PROJECT PROGRESS REPORT
                                As of June 2012

Project Title: Kabugao-Pudtol-Luna-Cagayan Boundary Road
Implementing Agency: Department of Public Works and Highways - CAR
Donor:          (x) GOP                   Loan/Grant Proceeds:
                ( ) Loan                  Peso Counterpart:
                ( ) Grant                 Total Project Cost:  P 58.827 M
Location/Area             Apayao Province
Coverage:
Description:

The road is a major component of the Cordillera Roads Improvement Project (CRIP)
as the northern tip of the regional backbone. It traverses the municipalities of
Kabugao, Pudtol and Luna in Apayao and turns east to Abulog in Cagayan.

The Kabugao-Pudtol-Luna-Abulug Road (95.7 km) directly links the capital town
Kabugao to lower Apayao. The road starts at junction Lenneng along the Kabugao-
Conner-Abbut Road and going north-east traverses municipalities of Kabugao, Pudtol
and Luna and ends at Junction Luna in Abulug, Cagayan along the Pan-Philippine
Highway.    The Pan-Philippine Highway connects Laoag, Ilocos Norte and
Tuguegarao, Cagayan.

The bridge construction across Maton and Nagan Rivers has been completed. These
rivers are major tributaries of Apayao River.

The gap at the Kabugao side (19.359 km.), traverses a rugged mountainous terrain,
then slowly goes down to the Paco Valley, which was then proposed as government
center. The road will also traverse the Mataguisi Valley in Pudtol. The valleys have
vast potential for agricultural production. While, Luna, is the location of the new
provincial capitol.

The specific project output is road construction of 2.873 kms.

Project Duration:          Start: February 20, 2012 End: October 16, 2012
                                 PROJECT PROGRESS
 For CY 2012        AO 1 Quarter AO 2nd Quarter AO 3rd Quarter AO 4th Quarter
                        st

Target                  5%               50%
Actual                  5%              35.7%
Slippage
Cumulative Status:              Status              Physical           Financial
(Since start of           Target                      55%
project)                  Actual                     40.70%             31.18%
                          Slippage                  (14.3%)


                                                      2nd Quarter RPMES Report CY 2012
Current
Implementation
Issues and/or
Problems
Encountered (if any):
Actions Taken/
Recommendations:

Remarks:                Memo (Nov. 3, 2011) from Secretary Singson:
                        Approved for upgrading from Secondary to Arterial Road
Agency Contact          DIR. EDILBERTO P. CARABBACAN
Person:                 Regional Director, DPWH – CAR
                        Engineer’s Hill
                        2600 Baguio City
                        Tel. 444-8838




                                                        2nd Quarter RPMES Report CY 2012
Project Location




                                Kabugao-Pudtol-Luna
                                 Cagayan Bdry Road




                        New Apayao Provincial
                           Capitol in Luna




Landmarks

                   2nd Quarter RPMES Report CY 2012
Kabugao-Pudtol-Luna Cagayan Bdry. Road


                                     Mataguisi Valley




 Babulayan Bridge across
      Apayao River




  Junction Lenneng                  Paco Valley
     (Kabugao)




                           2nd Quarter RPMES Report CY 2012

Weitere ähnliche Inhalte

Andere mochten auch

Andere mochten auch (7)

Pantawid Pamiliyang Pilipino Program - Conditional Cash Transfer (The Philipp...
Pantawid Pamiliyang Pilipino Program - Conditional Cash Transfer (The Philipp...Pantawid Pamiliyang Pilipino Program - Conditional Cash Transfer (The Philipp...
Pantawid Pamiliyang Pilipino Program - Conditional Cash Transfer (The Philipp...
 
4 p's
4 p's4 p's
4 p's
 
2 pantawid pamilya orientation
2   pantawid pamilya orientation2   pantawid pamilya orientation
2 pantawid pamilya orientation
 
The Impact of 4P's in Tagbina II District
The Impact of 4P's in Tagbina II DistrictThe Impact of 4P's in Tagbina II District
The Impact of 4P's in Tagbina II District
 
Pantawid Pamilyang Pilipino Program
Pantawid Pamilyang Pilipino ProgramPantawid Pamilyang Pilipino Program
Pantawid Pamilyang Pilipino Program
 
4 p's in the Philippines
4 p's in the Philippines4 p's in the Philippines
4 p's in the Philippines
 
D S W D Orientation
D S W D  OrientationD S W D  Orientation
D S W D Orientation
 

Ähnlich wie Dpwh kabugao pudtol_2nd qtr_f

Kabugao (Apayao)-Solsona (Ilocos Norte) Road
Kabugao (Apayao)-Solsona (Ilocos Norte) RoadKabugao (Apayao)-Solsona (Ilocos Norte) Road
Kabugao (Apayao)-Solsona (Ilocos Norte) RoadRdc Cordillera
 
Dar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_fDar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_fRdc Cordillera
 
ARISP III Inspection Report
ARISP III Inspection ReportARISP III Inspection Report
ARISP III Inspection ReportRdc Cordillera
 
Summary of priority sectoral program projects
Summary of priority sectoral program projectsSummary of priority sectoral program projects
Summary of priority sectoral program projectsRdc Cordillera
 
UPDATES ON 14 DREDGING SITES AROUND MAYON.pptx
UPDATES ON 14 DREDGING SITES AROUND MAYON.pptxUPDATES ON 14 DREDGING SITES AROUND MAYON.pptx
UPDATES ON 14 DREDGING SITES AROUND MAYON.pptxBerpOnrubia
 
Federal Capital Territory Administration
Federal  Capital Territory AdministrationFederal  Capital Territory Administration
Federal Capital Territory AdministrationTransformNG
 
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...FMINigeria
 
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...Nigeria Centenary
 
Ministry of works mid term performance report
Ministry of works mid term performance reportMinistry of works mid term performance report
Ministry of works mid term performance reportTransformNG
 
Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013
Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013
Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013FMINigeria
 
Civil society perspectives on uganda transport sector prospects
Civil society perspectives on uganda transport sector prospectsCivil society perspectives on uganda transport sector prospects
Civil society perspectives on uganda transport sector prospectsStewart Mutabazi
 
Institutional changes in peri urban areas a ase of bopal ghuma nagarplaika 1
Institutional changes in peri urban areas  a ase of bopal ghuma nagarplaika 1Institutional changes in peri urban areas  a ase of bopal ghuma nagarplaika 1
Institutional changes in peri urban areas a ase of bopal ghuma nagarplaika 1Riddhi Vakharia
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Oswar Mungkasa
 

Ähnlich wie Dpwh kabugao pudtol_2nd qtr_f (19)

Kabugao (Apayao)-Solsona (Ilocos Norte) Road
Kabugao (Apayao)-Solsona (Ilocos Norte) RoadKabugao (Apayao)-Solsona (Ilocos Norte) Road
Kabugao (Apayao)-Solsona (Ilocos Norte) Road
 
Dar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_fDar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_f
 
2nd qtr rpmes 2013
2nd qtr rpmes 20132nd qtr rpmes 2013
2nd qtr rpmes 2013
 
ARISP III Inspection Report
ARISP III Inspection ReportARISP III Inspection Report
ARISP III Inspection Report
 
Da charmp 2 2nd qtr_f
Da charmp 2 2nd qtr_fDa charmp 2 2nd qtr_f
Da charmp 2 2nd qtr_f
 
3rd qtr rpmes report
3rd qtr rpmes report3rd qtr rpmes report
3rd qtr rpmes report
 
Castaneda-29
Castaneda-29Castaneda-29
Castaneda-29
 
Summary of priority sectoral program projects
Summary of priority sectoral program projectsSummary of priority sectoral program projects
Summary of priority sectoral program projects
 
UPDATES ON 14 DREDGING SITES AROUND MAYON.pptx
UPDATES ON 14 DREDGING SITES AROUND MAYON.pptxUPDATES ON 14 DREDGING SITES AROUND MAYON.pptx
UPDATES ON 14 DREDGING SITES AROUND MAYON.pptx
 
Federal Capital Territory Administration
Federal  Capital Territory AdministrationFederal  Capital Territory Administration
Federal Capital Territory Administration
 
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
 
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
 
1st qtr rpmes 2013
1st qtr rpmes 20131st qtr rpmes 2013
1st qtr rpmes 2013
 
Ministry of works mid term performance report
Ministry of works mid term performance reportMinistry of works mid term performance report
Ministry of works mid term performance report
 
Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013
Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013
Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013
 
Civil society perspectives on uganda transport sector prospects
Civil society perspectives on uganda transport sector prospectsCivil society perspectives on uganda transport sector prospects
Civil society perspectives on uganda transport sector prospects
 
Institutional changes in peri urban areas a ase of bopal ghuma nagarplaika 1
Institutional changes in peri urban areas  a ase of bopal ghuma nagarplaika 1Institutional changes in peri urban areas  a ase of bopal ghuma nagarplaika 1
Institutional changes in peri urban areas a ase of bopal ghuma nagarplaika 1
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
 
SAP FY23 - COAH.ppt
SAP FY23 - COAH.pptSAP FY23 - COAH.ppt
SAP FY23 - COAH.ppt
 

Mehr von Rdc Cordillera

Search for cordillera champions
Search for cordillera championsSearch for cordillera champions
Search for cordillera championsRdc Cordillera
 
Dep ed red & black school buildngs_2nd qtr_f
Dep ed red & black school buildngs_2nd qtr_fDep ed red & black school buildngs_2nd qtr_f
Dep ed red & black school buildngs_2nd qtr_fRdc Cordillera
 
Doh local health system 2nd_qtr_f
Doh local health system 2nd_qtr_fDoh local health system 2nd_qtr_f
Doh local health system 2nd_qtr_fRdc Cordillera
 
2nd qtr major program projects
2nd qtr major program projects2nd qtr major program projects
2nd qtr major program projectsRdc Cordillera
 
State of the Nation Address 2012
State of the Nation Address 2012State of the Nation Address 2012
State of the Nation Address 2012Rdc Cordillera
 
State of the region address cordillera administrative region
State of the region address   cordillera administrative regionState of the region address   cordillera administrative region
State of the region address cordillera administrative regionRdc Cordillera
 
Summary of programs and projects as of first quarter 2012
Summary of programs and projects as of first quarter 2012Summary of programs and projects as of first quarter 2012
Summary of programs and projects as of first quarter 2012Rdc Cordillera
 
Red and black schoolbuilding program inspection report
Red and black schoolbuilding program inspection reportRed and black schoolbuilding program inspection report
Red and black schoolbuilding program inspection reportRdc Cordillera
 
National greening program inspection report
National greening program inspection reportNational greening program inspection report
National greening program inspection reportRdc Cordillera
 
2012 rpmc inspection reports
2012 rpmc inspection reports2012 rpmc inspection reports
2012 rpmc inspection reportsRdc Cordillera
 

Mehr von Rdc Cordillera (20)

2012 yearend report
2012 yearend report2012 yearend report
2012 yearend report
 
2nd qtr rpmes report
2nd qtr rpmes report2nd qtr rpmes report
2nd qtr rpmes report
 
2nd qtr rpmes report
2nd qtr rpmes report2nd qtr rpmes report
2nd qtr rpmes report
 
1st qtr rpmes report
1st qtr rpmes report1st qtr rpmes report
1st qtr rpmes report
 
Search for cordillera champions
Search for cordillera championsSearch for cordillera champions
Search for cordillera champions
 
Nomination form
Nomination formNomination form
Nomination form
 
Vacaciesjan2012 1
Vacaciesjan2012 1Vacaciesjan2012 1
Vacaciesjan2012 1
 
2nd qtr rpmes 2012
2nd qtr rpmes 20122nd qtr rpmes 2012
2nd qtr rpmes 2012
 
2nd qtr rpmes 2012
2nd qtr rpmes 20122nd qtr rpmes 2012
2nd qtr rpmes 2012
 
Dep ed red & black school buildngs_2nd qtr_f
Dep ed red & black school buildngs_2nd qtr_fDep ed red & black school buildngs_2nd qtr_f
Dep ed red & black school buildngs_2nd qtr_f
 
Doh local health system 2nd_qtr_f
Doh local health system 2nd_qtr_fDoh local health system 2nd_qtr_f
Doh local health system 2nd_qtr_f
 
Dswd 4 ps_2nd qtr_f
Dswd 4 ps_2nd qtr_fDswd 4 ps_2nd qtr_f
Dswd 4 ps_2nd qtr_f
 
Denr ngp 2nd qtr_f
Denr ngp 2nd qtr_fDenr ngp 2nd qtr_f
Denr ngp 2nd qtr_f
 
2nd qtr major program projects
2nd qtr major program projects2nd qtr major program projects
2nd qtr major program projects
 
State of the Nation Address 2012
State of the Nation Address 2012State of the Nation Address 2012
State of the Nation Address 2012
 
State of the region address cordillera administrative region
State of the region address   cordillera administrative regionState of the region address   cordillera administrative region
State of the region address cordillera administrative region
 
Summary of programs and projects as of first quarter 2012
Summary of programs and projects as of first quarter 2012Summary of programs and projects as of first quarter 2012
Summary of programs and projects as of first quarter 2012
 
Red and black schoolbuilding program inspection report
Red and black schoolbuilding program inspection reportRed and black schoolbuilding program inspection report
Red and black schoolbuilding program inspection report
 
National greening program inspection report
National greening program inspection reportNational greening program inspection report
National greening program inspection report
 
2012 rpmc inspection reports
2012 rpmc inspection reports2012 rpmc inspection reports
2012 rpmc inspection reports
 

Dpwh kabugao pudtol_2nd qtr_f

  • 1. PROJECT PROGRESS REPORT As of June 2012 Project Title: Kabugao-Pudtol-Luna-Cagayan Boundary Road Implementing Agency: Department of Public Works and Highways - CAR Donor: (x) GOP Loan/Grant Proceeds: ( ) Loan Peso Counterpart: ( ) Grant Total Project Cost: P 58.827 M Location/Area Apayao Province Coverage: Description: The road is a major component of the Cordillera Roads Improvement Project (CRIP) as the northern tip of the regional backbone. It traverses the municipalities of Kabugao, Pudtol and Luna in Apayao and turns east to Abulog in Cagayan. The Kabugao-Pudtol-Luna-Abulug Road (95.7 km) directly links the capital town Kabugao to lower Apayao. The road starts at junction Lenneng along the Kabugao- Conner-Abbut Road and going north-east traverses municipalities of Kabugao, Pudtol and Luna and ends at Junction Luna in Abulug, Cagayan along the Pan-Philippine Highway. The Pan-Philippine Highway connects Laoag, Ilocos Norte and Tuguegarao, Cagayan. The bridge construction across Maton and Nagan Rivers has been completed. These rivers are major tributaries of Apayao River. The gap at the Kabugao side (19.359 km.), traverses a rugged mountainous terrain, then slowly goes down to the Paco Valley, which was then proposed as government center. The road will also traverse the Mataguisi Valley in Pudtol. The valleys have vast potential for agricultural production. While, Luna, is the location of the new provincial capitol. The specific project output is road construction of 2.873 kms. Project Duration: Start: February 20, 2012 End: October 16, 2012 PROJECT PROGRESS For CY 2012 AO 1 Quarter AO 2nd Quarter AO 3rd Quarter AO 4th Quarter st Target 5% 50% Actual 5% 35.7% Slippage Cumulative Status: Status Physical Financial (Since start of Target 55% project) Actual 40.70% 31.18% Slippage (14.3%) 2nd Quarter RPMES Report CY 2012
  • 2. Current Implementation Issues and/or Problems Encountered (if any): Actions Taken/ Recommendations: Remarks: Memo (Nov. 3, 2011) from Secretary Singson: Approved for upgrading from Secondary to Arterial Road Agency Contact DIR. EDILBERTO P. CARABBACAN Person: Regional Director, DPWH – CAR Engineer’s Hill 2600 Baguio City Tel. 444-8838 2nd Quarter RPMES Report CY 2012
  • 3. Project Location Kabugao-Pudtol-Luna Cagayan Bdry Road New Apayao Provincial Capitol in Luna Landmarks 2nd Quarter RPMES Report CY 2012
  • 4. Kabugao-Pudtol-Luna Cagayan Bdry. Road Mataguisi Valley Babulayan Bridge across Apayao River Junction Lenneng Paco Valley (Kabugao) 2nd Quarter RPMES Report CY 2012