Federal Funding 101
Rail-Volution
Minneapolis, Minnesota
September 22, 2014
Jeffrey F. Boothe
202.828.1896/jeff.boothe@hklaw.com
Annual Budget Process - Authority
• Congress is granted the “power of the purse,” or the ability to tax and
spend public dollars for the federal government under the Constitution.
– “All bills for raising Revenue shall originate in the House of
Representatives; but the Senate may propose or concur with
amendments as on other Bills.”
• Constitution also requires an appropriations process to take place
before money can be spent.
– “No money shall be drawn from the Treasury, but in Consequence of
Appropriations made by Law; and a regular Statement and Account
of the Receipts and Expenditures of all public Money shall be
published from time to time.”
• House and Senate have adopted rules prescribing a two-step
authorization-appropriation process.
2
Annual Budget Process - Terminology
• Authorization: authorizes the appropriation of funds for agencies, programs, and
government functions. Purpose is to set parameters for spending.
• Appropriation: confers actual authority to incur obligations.
• Budget Resolution: sets spending ceilings for the upcoming fiscal year.
• Types of Appropriations Measures:
– Regular Appropriations: must be enacted before the new fiscal year on October 1;
provides funding for fiscal year during typical process.
– Continuing Resolution: extends previous fiscal year funding in the absence of
regular appropriations, generally until regular bills are enacted.
– Supplemental Appropriations: provides additional appropriations during a fiscal year,
outside of the normal process.
– Omnibus Appropriations: a combined package of regular appropriations bills used to
consider a number of separate measures all at once.
• Types of Outlays:
– Direct (Mandatory): spending controlled by permanent laws, outside of the normal
appropriations process. Examples: Medicare, Medicaid, unemployment insurance.
– Discretionary: spending controlled through annual appropriations bills.
3
Annual Budget Process - Cycle
President Submits Budget Request to Congress
House and Senate Pass Budget Resolutions
House and Senate Appropriations Subcommittees
and Committees Markup Appropriations Bills
House and Senate Vote on Bills and Reconcile
Differences
President Signs Appropriations Bills Into Law
4
Annual Budget Process - President’s Budget
5
• Required by law to submit annual budget for upcoming fiscal
year no later than the first Monday in February of each year
– Congress may grant extensions on this deadline.
• The president’s submission to Congress initiates the annual
budget process.
• Budget is prepared by the Office of Management and Budget
(OMB).
• The President’s budget is a request and has no binding
authority on Congress.
• The President’s budget is used to detail administration policies
and priorities, while creating, modifying, or removing certain
programs and funding for agencies.
• DOT announces budget and FTA release project
recommendations
Annual Budget Process - Budget Resolution
6
• Congressional Budget and Impoundment Control Act of 1974
requires Congress to adopt an annual budget resolution.
• Purpose is to establish the total level of discretionary funding for
the fiscal year, which must cover at least five fiscal years.
• Also allocates federal spending among 20 major functional
categories of the federal budget, such as transportation.
• The Congressional Budget Act establishes April 15 as a target
for adoption of a budget resolution.
• After Congress adopts a budget resolution, all mandatory and
discretionary spending levels are allocated to the appropriate
Committees, in what are known as a “302(a) allocation.”
Annual Budget Process - Committee Activity
7
• There are 12 subcommittees under the House and Senate Committees on
Appropriations:
• Appropriations Committees further divide 302(a) allocations among each
subcommittee, known as 302(b) allocations, which further limit the total
spending on each bill.
Subcommittee
Consideration
and Markup
Report to Full
Appropriations
Committee
Full Committee
Consideration
and Markup
Floor Action
Agriculture, Rural
Development
Financial Services and
General Government
Legislative Branch
Commerce, Justice and
Science
Homeland Security Military Construction and
Veterans Affairs
Defense Interior and Environment State and Foreign Operations
Energy and Water
Development
Labor, Health and Human
Services, and Education
Transportation, Housing and
Urban Development
Annual Budget Process - Reconciliation
• After passing each appropriations bill, the House and Senate will go to
conference to reconcile any differences.
• Differences are negotiated by conferees or managers.
• Conferees or managers generally consist of members from the respective
House and Senate appropriations subcommittees, and the chair and ranking
minority Members of the full committees.
• Must remain within scope during negotiations: House and Senate rules
prevent conferees from (1) altering identical text in each bill, or (2) adding new
matter that was not included in either bill. However, these rules can sometimes
be waived.
• Once reconciled, bill is sent to the President for signature.
– President has 10 days to sign or veto the measure. If no action taken, bill
automatically becomes law at the end of a 10-day period that Congress is in
session.
– President may veto bill, which can only be overruled by Congress by a two-
thirds vote in both chambers.
8
Annual Budget Process - Timeline
February
• President submits budget proposal to Congress
April 15
• Congress adopts a budget resolution
May/June
• Appropriations Committees Begin Reporting Bills
Late July
• House and Senate finish considering appropriations bills
Fall/
Winter
• House and Senate reconcile, send bills to President
October 1
• New Fiscal Year Begins
9
Annual Budget Process - Outlook
10
• Congress has repeatedly failed to progress through a
typical appropriations process for years.
• Instead, Congress has adopted continuing resolutions and
omnibus appropriations measures in order to keep the
government funded.
– Still, partisan differences resulted in a government
shutdown in October 2013 that lasted 16 days.
• Another continuing resolution was adopted this past week
for fiscal year 2015 with expectation of Omnibus Bill in
December.
• It is unclear when Congress may once again return to a
normal process and enact appropriations measures in a
timely and bipartisan fashion.
Surface Transportation Authorization
• Congress must adopt legislation that authorizes funding for highways,
transit and the safety programs
– Moving Ahead for Progress in the 21st Century (MAP-21) signed into law in
July 2012
– MAP-21 was a two year bill recently extended by Congress until May 2015
by the transfer of General Funds (GF) to the Highway Trust Fund (HTF)
• HTF relies on 18.4 cent gasoline tax of which 2.86 cents are deposited
into the Mass Transit Account (MTA)
– Starting in 2008, Congress has been required to transfer monies from GF to
the HTF that have been offset by changes in tax law
• Highway programs funded entirely from HTF
• Mass Transit funded by a combination of funds from MTA and the GF
– Formula programs funded from MTA
– Capital Investment Grants, FTA Administration and Research programs
funded from GF
11
Federal Highway Programs
12
Availability of Highway Flex Monies
• MAP-21 retains provisions to flex monies to transit from STP and
CMAQ
– Expanded eligibility under STP for congestion pricing, ferry boats and
terminals, off system bridges, border infrastructure, and congestion pricing
– Enhancements eliminated and replaced by “Transportation Alternatives”
that expands eligibility to cover Safe Routes to Schools, Recreational Trails
and roadways within ROW of former Interstate or other divided highways
• 50% within local control while 50% can be transferred by States to other programs
– Operating Assistance – FHWA issued guidance in July 2014
• Start-up of new transit service or incremental costs of expanding services
• Three years of CMAQ may be spread over a period of five years but must be
tapered over that period
• End of five years, non-CMAQ monies must be found
13
National Highway Performance Program
14
• Allocated by formula to States
• Construction, reconstruction, resurfacing,
rehabilitation, preservation and operational
improvements to the National Highway
System (NHS), NHS system bridges and
tunnels
• Construction, rehabilitation or replacement of
ferry boats and facilities that connect road
segments of the NHS
• Construction of transit projects if project is in
HNS corridor and in proximity to NHS corridor,
if more cost-effective than NHS improvement
• Bicycle and Pedestrian projects
• Infrastructure-based ITS capital projects
Surface Transportation Program
• 50% of monies apportioned to States obligated in urbanized areas,
other 50% used in any area of the State
• Construction, reconstruction, resurfacing, rehabilitation, preservation
and operational improvements on any federal aid highway
• Construction of tunnels and bridges on federal aid highways
• Transit capital projects
• Carpool projects, fringe and corridor parking facilities
• Transportation Alternatives
– Enhancements plus following:
• Safe Routes to Schools
• Recreational Trails
• Roads within ROW of former
Interstates or other divided highways
• Surface transportation planning
15
Congestion Mitigation and Air Quality
16
• Formula program with set aside for
Transportation Alternatives
• Must contribute to attainment or
maintenance of air quality standard or
effectiveness in reducing air pollution
• Eligible Projects:
– Traffic monitoring or control facilities
– Transit capital projects
– Transit operating assistance for initial
operations or expansion of operations
for three years
– Bicycle/Pedestrian projects
– Projects that shift demand to off-peak
hours
– Facilities serving electric or natural gas-
fueled vehicles
Performance Measures Structure
• Measures are intended to increase the accountability and transparency of the
Federal-aid highway program and improve project decision making through
performance based planning and programming.
• Seven national goal areas:
• DOT will establish measures in consultation with State DOTs, MPOs and other
stakeholders.
• States are required to establish performance targets that reflect performance
measures established by DOT.
• MPOs and transit operators, will set targets for each measure, incorporate in
plans and programs and report progress.
• NPRM issued on June 2, 2014 (79 Fed. Reg. 31784) to implement measures
– comments are due October 2, 2014
17
Safety Infrastructure Condition Congestion
System Reliability Freight Movement and
Economic Vitality
Environmental Sustainability
Reduced Project Delays
Planning and Performance
• Performance measures must be incorporated into long-range planning
and short-term programming processes
• LRTPs, TIPs and STIPs must show the progress that is expected to be
achieved by planned decisions and investments
• DOT will evaluate the appropriateness of State targets and the progress that
the State is making in achieving performance targets
• States and MPO plans will include performance reports that described the
progress made toward achieving performance targets.
• Scenario Planning
• MPOs can develop multiple scenarios for LRTPs, but scenarios must be
evaluated against performance measures
– Used to assess pros and cons, as well as effects of each scenario
• FHWA is to conduct a study on costs and benefits associated with scenario
planning in developing the metropolitan transportation plan
• Analysis will also look at technical and financial capacity of MPOs to
develop planning scenarios
18
TIFIA
• Transportation Infrastructure Finance and Innovation Act (TIFIA)
– Provides credit assistance to eligible surface transportation projects,
including highways and transit
• Secured Loans – direct loans with flexible repayment terms and providing
combined construction and permanent financing – up to 49% of project cost
• Loan Guarantees – full-faith and credit loan guarantees by Federal government to
institutional investors – up to 49% of project cost
• Lines of Credit – contingent sources of funding in form of loans that may be drawn
down during first ten years of construction – up to 33% of project cost
• Master Credit Agreements – contingent commitment of future TIFIA assistance for
a program of projects secured by a common revenue pledge
– Program expanded from $250 M per year to $750 M in FY 13 and $1 B in
FY 14
– Must be repaid through dedicated funding sources that secure the
obligation, such as tolls, user fees or payments
19
TIFIA (Cont.)
• Transportation Infrastructure Finance and Innovation Act (TIFIA)
– Repayment of a loan may begin five years after substantial
completion or project, and must be fully repaid within 35 years
– Application Process –
• First submit letters of interest (LOI) using the form available on TIFIA's website
– Describe project location, purpose and cost
– Outline of Project financial plan, including requested assistance and proposed obligor
– Provide status of environmental review
– Provide information regarding satisfaction of TIFIA eligibility requirements
• DOT will review LOIs and request further information as necessary
• Upon completion of the review and a determination of eligibility, DOT will invite an
application for credit assistance
20
Accelerating Project Delivery
• States can assume FHWA’s role in NEPA process (excluding Clean Air
Act, Clean Water Act and Endangered Species Act), including direct
coordination with Federal environmental agencies (i.e. EPA, DOI,
FWS)
• Use of construction manager/general contractor (CMGC) method of
contracting
• Accelerated completion of complex projects within four years when
State and other project sponsors request technical assistance
– States and other project sponsors can request use of authority for projects
that have been under development for at least two years
• Up to 100% Federal share for some innovative techniques
– Limited to 10% of available highway funding for States
– Projects that contain innovative project delivery techniques, contain
innovative technologies (ITS, recycling technology), or accelerates project
delivery (incentives for early completion of the project, program or activity)
21
Accelerating Project Delivery
• Demonstration project for lump sum payments for purchase of ROW
– State has authority to acquire the real property interest under State law
– Will not cause any significant adverse environmental impact
• Will not limit the choice of reasonable alternatives for the project or otherwise influence the
decision of the Secretary on any required approval
• Does not prevent the lead agency from making an impartial decision as to whether to accept
an alternative that is being considered
• Consistent with the State transportation planning processes
• Acquired through negotiation, without the threat of condemnation and consistent with STURRA
and Civil Rights Act
– Secretary shall complete the review process under NEPA
– Property interest shall have independent utility for purposes of NEPA and limit
consideration of alternatives for future transportation improvements with respect to
the real property interest.
– Acquisition may consist of the acquisition of a specific parcel, a portion of a
transportation corridor, or an entire transportation corridor.
– May not be developed in anticipation all required environmental reviews completed.
22
Highlight of Transit Program Changes
23
Key Transit Terms
• Designated Grant Recipient
– Entity designated, in accordance with the planning process, by
Governor, local officials and transit operators to receive and
apportion federal transit monies, or
– State or regional authority
• Direct Recipient/Eligible Recipient
– Entity that operates fixed route bus service and authorized by
designated grant recipient to receive formula funds, or any entity
that receives funds under section 5309
• Subrecipient
– Receives monies through pass-through agreement with direct
recipient or designated grant recipient whereby original recipient
remains responsible for compliance
24
Key Transit Terms
• Grantee – Circular 5010.1D
– Entity to which a grant is awarded directly by FTA to support a
specific project in which FTA does not take an active role or retain
substantial control
• Project Sponsor
– Entity responsible for providing legal, technical and financial
capacity to managr a New Starts, Small Starts or Core Capacity
project
25
Capital Investment Grants
• New Starts
– Projects exceeding $250 million in total cost
– Federal share usually 50 percent as project exceed $1 billion in total
cost FTA is providing less than 50 percent
• Small Starts
– Projects less than $250 million in total cost
– Federal share is capped at $75 million
• Core Capacity
– Projects that add ten percent capacity
– No State of Good Repair projects
26
Bus Rapid Transit
Small Starts New Starts
Right of Way Operates in a defined corridor but
majority of which does not operate
in a separated ROW dedicated to
transit use during peak periods
Majority of project operates in a
separated ROW dedicated to
transit use during peak hour
Features of Project Substantial investment in a defined
corridor by features that emulate rail
fixed guideway services, including:
• Defined stations;
• Traffic signal priority;
• Short headway bidirectional
services for a substantial part of
weekday and weekend days; and
• Any other features Secretary
determines support long-term
investment
Substantial investment in a single
route in a defined corridor or subarea
Includes features the emulate
services provided by rail fixed
guideway systems, including:
• Defined stations;
• Traffic signal priority
• Short headway bidirectional
services for a substantial part of
weekday and weekend days; and
• Any other features Secretary
determines are necessary to produce
high quality transit that emulates rail
fixed guideway systems
27
Urbanized Area Formula Programs
• Urbanized Area Formula
– Prior eligibility is retained but expanded to include jobs access and reverse
commute
– Provides funding for State Safety Oversight
– Retains operating assistance for areas below 200,000
– Limited operating assistance for areas above 200,000 which operate up to
100 buses in fixed route service during peak hours
– 1% mandatory set aside for transportation security projects
• Growing States and High Intensity State Formula
– Retains formula program first included in SAFETEA-LU
28
Enhanced Mobility for Seniors/Persons with Disabilities
• Consolidates New Freedom and Elderly and Disabled Program
• Eligible Activities
– 55% for capital projects to meet needs of seniors
– 45% for transit projects to provide access to service or exceed ADA
• Funding
– 60% to designated recipients in urbanized areas (above 200,000)
– 20% each to states for small urbanized area and for rural areas
– Monies can be used for operating assistance – 50% federal share
– Capital projects match – 80% federal share
29
Other Formula Programs
• Rural Area Formula
– Incorporates rural transit, tribal discretionary grant programs, Rural Transit
Assistance Program and Appalachian Development Public Transportation
Assistance
– Federal share is 80% for capital and 50% for operating assistance
– Includes planning, capital, operating, JARC and acquisition of public
transportation services
• Bus and Bus Facilities
– Shift from a discretionary to formula program
– Overall funding reduced by 50%
– First $65.5 million allocated with each state receiving $1.25 M with
remaining $356.6 M allocated based on population, vehicle revenue miles
and passenger miles
30
Transit Planning Program
• Performance-Based Planning Process
– MPOs and States to develop transportation plans through performance-
based planning
– Transit performance-based planning focus is on asset management and
State of Good Repair
• Regional Transportation Planning Organizations may be
created for nonmetropolitan areas
• MPOs in urbanized areas designated as TMAs must
include transit officials on policy boards – Guidance
published on June 2, 2014 (79 Fed. Reg. 31214)
– Representative should be either a board member (elected or
appointed) or officer of a provider of public transportation
– Should not be a person serving on MPO in another capacity
– Have equal voting rights with other MPO Board members
31
Pilot Program for TOD Planning
• Applies to New Starts and Core Capacity Projects
• States and local governmental entities are eligible for funding
• $10 M annually is awarded competitively
• Competitive grants would seek to:
– Enhance economic development, ridership and other goals established
during the project development and engineering processes;
– Facilitate multi-modal connectivity and accessibility;
– Increase access to transit hubs for bicycle and pedestrian activity;
– Enable mixed-use development;
– Identify infrastructure needs associated with the eligible project; and
– Include private sector participation.
32
State of Good Repair Program
• High Intensity Fixed Guideway Program – 97.15%
– Must be fixed guideway to receive funding
– Alignment and operations contain each of the features set forth in
State of Good Repair Circular
• High Intensity Motorbus Program – 2.85%
– Systems not operating in dedicated ROW
– May share lane with other High Occupancy Vehicles
– May share a “HOT lane” if transit and other HOVs ride for free
– Monies may not be used to maintain or rehabilitate HOV lanes
33
State of Good Repair Program
• Transit Asset Management
– FTA will introduce a regulation defining “state of good repair”
– Regulation will set standards for measuring condition of capital assets
– Will establish performance standards for state of good repair with each
transit agency required to set targets
– Transit agencies will be required to report condition of assets to the National
Transit Database (NTD)
• Condition of their system and any change in the condition
• Targets set and progress towards meeting those targets
34
Fixed Guideway BRT - Proposed Definition in SGR Circular
• Over 50 percent of route operates in a separated right-of-way
dedicated for transit use during peak periods
– Other traffic can make turning movements through the separated right-of-
way.
• Defined stations
– Accessible for persons with disabilities
– Offer shelter from the weather
– Provide information on schedules and routes.
Fixed Guideway BRT - Proposed Definition in SGR Circular
• Provide faster passenger travel times through congested intersections
by using active signal priority in separated guideway, and either
queue-jump lanes or active signal priority in non-separated guideway
• The route must provide:
– short headway, bi-directional service for at least a 14-hour span of service
on weekdays and a 10-hour span of service on weekends
– Short headway service on weekdays consists of either 15 minutes or less
maximum headways throughout the day, or 10 minutes or less maximum
headways during peak periods and 20 minutes or less maximum headways
at all other times
– Short headway service on weekends consists of 30 minutes or less
maximum headways for at least 10 hours a day
• The provider must apply a separate and consistent brand identity to
stations and vehicles”
Program of Interrelated Projects
• Available only for New Starts/Core Capacity projects
– Project is in the Engineering phase
– Program of projects
• has logical connectivity
• when evaluated as a whole, meets the requirements for project justification
capacity
• supported by a logical implementation plan and by an acceptable degree of
financial commitment
– Monies must be repaid if sponsor does not complete program within a
reasonable period of time
– Government share of each project within program may not exceed 80%
– Including a project not financed by Federal Government in a program does
not impose Federal governments otherwise applicable
37
Private Sector Participation
• Secretary is directed to promote better coordination between public
and private sector providers by providing technical assistance
• If requested by sponsor of New Start, Small Start or Core Capacity
project –
– Identify best practices for PPP models in USA and elsewhere
– Develop standard PPP transaction models
– Perform financial assessments that include calculation of public and private
benefits of PPPs
• Secretary to identify provisions that impede use of PPPS
• Develop guidance to provide transparency and public access to PPP
agreements
38
Private Sector Participation
• Develop guidance to provide transparency and public access to PPP
agreements
– Any conflicts of interest for parties involved in PPPs;
– Tax and financing aspects related to PPPs;
– Changes in workforce and wages, benefits, or rules as a result of PPPs;
– Estimates of the revenue or savings the PPP will produce for the public
entity and private entity;
– Any impacts on other developments and transportation modes as a result of
non-compete clauses contained in PPPS; and,
– Any other issue.
• Project sponsors are encouraged to conduct assessments to determine
whether a PPP represents a better public and financial benefits
39
Pilot Project for Innovative Project Delivery
• Available for any New Start, Small Start or Core Capacity Project
• Demonstrate whether innovative project development and delivery
methods or innovative finance arrangements can expedite project
delivery
• FTA select three projects to participate
– At least one shall be requesting more than $100 million
– At least one a project seeking less than $100 million
• Government share limited to 50%
• Recipient shall submit an application that identifies (a) project, (b)
project schedule, (c) finance plan, and, (d) an analysis of efficiencies
of proposed P3
• Certify system is in a state of good repair, project completed NEPA and
demonstrate legal, technical and financial capacity
40
TIGER
• $600 million for FY 14 – up to $35 M for Planning
– No less than $10 million per project and greater than $200 M in
urban areas
• Major focus on “ladders of opportunity”
– Connect to centers of employment, education and services
– Stimulate long-term growth, especially in economically depressed
areas
• Total of five primary criteria and two secondary criteria
used to evaluate projects
41
TIGER
• Planning Grants
– Planning, preparation and design of a project, or planning related to
interdisciplinary factors such as housing, economic development,
stormwater and other infrastructure investments
– Applicant must discuss how the project resulting from the planning
efforts will lead to the fulfillment of the criteria
• Benefit/Cost Analysis (BCA)
– Key is identifying and quantifying project benefits
– Must receive a positive BCA in order to be considered
• Selection Process
– About 15 percent of projects are highly recommended
– Only about three percent of the projects are funded
42
TIGER
• Key considerations for funding
– Readiness – NEPA schedule, local match, status in terms of design
and engineering and schedule
– TIGER funds are the “last dollar” necessary to advance the project
– Complete project with independent utility
– Political and community support
• Expect and prepare for TIGER funding in FY 15
43
Accelerated Innovation Deployment (AID) Program
44
• Component of FHWA’s Technology and Innovation Deployment
Program (TIDP)
• State DOTs, local governments, MPOs, tribal governments and
Federal Land Management Agencies are eligible
• Projects may be in any aspect of highway transportation, including:
planning, financing, operation, structures, materials, pavements,
environment, and construction
– e.g. lateral slide, high friction surface treatment
• Project must be ready to initiate within 6 months of applying
• $15 million available for FY 2014
– Up to $14 million for State DOTs
– Up to $1 million to tribal governments and Federal Land
Management Agencies
Federal Railroad Administration –
FY14 Grant Application Solicitation
45
• Solicitation for intercity passenger rail grade crossing improvement
projects, positive train control (PTC) implementation projects, and
Passenger Rail Corridor Investment Plan (PRCIP) projects
• At least $36.3 million in funding available
– FY14 Omnibus Authority: $19.8 million
– FY08/08 Remaining HSIPR: $11.3 million
– FY10 Remaining HSIPR: $5.2 million
Bus and Bus Facilities, Ladders of Opportunity
• One-time opportunity through FTA
• Approximately $100 million available through recoveries from Section
5309 Bus and Bus Facilities Program authorized by SAFETEA-LU
• Financing for capital projects to replace, rehabilitate, and purchase
busses and to construct bus-related facilities
– Operating expenses, preventive maintenance, and previous project
expenses are ineligible
• Eligible applicants included Urbanized Area Formula Program direct
recipients, States, or Indian Tribes; Rural areas must submit as part of
consolidated application
• Opportunity closed on August 4, 2014
46
FAA Airport Improvement Program (AIP)
• Planning & development grants for public-use airports
• Eligible projects include improvements related to airport security,
capacity, and environmental concerns
– e.g. Runway rehabilitation, airfield signage and lighting, planning or
environmental studies, land acquisition, and others
• FAA makes case-by-case determination for funding under the
Passenger Facility Charge (PFC) program of airport ground access
transportation projects
– PFCs can be used for ground transportation projects, such as LRT,
streetcar, BRT that provide access to airports
– Project on airport property
– Project can only provide access to the airport
47
Passenger Ferry Grant Program
• Federal Transit Administration (FTA) competitive program
• Funding to support existing service, establish new service, and
modernize boats and facilities for public ferry systems in urbanized
areas
- June 2014, FTA announced $60 million for 26 projects in 13 states
• State and local government entities, public transportation providers,
and private or non-profit organizations are eligible
- Must be direct recipients of Section 5307 Urbanized Area Program
48
Railway-Highway Crossings Program
49
• $220 million available for the program in 2014, funded from the
Highway Account of the Highway Trust Fund
• Funds safety improvements to reduce fatalities, injuries, and crashes
at public grade crossings
• Eligible projects include all public crossings at roadways, bike trails,
and pedestrian paths
• State funding levels determined by two factors:
– 50% on formula factors for the Surface Transportation Program (STP)
– 50% based on the number of public railway-highway crossings
• Each state guaranteed to receive a minimum of 1/2% of program funds
• 90% federal funding share
Projects of National and Regional Significance (PNRS)
50
• Section 1301 of SAFETEA-LU provided grants to States for PNRS to
improve movement of goods and people
• MAP-21 authorized $500 million in fiscal year 2013 for PNRS,
however no funds appropriated in FY13
• Section 1120 of MAP-21 requires DOT to develop a report to Congress
containing a list of projects of national and regional significance, used
to develop recommendations on financing
• PNRS Survey
– Compiled through surveys of State departments of transportation, transit
agencies, tribal governments, and multi-state/multi-jurisdictional groups
– Survey closed June 30, 2014
Tribal High Priority Projects Program
51
• Provides funding to tribes whose “annual allocation of funding received
under the Tribal Transportation Program (TTP) is insufficient to
complete the highest priority project of the Tribe,” or to provide
emergency funding for inoperative facilities due to disaster
• $30 million appropriated from the General Fund
• Modeled after former Indian Reservation Roads High Priority Projects
Program
• Projects limited to $1 million per application; 100% federal share
• Indian Tribes or tribal government subdivisions are eligible
EPA Brownfields
52
• Brownfield Economic Redevelopment Initiative aims to “prevent,
asses, safely clean up, and sustainably reuse brownfields”
– Definition: a site, or portion thereof, that has actual or perceived
contamination and an active potential for redevelopment or reuse
• Administered by Environmental Protection Agency (EPA), Office of
Brownfields and Land Revitalization (OBLR)
• FY 2015 Brownfields area-wide planning grant proposals due
September 22, 2014
– Funding to conduct research, technical assistance, and/or training
activities to develop brownfields area-wide plan
• $4 million available for FY 2015, with maximum of $200,000 for each
proposal
• Urban brownfields can be preferable locations for transportation
facilities
Questions?
www.hklaw.com
Thank You!
www.hklaw.com
Holland & Knight - Overview
Founded in 1968, Holland & Knight is a global law firm with more than 1,000
lawyers and other professionals in 20 U.S. offices, as well as Bogotá and Mexico
City.
Among the nation's largest law firms, Holland & Knight provides representation in
litigation, business, real estate and governmental law.
Interdisciplinary practice groups and industry-based teams provide clients with
access to attorneys throughout the firm, regardless of location.
Holland & Knight has dedicated Local Government Advocacy and Transit
practices to identify key funding opportunities and guide clients through the
intricate federal funding process.
55
Holland & Knight Offices
56
Portland
Los Angeles
San Francisco
Dallas
Chicago
Boston
New York
Washington, D.C.
Northern Virginia
Atlanta
Lakeland Miami
Fort Lauderdale
West Palm Beach
Orlando
Jacksonville
Tampa
Tallahassee
Anchorage
Bogotá,
Colombia
Mexico City,
Mexico
Austin
Holland & Knight - Local Government Advocacy Practice
Holland & Knight’s Local Government Advocacy Team has an extensive history of
representing cities, counties, transportation agencies, education districts, housing
authorities, public utilities, and other municipal entities across the United States.
The firm assists clients in a broad range of areas, including transportation, water,
energy and environment, public safety and homeland security to housing,
community/economic development, education, workforce development, human
services, public health, tax and pension matters – touching every local
government issue.
Holland & Knight’s bipartisan team maintains strong working relationships to
Congress, the White House, virtually every federal department and agency,
national stakeholders, think tanks, and thought leaders. In addition to the firm’s
policy focus, Holland & Knight is equally matched in knowledge and expertise in
the federal funding process and the ways to successfully maneuver funding
outcomes in the current earmark-free environment.
57
Holland & Knight - Transit Practice
Holland & Knight has more than 30 years’ experience and knowledge of federal
surface transportation programs, with a significant emphasis on public transit,
and extensive experience working with transit agencies across the United States.
Using our close bipartisan relationships, we have secured billions of dollars in
federal resources to support small and large-scale transportation initiatives
across the country, covering transit, light rail, bus and bus facilities, highway, road
and bridge and pedestrian improvement.
Holland & Knight also has an in-depth knowledge of the legislative, regulatory
and statutory provisions affecting public transit agencies. We have a strong
record of success assisting local governments, transit agencies, and
transportation authorities in securing annual appropriations, program grants,
loan, and bond financing.
58
59
Holland & Knight
Team Members
Lisa Ann Barkovic
Senior Policy Advisor
Ms. Barkovic has extensive experience in the areas of federal appropriations,
transportation, environment, energy, and homeland security. Prior to joining
Holland & Knight, Ms. Barkovic served five years in the office of former
Congressman Mark Foley (FL-16) as a Legislative Assistant.
Paul S. Bock
Partner
Mr. Bock has more than 20 years of experience working with key decision-makers
in the U.S. Senate and House of Representatives, including lawmakers, senior
staff members and interest groups involved in public policy. He has extensive
experience and knowledge in financial services, transportation and energy.
Jeffrey F. Boothe
Partner
Mr. Boothe is nationally recognized on matters relating to transportation policy,
transit project planning, strategy and implementation, procurement and transit-
oriented development. Mr. Boothe is experienced in representing public transit
properties and helping clients advance projects through the federal approval
process for discretionary grants, transit procurement and Buy America provisions.
Holland & Knight
Team Members (Cont.)
60
Jim Davis
Partner
Mr. Davis served in the U.S. House of Representatives for 10 years, from 1997 to
2007. While in Congress, Mr. Davis served on the Energy and Commerce
Committee where he was focused on energy, telecommunications and electronic
commerce, healthcare, the environment and consumer protection issues.
Rich Gold
Partner
Mr. Gold is the leader of Holland & Knight's Public Policy & Regulation Practice
Group. Mr. Gold joined Holland & Knight in 1994 after eight years of government
service, culminating in stints with Senator Lloyd Bentsen and EPA Administrator
Carol Browner.
Lauri A. Hettinger
Senior Policy Advisor
Ms. Hettinger advocates for local government municipalities' and industry's
infrastructure needs, including surface transportation, water resources, economic
development and Army Corps of Engineers.
Holland & Knight
Team Members (Cont.)
61
Ronald J. Klein
Partner
Mr. Klein has worked in the private sector as a business and transactional attorney
for over 25 years, as well as the public sector as an elected official in both
Tallahassee and Washington, D.C. Mr. Klein's experience gives clients an added
edge in having their advocate understand their issues and concerns.
Kathryn Lehman
Partner
A 15-year veteran of the Hill, Ms. Lehman has significant and wide-ranging
experience, having worked closely with the White House, administrative agencies,
House and Senate leadership and committees, political committees and other key
members of government.
Dan Maldonado
Senior Policy Advisor
Mr. Maldonado has over 30 years of federal appropriations, legislative and budget
experience. He has extensive expertise in Federal financing of a range of critical
public policy areas, including economic development, redevelopment and
transportation projects; energy, water and environmental programs.
Holland & Knight
Team Members (Cont.)
62
Leslie Pollner
Senior Policy Advisor
Ms. Pollner focuses on several key industries, including transportation, economic
development and housing. Prior to joining the firm, Ms. Pollner was the deputy
mayor for federal affairs in Los Angeles under Mayor Antonio Villaraigosa.
Eve M. O’Toole
Senior Policy Advisor
Ms. O'Toole brings more than 20 years of federal lobbying experience, with
substantial background in local government/public sector advocacy, regulatory,
appropriations and policy development, and in establishing and executing local
public-private partnerships and successful grassroots campaigns and coalitions.
Justin A. Maturo
Legislative Assistant
Mr. Maturo has over 4 years of combined experience working in the U.S. House of
Representatives. Prior to joining Holland & Knight, Mr. Maturo served as legislative
assistant for Congresswoman Eddie Bernice Johnson.
Holland & Knight
Team Members (Cont.)
63
David Whitestone
Partner
David Whitestone is a lawyer in the Public Policy & Regulation Practice Group and
oversees the provision of legal and legislative counsel services. Prior to joining
private practice, Mr. Whitestone worked in the U.S. House of Representatives and
was an associate staff member on the House Appropriations Committee.
Shawna Watley
Senior Policy Advisor
Ms. Watley has cultivated strong relationships on the federal, state and local levels
of government. Prior to joining Holland & Knight, Ms. Watley served as manager of
federal relations for the Dallas Area Rapid Transit and was founder and president
of the Francis Group LLC, which specialized in consulting on transportation issues.

Weitere ähnliche Inhalte

Was ist angesagt?

American Recovery and Reinvestment Conference Report Division A
American Recovery and Reinvestment Conference Report Division AAmerican Recovery and Reinvestment Conference Report Division A
American Recovery and Reinvestment Conference Report Division Afinance3
 
Session Six: Inclusive Growth Design Of Inter Governmental Transfers, Meeting...
Session Six: Inclusive Growth Design Of Inter Governmental Transfers, Meeting...Session Six: Inclusive Growth Design Of Inter Governmental Transfers, Meeting...
Session Six: Inclusive Growth Design Of Inter Governmental Transfers, Meeting...OECDtax
 
Municipal Finance Reforms Good Practices
Municipal Finance Reforms   Good PracticesMunicipal Finance Reforms   Good Practices
Municipal Finance Reforms Good PracticesRavikant Joshi
 
Centre state financial relations
Centre state financial relationsCentre state financial relations
Centre state financial relationsSuranjan Kakra
 
Finance commision of India
Finance commision of IndiaFinance commision of India
Finance commision of IndiaHemant Mahaver
 
Assessing Financial Sustainability of Indian Municipal Bodies
Assessing Financial Sustainability of Indian Municipal Bodies Assessing Financial Sustainability of Indian Municipal Bodies
Assessing Financial Sustainability of Indian Municipal Bodies Ravikant Joshi
 
The National Treasury, PPP Unit Health Infrastructure Development and Servi...
The National Treasury, PPP Unit   Health Infrastructure Development and Servi...The National Treasury, PPP Unit   Health Infrastructure Development and Servi...
The National Treasury, PPP Unit Health Infrastructure Development and Servi...Emmanuel Mosoti Machani
 
The budget making process _entry points
The budget making process  _entry pointsThe budget making process  _entry points
The budget making process _entry pointsRachna Shanbog
 
14th finance commission of India
14th finance commission of India14th finance commission of India
14th finance commission of IndiaThazuala
 
Finance commission
Finance commissionFinance commission
Finance commissionNaveen Som
 
Analysis of 15th Finance Commission's First Report
Analysis of 15th Finance Commission's First ReportAnalysis of 15th Finance Commission's First Report
Analysis of 15th Finance Commission's First ReportDVSResearchFoundatio
 
Financial Viability of Distribution Companies in India
Financial Viability of Distribution Companies in IndiaFinancial Viability of Distribution Companies in India
Financial Viability of Distribution Companies in IndiaIPPAI
 
Regional Government
Regional GovernmentRegional Government
Regional GovernmentJaypeeRojas
 

Was ist angesagt? (20)

American Recovery and Reinvestment Conference Report Division A
American Recovery and Reinvestment Conference Report Division AAmerican Recovery and Reinvestment Conference Report Division A
American Recovery and Reinvestment Conference Report Division A
 
Session Six: Inclusive Growth Design Of Inter Governmental Transfers, Meeting...
Session Six: Inclusive Growth Design Of Inter Governmental Transfers, Meeting...Session Six: Inclusive Growth Design Of Inter Governmental Transfers, Meeting...
Session Six: Inclusive Growth Design Of Inter Governmental Transfers, Meeting...
 
Analysis of the fiscal management bill-2008
Analysis of the fiscal management bill-2008Analysis of the fiscal management bill-2008
Analysis of the fiscal management bill-2008
 
Lgu budgeting process
Lgu budgeting processLgu budgeting process
Lgu budgeting process
 
Kenya PBO structure
Kenya PBO structureKenya PBO structure
Kenya PBO structure
 
Appropriations 101
Appropriations 101Appropriations 101
Appropriations 101
 
Municipal Finance Reforms Good Practices
Municipal Finance Reforms   Good PracticesMunicipal Finance Reforms   Good Practices
Municipal Finance Reforms Good Practices
 
NYSA Bronchure
NYSA BronchureNYSA Bronchure
NYSA Bronchure
 
LBP 2
LBP 2LBP 2
LBP 2
 
Centre state financial relations
Centre state financial relationsCentre state financial relations
Centre state financial relations
 
Finance commision of India
Finance commision of IndiaFinance commision of India
Finance commision of India
 
Assessing Financial Sustainability of Indian Municipal Bodies
Assessing Financial Sustainability of Indian Municipal Bodies Assessing Financial Sustainability of Indian Municipal Bodies
Assessing Financial Sustainability of Indian Municipal Bodies
 
The National Treasury, PPP Unit Health Infrastructure Development and Servi...
The National Treasury, PPP Unit   Health Infrastructure Development and Servi...The National Treasury, PPP Unit   Health Infrastructure Development and Servi...
The National Treasury, PPP Unit Health Infrastructure Development and Servi...
 
The budget making process _entry points
The budget making process  _entry pointsThe budget making process  _entry points
The budget making process _entry points
 
Miami-Dade TPO's Overview of Federal & State Funding presentation
Miami-Dade TPO's Overview of Federal & State Funding presentationMiami-Dade TPO's Overview of Federal & State Funding presentation
Miami-Dade TPO's Overview of Federal & State Funding presentation
 
14th finance commission of India
14th finance commission of India14th finance commission of India
14th finance commission of India
 
Finance commission
Finance commissionFinance commission
Finance commission
 
Analysis of 15th Finance Commission's First Report
Analysis of 15th Finance Commission's First ReportAnalysis of 15th Finance Commission's First Report
Analysis of 15th Finance Commission's First Report
 
Financial Viability of Distribution Companies in India
Financial Viability of Distribution Companies in IndiaFinancial Viability of Distribution Companies in India
Financial Viability of Distribution Companies in India
 
Regional Government
Regional GovernmentRegional Government
Regional Government
 

Andere mochten auch

Is public education_necessary-sam_blumenfeld-1981-285pgs-edu
Is public education_necessary-sam_blumenfeld-1981-285pgs-eduIs public education_necessary-sam_blumenfeld-1981-285pgs-edu
Is public education_necessary-sam_blumenfeld-1981-285pgs-eduRareBooksnRecords
 
Federal Funding
Federal FundingFederal Funding
Federal FundingJennifer
 
MeginShow Version 2
MeginShow Version 2MeginShow Version 2
MeginShow Version 2Blackboard
 
Federal Education Funding Update 2013 by AASA
Federal Education Funding Update 2013 by AASAFederal Education Funding Update 2013 by AASA
Federal Education Funding Update 2013 by AASAPresenceLearning
 
Megin Version 4
Megin Version 4Megin Version 4
Megin Version 4Blackboard
 
The role of federal funding in education
The role of federal funding in educationThe role of federal funding in education
The role of federal funding in educationJanine
 
The Federal Government Supporting Childrn's Success
The Federal Government Supporting Childrn's  SuccessThe Federal Government Supporting Childrn's  Success
The Federal Government Supporting Childrn's SuccessChristian Sisles Gle
 
Financing of higher education.
Financing of higher education.Financing of higher education.
Financing of higher education.Varadraj Bapat
 
Ministry of Federal Education and Professional Training
Ministry of Federal Education and Professional TrainingMinistry of Federal Education and Professional Training
Ministry of Federal Education and Professional TrainingSyeda Laila Ali Jaffri
 
Syria’s civil war
Syria’s civil warSyria’s civil war
Syria’s civil warevercad18
 
Economics in education1/financing Education
Economics in education1/financing EducationEconomics in education1/financing Education
Economics in education1/financing EducationReve Faith Bagas
 
Idealism in philosophy of education
Idealism in philosophy of educationIdealism in philosophy of education
Idealism in philosophy of educationLee Vhay Yin
 

Andere mochten auch (14)

Is public education_necessary-sam_blumenfeld-1981-285pgs-edu
Is public education_necessary-sam_blumenfeld-1981-285pgs-eduIs public education_necessary-sam_blumenfeld-1981-285pgs-edu
Is public education_necessary-sam_blumenfeld-1981-285pgs-edu
 
Federal Funding
Federal FundingFederal Funding
Federal Funding
 
MeginShow Version 2
MeginShow Version 2MeginShow Version 2
MeginShow Version 2
 
Federal Education Funding Update 2013 by AASA
Federal Education Funding Update 2013 by AASAFederal Education Funding Update 2013 by AASA
Federal Education Funding Update 2013 by AASA
 
Megin Version 4
Megin Version 4Megin Version 4
Megin Version 4
 
The role of federal funding in education
The role of federal funding in educationThe role of federal funding in education
The role of federal funding in education
 
The Federal Government Supporting Childrn's Success
The Federal Government Supporting Childrn's  SuccessThe Federal Government Supporting Childrn's  Success
The Federal Government Supporting Childrn's Success
 
American School System
American School SystemAmerican School System
American School System
 
Financing of higher education.
Financing of higher education.Financing of higher education.
Financing of higher education.
 
God Works All Things For Good
God Works All Things For GoodGod Works All Things For Good
God Works All Things For Good
 
Ministry of Federal Education and Professional Training
Ministry of Federal Education and Professional TrainingMinistry of Federal Education and Professional Training
Ministry of Federal Education and Professional Training
 
Syria’s civil war
Syria’s civil warSyria’s civil war
Syria’s civil war
 
Economics in education1/financing Education
Economics in education1/financing EducationEconomics in education1/financing Education
Economics in education1/financing Education
 
Idealism in philosophy of education
Idealism in philosophy of educationIdealism in philosophy of education
Idealism in philosophy of education
 

Ähnlich wie RV 2014: Show Me the Money- Federal Funding in a Non-Earmark World (Federal Funding 101) by Jeff Boothe

The Philippine Budget Process
The Philippine Budget ProcessThe Philippine Budget Process
The Philippine Budget ProcessRomz Albercz
 
Distribution and Expenditures of Philippine National Budget
Distribution and Expenditures of Philippine National BudgetDistribution and Expenditures of Philippine National Budget
Distribution and Expenditures of Philippine National BudgetPat Reyes
 
Making the Federal Budget
Making the Federal BudgetMaking the Federal Budget
Making the Federal BudgetMercatus Center
 
Secretary brown's presentation
Secretary brown's presentationSecretary brown's presentation
Secretary brown's presentationLEAD VIRGINIA
 
tin-160201063310.ppt budget budget............
tin-160201063310.ppt budget budget............tin-160201063310.ppt budget budget............
tin-160201063310.ppt budget budget............ssuser486a8b
 
Learn About the Morris County NJ Capital Budget
Learn About the Morris County NJ Capital BudgetLearn About the Morris County NJ Capital Budget
Learn About the Morris County NJ Capital BudgetMorris County NJ
 
Budgeting: Allocation & Public Policy, A Summary, Analysis, & Recommendations
Budgeting: Allocation & Public Policy, A Summary, Analysis, & RecommendationsBudgeting: Allocation & Public Policy, A Summary, Analysis, & Recommendations
Budgeting: Allocation & Public Policy, A Summary, Analysis, & RecommendationsThe University of Texas (UTRGV)
 
The Philippine National Budget Process.pptx
The Philippine National Budget Process.pptxThe Philippine National Budget Process.pptx
The Philippine National Budget Process.pptxera1martinez
 
MAP-21: What's in it for my business? presented by Jack Schenendorf
MAP-21: What's in it for my business? presented by Jack SchenendorfMAP-21: What's in it for my business? presented by Jack Schenendorf
MAP-21: What's in it for my business? presented by Jack Schenendorfnssga
 
What Every Ohio School Leader Should Know About Advocacy and the Legislative ...
What Every Ohio School Leader Should Know About Advocacy and the Legislative ...What Every Ohio School Leader Should Know About Advocacy and the Legislative ...
What Every Ohio School Leader Should Know About Advocacy and the Legislative ...Craig Eric Burford
 
What Every Ohio School Leader Should Know About Advocacy and the Legislative ...
What Every Ohio School Leader Should Know About Advocacy and the Legislative ...What Every Ohio School Leader Should Know About Advocacy and the Legislative ...
What Every Ohio School Leader Should Know About Advocacy and the Legislative ...Craig Eric Burford
 
Draft of the proposed legislation to abolish the pork barrel system
Draft of the proposed legislation to abolish the pork barrel systemDraft of the proposed legislation to abolish the pork barrel system
Draft of the proposed legislation to abolish the pork barrel systemEmmanuel Mongaya
 
Capital Improvement Program
Capital Improvement ProgramCapital Improvement Program
Capital Improvement ProgramJames May
 
Summer 2013 NCLM Legislative Update
Summer 2013 NCLM Legislative UpdateSummer 2013 NCLM Legislative Update
Summer 2013 NCLM Legislative UpdatePublicFinanceTV
 
Financial control by parliament
Financial control by parliamentFinancial control by parliament
Financial control by parliamentTrisom Sahu
 

Ähnlich wie RV 2014: Show Me the Money- Federal Funding in a Non-Earmark World (Federal Funding 101) by Jeff Boothe (20)

Budget cycle
Budget cycleBudget cycle
Budget cycle
 
BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT
BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENTBUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT
BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT
 
The Philippine Budget Process
The Philippine Budget ProcessThe Philippine Budget Process
The Philippine Budget Process
 
Distribution and Expenditures of Philippine National Budget
Distribution and Expenditures of Philippine National BudgetDistribution and Expenditures of Philippine National Budget
Distribution and Expenditures of Philippine National Budget
 
National Government and Local Government Budget Process
National Government and Local Government Budget ProcessNational Government and Local Government Budget Process
National Government and Local Government Budget Process
 
Making the Federal Budget
Making the Federal BudgetMaking the Federal Budget
Making the Federal Budget
 
Secretary brown's presentation
Secretary brown's presentationSecretary brown's presentation
Secretary brown's presentation
 
tin-160201063310.ppt budget budget............
tin-160201063310.ppt budget budget............tin-160201063310.ppt budget budget............
tin-160201063310.ppt budget budget............
 
Learn About the Morris County NJ Capital Budget
Learn About the Morris County NJ Capital BudgetLearn About the Morris County NJ Capital Budget
Learn About the Morris County NJ Capital Budget
 
Budgeting: Allocation & Public Policy, A Summary, Analysis, & Recommendations
Budgeting: Allocation & Public Policy, A Summary, Analysis, & RecommendationsBudgeting: Allocation & Public Policy, A Summary, Analysis, & Recommendations
Budgeting: Allocation & Public Policy, A Summary, Analysis, & Recommendations
 
The Philippine National Budget Process.pptx
The Philippine National Budget Process.pptxThe Philippine National Budget Process.pptx
The Philippine National Budget Process.pptx
 
MAP-21: What's in it for my business? presented by Jack Schenendorf
MAP-21: What's in it for my business? presented by Jack SchenendorfMAP-21: What's in it for my business? presented by Jack Schenendorf
MAP-21: What's in it for my business? presented by Jack Schenendorf
 
What Every Ohio School Leader Should Know About Advocacy and the Legislative ...
What Every Ohio School Leader Should Know About Advocacy and the Legislative ...What Every Ohio School Leader Should Know About Advocacy and the Legislative ...
What Every Ohio School Leader Should Know About Advocacy and the Legislative ...
 
What Every Ohio School Leader Should Know About Advocacy and the Legislative ...
What Every Ohio School Leader Should Know About Advocacy and the Legislative ...What Every Ohio School Leader Should Know About Advocacy and the Legislative ...
What Every Ohio School Leader Should Know About Advocacy and the Legislative ...
 
Draft of the proposed legislation to abolish the pork barrel system
Draft of the proposed legislation to abolish the pork barrel systemDraft of the proposed legislation to abolish the pork barrel system
Draft of the proposed legislation to abolish the pork barrel system
 
Capital Improvement Program
Capital Improvement ProgramCapital Improvement Program
Capital Improvement Program
 
Processes of Budgeting in India
Processes of Budgeting in IndiaProcesses of Budgeting in India
Processes of Budgeting in India
 
Summer 2013 NCLM Legislative Update
Summer 2013 NCLM Legislative UpdateSummer 2013 NCLM Legislative Update
Summer 2013 NCLM Legislative Update
 
Financial control by parliament
Financial control by parliamentFinancial control by parliament
Financial control by parliament
 
Budget Process.ppt
Budget Process.pptBudget Process.ppt
Budget Process.ppt
 

Mehr von Rail~Volution

Rail~Volution 2017 John Martin | Headwinds or Tailwinds?
Rail~Volution 2017 John Martin | Headwinds or Tailwinds?Rail~Volution 2017 John Martin | Headwinds or Tailwinds?
Rail~Volution 2017 John Martin | Headwinds or Tailwinds?Rail~Volution
 
Station Area Planning: The Fundamentals by Tim Chan
Station Area Planning: The Fundamentals by Tim ChanStation Area Planning: The Fundamentals by Tim Chan
Station Area Planning: The Fundamentals by Tim ChanRail~Volution
 
Station Area Planning: The Fundamentals by W. Brian Keith
Station Area Planning: The Fundamentals by W. Brian KeithStation Area Planning: The Fundamentals by W. Brian Keith
Station Area Planning: The Fundamentals by W. Brian KeithRail~Volution
 
BRT 101: Design, Operations and Economic Impact by Andrew Guthrie
BRT 101: Design, Operations and Economic Impact by Andrew GuthrieBRT 101: Design, Operations and Economic Impact by Andrew Guthrie
BRT 101: Design, Operations and Economic Impact by Andrew GuthrieRail~Volution
 
TOD Redevelopment on the Grandest Scale by Tom Young
TOD Redevelopment on the Grandest Scale by Tom YoungTOD Redevelopment on the Grandest Scale by Tom Young
TOD Redevelopment on the Grandest Scale by Tom YoungRail~Volution
 
Advocacy and Coalition Building: Fighting Transit Opposition by Julie Gustafson
Advocacy and Coalition Building: Fighting Transit Opposition by Julie GustafsonAdvocacy and Coalition Building: Fighting Transit Opposition by Julie Gustafson
Advocacy and Coalition Building: Fighting Transit Opposition by Julie GustafsonRail~Volution
 
Multi-Modal Transportation in North Texas: Increasing Connectivity Between Jo...
Multi-Modal Transportation in North Texas: Increasing Connectivity Between Jo...Multi-Modal Transportation in North Texas: Increasing Connectivity Between Jo...
Multi-Modal Transportation in North Texas: Increasing Connectivity Between Jo...Rail~Volution
 
Food: How Transit is Improving Choices by Veletta Lill
Food: How Transit is Improving Choices by Veletta LillFood: How Transit is Improving Choices by Veletta Lill
Food: How Transit is Improving Choices by Veletta LillRail~Volution
 
Integrating Health, Livable Communities and Transit: A How-To Discussion by E...
Integrating Health, Livable Communities and Transit: A How-To Discussion by E...Integrating Health, Livable Communities and Transit: A How-To Discussion by E...
Integrating Health, Livable Communities and Transit: A How-To Discussion by E...Rail~Volution
 
Sharing the Road, Sharing the Bike by Jennifer McGrath
Sharing the Road, Sharing the Bike by Jennifer McGrathSharing the Road, Sharing the Bike by Jennifer McGrath
Sharing the Road, Sharing the Bike by Jennifer McGrathRail~Volution
 
Employment TOD: The Other E in ETOD by Alden S. Raine, PhD
Employment TOD: The Other E in ETOD by Alden S. Raine, PhDEmployment TOD: The Other E in ETOD by Alden S. Raine, PhD
Employment TOD: The Other E in ETOD by Alden S. Raine, PhDRail~Volution
 
Rail~Volution 101 - Fundamentals: Principles and Practices
Rail~Volution 101 - Fundamentals: Principles and PracticesRail~Volution 101 - Fundamentals: Principles and Practices
Rail~Volution 101 - Fundamentals: Principles and PracticesRail~Volution
 
The Other TOD: Retaining Existing Development in a Corridor by Terry Benelli
The Other TOD: Retaining Existing Development in a Corridor by Terry BenelliThe Other TOD: Retaining Existing Development in a Corridor by Terry Benelli
The Other TOD: Retaining Existing Development in a Corridor by Terry BenelliRail~Volution
 
TOD and Parking: Matching the Requirements to the Neighborhood by Meea Kang
TOD and Parking: Matching the Requirements to the Neighborhood by Meea KangTOD and Parking: Matching the Requirements to the Neighborhood by Meea Kang
TOD and Parking: Matching the Requirements to the Neighborhood by Meea KangRail~Volution
 
TOD and Parking: Matching the Requirements to the Neighborhood by Karina Ricks
TOD and Parking: Matching the Requirements to the Neighborhood by Karina RicksTOD and Parking: Matching the Requirements to the Neighborhood by Karina Ricks
TOD and Parking: Matching the Requirements to the Neighborhood by Karina RicksRail~Volution
 
TOD and Parking: Matching the Requirements to the Neighborhood by Jason Witte...
TOD and Parking: Matching the Requirements to the Neighborhood by Jason Witte...TOD and Parking: Matching the Requirements to the Neighborhood by Jason Witte...
TOD and Parking: Matching the Requirements to the Neighborhood by Jason Witte...Rail~Volution
 
A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock
A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock
A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock Rail~Volution
 
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert HastingsRV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert HastingsRail~Volution
 
RV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-Lyman
RV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-LymanRV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-Lyman
RV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-LymanRail~Volution
 
RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...
RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...
RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...Rail~Volution
 

Mehr von Rail~Volution (20)

Rail~Volution 2017 John Martin | Headwinds or Tailwinds?
Rail~Volution 2017 John Martin | Headwinds or Tailwinds?Rail~Volution 2017 John Martin | Headwinds or Tailwinds?
Rail~Volution 2017 John Martin | Headwinds or Tailwinds?
 
Station Area Planning: The Fundamentals by Tim Chan
Station Area Planning: The Fundamentals by Tim ChanStation Area Planning: The Fundamentals by Tim Chan
Station Area Planning: The Fundamentals by Tim Chan
 
Station Area Planning: The Fundamentals by W. Brian Keith
Station Area Planning: The Fundamentals by W. Brian KeithStation Area Planning: The Fundamentals by W. Brian Keith
Station Area Planning: The Fundamentals by W. Brian Keith
 
BRT 101: Design, Operations and Economic Impact by Andrew Guthrie
BRT 101: Design, Operations and Economic Impact by Andrew GuthrieBRT 101: Design, Operations and Economic Impact by Andrew Guthrie
BRT 101: Design, Operations and Economic Impact by Andrew Guthrie
 
TOD Redevelopment on the Grandest Scale by Tom Young
TOD Redevelopment on the Grandest Scale by Tom YoungTOD Redevelopment on the Grandest Scale by Tom Young
TOD Redevelopment on the Grandest Scale by Tom Young
 
Advocacy and Coalition Building: Fighting Transit Opposition by Julie Gustafson
Advocacy and Coalition Building: Fighting Transit Opposition by Julie GustafsonAdvocacy and Coalition Building: Fighting Transit Opposition by Julie Gustafson
Advocacy and Coalition Building: Fighting Transit Opposition by Julie Gustafson
 
Multi-Modal Transportation in North Texas: Increasing Connectivity Between Jo...
Multi-Modal Transportation in North Texas: Increasing Connectivity Between Jo...Multi-Modal Transportation in North Texas: Increasing Connectivity Between Jo...
Multi-Modal Transportation in North Texas: Increasing Connectivity Between Jo...
 
Food: How Transit is Improving Choices by Veletta Lill
Food: How Transit is Improving Choices by Veletta LillFood: How Transit is Improving Choices by Veletta Lill
Food: How Transit is Improving Choices by Veletta Lill
 
Integrating Health, Livable Communities and Transit: A How-To Discussion by E...
Integrating Health, Livable Communities and Transit: A How-To Discussion by E...Integrating Health, Livable Communities and Transit: A How-To Discussion by E...
Integrating Health, Livable Communities and Transit: A How-To Discussion by E...
 
Sharing the Road, Sharing the Bike by Jennifer McGrath
Sharing the Road, Sharing the Bike by Jennifer McGrathSharing the Road, Sharing the Bike by Jennifer McGrath
Sharing the Road, Sharing the Bike by Jennifer McGrath
 
Employment TOD: The Other E in ETOD by Alden S. Raine, PhD
Employment TOD: The Other E in ETOD by Alden S. Raine, PhDEmployment TOD: The Other E in ETOD by Alden S. Raine, PhD
Employment TOD: The Other E in ETOD by Alden S. Raine, PhD
 
Rail~Volution 101 - Fundamentals: Principles and Practices
Rail~Volution 101 - Fundamentals: Principles and PracticesRail~Volution 101 - Fundamentals: Principles and Practices
Rail~Volution 101 - Fundamentals: Principles and Practices
 
The Other TOD: Retaining Existing Development in a Corridor by Terry Benelli
The Other TOD: Retaining Existing Development in a Corridor by Terry BenelliThe Other TOD: Retaining Existing Development in a Corridor by Terry Benelli
The Other TOD: Retaining Existing Development in a Corridor by Terry Benelli
 
TOD and Parking: Matching the Requirements to the Neighborhood by Meea Kang
TOD and Parking: Matching the Requirements to the Neighborhood by Meea KangTOD and Parking: Matching the Requirements to the Neighborhood by Meea Kang
TOD and Parking: Matching the Requirements to the Neighborhood by Meea Kang
 
TOD and Parking: Matching the Requirements to the Neighborhood by Karina Ricks
TOD and Parking: Matching the Requirements to the Neighborhood by Karina RicksTOD and Parking: Matching the Requirements to the Neighborhood by Karina Ricks
TOD and Parking: Matching the Requirements to the Neighborhood by Karina Ricks
 
TOD and Parking: Matching the Requirements to the Neighborhood by Jason Witte...
TOD and Parking: Matching the Requirements to the Neighborhood by Jason Witte...TOD and Parking: Matching the Requirements to the Neighborhood by Jason Witte...
TOD and Parking: Matching the Requirements to the Neighborhood by Jason Witte...
 
A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock
A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock
A Complete Picture of Corridor Planning: The Fundamentals by Dwight Schock
 
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert HastingsRV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
 
RV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-Lyman
RV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-LymanRV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-Lyman
RV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-Lyman
 
RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...
RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...
RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...
 

Kürzlich hochgeladen

Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfMichael Silva
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...ssifa0344
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja Nehwal
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignHenry Tapper
 
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfGale Pooley
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Pooja Nehwal
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Pooja Nehwal
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptxFinTech Belgium
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Vinodha Devi
 

Kürzlich hochgeladen (20)

Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdf
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaign
 
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdf
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 
Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.
 

RV 2014: Show Me the Money- Federal Funding in a Non-Earmark World (Federal Funding 101) by Jeff Boothe

  • 1. Copyright © 2012 Holland & Knight LLP. All Rights Reserved Federal Funding 101 Rail-Volution Minneapolis, Minnesota September 22, 2014 Jeffrey F. Boothe 202.828.1896/jeff.boothe@hklaw.com
  • 2. Annual Budget Process - Authority • Congress is granted the “power of the purse,” or the ability to tax and spend public dollars for the federal government under the Constitution. – “All bills for raising Revenue shall originate in the House of Representatives; but the Senate may propose or concur with amendments as on other Bills.” • Constitution also requires an appropriations process to take place before money can be spent. – “No money shall be drawn from the Treasury, but in Consequence of Appropriations made by Law; and a regular Statement and Account of the Receipts and Expenditures of all public Money shall be published from time to time.” • House and Senate have adopted rules prescribing a two-step authorization-appropriation process. 2
  • 3. Annual Budget Process - Terminology • Authorization: authorizes the appropriation of funds for agencies, programs, and government functions. Purpose is to set parameters for spending. • Appropriation: confers actual authority to incur obligations. • Budget Resolution: sets spending ceilings for the upcoming fiscal year. • Types of Appropriations Measures: – Regular Appropriations: must be enacted before the new fiscal year on October 1; provides funding for fiscal year during typical process. – Continuing Resolution: extends previous fiscal year funding in the absence of regular appropriations, generally until regular bills are enacted. – Supplemental Appropriations: provides additional appropriations during a fiscal year, outside of the normal process. – Omnibus Appropriations: a combined package of regular appropriations bills used to consider a number of separate measures all at once. • Types of Outlays: – Direct (Mandatory): spending controlled by permanent laws, outside of the normal appropriations process. Examples: Medicare, Medicaid, unemployment insurance. – Discretionary: spending controlled through annual appropriations bills. 3
  • 4. Annual Budget Process - Cycle President Submits Budget Request to Congress House and Senate Pass Budget Resolutions House and Senate Appropriations Subcommittees and Committees Markup Appropriations Bills House and Senate Vote on Bills and Reconcile Differences President Signs Appropriations Bills Into Law 4
  • 5. Annual Budget Process - President’s Budget 5 • Required by law to submit annual budget for upcoming fiscal year no later than the first Monday in February of each year – Congress may grant extensions on this deadline. • The president’s submission to Congress initiates the annual budget process. • Budget is prepared by the Office of Management and Budget (OMB). • The President’s budget is a request and has no binding authority on Congress. • The President’s budget is used to detail administration policies and priorities, while creating, modifying, or removing certain programs and funding for agencies. • DOT announces budget and FTA release project recommendations
  • 6. Annual Budget Process - Budget Resolution 6 • Congressional Budget and Impoundment Control Act of 1974 requires Congress to adopt an annual budget resolution. • Purpose is to establish the total level of discretionary funding for the fiscal year, which must cover at least five fiscal years. • Also allocates federal spending among 20 major functional categories of the federal budget, such as transportation. • The Congressional Budget Act establishes April 15 as a target for adoption of a budget resolution. • After Congress adopts a budget resolution, all mandatory and discretionary spending levels are allocated to the appropriate Committees, in what are known as a “302(a) allocation.”
  • 7. Annual Budget Process - Committee Activity 7 • There are 12 subcommittees under the House and Senate Committees on Appropriations: • Appropriations Committees further divide 302(a) allocations among each subcommittee, known as 302(b) allocations, which further limit the total spending on each bill. Subcommittee Consideration and Markup Report to Full Appropriations Committee Full Committee Consideration and Markup Floor Action Agriculture, Rural Development Financial Services and General Government Legislative Branch Commerce, Justice and Science Homeland Security Military Construction and Veterans Affairs Defense Interior and Environment State and Foreign Operations Energy and Water Development Labor, Health and Human Services, and Education Transportation, Housing and Urban Development
  • 8. Annual Budget Process - Reconciliation • After passing each appropriations bill, the House and Senate will go to conference to reconcile any differences. • Differences are negotiated by conferees or managers. • Conferees or managers generally consist of members from the respective House and Senate appropriations subcommittees, and the chair and ranking minority Members of the full committees. • Must remain within scope during negotiations: House and Senate rules prevent conferees from (1) altering identical text in each bill, or (2) adding new matter that was not included in either bill. However, these rules can sometimes be waived. • Once reconciled, bill is sent to the President for signature. – President has 10 days to sign or veto the measure. If no action taken, bill automatically becomes law at the end of a 10-day period that Congress is in session. – President may veto bill, which can only be overruled by Congress by a two- thirds vote in both chambers. 8
  • 9. Annual Budget Process - Timeline February • President submits budget proposal to Congress April 15 • Congress adopts a budget resolution May/June • Appropriations Committees Begin Reporting Bills Late July • House and Senate finish considering appropriations bills Fall/ Winter • House and Senate reconcile, send bills to President October 1 • New Fiscal Year Begins 9
  • 10. Annual Budget Process - Outlook 10 • Congress has repeatedly failed to progress through a typical appropriations process for years. • Instead, Congress has adopted continuing resolutions and omnibus appropriations measures in order to keep the government funded. – Still, partisan differences resulted in a government shutdown in October 2013 that lasted 16 days. • Another continuing resolution was adopted this past week for fiscal year 2015 with expectation of Omnibus Bill in December. • It is unclear when Congress may once again return to a normal process and enact appropriations measures in a timely and bipartisan fashion.
  • 11. Surface Transportation Authorization • Congress must adopt legislation that authorizes funding for highways, transit and the safety programs – Moving Ahead for Progress in the 21st Century (MAP-21) signed into law in July 2012 – MAP-21 was a two year bill recently extended by Congress until May 2015 by the transfer of General Funds (GF) to the Highway Trust Fund (HTF) • HTF relies on 18.4 cent gasoline tax of which 2.86 cents are deposited into the Mass Transit Account (MTA) – Starting in 2008, Congress has been required to transfer monies from GF to the HTF that have been offset by changes in tax law • Highway programs funded entirely from HTF • Mass Transit funded by a combination of funds from MTA and the GF – Formula programs funded from MTA – Capital Investment Grants, FTA Administration and Research programs funded from GF 11
  • 13. Availability of Highway Flex Monies • MAP-21 retains provisions to flex monies to transit from STP and CMAQ – Expanded eligibility under STP for congestion pricing, ferry boats and terminals, off system bridges, border infrastructure, and congestion pricing – Enhancements eliminated and replaced by “Transportation Alternatives” that expands eligibility to cover Safe Routes to Schools, Recreational Trails and roadways within ROW of former Interstate or other divided highways • 50% within local control while 50% can be transferred by States to other programs – Operating Assistance – FHWA issued guidance in July 2014 • Start-up of new transit service or incremental costs of expanding services • Three years of CMAQ may be spread over a period of five years but must be tapered over that period • End of five years, non-CMAQ monies must be found 13
  • 14. National Highway Performance Program 14 • Allocated by formula to States • Construction, reconstruction, resurfacing, rehabilitation, preservation and operational improvements to the National Highway System (NHS), NHS system bridges and tunnels • Construction, rehabilitation or replacement of ferry boats and facilities that connect road segments of the NHS • Construction of transit projects if project is in HNS corridor and in proximity to NHS corridor, if more cost-effective than NHS improvement • Bicycle and Pedestrian projects • Infrastructure-based ITS capital projects
  • 15. Surface Transportation Program • 50% of monies apportioned to States obligated in urbanized areas, other 50% used in any area of the State • Construction, reconstruction, resurfacing, rehabilitation, preservation and operational improvements on any federal aid highway • Construction of tunnels and bridges on federal aid highways • Transit capital projects • Carpool projects, fringe and corridor parking facilities • Transportation Alternatives – Enhancements plus following: • Safe Routes to Schools • Recreational Trails • Roads within ROW of former Interstates or other divided highways • Surface transportation planning 15
  • 16. Congestion Mitigation and Air Quality 16 • Formula program with set aside for Transportation Alternatives • Must contribute to attainment or maintenance of air quality standard or effectiveness in reducing air pollution • Eligible Projects: – Traffic monitoring or control facilities – Transit capital projects – Transit operating assistance for initial operations or expansion of operations for three years – Bicycle/Pedestrian projects – Projects that shift demand to off-peak hours – Facilities serving electric or natural gas- fueled vehicles
  • 17. Performance Measures Structure • Measures are intended to increase the accountability and transparency of the Federal-aid highway program and improve project decision making through performance based planning and programming. • Seven national goal areas: • DOT will establish measures in consultation with State DOTs, MPOs and other stakeholders. • States are required to establish performance targets that reflect performance measures established by DOT. • MPOs and transit operators, will set targets for each measure, incorporate in plans and programs and report progress. • NPRM issued on June 2, 2014 (79 Fed. Reg. 31784) to implement measures – comments are due October 2, 2014 17 Safety Infrastructure Condition Congestion System Reliability Freight Movement and Economic Vitality Environmental Sustainability Reduced Project Delays
  • 18. Planning and Performance • Performance measures must be incorporated into long-range planning and short-term programming processes • LRTPs, TIPs and STIPs must show the progress that is expected to be achieved by planned decisions and investments • DOT will evaluate the appropriateness of State targets and the progress that the State is making in achieving performance targets • States and MPO plans will include performance reports that described the progress made toward achieving performance targets. • Scenario Planning • MPOs can develop multiple scenarios for LRTPs, but scenarios must be evaluated against performance measures – Used to assess pros and cons, as well as effects of each scenario • FHWA is to conduct a study on costs and benefits associated with scenario planning in developing the metropolitan transportation plan • Analysis will also look at technical and financial capacity of MPOs to develop planning scenarios 18
  • 19. TIFIA • Transportation Infrastructure Finance and Innovation Act (TIFIA) – Provides credit assistance to eligible surface transportation projects, including highways and transit • Secured Loans – direct loans with flexible repayment terms and providing combined construction and permanent financing – up to 49% of project cost • Loan Guarantees – full-faith and credit loan guarantees by Federal government to institutional investors – up to 49% of project cost • Lines of Credit – contingent sources of funding in form of loans that may be drawn down during first ten years of construction – up to 33% of project cost • Master Credit Agreements – contingent commitment of future TIFIA assistance for a program of projects secured by a common revenue pledge – Program expanded from $250 M per year to $750 M in FY 13 and $1 B in FY 14 – Must be repaid through dedicated funding sources that secure the obligation, such as tolls, user fees or payments 19
  • 20. TIFIA (Cont.) • Transportation Infrastructure Finance and Innovation Act (TIFIA) – Repayment of a loan may begin five years after substantial completion or project, and must be fully repaid within 35 years – Application Process – • First submit letters of interest (LOI) using the form available on TIFIA's website – Describe project location, purpose and cost – Outline of Project financial plan, including requested assistance and proposed obligor – Provide status of environmental review – Provide information regarding satisfaction of TIFIA eligibility requirements • DOT will review LOIs and request further information as necessary • Upon completion of the review and a determination of eligibility, DOT will invite an application for credit assistance 20
  • 21. Accelerating Project Delivery • States can assume FHWA’s role in NEPA process (excluding Clean Air Act, Clean Water Act and Endangered Species Act), including direct coordination with Federal environmental agencies (i.e. EPA, DOI, FWS) • Use of construction manager/general contractor (CMGC) method of contracting • Accelerated completion of complex projects within four years when State and other project sponsors request technical assistance – States and other project sponsors can request use of authority for projects that have been under development for at least two years • Up to 100% Federal share for some innovative techniques – Limited to 10% of available highway funding for States – Projects that contain innovative project delivery techniques, contain innovative technologies (ITS, recycling technology), or accelerates project delivery (incentives for early completion of the project, program or activity) 21
  • 22. Accelerating Project Delivery • Demonstration project for lump sum payments for purchase of ROW – State has authority to acquire the real property interest under State law – Will not cause any significant adverse environmental impact • Will not limit the choice of reasonable alternatives for the project or otherwise influence the decision of the Secretary on any required approval • Does not prevent the lead agency from making an impartial decision as to whether to accept an alternative that is being considered • Consistent with the State transportation planning processes • Acquired through negotiation, without the threat of condemnation and consistent with STURRA and Civil Rights Act – Secretary shall complete the review process under NEPA – Property interest shall have independent utility for purposes of NEPA and limit consideration of alternatives for future transportation improvements with respect to the real property interest. – Acquisition may consist of the acquisition of a specific parcel, a portion of a transportation corridor, or an entire transportation corridor. – May not be developed in anticipation all required environmental reviews completed. 22
  • 23. Highlight of Transit Program Changes 23
  • 24. Key Transit Terms • Designated Grant Recipient – Entity designated, in accordance with the planning process, by Governor, local officials and transit operators to receive and apportion federal transit monies, or – State or regional authority • Direct Recipient/Eligible Recipient – Entity that operates fixed route bus service and authorized by designated grant recipient to receive formula funds, or any entity that receives funds under section 5309 • Subrecipient – Receives monies through pass-through agreement with direct recipient or designated grant recipient whereby original recipient remains responsible for compliance 24
  • 25. Key Transit Terms • Grantee – Circular 5010.1D – Entity to which a grant is awarded directly by FTA to support a specific project in which FTA does not take an active role or retain substantial control • Project Sponsor – Entity responsible for providing legal, technical and financial capacity to managr a New Starts, Small Starts or Core Capacity project 25
  • 26. Capital Investment Grants • New Starts – Projects exceeding $250 million in total cost – Federal share usually 50 percent as project exceed $1 billion in total cost FTA is providing less than 50 percent • Small Starts – Projects less than $250 million in total cost – Federal share is capped at $75 million • Core Capacity – Projects that add ten percent capacity – No State of Good Repair projects 26
  • 27. Bus Rapid Transit Small Starts New Starts Right of Way Operates in a defined corridor but majority of which does not operate in a separated ROW dedicated to transit use during peak periods Majority of project operates in a separated ROW dedicated to transit use during peak hour Features of Project Substantial investment in a defined corridor by features that emulate rail fixed guideway services, including: • Defined stations; • Traffic signal priority; • Short headway bidirectional services for a substantial part of weekday and weekend days; and • Any other features Secretary determines support long-term investment Substantial investment in a single route in a defined corridor or subarea Includes features the emulate services provided by rail fixed guideway systems, including: • Defined stations; • Traffic signal priority • Short headway bidirectional services for a substantial part of weekday and weekend days; and • Any other features Secretary determines are necessary to produce high quality transit that emulates rail fixed guideway systems 27
  • 28. Urbanized Area Formula Programs • Urbanized Area Formula – Prior eligibility is retained but expanded to include jobs access and reverse commute – Provides funding for State Safety Oversight – Retains operating assistance for areas below 200,000 – Limited operating assistance for areas above 200,000 which operate up to 100 buses in fixed route service during peak hours – 1% mandatory set aside for transportation security projects • Growing States and High Intensity State Formula – Retains formula program first included in SAFETEA-LU 28
  • 29. Enhanced Mobility for Seniors/Persons with Disabilities • Consolidates New Freedom and Elderly and Disabled Program • Eligible Activities – 55% for capital projects to meet needs of seniors – 45% for transit projects to provide access to service or exceed ADA • Funding – 60% to designated recipients in urbanized areas (above 200,000) – 20% each to states for small urbanized area and for rural areas – Monies can be used for operating assistance – 50% federal share – Capital projects match – 80% federal share 29
  • 30. Other Formula Programs • Rural Area Formula – Incorporates rural transit, tribal discretionary grant programs, Rural Transit Assistance Program and Appalachian Development Public Transportation Assistance – Federal share is 80% for capital and 50% for operating assistance – Includes planning, capital, operating, JARC and acquisition of public transportation services • Bus and Bus Facilities – Shift from a discretionary to formula program – Overall funding reduced by 50% – First $65.5 million allocated with each state receiving $1.25 M with remaining $356.6 M allocated based on population, vehicle revenue miles and passenger miles 30
  • 31. Transit Planning Program • Performance-Based Planning Process – MPOs and States to develop transportation plans through performance- based planning – Transit performance-based planning focus is on asset management and State of Good Repair • Regional Transportation Planning Organizations may be created for nonmetropolitan areas • MPOs in urbanized areas designated as TMAs must include transit officials on policy boards – Guidance published on June 2, 2014 (79 Fed. Reg. 31214) – Representative should be either a board member (elected or appointed) or officer of a provider of public transportation – Should not be a person serving on MPO in another capacity – Have equal voting rights with other MPO Board members 31
  • 32. Pilot Program for TOD Planning • Applies to New Starts and Core Capacity Projects • States and local governmental entities are eligible for funding • $10 M annually is awarded competitively • Competitive grants would seek to: – Enhance economic development, ridership and other goals established during the project development and engineering processes; – Facilitate multi-modal connectivity and accessibility; – Increase access to transit hubs for bicycle and pedestrian activity; – Enable mixed-use development; – Identify infrastructure needs associated with the eligible project; and – Include private sector participation. 32
  • 33. State of Good Repair Program • High Intensity Fixed Guideway Program – 97.15% – Must be fixed guideway to receive funding – Alignment and operations contain each of the features set forth in State of Good Repair Circular • High Intensity Motorbus Program – 2.85% – Systems not operating in dedicated ROW – May share lane with other High Occupancy Vehicles – May share a “HOT lane” if transit and other HOVs ride for free – Monies may not be used to maintain or rehabilitate HOV lanes 33
  • 34. State of Good Repair Program • Transit Asset Management – FTA will introduce a regulation defining “state of good repair” – Regulation will set standards for measuring condition of capital assets – Will establish performance standards for state of good repair with each transit agency required to set targets – Transit agencies will be required to report condition of assets to the National Transit Database (NTD) • Condition of their system and any change in the condition • Targets set and progress towards meeting those targets 34
  • 35. Fixed Guideway BRT - Proposed Definition in SGR Circular • Over 50 percent of route operates in a separated right-of-way dedicated for transit use during peak periods – Other traffic can make turning movements through the separated right-of- way. • Defined stations – Accessible for persons with disabilities – Offer shelter from the weather – Provide information on schedules and routes.
  • 36. Fixed Guideway BRT - Proposed Definition in SGR Circular • Provide faster passenger travel times through congested intersections by using active signal priority in separated guideway, and either queue-jump lanes or active signal priority in non-separated guideway • The route must provide: – short headway, bi-directional service for at least a 14-hour span of service on weekdays and a 10-hour span of service on weekends – Short headway service on weekdays consists of either 15 minutes or less maximum headways throughout the day, or 10 minutes or less maximum headways during peak periods and 20 minutes or less maximum headways at all other times – Short headway service on weekends consists of 30 minutes or less maximum headways for at least 10 hours a day • The provider must apply a separate and consistent brand identity to stations and vehicles”
  • 37. Program of Interrelated Projects • Available only for New Starts/Core Capacity projects – Project is in the Engineering phase – Program of projects • has logical connectivity • when evaluated as a whole, meets the requirements for project justification capacity • supported by a logical implementation plan and by an acceptable degree of financial commitment – Monies must be repaid if sponsor does not complete program within a reasonable period of time – Government share of each project within program may not exceed 80% – Including a project not financed by Federal Government in a program does not impose Federal governments otherwise applicable 37
  • 38. Private Sector Participation • Secretary is directed to promote better coordination between public and private sector providers by providing technical assistance • If requested by sponsor of New Start, Small Start or Core Capacity project – – Identify best practices for PPP models in USA and elsewhere – Develop standard PPP transaction models – Perform financial assessments that include calculation of public and private benefits of PPPs • Secretary to identify provisions that impede use of PPPS • Develop guidance to provide transparency and public access to PPP agreements 38
  • 39. Private Sector Participation • Develop guidance to provide transparency and public access to PPP agreements – Any conflicts of interest for parties involved in PPPs; – Tax and financing aspects related to PPPs; – Changes in workforce and wages, benefits, or rules as a result of PPPs; – Estimates of the revenue or savings the PPP will produce for the public entity and private entity; – Any impacts on other developments and transportation modes as a result of non-compete clauses contained in PPPS; and, – Any other issue. • Project sponsors are encouraged to conduct assessments to determine whether a PPP represents a better public and financial benefits 39
  • 40. Pilot Project for Innovative Project Delivery • Available for any New Start, Small Start or Core Capacity Project • Demonstrate whether innovative project development and delivery methods or innovative finance arrangements can expedite project delivery • FTA select three projects to participate – At least one shall be requesting more than $100 million – At least one a project seeking less than $100 million • Government share limited to 50% • Recipient shall submit an application that identifies (a) project, (b) project schedule, (c) finance plan, and, (d) an analysis of efficiencies of proposed P3 • Certify system is in a state of good repair, project completed NEPA and demonstrate legal, technical and financial capacity 40
  • 41. TIGER • $600 million for FY 14 – up to $35 M for Planning – No less than $10 million per project and greater than $200 M in urban areas • Major focus on “ladders of opportunity” – Connect to centers of employment, education and services – Stimulate long-term growth, especially in economically depressed areas • Total of five primary criteria and two secondary criteria used to evaluate projects 41
  • 42. TIGER • Planning Grants – Planning, preparation and design of a project, or planning related to interdisciplinary factors such as housing, economic development, stormwater and other infrastructure investments – Applicant must discuss how the project resulting from the planning efforts will lead to the fulfillment of the criteria • Benefit/Cost Analysis (BCA) – Key is identifying and quantifying project benefits – Must receive a positive BCA in order to be considered • Selection Process – About 15 percent of projects are highly recommended – Only about three percent of the projects are funded 42
  • 43. TIGER • Key considerations for funding – Readiness – NEPA schedule, local match, status in terms of design and engineering and schedule – TIGER funds are the “last dollar” necessary to advance the project – Complete project with independent utility – Political and community support • Expect and prepare for TIGER funding in FY 15 43
  • 44. Accelerated Innovation Deployment (AID) Program 44 • Component of FHWA’s Technology and Innovation Deployment Program (TIDP) • State DOTs, local governments, MPOs, tribal governments and Federal Land Management Agencies are eligible • Projects may be in any aspect of highway transportation, including: planning, financing, operation, structures, materials, pavements, environment, and construction – e.g. lateral slide, high friction surface treatment • Project must be ready to initiate within 6 months of applying • $15 million available for FY 2014 – Up to $14 million for State DOTs – Up to $1 million to tribal governments and Federal Land Management Agencies
  • 45. Federal Railroad Administration – FY14 Grant Application Solicitation 45 • Solicitation for intercity passenger rail grade crossing improvement projects, positive train control (PTC) implementation projects, and Passenger Rail Corridor Investment Plan (PRCIP) projects • At least $36.3 million in funding available – FY14 Omnibus Authority: $19.8 million – FY08/08 Remaining HSIPR: $11.3 million – FY10 Remaining HSIPR: $5.2 million
  • 46. Bus and Bus Facilities, Ladders of Opportunity • One-time opportunity through FTA • Approximately $100 million available through recoveries from Section 5309 Bus and Bus Facilities Program authorized by SAFETEA-LU • Financing for capital projects to replace, rehabilitate, and purchase busses and to construct bus-related facilities – Operating expenses, preventive maintenance, and previous project expenses are ineligible • Eligible applicants included Urbanized Area Formula Program direct recipients, States, or Indian Tribes; Rural areas must submit as part of consolidated application • Opportunity closed on August 4, 2014 46
  • 47. FAA Airport Improvement Program (AIP) • Planning & development grants for public-use airports • Eligible projects include improvements related to airport security, capacity, and environmental concerns – e.g. Runway rehabilitation, airfield signage and lighting, planning or environmental studies, land acquisition, and others • FAA makes case-by-case determination for funding under the Passenger Facility Charge (PFC) program of airport ground access transportation projects – PFCs can be used for ground transportation projects, such as LRT, streetcar, BRT that provide access to airports – Project on airport property – Project can only provide access to the airport 47
  • 48. Passenger Ferry Grant Program • Federal Transit Administration (FTA) competitive program • Funding to support existing service, establish new service, and modernize boats and facilities for public ferry systems in urbanized areas - June 2014, FTA announced $60 million for 26 projects in 13 states • State and local government entities, public transportation providers, and private or non-profit organizations are eligible - Must be direct recipients of Section 5307 Urbanized Area Program 48
  • 49. Railway-Highway Crossings Program 49 • $220 million available for the program in 2014, funded from the Highway Account of the Highway Trust Fund • Funds safety improvements to reduce fatalities, injuries, and crashes at public grade crossings • Eligible projects include all public crossings at roadways, bike trails, and pedestrian paths • State funding levels determined by two factors: – 50% on formula factors for the Surface Transportation Program (STP) – 50% based on the number of public railway-highway crossings • Each state guaranteed to receive a minimum of 1/2% of program funds • 90% federal funding share
  • 50. Projects of National and Regional Significance (PNRS) 50 • Section 1301 of SAFETEA-LU provided grants to States for PNRS to improve movement of goods and people • MAP-21 authorized $500 million in fiscal year 2013 for PNRS, however no funds appropriated in FY13 • Section 1120 of MAP-21 requires DOT to develop a report to Congress containing a list of projects of national and regional significance, used to develop recommendations on financing • PNRS Survey – Compiled through surveys of State departments of transportation, transit agencies, tribal governments, and multi-state/multi-jurisdictional groups – Survey closed June 30, 2014
  • 51. Tribal High Priority Projects Program 51 • Provides funding to tribes whose “annual allocation of funding received under the Tribal Transportation Program (TTP) is insufficient to complete the highest priority project of the Tribe,” or to provide emergency funding for inoperative facilities due to disaster • $30 million appropriated from the General Fund • Modeled after former Indian Reservation Roads High Priority Projects Program • Projects limited to $1 million per application; 100% federal share • Indian Tribes or tribal government subdivisions are eligible
  • 52. EPA Brownfields 52 • Brownfield Economic Redevelopment Initiative aims to “prevent, asses, safely clean up, and sustainably reuse brownfields” – Definition: a site, or portion thereof, that has actual or perceived contamination and an active potential for redevelopment or reuse • Administered by Environmental Protection Agency (EPA), Office of Brownfields and Land Revitalization (OBLR) • FY 2015 Brownfields area-wide planning grant proposals due September 22, 2014 – Funding to conduct research, technical assistance, and/or training activities to develop brownfields area-wide plan • $4 million available for FY 2015, with maximum of $200,000 for each proposal • Urban brownfields can be preferable locations for transportation facilities
  • 55. Holland & Knight - Overview Founded in 1968, Holland & Knight is a global law firm with more than 1,000 lawyers and other professionals in 20 U.S. offices, as well as Bogotá and Mexico City. Among the nation's largest law firms, Holland & Knight provides representation in litigation, business, real estate and governmental law. Interdisciplinary practice groups and industry-based teams provide clients with access to attorneys throughout the firm, regardless of location. Holland & Knight has dedicated Local Government Advocacy and Transit practices to identify key funding opportunities and guide clients through the intricate federal funding process. 55
  • 56. Holland & Knight Offices 56 Portland Los Angeles San Francisco Dallas Chicago Boston New York Washington, D.C. Northern Virginia Atlanta Lakeland Miami Fort Lauderdale West Palm Beach Orlando Jacksonville Tampa Tallahassee Anchorage Bogotá, Colombia Mexico City, Mexico Austin
  • 57. Holland & Knight - Local Government Advocacy Practice Holland & Knight’s Local Government Advocacy Team has an extensive history of representing cities, counties, transportation agencies, education districts, housing authorities, public utilities, and other municipal entities across the United States. The firm assists clients in a broad range of areas, including transportation, water, energy and environment, public safety and homeland security to housing, community/economic development, education, workforce development, human services, public health, tax and pension matters – touching every local government issue. Holland & Knight’s bipartisan team maintains strong working relationships to Congress, the White House, virtually every federal department and agency, national stakeholders, think tanks, and thought leaders. In addition to the firm’s policy focus, Holland & Knight is equally matched in knowledge and expertise in the federal funding process and the ways to successfully maneuver funding outcomes in the current earmark-free environment. 57
  • 58. Holland & Knight - Transit Practice Holland & Knight has more than 30 years’ experience and knowledge of federal surface transportation programs, with a significant emphasis on public transit, and extensive experience working with transit agencies across the United States. Using our close bipartisan relationships, we have secured billions of dollars in federal resources to support small and large-scale transportation initiatives across the country, covering transit, light rail, bus and bus facilities, highway, road and bridge and pedestrian improvement. Holland & Knight also has an in-depth knowledge of the legislative, regulatory and statutory provisions affecting public transit agencies. We have a strong record of success assisting local governments, transit agencies, and transportation authorities in securing annual appropriations, program grants, loan, and bond financing. 58
  • 59. 59 Holland & Knight Team Members Lisa Ann Barkovic Senior Policy Advisor Ms. Barkovic has extensive experience in the areas of federal appropriations, transportation, environment, energy, and homeland security. Prior to joining Holland & Knight, Ms. Barkovic served five years in the office of former Congressman Mark Foley (FL-16) as a Legislative Assistant. Paul S. Bock Partner Mr. Bock has more than 20 years of experience working with key decision-makers in the U.S. Senate and House of Representatives, including lawmakers, senior staff members and interest groups involved in public policy. He has extensive experience and knowledge in financial services, transportation and energy. Jeffrey F. Boothe Partner Mr. Boothe is nationally recognized on matters relating to transportation policy, transit project planning, strategy and implementation, procurement and transit- oriented development. Mr. Boothe is experienced in representing public transit properties and helping clients advance projects through the federal approval process for discretionary grants, transit procurement and Buy America provisions.
  • 60. Holland & Knight Team Members (Cont.) 60 Jim Davis Partner Mr. Davis served in the U.S. House of Representatives for 10 years, from 1997 to 2007. While in Congress, Mr. Davis served on the Energy and Commerce Committee where he was focused on energy, telecommunications and electronic commerce, healthcare, the environment and consumer protection issues. Rich Gold Partner Mr. Gold is the leader of Holland & Knight's Public Policy & Regulation Practice Group. Mr. Gold joined Holland & Knight in 1994 after eight years of government service, culminating in stints with Senator Lloyd Bentsen and EPA Administrator Carol Browner. Lauri A. Hettinger Senior Policy Advisor Ms. Hettinger advocates for local government municipalities' and industry's infrastructure needs, including surface transportation, water resources, economic development and Army Corps of Engineers.
  • 61. Holland & Knight Team Members (Cont.) 61 Ronald J. Klein Partner Mr. Klein has worked in the private sector as a business and transactional attorney for over 25 years, as well as the public sector as an elected official in both Tallahassee and Washington, D.C. Mr. Klein's experience gives clients an added edge in having their advocate understand their issues and concerns. Kathryn Lehman Partner A 15-year veteran of the Hill, Ms. Lehman has significant and wide-ranging experience, having worked closely with the White House, administrative agencies, House and Senate leadership and committees, political committees and other key members of government. Dan Maldonado Senior Policy Advisor Mr. Maldonado has over 30 years of federal appropriations, legislative and budget experience. He has extensive expertise in Federal financing of a range of critical public policy areas, including economic development, redevelopment and transportation projects; energy, water and environmental programs.
  • 62. Holland & Knight Team Members (Cont.) 62 Leslie Pollner Senior Policy Advisor Ms. Pollner focuses on several key industries, including transportation, economic development and housing. Prior to joining the firm, Ms. Pollner was the deputy mayor for federal affairs in Los Angeles under Mayor Antonio Villaraigosa. Eve M. O’Toole Senior Policy Advisor Ms. O'Toole brings more than 20 years of federal lobbying experience, with substantial background in local government/public sector advocacy, regulatory, appropriations and policy development, and in establishing and executing local public-private partnerships and successful grassroots campaigns and coalitions. Justin A. Maturo Legislative Assistant Mr. Maturo has over 4 years of combined experience working in the U.S. House of Representatives. Prior to joining Holland & Knight, Mr. Maturo served as legislative assistant for Congresswoman Eddie Bernice Johnson.
  • 63. Holland & Knight Team Members (Cont.) 63 David Whitestone Partner David Whitestone is a lawyer in the Public Policy & Regulation Practice Group and oversees the provision of legal and legislative counsel services. Prior to joining private practice, Mr. Whitestone worked in the U.S. House of Representatives and was an associate staff member on the House Appropriations Committee. Shawna Watley Senior Policy Advisor Ms. Watley has cultivated strong relationships on the federal, state and local levels of government. Prior to joining Holland & Knight, Ms. Watley served as manager of federal relations for the Dallas Area Rapid Transit and was founder and president of the Francis Group LLC, which specialized in consulting on transportation issues.