SlideShare ist ein Scribd-Unternehmen logo
1 von 5
Downloaden Sie, um offline zu lesen
A DIVISION OF ALLIED RELIABILITY GROUP




              Reliability Begins With Your Operators


                                         By: Doug Plucknette, Worldwide RCM Discipline Leader


The Role of Reliability Centered Maintenance in improving reliability

In today’s economic environment where companies around the world are tightening the financial belt to
improve costs and performance, the key performance indicators of equipment and process reliability have
become an important area for companies to build focused initiatives to improve reliability and reduce costs.
While some companies got an early start in building reliability efforts the vast majority is just now getting
educated in the benefits that equipment and process reliability can bring to their business. Those who have
worked in the field for years understand that word reliability means more than just having equipment and
processes that run when needed; reliability has a direct effect on nearly every aspect of your business. Reliable
equipment costs less to maintain, reliable equipment produces higher product quality, reliable equipment is
more energy efficient and most important reliable equipment and processes by far suffer less health, safety and
environmental incidents and accidents.

One of the time proven ways to improve equipment and process reliability is to perform Reliability Centered
Analysis (RCM) on your critical assets. Developed in the 1970’s as a tool to build a complete equipment
maintenance strategy for commercial aircraft the RCM process has transformed how companies view and
perform maintenance around the world. From food and beverage to pharmaceuticals our customers are
learning the value that a thorough Reliability Centered Maintenance analysis can bring to their business with
results that have improved productivity by 27% while at the same time reducing maintenance costs by a similar
amount.*

One of the keys to getting the most from your RCM effort is having a cross-functional RCM team that includes
maintenance tradespeople, process engineers, PdM (Predictive Maintenance) technicians, and often overlooked
equipment operator.



The role that the equipment operator plays in the RCM analysis

In my over fifteen years of experienc instructing and facilitating RCM (Reliability Centered Maintenance) the
question I am asked most often is this; “This RCM process uses the word Maintenance and I’m an equipment
operator, why am I here?”



© 2013 GPALLIED                                               1                                 A DIVISION OF ALLIED RELIABILITY GROUP
A DIVISION OF ALLIED RELIABILITY GROUP




This question opens my favorite discussion in regard to Reliability Centered Maintenance, the importance in
having Operations deeply involved in the RCM process from start to finish. Simply stated, RCM does not achieve
its full benefit without involving key operations people in the process. Completing a RCM analysis without
having an experienced and respected equipment operator involved will always result in an incomplete listing of
failure modes, and poorly detailed failure effect statements that lack important details in regard to what our
operators experience when a critical failure mode occurs that could help us determine the actual cause and
mitigate the failure.

So, how important is the operator when it comes to performing a RCM Analysis?

I tell my customers that I refuse to conduct a RCM analysis without an experienced equipment operator. If your
thinking your operations people are not important in helping to develop your equipment maintenance strategy
think again. They are not only important in helping to develop the strategy; your strategy is incomplete if the
operator is not a part of your equipment maintenance plan!

This is the point where in my mind I see the engineer/operator of this train reach over and apply the hand break.
Just as things were beginning to roll along quite smoothly we are about to come to a complete and abrupt stop.
While that question in regard to being an equipment operator and how does that apply to Reliability Centered
Maintenance is the most popular, the question most feared is what comes next.

You don’t really expect the operator to actually perform maintenance tasks do you?

The room is now silent and it is now quite clear that while we all understand why we need to have operators
involved in the RCM analysis it is not clear at all why operators need to perform maintenance tasks. In fact what
is quite clear at this moment is the operator not keen on performing any maintenance. He/she is after all the
equipment operator not a maintenance technician. And, the maintenance people don’t want the operator
taking away any of their tasks because of the fear that giving up certain tasks could cost someone their job. The
train this is my RCM introductory meeting has now stopped and it is at this point I begin to discuss some
common real life examples of equipment operators we can all relate to and how they are involved in and
perform regular maintenance tasks.

     ď‚·     State examples of the importance operators play producing exception results in reliability
           and equipment performance (Airline Industry, NASCAR, Manufacturing Equipment come to
           mind here)



How many of you folks watch NASCAR?

Who is the operator if the race car?

Is he or she at all in any way involved in the maintenance of that car?


© 2013 GPALLIED                                      2                               A DIVISION OF ALLIED RELIABILITY GROUP
A DIVISION OF ALLIED RELIABILITY GROUP




The discussion usually starts with the driver drives the car and the mechanics and pit crew maintain the car but
within a minute or two someone brings up the fact that the driver communicates several things the race team
throughout a race in regard to how the car is performing, and how it holds the track in and out of the turns.

Could this information passed from the operator to the race team be considered Maintenance?

How about flying? How many people in this group have ever flown on a jet for vacation or business?

Who is the equipment operator of that jet?

Does the pilot perform any maintenance tasks for his aircraft?

This conversation is easy as most everyone has seen the pilot walk around the aircraft and performs visual
inspections of the equipment before the passenger’s board. Once the visual inspection is complete the pilot and
co-pilot work to complete the pre-flight procedures or checklists. Safety and reliability are extremely important
to this industry and as a result there are several items that need to be checked each to ensure the aircraft is fit
for operation. While the pilot is indeed our equipment operator, it is quite clear that they perform several
important maintenance tasks each and every time they operate the equipment. The airline pilot also receives
some very intensive training on how to start, operate and shut down the aircraft along with detailed instructions
and training on how to handle and address critical component failures.

Types of failure modes identified by equipment operators that are often overlooked when operators are not
included as part of the RCM Team

The reality of why equipment operators need to be part of your RCM effort comes down to the identification of
failure modes. While your maintenance mechanics and engineers can typically do a thorough job at identifying
the mechanical and electrical failure modes associated with the components within your system, they will fall
short in identifying the process related failure modes that the operators deal with and experience in the day to
day operation of your equipment. While we would like to believe that most of our equipment is automated and
controlled through a PLC the reality can sometimes be very different and we rely on the operators training and
experience in starting up, operating equipment, shutting down the equipment and performing equipment and
product changes. In reviewing failure modes identified in the typical RCM analysis, twenty-eight percent of the
failure modes identified address failures resulting from how we operate our assets and equally important, these
failures are often are the most frequent in occurrence. Without the participation of the operator these
important failure modes would surely be overlooked and continue to impact the reliability of your asset.

The value operators bring in writing good failure effect statements

An important part of every analysis is identifying and recording the failure effects that result from each failure
mode. It is through the failure effects that we determine the consequence to our business should the failure
occur and while our maintenance and engineering team members are well suited to identify the effects the
failure will have on the component or part being analyzed they often struggle to identify the effect each failure
has on our overall process. Each failure effect statement should include the following information:

© 2013 GPALLIED                                      3                                 A DIVISION OF ALLIED RELIABILITY GROUP
A DIVISION OF ALLIED RELIABILITY GROUP




     ď‚·     Events that lead up to the failure for wear based components/parts and components/parts that
           have a useful P-F interval
     ď‚·     First sign of evidence that the failure has occurred. It is here where the operator in most cases
           will be able to identify the alarm that results from the failure or the indication they receive that
           failure has occurred.
     ď‚·     The secondary effects or damage that results from the failure mode. While again our
           maintenance people will do an outstanding job of identifying the mechanical and electrical
           collateral damage we will need to rely on the operators experience to identify how the process
           is affected.
     ď‚·     Events required to bring the process back to normal operating condition. While some may
           consider this in most cases to be a simple statement about shutting down, troubleshooting and
           replacing or repairing a part, we will again rely in the operator to identify critical effects
           regarding how to best avoid secondary damage that could result from improper shut down
           following the failure.

With a well written failure affect statement we look for one more piece of critical information to help determine
the consequence of the failure mode; the down time that results from the failure mode is best determined by
the operators input in regard to how long it takes from the time the failure occurs and the equipment is shut
down to the time the process is again restarted to normal operating condition.

The role operators play in making sound RCM task decisions

As the team moves forward to identify mitigating tasks the operator will again play a key role in helping to
identify operator care tasks, as well as tasks that can be performed by the operators during equipment start-up,
shut down and product changes as well as operator care tasks that can be performed on their daily rounds.
Experienced operators are also valuable in the development of tasks associated with process monitoring or
process verification including control logic changes, process data trending, as well as warning and shutdown
alarms. Process verification is one of the most cost effective and reliable forms of PdM; by using the PLC to
monitor, trend and alarm key process variables such as pressure, temperature, flow, amp draw and vibration the
system essentially becomes a condition based monitoring tool all the while your equipment is running. Nearly
fifty percent of process verification tasks have been identified by the operators participating on the RCM team.



As time moves forward and technologies improve the role and involvement of operators in the effort to
continuously improve equipment reliability will surely increase. Innovations in hand held data loggers the last
10 years have made the simple the ability to develop precise operator rounds where critical pressures,
temperatures and conditions can be entered for trending as well as immediate feedback.




© 2013 GPALLIED                                      4                                A DIVISION OF ALLIED RELIABILITY GROUP
A DIVISION OF ALLIED RELIABILITY GROUP




© 2013 GPALLIED                          5   A DIVISION OF ALLIED RELIABILITY GROUP

Weitere ähnliche Inhalte

Was ist angesagt?

Why People do not understand the P-F Curve
Why People do not understand the P-F CurveWhy People do not understand the P-F Curve
Why People do not understand the P-F CurveRicky Smith CMRP, CMRT
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleRicky Smith CMRP, CMRT
 
Glossary. Maintenance and Reliability Body of Knowledge
Glossary. Maintenance and Reliability Body of KnowledgeGlossary. Maintenance and Reliability Body of Knowledge
Glossary. Maintenance and Reliability Body of KnowledgeEliezer Jimenez
 
Day In the Life Of a Proactive Maintenance Manager
Day In the Life Of a Proactive Maintenance ManagerDay In the Life Of a Proactive Maintenance Manager
Day In the Life Of a Proactive Maintenance ManagerRicky Smith CMRP, CMRT
 
Procedure Based Maintenance White Paper
Procedure Based Maintenance White PaperProcedure Based Maintenance White Paper
Procedure Based Maintenance White PaperRicky Smith CMRP, CMRT
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician ArticleRicky Smith CMRP, CMRT
 
Day In The Life Of A Proactive Maintenance Technician (Dilo)
Day In The Life Of A Proactive Maintenance Technician (Dilo)Day In The Life Of A Proactive Maintenance Technician (Dilo)
Day In The Life Of A Proactive Maintenance Technician (Dilo)Ricky Smith CMRP, CMRT
 
Uptime Magazine - Failure Reporting Article
Uptime Magazine - Failure Reporting ArticleUptime Magazine - Failure Reporting Article
Uptime Magazine - Failure Reporting ArticleRicky Smith CMRP, CMRT
 
Why is your current PM Program not Effective?
Why is your current PM Program not Effective?Why is your current PM Program not Effective?
Why is your current PM Program not Effective?Ricky Smith CMRP, CMRT
 
Lubrication linked with a maintenance strategy
Lubrication linked with a maintenance strategyLubrication linked with a maintenance strategy
Lubrication linked with a maintenance strategyMosil Lubricants
 
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...Ricky Smith CMRP, CMRT
 
The key to improving your availability is fracas
The key to improving your availability is fracasThe key to improving your availability is fracas
The key to improving your availability is fracasJim Taylor, ASQ-CRE, CPE, CPMM
 
FRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action SystemFRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action SystemRicky Smith CMRP, CMRT
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
Top Tips for Improving your Quality Management
Top Tips for Improving your Quality ManagementTop Tips for Improving your Quality Management
Top Tips for Improving your Quality ManagementClaire Healey
 
Using Safety to Drive Lean Implementation
Using Safety to Drive Lean ImplementationUsing Safety to Drive Lean Implementation
Using Safety to Drive Lean ImplementationPhil La Duke
 
Perspectiveson Asset Management
Perspectiveson Asset ManagementPerspectiveson Asset Management
Perspectiveson Asset ManagementSteve Turner
 

Was ist angesagt? (20)

Why People do not understand the P-F Curve
Why People do not understand the P-F CurveWhy People do not understand the P-F Curve
Why People do not understand the P-F Curve
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices Article
 
Why RCM Doesn't Work?
Why RCM Doesn't Work?Why RCM Doesn't Work?
Why RCM Doesn't Work?
 
Glossary. Maintenance and Reliability Body of Knowledge
Glossary. Maintenance and Reliability Body of KnowledgeGlossary. Maintenance and Reliability Body of Knowledge
Glossary. Maintenance and Reliability Body of Knowledge
 
Day In the Life Of a Proactive Maintenance Manager
Day In the Life Of a Proactive Maintenance ManagerDay In the Life Of a Proactive Maintenance Manager
Day In the Life Of a Proactive Maintenance Manager
 
Procedure Based Maintenance White Paper
Procedure Based Maintenance White PaperProcedure Based Maintenance White Paper
Procedure Based Maintenance White Paper
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician Article
 
Doing Too Much PM Report
Doing Too Much PM ReportDoing Too Much PM Report
Doing Too Much PM Report
 
Day In The Life Of A Proactive Maintenance Technician (Dilo)
Day In The Life Of A Proactive Maintenance Technician (Dilo)Day In The Life Of A Proactive Maintenance Technician (Dilo)
Day In The Life Of A Proactive Maintenance Technician (Dilo)
 
Uptime Magazine - Failure Reporting Article
Uptime Magazine - Failure Reporting ArticleUptime Magazine - Failure Reporting Article
Uptime Magazine - Failure Reporting Article
 
Why is your current PM Program not Effective?
Why is your current PM Program not Effective?Why is your current PM Program not Effective?
Why is your current PM Program not Effective?
 
Lubrication linked with a maintenance strategy
Lubrication linked with a maintenance strategyLubrication linked with a maintenance strategy
Lubrication linked with a maintenance strategy
 
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...
 
The key to improving your availability is fracas
The key to improving your availability is fracasThe key to improving your availability is fracas
The key to improving your availability is fracas
 
FRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action SystemFRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action System
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Top Tips for Improving your Quality Management
Top Tips for Improving your Quality ManagementTop Tips for Improving your Quality Management
Top Tips for Improving your Quality Management
 
SWMS
SWMSSWMS
SWMS
 
Using Safety to Drive Lean Implementation
Using Safety to Drive Lean ImplementationUsing Safety to Drive Lean Implementation
Using Safety to Drive Lean Implementation
 
Perspectiveson Asset Management
Perspectiveson Asset ManagementPerspectiveson Asset Management
Perspectiveson Asset Management
 

Andere mochten auch

Unit 9 implementing the reliability strategy
Unit 9  implementing the reliability strategyUnit 9  implementing the reliability strategy
Unit 9 implementing the reliability strategyCharlton Inao
 
Software Availability by Resiliency
Software Availability by ResiliencySoftware Availability by Resiliency
Software Availability by ResiliencyReza Samei
 
Reliability - Availability
Reliability -  AvailabilityReliability -  Availability
Reliability - AvailabilityTom Jacyszyn
 
Draft comparison of electronic reliability prediction methodologies
Draft comparison of electronic reliability prediction methodologiesDraft comparison of electronic reliability prediction methodologies
Draft comparison of electronic reliability prediction methodologiesAccendo Reliability
 
Tracker Lifetime Cost: MTBF, Lifetime and Other Events
Tracker Lifetime Cost: MTBF, Lifetime and Other EventsTracker Lifetime Cost: MTBF, Lifetime and Other Events
Tracker Lifetime Cost: MTBF, Lifetime and Other EventsArray Technologies, Inc.
 
Efficient Reliability Demonstration Tests - by Guangbin Yang
Efficient Reliability Demonstration Tests - by Guangbin YangEfficient Reliability Demonstration Tests - by Guangbin Yang
Efficient Reliability Demonstration Tests - by Guangbin YangASQ Reliability Division
 
Metastability,MTBF,synchronizer & synchronizer failure
Metastability,MTBF,synchronizer & synchronizer failureMetastability,MTBF,synchronizer & synchronizer failure
Metastability,MTBF,synchronizer & synchronizer failureprashant singh
 
Overview and Basic Maintenance
Overview and Basic MaintenanceOverview and Basic Maintenance
Overview and Basic MaintenanceFuangwith Sopharath
 
Technology Primer: Attain Faster MTTR through CA Application Performance Mana...
Technology Primer: Attain Faster MTTR through CA Application Performance Mana...Technology Primer: Attain Faster MTTR through CA Application Performance Mana...
Technology Primer: Attain Faster MTTR through CA Application Performance Mana...CA Technologies
 
Reliability Modeling Using Degradation Data - by Harry Guo
Reliability Modeling Using Degradation Data - by Harry GuoReliability Modeling Using Degradation Data - by Harry Guo
Reliability Modeling Using Degradation Data - by Harry GuoASQ Reliability Division
 
Reliability Maintenance Engineering 2 - 2 Reliability Techniques
Reliability Maintenance Engineering 2 - 2 Reliability TechniquesReliability Maintenance Engineering 2 - 2 Reliability Techniques
Reliability Maintenance Engineering 2 - 2 Reliability TechniquesAccendo Reliability
 
HBase: How to get MTTR below 1 minute
HBase: How to get MTTR below 1 minuteHBase: How to get MTTR below 1 minute
HBase: How to get MTTR below 1 minuteHortonworks
 
How to Reduce your MTTI/MTTR with a Single Click
How to Reduce your MTTI/MTTR with a Single ClickHow to Reduce your MTTI/MTTR with a Single Click
How to Reduce your MTTI/MTTR with a Single ClickSumo Logic
 
Zero Downtime JEE Architectures
Zero Downtime JEE ArchitecturesZero Downtime JEE Architectures
Zero Downtime JEE ArchitecturesAlexander Penev
 

Andere mochten auch (20)

Unit 9 implementing the reliability strategy
Unit 9  implementing the reliability strategyUnit 9  implementing the reliability strategy
Unit 9 implementing the reliability strategy
 
How to measure reliability
How to measure reliabilityHow to measure reliability
How to measure reliability
 
How to measure reliability 2
How to measure reliability 2How to measure reliability 2
How to measure reliability 2
 
Software Availability by Resiliency
Software Availability by ResiliencySoftware Availability by Resiliency
Software Availability by Resiliency
 
Reliability - Availability
Reliability -  AvailabilityReliability -  Availability
Reliability - Availability
 
Draft comparison of electronic reliability prediction methodologies
Draft comparison of electronic reliability prediction methodologiesDraft comparison of electronic reliability prediction methodologies
Draft comparison of electronic reliability prediction methodologies
 
Misuses of MTBF
Misuses of MTBFMisuses of MTBF
Misuses of MTBF
 
Tracker Lifetime Cost: MTBF, Lifetime and Other Events
Tracker Lifetime Cost: MTBF, Lifetime and Other EventsTracker Lifetime Cost: MTBF, Lifetime and Other Events
Tracker Lifetime Cost: MTBF, Lifetime and Other Events
 
Efficient Reliability Demonstration Tests - by Guangbin Yang
Efficient Reliability Demonstration Tests - by Guangbin YangEfficient Reliability Demonstration Tests - by Guangbin Yang
Efficient Reliability Demonstration Tests - by Guangbin Yang
 
Metastability,MTBF,synchronizer & synchronizer failure
Metastability,MTBF,synchronizer & synchronizer failureMetastability,MTBF,synchronizer & synchronizer failure
Metastability,MTBF,synchronizer & synchronizer failure
 
Overview and Basic Maintenance
Overview and Basic MaintenanceOverview and Basic Maintenance
Overview and Basic Maintenance
 
Technology Primer: Attain Faster MTTR through CA Application Performance Mana...
Technology Primer: Attain Faster MTTR through CA Application Performance Mana...Technology Primer: Attain Faster MTTR through CA Application Performance Mana...
Technology Primer: Attain Faster MTTR through CA Application Performance Mana...
 
Reliability Modeling Using Degradation Data - by Harry Guo
Reliability Modeling Using Degradation Data - by Harry GuoReliability Modeling Using Degradation Data - by Harry Guo
Reliability Modeling Using Degradation Data - by Harry Guo
 
Reliability Maintenance Engineering 2 - 2 Reliability Techniques
Reliability Maintenance Engineering 2 - 2 Reliability TechniquesReliability Maintenance Engineering 2 - 2 Reliability Techniques
Reliability Maintenance Engineering 2 - 2 Reliability Techniques
 
Pom
PomPom
Pom
 
MTTR
MTTRMTTR
MTTR
 
Budgeting
BudgetingBudgeting
Budgeting
 
HBase: How to get MTTR below 1 minute
HBase: How to get MTTR below 1 minuteHBase: How to get MTTR below 1 minute
HBase: How to get MTTR below 1 minute
 
How to Reduce your MTTI/MTTR with a Single Click
How to Reduce your MTTI/MTTR with a Single ClickHow to Reduce your MTTI/MTTR with a Single Click
How to Reduce your MTTI/MTTR with a Single Click
 
Zero Downtime JEE Architectures
Zero Downtime JEE ArchitecturesZero Downtime JEE Architectures
Zero Downtime JEE Architectures
 

Ă„hnlich wie Asset Reliability Begins With Your Operators

Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master ClassMarcep Inc.
 
Tpm total productive maintenance
Tpm  total productive maintenanceTpm  total productive maintenance
Tpm total productive maintenanceKULDEEP MATHUR
 
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in IndustryIRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in IndustryIRJET Journal
 
Reliability Centred Maintenance - RCM by Aminul Islam
Reliability Centred Maintenance - RCM by Aminul IslamReliability Centred Maintenance - RCM by Aminul Islam
Reliability Centred Maintenance - RCM by Aminul IslamMd.Aminul Islam ,CMRP,CSSBB
 
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-32937903 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790Jose Quintero
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxSamuel Gher
 
Maintenance best practices
Maintenance best practicesMaintenance best practices
Maintenance best practicesUjjwal Choubey
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e bookjericfreimuth
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET Journal
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Flevy.com Best Practices
 
Cross craft trainning
Cross craft trainningCross craft trainning
Cross craft trainningAntonio Reis
 
Report of vocational training in jspl
Report of vocational training in jsplReport of vocational training in jspl
Report of vocational training in jsplAashish Chaudhary
 

Ă„hnlich wie Asset Reliability Begins With Your Operators (20)

Procedure Based Maintenance
Procedure Based MaintenanceProcedure Based Maintenance
Procedure Based Maintenance
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master Class
 
Rcm
RcmRcm
Rcm
 
Tpm total productive maintenance
Tpm  total productive maintenanceTpm  total productive maintenance
Tpm total productive maintenance
 
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in IndustryIRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
IRJET- Maintenance and Reliability Strategy of Mechanical Equipment in Industry
 
Reliability Centred Maintenance - RCM by Aminul Islam
Reliability Centred Maintenance - RCM by Aminul IslamReliability Centred Maintenance - RCM by Aminul Islam
Reliability Centred Maintenance - RCM by Aminul Islam
 
Maximo Overview
Maximo OverviewMaximo Overview
Maximo Overview
 
tpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadamtpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadam
 
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-32937903 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
 
Precision Maintenance
Precision MaintenancePrecision Maintenance
Precision Maintenance
 
Maintenance best practices
Maintenance best practicesMaintenance best practices
Maintenance best practices
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 
FINAL PROJECT-MBA
FINAL PROJECT-MBAFINAL PROJECT-MBA
FINAL PROJECT-MBA
 
RCM
RCMRCM
RCM
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
 
Cross craft trainning
Cross craft trainningCross craft trainning
Cross craft trainning
 
Report of vocational training in jspl
Report of vocational training in jsplReport of vocational training in jspl
Report of vocational training in jspl
 
Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)
 

Mehr von Ricky Smith CMRP, CMRT

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerRicky Smith CMRP, CMRT
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutRicky Smith CMRP, CMRT
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingRicky Smith CMRP, CMRT
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyRicky Smith CMRP, CMRT
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyRicky Smith CMRP, CMRT
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsRicky Smith CMRP, CMRT
 
Best Maintenance Repair Practices
Best Maintenance Repair PracticesBest Maintenance Repair Practices
Best Maintenance Repair PracticesRicky Smith CMRP, CMRT
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollySMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollyRicky Smith CMRP, CMRT
 
How to Optimize your CMMS viewer copy
How to Optimize your CMMS  viewer copyHow to Optimize your CMMS  viewer copy
How to Optimize your CMMS viewer copyRicky Smith CMRP, CMRT
 
Preventive Maintenance Best Practices plus PM Optimization Workshop Brochure
Preventive Maintenance Best Practices plus PM Optimization Workshop BrochurePreventive Maintenance Best Practices plus PM Optimization Workshop Brochure
Preventive Maintenance Best Practices plus PM Optimization Workshop BrochureRicky Smith CMRP, CMRT
 
Tool Box Talk - CMRP exam recommendations
Tool Box Talk - CMRP exam recommendationsTool Box Talk - CMRP exam recommendations
Tool Box Talk - CMRP exam recommendationsRicky Smith CMRP, CMRT
 

Mehr von Ricky Smith CMRP, CMRT (20)

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance Technician
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance Planner
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effective
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts Checkout
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of Bearings
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and Why
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Best Maintenance Repair Practices
Best Maintenance Repair PracticesBest Maintenance Repair Practices
Best Maintenance Repair Practices
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance Technician
 
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollySMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
 
How to Optimize your CMMS viewer copy
How to Optimize your CMMS  viewer copyHow to Optimize your CMMS  viewer copy
How to Optimize your CMMS viewer copy
 
Preventive Maintenance Best Practices plus PM Optimization Workshop Brochure
Preventive Maintenance Best Practices plus PM Optimization Workshop BrochurePreventive Maintenance Best Practices plus PM Optimization Workshop Brochure
Preventive Maintenance Best Practices plus PM Optimization Workshop Brochure
 
Tool Box Talk - CMRP exam recommendations
Tool Box Talk - CMRP exam recommendationsTool Box Talk - CMRP exam recommendations
Tool Box Talk - CMRP exam recommendations
 

KĂĽrzlich hochgeladen

8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 

KĂĽrzlich hochgeladen (20)

8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 

Asset Reliability Begins With Your Operators

  • 1. A DIVISION OF ALLIED RELIABILITY GROUP Reliability Begins With Your Operators By: Doug Plucknette, Worldwide RCM Discipline Leader The Role of Reliability Centered Maintenance in improving reliability In today’s economic environment where companies around the world are tightening the financial belt to improve costs and performance, the key performance indicators of equipment and process reliability have become an important area for companies to build focused initiatives to improve reliability and reduce costs. While some companies got an early start in building reliability efforts the vast majority is just now getting educated in the benefits that equipment and process reliability can bring to their business. Those who have worked in the field for years understand that word reliability means more than just having equipment and processes that run when needed; reliability has a direct effect on nearly every aspect of your business. Reliable equipment costs less to maintain, reliable equipment produces higher product quality, reliable equipment is more energy efficient and most important reliable equipment and processes by far suffer less health, safety and environmental incidents and accidents. One of the time proven ways to improve equipment and process reliability is to perform Reliability Centered Analysis (RCM) on your critical assets. Developed in the 1970’s as a tool to build a complete equipment maintenance strategy for commercial aircraft the RCM process has transformed how companies view and perform maintenance around the world. From food and beverage to pharmaceuticals our customers are learning the value that a thorough Reliability Centered Maintenance analysis can bring to their business with results that have improved productivity by 27% while at the same time reducing maintenance costs by a similar amount.* One of the keys to getting the most from your RCM effort is having a cross-functional RCM team that includes maintenance tradespeople, process engineers, PdM (Predictive Maintenance) technicians, and often overlooked equipment operator. The role that the equipment operator plays in the RCM analysis In my over fifteen years of experienc instructing and facilitating RCM (Reliability Centered Maintenance) the question I am asked most often is this; “This RCM process uses the word Maintenance and I’m an equipment operator, why am I here?” © 2013 GPALLIED 1 A DIVISION OF ALLIED RELIABILITY GROUP
  • 2. A DIVISION OF ALLIED RELIABILITY GROUP This question opens my favorite discussion in regard to Reliability Centered Maintenance, the importance in having Operations deeply involved in the RCM process from start to finish. Simply stated, RCM does not achieve its full benefit without involving key operations people in the process. Completing a RCM analysis without having an experienced and respected equipment operator involved will always result in an incomplete listing of failure modes, and poorly detailed failure effect statements that lack important details in regard to what our operators experience when a critical failure mode occurs that could help us determine the actual cause and mitigate the failure. So, how important is the operator when it comes to performing a RCM Analysis? I tell my customers that I refuse to conduct a RCM analysis without an experienced equipment operator. If your thinking your operations people are not important in helping to develop your equipment maintenance strategy think again. They are not only important in helping to develop the strategy; your strategy is incomplete if the operator is not a part of your equipment maintenance plan! This is the point where in my mind I see the engineer/operator of this train reach over and apply the hand break. Just as things were beginning to roll along quite smoothly we are about to come to a complete and abrupt stop. While that question in regard to being an equipment operator and how does that apply to Reliability Centered Maintenance is the most popular, the question most feared is what comes next. You don’t really expect the operator to actually perform maintenance tasks do you? The room is now silent and it is now quite clear that while we all understand why we need to have operators involved in the RCM analysis it is not clear at all why operators need to perform maintenance tasks. In fact what is quite clear at this moment is the operator not keen on performing any maintenance. He/she is after all the equipment operator not a maintenance technician. And, the maintenance people don’t want the operator taking away any of their tasks because of the fear that giving up certain tasks could cost someone their job. The train this is my RCM introductory meeting has now stopped and it is at this point I begin to discuss some common real life examples of equipment operators we can all relate to and how they are involved in and perform regular maintenance tasks. ď‚· State examples of the importance operators play producing exception results in reliability and equipment performance (Airline Industry, NASCAR, Manufacturing Equipment come to mind here) How many of you folks watch NASCAR? Who is the operator if the race car? Is he or she at all in any way involved in the maintenance of that car? © 2013 GPALLIED 2 A DIVISION OF ALLIED RELIABILITY GROUP
  • 3. A DIVISION OF ALLIED RELIABILITY GROUP The discussion usually starts with the driver drives the car and the mechanics and pit crew maintain the car but within a minute or two someone brings up the fact that the driver communicates several things the race team throughout a race in regard to how the car is performing, and how it holds the track in and out of the turns. Could this information passed from the operator to the race team be considered Maintenance? How about flying? How many people in this group have ever flown on a jet for vacation or business? Who is the equipment operator of that jet? Does the pilot perform any maintenance tasks for his aircraft? This conversation is easy as most everyone has seen the pilot walk around the aircraft and performs visual inspections of the equipment before the passenger’s board. Once the visual inspection is complete the pilot and co-pilot work to complete the pre-flight procedures or checklists. Safety and reliability are extremely important to this industry and as a result there are several items that need to be checked each to ensure the aircraft is fit for operation. While the pilot is indeed our equipment operator, it is quite clear that they perform several important maintenance tasks each and every time they operate the equipment. The airline pilot also receives some very intensive training on how to start, operate and shut down the aircraft along with detailed instructions and training on how to handle and address critical component failures. Types of failure modes identified by equipment operators that are often overlooked when operators are not included as part of the RCM Team The reality of why equipment operators need to be part of your RCM effort comes down to the identification of failure modes. While your maintenance mechanics and engineers can typically do a thorough job at identifying the mechanical and electrical failure modes associated with the components within your system, they will fall short in identifying the process related failure modes that the operators deal with and experience in the day to day operation of your equipment. While we would like to believe that most of our equipment is automated and controlled through a PLC the reality can sometimes be very different and we rely on the operators training and experience in starting up, operating equipment, shutting down the equipment and performing equipment and product changes. In reviewing failure modes identified in the typical RCM analysis, twenty-eight percent of the failure modes identified address failures resulting from how we operate our assets and equally important, these failures are often are the most frequent in occurrence. Without the participation of the operator these important failure modes would surely be overlooked and continue to impact the reliability of your asset. The value operators bring in writing good failure effect statements An important part of every analysis is identifying and recording the failure effects that result from each failure mode. It is through the failure effects that we determine the consequence to our business should the failure occur and while our maintenance and engineering team members are well suited to identify the effects the failure will have on the component or part being analyzed they often struggle to identify the effect each failure has on our overall process. Each failure effect statement should include the following information: © 2013 GPALLIED 3 A DIVISION OF ALLIED RELIABILITY GROUP
  • 4. A DIVISION OF ALLIED RELIABILITY GROUP ď‚· Events that lead up to the failure for wear based components/parts and components/parts that have a useful P-F interval ď‚· First sign of evidence that the failure has occurred. It is here where the operator in most cases will be able to identify the alarm that results from the failure or the indication they receive that failure has occurred. ď‚· The secondary effects or damage that results from the failure mode. While again our maintenance people will do an outstanding job of identifying the mechanical and electrical collateral damage we will need to rely on the operators experience to identify how the process is affected. ď‚· Events required to bring the process back to normal operating condition. While some may consider this in most cases to be a simple statement about shutting down, troubleshooting and replacing or repairing a part, we will again rely in the operator to identify critical effects regarding how to best avoid secondary damage that could result from improper shut down following the failure. With a well written failure affect statement we look for one more piece of critical information to help determine the consequence of the failure mode; the down time that results from the failure mode is best determined by the operators input in regard to how long it takes from the time the failure occurs and the equipment is shut down to the time the process is again restarted to normal operating condition. The role operators play in making sound RCM task decisions As the team moves forward to identify mitigating tasks the operator will again play a key role in helping to identify operator care tasks, as well as tasks that can be performed by the operators during equipment start-up, shut down and product changes as well as operator care tasks that can be performed on their daily rounds. Experienced operators are also valuable in the development of tasks associated with process monitoring or process verification including control logic changes, process data trending, as well as warning and shutdown alarms. Process verification is one of the most cost effective and reliable forms of PdM; by using the PLC to monitor, trend and alarm key process variables such as pressure, temperature, flow, amp draw and vibration the system essentially becomes a condition based monitoring tool all the while your equipment is running. Nearly fifty percent of process verification tasks have been identified by the operators participating on the RCM team. As time moves forward and technologies improve the role and involvement of operators in the effort to continuously improve equipment reliability will surely increase. Innovations in hand held data loggers the last 10 years have made the simple the ability to develop precise operator rounds where critical pressures, temperatures and conditions can be entered for trending as well as immediate feedback. © 2013 GPALLIED 4 A DIVISION OF ALLIED RELIABILITY GROUP
  • 5. A DIVISION OF ALLIED RELIABILITY GROUP © 2013 GPALLIED 5 A DIVISION OF ALLIED RELIABILITY GROUP