Cheat Sheets to Data Center
Infrastructure Management




The Brands You Trust.
Cheat Sheets for Data Center Infrastructure Management                             Business-wise, Future-drivenTM



Table of Contents                                                                             Data Centers




                     Introduction..................................................................3
                     How DCIM helps operations.........................................4
                     How DCIM helps planning............................................5
                     How DCIM helps analytics............................................6	
                     Examples of how DCIM tools can
                     improve traditional processes.......................................7




Schneider Electric                                                                                     Table of Contents
Cheat Sheets for Data Center Infrastructure Management                                        Business-wise, Future-drivenTM



Introduction                                                                                                   Data Centers


               Once upon a time, a data center operator managed a 15 rack data center at a
               small manufacturing firm. Because his facility was so small, he didn’t use any
               physical infrastructure management tools. Instead, he felt confident in and relied
               on the “tribal knowledge” he had acquired over the years. However, over time, his
               15 racks became much denser. His energy bills went up and his cooling and power
               systems drifted out of balance. At one point, when he added a new server, he
               overloaded a branch circuit and took down an entire rack.

               While this story begins with “once upon a time,” it is a true story, and illustrates just
               one set of challenges in managing a data center without the right tools. Data center
               infrastructure management (DCIM) tools enable organizations to plan, predict,
               analyze, and ultimately drive down costs. Without DCIM tools, the business value
               of the data center can improve only as far and as fast as the human brain will allow.

               The following cheat sheets and illustrations provide a snapshot look at how DCIM
               software can improve planning, operations and analytics.

               Each cheat sheet addresses:
                                                                                                                      For an even
                  •	 Common questions answered by DCIM tools
                  •	 Functions that can be performed by DCIM software, and
                                                                                                                      deeper look into
                  •	 Examples of how DCIM can improve day-to-day operation as 	 	                	         	   the benefits of DCIM,
               	     well as long term planning and management                                                 read the complete
                                                                                                               white paper, “How Data
               The illustrations provide examples of common workflows (ex. Load shifting,                      Center Infrastructure
               inlet temperature setting, CRAC fan loss) that can be dramatically improved                     Management Software
               with modern data center infrastructure management.                                              Improves Planning and
                                                                                                               Cuts Operational Costs."

Schneider Electric                                                                                                                        3
Cheat Sheets for Data Center Infrastructure Management                                                        Business-wise, Future-drivenTM



 How DCIM helps operations                                                                                                    Data Centers

Common questions that DCIM                           Operational functions that DCIM                          What can happen WITHOUT DCIM
operational tools answer                             software performs                                        software

•	   What is my current workflow?                    •	   Track single & three phase equipment power          •	   In a large financial data center, the provisioning and
•	   How can I address hot spots?                         draw, ensuring all three phases are balanced             installation of servers became so complex that only
•	   What is the overall health of my data center?   •	   Illustrate power path down to rack, including            highly paid engineers were able to do it.
•	   I lost a fan on my CRAC. What do I do now?           measured load and rack capacity                     •	   A data center manager in NY was concerned about
•	   My power capacity is exceeded on a rack, what   •	   Report average and peak power usage by rack              provisioning a server in his London data center, and
     can I do?                                            which helps ensure optimal placement of a new            flew to London in order to place a Post-It® note
•	   What is my PUE?                                      server                                                   on the rack position he wanted reserved, just to
                                                     •	   Generate an audit trail for all changes to assets        ensure the power and cooling could support the
                                                          and work orders for a specified range of time,           additional server.
                                                          including a record of alarms raised and alarms      •	   A mid-size data center was intentionally over-sizing
                                                          removed                                                  their cooling capacity to avoid running out of cool-
                                                     •	   Identify excess capacity and indicate which              ing. They also had several servers underutilized.
                                                          devices can either be decommissioned or used        •	   A data center operator installed 9 new servers
                                                          elsewhere                                                in a nearly-empty rack. He checked that all the
                                                     •	   Generate a power usage effectiveness (PUE)               servers turned on and considered the installation
                                                          value on a daily basis and track historical PUE          a success. However, the next day the UPS had
                                                     •	   Communicate power, cooling, rack and other               switched to bypass because the overnight load on
                                                          physical infrastructure information directly to          the newly installed servers had peaked and over-
                                                          a VM manager to ensure physical hosts have               loaded the UPS.
                                                          “healthy” power and cooling resources               •	   A low criticality server was inadvertently installed in
                                                                                                                   a high criticality rack (2N) instead of a rack with no
                                                                                                                   redundancy. This error, discovered when decom-
                                                                                                                   missioning the server, cost them 20 times more in
                                                                                                                   electricity than necessary.
                                                                                                              •	   A recently virtualized data center was allowing the
                                                                                                                   VM manager to automatically move VMs based on
                                                                                                                   compute requirements. They failed to consider the
                                                                                                                   possibility of overloading the PDU and ended up
                                                                                                                   crashing.


Schneider Electric                                                                                                                                                    4
Cheat Sheets for Data Center Infrastructure Management                                                                Business-wise, Future-drivenTM



How DCIM helps planning                                                                                                               Data Centers

Common questions that DCIM                                Planning functions that DCIM software                       What can happen WITHOUT DCIM
planning tools answer                                     performs                                                    software

•	   Where does the next physical or virtual server get   •	   Provide graphical representations of IT equipment      •	   A data center with no real process for deploying
     placed?                                                   and its location in the rack                                equipment learned through an assessment that
•	   Will I still have power or cooling redundancy        •	   Visually display the impact of pending moves and            they had numerous hotspots. The air distribution
     under fault or maintenance conditions?                    changes on power capacity and cooling distribu-             was insufficient, even though the bulk capacity was
•	   Do I need to spread out my blade servers to get           tion                                                        available.
     reliable operations?                                 •	   Simulate the consequences of power and cooling         •	   A rack of servers was lost when an IT administrator
•	   How will a new server impact the existing branch          device failure on IT equipment for identification of        unintentionally overloaded an already maxed-out
     circuit?                                                  critical business application impacts                       power strip.
•	   What will the impact of new equipment be on my       •	   Proactively manage within rack and floor tile          •	   A data center with no asset management tool had
     redundancy and safety margins?                            weight limits                                               IT equipment removed from a rack. Since no auto-
•	   Does the existing power and cooling equip-           •	   Simulate cooling scenarios in the data center with          mated tracking of rack assets occurred, significant
     ment have the capacity to accommodate new                 computational fluid dynamics (CFD) approxima-               time was wasted trying to locate the misappropri-
     technologies?                                             tion                                                        ated equipment.
                                                          •	   Generate recommended installation locations            •	   A data center was using the failover mechanism of
                                                               for rack-mount IT equipment based on available              their virtualization platform (ability to migrate their
                                                               power, cooling, space capacity, and network                 virtual machines), but in their planning, they didn’t
                                                               ports                                                       consider that the servers were all dependent on the
                                                                                                                           same UPS. When the UPS failed, no UPS protect-
                                                                                                                           ed servers were available to migrate the loads to.
                                                                                                                      •	   A data center operator performed manual checks
                                                                                                                           on racks looking for free space and a network port.
                                                                                                                           Their planning consisted of feeling behind the racks
                                                                                                                           to check if they were too hot, placing the new serv-
                                                                                                                           ers in racks, and hoping for the best.




Schneider Electric                                                                                                                                                            5
Cheat Sheets for Data Center Infrastructure Management                                                             Business-wise, Future-drivenTM



How DCIM helps analytics                                                                                                           Data Centers

Common questions that DCIM                               Analytics functions that DCIM software                    What can happen WITHOUT DCIM
planning tools answer                                    performs                                                  software

•	   What do I have in my data center?                   •	   Identify discrepancies between planned energy        •	   An air conditioner has sufficient capacity, but inad-
•	   Who has touched which equipment and when?                usage, based on nameplate information, and                equate air distribution to the IT load
•	   Do I have stranded cooling and power capacity?           actual usage, based on actual power data             •	   A PDU has sufficient capacity but no available
•	   When will firmware have to be updated?              •	   Generate inventory reports organized by device            breaker positions
•	   By what date will the data center run out of             type, age, manufacturer, and properties of the       •	   Floor space is available, but there is no remaining
     power and cooling capacity? What will run out            device                                                    power
     first?                                              •	   Generate energy usage reports by subsystem           •	   Air conditioners are in the wrong location
•	   When should batteries be charged on the UPS?        •	   Provide energy use details that enable the linking   •	   Some PDUs are overloaded while others are lightly
•	   When will the next large data center physical            of operating costs to each business unit user             loaded
     infrastructure investment be necessary?                  group which then allows for “charge backs”           •	   Some areas are overheated while others are cold
•	   How can I predict the need for future infrastruc-
     ture, investments and rollouts?




Schneider Electric                                                                                                                                                        6
Cheat Sheets for Data Center Infrastructure Management                Business-wise, Future-drivenTM


Examples of how DCIM tools can improve traditional processes                    Data Centers

      Load Shifting                                  Intelligent Temperature Setting




               CRAC fan loss




Schneider Electric                                                                                     7
Cheat Sheets for Data Center Infrastructure Management                                                                  Business-wise, Future-drivenTM


                                                                                                                                         Data Centers




                                                The global specialist in
                                                energy management ™




                 1 32 Fa irg rou n d s R d . - We st K i n g sto n , R I 02 8 9 2 - 8 00- 8 00- 42 7 2 - www. s c h n e i de r-e l e c t ri c .c o m
Schneider Electric                                                                                                                                       8

More Related Content

What's hot

What's hot (20)

Panduit DCIM Solution Overview
Panduit DCIM Solution OverviewPanduit DCIM Solution Overview
Panduit DCIM Solution Overview
 
Classification of data center operations technology management tools
Classification of data center operations technology management toolsClassification of data center operations technology management tools
Classification of data center operations technology management tools
 
Panduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution DetailsPanduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution Details
 
Better Data Center Infrastructure Management
Better Data Center Infrastructure ManagementBetter Data Center Infrastructure Management
Better Data Center Infrastructure Management
 
10 Steps to Data Center Infrastructure Management Success
10 Steps to Data Center Infrastructure Management Success10 Steps to Data Center Infrastructure Management Success
10 Steps to Data Center Infrastructure Management Success
 
Improvements in Data Center Management
Improvements in Data Center ManagementImprovements in Data Center Management
Improvements in Data Center Management
 
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildDatacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build
 
Best Practices for Planning your Datacenter
Best Practices for Planning your DatacenterBest Practices for Planning your Datacenter
Best Practices for Planning your Datacenter
 
Five key emerging trends impacting Data Centers in 2016
Five key emerging trends impacting Data Centers in 2016 Five key emerging trends impacting Data Centers in 2016
Five key emerging trends impacting Data Centers in 2016
 
Data Center Trends 2014
Data Center Trends 2014Data Center Trends 2014
Data Center Trends 2014
 
Top 10 Data Center Success Criteria
Top 10 Data Center Success CriteriaTop 10 Data Center Success Criteria
Top 10 Data Center Success Criteria
 
Essential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility OperationsEssential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility Operations
 
Datacenter
DatacenterDatacenter
Datacenter
 
What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)
 
Multi tiered hybrid data center design
Multi tiered hybrid data center designMulti tiered hybrid data center design
Multi tiered hybrid data center design
 
Improving Datacenter Performance through Capacity Planning – Netmagic
Improving Datacenter Performance through Capacity Planning – NetmagicImproving Datacenter Performance through Capacity Planning – Netmagic
Improving Datacenter Performance through Capacity Planning – Netmagic
 
Importance of data centers
Importance of data centersImportance of data centers
Importance of data centers
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
 
Boomerang Total Recall
Boomerang Total RecallBoomerang Total Recall
Boomerang Total Recall
 
StruxureWare DCIM Q&A
StruxureWare DCIM Q&AStruxureWare DCIM Q&A
StruxureWare DCIM Q&A
 

Similar to StruxureWare DCIM

Getting Started with Advanced Network Operations
Getting Started with Advanced Network OperationsGetting Started with Advanced Network Operations
Getting Started with Advanced Network Operations
Schneider Electric
 
Schneider - ASK THE EXPERT - ITNEXT
Schneider - ASK THE EXPERT - ITNEXTSchneider - ASK THE EXPERT - ITNEXT
Schneider - ASK THE EXPERT - ITNEXT
Aniket Patange
 
Enhance ServiceNow with Automated Discovery for Mainframe and IBM i
Enhance ServiceNow with Automated Discovery for Mainframe and IBM iEnhance ServiceNow with Automated Discovery for Mainframe and IBM i
Enhance ServiceNow with Automated Discovery for Mainframe and IBM i
Precisely
 
WP107 How Data Center Management Software Improves Planning and Cuts OPEX
WP107   How Data Center Management Software Improves Planning and Cuts OPEXWP107   How Data Center Management Software Improves Planning and Cuts OPEX
WP107 How Data Center Management Software Improves Planning and Cuts OPEX
SE_NAM_Training
 
Device42 Managing Data Center Assets
Device42 Managing Data Center AssetsDevice42 Managing Data Center Assets
Device42 Managing Data Center Assets
Jean-Paul Rousseau
 
Virtualisatie In Het NGDC - Marc Janssen
Virtualisatie In Het NGDC - Marc JanssenVirtualisatie In Het NGDC - Marc Janssen
Virtualisatie In Het NGDC - Marc Janssen
HPDutchWorld
 

Similar to StruxureWare DCIM (20)

DCIM
DCIMDCIM
DCIM
 
Getting Started with Advanced Network Operations
Getting Started with Advanced Network OperationsGetting Started with Advanced Network Operations
Getting Started with Advanced Network Operations
 
Schneider - ASK THE EXPERT - ITNEXT
Schneider - ASK THE EXPERT - ITNEXTSchneider - ASK THE EXPERT - ITNEXT
Schneider - ASK THE EXPERT - ITNEXT
 
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
 
iTRACS overview
iTRACS overviewiTRACS overview
iTRACS overview
 
Data Center Management: Where Brain Meet Braun
Data Center Management: Where Brain Meet BraunData Center Management: Where Brain Meet Braun
Data Center Management: Where Brain Meet Braun
 
Mt19 Integrated systems as a foundation of the Software Defined Datacentre
Mt19 Integrated systems as a foundation of the Software Defined DatacentreMt19 Integrated systems as a foundation of the Software Defined Datacentre
Mt19 Integrated systems as a foundation of the Software Defined Datacentre
 
Enhance ServiceNow with Automated Discovery for Mainframe and IBM i
Enhance ServiceNow with Automated Discovery for Mainframe and IBM iEnhance ServiceNow with Automated Discovery for Mainframe and IBM i
Enhance ServiceNow with Automated Discovery for Mainframe and IBM i
 
Cloud computing simplified
Cloud computing simplifiedCloud computing simplified
Cloud computing simplified
 
WP107 How Data Center Management Software Improves Planning and Cuts OPEX
WP107   How Data Center Management Software Improves Planning and Cuts OPEXWP107   How Data Center Management Software Improves Planning and Cuts OPEX
WP107 How Data Center Management Software Improves Planning and Cuts OPEX
 
Efficient Data Centers Are Built On New Technologies and Strategies
Efficient Data Centers Are Built On New Technologies and StrategiesEfficient Data Centers Are Built On New Technologies and Strategies
Efficient Data Centers Are Built On New Technologies and Strategies
 
DCIM: ERP for the Data Center Manager
DCIM: ERP for the Data Center ManagerDCIM: ERP for the Data Center Manager
DCIM: ERP for the Data Center Manager
 
DCIM Software: What & Why?
DCIM Software: What & Why?DCIM Software: What & Why?
DCIM Software: What & Why?
 
Virtualising your mission-critical applications
Virtualising your mission-critical applicationsVirtualising your mission-critical applications
Virtualising your mission-critical applications
 
Device42 Managing Data Center Assets
Device42 Managing Data Center AssetsDevice42 Managing Data Center Assets
Device42 Managing Data Center Assets
 
Virtualisatie In Het NGDC - Marc Janssen
Virtualisatie In Het NGDC - Marc JanssenVirtualisatie In Het NGDC - Marc Janssen
Virtualisatie In Het NGDC - Marc Janssen
 
GIS POV
GIS POVGIS POV
GIS POV
 
VMworld 2015: vRealize Operations Insight: Manage vSphere and Your Entire Dat...
VMworld 2015: vRealize Operations Insight: Manage vSphere and Your Entire Dat...VMworld 2015: vRealize Operations Insight: Manage vSphere and Your Entire Dat...
VMworld 2015: vRealize Operations Insight: Manage vSphere and Your Entire Dat...
 
Intergen Twilight Seminar: Constructive Disruption with Cloud Technologies
Intergen Twilight Seminar: Constructive Disruption with Cloud TechnologiesIntergen Twilight Seminar: Constructive Disruption with Cloud Technologies
Intergen Twilight Seminar: Constructive Disruption with Cloud Technologies
 
Idc Reducing It Costs With Blades
Idc Reducing It Costs With BladesIdc Reducing It Costs With Blades
Idc Reducing It Costs With Blades
 

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Recently uploaded (20)

08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 

StruxureWare DCIM

  • 1. ^ Business-wise, Future-drivenTM Cheat Sheets to Data Center Infrastructure Management The Brands You Trust.
  • 2. Cheat Sheets for Data Center Infrastructure Management Business-wise, Future-drivenTM Table of Contents Data Centers Introduction..................................................................3 How DCIM helps operations.........................................4 How DCIM helps planning............................................5 How DCIM helps analytics............................................6 Examples of how DCIM tools can improve traditional processes.......................................7 Schneider Electric Table of Contents
  • 3. Cheat Sheets for Data Center Infrastructure Management Business-wise, Future-drivenTM Introduction Data Centers Once upon a time, a data center operator managed a 15 rack data center at a small manufacturing firm. Because his facility was so small, he didn’t use any physical infrastructure management tools. Instead, he felt confident in and relied on the “tribal knowledge” he had acquired over the years. However, over time, his 15 racks became much denser. His energy bills went up and his cooling and power systems drifted out of balance. At one point, when he added a new server, he overloaded a branch circuit and took down an entire rack. While this story begins with “once upon a time,” it is a true story, and illustrates just one set of challenges in managing a data center without the right tools. Data center infrastructure management (DCIM) tools enable organizations to plan, predict, analyze, and ultimately drive down costs. Without DCIM tools, the business value of the data center can improve only as far and as fast as the human brain will allow. The following cheat sheets and illustrations provide a snapshot look at how DCIM software can improve planning, operations and analytics. Each cheat sheet addresses: For an even • Common questions answered by DCIM tools • Functions that can be performed by DCIM software, and deeper look into • Examples of how DCIM can improve day-to-day operation as the benefits of DCIM, well as long term planning and management read the complete white paper, “How Data The illustrations provide examples of common workflows (ex. Load shifting, Center Infrastructure inlet temperature setting, CRAC fan loss) that can be dramatically improved Management Software with modern data center infrastructure management. Improves Planning and Cuts Operational Costs." Schneider Electric 3
  • 4. Cheat Sheets for Data Center Infrastructure Management Business-wise, Future-drivenTM How DCIM helps operations Data Centers Common questions that DCIM Operational functions that DCIM What can happen WITHOUT DCIM operational tools answer software performs software • What is my current workflow? • Track single & three phase equipment power • In a large financial data center, the provisioning and • How can I address hot spots? draw, ensuring all three phases are balanced installation of servers became so complex that only • What is the overall health of my data center? • Illustrate power path down to rack, including highly paid engineers were able to do it. • I lost a fan on my CRAC. What do I do now? measured load and rack capacity • A data center manager in NY was concerned about • My power capacity is exceeded on a rack, what • Report average and peak power usage by rack provisioning a server in his London data center, and can I do? which helps ensure optimal placement of a new flew to London in order to place a Post-It® note • What is my PUE? server on the rack position he wanted reserved, just to • Generate an audit trail for all changes to assets ensure the power and cooling could support the and work orders for a specified range of time, additional server. including a record of alarms raised and alarms • A mid-size data center was intentionally over-sizing removed their cooling capacity to avoid running out of cool- • Identify excess capacity and indicate which ing. They also had several servers underutilized. devices can either be decommissioned or used • A data center operator installed 9 new servers elsewhere in a nearly-empty rack. He checked that all the • Generate a power usage effectiveness (PUE) servers turned on and considered the installation value on a daily basis and track historical PUE a success. However, the next day the UPS had • Communicate power, cooling, rack and other switched to bypass because the overnight load on physical infrastructure information directly to the newly installed servers had peaked and over- a VM manager to ensure physical hosts have loaded the UPS. “healthy” power and cooling resources • A low criticality server was inadvertently installed in a high criticality rack (2N) instead of a rack with no redundancy. This error, discovered when decom- missioning the server, cost them 20 times more in electricity than necessary. • A recently virtualized data center was allowing the VM manager to automatically move VMs based on compute requirements. They failed to consider the possibility of overloading the PDU and ended up crashing. Schneider Electric 4
  • 5. Cheat Sheets for Data Center Infrastructure Management Business-wise, Future-drivenTM How DCIM helps planning Data Centers Common questions that DCIM Planning functions that DCIM software What can happen WITHOUT DCIM planning tools answer performs software • Where does the next physical or virtual server get • Provide graphical representations of IT equipment • A data center with no real process for deploying placed? and its location in the rack equipment learned through an assessment that • Will I still have power or cooling redundancy • Visually display the impact of pending moves and they had numerous hotspots. The air distribution under fault or maintenance conditions? changes on power capacity and cooling distribu- was insufficient, even though the bulk capacity was • Do I need to spread out my blade servers to get tion available. reliable operations? • Simulate the consequences of power and cooling • A rack of servers was lost when an IT administrator • How will a new server impact the existing branch device failure on IT equipment for identification of unintentionally overloaded an already maxed-out circuit? critical business application impacts power strip. • What will the impact of new equipment be on my • Proactively manage within rack and floor tile • A data center with no asset management tool had redundancy and safety margins? weight limits IT equipment removed from a rack. Since no auto- • Does the existing power and cooling equip- • Simulate cooling scenarios in the data center with mated tracking of rack assets occurred, significant ment have the capacity to accommodate new computational fluid dynamics (CFD) approxima- time was wasted trying to locate the misappropri- technologies? tion ated equipment. • Generate recommended installation locations • A data center was using the failover mechanism of for rack-mount IT equipment based on available their virtualization platform (ability to migrate their power, cooling, space capacity, and network virtual machines), but in their planning, they didn’t ports consider that the servers were all dependent on the same UPS. When the UPS failed, no UPS protect- ed servers were available to migrate the loads to. • A data center operator performed manual checks on racks looking for free space and a network port. Their planning consisted of feeling behind the racks to check if they were too hot, placing the new serv- ers in racks, and hoping for the best. Schneider Electric 5
  • 6. Cheat Sheets for Data Center Infrastructure Management Business-wise, Future-drivenTM How DCIM helps analytics Data Centers Common questions that DCIM Analytics functions that DCIM software What can happen WITHOUT DCIM planning tools answer performs software • What do I have in my data center? • Identify discrepancies between planned energy • An air conditioner has sufficient capacity, but inad- • Who has touched which equipment and when? usage, based on nameplate information, and equate air distribution to the IT load • Do I have stranded cooling and power capacity? actual usage, based on actual power data • A PDU has sufficient capacity but no available • When will firmware have to be updated? • Generate inventory reports organized by device breaker positions • By what date will the data center run out of type, age, manufacturer, and properties of the • Floor space is available, but there is no remaining power and cooling capacity? What will run out device power first? • Generate energy usage reports by subsystem • Air conditioners are in the wrong location • When should batteries be charged on the UPS? • Provide energy use details that enable the linking • Some PDUs are overloaded while others are lightly • When will the next large data center physical of operating costs to each business unit user loaded infrastructure investment be necessary? group which then allows for “charge backs” • Some areas are overheated while others are cold • How can I predict the need for future infrastruc- ture, investments and rollouts? Schneider Electric 6
  • 7. Cheat Sheets for Data Center Infrastructure Management Business-wise, Future-drivenTM Examples of how DCIM tools can improve traditional processes Data Centers Load Shifting Intelligent Temperature Setting CRAC fan loss Schneider Electric 7
  • 8. Cheat Sheets for Data Center Infrastructure Management Business-wise, Future-drivenTM Data Centers The global specialist in energy management ™ 1 32 Fa irg rou n d s R d . - We st K i n g sto n , R I 02 8 9 2 - 8 00- 8 00- 42 7 2 - www. s c h n e i de r-e l e c t ri c .c o m Schneider Electric 8