- 8. CURRENT ZONING CONSTRAINTS +/- 30k Footprint 3 Levels – 90k SF Residual DC ZONING OVERLAY Existing Chapel +/- 7,000 SF Existing Bldg +/- 8,000 SF Footprint
- 10. DC SCHEME 1 6 levels +/- 400 stalls 6 levels 130k SF 12,500 SF
- 13. SCHEME 2a 30k Footprint 180k SF Total 6 Levels Parking +/- 400 Stalls +/- 17k SF
- 14. SCHEME 2 30k Footprint 180k SF Total Parking Structure 6 Levels – 400 Stalls +/- 17k SF
- 21. SCHEME 3 +/- 52k SF Footprint 6 Levels – 312k SF Total Parking? Additional Chapel? Chapel Expansion 16k SF