1PG&E - ET&S Systems Integration Patent Pending
ET&S Systems Integration Program
Delivering a Positive Mobile Experience
via SAP Integration
Crawford Owens (PG&E), Todd Mintzer (PG&E), Amar Chhatwal (PwC)
Monday, September 16, 2013
11:30am – 12:15pm
2PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
• Objectives
– Share insights from PG&E’s Electric Transmission & Substation Systems Integration and
MobileConnect programs
– Share a technology deployment model that enhances mobile user experience with SAP PM at the
core of the integrated solution
– Highlight enablers / required design elements that deliver on integrated platform and mobile
solutions (e.g., IT / Business partnership, change management, robust governance structure,
system integration)
– Share industry best practices amongst presentation participants
• Contents
– Executive Summary
– Background
• PG&E Company Overview
• Our Strategy to Realizing Benefits and High Quality End User Experiences
• Electric Transmission & Substation System Integration (ET&S SI) and MobileConnect Overviews
– Deployment Challenges
• Process Redesign, Technology Integration, User Adoption, Device Support
– Deployment Approach
• User Experience Centric Model
– Change Management
– Sample Results
– Path Forward
• Upcoming Initiatives, Anticipated Challenges / Opportunities
– T&D World – Mobile Drives User Adoption
– Q&A / General Discussion
– Closing Comments and Contact Information
Objectives and Contents
3PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
Common
Issues
• Most utilities are deploying some form of mobile technology to field workers
to improve safety, reliability and operations; however, most utilities are
finding that it is much easier said than done
• There are upstream and downstream constraints that make or break mobile
deployments:
̵ Upstream, well defined business processes and robust / integrated technology
infrastructure must be efficient, stable and integrated
̵ Downstream, user centric deployment and support models must be in place to
ensure user adoption and realization of benefits
• Mobile programs are complex from process, technology and people
perspectives; program failures are highly likely unless leaders are engaged
and a well defined governance structure is in place to lead the program
Our
Approach
• PG&E started at “the core” and built integrated systems to support business
process; this core enabled mobile solutions to be brought to life
• PG&E implemented a user centric deployment model to ensure the mobile
solutions “stuck”; this started at project kickoff and carried through to
deployment and to operations and maintenance
Our
Results
• PG&E is midway through its mobile program and has already shifted ~2000
workers from paper-based to mobile-based processes
Executive Summary
4PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
• Founded in 1905; headquartered in San Francisco, California
• 15 MM customers (~1 in 20 people in the US)
• 70,000 square-mile service territory in Central and Northern California
• 20,000 employees
• 2012 revenue ~$12B
Background
PG&E Company Overview
Electric and gas distribution
customers (% of total connections)
54% electric
46% gas
Electric transmission circuits
Electric distribution circuits
18,616 miles
141,215 miles
Gas transmission backbone
Gas distribution
6,128 miles
40,123 miles
Electric generation capacity
Nuclear (1), Fossil (2), Hydro (110)
Plants
7,833 MW
22,544 Peak MW
5PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
• Realizing end-user benefits starts with a well understood and defined business need
that is enabled by process, technology, tools and people
• PG&E’s Strategy:
Background
Our Strategy to Realizing Benefits and High Quality End User Experiences
Business
Need /
Benefit
Process
Technology
Enablement
End User
Tools
End User
Experience
Strategic Area High-Level Attribute
Business Need
/ Benefit
• Business need that when
resolved results in business
benefit (hard or soft)
Process • Defined business processes
that enable business needs /
strategies
Technology
Enablement
• Architecture and infrastructure
that drives enablement of
business process
End User Tools • Devices and applications that
interface backend technology
with end users
End User
Experience
• Intersection of process,
technology and tools that drive
solution usability
Using PG&E’s ET&S System Integration and MobileConnect programs, we will demonstrate a best practice approach
to enabling business benefits through a well defined core infrastructure that results in a positive end-user experience
6PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
• Once business needs, strategies and processes are defined, an integrated
technology architecture is required to enable business and end user benefit
• Electric Transmission & Substation (ET&S) System Integration (SI) eliminated
redundancies and established critical interfaces to link core systems
• “Before” Process and System Structure:
Background
Electric Transmission & Substation System Integration Program Overview
PG&E’s starting point was fragmented and made planning, design, work execution and overall reporting and
management a major challenge
System
Planning
Design
Project Mgmt
Business
Mgmt
Software
“Home
Grown” Work
Mgmt
Key Takeaways
• Disconnected processes
and systems
• Customized, “home-grown”
systems
• Multiple systems of record
with conflicting data
7PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
• “To-Be” Process and System Structure:
• High Level Project Data Flow:
System
Background
Electric Transmission & Substation System Integration Program Overview
Planning
Design
Project Mgmt
Business
Mgmt
Software
GIS
Continued
Scheduling
Project Mgmt Scheduling
Scheduling ReportingWork Planning Reporting
Portfolio Planning Core Business App
Key Takeaways
 Integrated processes
and systems
 Replacement of “home-
grown” Excel / Access /
etc. databases
 One true system of
record
In the “to-be” design, integration of key systems and processes creates a single plan of record and improves
transparency across various organizations. Additionally, integrated backend systems provide a robust infrastructure
enabling mobile work management solution
8PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
• Program Overview
– Multi-year program started 2007 and completes in 2016
– Mobile solutions to be deployed to ~18 different work groups
– Electric, Gas and Customer Care business groups impacted
– Over 7000 field users to be mobilized (~2000 mobilized to date)
• Business Objectives
– Move from manual, paper-based processes into an integrated mobile-back office environment to
improve safety, reliability, compliance, data accuracy and operational efficiencies
Background
MobileConnect Program Overview
What we were… What we’re becoming…
9PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
• The scale and complexity of MobileConnect required a new, user-experience
centric deployment approach to realize benefits at desirable speed
• Typical mobile deployment challenges PG&E addressed include: process
redesign, technology integration, user adoption, and device support
• Typical Challenges:
Deployment Challenges
Process Redesign, Technology Integration, User Adoption, Device Support
Mobile projects have a high likelihood of failure unless key challenges are addressed and mitigated throughout the
project (e.g., great technology can only take a deployment so far if the underlying processes are broken)
Process
Redesign
Technology
Integration
User
Adoption
Operations &
Maintenance Support
• Business process
redesign often results in
roles and metrics
changes, and
headcount reduction or
redeployment, which
could engender
negative user
perception if not
managed appropriately
• Behind the scenes of a
seemingly easy user
experience is the
complex integration of
devices, applications
and systems
• There are very high
expectations for
availability and usability,
which are specific to
user groups
• Mobile adoption within
an overall low tech
workforce requires
dramatic behavioral and
cultural change
• Mobile technology
requires a high touch
user support model,
compared to traditional
desktop IT services
10PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
• The post deployment support experience is critical to benefits realization
• PG&E’s user experience centric approach consists of four pillars: governance,
user group customization, employee engagement, and post-deployment support
Deployment Approach
User Experience Centric Model
• Accountable / engaged program leadership
• Engaged project sponsors and teams
• Robust project lifecycle management,
including prioritization and sequencing
• Well defined business objectives
that tie to program portfolio
and benefits
• Business / IT collaboration model
• High-touch deployment,
especially with users who may
not be tech savvy
• Use of on-the-ground SMEs
• Job aides, training, support channels
• Pre-/post-deployment metrics to validate
issues / successes
• Capture / prioritize improvement opportunities
• Change management
• Engagement throughout
project lifecycle, not just at the end
• Identification of training needs
• Targeted communications making
employees aware of benefits / changes
• Continuous user feedback loops via user
acceptance testing, piloting, business validation
• Well defined business issue to solve (start with
the problem, not the solution)
• Cross-functional engagement during
requirements definition
• Device / application selection
criteria
• Field testing, piloting, business
validation
A user experience centric model is critical when deploying high tech solutions to a traditionally low tech workforce
Governance
User Group
Customization
Employee
Engagement
Post-
Deployment
Support
11PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
Change Management
Need for Change Management
Change Management is necessary to manage and monitor the six critical drivers that:
• Affect the extent to which project / program objectives are being achieved
• Impact business performance while change is taking place
Low High
Turbulence, Risk
& Roadblocks
Leadership
Engagement
Team Skills,
Value &
Accountability
Resistance /
Snap Back
Directional
Alignment
Emotional
Energy, Passion
& Drive
Without Change Mgmt. With Change Mgmt.
• Project
Objectives
• Business
Results
High
Performance
1
2
3
4
5
6
An innovative technical solution is not sufficient for success. Dedicated change management
resources ensure that technology will be adopted to realize the intended business benefits
12PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
Change Mgmt. & Communications At The Individual Level May Be
Required
• Within each group, typically 3
profiles of users exist:
– “Change Embracers”, “On the
Fence” and “Resistors”
– Typically bell-curve distributed,
but exception exists
• Group on the left typically more
vocal
• Communications and Change
Management is about
– Moving the people to the right
– Raising the “positive” voices
• The “change leaders” within
each group will play a critical
role in achieving the rightward
movement
Vocal
Level
“Resistors” “On the Fence” “Change
Embracers”
Vocal
Level
“Resistors” “On the Fence” “Change
Embracers”
Without Strategic Change Management With Strategic Change Management
13PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
Sample Results
PG&E has successfully deployed integrated solution to over 800 users, with ongoing work to integrate Portfolio
Planning and Sourcing users
• Deployed integrated platform with
SAP at the core to ~800 users
(Substation/T-Line – Project
Management, Engineering,
Construction, Environmental, etc.)
• Project Managers developing
monthly forecasts using integrated
solution. Forecast visible to down-
stream users for review/updates
• All work – capital and expense –
visible in one system/tool
• Large capital, Small capital and
Expense work is planned using
integrated solution
Screenshots of Integrated Solution
Planning
Execution
14PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
Sample Results (cont.)
PG&E has successfully deployed mobile technology to over 2000 field users, with 5000 more planned
• Deployed mobile to ~2000 field users
(Restoration, Gas Services, Meter Techs,
Substation, Vegetation Management,
etc.)
• Projects with Patrol & Inspect,
Maintenance & Construction and Electric
Transmission are being planned
Screenshots of Mobile Work Solution
Map
Drilldown
Motion F5v
Panasonic CF19
Panasonic H1
Sample Devices Deployed
15PG&E - ET&S Systems Integration Patent Pending
Benefits of Integrated Framework
DRAFT ONLY - NOT YET REVIEWED OR APPROVED BY MANAGEMENT
• Deploying an integrated platform with SAP at the core as the ‘single
source of the truth’ leads to following benefits
– Retirement of legacy systems/applications reducing IT maintenance
– Improved planning and forecasting information
– Improved visibility to materials and environmental
– Enhanced material forecasts
– Improved capital plan execution
– Enhanced communications between project management and
downstream users – Engineering, Construction
– Improved coordination of cross-departmental resources
– Reduced setup and mobilization costs
– Increasing capacity of the workforce by removing non-value added
tasks
– Increasing throughput as excess capacity can focus on core work
– Better coordination and oversight of the entire electric transmission
multi-year portfolio
16PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
• PG&E has a full plate for 2013 as it moves system integration efforts
to new business units and deploys mobile to new user groups
Path Forward
Upcoming Initiatives, Anticipated Challenges / Opportunities
Upcoming
Initiatives
•Expanding system integration activities to new business units
•Deploying mobile technology to maintenance and construction
crews, and compliance inspectors
•Implementing more robust operations and maintenance
support for end users
Anticipated
Challenges /
Opportunities
•Continuing to ensure that true business needs are defined and
met through program governance enhancements
•Ensuring benefit tracking and realization to ensure delivery on
hard / soft cost benefits and corporate KPIs (e.g., reliability,
operations)
Successfully integrating disparate systems and enabling mobile solutions involves complex coordination across many
business units and highly effective Business-IT collaboration
17PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
• Mobile Deployment article published in T&D World magazine
(August 2013 Issue)
T&D World
User Focus Drives Mobile Deployment
http://tdworld.com/business/user-focus-drives-mobile-deployment?page=1
August 2013 Issue
18PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending
• Closing Comments
• Contact Information
Closing Comments and Contact Information
Crawford Owens Todd Mintzer Amar Chhatwal
Director
Technology Deployment
PG&E
Sr. Manager
Work and Resource
Management
PG&E
Director
Power & Utilities, Advisory
PwC
925.270.2872 925.328.5712 415.794.4856
cwo3@pge.com tbm0@pge.com amardeep.s.chhatwal@us.pwc.com
www.pge.com www.pge.com www.pwc.com
19
Q&A / General Discussion

Weitere ähnliche Inhalte

Was ist angesagt?

Simplifying it using a disciplined portfolio governance approach
Simplifying it using a disciplined portfolio governance approachSimplifying it using a disciplined portfolio governance approach
Simplifying it using a disciplined portfolio governance approachp6academy
 
Application Portfolio Management, the Basics - How much Software do I have
Application Portfolio Management, the Basics - How much Software do I haveApplication Portfolio Management, the Basics - How much Software do I have
Application Portfolio Management, the Basics - How much Software do I haveFrank Vogelezang
 
Next generation Enterprise Architecture primer
Next generation Enterprise Architecture  primer Next generation Enterprise Architecture  primer
Next generation Enterprise Architecture primer Million Innovators Group
 
Resume - Woods - Avaya
Resume - Woods - AvayaResume - Woods - Avaya
Resume - Woods - AvayaJeffrey Woods
 
ITIL compliant Open Source tools
ITIL compliant Open Source toolsITIL compliant Open Source tools
ITIL compliant Open Source toolsBruno Cornec
 
Application Management Framework
Application Management FrameworkApplication Management Framework
Application Management FrameworkRory Mackay
 
Mobility - The Key Pillar of Digital Transformation and Economy
Mobility - The Key Pillar of Digital Transformation and EconomyMobility - The Key Pillar of Digital Transformation and Economy
Mobility - The Key Pillar of Digital Transformation and EconomySandeep Mahindra
 
Venkata Nagi Reddy
Venkata Nagi ReddyVenkata Nagi Reddy
Venkata Nagi ReddyNagi Reddy
 
A Case Study on Business Process Management
A Case Study on Business Process ManagementA Case Study on Business Process Management
A Case Study on Business Process ManagementGoutama Bachtiar
 
IT Transformation Initiatives PowerPoint Presentation Slides
IT Transformation Initiatives PowerPoint Presentation SlidesIT Transformation Initiatives PowerPoint Presentation Slides
IT Transformation Initiatives PowerPoint Presentation SlidesSlideTeam
 
Qspear Corporate Brief
Qspear  Corporate  BriefQspear  Corporate  Brief
Qspear Corporate BriefDinesh Chauhan
 
DHL Logistics - Enterprise Architecture
DHL Logistics - Enterprise ArchitectureDHL Logistics - Enterprise Architecture
DHL Logistics - Enterprise ArchitectureHarry Strover
 
Rajeev Bajpai_resume
Rajeev Bajpai_resumeRajeev Bajpai_resume
Rajeev Bajpai_resumeRajeev Bajpai
 
Infosys - SAP Implementation Methodology | Integration Software
Infosys - SAP Implementation Methodology | Integration SoftwareInfosys - SAP Implementation Methodology | Integration Software
Infosys - SAP Implementation Methodology | Integration SoftwareInfosys
 
Mark Ledda resume_rev1
Mark Ledda resume_rev1Mark Ledda resume_rev1
Mark Ledda resume_rev1Mark Joy Ledda
 
TeamProsource @ ITSMF 2010 - CMMI for services what about ITIL by Gert Leroy
TeamProsource @ ITSMF 2010 - CMMI for services what about ITIL by Gert LeroyTeamProsource @ ITSMF 2010 - CMMI for services what about ITIL by Gert Leroy
TeamProsource @ ITSMF 2010 - CMMI for services what about ITIL by Gert LeroyTeamProsource
 

Was ist angesagt? (20)

Bhautik Parekh
Bhautik ParekhBhautik Parekh
Bhautik Parekh
 
Al Mateus Oct2010 2
Al Mateus Oct2010 2Al Mateus Oct2010 2
Al Mateus Oct2010 2
 
Simplifying it using a disciplined portfolio governance approach
Simplifying it using a disciplined portfolio governance approachSimplifying it using a disciplined portfolio governance approach
Simplifying it using a disciplined portfolio governance approach
 
Application Portfolio Management, the Basics - How much Software do I have
Application Portfolio Management, the Basics - How much Software do I haveApplication Portfolio Management, the Basics - How much Software do I have
Application Portfolio Management, the Basics - How much Software do I have
 
Saurabh Chawla
Saurabh ChawlaSaurabh Chawla
Saurabh Chawla
 
Next generation Enterprise Architecture primer
Next generation Enterprise Architecture  primer Next generation Enterprise Architecture  primer
Next generation Enterprise Architecture primer
 
Resume - Woods - Avaya
Resume - Woods - AvayaResume - Woods - Avaya
Resume - Woods - Avaya
 
ITIL compliant Open Source tools
ITIL compliant Open Source toolsITIL compliant Open Source tools
ITIL compliant Open Source tools
 
Application Management Framework
Application Management FrameworkApplication Management Framework
Application Management Framework
 
Mobility - The Key Pillar of Digital Transformation and Economy
Mobility - The Key Pillar of Digital Transformation and EconomyMobility - The Key Pillar of Digital Transformation and Economy
Mobility - The Key Pillar of Digital Transformation and Economy
 
Venkata Nagi Reddy
Venkata Nagi ReddyVenkata Nagi Reddy
Venkata Nagi Reddy
 
A Case Study on Business Process Management
A Case Study on Business Process ManagementA Case Study on Business Process Management
A Case Study on Business Process Management
 
IT Transformation Initiatives PowerPoint Presentation Slides
IT Transformation Initiatives PowerPoint Presentation SlidesIT Transformation Initiatives PowerPoint Presentation Slides
IT Transformation Initiatives PowerPoint Presentation Slides
 
Qspear Corporate Brief
Qspear  Corporate  BriefQspear  Corporate  Brief
Qspear Corporate Brief
 
DHL Logistics - Enterprise Architecture
DHL Logistics - Enterprise ArchitectureDHL Logistics - Enterprise Architecture
DHL Logistics - Enterprise Architecture
 
SBiswal
SBiswalSBiswal
SBiswal
 
Rajeev Bajpai_resume
Rajeev Bajpai_resumeRajeev Bajpai_resume
Rajeev Bajpai_resume
 
Infosys - SAP Implementation Methodology | Integration Software
Infosys - SAP Implementation Methodology | Integration SoftwareInfosys - SAP Implementation Methodology | Integration Software
Infosys - SAP Implementation Methodology | Integration Software
 
Mark Ledda resume_rev1
Mark Ledda resume_rev1Mark Ledda resume_rev1
Mark Ledda resume_rev1
 
TeamProsource @ ITSMF 2010 - CMMI for services what about ITIL by Gert Leroy
TeamProsource @ ITSMF 2010 - CMMI for services what about ITIL by Gert LeroyTeamProsource @ ITSMF 2010 - CMMI for services what about ITIL by Gert Leroy
TeamProsource @ ITSMF 2010 - CMMI for services what about ITIL by Gert Leroy
 

Ähnlich wie Deliver a positive mobile experience via sap integration

2015 Resume_Kuntal Neogi
2015 Resume_Kuntal Neogi2015 Resume_Kuntal Neogi
2015 Resume_Kuntal NeogiKuntal Neogi
 
Accenture SaaS Financial Applications
Accenture SaaS Financial ApplicationsAccenture SaaS Financial Applications
Accenture SaaS Financial ApplicationsDave Kellogg
 
Resume_ Prabhu Kannan_PM
Resume_ Prabhu Kannan_PMResume_ Prabhu Kannan_PM
Resume_ Prabhu Kannan_PMPrabhu Kannan
 
Tim Knudson Resume
Tim Knudson ResumeTim Knudson Resume
Tim Knudson ResumeTim Knudson
 
E Team Dm Service Offerings General
E Team Dm Service Offerings  GeneralE Team Dm Service Offerings  General
E Team Dm Service Offerings Generalsamishaikh
 
Ravi Manickam_CV_Sep 2015 Ver 2
Ravi Manickam_CV_Sep 2015 Ver 2Ravi Manickam_CV_Sep 2015 Ver 2
Ravi Manickam_CV_Sep 2015 Ver 2Ravi M
 
AURORA01c_spadhee_detailed_resume
AURORA01c_spadhee_detailed_resumeAURORA01c_spadhee_detailed_resume
AURORA01c_spadhee_detailed_resumeSalegram Padhee
 
PureApp Hybrid Cloud - Mark Willemse ING Presentation 11th September 2014
PureApp Hybrid Cloud - Mark Willemse ING Presentation 11th September 2014PureApp Hybrid Cloud - Mark Willemse ING Presentation 11th September 2014
PureApp Hybrid Cloud - Mark Willemse ING Presentation 11th September 2014IBM Systems UKI
 
Carden carrieresume2016
Carden carrieresume2016Carden carrieresume2016
Carden carrieresume2016Carrie Carden
 
Hilton procurement optimization
Hilton procurement optimizationHilton procurement optimization
Hilton procurement optimizationArvind Rajan
 
Upgrade JDE Quicker, Faster, and More Predictable
Upgrade JDE Quicker, Faster, and More PredictableUpgrade JDE Quicker, Faster, and More Predictable
Upgrade JDE Quicker, Faster, and More PredictableTerillium
 
Mani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani Shekhar
 
Briefing Simplicité Software (English)
Briefing Simplicité Software (English)Briefing Simplicité Software (English)
Briefing Simplicité Software (English)Simplicité Software
 
MuleSoft's Approach to Driving Customer Outcomes
MuleSoft's Approach to Driving Customer Outcomes MuleSoft's Approach to Driving Customer Outcomes
MuleSoft's Approach to Driving Customer Outcomes MuleSoft
 

Ähnlich wie Deliver a positive mobile experience via sap integration (20)

2015 Resume_Kuntal Neogi
2015 Resume_Kuntal Neogi2015 Resume_Kuntal Neogi
2015 Resume_Kuntal Neogi
 
Accenture SaaS Financial Applications
Accenture SaaS Financial ApplicationsAccenture SaaS Financial Applications
Accenture SaaS Financial Applications
 
Resume_ Prabhu Kannan_PM
Resume_ Prabhu Kannan_PMResume_ Prabhu Kannan_PM
Resume_ Prabhu Kannan_PM
 
Tim Knudson Resume
Tim Knudson ResumeTim Knudson Resume
Tim Knudson Resume
 
E Team Dm Service Offerings General
E Team Dm Service Offerings  GeneralE Team Dm Service Offerings  General
E Team Dm Service Offerings General
 
Ravi Manickam_CV_Sep 2015 Ver 2
Ravi Manickam_CV_Sep 2015 Ver 2Ravi Manickam_CV_Sep 2015 Ver 2
Ravi Manickam_CV_Sep 2015 Ver 2
 
AURORA01c_spadhee_detailed_resume
AURORA01c_spadhee_detailed_resumeAURORA01c_spadhee_detailed_resume
AURORA01c_spadhee_detailed_resume
 
MSHariRD_CV
MSHariRD_CVMSHariRD_CV
MSHariRD_CV
 
0916 resume
0916  resume0916  resume
0916 resume
 
PureApp Hybrid Cloud - Mark Willemse ING Presentation 11th September 2014
PureApp Hybrid Cloud - Mark Willemse ING Presentation 11th September 2014PureApp Hybrid Cloud - Mark Willemse ING Presentation 11th September 2014
PureApp Hybrid Cloud - Mark Willemse ING Presentation 11th September 2014
 
Carden carrieresume2016
Carden carrieresume2016Carden carrieresume2016
Carden carrieresume2016
 
Hilton procurement optimization
Hilton procurement optimizationHilton procurement optimization
Hilton procurement optimization
 
Upgrade JDE Quicker, Faster, and More Predictable
Upgrade JDE Quicker, Faster, and More PredictableUpgrade JDE Quicker, Faster, and More Predictable
Upgrade JDE Quicker, Faster, and More Predictable
 
Mani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_Consultant
 
Vishal_Bahekar
Vishal_BahekarVishal_Bahekar
Vishal_Bahekar
 
Briefing Simplicité Software (English)
Briefing Simplicité Software (English)Briefing Simplicité Software (English)
Briefing Simplicité Software (English)
 
Pramod Resume
Pramod ResumePramod Resume
Pramod Resume
 
Sheldon cousino resume
Sheldon cousino resumeSheldon cousino resume
Sheldon cousino resume
 
Resume July 2016
Resume July 2016Resume July 2016
Resume July 2016
 
MuleSoft's Approach to Driving Customer Outcomes
MuleSoft's Approach to Driving Customer Outcomes MuleSoft's Approach to Driving Customer Outcomes
MuleSoft's Approach to Driving Customer Outcomes
 

Mehr von robgirvan

Work clearance management operational switching
Work clearance management   operational switchingWork clearance management   operational switching
Work clearance management operational switchingrobgirvan
 
Using sap implementation to drive process change
Using sap implementation to drive process changeUsing sap implementation to drive process change
Using sap implementation to drive process changerobgirvan
 
Using hana to add value to electric & gas revenue integrity
Using hana to add value to electric & gas revenue integrityUsing hana to add value to electric & gas revenue integrity
Using hana to add value to electric & gas revenue integrityrobgirvan
 
Transforming the customer experience crb
Transforming the customer experience   crbTransforming the customer experience   crb
Transforming the customer experience crbrobgirvan
 
Too big for twitter the superstorm sandy experience
Too big for twitter   the superstorm sandy experienceToo big for twitter   the superstorm sandy experience
Too big for twitter the superstorm sandy experiencerobgirvan
 
The smart grid journey at oklahoma gas and electric
The smart grid journey at oklahoma gas and electricThe smart grid journey at oklahoma gas and electric
The smart grid journey at oklahoma gas and electricrobgirvan
 
T keynote 1020_de_lost wylie
T keynote 1020_de_lost wylieT keynote 1020_de_lost wylie
T keynote 1020_de_lost wylierobgirvan
 
T keynote 845_valoochi
T keynote 845_valoochiT keynote 845_valoochi
T keynote 845_valoochirobgirvan
 
T keynote 830_lisa_d
T keynote 830_lisa_dT keynote 830_lisa_d
T keynote 830_lisa_drobgirvan
 
Simplifying the work order business processes at marin municipal water distri...
Simplifying the work order business processes at marin municipal water distri...Simplifying the work order business processes at marin municipal water distri...
Simplifying the work order business processes at marin municipal water distri...robgirvan
 
Sap hana experiences at southern california edison — bw hana and standalone hana
Sap hana experiences at southern california edison — bw hana and standalone hanaSap hana experiences at southern california edison — bw hana and standalone hana
Sap hana experiences at southern california edison — bw hana and standalone hanarobgirvan
 
Replacement of legacy cis with sap cr&b at phi
Replacement of legacy cis with sap cr&b at phiReplacement of legacy cis with sap cr&b at phi
Replacement of legacy cis with sap cr&b at phirobgirvan
 
Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...robgirvan
 
M keynote 820_mc_cue_jones
M keynote 820_mc_cue_jonesM keynote 820_mc_cue_jones
M keynote 820_mc_cue_jonesrobgirvan
 
M keynote 800_capitani_inlander
M keynote 800_capitani_inlanderM keynote 800_capitani_inlander
M keynote 800_capitani_inlanderrobgirvan
 
M keynote 400_bailey
M keynote 400_baileyM keynote 400_bailey
M keynote 400_baileyrobgirvan
 
Key findings when upgrading your sap crm system
Key findings when upgrading your sap crm systemKey findings when upgrading your sap crm system
Key findings when upgrading your sap crm systemrobgirvan
 
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...robgirvan
 
Huntsville utilties and source gas — delivering total customer care
Huntsville utilties and source gas — delivering total customer careHuntsville utilties and source gas — delivering total customer care
Huntsville utilties and source gas — delivering total customer carerobgirvan
 
How to successfully implement sap ami
How to successfully implement sap amiHow to successfully implement sap ami
How to successfully implement sap amirobgirvan
 

Mehr von robgirvan (20)

Work clearance management operational switching
Work clearance management   operational switchingWork clearance management   operational switching
Work clearance management operational switching
 
Using sap implementation to drive process change
Using sap implementation to drive process changeUsing sap implementation to drive process change
Using sap implementation to drive process change
 
Using hana to add value to electric & gas revenue integrity
Using hana to add value to electric & gas revenue integrityUsing hana to add value to electric & gas revenue integrity
Using hana to add value to electric & gas revenue integrity
 
Transforming the customer experience crb
Transforming the customer experience   crbTransforming the customer experience   crb
Transforming the customer experience crb
 
Too big for twitter the superstorm sandy experience
Too big for twitter   the superstorm sandy experienceToo big for twitter   the superstorm sandy experience
Too big for twitter the superstorm sandy experience
 
The smart grid journey at oklahoma gas and electric
The smart grid journey at oklahoma gas and electricThe smart grid journey at oklahoma gas and electric
The smart grid journey at oklahoma gas and electric
 
T keynote 1020_de_lost wylie
T keynote 1020_de_lost wylieT keynote 1020_de_lost wylie
T keynote 1020_de_lost wylie
 
T keynote 845_valoochi
T keynote 845_valoochiT keynote 845_valoochi
T keynote 845_valoochi
 
T keynote 830_lisa_d
T keynote 830_lisa_dT keynote 830_lisa_d
T keynote 830_lisa_d
 
Simplifying the work order business processes at marin municipal water distri...
Simplifying the work order business processes at marin municipal water distri...Simplifying the work order business processes at marin municipal water distri...
Simplifying the work order business processes at marin municipal water distri...
 
Sap hana experiences at southern california edison — bw hana and standalone hana
Sap hana experiences at southern california edison — bw hana and standalone hanaSap hana experiences at southern california edison — bw hana and standalone hana
Sap hana experiences at southern california edison — bw hana and standalone hana
 
Replacement of legacy cis with sap cr&b at phi
Replacement of legacy cis with sap cr&b at phiReplacement of legacy cis with sap cr&b at phi
Replacement of legacy cis with sap cr&b at phi
 
Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...
 
M keynote 820_mc_cue_jones
M keynote 820_mc_cue_jonesM keynote 820_mc_cue_jones
M keynote 820_mc_cue_jones
 
M keynote 800_capitani_inlander
M keynote 800_capitani_inlanderM keynote 800_capitani_inlander
M keynote 800_capitani_inlander
 
M keynote 400_bailey
M keynote 400_baileyM keynote 400_bailey
M keynote 400_bailey
 
Key findings when upgrading your sap crm system
Key findings when upgrading your sap crm systemKey findings when upgrading your sap crm system
Key findings when upgrading your sap crm system
 
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
 
Huntsville utilties and source gas — delivering total customer care
Huntsville utilties and source gas — delivering total customer careHuntsville utilties and source gas — delivering total customer care
Huntsville utilties and source gas — delivering total customer care
 
How to successfully implement sap ami
How to successfully implement sap amiHow to successfully implement sap ami
How to successfully implement sap ami
 

Kürzlich hochgeladen

IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IES VE
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfJamie (Taka) Wang
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsSeth Reyes
 
AI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarAI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarPrecisely
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaborationbruanjhuli
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxMatsuo Lab
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintMahmoud Rabie
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...Aggregage
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Websitedgelyza
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfAijun Zhang
 
VoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXVoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXTarek Kalaji
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfinfogdgmi
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemAsko Soukka
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Will Schroeder
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfDaniel Santiago Silva Capera
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsSafe Software
 
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...DianaGray10
 

Kürzlich hochgeladen (20)

IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and Hazards
 
AI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarAI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity Webinar
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptx
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership Blueprint
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Website
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdf
 
VoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXVoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBX
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdf
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystem
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
 
201610817 - edge part1
201610817 - edge part1201610817 - edge part1
201610817 - edge part1
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
 
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
 

Deliver a positive mobile experience via sap integration

  • 1. 1PG&E - ET&S Systems Integration Patent Pending ET&S Systems Integration Program Delivering a Positive Mobile Experience via SAP Integration Crawford Owens (PG&E), Todd Mintzer (PG&E), Amar Chhatwal (PwC) Monday, September 16, 2013 11:30am – 12:15pm
  • 2. 2PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending • Objectives – Share insights from PG&E’s Electric Transmission & Substation Systems Integration and MobileConnect programs – Share a technology deployment model that enhances mobile user experience with SAP PM at the core of the integrated solution – Highlight enablers / required design elements that deliver on integrated platform and mobile solutions (e.g., IT / Business partnership, change management, robust governance structure, system integration) – Share industry best practices amongst presentation participants • Contents – Executive Summary – Background • PG&E Company Overview • Our Strategy to Realizing Benefits and High Quality End User Experiences • Electric Transmission & Substation System Integration (ET&S SI) and MobileConnect Overviews – Deployment Challenges • Process Redesign, Technology Integration, User Adoption, Device Support – Deployment Approach • User Experience Centric Model – Change Management – Sample Results – Path Forward • Upcoming Initiatives, Anticipated Challenges / Opportunities – T&D World – Mobile Drives User Adoption – Q&A / General Discussion – Closing Comments and Contact Information Objectives and Contents
  • 3. 3PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending Common Issues • Most utilities are deploying some form of mobile technology to field workers to improve safety, reliability and operations; however, most utilities are finding that it is much easier said than done • There are upstream and downstream constraints that make or break mobile deployments: ̵ Upstream, well defined business processes and robust / integrated technology infrastructure must be efficient, stable and integrated ̵ Downstream, user centric deployment and support models must be in place to ensure user adoption and realization of benefits • Mobile programs are complex from process, technology and people perspectives; program failures are highly likely unless leaders are engaged and a well defined governance structure is in place to lead the program Our Approach • PG&E started at “the core” and built integrated systems to support business process; this core enabled mobile solutions to be brought to life • PG&E implemented a user centric deployment model to ensure the mobile solutions “stuck”; this started at project kickoff and carried through to deployment and to operations and maintenance Our Results • PG&E is midway through its mobile program and has already shifted ~2000 workers from paper-based to mobile-based processes Executive Summary
  • 4. 4PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending • Founded in 1905; headquartered in San Francisco, California • 15 MM customers (~1 in 20 people in the US) • 70,000 square-mile service territory in Central and Northern California • 20,000 employees • 2012 revenue ~$12B Background PG&E Company Overview Electric and gas distribution customers (% of total connections) 54% electric 46% gas Electric transmission circuits Electric distribution circuits 18,616 miles 141,215 miles Gas transmission backbone Gas distribution 6,128 miles 40,123 miles Electric generation capacity Nuclear (1), Fossil (2), Hydro (110) Plants 7,833 MW 22,544 Peak MW
  • 5. 5PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending • Realizing end-user benefits starts with a well understood and defined business need that is enabled by process, technology, tools and people • PG&E’s Strategy: Background Our Strategy to Realizing Benefits and High Quality End User Experiences Business Need / Benefit Process Technology Enablement End User Tools End User Experience Strategic Area High-Level Attribute Business Need / Benefit • Business need that when resolved results in business benefit (hard or soft) Process • Defined business processes that enable business needs / strategies Technology Enablement • Architecture and infrastructure that drives enablement of business process End User Tools • Devices and applications that interface backend technology with end users End User Experience • Intersection of process, technology and tools that drive solution usability Using PG&E’s ET&S System Integration and MobileConnect programs, we will demonstrate a best practice approach to enabling business benefits through a well defined core infrastructure that results in a positive end-user experience
  • 6. 6PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending • Once business needs, strategies and processes are defined, an integrated technology architecture is required to enable business and end user benefit • Electric Transmission & Substation (ET&S) System Integration (SI) eliminated redundancies and established critical interfaces to link core systems • “Before” Process and System Structure: Background Electric Transmission & Substation System Integration Program Overview PG&E’s starting point was fragmented and made planning, design, work execution and overall reporting and management a major challenge System Planning Design Project Mgmt Business Mgmt Software “Home Grown” Work Mgmt Key Takeaways • Disconnected processes and systems • Customized, “home-grown” systems • Multiple systems of record with conflicting data
  • 7. 7PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending • “To-Be” Process and System Structure: • High Level Project Data Flow: System Background Electric Transmission & Substation System Integration Program Overview Planning Design Project Mgmt Business Mgmt Software GIS Continued Scheduling Project Mgmt Scheduling Scheduling ReportingWork Planning Reporting Portfolio Planning Core Business App Key Takeaways  Integrated processes and systems  Replacement of “home- grown” Excel / Access / etc. databases  One true system of record In the “to-be” design, integration of key systems and processes creates a single plan of record and improves transparency across various organizations. Additionally, integrated backend systems provide a robust infrastructure enabling mobile work management solution
  • 8. 8PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending • Program Overview – Multi-year program started 2007 and completes in 2016 – Mobile solutions to be deployed to ~18 different work groups – Electric, Gas and Customer Care business groups impacted – Over 7000 field users to be mobilized (~2000 mobilized to date) • Business Objectives – Move from manual, paper-based processes into an integrated mobile-back office environment to improve safety, reliability, compliance, data accuracy and operational efficiencies Background MobileConnect Program Overview What we were… What we’re becoming…
  • 9. 9PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending • The scale and complexity of MobileConnect required a new, user-experience centric deployment approach to realize benefits at desirable speed • Typical mobile deployment challenges PG&E addressed include: process redesign, technology integration, user adoption, and device support • Typical Challenges: Deployment Challenges Process Redesign, Technology Integration, User Adoption, Device Support Mobile projects have a high likelihood of failure unless key challenges are addressed and mitigated throughout the project (e.g., great technology can only take a deployment so far if the underlying processes are broken) Process Redesign Technology Integration User Adoption Operations & Maintenance Support • Business process redesign often results in roles and metrics changes, and headcount reduction or redeployment, which could engender negative user perception if not managed appropriately • Behind the scenes of a seemingly easy user experience is the complex integration of devices, applications and systems • There are very high expectations for availability and usability, which are specific to user groups • Mobile adoption within an overall low tech workforce requires dramatic behavioral and cultural change • Mobile technology requires a high touch user support model, compared to traditional desktop IT services
  • 10. 10PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending • The post deployment support experience is critical to benefits realization • PG&E’s user experience centric approach consists of four pillars: governance, user group customization, employee engagement, and post-deployment support Deployment Approach User Experience Centric Model • Accountable / engaged program leadership • Engaged project sponsors and teams • Robust project lifecycle management, including prioritization and sequencing • Well defined business objectives that tie to program portfolio and benefits • Business / IT collaboration model • High-touch deployment, especially with users who may not be tech savvy • Use of on-the-ground SMEs • Job aides, training, support channels • Pre-/post-deployment metrics to validate issues / successes • Capture / prioritize improvement opportunities • Change management • Engagement throughout project lifecycle, not just at the end • Identification of training needs • Targeted communications making employees aware of benefits / changes • Continuous user feedback loops via user acceptance testing, piloting, business validation • Well defined business issue to solve (start with the problem, not the solution) • Cross-functional engagement during requirements definition • Device / application selection criteria • Field testing, piloting, business validation A user experience centric model is critical when deploying high tech solutions to a traditionally low tech workforce Governance User Group Customization Employee Engagement Post- Deployment Support
  • 11. 11PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending Change Management Need for Change Management Change Management is necessary to manage and monitor the six critical drivers that: • Affect the extent to which project / program objectives are being achieved • Impact business performance while change is taking place Low High Turbulence, Risk & Roadblocks Leadership Engagement Team Skills, Value & Accountability Resistance / Snap Back Directional Alignment Emotional Energy, Passion & Drive Without Change Mgmt. With Change Mgmt. • Project Objectives • Business Results High Performance 1 2 3 4 5 6 An innovative technical solution is not sufficient for success. Dedicated change management resources ensure that technology will be adopted to realize the intended business benefits
  • 12. 12PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending Change Mgmt. & Communications At The Individual Level May Be Required • Within each group, typically 3 profiles of users exist: – “Change Embracers”, “On the Fence” and “Resistors” – Typically bell-curve distributed, but exception exists • Group on the left typically more vocal • Communications and Change Management is about – Moving the people to the right – Raising the “positive” voices • The “change leaders” within each group will play a critical role in achieving the rightward movement Vocal Level “Resistors” “On the Fence” “Change Embracers” Vocal Level “Resistors” “On the Fence” “Change Embracers” Without Strategic Change Management With Strategic Change Management
  • 13. 13PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending Sample Results PG&E has successfully deployed integrated solution to over 800 users, with ongoing work to integrate Portfolio Planning and Sourcing users • Deployed integrated platform with SAP at the core to ~800 users (Substation/T-Line – Project Management, Engineering, Construction, Environmental, etc.) • Project Managers developing monthly forecasts using integrated solution. Forecast visible to down- stream users for review/updates • All work – capital and expense – visible in one system/tool • Large capital, Small capital and Expense work is planned using integrated solution Screenshots of Integrated Solution Planning Execution
  • 14. 14PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending Sample Results (cont.) PG&E has successfully deployed mobile technology to over 2000 field users, with 5000 more planned • Deployed mobile to ~2000 field users (Restoration, Gas Services, Meter Techs, Substation, Vegetation Management, etc.) • Projects with Patrol & Inspect, Maintenance & Construction and Electric Transmission are being planned Screenshots of Mobile Work Solution Map Drilldown Motion F5v Panasonic CF19 Panasonic H1 Sample Devices Deployed
  • 15. 15PG&E - ET&S Systems Integration Patent Pending Benefits of Integrated Framework DRAFT ONLY - NOT YET REVIEWED OR APPROVED BY MANAGEMENT • Deploying an integrated platform with SAP at the core as the ‘single source of the truth’ leads to following benefits – Retirement of legacy systems/applications reducing IT maintenance – Improved planning and forecasting information – Improved visibility to materials and environmental – Enhanced material forecasts – Improved capital plan execution – Enhanced communications between project management and downstream users – Engineering, Construction – Improved coordination of cross-departmental resources – Reduced setup and mobilization costs – Increasing capacity of the workforce by removing non-value added tasks – Increasing throughput as excess capacity can focus on core work – Better coordination and oversight of the entire electric transmission multi-year portfolio
  • 16. 16PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending • PG&E has a full plate for 2013 as it moves system integration efforts to new business units and deploys mobile to new user groups Path Forward Upcoming Initiatives, Anticipated Challenges / Opportunities Upcoming Initiatives •Expanding system integration activities to new business units •Deploying mobile technology to maintenance and construction crews, and compliance inspectors •Implementing more robust operations and maintenance support for end users Anticipated Challenges / Opportunities •Continuing to ensure that true business needs are defined and met through program governance enhancements •Ensuring benefit tracking and realization to ensure delivery on hard / soft cost benefits and corporate KPIs (e.g., reliability, operations) Successfully integrating disparate systems and enabling mobile solutions involves complex coordination across many business units and highly effective Business-IT collaboration
  • 17. 17PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending • Mobile Deployment article published in T&D World magazine (August 2013 Issue) T&D World User Focus Drives Mobile Deployment http://tdworld.com/business/user-focus-drives-mobile-deployment?page=1 August 2013 Issue
  • 18. 18PG&E – Delivering a Positive Mobile / End-User Experience via SAP Integration ; Patent Pending • Closing Comments • Contact Information Closing Comments and Contact Information Crawford Owens Todd Mintzer Amar Chhatwal Director Technology Deployment PG&E Sr. Manager Work and Resource Management PG&E Director Power & Utilities, Advisory PwC 925.270.2872 925.328.5712 415.794.4856 cwo3@pge.com tbm0@pge.com amardeep.s.chhatwal@us.pwc.com www.pge.com www.pge.com www.pwc.com
  • 19. 19 Q&A / General Discussion