on proengineertips.com.




                             (a)                                                              (b)
Figure 3 (a) The CAD model of the spring in Part C; and (b) the same CAD model of Part C at a different view.




3.4 Part E
Part E was relatively easy. In this part you had to create a 2D drawing showing various views of the
pulley used in Part F. The Tutorial was very helpful in showing us how to create the various views as well
as inserting dimensions. When starting this drawing I had already been exposed to 2D technical drawing.
The only differences were I was doing it on a computer and I was modeling my 2D drawing after a 3D
part I had already created.




                                                              4
(a)
Figure 4 (a) The CAD model of the 2D drawing in part E.




3.5 Part F
Part F consisted of the creation of all the parts of a working pulley assembly. Part F turned out to be the
most involved of all the sections of Project 02. First of all you had to create each of the parts in the
assembly. Then you had to put all of those parts into an aligned view of the blown out assembly.
Although there were many steps in Part F, the Tutorial was very helpful in providing step by step
instructions.




                             (a)                                                             (b)
Figure 4 (a) The CAD model of the assembly in Part F; and (b) the same CAD model of Part F at a different view.




                                                              5
4 Discussion
There were not too many problems in the creation of the parts in Project 02. It was however, very time
consuming. This was the most in depth project in MAE 377 so far. One issue I encountered was the
compatibility of files going from computer to computer. Specifically, I had problems when trying to load
part files that I had created in lab onto my personal computer. To make a long story short I was unable
to load these files because the files created in lab were done so on an educational version. Apparently
the version of Pro Engineer on my personal computer is not compatible with the educational version,
because all other aspects of the two programs are identical.


5 Conclusion
Project 02 was a very involved project and took a lot of time to complete. I was able to learn many
valuable skills in the Pro Engineer program, which I believe to be the goal of this project.. All of these
skills, I am sure, will help me in the future. I was able to complete all of the components of Project 02 to
their specifications.


6 References
The following materials were used to create Project 02:

Pro Engineer Wildfire 4.0 Tutorial and Multimedia CD written by: Roger Toogood, PH.D., Eng.

www.proengineertips.com/part-design




                                                     6

Weitere ähnliche Inhalte

Ähnlich wie Ryan Bierl Mae377 Project02

Jonathan Jones Mae377 Project02
Jonathan Jones Mae377 Project02Jonathan Jones Mae377 Project02
Jonathan Jones Mae377 Project02spiffyjj115
 
Ryan Bierl Mae377 Project06
Ryan Bierl Mae377 Project06Ryan Bierl Mae377 Project06
Ryan Bierl Mae377 Project06rrbierl
 
Jonathan Jones Mae377 Project01
Jonathan Jones Mae377 Project01Jonathan Jones Mae377 Project01
Jonathan Jones Mae377 Project01spiffyjj115
 
Ryan Bierl Mae377 Project04
Ryan Bierl Mae377 Project04Ryan Bierl Mae377 Project04
Ryan Bierl Mae377 Project04rrbierl
 
Ryan Bierl Mae377 Project04
Ryan Bierl Mae377 Project04Ryan Bierl Mae377 Project04
Ryan Bierl Mae377 Project04rrbierl
 
Jonathan Jones Mae377 Project05
Jonathan Jones Mae377 Project05Jonathan Jones Mae377 Project05
Jonathan Jones Mae377 Project05spiffyjj115
 
Jonathan Jones Mae377 Project04
Jonathan Jones Mae377 Project04Jonathan Jones Mae377 Project04
Jonathan Jones Mae377 Project04spiffyjj115
 
Jonathan Jones Mae377 Project06 Final
Jonathan Jones Mae377 Project06 FinalJonathan Jones Mae377 Project06 Final
Jonathan Jones Mae377 Project06 Finalspiffyjj115
 
Ryan Bierl Mae377 Project05
Ryan Bierl Mae377 Project05Ryan Bierl Mae377 Project05
Ryan Bierl Mae377 Project05rrbierl
 
Ryan Bierl Mae377 Project05
Ryan Bierl Mae377 Project05Ryan Bierl Mae377 Project05
Ryan Bierl Mae377 Project05rrbierl
 
internship training and report
internship training and reportinternship training and report
internship training and reportJing Fan Koh
 
Senior Project Presentation
Senior Project PresentationSenior Project Presentation
Senior Project PresentationTim Heath
 
Civil 3 d 2011 tutorials
Civil 3 d 2011 tutorialsCivil 3 d 2011 tutorials
Civil 3 d 2011 tutorialsocramr0111
 
ALEXANDER BRANDT - Solidoworks Portfolio
ALEXANDER BRANDT - Solidoworks PortfolioALEXANDER BRANDT - Solidoworks Portfolio
ALEXANDER BRANDT - Solidoworks PortfolioAlex Brandt
 
Mechanical Designing 6 Months
Mechanical Designing 6 MonthsMechanical Designing 6 Months
Mechanical Designing 6 MonthsPratima Parida
 

Ähnlich wie Ryan Bierl Mae377 Project02 (20)

Jonathan Jones Mae377 Project02
Jonathan Jones Mae377 Project02Jonathan Jones Mae377 Project02
Jonathan Jones Mae377 Project02
 
Ryan Bierl Mae377 Project06
Ryan Bierl Mae377 Project06Ryan Bierl Mae377 Project06
Ryan Bierl Mae377 Project06
 
Jonathan Jones Mae377 Project01
Jonathan Jones Mae377 Project01Jonathan Jones Mae377 Project01
Jonathan Jones Mae377 Project01
 
Ryan Bierl Mae377 Project04
Ryan Bierl Mae377 Project04Ryan Bierl Mae377 Project04
Ryan Bierl Mae377 Project04
 
Ryan Bierl Mae377 Project04
Ryan Bierl Mae377 Project04Ryan Bierl Mae377 Project04
Ryan Bierl Mae377 Project04
 
Jonathan Jones Mae377 Project05
Jonathan Jones Mae377 Project05Jonathan Jones Mae377 Project05
Jonathan Jones Mae377 Project05
 
Project01
Project01Project01
Project01
 
Jonathan Jones Mae377 Project04
Jonathan Jones Mae377 Project04Jonathan Jones Mae377 Project04
Jonathan Jones Mae377 Project04
 
Project 02
Project 02Project 02
Project 02
 
Ar2615 report
Ar2615 report Ar2615 report
Ar2615 report
 
Jonathan Jones Mae377 Project06 Final
Jonathan Jones Mae377 Project06 FinalJonathan Jones Mae377 Project06 Final
Jonathan Jones Mae377 Project06 Final
 
Ryan Bierl Mae377 Project05
Ryan Bierl Mae377 Project05Ryan Bierl Mae377 Project05
Ryan Bierl Mae377 Project05
 
Ryan Bierl Mae377 Project05
Ryan Bierl Mae377 Project05Ryan Bierl Mae377 Project05
Ryan Bierl Mae377 Project05
 
Car Remote CAD/CAM
Car Remote CAD/CAMCar Remote CAD/CAM
Car Remote CAD/CAM
 
internship training and report
internship training and reportinternship training and report
internship training and report
 
Senior Project Presentation
Senior Project PresentationSenior Project Presentation
Senior Project Presentation
 
Civil 3 d 2011 tutorials
Civil 3 d 2011 tutorialsCivil 3 d 2011 tutorials
Civil 3 d 2011 tutorials
 
ALEXANDER BRANDT - Solidoworks Portfolio
ALEXANDER BRANDT - Solidoworks PortfolioALEXANDER BRANDT - Solidoworks Portfolio
ALEXANDER BRANDT - Solidoworks Portfolio
 
Mechanical Designing 6 Months
Mechanical Designing 6 MonthsMechanical Designing 6 Months
Mechanical Designing 6 Months
 
Question 1(a) use of technology
Question 1(a) use of technologyQuestion 1(a) use of technology
Question 1(a) use of technology
 

Mehr von rrbierl

Ryan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final ReportRyan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final Reportrrbierl
 
Ryan Bierl Mae377 Project08 User Manual
Ryan Bierl Mae377 Project08 User ManualRyan Bierl Mae377 Project08 User Manual
Ryan Bierl Mae377 Project08 User Manualrrbierl
 
Ryan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final ReportRyan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final Reportrrbierl
 
Ryan Bierl Mae377 Project08 User Manual
Ryan Bierl Mae377 Project08 User ManualRyan Bierl Mae377 Project08 User Manual
Ryan Bierl Mae377 Project08 User Manualrrbierl
 
Ryan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final ReportRyan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final Reportrrbierl
 
Ryan Bierl Mae377 Project07
Ryan Bierl Mae377 Project07Ryan Bierl Mae377 Project07
Ryan Bierl Mae377 Project07rrbierl
 
Blitzkrieg 9000
Blitzkrieg 9000Blitzkrieg 9000
Blitzkrieg 9000rrbierl
 

Mehr von rrbierl (7)

Ryan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final ReportRyan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final Report
 
Ryan Bierl Mae377 Project08 User Manual
Ryan Bierl Mae377 Project08 User ManualRyan Bierl Mae377 Project08 User Manual
Ryan Bierl Mae377 Project08 User Manual
 
Ryan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final ReportRyan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final Report
 
Ryan Bierl Mae377 Project08 User Manual
Ryan Bierl Mae377 Project08 User ManualRyan Bierl Mae377 Project08 User Manual
Ryan Bierl Mae377 Project08 User Manual
 
Ryan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final ReportRyan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final Report
 
Ryan Bierl Mae377 Project07
Ryan Bierl Mae377 Project07Ryan Bierl Mae377 Project07
Ryan Bierl Mae377 Project07
 
Blitzkrieg 9000
Blitzkrieg 9000Blitzkrieg 9000
Blitzkrieg 9000
 

Kürzlich hochgeladen

From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 

Kürzlich hochgeladen (20)

From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 

Ryan Bierl Mae377 Project02

  • 1. UNIVERSITY AT BUFFALO Project 02 Solid Modeling Assignment 02 Ryan R. Bierl 9/23/2009 Project 02 in an extension of Project 01. This project taught us more advanced skills in Pro Engineer. Some skills included creating an assembly and a helical sweep.
  • 2. Table of Contents 1 Introduction .......................................................................................................................................... 3 2 Requirements ........................................................................................................................................ 3 3 Results ................................................................................................................................................... 3 3.1 Part A............................................................................................................................................. 3 3.2 Part B ............................................................................................................................................. 3 3.3 Part C ............................................................................................................................................. 4 3.4 Part E ............................................................................................................................................. 4 3.5 Part F ............................................................................................................................................. 5 4 Discussion.............................................................................................................................................. 6 5 Conclusion ............................................................................................................................................. 6 6 References ............................................................................................................................................ 6 2
  • 3. 1 Introduction Project 02 served as an extension of Project 01, increasing the skill level to create each part. The parts created in Project 02 were more complex than the parts created in Project 01. With the aid of the tutorial and Multimedia CD we were able to learn more advanced skills to create and manage models in the Pro Engineer program. 2 Requirements There are five parts to Project 02. To create the five different parts we were required to use the Tutorial and Multimedia CD. 3 Results 3.1 Part A When creating this part we had one constraint. We were only allowed to use one solid protrusion and one cut. At first this seemed to difficult for someone with my skill level in Pro Engineer, but after further inspection the steps needed to complete the part became very clear. The figure in the Tutorial did not give a good representation of the actual part, in that it did not clearly show that the two tall sections of the part were symmetrical. Knowing this made the creation of the part much easier. (a) (b) Figure 1 (a) The CAD model of the block in Part A; and (b) the same CAD model of Part A at a different view. 3.2 Part B In Part B we had to create a Phillips Head Screw.The screw in Part B was very easy to create. The only problem that I encountered was when creating the slots in the head of the screw. A few times after creating the first extrusion, when attempting to apply a patter, the pattern resulted in asymmetrical slots in the screw head. I had to edit my sketch to solve this problem. 3
  • 4. (a) (b) Figure 2 (a) The CAD model of the screw in Part B; and (b) the same CAD model of Part B at a different view. 3.3 Part C This section required us to create a spring by creating a Helical Sweep in Pro Engineer. At first I was unable to create the spring based on the “Helical Sweep Tutorial by DiCorso”. It was unclear when instructing us to draw a section of the spring, in that I had no idea that it mean just to draw a circle. I was forced to research the procedure on how to create a spring. I was able to find a good step by step guide on proengineertips.com. (a) (b) Figure 3 (a) The CAD model of the spring in Part C; and (b) the same CAD model of Part C at a different view. 3.4 Part E Part E was relatively easy. In this part you had to create a 2D drawing showing various views of the pulley used in Part F. The Tutorial was very helpful in showing us how to create the various views as well as inserting dimensions. When starting this drawing I had already been exposed to 2D technical drawing. The only differences were I was doing it on a computer and I was modeling my 2D drawing after a 3D part I had already created. 4
  • 5. (a) Figure 4 (a) The CAD model of the 2D drawing in part E. 3.5 Part F Part F consisted of the creation of all the parts of a working pulley assembly. Part F turned out to be the most involved of all the sections of Project 02. First of all you had to create each of the parts in the assembly. Then you had to put all of those parts into an aligned view of the blown out assembly. Although there were many steps in Part F, the Tutorial was very helpful in providing step by step instructions. (a) (b) Figure 4 (a) The CAD model of the assembly in Part F; and (b) the same CAD model of Part F at a different view. 5
  • 6. 4 Discussion There were not too many problems in the creation of the parts in Project 02. It was however, very time consuming. This was the most in depth project in MAE 377 so far. One issue I encountered was the compatibility of files going from computer to computer. Specifically, I had problems when trying to load part files that I had created in lab onto my personal computer. To make a long story short I was unable to load these files because the files created in lab were done so on an educational version. Apparently the version of Pro Engineer on my personal computer is not compatible with the educational version, because all other aspects of the two programs are identical. 5 Conclusion Project 02 was a very involved project and took a lot of time to complete. I was able to learn many valuable skills in the Pro Engineer program, which I believe to be the goal of this project.. All of these skills, I am sure, will help me in the future. I was able to complete all of the components of Project 02 to their specifications. 6 References The following materials were used to create Project 02: Pro Engineer Wildfire 4.0 Tutorial and Multimedia CD written by: Roger Toogood, PH.D., Eng. www.proengineertips.com/part-design 6