Jerram Falkus
Construction Ltd
Healthcare Sector
projects
Project:              Osborne Grove
Address:              Osborne Grove, 16 Upper Tollington Park, London, N4 3EL
Client:               London Borough of Haringey
Contract Value:       £2.4M
Form of Contract:     Standard Form of Building Contract, Private with Quantities 1998
                      Edition including all amendments
Architect:            Hazel McCormack Young

Description:

The works comprise the construction of a new care home building in the traditional style
to provide 32 bedroom units with en-suite wcs, and communal facilities including a
daycentre. Concrete trench fill foundations, precast concrete beam and pot ground floor
and precast slabs first floors. External walls are mainly facing brick cavity construction,
with some facing blockwork cavity walls. Concrete surrounds around Velfac windows.
The roofs are pitched formed using timber trusses and covered with Eternit slates

Internal loadbearing blockwork walls generally are cavity type between bedroom units
and the communal and circulation areas. Elsewhere internal partitions are a mixture of
plastered blockwork, double and single metal stud.
Specialist disabled sanitaryware is to be provided throughout. The living areas
incorporate a main kitchen (suitably fitted out with commercial stainless steel units and
extract system), kitchenettes, laundry and sluice facilities. The building also includes
office, shop and staff facilities.

Walls and ceilings are generally painted plaster, with suspended ceilings in the corridors
providing space to run the services, wet areas are only part wall tiled. Central heating is
a radiator system with a central boiler.

Floor coverings are carpets within the bedroom units with vinyl to all wet areas and the
entrance foyer.

Paved areas surround the building and a new tarmac finished road with security gates
forms the access, with parking facilities clearly marked out.
Project:                 Mile End Hospital
Address:                 Bancroft Road London E1 4DG
Client:                  Tower Hamlets Primary Care Trust
Contract Value:          £2,141,270.31
Form of Contract:        JCT Standard Form with Quantities 2005 incorporating CDP
Duration:                55 Weeks
Architect:               Tangram Architects

Description:

The works for this project entailed the following:

New build construction of a 3 storey education unit for Mile End Hospital, incorporating
classrooms, lecture theatres, resource areas, reception, offices, and w / c’s. Fully integrated
intelligent M&E installations comfort cooling and ICT services.

Construction was a steel frame with insitu concrete floors, rendered masonary, external walls,
single-ply membrane and flat roof coverings. Built within an internal courtyard within the hospital.
Project:                Netley Primary School
Address:                NETLEY STREET, LONDON, NW1 3EJ
Client:                 London Borough of Camden - Education Department
Contract Value:         £846, 755
Form of Contract:       JCT 1998 standard, LA with Quantities
Duration:               35 weeks
Architect:              Haverstock Associates

Description:

This project involved the construction of a single storey structure to provide the London Borough of
Camden with an Autistic Unit and Community Building. The steel framed, dry lined development is
clad with curved timber panels containing powder coated aluminium framed windows.

The roof is clad in Eternit slate and Kalzip cladding, incorporating Sarnafil continuous guttering.
Internally, acoustic suspended ceilings provide a functional & decorative finish. Heating of the building
is provided by an under floor gas fired system, designed to allow maximum use of space within the unit.
Jerram Falkus is always keen to employ the use of Green Technologies where possible and within this
project Sun Pipe Lighting was incorporated in to the design in order to help illuminate the 338m2
educational facility. Due to the confined location of the site, management of the project had to be of the
highest order to allow efficient coordinated working to be carried out without danger to pupils and staff
in adjoining areas.
Project:                    Jack Tizard
Client                      London Borough of Hammersmith & Fulham
Architect                  Hox Design (formerly Clarke Kidwell Architects)
Quantity Surveyor          John Cobb & Partners
Contract Period              52 weeks
Contract Value              £3,142,000

Design & Construction of a Flagship SEN Educational Facility
The construction of a two/three storey, steel framed, special needs educational facility with state of the art
medical facilities, for the London Borough of Hammersmith & Fulham. The front elevation boasting a large
mosaic feature wall.

The construction of this structure with external services and infrastructure commenced after the demolition
of the old school buildings. Colour coded corridors help the students navigate around the school and help
visual recognition within the students.

A Sensory Development room helps the most severely disabled pupils (aged 3-18 yrs) gain enjoyment from
sites, sounds and textures other pupils take for granted. This is managed through the substitution of those
mediums with forces the student can distinguish and appreciate.

A gym, secure external play areas and creative internal décor means the students are able to learn and
develop while in a surrounding that suggest comfort, fun and specialist care.
Additional relevant Health sector projects
Whipps Cross Hospital, London E11
Ward refurbishment programme for Whipps Cross University Hospital NHS Trust. Tangram
Architects and Designers, The Leathermarket, Weston Street, London SE1 3EX
£ 1,900,000

Meadow House, Ealing General Hospital, Ealing
Extension to form a Hospice Day Care Centre and teaching accommodationfor West London
Healthcare NHS Trust. Architects Design Partnership, Hendford Manor, 33 Hendford, Yeovil,
Somerset.
£ 938,000

Great Ormond Street Hospital for Children, London WC1
Conversion to form a MRI Scanner Department for Great Ormond Street Hospital NHS Trust.
Nightingale Associates, The Cherry Barn, High Street, Harwell, Oxford, OX11 OEY
£ 630,000

St Pancras Hospital, London NW1
Refurbishment of the east wing for Camden NHS Primary Care Trust
The Capital Projects Department, St Pancras Hospital, 4 St Pancras Way, London NW1 0PE
£ 452,000

Finsbury Health Centre, Pine Street, London EC1
Refurbishment of the external fabric of a Grade I listed building for Camden NHS Primary Care
Trust Avanti Architects, 1 Torriano Mews, London NW5
£ 350,000

Royal Docks Health Centre, London E16
Internal alterations for Newham Community Health Services NHS Trust
FDE Architects, 15 Old Ford Road, London E2 9PJ
£ 125,000

St Luke’s Hospice, Kenton Grange, Kenton, Middlesex
Alterations and extensions to form a residential Hospice for The Trustees. David R Yeoman &
Associates, 73 Canning Rd Harrow, Middlesex HA3 7SP
£ 2,950,000

Finsbury Health Centre, Pine Street, London, EC1
Refurbishment of external fabric of a Grade I Listed Building for Camden & Islington, Community
Health Services NHS Trust. Avanti Architects, 1 Torriano Mews, London NW5
£ 350,000

Weitere ähnliche Inhalte

Was ist angesagt?

HMP Polmont - landscape
HMP Polmont - landscapeHMP Polmont - landscape
HMP Polmont - landscapeGeorge Dillet
 
Lynnette Parvez, Kelmscott School
Lynnette Parvez, Kelmscott SchoolLynnette Parvez, Kelmscott School
Lynnette Parvez, Kelmscott SchoolVikki Jacobs
 
BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTJoyeeLee0131
 
Civil Construction and Repairing Turnkey Contractors
Civil Construction and Repairing Turnkey ContractorsCivil Construction and Repairing Turnkey Contractors
Civil Construction and Repairing Turnkey ContractorsRajesh B
 
The National Eco House Oman
The National Eco House OmanThe National Eco House Oman
The National Eco House OmanMECandPMV
 
30 st mary axe the bullet building
30 st mary axe   the bullet building30 st mary axe   the bullet building
30 st mary axe the bullet buildingRohan Maskay
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS Mohammed Naeem Darwish
 
IHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-bIHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-bisrael hurtado cola
 

Was ist angesagt? (14)

Elevations
ElevationsElevations
Elevations
 
HMP Polmont - landscape
HMP Polmont - landscapeHMP Polmont - landscape
HMP Polmont - landscape
 
Lynnette Parvez, Kelmscott School
Lynnette Parvez, Kelmscott SchoolLynnette Parvez, Kelmscott School
Lynnette Parvez, Kelmscott School
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
Manhattan House
Manhattan HouseManhattan House
Manhattan House
 
PORTFOLIO-DCASSIANO
PORTFOLIO-DCASSIANOPORTFOLIO-DCASSIANO
PORTFOLIO-DCASSIANO
 
BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORT
 
AF CV June 2014
AF CV June 2014AF CV June 2014
AF CV June 2014
 
Civil Construction and Repairing Turnkey Contractors
Civil Construction and Repairing Turnkey ContractorsCivil Construction and Repairing Turnkey Contractors
Civil Construction and Repairing Turnkey Contractors
 
The National Eco House Oman
The National Eco House OmanThe National Eco House Oman
The National Eco House Oman
 
30 st mary axe the bullet building
30 st mary axe   the bullet building30 st mary axe   the bullet building
30 st mary axe the bullet building
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
 
IHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-bIHC_Selected PORTFOLIO_Sept2015_Built-b
IHC_Selected PORTFOLIO_Sept2015_Built-b
 
Walk denver
Walk denverWalk denver
Walk denver
 

Andere mochten auch

Cedara healthcare-Hospital designing & planning consultants
Cedara healthcare-Hospital designing & planning consultantsCedara healthcare-Hospital designing & planning consultants
Cedara healthcare-Hospital designing & planning consultantshasnaalam
 
Embrace Project Report: Hospital Project for Ethnic Minority
Embrace Project Report: Hospital Project for Ethnic MinorityEmbrace Project Report: Hospital Project for Ethnic Minority
Embrace Project Report: Hospital Project for Ethnic MinorityJackson Choi
 
Architectural Design - Cardiac Hospital
Architectural Design - Cardiac HospitalArchitectural Design - Cardiac Hospital
Architectural Design - Cardiac HospitalMukund Mundhada
 
Inpatient services
Inpatient servicesInpatient services
Inpatient servicesNc Das
 
Organizational Structure and Design - A case for a mid-sized Hospital
Organizational Structure and Design - A case for a mid-sized HospitalOrganizational Structure and Design - A case for a mid-sized Hospital
Organizational Structure and Design - A case for a mid-sized HospitalSarang Bhutada
 
32 Ways a Digital Marketing Consultant Can Help Grow Your Business
32 Ways a Digital Marketing Consultant Can Help Grow Your Business32 Ways a Digital Marketing Consultant Can Help Grow Your Business
32 Ways a Digital Marketing Consultant Can Help Grow Your BusinessBarry Feldman
 

Andere mochten auch (8)

Health Care Planning
Health Care PlanningHealth Care Planning
Health Care Planning
 
Healing Gardens in Hospitals ~ The Architecture of Hospitals
Healing Gardens in Hospitals ~ The Architecture of HospitalsHealing Gardens in Hospitals ~ The Architecture of Hospitals
Healing Gardens in Hospitals ~ The Architecture of Hospitals
 
Cedara healthcare-Hospital designing & planning consultants
Cedara healthcare-Hospital designing & planning consultantsCedara healthcare-Hospital designing & planning consultants
Cedara healthcare-Hospital designing & planning consultants
 
Embrace Project Report: Hospital Project for Ethnic Minority
Embrace Project Report: Hospital Project for Ethnic MinorityEmbrace Project Report: Hospital Project for Ethnic Minority
Embrace Project Report: Hospital Project for Ethnic Minority
 
Architectural Design - Cardiac Hospital
Architectural Design - Cardiac HospitalArchitectural Design - Cardiac Hospital
Architectural Design - Cardiac Hospital
 
Inpatient services
Inpatient servicesInpatient services
Inpatient services
 
Organizational Structure and Design - A case for a mid-sized Hospital
Organizational Structure and Design - A case for a mid-sized HospitalOrganizational Structure and Design - A case for a mid-sized Hospital
Organizational Structure and Design - A case for a mid-sized Hospital
 
32 Ways a Digital Marketing Consultant Can Help Grow Your Business
32 Ways a Digital Marketing Consultant Can Help Grow Your Business32 Ways a Digital Marketing Consultant Can Help Grow Your Business
32 Ways a Digital Marketing Consultant Can Help Grow Your Business
 

Ähnlich wie Healthcare projects 2013

09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012JerramFalkus
 
Introduction to The Elliott Thomas Group
Introduction to The Elliott Thomas GroupIntroduction to The Elliott Thomas Group
Introduction to The Elliott Thomas GroupJohn Self
 
Take a look at some of our recent projects.
Take a look at some of our recent projects. Take a look at some of our recent projects.
Take a look at some of our recent projects. Tony Mantle
 
MHA Brochure 2013
MHA Brochure 2013MHA Brochure 2013
MHA Brochure 2013Katie Frost
 
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CVDave Arkell
 
Case Study - Court Buckingham, 94 New Cavendish St. London
Case Study - Court Buckingham, 94 New Cavendish St. LondonCase Study - Court Buckingham, 94 New Cavendish St. London
Case Study - Court Buckingham, 94 New Cavendish St. LondonSteve Mandry
 
Matthew Thomas Education Sector Portfolio 2011
Matthew Thomas   Education Sector Portfolio 2011Matthew Thomas   Education Sector Portfolio 2011
Matthew Thomas Education Sector Portfolio 2011Matthewthomas11
 
PRESENTATION - Modular Direct
PRESENTATION - Modular DirectPRESENTATION - Modular Direct
PRESENTATION - Modular DirectStephen Fleming
 
Scientific Support Unit - Wakefield
Scientific Support Unit - WakefieldScientific Support Unit - Wakefield
Scientific Support Unit - WakefieldAlan Wood & Partners
 
MKUH Physiotherapy Hydropool refurbishment Project Fact Sheet 2015
MKUH Physiotherapy Hydropool refurbishment Project Fact Sheet 2015MKUH Physiotherapy Hydropool refurbishment Project Fact Sheet 2015
MKUH Physiotherapy Hydropool refurbishment Project Fact Sheet 2015Alessandro Annunziata
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1Eamon Hannaway
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 

Ähnlich wie Healthcare projects 2013 (20)

09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012
 
Introduction to The Elliott Thomas Group
Introduction to The Elliott Thomas GroupIntroduction to The Elliott Thomas Group
Introduction to The Elliott Thomas Group
 
Glenn Hutchison # Project Portfolio # V9
Glenn Hutchison # Project Portfolio # V9Glenn Hutchison # Project Portfolio # V9
Glenn Hutchison # Project Portfolio # V9
 
JG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our ReputationJG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our Reputation
 
The Deep - Hull
The Deep -  HullThe Deep -  Hull
The Deep - Hull
 
Take a look at some of our recent projects.
Take a look at some of our recent projects. Take a look at some of our recent projects.
Take a look at some of our recent projects.
 
MHA Brochure 2013
MHA Brochure 2013MHA Brochure 2013
MHA Brochure 2013
 
high tech building
high tech buildinghigh tech building
high tech building
 
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CV
 
Case Study - Court Buckingham, 94 New Cavendish St. London
Case Study - Court Buckingham, 94 New Cavendish St. LondonCase Study - Court Buckingham, 94 New Cavendish St. London
Case Study - Court Buckingham, 94 New Cavendish St. London
 
Matthew Thomas Education Sector Portfolio 2011
Matthew Thomas   Education Sector Portfolio 2011Matthew Thomas   Education Sector Portfolio 2011
Matthew Thomas Education Sector Portfolio 2011
 
PRESENTATION - Modular Direct
PRESENTATION - Modular DirectPRESENTATION - Modular Direct
PRESENTATION - Modular Direct
 
Baytree Dagenham Brochure
Baytree Dagenham BrochureBaytree Dagenham Brochure
Baytree Dagenham Brochure
 
Scientific Support Unit - Wakefield
Scientific Support Unit - WakefieldScientific Support Unit - Wakefield
Scientific Support Unit - Wakefield
 
MKUH Physiotherapy Hydropool refurbishment Project Fact Sheet 2015
MKUH Physiotherapy Hydropool refurbishment Project Fact Sheet 2015MKUH Physiotherapy Hydropool refurbishment Project Fact Sheet 2015
MKUH Physiotherapy Hydropool refurbishment Project Fact Sheet 2015
 
Appendices
AppendicesAppendices
Appendices
 
TB Clinic Project Report
TB Clinic Project ReportTB Clinic Project Report
TB Clinic Project Report
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
King's Cross T5
King's Cross T5King's Cross T5
King's Cross T5
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 

Healthcare projects 2013

  • 2. Project: Osborne Grove Address: Osborne Grove, 16 Upper Tollington Park, London, N4 3EL Client: London Borough of Haringey Contract Value: £2.4M Form of Contract: Standard Form of Building Contract, Private with Quantities 1998 Edition including all amendments Architect: Hazel McCormack Young Description: The works comprise the construction of a new care home building in the traditional style to provide 32 bedroom units with en-suite wcs, and communal facilities including a daycentre. Concrete trench fill foundations, precast concrete beam and pot ground floor and precast slabs first floors. External walls are mainly facing brick cavity construction, with some facing blockwork cavity walls. Concrete surrounds around Velfac windows. The roofs are pitched formed using timber trusses and covered with Eternit slates Internal loadbearing blockwork walls generally are cavity type between bedroom units and the communal and circulation areas. Elsewhere internal partitions are a mixture of plastered blockwork, double and single metal stud.
  • 3. Specialist disabled sanitaryware is to be provided throughout. The living areas incorporate a main kitchen (suitably fitted out with commercial stainless steel units and extract system), kitchenettes, laundry and sluice facilities. The building also includes office, shop and staff facilities. Walls and ceilings are generally painted plaster, with suspended ceilings in the corridors providing space to run the services, wet areas are only part wall tiled. Central heating is a radiator system with a central boiler. Floor coverings are carpets within the bedroom units with vinyl to all wet areas and the entrance foyer. Paved areas surround the building and a new tarmac finished road with security gates forms the access, with parking facilities clearly marked out.
  • 4.
  • 5.
  • 6. Project: Mile End Hospital Address: Bancroft Road London E1 4DG Client: Tower Hamlets Primary Care Trust Contract Value: £2,141,270.31 Form of Contract: JCT Standard Form with Quantities 2005 incorporating CDP Duration: 55 Weeks Architect: Tangram Architects Description: The works for this project entailed the following: New build construction of a 3 storey education unit for Mile End Hospital, incorporating classrooms, lecture theatres, resource areas, reception, offices, and w / c’s. Fully integrated intelligent M&E installations comfort cooling and ICT services. Construction was a steel frame with insitu concrete floors, rendered masonary, external walls, single-ply membrane and flat roof coverings. Built within an internal courtyard within the hospital.
  • 7.
  • 8.
  • 9.
  • 10. Project: Netley Primary School Address: NETLEY STREET, LONDON, NW1 3EJ Client: London Borough of Camden - Education Department Contract Value: £846, 755 Form of Contract: JCT 1998 standard, LA with Quantities Duration: 35 weeks Architect: Haverstock Associates Description: This project involved the construction of a single storey structure to provide the London Borough of Camden with an Autistic Unit and Community Building. The steel framed, dry lined development is clad with curved timber panels containing powder coated aluminium framed windows. The roof is clad in Eternit slate and Kalzip cladding, incorporating Sarnafil continuous guttering. Internally, acoustic suspended ceilings provide a functional & decorative finish. Heating of the building is provided by an under floor gas fired system, designed to allow maximum use of space within the unit.
  • 11. Jerram Falkus is always keen to employ the use of Green Technologies where possible and within this project Sun Pipe Lighting was incorporated in to the design in order to help illuminate the 338m2 educational facility. Due to the confined location of the site, management of the project had to be of the highest order to allow efficient coordinated working to be carried out without danger to pupils and staff in adjoining areas.
  • 12.
  • 13. Project: Jack Tizard Client London Borough of Hammersmith & Fulham Architect Hox Design (formerly Clarke Kidwell Architects) Quantity Surveyor John Cobb & Partners Contract Period 52 weeks Contract Value £3,142,000 Design & Construction of a Flagship SEN Educational Facility The construction of a two/three storey, steel framed, special needs educational facility with state of the art medical facilities, for the London Borough of Hammersmith & Fulham. The front elevation boasting a large mosaic feature wall. The construction of this structure with external services and infrastructure commenced after the demolition of the old school buildings. Colour coded corridors help the students navigate around the school and help visual recognition within the students. A Sensory Development room helps the most severely disabled pupils (aged 3-18 yrs) gain enjoyment from sites, sounds and textures other pupils take for granted. This is managed through the substitution of those mediums with forces the student can distinguish and appreciate. A gym, secure external play areas and creative internal décor means the students are able to learn and develop while in a surrounding that suggest comfort, fun and specialist care.
  • 14.
  • 15.
  • 16. Additional relevant Health sector projects Whipps Cross Hospital, London E11 Ward refurbishment programme for Whipps Cross University Hospital NHS Trust. Tangram Architects and Designers, The Leathermarket, Weston Street, London SE1 3EX £ 1,900,000 Meadow House, Ealing General Hospital, Ealing Extension to form a Hospice Day Care Centre and teaching accommodationfor West London Healthcare NHS Trust. Architects Design Partnership, Hendford Manor, 33 Hendford, Yeovil, Somerset. £ 938,000 Great Ormond Street Hospital for Children, London WC1 Conversion to form a MRI Scanner Department for Great Ormond Street Hospital NHS Trust. Nightingale Associates, The Cherry Barn, High Street, Harwell, Oxford, OX11 OEY £ 630,000 St Pancras Hospital, London NW1 Refurbishment of the east wing for Camden NHS Primary Care Trust The Capital Projects Department, St Pancras Hospital, 4 St Pancras Way, London NW1 0PE £ 452,000 Finsbury Health Centre, Pine Street, London EC1 Refurbishment of the external fabric of a Grade I listed building for Camden NHS Primary Care Trust Avanti Architects, 1 Torriano Mews, London NW5 £ 350,000 Royal Docks Health Centre, London E16 Internal alterations for Newham Community Health Services NHS Trust FDE Architects, 15 Old Ford Road, London E2 9PJ £ 125,000 St Luke’s Hospice, Kenton Grange, Kenton, Middlesex Alterations and extensions to form a residential Hospice for The Trustees. David R Yeoman & Associates, 73 Canning Rd Harrow, Middlesex HA3 7SP £ 2,950,000 Finsbury Health Centre, Pine Street, London, EC1 Refurbishment of external fabric of a Grade I Listed Building for Camden & Islington, Community Health Services NHS Trust. Avanti Architects, 1 Torriano Mews, London NW5 £ 350,000