PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES

PHASE 1 – 16 MW
I. THE MINDORO ADVANTAGE




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES   PHASE 1 – 16 MW
1. Strategic Location



          o Nearest island to Metro Manila and
            CALABARZON

          o Located at the center of the Philippines.                         Luzon
                                                                        Metro Manila
          o Oriental Mindoro serves as the main link
                                                                    CALABARZON
            to Luzon, Visayas and Mindanao thru the
            Nautical Highway.                                 MINDORO

                                                                              Visayas




                                                                                       Mindanao



          Calapan City Port          Dangay Port oin Roxas,
                                     Oriental MIndoro




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                                    PHASE 1 – 16 MW
2. Geographical Advantage in Size/Area

          Mindoro is the 7th largest island in the Philippines.

                                                                             Land Area
                                                             Province
                                                                                ( in sq. km.)
                                                            Batangas                 3,165.80
                                                            Cavite                   1,287.60
                                                            Laguna                   1,759 .00
                                                            Rizal                    1,175.96
                                                            Total                    7,388.36
                                                                                 Land Area
                                                                  Province            ( in sq.
                                                                                    km.)
                                                            Or. Mindoro              4,364.72
                                                            Occ. Mindoro             5,879.90
                                                            Total                   10,224.62


PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                                          PHASE 1 – 16 MW
3. Abundant Natural Resources


             o Oriental Mindoro – with protected watersheds

             o Rich fertile land suitable to massive agro-industrial
               development.

             o Most ideal for agro-eco-tourism (green mountains,
               clean lakes and rivers, and white sand beaches.

             o Rich in minerals such as gold, nickel, marble, and
               others.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                           PHASE 1 – 16 MW
4. Environmental Protection

          o Preserved watersheds with strong rivers for
            hydropower, irrigation, and mineral free flow
            waters.

          o Comprehensive Land Use              Plan    that
            indentifies geo-hazard areas.

          o Successful implementation of laws against
            illegal logging, illegal mining, illegal fishing,
            etc.                                                 Free flowing mineral water in the province.

          o Awarded by Asian Development Bank (ADB)
            as Most Successful Reforestation Program in
            the Philippines under Low Income Upland
            Community Projects (LIUCP).

          o Naujan Lake (13,000 has.)- the cleanest lake
            in the Philippines.


                                                                Naujan Lake is one of the cleanest lakes in the Philippines



PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                                                PHASE 1 – 16 MW
5. Strong Agro-Industry – To be the Food Basket of the Philippines.


              o Today, Mindoro is considered as the:
              1. Rice Granary of the Philippines.
              2. Calamansi King.
              3. Banana (cassava variety) King.

              o Best site for Aquaculture
              o Best site for upland and lowland farming.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                            PHASE 1 – 16 MW
5. Political Stability and Peace and Order



           o Good working relationship among National and
             Local Officials including NGOs.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                PHASE 1 – 16 MW
6. Infrastructures.

             o   Concrete National Highways
             o   Completed Vital National and Provincial Bridges
             o   Implementation of Flood Mitigation Projects.
             o   Farm to Market Roads.
             o   Schools, Hospitals and Other Facilities for Social
                 Services.
             o   Commercial and Housing Development




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                          PHASE 1 – 16 MW
Strong Tourism Potential – To be the Eco-tourism Capital of the Philippines.

          o Beach Resort Development with about 300 kms. shoreline.
          o Lake Naujan – cleanest lake in the Philippines
          o Puerto Galera – Tourism Capital of Oriental Mindoro
          o Bulalacao – next tourism capital of Mindoro in the south..
          o   Mt. Halcon – 8,488 ft. above sea level, Temperature;
                Day : 12-18˚C, Night : 4-12˚C




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                             PHASE 1 – 16 MW
List of 35 Waterfalls in Oriental Mindoro


           1.    Tamaraw Waterfalls,        19.   Tabunan Water Falls,
           2.    Aninuan Water falls,       20.   Enchanted Water Falls,
           3.    Binaybay Water Falls,      21.   Bosai Water Falls,
           4.    Lambingan Water Falls,     22.   Campamento Water Falls
           5.    Agsambalilo Water Falls,   23.   Cawa-Cawa Water Falls,
           6.    Paspasin Water Falls,      24.   Walang Langit Water Falls
           7.    Raymundo Water Falls,      25.   Manihala Water Falls,
           8.    Ibuye Water Falls,         26.   Talse(Molo) Water Falls,
           9.    Kaguinto Water Falls,      27.   Tangisan Water Falls,
           10.   Bayanan Water Falls,       28.   Agpayan Water Falls,
           11.   Lantuyang Water Falls,     29.   Campana Water Falls,
           12.   Paitan Water Falls,        30.   Tangisan Water Falls,
           13.   Arangin Water Falls,       31.   Agpayan Water Falls,
           14.   Karacha Water Falls,       32.   Campana Water Falls,
           15.   Taguan Water Falls,        33.   Matang Pugita WaterFalls
           16.   Arambyaw Water Falls,      34.   Cabugno Falls
           17.   Maradyong Water Falls,     35.   Bagong Sikat Falls
           18.   Talon Water Falls,




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                                  PHASE 1 – 16 MW
MINDORO VISION 2020




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES   PHASE 1 – 16 MW
Long Term Program Under Mindoro Vision 2020


               Food Basket of the
                       Philippines




                                     Agro-Eco-Tourism Capital of
                                                 the Philippines


                                                    Producer and Exporter of
                                                           Power and Energy



                   Productive and Self-Reliant
                 People Living in an Ecologically
                         Balanced Environment




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                                    PHASE 1 – 16 MW
II. OR. MINDORO POWER
     DEVELOPMENT PROGRAM




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES   PHASE 1 – 16 MW
A. Oriental Mindoro Power Demand Forecast


             1. Type of Forecast

                a. ORMECO DEMAND FORECAST
                      Forecast is based on an average minimal increase of power
                consumption ranging from 4% to 7 % per year.

                b. ORMINVEST FORECAST
                       Forecast is based on development programs i.e. eco-tourism
                and agro-industrial development, commercial and housing programs.
                An estimated increase in power demand is projected at 20% per year.



                Note:
                ORMECO - Oriental Mindoro Electric Cooperative
                ORMINVEST – Oriental Mindoro Investments, Inc.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                                PHASE 1 – 16 MW
Oriental Mindoro Projected Demand for Power


                           ORMECO                    ORMINVEST
           Year
                      FORECAST   GROWTH          FORECAST      GROWTH
           2010       28.56MW                    28.56MW
           2011       30.37MW     6.35%          34.27MW        20.00%
           2012       32.51MW     7.04%          41.13MW        20.00%
           2013       34.64MW     6.58%          49.35MW        20.00%
           2014       36.78MW     6.17%          59.22MW        20.00%
           2015       38.92MW     5.81%          71.07MW        20.00%
           2016       41.06MW     5.59%          85.28MW        20.00%
           2017       43.19MW     5.21%         102.34MW        20.00%
           2018       45.33MW     4.95%         122.80MW        20.00%
           2019       47.47MW     4.72%         147.36MW        20.00%
           2020       49.74MW     4.72%         176.84MW        20.00%




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                  PHASE 1 – 16 MW
B. Alternative Sources of Renewable Energy

        A.   HYDRO POWER:
             San Teodoro                   50 MW
             Baco                          25 MW
             Naujan
             20 MW
             Victoria                      25 MW
             Bongabong                     20 MW
             Bansud                        10 MW
             Occidental Mindoro,           20 MW
             Combined Capacity           160 MW
             Note: 39 WATERFALLS HAVE YET TO BE
        B.   WIND EXPLORED FOR HYDROPOWER PROJECT.
                    POWER:                                           c
             Puerto Galera power resources.48MW
                     for hydro
                                                                     c
             Victoria                      20 MW
             Bulalacao                 40- 70 MW
                                                                     c
             Abra de Ilog              10- 20 MW
             Combined Capacity       118-158 MW
        C.   GEO-THERMAL:
             Naujan                            20-
             70 MW                                   RENEWABLE ENERGY SITES
             GRAND TOTAL          300-388 MW


PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                       PHASE 1 – 16 MW
III. MINDORO POWER PROGRAM
  DEVELOPMENT UPDATES




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES   PHASE 1 – 16 MW
1) Electrification Level in Oriental Mindoro (As of October, 2011)

                                                 Barangays                                           Sitios
           City/Municipality                                                                                          UnEnergize
                                    Potential     Energized          %          Potential   Energized           %         d
       Calapan City                    62            62             100           347         337             97.12       10
       Naujan                          70            70             100           403         320             79.40       69
       Victoria                        32            32             100           195         157             80.51       38
       Baco                            27            27             100           157         117             74.52       40
       San Teodoro                      8             8             100            69          35             50.72       34
       Puerto Galera                   13            13             100            74          41             55.41       29
       Socorro                         26            26             100           175         123             70.29       52
       Pola                            23            23             100           153          93             60.78       62
       Pinamalayan                     37            37             100           237         192             81.01       45
       Gloria                          27            27             100           189         131             69.31       58
       Bansud                          13            13             100            92          43             46.74       42
       Bongabong                       36            36             100           224         131             58.48       81
       Roxas                           20            20             100           135         111             82.96       12
       Mansalay                        17            17             100            77          44             57.14       22
       Bulalacao                       15            15             100            48          27             56.25       21
                 Totals               426           426             100           2575        1903            73.90      613
       Source: ORMECO, Inc.
            Note: All 426 Barangays are energized. However,               Electricity Rates as of April, 2012:
            26.10% of all the 2,575 Sitios are still unenergized.         Commercial P11.43/kwh            Public Buildings P11.15/kwh
            Pres. Aquino promised to fully energized the                  Residential     P12.42/kwh       Street Lights    P13.24/kwh
            province by 2016.                                             Industrial      P11.04/kwh




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                                                                    PHASE 1 – 16 MW
2) 4.2 MW Hydro Power Project in San Teodoro, Or. Mindoro.




                        LINAW-KAWAYAN MINI-HYDRO POWER PLANT
              Development Bank of the Philippines (DBP) Loan extended to ORMECO.
                      Photo was taken during the Groundbreaking Ceremony.



PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                             PHASE 1 – 16 MW
BLESSING AND RIBBON CUTTING (MARCH 2, 2012)




                     2.1 MEGAWATTS LINAW-KAWAYAN MINI-HYDRO PROJECT
                            AT SAN-TEODORO, ORIENTAL MINDORO.



PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                          PHASE 1 – 16 MW
CEREMONIAL SWITCH ON




                       2.1 MEGAWATTS LINAW-KAWAYAN MINI-HYDRO PROJECT
                              AT SAN-TEODORO, ORIENTAL MINDORO.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                            PHASE 1 – 16 MW
CEREMONIAL SWITCH ON with PRES. AQUINO and Sec. ALMENDRAS




                         2.1 MEGAWATTS LINAW-KAWAYAN MINI-HYDRO PROJECT
                                 CEREMONIAL SWITCH ON - MARCH 02, 2012
               Other Officials: CONG RGV, GOV. BOY UMALI, CONG. REY UMALI, AND OTHERS.



PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                                    PHASE 1 – 16 MW
3. Diesel Bunker Power at Calapan City 6.4 MW




                                                      A P400 MILLION
                                                      POWER
                                                      DEVELOPMENT
                                                      IN 2011




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES               PHASE 1 – 16 MW
4. Batangas-Mindoro Submarine Cable Project Under H.R. No. 56




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                       PHASE 1 – 16 MW
APPLICATION OF NGCP TO ERC



Filed: August 1, 2011
with ERC Case No. 2011-108

Supported bY:
H.R. No. 56 by: Hon. RGV
 Resolution No. 11-41 of Board of
Directors, ORMECO
Resolution No. 36-2011 of Boar d
of Directors, OMECO

NGCP has included the Project
under the name “Luzon-Mindoro
Interconnection Project” as part of
2009-2010 Transmission
Development Plan.


                                      PAGE 3
                                      PAGE 2 1
                                        PAGE
APPLICATION OF NGCP TO ERC



Based on DOE, about 203 MW
generation capacity is targeted to be
installed in Mindoro up to year 2016.

Interconnection Scheme:
1)Via Batangas – 230 KV Substation
2)Via Ilijan – 500 KV Sub-station

NGCP proposes Option 1 – 230 KV via
Batangas with a project cost estimate
of P10.99 Billion.




                                        PAGE 3
                                         PAGE 4
APPLICATION OF NGCP TO ERC




NGCP prays for ERC to:
1)Issue Provisional Authority to
Implement BMIP
2)Approve the Application for
Implementation of BMIP
Batangas-Mindoro Submarine Cable Project Under H.R. No. 56


             4. Project Benefits:

                       a. Reliability of Power Supply in Mindoro will improve

                       b. Cheaper Power for All

                       c. Mindoro Grid will become part of NGCP Operation thus will
                          strengthen the Transmission

                       d. Mindoro will become conducive for expanding business in tourism,
                          manufacturing and other industries thereby improving the economy
                          of the island.

                       e. Possible development of coal-fired power plants since Mindoro is rich
                          in coal resources.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                                          PHASE 1 – 16 MW
Batangas-Mindoro Submarine Cable Project Under H.R. No. 56




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                         PHASE 1 – 16 MW
LATEST DEVELOPMENTS




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES   PHASE 1 – 16 MW
LATEST DEVELOPMENTS




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES   PHASE 1 – 16 MW
LATEST DEVELOPMENTS




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES   PHASE 1 – 16 MW
IV. MINDORO RENEWABLE ENERGY PROGRAM, IN SUPPORT
    TO NATIONAL POWER PROGRAM OF PRES. AQUINO.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES   PHASE 1 – 16 MW
1. The Mindanao Power Crisis.



    o Higher Electricity Cost
      or No Electricity.

    o Power Supply deficit
      up to 270 MW

    o Earliest to set up new
      power plant, 2014.

    o Problem could have
      been prevented if
      gov’t decided to invest
      in RENEWABLE
      ENERGY – Sen. Angara.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES   PHASE 1 – 16 MW
2. Power outrage also seen in Visayas.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES     PHASE 1 – 16 MW
3. The LUZON Power Crisis NEXT




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES   PHASE 1 – 16 MW
4. Like Mindanao, Luzon will experience power shortage.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                      PHASE 1 – 16 MW
5. Luzon Grid needs more Power Sources.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES      PHASE 1 – 16 MW
6. Renewable Enengy, primary and immediate solution to nation’s power crisis..




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                         PHASE 1 – 16 MW
7. Mindoro Renewable Energy, One of the Reliable Sources.


                                                o Based on DOE, about 203 MW to be
                                                  installed in Mindoro Island by Year
                                                  2016.
                                                o Mindoro Island excess power capacity
                                                  can be exported to Main Luzon Grid.

                                                o Mindoro Island has still other sources
                                                  of Renewable Energy like:
                                                      a. 35 Waterfalls,
                              c                       b. other sources to be explored
                              c                             i.e.: coal and biomass.
                              c
                                               LEGEND:
                                                  SITES OF RENEWABLE ENERGYSOURCES
                                                  PROPOSED SUBMARINE CABLE




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                              PHASE 1 – 16 MW
Mindoro’s Renewable
      Energy Resources in
      Support to Pres.
      Aquino’s Power
      Development Program




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES   PHASE 1 – 16 MW
Mindoro’s Renewable
      Energy Resources in
      Support to Pres.
      Aquino’s Power
      Development Program




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES   PHASE 1 – 16 MW
The 48 MW
   WIND ENERGY PROJECT
   PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES      PHASE 1 – 16 MW
Project Background

             1. A long 7 Years Process




                  Dec., 2010. Meeting with House of Representative, Department of Energy,
                    National Power Corporation, Contractor and Italian Ambassador Luca
                                                 Fernari.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                                        PHASE 1 – 16 MW
Project Background

             2. Finally Approved under Sec. Jose Rene D. Almendras




                Signing of Service Contract for 16MW Wind Power ProjectBy Energy Sec. Jose Rene D.
                Almendras, Cong Rodolfo G. Valencia , Gov. Alfonso V. Umali, and CMC Asia Chairman Andy
                de Rossi with Congress Chief of Staff Nico Valencia and Nicky Villaseñor, PHESI President


PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                                        PHASE 1 – 16 MW
Latest Development

           Signing of MOA between PHESI, CMC-ASIA and GAMESA EOLICA S.L. UNIPERSONAL,
           witnessed by Vice President JEJOMAR BINAY, Cong. RGV, Gov. Umali, Cong. Umali and
           other LGUs.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                               PHASE 1 – 16 MW
Latest Development

             Signing of ESA with Oriental Mindoro Electric Cooperative.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                              PHASE 1 – 16 MW
Latest Development

             Official Signing and Awarding Ceremony, Shangri-la Hotel, Makati.




PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES                                 PHASE 1 – 16 MW
Philippine Hybrid Energy Systems, Inc.
 Unit 2406, 24/F The Orient Square Bldg., Emerald Ave.,
                Ortigas Center, Pasig City
        Tel: +63 2 638 2801, +63 2 638 8901 to 02
                   Fax: +63 2 638 8899
JETTY
     •A Jetty has been designed (armor rock plus a concrete) to




SPECIFICATION
  Dimension:      35 meters width (W); 45 meters length (L)
ACCESS ROAD
• The Access Road has been designed to achieve and
           compromise the high slopes of the terrain from the Jetty to
           the wind farm site.

  SPECIFICATION

     Length:          4.45 km (approximate)
     Width:           5 meters; maximum of 10 meters on curves


• Typical Section:       0.35 meter thick of aggregate (compacted); if
                         slope is over 10%, 50 mm thick of asphalt
                         runway will be considered.
INTERNAL / SERVICE ROADS
• The Internal Roads have been designed achieving a
            compromise between the high slopes of the terrain and the
            amount of soil to be removed. All the roads from the position
            of WTG # 1 to WTG # 8 are considered internal roads.

    SPECIFICATION

Length:          7 segments @ 200 meters per segment (approximate)
Width:           10 meters (6 meters plus 2 meters sidetrack, both sides)
Typical Section: 0.35 meter thick of aggregate (compacted); if slope is
                 over 10%, 50 mm thick of asphalt runway will be
                 considered.
PHASE 2 & 3 LAYOUT
WIND TURBINE

Gamesa G8X -2.0 MW


  Wind Vane




              Anemometer
• Wind turbine of the Gamesa G8X-2.0MW platform are of the
          three-bladed wind-facing rotor type with a nominal power of
          2.0 MW.

• It consists of three major parts: TOWER, NACELLE, and BLADES.


• Wind Turbines have an instrument on top of the nacelle, an
  anemometer and wind vane, which respectively measure wind
  speed and direction.

• When the wind changes direction the motors turn the nacelle and
  the blades, directly facing the wind.
Properties of the Model

ROTOR

Diameter                  80 m

Swept area                5,027 m²

Rotational speed          9.0 - 19.0 rpm

BLADES

Number of blades          3

Length                    39 m

Airfoils                  NACA 63. XXX - FFA-W3

Material                  Pre-impregnated epoxy glass fiber

TOWER

Type                      Modular

Height                    60, 67, 78 and 100m

GEAR BOX

                          1 planetary stage
Type
                          2 parallel stages

                          1:100,5 (50Hz)
Ratio
                          1:120,5 (60Hz)
GENERATOR 2.0 MW
Type               Doubly-fed machine
Rated power        2.0 MW
Voltage            690 V AC
Frequency          50 Hz / 60Hz
Potection class    IP 54
Power factor       0.95 CAP - 0.95 IND throughout the power range
TOWERS

    • The wind turbine tower is made of tubular steel, in a truncated
      conical shape, divided into four sections.

• Includes platforms, ladders, and emergency lighting.


•       Includes a cable guided elevator for easy maintenance of the
        wind turbine.
TOWER FOUNDATION




 Specifications:

 • The tower foundation will be a squared size 15.84m x 15.84m x
    1.46m concrete pad.
• Foundation ring (diameter = 4.037) is embedded from the surface
   of pedestal ; whereas the pedestal (with dimensions of 8.449 m in
   diameter & 2.15m in thickness) is connected to the pad through
   vertical armors.
Transporting of Towers   Erection of Towers
NACELLE

• The nacelle is a cover housing that holds all the generating
  component in a wind turbine, including the generator,
  gearbox, drive train and brake assembly.

• The dimension of the nacelle is approximately 10.6m x 3.4m x
  3.6m. Its weight is approximately 70 tons.


• Contains 800kg service crane with lifting capacity up to
  8000kg
Conveying of Nacelle   Installation of Nacelle
BLADES

     • The blades in wind turbines of the Gamesa G8x-2.0MW
       platform are manufactured in an organic matrix composite and
       reinforced with fiber glass or carbon fiber, which provide the
       necessary rigidity without increasing the weight of the blades.

• The length of the blade is 39 meters


• The blades come with the necessary drains to prevent water being
  retained inside, which can cause imbalance or structural damage due
  to water vaporization upon lightning striking them.
Transporting of Blades   Installation of three-blades
SUBSTATION

       • A 20MVA 22.8/69 kV substation will be built in order to increase
         the voltage to transmission levels.

• Medium Voltage facilities will have two vacuum circuit breakers for two
   feeders, and one circuit breaker for spare. A Fused Load Breaker Switch
  (FLBS) will protect the auxiliary facilities of the substation.


  • A 69/22.8 kV, 20 MVA power transformer will be installed. The neutral in
    the high voltage side will be solidly connected to earth.
• High voltage output will be connected to the transmission line
  through a SF6 circuit breaker and a disconnector switch.


• DNP3 will be the substation communication bus



• Three Winding Phase Shihlin electric generator step-up transformer
omposed of the following main bays:
                                      A
                                      On
                                      A
                                      On
24 kV Equipment
            • Installed inside the control building of the substation

            • Single Busbar

 Composition of Busbar:

       Switchgear Cabinet for power transformer protection
       Switchgear Cabinets to connect the wind turbines circuits
       Switchgear Cabinets for auxiliary services transformer protection
       Spare Switchgear cabinet for possible future expansions
       Ground reactor bay
       Voltage Measurement
       Lightning arresters
Transmission Line


 • Single circuit, 4.5 m length, 69 kV line will join the substation and
   the connection point.

• 200mm2 Aluminum Conductor Steel Reinforced cable will be
  used.


• 17 poles will be used to hold up the cables. Install a pole close to the
  substation for the line termination. Another pole near the metering
  facilities will be installed to perform the same function.
Metering Interconnection Station
• Equipped with metering equipment to measure the flow of
  electricity in both directions at the same rate
• Has a SF6 circuit breaker and a disconnector switch.
END OF
  TECHNICAL
PRESENTATION
ACKNOWLEDGEMENTS

                   o   H.E. BENIGNO S. AQUINO, III
                   o   SEC. JOSE RENE D. ALMENDRAS, DOE
                   o   CONGRESS OF THE PHILIPPINES
                   o   PROVINCIAL GOVERNMENT OF OR. MINDORO
                   o   SANGGUNIANG PANLALAWIGAN
                   o   PUERTO GALERA LOCAL GOVERNMENT
                   o   OR. MINDORO ELECTRIC COOPERATIVE
                   o   NATIONAL POWER CORPORATION
                   o   NATIONAL ELECTRIFICATION AUTHORITY
                   o   ITALIAN EMBASSY
                   o   CMC-ASIA, INC.
                   o   ORMINVEST FOUNDATION, INC.
                   o   K4 ORIENTAL MINDORO COUNCIL, INC.
                             . . . and the MINDOREÑOS!


PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES             PHASE 1 – 16 MW
PARA SA MAUNLAD NA MINDORO!




   HON. RODOLFO G. VALENCIA           NICO P. VALENCIA
   Congressman,                       President
   First District, Oriental Mindoro   K4 Oriental Mindoro council, Inc.

Weitere ähnliche Inhalte

Was ist angesagt?

3_hydrostatic-force_tutorial-solution(1)
3_hydrostatic-force_tutorial-solution(1)3_hydrostatic-force_tutorial-solution(1)
3_hydrostatic-force_tutorial-solution(1)
Diptesh Dash
 
Flooding 6 Solutions To Flooding
Flooding 6 Solutions To FloodingFlooding 6 Solutions To Flooding
Flooding 6 Solutions To Flooding
tudorgeog
 
Chemistry notes ideal gas laws
Chemistry notes ideal gas lawsChemistry notes ideal gas laws
Chemistry notes ideal gas laws
hega coc
 

Was ist angesagt? (20)

HYDROPOWER DEVELOPMENT IN NEPAL
HYDROPOWER DEVELOPMENT IN NEPALHYDROPOWER DEVELOPMENT IN NEPAL
HYDROPOWER DEVELOPMENT IN NEPAL
 
Electricity - A Visual Primer
Electricity - A Visual PrimerElectricity - A Visual Primer
Electricity - A Visual Primer
 
Rajastan canal or indira Ghandi canal project ppt
Rajastan canal or indira Ghandi canal project pptRajastan canal or indira Ghandi canal project ppt
Rajastan canal or indira Ghandi canal project ppt
 
3_hydrostatic-force_tutorial-solution(1)
3_hydrostatic-force_tutorial-solution(1)3_hydrostatic-force_tutorial-solution(1)
3_hydrostatic-force_tutorial-solution(1)
 
Lists of Civil Engineering Review Centers in the Philippines
Lists of Civil Engineering Review Centers in the PhilippinesLists of Civil Engineering Review Centers in the Philippines
Lists of Civil Engineering Review Centers in the Philippines
 
Flooding 6 Solutions To Flooding
Flooding 6 Solutions To FloodingFlooding 6 Solutions To Flooding
Flooding 6 Solutions To Flooding
 
Wind Power Plant
Wind Power PlantWind Power Plant
Wind Power Plant
 
Wind Power presentation 2023.pdf
Wind Power presentation 2023.pdfWind Power presentation 2023.pdf
Wind Power presentation 2023.pdf
 
Presentation on Geothermal Energy
Presentation on Geothermal EnergyPresentation on Geothermal Energy
Presentation on Geothermal Energy
 
Case Study No. 8-Managing Floods in Metro Manila
Case  Study No. 8-Managing Floods in Metro ManilaCase  Study No. 8-Managing Floods in Metro Manila
Case Study No. 8-Managing Floods in Metro Manila
 
Chemistry notes ideal gas laws
Chemistry notes ideal gas lawsChemistry notes ideal gas laws
Chemistry notes ideal gas laws
 
Design of flood control structures
Design of flood control structuresDesign of flood control structures
Design of flood control structures
 
Hyetograph and hydrograph analysis
Hyetograph and hydrograph analysisHyetograph and hydrograph analysis
Hyetograph and hydrograph analysis
 
Thermo problem set no. 2
Thermo problem set no. 2Thermo problem set no. 2
Thermo problem set no. 2
 
Lec.2 statically determinate structures & statically indeterminate struct...
Lec.2 statically determinate structures & statically indeterminate struct...Lec.2 statically determinate structures & statically indeterminate struct...
Lec.2 statically determinate structures & statically indeterminate struct...
 
Development works on Major river basins of nepal
Development works on Major river basins of nepalDevelopment works on Major river basins of nepal
Development works on Major river basins of nepal
 
Waste to energy
Waste to energyWaste to energy
Waste to energy
 
Hydro electric power plant ppt
Hydro electric power plant pptHydro electric power plant ppt
Hydro electric power plant ppt
 
Types of hydro power plant
Types of hydro power plantTypes of hydro power plant
Types of hydro power plant
 
Engineering Economics: Solved exam problems [ch1-ch4]
Engineering Economics: Solved exam problems [ch1-ch4]Engineering Economics: Solved exam problems [ch1-ch4]
Engineering Economics: Solved exam problems [ch1-ch4]
 

Andere mochten auch (7)

Solar Power Project (45 MW): Bulgarian Electricity Market Study
Solar Power Project (45 MW): Bulgarian Electricity Market  Study  Solar Power Project (45 MW): Bulgarian Electricity Market  Study
Solar Power Project (45 MW): Bulgarian Electricity Market Study
 
52528672 microwave-planning-and-design
52528672 microwave-planning-and-design52528672 microwave-planning-and-design
52528672 microwave-planning-and-design
 
Mw presentation 1
Mw presentation 1Mw presentation 1
Mw presentation 1
 
Microwave digestion
Microwave digestionMicrowave digestion
Microwave digestion
 
Implementation of-mw-link-and-bts
Implementation of-mw-link-and-btsImplementation of-mw-link-and-bts
Implementation of-mw-link-and-bts
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plant
 
Digital microwave communication principles
Digital microwave communication principles Digital microwave communication principles
Digital microwave communication principles
 

Ähnlich wie 48 mw wind power

Mag asawng tubig multi-purpose project
Mag asawng tubig multi-purpose projectMag asawng tubig multi-purpose project
Mag asawng tubig multi-purpose project
rhoan_co
 
MAG-ASAWANG TUBIG MULT- PURPOSE PROJECT
MAG-ASAWANG TUBIG MULT- PURPOSE PROJECTMAG-ASAWANG TUBIG MULT- PURPOSE PROJECT
MAG-ASAWANG TUBIG MULT- PURPOSE PROJECT
rhoan_co
 
MIMAROPA, Region IV - B
MIMAROPA, Region IV - BMIMAROPA, Region IV - B
MIMAROPA, Region IV - B
kimcarlo2
 
thephilippineenvironment-150312020049-conversion-gate01(1).pptx
thephilippineenvironment-150312020049-conversion-gate01(1).pptxthephilippineenvironment-150312020049-conversion-gate01(1).pptx
thephilippineenvironment-150312020049-conversion-gate01(1).pptx
RamiscalMaChristinaM
 

Ähnlich wie 48 mw wind power (20)

State of the Mangroves: La Union
State of the Mangroves: La UnionState of the Mangroves: La Union
State of the Mangroves: La Union
 
Mag asawng tubig multi-purpose project
Mag asawng tubig multi-purpose projectMag asawng tubig multi-purpose project
Mag asawng tubig multi-purpose project
 
MAG-ASAWANG TUBIG MULT- PURPOSE PROJECT
MAG-ASAWANG TUBIG MULT- PURPOSE PROJECTMAG-ASAWANG TUBIG MULT- PURPOSE PROJECT
MAG-ASAWANG TUBIG MULT- PURPOSE PROJECT
 
Region ii (2)
Region ii (2)Region ii (2)
Region ii (2)
 
MIMAROPA, Region IV - B
MIMAROPA, Region IV - BMIMAROPA, Region IV - B
MIMAROPA, Region IV - B
 
Geography and Natural Resources of the Philippines
Geography and Natural Resources of the PhilippinesGeography and Natural Resources of the Philippines
Geography and Natural Resources of the Philippines
 
Palawan: A Tinderbox-An Assessment of Environment and Natural Resource Use (E...
Palawan: A Tinderbox-An Assessment of Environment and Natural Resource Use (E...Palawan: A Tinderbox-An Assessment of Environment and Natural Resource Use (E...
Palawan: A Tinderbox-An Assessment of Environment and Natural Resource Use (E...
 
R E G I O N I V B
R E G I O N  I V  BR E G I O N  I V  B
R E G I O N I V B
 
2 ACCIDENTS CAUSED BY LARGE-SCALE MINING IN PALAWAN
2 ACCIDENTS CAUSED BY LARGE-SCALE MINING IN PALAWAN2 ACCIDENTS CAUSED BY LARGE-SCALE MINING IN PALAWAN
2 ACCIDENTS CAUSED BY LARGE-SCALE MINING IN PALAWAN
 
Gina Lopez presentation - Conference on Mining's Impact on Philippine Economy...
Gina Lopez presentation - Conference on Mining's Impact on Philippine Economy...Gina Lopez presentation - Conference on Mining's Impact on Philippine Economy...
Gina Lopez presentation - Conference on Mining's Impact on Philippine Economy...
 
Gina Lopez Presentation Conference on Mining's Impact on Philippine Economy a...
Gina Lopez Presentation Conference on Mining's Impact on Philippine Economy a...Gina Lopez Presentation Conference on Mining's Impact on Philippine Economy a...
Gina Lopez Presentation Conference on Mining's Impact on Philippine Economy a...
 
The Inconvenient Realities of Protected Area Management in the Philippines
The Inconvenient Realities of Protected Area Management in the PhilippinesThe Inconvenient Realities of Protected Area Management in the Philippines
The Inconvenient Realities of Protected Area Management in the Philippines
 
MIMAROPA (Region 4B)
MIMAROPA (Region 4B)MIMAROPA (Region 4B)
MIMAROPA (Region 4B)
 
Bukidnon and Misamis Occidental
Bukidnon and Misamis OccidentalBukidnon and Misamis Occidental
Bukidnon and Misamis Occidental
 
region 2 (cagayan valley) province of cagayan and Isabela
 region 2 (cagayan valley) province of cagayan and Isabela region 2 (cagayan valley) province of cagayan and Isabela
region 2 (cagayan valley) province of cagayan and Isabela
 
thephilippineenvironment-150312020049-conversion-gate01(1).pptx
thephilippineenvironment-150312020049-conversion-gate01(1).pptxthephilippineenvironment-150312020049-conversion-gate01(1).pptx
thephilippineenvironment-150312020049-conversion-gate01(1).pptx
 
Palawan - A Clash Between Mining and Biodiversity
Palawan - A Clash Between Mining and BiodiversityPalawan - A Clash Between Mining and Biodiversity
Palawan - A Clash Between Mining and Biodiversity
 
Marine Reserves in the Philippines: Challenges, Success and Perspectives (IWC...
Marine Reserves in the Philippines: Challenges, Success and Perspectives (IWC...Marine Reserves in the Philippines: Challenges, Success and Perspectives (IWC...
Marine Reserves in the Philippines: Challenges, Success and Perspectives (IWC...
 
Region IV-B Mimaropa Geography
Region IV-B Mimaropa GeographyRegion IV-B Mimaropa Geography
Region IV-B Mimaropa Geography
 
Proyect trout
Proyect troutProyect trout
Proyect trout
 

Kürzlich hochgeladen

CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
Abortion pills in Riyadh +966572737505 get cytotec
 
Study Consultants in Lahore || 📞03094429236
Study Consultants in Lahore || 📞03094429236Study Consultants in Lahore || 📞03094429236
Study Consultants in Lahore || 📞03094429236
Sherazi Tours
 
sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sample
Casey Keith
 

Kürzlich hochgeladen (20)

Discover Mathura And Vrindavan A Spritual Journey.pdf
Discover Mathura And Vrindavan A Spritual Journey.pdfDiscover Mathura And Vrindavan A Spritual Journey.pdf
Discover Mathura And Vrindavan A Spritual Journey.pdf
 
Jhargram call girls 📞 8617697112 At Low Cost Cash Payment Booking
Jhargram call girls 📞 8617697112 At Low Cost Cash Payment BookingJhargram call girls 📞 8617697112 At Low Cost Cash Payment Booking
Jhargram call girls 📞 8617697112 At Low Cost Cash Payment Booking
 
08448380779 Call Girls In Chhattarpur Women Seeking Men
08448380779 Call Girls In Chhattarpur Women Seeking Men08448380779 Call Girls In Chhattarpur Women Seeking Men
08448380779 Call Girls In Chhattarpur Women Seeking Men
 
Are Vatican Museum Tickets and Private Tours Worth It
Are Vatican Museum Tickets and Private Tours Worth ItAre Vatican Museum Tickets and Private Tours Worth It
Are Vatican Museum Tickets and Private Tours Worth It
 
Hire 💕 8617697112 Champawat Call Girls Service Call Girls Agency
Hire 💕 8617697112 Champawat Call Girls Service Call Girls AgencyHire 💕 8617697112 Champawat Call Girls Service Call Girls Agency
Hire 💕 8617697112 Champawat Call Girls Service Call Girls Agency
 
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
 
WhatsApp Chat: 📞 8617697112 Independent Call Girls in Darjeeling
WhatsApp Chat: 📞 8617697112 Independent Call Girls in DarjeelingWhatsApp Chat: 📞 8617697112 Independent Call Girls in Darjeeling
WhatsApp Chat: 📞 8617697112 Independent Call Girls in Darjeeling
 
Night 7k to 12k Lahaul and Spiti Call Girls 👉👉 8617697112⭐⭐ 100% Genuine Esco...
Night 7k to 12k Lahaul and Spiti Call Girls 👉👉 8617697112⭐⭐ 100% Genuine Esco...Night 7k to 12k Lahaul and Spiti Call Girls 👉👉 8617697112⭐⭐ 100% Genuine Esco...
Night 7k to 12k Lahaul and Spiti Call Girls 👉👉 8617697112⭐⭐ 100% Genuine Esco...
 
9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris
9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris
9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris
 
Study Consultants in Lahore || 📞03094429236
Study Consultants in Lahore || 📞03094429236Study Consultants in Lahore || 📞03094429236
Study Consultants in Lahore || 📞03094429236
 
"Embark on the Ultimate Adventure: Top 10 Must-Visit Destinations for Thrill-...
"Embark on the Ultimate Adventure: Top 10 Must-Visit Destinations for Thrill-..."Embark on the Ultimate Adventure: Top 10 Must-Visit Destinations for Thrill-...
"Embark on the Ultimate Adventure: Top 10 Must-Visit Destinations for Thrill-...
 
A tour of African gastronomy - World Tourism Organization
A tour of African gastronomy - World Tourism OrganizationA tour of African gastronomy - World Tourism Organization
A tour of African gastronomy - World Tourism Organization
 
WhatsApp Chat: 📞 8617697112 Hire Call Girls Cooch Behar For a Sensual Sex Exp...
WhatsApp Chat: 📞 8617697112 Hire Call Girls Cooch Behar For a Sensual Sex Exp...WhatsApp Chat: 📞 8617697112 Hire Call Girls Cooch Behar For a Sensual Sex Exp...
WhatsApp Chat: 📞 8617697112 Hire Call Girls Cooch Behar For a Sensual Sex Exp...
 
Hire 💕 8617697112 Chamba Call Girls Service Call Girls Agency
Hire 💕 8617697112 Chamba Call Girls Service Call Girls AgencyHire 💕 8617697112 Chamba Call Girls Service Call Girls Agency
Hire 💕 8617697112 Chamba Call Girls Service Call Girls Agency
 
Genuine 8250077686 Hot and Beautiful 💕 Amaravati Escorts call Girls
Genuine 8250077686 Hot and Beautiful 💕 Amaravati Escorts call GirlsGenuine 8250077686 Hot and Beautiful 💕 Amaravati Escorts call Girls
Genuine 8250077686 Hot and Beautiful 💕 Amaravati Escorts call Girls
 
sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sample
 
❤Personal Contact Number Mcleodganj Call Girls 8617697112💦✅.
❤Personal Contact Number Mcleodganj Call Girls 8617697112💦✅.❤Personal Contact Number Mcleodganj Call Girls 8617697112💦✅.
❤Personal Contact Number Mcleodganj Call Girls 8617697112💦✅.
 
08448380779 Call Girls In Shahdara Women Seeking Men
08448380779 Call Girls In Shahdara Women Seeking Men08448380779 Call Girls In Shahdara Women Seeking Men
08448380779 Call Girls In Shahdara Women Seeking Men
 
Top travel agency in panchkula - Best travel agents in panchkula
Top  travel agency in panchkula - Best travel agents in panchkulaTop  travel agency in panchkula - Best travel agents in panchkula
Top travel agency in panchkula - Best travel agents in panchkula
 
Kanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Kanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceKanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Kanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 

48 mw wind power

  • 1. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 2. I. THE MINDORO ADVANTAGE PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 3. 1. Strategic Location o Nearest island to Metro Manila and CALABARZON o Located at the center of the Philippines. Luzon Metro Manila o Oriental Mindoro serves as the main link CALABARZON to Luzon, Visayas and Mindanao thru the Nautical Highway. MINDORO Visayas Mindanao Calapan City Port Dangay Port oin Roxas, Oriental MIndoro PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 4. 2. Geographical Advantage in Size/Area Mindoro is the 7th largest island in the Philippines. Land Area Province ( in sq. km.) Batangas 3,165.80 Cavite 1,287.60 Laguna 1,759 .00 Rizal 1,175.96 Total 7,388.36 Land Area Province ( in sq. km.) Or. Mindoro 4,364.72 Occ. Mindoro 5,879.90 Total 10,224.62 PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 5. 3. Abundant Natural Resources o Oriental Mindoro – with protected watersheds o Rich fertile land suitable to massive agro-industrial development. o Most ideal for agro-eco-tourism (green mountains, clean lakes and rivers, and white sand beaches. o Rich in minerals such as gold, nickel, marble, and others. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 6. 4. Environmental Protection o Preserved watersheds with strong rivers for hydropower, irrigation, and mineral free flow waters. o Comprehensive Land Use Plan that indentifies geo-hazard areas. o Successful implementation of laws against illegal logging, illegal mining, illegal fishing, etc. Free flowing mineral water in the province. o Awarded by Asian Development Bank (ADB) as Most Successful Reforestation Program in the Philippines under Low Income Upland Community Projects (LIUCP). o Naujan Lake (13,000 has.)- the cleanest lake in the Philippines. Naujan Lake is one of the cleanest lakes in the Philippines PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 7. 5. Strong Agro-Industry – To be the Food Basket of the Philippines. o Today, Mindoro is considered as the: 1. Rice Granary of the Philippines. 2. Calamansi King. 3. Banana (cassava variety) King. o Best site for Aquaculture o Best site for upland and lowland farming. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 8. 5. Political Stability and Peace and Order o Good working relationship among National and Local Officials including NGOs. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 9. 6. Infrastructures. o Concrete National Highways o Completed Vital National and Provincial Bridges o Implementation of Flood Mitigation Projects. o Farm to Market Roads. o Schools, Hospitals and Other Facilities for Social Services. o Commercial and Housing Development PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 10. Strong Tourism Potential – To be the Eco-tourism Capital of the Philippines. o Beach Resort Development with about 300 kms. shoreline. o Lake Naujan – cleanest lake in the Philippines o Puerto Galera – Tourism Capital of Oriental Mindoro o Bulalacao – next tourism capital of Mindoro in the south.. o Mt. Halcon – 8,488 ft. above sea level, Temperature; Day : 12-18˚C, Night : 4-12˚C PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 11. List of 35 Waterfalls in Oriental Mindoro 1. Tamaraw Waterfalls, 19. Tabunan Water Falls, 2. Aninuan Water falls, 20. Enchanted Water Falls, 3. Binaybay Water Falls, 21. Bosai Water Falls, 4. Lambingan Water Falls, 22. Campamento Water Falls 5. Agsambalilo Water Falls, 23. Cawa-Cawa Water Falls, 6. Paspasin Water Falls, 24. Walang Langit Water Falls 7. Raymundo Water Falls, 25. Manihala Water Falls, 8. Ibuye Water Falls, 26. Talse(Molo) Water Falls, 9. Kaguinto Water Falls, 27. Tangisan Water Falls, 10. Bayanan Water Falls, 28. Agpayan Water Falls, 11. Lantuyang Water Falls, 29. Campana Water Falls, 12. Paitan Water Falls, 30. Tangisan Water Falls, 13. Arangin Water Falls, 31. Agpayan Water Falls, 14. Karacha Water Falls, 32. Campana Water Falls, 15. Taguan Water Falls, 33. Matang Pugita WaterFalls 16. Arambyaw Water Falls, 34. Cabugno Falls 17. Maradyong Water Falls, 35. Bagong Sikat Falls 18. Talon Water Falls, PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 12. MINDORO VISION 2020 PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 13. Long Term Program Under Mindoro Vision 2020 Food Basket of the Philippines Agro-Eco-Tourism Capital of the Philippines Producer and Exporter of Power and Energy Productive and Self-Reliant People Living in an Ecologically Balanced Environment PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 14. II. OR. MINDORO POWER DEVELOPMENT PROGRAM PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 15. A. Oriental Mindoro Power Demand Forecast 1. Type of Forecast a. ORMECO DEMAND FORECAST Forecast is based on an average minimal increase of power consumption ranging from 4% to 7 % per year. b. ORMINVEST FORECAST Forecast is based on development programs i.e. eco-tourism and agro-industrial development, commercial and housing programs. An estimated increase in power demand is projected at 20% per year. Note: ORMECO - Oriental Mindoro Electric Cooperative ORMINVEST – Oriental Mindoro Investments, Inc. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 16. Oriental Mindoro Projected Demand for Power ORMECO ORMINVEST Year FORECAST GROWTH FORECAST GROWTH 2010 28.56MW 28.56MW 2011 30.37MW 6.35% 34.27MW 20.00% 2012 32.51MW 7.04% 41.13MW 20.00% 2013 34.64MW 6.58% 49.35MW 20.00% 2014 36.78MW 6.17% 59.22MW 20.00% 2015 38.92MW 5.81% 71.07MW 20.00% 2016 41.06MW 5.59% 85.28MW 20.00% 2017 43.19MW 5.21% 102.34MW 20.00% 2018 45.33MW 4.95% 122.80MW 20.00% 2019 47.47MW 4.72% 147.36MW 20.00% 2020 49.74MW 4.72% 176.84MW 20.00% PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 17. B. Alternative Sources of Renewable Energy A. HYDRO POWER: San Teodoro 50 MW Baco 25 MW Naujan 20 MW Victoria 25 MW Bongabong 20 MW Bansud 10 MW Occidental Mindoro, 20 MW Combined Capacity 160 MW Note: 39 WATERFALLS HAVE YET TO BE B. WIND EXPLORED FOR HYDROPOWER PROJECT. POWER: c Puerto Galera power resources.48MW for hydro c Victoria 20 MW Bulalacao 40- 70 MW c Abra de Ilog 10- 20 MW Combined Capacity 118-158 MW C. GEO-THERMAL: Naujan 20- 70 MW RENEWABLE ENERGY SITES GRAND TOTAL 300-388 MW PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 18. III. MINDORO POWER PROGRAM DEVELOPMENT UPDATES PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 19. 1) Electrification Level in Oriental Mindoro (As of October, 2011) Barangays Sitios City/Municipality UnEnergize Potential Energized % Potential Energized % d Calapan City 62 62 100 347 337 97.12 10 Naujan 70 70 100 403 320 79.40 69 Victoria 32 32 100 195 157 80.51 38 Baco 27 27 100 157 117 74.52 40 San Teodoro 8 8 100 69 35 50.72 34 Puerto Galera 13 13 100 74 41 55.41 29 Socorro 26 26 100 175 123 70.29 52 Pola 23 23 100 153 93 60.78 62 Pinamalayan 37 37 100 237 192 81.01 45 Gloria 27 27 100 189 131 69.31 58 Bansud 13 13 100 92 43 46.74 42 Bongabong 36 36 100 224 131 58.48 81 Roxas 20 20 100 135 111 82.96 12 Mansalay 17 17 100 77 44 57.14 22 Bulalacao 15 15 100 48 27 56.25 21 Totals 426 426 100 2575 1903 73.90 613 Source: ORMECO, Inc. Note: All 426 Barangays are energized. However, Electricity Rates as of April, 2012: 26.10% of all the 2,575 Sitios are still unenergized. Commercial P11.43/kwh Public Buildings P11.15/kwh Pres. Aquino promised to fully energized the Residential P12.42/kwh Street Lights P13.24/kwh province by 2016. Industrial P11.04/kwh PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 20. 2) 4.2 MW Hydro Power Project in San Teodoro, Or. Mindoro. LINAW-KAWAYAN MINI-HYDRO POWER PLANT Development Bank of the Philippines (DBP) Loan extended to ORMECO. Photo was taken during the Groundbreaking Ceremony. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 21. BLESSING AND RIBBON CUTTING (MARCH 2, 2012) 2.1 MEGAWATTS LINAW-KAWAYAN MINI-HYDRO PROJECT AT SAN-TEODORO, ORIENTAL MINDORO. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 22. CEREMONIAL SWITCH ON 2.1 MEGAWATTS LINAW-KAWAYAN MINI-HYDRO PROJECT AT SAN-TEODORO, ORIENTAL MINDORO. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 23. CEREMONIAL SWITCH ON with PRES. AQUINO and Sec. ALMENDRAS 2.1 MEGAWATTS LINAW-KAWAYAN MINI-HYDRO PROJECT CEREMONIAL SWITCH ON - MARCH 02, 2012 Other Officials: CONG RGV, GOV. BOY UMALI, CONG. REY UMALI, AND OTHERS. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 24. 3. Diesel Bunker Power at Calapan City 6.4 MW A P400 MILLION POWER DEVELOPMENT IN 2011 PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 25. 4. Batangas-Mindoro Submarine Cable Project Under H.R. No. 56 PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 26. APPLICATION OF NGCP TO ERC Filed: August 1, 2011 with ERC Case No. 2011-108 Supported bY: H.R. No. 56 by: Hon. RGV  Resolution No. 11-41 of Board of Directors, ORMECO Resolution No. 36-2011 of Boar d of Directors, OMECO NGCP has included the Project under the name “Luzon-Mindoro Interconnection Project” as part of 2009-2010 Transmission Development Plan. PAGE 3 PAGE 2 1 PAGE
  • 27. APPLICATION OF NGCP TO ERC Based on DOE, about 203 MW generation capacity is targeted to be installed in Mindoro up to year 2016. Interconnection Scheme: 1)Via Batangas – 230 KV Substation 2)Via Ilijan – 500 KV Sub-station NGCP proposes Option 1 – 230 KV via Batangas with a project cost estimate of P10.99 Billion. PAGE 3 PAGE 4
  • 28. APPLICATION OF NGCP TO ERC NGCP prays for ERC to: 1)Issue Provisional Authority to Implement BMIP 2)Approve the Application for Implementation of BMIP
  • 29. Batangas-Mindoro Submarine Cable Project Under H.R. No. 56 4. Project Benefits: a. Reliability of Power Supply in Mindoro will improve b. Cheaper Power for All c. Mindoro Grid will become part of NGCP Operation thus will strengthen the Transmission d. Mindoro will become conducive for expanding business in tourism, manufacturing and other industries thereby improving the economy of the island. e. Possible development of coal-fired power plants since Mindoro is rich in coal resources. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 30. Batangas-Mindoro Submarine Cable Project Under H.R. No. 56 PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 31. LATEST DEVELOPMENTS PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 32. LATEST DEVELOPMENTS PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 33. LATEST DEVELOPMENTS PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 34. IV. MINDORO RENEWABLE ENERGY PROGRAM, IN SUPPORT TO NATIONAL POWER PROGRAM OF PRES. AQUINO. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 35. 1. The Mindanao Power Crisis. o Higher Electricity Cost or No Electricity. o Power Supply deficit up to 270 MW o Earliest to set up new power plant, 2014. o Problem could have been prevented if gov’t decided to invest in RENEWABLE ENERGY – Sen. Angara. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 36. 2. Power outrage also seen in Visayas. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 37. 3. The LUZON Power Crisis NEXT PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 38. 4. Like Mindanao, Luzon will experience power shortage. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 39. 5. Luzon Grid needs more Power Sources. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 40. 6. Renewable Enengy, primary and immediate solution to nation’s power crisis.. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 41. 7. Mindoro Renewable Energy, One of the Reliable Sources. o Based on DOE, about 203 MW to be installed in Mindoro Island by Year 2016. o Mindoro Island excess power capacity can be exported to Main Luzon Grid. o Mindoro Island has still other sources of Renewable Energy like: a. 35 Waterfalls, c b. other sources to be explored c i.e.: coal and biomass. c LEGEND: SITES OF RENEWABLE ENERGYSOURCES PROPOSED SUBMARINE CABLE PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 42. Mindoro’s Renewable Energy Resources in Support to Pres. Aquino’s Power Development Program PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 43. Mindoro’s Renewable Energy Resources in Support to Pres. Aquino’s Power Development Program PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 44. The 48 MW WIND ENERGY PROJECT PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 45. Project Background 1. A long 7 Years Process Dec., 2010. Meeting with House of Representative, Department of Energy, National Power Corporation, Contractor and Italian Ambassador Luca Fernari. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 46. Project Background 2. Finally Approved under Sec. Jose Rene D. Almendras Signing of Service Contract for 16MW Wind Power ProjectBy Energy Sec. Jose Rene D. Almendras, Cong Rodolfo G. Valencia , Gov. Alfonso V. Umali, and CMC Asia Chairman Andy de Rossi with Congress Chief of Staff Nico Valencia and Nicky Villaseñor, PHESI President PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 47. Latest Development Signing of MOA between PHESI, CMC-ASIA and GAMESA EOLICA S.L. UNIPERSONAL, witnessed by Vice President JEJOMAR BINAY, Cong. RGV, Gov. Umali, Cong. Umali and other LGUs. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 48. Latest Development Signing of ESA with Oriental Mindoro Electric Cooperative. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 49. Latest Development Official Signing and Awarding Ceremony, Shangri-la Hotel, Makati. PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58. Philippine Hybrid Energy Systems, Inc. Unit 2406, 24/F The Orient Square Bldg., Emerald Ave., Ortigas Center, Pasig City Tel: +63 2 638 2801, +63 2 638 8901 to 02 Fax: +63 2 638 8899
  • 59. JETTY •A Jetty has been designed (armor rock plus a concrete) to SPECIFICATION Dimension: 35 meters width (W); 45 meters length (L)
  • 61. • The Access Road has been designed to achieve and compromise the high slopes of the terrain from the Jetty to the wind farm site. SPECIFICATION Length: 4.45 km (approximate) Width: 5 meters; maximum of 10 meters on curves • Typical Section: 0.35 meter thick of aggregate (compacted); if slope is over 10%, 50 mm thick of asphalt runway will be considered.
  • 63. • The Internal Roads have been designed achieving a compromise between the high slopes of the terrain and the amount of soil to be removed. All the roads from the position of WTG # 1 to WTG # 8 are considered internal roads. SPECIFICATION Length: 7 segments @ 200 meters per segment (approximate) Width: 10 meters (6 meters plus 2 meters sidetrack, both sides) Typical Section: 0.35 meter thick of aggregate (compacted); if slope is over 10%, 50 mm thick of asphalt runway will be considered.
  • 64. PHASE 2 & 3 LAYOUT
  • 65. WIND TURBINE Gamesa G8X -2.0 MW Wind Vane Anemometer
  • 66. • Wind turbine of the Gamesa G8X-2.0MW platform are of the three-bladed wind-facing rotor type with a nominal power of 2.0 MW. • It consists of three major parts: TOWER, NACELLE, and BLADES. • Wind Turbines have an instrument on top of the nacelle, an anemometer and wind vane, which respectively measure wind speed and direction. • When the wind changes direction the motors turn the nacelle and the blades, directly facing the wind.
  • 67. Properties of the Model ROTOR Diameter 80 m Swept area 5,027 m² Rotational speed 9.0 - 19.0 rpm BLADES Number of blades 3 Length 39 m Airfoils NACA 63. XXX - FFA-W3 Material Pre-impregnated epoxy glass fiber TOWER Type Modular Height 60, 67, 78 and 100m GEAR BOX 1 planetary stage Type 2 parallel stages 1:100,5 (50Hz) Ratio 1:120,5 (60Hz)
  • 68. GENERATOR 2.0 MW Type Doubly-fed machine Rated power 2.0 MW Voltage 690 V AC Frequency 50 Hz / 60Hz Potection class IP 54 Power factor 0.95 CAP - 0.95 IND throughout the power range
  • 69. TOWERS • The wind turbine tower is made of tubular steel, in a truncated conical shape, divided into four sections. • Includes platforms, ladders, and emergency lighting. • Includes a cable guided elevator for easy maintenance of the wind turbine.
  • 70. TOWER FOUNDATION Specifications: • The tower foundation will be a squared size 15.84m x 15.84m x 1.46m concrete pad. • Foundation ring (diameter = 4.037) is embedded from the surface of pedestal ; whereas the pedestal (with dimensions of 8.449 m in diameter & 2.15m in thickness) is connected to the pad through vertical armors.
  • 71. Transporting of Towers Erection of Towers
  • 72. NACELLE • The nacelle is a cover housing that holds all the generating component in a wind turbine, including the generator, gearbox, drive train and brake assembly. • The dimension of the nacelle is approximately 10.6m x 3.4m x 3.6m. Its weight is approximately 70 tons. • Contains 800kg service crane with lifting capacity up to 8000kg
  • 73. Conveying of Nacelle Installation of Nacelle
  • 74. BLADES • The blades in wind turbines of the Gamesa G8x-2.0MW platform are manufactured in an organic matrix composite and reinforced with fiber glass or carbon fiber, which provide the necessary rigidity without increasing the weight of the blades. • The length of the blade is 39 meters • The blades come with the necessary drains to prevent water being retained inside, which can cause imbalance or structural damage due to water vaporization upon lightning striking them.
  • 75. Transporting of Blades Installation of three-blades
  • 76. SUBSTATION • A 20MVA 22.8/69 kV substation will be built in order to increase the voltage to transmission levels. • Medium Voltage facilities will have two vacuum circuit breakers for two feeders, and one circuit breaker for spare. A Fused Load Breaker Switch (FLBS) will protect the auxiliary facilities of the substation. • A 69/22.8 kV, 20 MVA power transformer will be installed. The neutral in the high voltage side will be solidly connected to earth.
  • 77. • High voltage output will be connected to the transmission line through a SF6 circuit breaker and a disconnector switch. • DNP3 will be the substation communication bus • Three Winding Phase Shihlin electric generator step-up transformer
  • 78. omposed of the following main bays: A On A On
  • 79. 24 kV Equipment • Installed inside the control building of the substation • Single Busbar  Composition of Busbar:  Switchgear Cabinet for power transformer protection  Switchgear Cabinets to connect the wind turbines circuits  Switchgear Cabinets for auxiliary services transformer protection  Spare Switchgear cabinet for possible future expansions  Ground reactor bay  Voltage Measurement  Lightning arresters
  • 80. Transmission Line • Single circuit, 4.5 m length, 69 kV line will join the substation and the connection point. • 200mm2 Aluminum Conductor Steel Reinforced cable will be used. • 17 poles will be used to hold up the cables. Install a pole close to the substation for the line termination. Another pole near the metering facilities will be installed to perform the same function.
  • 81. Metering Interconnection Station • Equipped with metering equipment to measure the flow of electricity in both directions at the same rate • Has a SF6 circuit breaker and a disconnector switch.
  • 82. END OF TECHNICAL PRESENTATION
  • 83. ACKNOWLEDGEMENTS o H.E. BENIGNO S. AQUINO, III o SEC. JOSE RENE D. ALMENDRAS, DOE o CONGRESS OF THE PHILIPPINES o PROVINCIAL GOVERNMENT OF OR. MINDORO o SANGGUNIANG PANLALAWIGAN o PUERTO GALERA LOCAL GOVERNMENT o OR. MINDORO ELECTRIC COOPERATIVE o NATIONAL POWER CORPORATION o NATIONAL ELECTRIFICATION AUTHORITY o ITALIAN EMBASSY o CMC-ASIA, INC. o ORMINVEST FOUNDATION, INC. o K4 ORIENTAL MINDORO COUNCIL, INC. . . . and the MINDOREÑOS! PUERTO GALERA, ORIENTAL MINDORO, PHILIPPINES PHASE 1 – 16 MW
  • 84. PARA SA MAUNLAD NA MINDORO! HON. RODOLFO G. VALENCIA NICO P. VALENCIA Congressman, President First District, Oriental Mindoro K4 Oriental Mindoro council, Inc.