Provision of Urban Amenities in 
     Rural Areas (PURA)
Vision of PURA
       President Dr. A.P.J. Kalam's address on eve of Republic Day ­ 2003




“Knowledge Powered PURA
• Vision of transformation to a ‘developed’ India can only be realized if we
  launch a mega mission for empowering the rural people
• Creation of physical, electronic and knowledge connectivities leading
  to economic connectivity in villages. Such a model of establishing a
  circular connectivity among the rural village complexes will accelerate rural
  development process by empowerment
• PURA to be a business proposition economically viable and managed
  by entrepreneurs, local people and small scale industrialists
• Government’s support should be in the form of empowering such
  management agencies, providing initial economic support and finding the
                                                                     2
  right type of management structure and leaders to manage and maintain ”
Pilot Phase

• Hon’ble Prime Minister announced implementation of PURA
  on Independence Day, 2003
• Planning Commission moved a Cabinet Note on PURA
  scheme and this was approved in-principle in January 2004
• A pilot phase was implemented from 2004-05 till 2006-07
  with concurrence of Planning Commission and a total budget
  of Rs. 30 crore
• Cabinet gave ex post-facto approval to pilot phase in March
  2006
• Rs.4 - 5 crore per cluster (over a period of 3 years) in 7
  clusters in 7 States to provide connectivities: transport,
  power, electronic, knowledge, market and provision of
  drinking water and health facilities                    3
Experience of Pilot Projects
• No business plan. Conventional mode of scheme delivery. No
  participation of private partners

• Largely infrastructure centric without factoring lead economic
  activities

• Criteria for project site selection did not factor growth potential

• No ownership at State level

• Lack of institutional structure with dedicated professional support

• No convergence with other schemes of rural development or other
  Departments

After appraising the pilot phase, Planning Commission advised in
   2007 that PURA may be re-designed as a demand-driven
                                                                        4
                                                             4
   programme through Public Private Partnership (PPP) mode
NIRD Study on the Pilot Projects
Independent evaluation by National Institute of Rural Development:

• Convergence with on-going schemes was found missing

• Highlighted need for consultation with wide spectrum of
  stakeholders for community and private sector participation

• Suggested taking up PURA near a growth centre

• Recommended inclusion of livelihoods aspects besides creation
  of connectivities

• Plan should include efforts to improve linkages for improving all-
  round productivity across sectors in the rural cluster

• Recommended restructuring of the scheme
                                                                5
                                                                 5
Restructuring Process
• Planning Commission suggested that financial outlay for a
  cluster may be to the tune of Rs. 70-80 crore and recommended
  that MoRD may obtain technical assistance from international
  agencies such as ADB, IFC, etc
• Extensive consultations undertaken by MoRD with Planning
  Commission, Line Ministries, State Governments, Private
  Sector, Chambers of Commerce, etc during 2007-09
• Planning Commission approved a budget of Rs. 248 crore in the
  XI Plan for PURA scheme
• Restructured scheme proposal was circulated to different
  Ministries and their views incorporated in preparing Cabinet Note
• Cabinet approved restructured PURA scheme in January 2010
• Guidelines notified and scheme launched in April 2010
                                                               6
                                                                6
The Restructured PURA Scheme
PURA Mission Statement 




Mission
  “Holistic and accelerated development of compact areas
  around a potential growth centre in a Panchayat (or
  group of Panchayats) through Public Private Partnership
  (PPP) by providing livelihood opportunities and urban
  amenities to improve the quality of life in rural areas.” 8
                                                         8
PURA Strategy & Uniqueness
•   To address defects and incorporate new learnings, the
    strategy was based on combining rural infrastructure
    development with livelihoods creation
•   Implementation of scheme through PPP between Gram
    Panchayat (GP) and private sector partner
•   Core funding from PURA scheme of MoRD and additional
    support through convergence of other Central Government
    schemes
•   Private sector to bring in investment and operational
    expertise on basis of a detailed business plan
•   Project based. Risk sharing among stakeholders.
•   It is not a CSR activity - Private sector partner to select its
    PURA project, and, earn from the same
                                                                 9
What does PURA aim to achieve




• Combining livelihoods creation with infrastructure development in rural
  areas
• Simultaneous delivery of key infrastructure required in villages
• Provision of funds for operations and maintenance of assets, along with
  capital investment for creation of assets
• Standards of service delivery in rural areas almost at par to those set for
  urban areas                                                           10
                                                                        10
• Enforcement of service standards through a legally binding arrangement
Urban Amenities to be provided under PURA
•   Under MoRD Schemes (Existing and PURA):
       1.    Water and Sewerage              Schemes such as NRDWP,
       2.    Village streets
                                             TSC, Special SGSY, etc
       3.    Drainage
                                             will be converged in
       4.    Solid Waste Mgt
       5.    Skill Development               CAPEX provision of PURA
       6.    Development of Economic Activity
•   Under Non MoRD Schemes:                  Access schemes for
       7. Village Street Lighting
                                             dovetailing in PURA
       8. Telecom
       9. Electricity, etc.
•   Add-on Projects i.e. Revenue earning projects (Indicative):
       10.   Village linked Tourism
       11.   Integrated Rural Hub, Rural Market
       12.   Agri – Common Services Centre, etc .
       13.   Any other rural economy based project                 11
                                                                   11
What is a PURA Village
• A Gram Panchayat / a cluster of geographically contiguous Gram Panchayats
  with a population of about 25,000 – 40,000
• Water supply
     – Piped water supply of 100 lpcd through individual household connections
     – Sustainability of water supply through water harvesting and water recharge
       activities
• Sewerage
     – 100% sanitation coverage, with provision of sewerage connections to individual
       households
• Solid waste management
     – 100% coverage of SWM services to individual households
     – Scientific treatment of solid waste
• Village streets and drainage
     – 100% of village streets paved along with storm water drains, to cover entire rural
       populace
     – 100% of village streets to have street lighting
• Increase in livelihood opportunities
     – Skills building program to cover 50% of candidates in BPL households
     – Assure placement for at least 75% of the trainees                           12
                                                                                   12
Business Model




•   Leveraging public funds with private capital & management
    for creation & maintenance of rural infrastructure
•   Schemes included are ones focused on community
    development and not targeted towards individuals
•   O&M of assets and services for 10 years after a construction
    period of 3 years
•   Private Developer to have flexibility in choosing PURA
    project area & revenue generating projects as add-ons 13
Financial Model




•   Due to thin revenue base, most capital expenditure from
    Government schemes
•   Cost of each PURA project limited to Rs. 120 crore
•   Capital Grant limited to 35% of project cost for meeting
    viability gap – the PURA scheme fund of Rs. 248 crore is
    towards this grant
•   12% returns on investment budgeted as part of financial 14
    model (as per norms of Planning Commission)
Project Agreements 
 Concession Agreement
• Between Gram Panchayat and Private Developer. Gram Panchayat
would sanction the Private Developer to undertake development of
infrastructure as its authorised agent
•Will include minimum service level standards, performance
guarantees, etc

 State Support Agreement 
• Tripartite Agreement between Central Govt, State Govt and Private
Developer
• State Govt. commitment for core facilities like roads, water and
power to the PURA area

 Independent Engineer
• To supervise and monitor performance during project life cycle
                                                                   15
• Cost of Independent Engineer financed under PURA scheme
Selection Process...1 
•   Through open competitive 2-stage bidding process
•   Expression of Interest from private sector entities experienced in
    community-oriented infrastructure projects and having
    – Minimum net worth of Rs. 25 crore
    – Experience of developing infrastructure projects with a
      cumulative value of at least Rs. 50 crore


•   Short listed bidders invited to pre-bid conference and issued the
    Request for Proposal (RfP) document
•   Each bidder required to submit consent from the Gram
    Panchayat(s) and State Government(s) concerned
•   Short listed bidders invited to submit bids consisting of their
    experience and concept plans
•   No financial bidding
                                                                16
                                                                16
Selection Process...2 
• Evaluation of Concept Plans on parameters of innovativeness,
  inclusivity, sustainability, convergence, etc
• Evaluation of organisation’s experience focussed on:
   – Understanding of rural sector and demonstrated experience of working in the same
   – Ability and resources to engage with stakeholders to create a sustainable project
   – Experience in development/construction and management of community-oriented
     infrastructure projects
   – Ability to raise finances



• Bidders to be ranked on basis of (experience score + concept plan
  score) – Bidder has to score at least 50% on the concept plan score
• Detailed Project Report (DPR) as the basis of determining capital
  grant admissible which shall be evaluated by technical consultants
• Inter-Ministerial Empowered Committee to approve cost and capital
  grant                                                      17
                                                             17
Current Status
• Notice inviting Expression of Interest evoked positive
  response with 93 reputed organisations applying out of
  which 45 qualified
• Request for Proposal (RfP) issued to qualified organisations
  for submitting detailed bid - 09 organisations submitted 14
  proposals
• 11 projects were qualified on the basis of a rigorous
  evaluation and appraisal
• GoTN decided to withdraw consent and GoUP consent was
  not received
• 08 DPRs (projects located in 04 States and 1 U.T.) were
  received which are now under evaluation – expected to be
  completed by September 2011
• Execution of agreements and project execution to          18
                                                            18
  commence thereafter
Qualified PURA projects: Across 8 districts in the country
                                                                                                  Map for representation only

1. Dehradun district,
   Uttarakhand;
2. Jaipur district, Rajasthan;                                              1
                                                                                              Dehradun
                                                                                    Uttarakhand
                                           Jaipur
3. Rajsamand district,                                               2
                                                       Rajasthan

   Rajasthan;                          Rajasmand
                                                            3


4. Warangal district, Andhra
   Pradesh;
                                                                                                       Warangal
                                                                                4
5. Krishna district, Andhra                                              Andhra
                                                                         Pradesh
                                                                                    5     Krishna
   Pradesh;                                                                             Machilipatnam



6. Karaikal district, Puducherry;         Malappuram                                Puducherry
                                                                7           6
                                            Thrissur             8
7. Malappuram district, Kerala;                             Kerala



8. Thrissur district, Kerala.                          Major themes                            Agriculture Park / Support
                                                                                               Agriculture Park / Support
                                                       Major themes
                                                        Rural tourism
                                                         Rural tourism                         Micro & Small Industries
                                                                                                Micro & Small Industries
                                                Food / Meat processing
                                                Food / Meat processing                                   Rural Business Hub
                                                                                                          Rural Business Hub
                                                         Apparel Park
                                                         Apparel Park
Future Planning...1




Under XI Plan
• XI Plan provision of Rs. 248 crore allows for only 06-08 projects
• With a view to increasing the bouquet of pilot projects and to glean
  experience from a wider sample of States, MoRD proposes further
  10 PURA pilot projects under XI Plan
• Wide interest and commitment evinced by number of stakeholders
  including elected representatives for more PURA projects
• Proposal to Planning Commission for enhancing budget ceiling by
                                                                 20
                                                                 20
  Rs. 560 crore under XI Plan – advanced stage of consideration
Future Planning...2




Under XII Plan
• The pilot projects will provide a framework for testing the principles
  on which the scheme is based. This will help in upscaling the
  scheme in future
• Scaling up after experience of pilot phase during XII Plan
• It is proposed to engage an Indian Institute of Management (IIM)
  which will do a concurrent evaluation of the PURA implementation
  for a period of 1 year and assist MoRD in preparing its proposal
  under the XII Plan. The evaluation would also enable                21
                                                                      21
  improvements to the current project design
Thank You




            22
            22

Weitere ähnliche Inhalte

Was ist angesagt?

Gandhian model of rural development
Gandhian model of rural developmentGandhian model of rural development
Gandhian model of rural developmentBharat Badal
 
Infrastructure and rural development
Infrastructure and rural developmentInfrastructure and rural development
Infrastructure and rural developmentsabareesh AS
 
Provision of urban amenities in rural areas
Provision of urban amenities in rural areasProvision of urban amenities in rural areas
Provision of urban amenities in rural areasSiva Prasath T R
 
Urban Management & Governance Structures in India
Urban Management & Governance Structures in IndiaUrban Management & Governance Structures in India
Urban Management & Governance Structures in IndiaRavikant Joshi
 
Defination and types of slums
Defination and types of slumsDefination and types of slums
Defination and types of slumsjadabmunda
 
1.7.rural development in five year plans
1.7.rural development in five year plans1.7.rural development in five year plans
1.7.rural development in five year plansDr Rajeev Kumar
 
Concept and Component of Urban Governance
Concept and Component of Urban GovernanceConcept and Component of Urban Governance
Concept and Component of Urban GovernanceASRufai
 
types and contents for regional planning for block,district,state and nation
 types and contents for regional planning for block,district,state and nation types and contents for regional planning for block,district,state and nation
types and contents for regional planning for block,district,state and nationgayathrysatheesan1
 
Infrastructure
InfrastructureInfrastructure
Infrastructuremanu345
 
Urbanisation in india
Urbanisation in indiaUrbanisation in india
Urbanisation in indiaCharu Jaiswal
 
Indian Urban Policies & Programmes
Indian Urban Policies & ProgrammesIndian Urban Policies & Programmes
Indian Urban Policies & ProgrammesIram Aziz
 
Pradhan Mantri Gram Sadak Yojana (PMGSY)
Pradhan Mantri Gram Sadak Yojana (PMGSY)Pradhan Mantri Gram Sadak Yojana (PMGSY)
Pradhan Mantri Gram Sadak Yojana (PMGSY)RAMPRASAD KUMAWAT
 
1. urban economics and its scope
1.  urban economics and its scope1.  urban economics and its scope
1. urban economics and its scopeKokab Manzoor
 

Was ist angesagt? (20)

Gandhian model of rural development
Gandhian model of rural developmentGandhian model of rural development
Gandhian model of rural development
 
social infrastrctur
social infrastrctursocial infrastrctur
social infrastrctur
 
Infrastructure and rural development
Infrastructure and rural developmentInfrastructure and rural development
Infrastructure and rural development
 
Provision of urban amenities in rural areas
Provision of urban amenities in rural areasProvision of urban amenities in rural areas
Provision of urban amenities in rural areas
 
Urban Management & Governance Structures in India
Urban Management & Governance Structures in IndiaUrban Management & Governance Structures in India
Urban Management & Governance Structures in India
 
Defination and types of slums
Defination and types of slumsDefination and types of slums
Defination and types of slums
 
1.7.rural development in five year plans
1.7.rural development in five year plans1.7.rural development in five year plans
1.7.rural development in five year plans
 
Amrut ppt
Amrut pptAmrut ppt
Amrut ppt
 
Concept and Component of Urban Governance
Concept and Component of Urban GovernanceConcept and Component of Urban Governance
Concept and Component of Urban Governance
 
Indira awaas yojana
Indira awaas yojanaIndira awaas yojana
Indira awaas yojana
 
types and contents for regional planning for block,district,state and nation
 types and contents for regional planning for block,district,state and nation types and contents for regional planning for block,district,state and nation
types and contents for regional planning for block,district,state and nation
 
Infrastructure
InfrastructureInfrastructure
Infrastructure
 
Urbanisation in india
Urbanisation in indiaUrbanisation in india
Urbanisation in india
 
SPECIAL AREA DEVELOPMENT
SPECIAL AREA DEVELOPMENTSPECIAL AREA DEVELOPMENT
SPECIAL AREA DEVELOPMENT
 
The Evolution of Planning in India
The Evolution of Planning in IndiaThe Evolution of Planning in India
The Evolution of Planning in India
 
Indian Urban Policies & Programmes
Indian Urban Policies & ProgrammesIndian Urban Policies & Programmes
Indian Urban Policies & Programmes
 
Rural development ppt
Rural development pptRural development ppt
Rural development ppt
 
Programme pointers of NRLM
Programme pointers of NRLMProgramme pointers of NRLM
Programme pointers of NRLM
 
Pradhan Mantri Gram Sadak Yojana (PMGSY)
Pradhan Mantri Gram Sadak Yojana (PMGSY)Pradhan Mantri Gram Sadak Yojana (PMGSY)
Pradhan Mantri Gram Sadak Yojana (PMGSY)
 
1. urban economics and its scope
1.  urban economics and its scope1.  urban economics and its scope
1. urban economics and its scope
 

Andere mochten auch

PMRDF CTB_Option 1_Dec 11
PMRDF CTB_Option 1_Dec 11PMRDF CTB_Option 1_Dec 11
PMRDF CTB_Option 1_Dec 11Animesh Ghosh
 
SEWA-Self Employed Women Association by ppm group
SEWA-Self Employed Women Association by ppm groupSEWA-Self Employed Women Association by ppm group
SEWA-Self Employed Women Association by ppm groupyadavnavs
 
NSAP DBT jharkhand presentation
NSAP  DBT jharkhand presentation NSAP  DBT jharkhand presentation
NSAP DBT jharkhand presentation Riju Sinha
 
Deen Dayal Upadhyaya Grameen Kaushalya Yojna (DDU-GKY)
Deen Dayal Upadhyaya Grameen Kaushalya Yojna (DDU-GKY)Deen Dayal Upadhyaya Grameen Kaushalya Yojna (DDU-GKY)
Deen Dayal Upadhyaya Grameen Kaushalya Yojna (DDU-GKY)Tarun Dehare
 
Shifting cultivation
Shifting cultivationShifting cultivation
Shifting cultivationManzoor Wani
 
NREGA: THE SCHEME AND ITS CURRENT STATUS
NREGA: THE SCHEME AND ITS CURRENT STATUSNREGA: THE SCHEME AND ITS CURRENT STATUS
NREGA: THE SCHEME AND ITS CURRENT STATUSshivraj negi
 
Child marriage in india with special references to rural area
Child marriage in india with special references to rural areaChild marriage in india with special references to rural area
Child marriage in india with special references to rural areaM F
 
11138471151 Swarnajayanti Gram Swarozgar Yojana
11138471151 Swarnajayanti  Gram Swarozgar Yojana11138471151 Swarnajayanti  Gram Swarozgar Yojana
11138471151 Swarnajayanti Gram Swarozgar Yojananifalko
 
Indira awaas yojana (iay)
Indira awaas yojana (iay)Indira awaas yojana (iay)
Indira awaas yojana (iay)Manoj Das
 
Shifting Cultivation & Its Alternatives for Sustainable Agriculture
Shifting Cultivation & Its Alternatives for Sustainable AgricultureShifting Cultivation & Its Alternatives for Sustainable Agriculture
Shifting Cultivation & Its Alternatives for Sustainable AgricultureNurIbneShamsTuhin
 
NRLM Key Policy and Programmatic Pointers 100610
NRLM Key Policy and Programmatic Pointers 100610NRLM Key Policy and Programmatic Pointers 100610
NRLM Key Policy and Programmatic Pointers 100610jiteshindia
 
INDIRA AWAAS YOJANA
INDIRA AWAAS YOJANAINDIRA AWAAS YOJANA
INDIRA AWAAS YOJANABismi S
 

Andere mochten auch (20)

Slash and burn
Slash and burnSlash and burn
Slash and burn
 
PMRDF CTB_Option 1_Dec 11
PMRDF CTB_Option 1_Dec 11PMRDF CTB_Option 1_Dec 11
PMRDF CTB_Option 1_Dec 11
 
SEWA-Self Employed Women Association by ppm group
SEWA-Self Employed Women Association by ppm groupSEWA-Self Employed Women Association by ppm group
SEWA-Self Employed Women Association by ppm group
 
NSAP DBT jharkhand presentation
NSAP  DBT jharkhand presentation NSAP  DBT jharkhand presentation
NSAP DBT jharkhand presentation
 
Deen Dayal Upadhyaya Grameen Kaushalya Yojna (DDU-GKY)
Deen Dayal Upadhyaya Grameen Kaushalya Yojna (DDU-GKY)Deen Dayal Upadhyaya Grameen Kaushalya Yojna (DDU-GKY)
Deen Dayal Upadhyaya Grameen Kaushalya Yojna (DDU-GKY)
 
Health scheme
Health schemeHealth scheme
Health scheme
 
Shifting cultivation
Shifting cultivationShifting cultivation
Shifting cultivation
 
NREGA: THE SCHEME AND ITS CURRENT STATUS
NREGA: THE SCHEME AND ITS CURRENT STATUSNREGA: THE SCHEME AND ITS CURRENT STATUS
NREGA: THE SCHEME AND ITS CURRENT STATUS
 
Sewa
SewaSewa
Sewa
 
Child marriage in india with special references to rural area
Child marriage in india with special references to rural areaChild marriage in india with special references to rural area
Child marriage in india with special references to rural area
 
Presentation on swarnjayanti gram swarozgar yojana (sgsy
Presentation on swarnjayanti gram swarozgar yojana (sgsyPresentation on swarnjayanti gram swarozgar yojana (sgsy
Presentation on swarnjayanti gram swarozgar yojana (sgsy
 
BPMC Act,1949
BPMC Act,1949BPMC Act,1949
BPMC Act,1949
 
11138471151 Swarnajayanti Gram Swarozgar Yojana
11138471151 Swarnajayanti  Gram Swarozgar Yojana11138471151 Swarnajayanti  Gram Swarozgar Yojana
11138471151 Swarnajayanti Gram Swarozgar Yojana
 
Indira awaas yojana (iay)
Indira awaas yojana (iay)Indira awaas yojana (iay)
Indira awaas yojana (iay)
 
NREGA and NGO
NREGA and NGONREGA and NGO
NREGA and NGO
 
07 Sewa
07 Sewa07 Sewa
07 Sewa
 
Shifting Cultivation & Its Alternatives for Sustainable Agriculture
Shifting Cultivation & Its Alternatives for Sustainable AgricultureShifting Cultivation & Its Alternatives for Sustainable Agriculture
Shifting Cultivation & Its Alternatives for Sustainable Agriculture
 
NRLM Key Policy and Programmatic Pointers 100610
NRLM Key Policy and Programmatic Pointers 100610NRLM Key Policy and Programmatic Pointers 100610
NRLM Key Policy and Programmatic Pointers 100610
 
INDIRA AWAAS YOJANA
INDIRA AWAAS YOJANAINDIRA AWAAS YOJANA
INDIRA AWAAS YOJANA
 
Unemployment in rural area
Unemployment in rural areaUnemployment in rural area
Unemployment in rural area
 

Ähnlich wie Transforming Rural India with PURA

Twelfth five year plan review
Twelfth five year plan reviewTwelfth five year plan review
Twelfth five year plan reviewSushant Karnik
 
Community Infrastructure Levy- Helen Martin, RTPI West Midlands CPD
Community Infrastructure Levy- Helen Martin, RTPI West Midlands CPDCommunity Infrastructure Levy- Helen Martin, RTPI West Midlands CPD
Community Infrastructure Levy- Helen Martin, RTPI West Midlands CPDDesign South East
 
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015Robust Marketing & Consulting (Pty) Ltd
 
2040 RTP Community Advisory Committee/Core Technical Team #2
2040 RTP Community Advisory Committee/Core Technical Team #22040 RTP Community Advisory Committee/Core Technical Team #2
2040 RTP Community Advisory Committee/Core Technical Team #2CHCRPA
 
Assessment of pura rural water scheme
Assessment of pura rural water schemeAssessment of pura rural water scheme
Assessment of pura rural water schemeBrowne & Mohan
 
New Town Development Strategies Jan 2015 - Day 2
New Town Development Strategies Jan 2015  - Day 2New Town Development Strategies Jan 2015  - Day 2
New Town Development Strategies Jan 2015 - Day 2Ian Butter
 
Presentación ppp casa paulista ingles
Presentación ppp casa paulista inglesPresentación ppp casa paulista ingles
Presentación ppp casa paulista inglesEraikune
 
Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...
Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...
Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...Lynn Aziz
 
Using land for housing draft report presentation
Using land for housing draft report presentationUsing land for housing draft report presentation
Using land for housing draft report presentationProductivity Commission
 
Urban planning for smart cities - Smart tools for Smart Cities
Urban planning for smart cities - Smart tools for Smart CitiesUrban planning for smart cities - Smart tools for Smart Cities
Urban planning for smart cities - Smart tools for Smart CitiesVivek Pai
 
Financing water in_the_arab_countries_beirut89_3_2010
Financing water in_the_arab_countries_beirut89_3_2010Financing water in_the_arab_countries_beirut89_3_2010
Financing water in_the_arab_countries_beirut89_3_2010Parti Djibouti
 
Smart City Mission & AMRUT.pptx
Smart City Mission & AMRUT.pptxSmart City Mission & AMRUT.pptx
Smart City Mission & AMRUT.pptxSachinArora190118
 
Presentation of the Modernization of Local Public Services in the RM Project
Presentation of the Modernization of Local Public Services in the RM ProjectPresentation of the Modernization of Local Public Services in the RM Project
Presentation of the Modernization of Local Public Services in the RM ProjectGIZ Moldova
 
2040 RTP October 2012 Public Workshop Presentation
2040 RTP October 2012 Public Workshop Presentation 2040 RTP October 2012 Public Workshop Presentation
2040 RTP October 2012 Public Workshop Presentation CHCRPA
 

Ähnlich wie Transforming Rural India with PURA (20)

Twelfth five year plan review
Twelfth five year plan reviewTwelfth five year plan review
Twelfth five year plan review
 
Community Infrastructure Levy- Helen Martin, RTPI West Midlands CPD
Community Infrastructure Levy- Helen Martin, RTPI West Midlands CPDCommunity Infrastructure Levy- Helen Martin, RTPI West Midlands CPD
Community Infrastructure Levy- Helen Martin, RTPI West Midlands CPD
 
Tn presentation.pdf2
Tn presentation.pdf2Tn presentation.pdf2
Tn presentation.pdf2
 
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
 
2040 RTP Community Advisory Committee/Core Technical Team #2
2040 RTP Community Advisory Committee/Core Technical Team #22040 RTP Community Advisory Committee/Core Technical Team #2
2040 RTP Community Advisory Committee/Core Technical Team #2
 
Assessment of pura rural water scheme
Assessment of pura rural water schemeAssessment of pura rural water scheme
Assessment of pura rural water scheme
 
Rural Policy Towards 2020 - Audrey Roy (DEFRA RCPU)
Rural Policy Towards 2020 - Audrey Roy (DEFRA RCPU)Rural Policy Towards 2020 - Audrey Roy (DEFRA RCPU)
Rural Policy Towards 2020 - Audrey Roy (DEFRA RCPU)
 
New Town Development Strategies Jan 2015 - Day 2
New Town Development Strategies Jan 2015  - Day 2New Town Development Strategies Jan 2015  - Day 2
New Town Development Strategies Jan 2015 - Day 2
 
HRIDAY Scheme.pptx
HRIDAY Scheme.pptxHRIDAY Scheme.pptx
HRIDAY Scheme.pptx
 
Presentación ppp casa paulista ingles
Presentación ppp casa paulista inglesPresentación ppp casa paulista ingles
Presentación ppp casa paulista ingles
 
Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...
Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...
Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...
 
Using land for housing draft report presentation
Using land for housing draft report presentationUsing land for housing draft report presentation
Using land for housing draft report presentation
 
Urban planning for smart cities - Smart tools for Smart Cities
Urban planning for smart cities - Smart tools for Smart CitiesUrban planning for smart cities - Smart tools for Smart Cities
Urban planning for smart cities - Smart tools for Smart Cities
 
Smart republic 2018
Smart republic 2018Smart republic 2018
Smart republic 2018
 
Ppp or csr
Ppp or csrPpp or csr
Ppp or csr
 
Financing water in_the_arab_countries_beirut89_3_2010
Financing water in_the_arab_countries_beirut89_3_2010Financing water in_the_arab_countries_beirut89_3_2010
Financing water in_the_arab_countries_beirut89_3_2010
 
Drishti
DrishtiDrishti
Drishti
 
Smart City Mission & AMRUT.pptx
Smart City Mission & AMRUT.pptxSmart City Mission & AMRUT.pptx
Smart City Mission & AMRUT.pptx
 
Presentation of the Modernization of Local Public Services in the RM Project
Presentation of the Modernization of Local Public Services in the RM ProjectPresentation of the Modernization of Local Public Services in the RM Project
Presentation of the Modernization of Local Public Services in the RM Project
 
2040 RTP October 2012 Public Workshop Presentation
2040 RTP October 2012 Public Workshop Presentation 2040 RTP October 2012 Public Workshop Presentation
2040 RTP October 2012 Public Workshop Presentation
 

Mehr von Kartikeya Pandey

Mehr von Kartikeya Pandey (20)

Water and sanitation
Water and sanitationWater and sanitation
Water and sanitation
 
oil & gas drilling preliminaries
oil & gas drilling preliminariesoil & gas drilling preliminaries
oil & gas drilling preliminaries
 
Supplementary benefits
Supplementary benefitsSupplementary benefits
Supplementary benefits
 
Property tax
Property taxProperty tax
Property tax
 
Metros summary by Kartikeya Pandey
Metros summary by Kartikeya PandeyMetros summary by Kartikeya Pandey
Metros summary by Kartikeya Pandey
 
Marketing product placement strategies
Marketing product placement strategiesMarketing product placement strategies
Marketing product placement strategies
 
seven cs
seven csseven cs
seven cs
 
Indian ports (1)
Indian ports (1)Indian ports (1)
Indian ports (1)
 
Human resource planning ppt.
Human resource planning ppt.Human resource planning ppt.
Human resource planning ppt.
 
Gis
GisGis
Gis
 
Fire d project
Fire d projectFire d project
Fire d project
 
Alandur sewerage proj arun
Alandur sewerage proj   arunAlandur sewerage proj   arun
Alandur sewerage proj arun
 
24 x7 water in three states of karnataka
24 x7 water in three states of karnataka24 x7 water in three states of karnataka
24 x7 water in three states of karnataka
 
4
44
4
 
Land adjustment Land value capture
Land adjustment Land value captureLand adjustment Land value capture
Land adjustment Land value capture
 
Solid waste management practices in dehradun under jn nurm
Solid waste management practices in dehradun under jn nurmSolid waste management practices in dehradun under jn nurm
Solid waste management practices in dehradun under jn nurm
 
Infrastructure unbundling in south africa
Infrastructure unbundling in south africaInfrastructure unbundling in south africa
Infrastructure unbundling in south africa
 
Indian accounting standard (ind as) 27
Indian accounting standard (ind as) 27Indian accounting standard (ind as) 27
Indian accounting standard (ind as) 27
 
Hr presentation
Hr presentationHr presentation
Hr presentation
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in construction
 

Transforming Rural India with PURA

  • 2. Vision of PURA President Dr. A.P.J. Kalam's address on eve of Republic Day ­ 2003 “Knowledge Powered PURA • Vision of transformation to a ‘developed’ India can only be realized if we launch a mega mission for empowering the rural people • Creation of physical, electronic and knowledge connectivities leading to economic connectivity in villages. Such a model of establishing a circular connectivity among the rural village complexes will accelerate rural development process by empowerment • PURA to be a business proposition economically viable and managed by entrepreneurs, local people and small scale industrialists • Government’s support should be in the form of empowering such management agencies, providing initial economic support and finding the 2 right type of management structure and leaders to manage and maintain ”
  • 3. Pilot Phase • Hon’ble Prime Minister announced implementation of PURA on Independence Day, 2003 • Planning Commission moved a Cabinet Note on PURA scheme and this was approved in-principle in January 2004 • A pilot phase was implemented from 2004-05 till 2006-07 with concurrence of Planning Commission and a total budget of Rs. 30 crore • Cabinet gave ex post-facto approval to pilot phase in March 2006 • Rs.4 - 5 crore per cluster (over a period of 3 years) in 7 clusters in 7 States to provide connectivities: transport, power, electronic, knowledge, market and provision of drinking water and health facilities 3
  • 4. Experience of Pilot Projects • No business plan. Conventional mode of scheme delivery. No participation of private partners • Largely infrastructure centric without factoring lead economic activities • Criteria for project site selection did not factor growth potential • No ownership at State level • Lack of institutional structure with dedicated professional support • No convergence with other schemes of rural development or other Departments After appraising the pilot phase, Planning Commission advised in 2007 that PURA may be re-designed as a demand-driven 4 4 programme through Public Private Partnership (PPP) mode
  • 5. NIRD Study on the Pilot Projects Independent evaluation by National Institute of Rural Development: • Convergence with on-going schemes was found missing • Highlighted need for consultation with wide spectrum of stakeholders for community and private sector participation • Suggested taking up PURA near a growth centre • Recommended inclusion of livelihoods aspects besides creation of connectivities • Plan should include efforts to improve linkages for improving all- round productivity across sectors in the rural cluster • Recommended restructuring of the scheme 5 5
  • 6. Restructuring Process • Planning Commission suggested that financial outlay for a cluster may be to the tune of Rs. 70-80 crore and recommended that MoRD may obtain technical assistance from international agencies such as ADB, IFC, etc • Extensive consultations undertaken by MoRD with Planning Commission, Line Ministries, State Governments, Private Sector, Chambers of Commerce, etc during 2007-09 • Planning Commission approved a budget of Rs. 248 crore in the XI Plan for PURA scheme • Restructured scheme proposal was circulated to different Ministries and their views incorporated in preparing Cabinet Note • Cabinet approved restructured PURA scheme in January 2010 • Guidelines notified and scheme launched in April 2010 6 6
  • 8. PURA Mission Statement  Mission “Holistic and accelerated development of compact areas around a potential growth centre in a Panchayat (or group of Panchayats) through Public Private Partnership (PPP) by providing livelihood opportunities and urban amenities to improve the quality of life in rural areas.” 8 8
  • 9. PURA Strategy & Uniqueness • To address defects and incorporate new learnings, the strategy was based on combining rural infrastructure development with livelihoods creation • Implementation of scheme through PPP between Gram Panchayat (GP) and private sector partner • Core funding from PURA scheme of MoRD and additional support through convergence of other Central Government schemes • Private sector to bring in investment and operational expertise on basis of a detailed business plan • Project based. Risk sharing among stakeholders. • It is not a CSR activity - Private sector partner to select its PURA project, and, earn from the same 9
  • 10. What does PURA aim to achieve • Combining livelihoods creation with infrastructure development in rural areas • Simultaneous delivery of key infrastructure required in villages • Provision of funds for operations and maintenance of assets, along with capital investment for creation of assets • Standards of service delivery in rural areas almost at par to those set for urban areas 10 10 • Enforcement of service standards through a legally binding arrangement
  • 11. Urban Amenities to be provided under PURA • Under MoRD Schemes (Existing and PURA): 1. Water and Sewerage Schemes such as NRDWP, 2. Village streets TSC, Special SGSY, etc 3. Drainage will be converged in 4. Solid Waste Mgt 5. Skill Development CAPEX provision of PURA 6. Development of Economic Activity • Under Non MoRD Schemes: Access schemes for 7. Village Street Lighting dovetailing in PURA 8. Telecom 9. Electricity, etc. • Add-on Projects i.e. Revenue earning projects (Indicative): 10. Village linked Tourism 11. Integrated Rural Hub, Rural Market 12. Agri – Common Services Centre, etc . 13. Any other rural economy based project 11 11
  • 12. What is a PURA Village • A Gram Panchayat / a cluster of geographically contiguous Gram Panchayats with a population of about 25,000 – 40,000 • Water supply – Piped water supply of 100 lpcd through individual household connections – Sustainability of water supply through water harvesting and water recharge activities • Sewerage – 100% sanitation coverage, with provision of sewerage connections to individual households • Solid waste management – 100% coverage of SWM services to individual households – Scientific treatment of solid waste • Village streets and drainage – 100% of village streets paved along with storm water drains, to cover entire rural populace – 100% of village streets to have street lighting • Increase in livelihood opportunities – Skills building program to cover 50% of candidates in BPL households – Assure placement for at least 75% of the trainees 12 12
  • 13. Business Model • Leveraging public funds with private capital & management for creation & maintenance of rural infrastructure • Schemes included are ones focused on community development and not targeted towards individuals • O&M of assets and services for 10 years after a construction period of 3 years • Private Developer to have flexibility in choosing PURA project area & revenue generating projects as add-ons 13
  • 14. Financial Model • Due to thin revenue base, most capital expenditure from Government schemes • Cost of each PURA project limited to Rs. 120 crore • Capital Grant limited to 35% of project cost for meeting viability gap – the PURA scheme fund of Rs. 248 crore is towards this grant • 12% returns on investment budgeted as part of financial 14 model (as per norms of Planning Commission)
  • 15. Project Agreements  Concession Agreement • Between Gram Panchayat and Private Developer. Gram Panchayat would sanction the Private Developer to undertake development of infrastructure as its authorised agent •Will include minimum service level standards, performance guarantees, etc State Support Agreement  • Tripartite Agreement between Central Govt, State Govt and Private Developer • State Govt. commitment for core facilities like roads, water and power to the PURA area Independent Engineer • To supervise and monitor performance during project life cycle 15 • Cost of Independent Engineer financed under PURA scheme
  • 16. Selection Process...1  • Through open competitive 2-stage bidding process • Expression of Interest from private sector entities experienced in community-oriented infrastructure projects and having – Minimum net worth of Rs. 25 crore – Experience of developing infrastructure projects with a cumulative value of at least Rs. 50 crore • Short listed bidders invited to pre-bid conference and issued the Request for Proposal (RfP) document • Each bidder required to submit consent from the Gram Panchayat(s) and State Government(s) concerned • Short listed bidders invited to submit bids consisting of their experience and concept plans • No financial bidding 16 16
  • 17. Selection Process...2  • Evaluation of Concept Plans on parameters of innovativeness, inclusivity, sustainability, convergence, etc • Evaluation of organisation’s experience focussed on: – Understanding of rural sector and demonstrated experience of working in the same – Ability and resources to engage with stakeholders to create a sustainable project – Experience in development/construction and management of community-oriented infrastructure projects – Ability to raise finances • Bidders to be ranked on basis of (experience score + concept plan score) – Bidder has to score at least 50% on the concept plan score • Detailed Project Report (DPR) as the basis of determining capital grant admissible which shall be evaluated by technical consultants • Inter-Ministerial Empowered Committee to approve cost and capital grant 17 17
  • 18. Current Status • Notice inviting Expression of Interest evoked positive response with 93 reputed organisations applying out of which 45 qualified • Request for Proposal (RfP) issued to qualified organisations for submitting detailed bid - 09 organisations submitted 14 proposals • 11 projects were qualified on the basis of a rigorous evaluation and appraisal • GoTN decided to withdraw consent and GoUP consent was not received • 08 DPRs (projects located in 04 States and 1 U.T.) were received which are now under evaluation – expected to be completed by September 2011 • Execution of agreements and project execution to 18 18 commence thereafter
  • 19. Qualified PURA projects: Across 8 districts in the country Map for representation only 1. Dehradun district, Uttarakhand; 2. Jaipur district, Rajasthan; 1 Dehradun Uttarakhand Jaipur 3. Rajsamand district, 2 Rajasthan Rajasthan; Rajasmand 3 4. Warangal district, Andhra Pradesh; Warangal 4 5. Krishna district, Andhra Andhra Pradesh 5 Krishna Pradesh; Machilipatnam 6. Karaikal district, Puducherry; Malappuram Puducherry 7 6 Thrissur 8 7. Malappuram district, Kerala; Kerala 8. Thrissur district, Kerala. Major themes  Agriculture Park / Support  Agriculture Park / Support Major themes  Rural tourism  Rural tourism  Micro & Small Industries  Micro & Small Industries  Food / Meat processing  Food / Meat processing  Rural Business Hub  Rural Business Hub  Apparel Park  Apparel Park
  • 20. Future Planning...1 Under XI Plan • XI Plan provision of Rs. 248 crore allows for only 06-08 projects • With a view to increasing the bouquet of pilot projects and to glean experience from a wider sample of States, MoRD proposes further 10 PURA pilot projects under XI Plan • Wide interest and commitment evinced by number of stakeholders including elected representatives for more PURA projects • Proposal to Planning Commission for enhancing budget ceiling by 20 20 Rs. 560 crore under XI Plan – advanced stage of consideration
  • 21. Future Planning...2 Under XII Plan • The pilot projects will provide a framework for testing the principles on which the scheme is based. This will help in upscaling the scheme in future • Scaling up after experience of pilot phase during XII Plan • It is proposed to engage an Indian Institute of Management (IIM) which will do a concurrent evaluation of the PURA implementation for a period of 1 year and assist MoRD in preparing its proposal under the XII Plan. The evaluation would also enable 21 21 improvements to the current project design
  • 22. Thank You 22 22