                                                                                                   Pradhan Mantri Gram Sadak Yojana
                                                                                                               PMGSY
                                                                                          •    Rural Road Connectivity is not only a key component of Rural Development by
                                                                                               promoting access to economic and social services and thereby generating
                                                                                               increased agricultural incomes and productive employment opportunities in
                                                                                               India, it is also as a result, a key ingredient in ensuring sustainable poverty
                                                                                               reduction. Notwithstanding the efforts made, over the years, at the State and
                                                                                               Central levels, through different Programmes, about 40% of the Habitations in
                                                                                               the country are still not connected by All-weather roads.
                                                                                          •    It is well known that even where connectivity has been provided, the roads
                                                                                                                                                y          p        ,
                                                                                               constructed are of such quality (due to poor construction or maintenance) that
                                                                                               they cannot always be categorized as All-weather roads.
                    Guided by Dr. R. M. Damgir                                            •    With a view to redressing the situation, Government have launched the Pradhan
                                                                                               Mantri Gram Sadak Yojana on 25th December, 2000 to provide all-weather
                                                                                               access to unconnected habitations. The Pradhan Mantri Gram Sadak Yojana
                                                                                               (PMGSY) is a 100% Centrally Sponsored Scheme. 50% of the Cess on High
                                  Represented by Rahul Agrawal                                 Speed Diesel (HSD) is earmarked for this Programme.




18 April 2013                Transportation Engineering Rahul                         1   18 April 2013                Transportation Engineering Rahul                          2
                                          Agrawal                                                                                   Agrawal




         Pradhan Mantri Gram Sadak Yojana                                                                     Roman Road Construction
                     PMGSY                                                                                                    Basic cross section
•   The primary objective of the PMGSY is to provide Connectivity, by way of an All-
    weather Road (with necessary culverts and cross-drainage structures, which is
    operable throughout the year), to the eligible unconnected Habitations in the rural
    areas, in such a way that all Unconnected Habitations with a population of 1000
    persons and above are covered in three years (2000-2003) and all Unconnected
    Habitations with a population of 500 persons and above by the end of the Tenth
    Plan Period (2007). In respect of the Hill States (North-East, Sikkim, Himachal
    Pradesh, Jammu & Kashmir, Uttaranchal) and the Desert Areas (as identified in the
    Desert D l
    D       Development P  Programme) as well as the Tribal (Schedule V) areas, the
                                      )       ll    h T ib l (S h d l             h
    objective would be to connect Habitations with a population of 250 persons and
    above.
•   The PMGSY will permit the Upgradation (to prescribed standards) of the existing
    roads in those Districts where all the eligible Habitations of the designated
    population size (refer Para 2.1 above) have been provided all-weather road
    connectivity. However, it must be noted that Upgradation is not central to the
    Programme and cannot exceed 20% of the State’s allocation as long as eligible
    Unconnected Habitations in the State still exist. In Upgradation works, priority
    should be given to Through Routes of the Rural Core Network, which carry more
    traffic (see Para 3.7 below)

18 April 2013                Transportation Engineering Rahul                         3   18 April 2013                Transportation Engineering Rahul                          4
                                          Agrawal                                                                                   Agrawal




     Institution for Highway Planning, Design and
           Implementation at Different Levels                                                              Jayakar Committee,1927
     •    Jayakar Committee (1927)                                                             • Road development should be made a national
     •    Central Road Fund (1929)                                                               interest since the provincial and local govt do
     •    Indian Roads Congress (IRC), 1934                                                      not have financial and technical capacity for
     •    Central Road Research Institute (CRRI), 1950                                           road development.
     •    National Highway Act, 1956
                     g    y     ,                                                              • Levy extra tax on p
                                                                                                     y               petrol from road users to
     •    National Highway Authority of India (NHAI),1995                                        create the road development fund.
     •    National highway act ( 1956 )                                                        • To establish a semi-official ,technical institution
     •    Second twenty year road plan ( 1961 )                                                  to pool technical knowledge, sharing of ideas
     •    Highway Research board ( 1973 )
                                                                                                 and to act as an advisory body.
     •    National Transport Policy committee ( 1978 )                                         • To create a national level institution to carry
     •    Third twenty year road plan ( 1981 )                                                   research , development works and consultation.

18 April 2013                Transportation Engineering Rahul                         5   18 April 2013                Transportation Engineering Rahul                          6
                                          Agrawal                                                                                   Agrawal




                                                                                                                                                                                         1
18/04/2013




                                                                                                             Classification of Highways
                                                                                             Depending on weather
                                                                                             • All weather roads
                                                                                             • Fair weather roads
                                                                                             Depending the type of Carriage way
                                                                                             • Paved roads
                                                                                             • Unpaved roads
                                                                                             Depending upon the pavement surface
                                                                                             • Surfaced roads
                                                                                             • Un surfaced roads
                                                                                             Based on the Traffic Volume
                                                                                             • Heavy
                                                                                             • Medium
                                                                                             • Light
                                                                                             Based on Load or Tonnage
                                                                                             • Class 1 or Class 2 etc or Class A , B etc Tonnes per day
                                                                                             Based on location and function ( Nagpur road plan )
                                                                                              NH, SH, MDR, ODR & VR

18 April 2013                  Transportation Engineering Rahul                     7    18 April 2013                     Transportation Engineering Rahul                                    8
                                            Agrawal                                                                                     Agrawal




                                Road Patterns                                                 Factors Influencing Highway Alignment
    •    Rectangular or Block patterns                                                           Requirements:
    •    Radial or Star block pattern                                                                      Short
    •    Radial or Star Circular pattern                                                                   Easy
    •    Radial or Star grid pattern                                                                       Safe
                                                                                                           Economical
    •    Hexagonal Pattern
                                                                                                 Factors controlling alignment :
    •    Minimum travel Pattern
                                                                                                 1) Obligatory points
                                                                                                        A. Obligatory points through which alignment is to pass ( bridge site, intermediate
                  Classification of Roadways                                                          town , Mountain pass e c
                                                                                                       ow     ou       p ss etc
                                                                                                        B. Obligatory points through which alignment should not pass.
                                                                                                  2) Traffic
    •    Expressways                200 Km                                                        3) Geometric design
                                                                                                  4) Economics
    •    National Highways          70,548 Km                                                     5) Other considerations
    •    State Highways             1,31,899 Km                                                  Additional care in hill roads
    •    Major District Roads       4,67,763 Km                                                  Stability
                                                                                                 Drainage
    •    Rural and Other Roads      26,50,000 Km                                                 Geometric standards of hill roads
                                                                                                 Resisting length



18 April 2013                  Transportation Engineering Rahul                     9    18 April 2013                     Transportation Engineering Rahul                                   10
                                            Agrawal                                                                                     Agrawal




         Steps in New Highways Project Works                                                                   Necessity of Re-alignment
    •    Map Study (available topographic map)                                               •    Improvement of horizontal alignment design elements such as radius,
    •    Reconnaissance Survey (identification of soil & on spot site inspection)                 super elevation, transition curve, clearance on inner side of the curve
    •    Preliminary Survey (alternate alignment, comparison of alternate route              •    Improvement of vertical alignment design elements like steep gradients,
         & economic analysis)                                                                     changes in summit curve to increase sight distance, correction of
    •    Location of Final Alignment (transfer of alignment, circular curve &                     undesirable undulations like humps and dips etc
         transition curve & super elevation)                                                 •    Raising level of portion of road which is subjected to flooding,
    •    Detailed Survey (Earth work quantities & other construction materials)                   submergence or water logging during monsoons
    •    Materials Survey (their collection & testing)                                       •    Reconstruction of weak & narrow bridges & culverts & changes in
                                                                                                  R            i    f     k           b id          l         h       i
                                                                                                  water way at locations slightly away from existing site
    •    Design (embankment & cut slopes, bridges & pavement layers)
                                                                                             •    Construction of over bridges or under bridges at suitable locations
    •    Earth Work ( highway cutting & drainage system)                                          across a railway line in place of level crossing or another roads to
    •    Pavement Construction (preparation of sub grade, sub base & surface                      provide grade separate inter section
         course)                                                                             •    Construction of bypass to avoid the road running through a town or city
    •    Construction Control (quality control tests during different stages)                •    Defence requirements



18 April 2013                  Transportation Engineering Rahul                     11   18 April 2013                     Transportation Engineering Rahul                                   12
                                            Agrawal                                                                                     Agrawal




                                                                                                                                                                                                      2
18/04/2013




                                    Alignment for hill roads                                                                             Cross Slope or Camber
 •        Minimum hair pin bends.
 •        Bends should be located on stable and flat slopes.                                               •    It is the slope provided to the road surface in the transverse direction to drain off the rain water from the
                                                                                                                road surface. Drainage and quick disposal of water from pavements surface by providing cross slope is
 •        Cross section for hair pin bends should be at intervals of 20-25m.                                    considered important because
                        15 m on either side of centre line in straight alignment
                                                                                                                  – To prevent entry of surface water into the sub grade soil through pavement, stability & life of
 •        Avoid bends in valleys.                                                                                      pavement get affected if water enters in the sub grade and the soil gets soaked.
 •        Survey for a width of ; 30m on sharp curves.                                                            – To prevent entry of water into the bitumen layer and results in deterioration of pavement layers.
                                                                                                           •    Shape of Camber
                                              Geometric Design                                                    – Parabolic shape
                                                                                                                  – Straight line camber
 • Elements of design:                                                                                            – Combination of straight and parabolic shape

           – Sight distance
                     • The length of road ahead visible to drivers                                             Class of road                                       Width of carriage way
                            – Stopping sight distance
                                                                                                               Single lane                                         3.75m
                            – Passing sight distance
           – Horizontal alignment                                                                              Two lanes, without raised Krebs                     7.0m
                     • Super elevation rates (0.1 for rural areas, 0.06 for urban)                             Two lanes, with raised Krebs                        7.5m
                     • Minimum radius
                                                                                                               Intermediate carriage way                           5.5m
           – Vertical alignment
           – Pavement design                                                                                   Multi lane pavements                                3.5m per lane
           – Intersection and crossing design

18 April 2013                                  Transportation Engineering Rahul                       13   18 April 2013                         Transportation Engineering Rahul                                               14
                                                            Agrawal                                                                                           Agrawal




                                                Sight Distance                                                                                     PIEV Theory
      •      Sight distance available from a point is the actual distance along the road                        •   According to this theory the total reaction time of the driver is split into four
             surface, which driver from specific height above the carriage way has visibility
             of the stationary or moving object.
                                                                                                                    parts viz. time by the driver for
                                                                                                                      – Perception
      •      Length of road visible ahead the driver at any instance.
                                                                                                                            • It is time required for the sensation received by the eyes or ears to be transmitted to the
      •      Sight distance are of                                                                                            brain through nervous system & spinal cord.
                 –    Stopping or absolute minimum sight distance
                                                                                                                      – Intellection
                 –    Safe over taking or passing sight distance
                                                                                                                            • It is time required for understanding the situation
                 –    Safe sight distance for entering into uncontrolled intersections
                                                                                                                      – Emotion
     Stopping Sight Distance                                                                                                • It is time elapsed during emotional sensations and disturbance such as fear, anger or
                                                                                                                                                                                                     fear
              – Minimum sight distance available on highway at any spot should be of                                          other feelings.
                sufficient to length to stop vehicle traveling at design speed, safely without                        – Volition
                collision with any other obstruction.                                                                       • It is time taken for final action.
                                                                                                                                                                               I                  E
              – Depends on factor
                        •   Total reaction time of driver
                        •   Speed of vehicle
                        •   Efficiency of brakes
                        •   Frictional resistance between road and tyre                                                                                                P                                   V
                        •   Gradient of the road
                                                                                                                                                                                     Reflex Action

18 April 2013                                  Transportation Engineering Rahul                       15   18 April 2013                         Transportation Engineering Rahul                                               16
                                                            Agrawal                                                                                           Agrawal




                       Analysis of Stopping Sight Distance                                                                 Analysis of Overtaking Sight Distance
     1.          It is sum of                                                                                  1.      The minimum distance open to the vision of the driver of vehicle intending
             –          Lag distance (distance traveled by vehicle during total reaction time)                         to overtake of slow vehicle ahead with the safety against traffic of opposite
             –          Braking distance (distance traveled by vehicle after application of brakes)                    direction is known as Min. OSD or Safe OSD
     2.          Ld = v t meters                                                                               2.      Factor for min. OSD
     3.          Bd = (V.V) / (2gf) meters                                                                           1.     Overtaking speed of vehicle
                                                                                                                     2.     Overtaken speed of vehicle
                                                                                                                     3.     Speed of Vehicle coming from opposite side
     4.          SSD = Ld + Bd
                                                                                                                     4.
                                                                                                                     4      Skill and reaction time of driver
                                                                                                                                    d     ti ti      fd i
                   = (v t ) + {(v v) / (2gf)} meters
                                                                                                                     5.     Rate of acceleration of overtaking vehicle
                   = (0.278 v t ) + {(v v) / (254 f)} kmph
                                                                                                                     6.     Gradient of road
             V = speed of vehicles
                                                                                                               3.      (Justo Khanna Page no. 96)
             F = design coefficient of friction 0.4 to 0.35
                                                                                                                     OSD = 0.28 Vb t + 0.28 Vb T + 2s+ 0.28 V T
             G = acceleration due to gravity = 9.8 m/sec2
                                                                                                                     Vb = speed of over taking vehicle kmph
                                                                                                                     T = reaction time of driver = 2secs
                                                                                                                     V = speed of overtaking vehicle or design speed kmph
                                                                                                                     T = (14.4 s / A)^0.5 and Spacing = s = (0.2 Vb + 6 )


18 April 2013                                  Transportation Engineering Rahul                       17   18 April 2013                         Transportation Engineering Rahul                                               18
                                                            Agrawal                                                                                           Agrawal




                                                                                                                                                                                                                                        3
18/04/2013




                                  Traffic Engineering                                                                                 PCU Passenger Car Unit
   1.         Traffic characteristics                                                                           1.      Different class of vehicles such as cars, vans, buses, trucks, auto rickshaw,
         1.       Road user characteristics                                                                             motor cycles, pedal cycles, bullock carts, etc are found to use common
                 1.    Physical characteristics                                                                         roadway facilities without segregation on most of the roads in developing
                 2.    Mental characteristics                                                                           countries like India.
                 3.    Environmental factors                                                                    2.      The flow of traffic with unrestrained mixing of different vehicle classes on
         2.       Vehicular characteristics                                                                             the roadways forms the heterogeneous traffic flow or mixed traffic flow.
                 1.    Static characteristic : Vehicle Dimension, Weight, Speed & Power of vehicle
                                                                                                                3.      Different vehicle have different dimension like speed, length, acceleration..
                 2.    Braking characteristic
                                                                                                                        and apart this it has different driver behavior..
                                                                                                                                                               behavior
   2.         Traffic studies and analysis
                                                                                                                4.      Common practice of considering the passenger car as the standard vehicle
         1.       Traffic volume studies
                                                                                                                        unit to covert the other vehicle classes and this unit is called as PCU
         2.       Origin and destination study
                                                                                                                5.      PCU/lane or PCU/ hour or PCU/ kilometer length of lane..
         3.       Parking study
   3.         Traffic operation-control and regulation
   4.         Planning and analysis
   5.         Geometric design
   6.         Administration and management

18 April 2013                         Transportation Engineering Rahul                                  19   18 April 2013                    Transportation Engineering Rahul                                 20
                                                   Agrawal                                                                                                 Agrawal




                                      Regulatory signs                                                                                         Traffic Signals
   1.         Regulatory or mandatory sign are meant to inform the road users of certain laws,                  1.      At intersection where there are a large number of crossing and right turn
              regulations and prohibitions; the violation of these signs is legal offence.                              traffic, there is possibility of several accidents as there can’t be orderly
   2.         Signs are classified as                                                                                   movements.
         1.       Stop and Give-way sign
                                                                                                                2.      Traffic signals are control devices which could alternately direct traffic to
         2.       Prohibitory sign
                                                                                                                        stop and proceed at intersections using Red, Yellow and Green.
         3.       No parking and no stopping sign
         4.       Speed limit and vehicle control sign                                                          3.      Advantages
         5.       Restriction ends sign                                                                               1.     Smooth movements and crossings
         6.
         6        Compulsory direction control and other sign
                  C      l     di i           l d h i                                                                 2.
                                                                                                                      2      Reduce accidents
                                                                                                                             R d        id
   3.         Informative signs                                                                                       3.     Safety
         1.       This sign are used to guide road users along routes, inform them of destination and                 4.     Control speed
                  distance and provide with information to make travel easier, safe and pleasant.
         2.       Direction and place identification signs
                                                                                                                4.      Disadvantages
         3.       Facility information signs                                                                          1.     Rear end collisions may increase
         4.       Other useful information signs                                                                      2.     Improper design and location of signal may lead to violation of control systems
         5.       Parking signs                                                                                       3.     Failure of signal due to electric power.
         6.       Flood gauge



18 April 2013                         Transportation Engineering Rahul                                  21   18 April 2013                    Transportation Engineering Rahul                                 22
                                                   Agrawal                                                                                                 Agrawal




                                   Highway Materials                                                                                        Direct Shear Tests
   1.         Sub grade soil is an integral part of the road pavement structure as it                           1.      It is oldest shear tests.
              provides the support to the pavement from beneath.                                                2.      Apparatus consists of box divided horizontally into two halves.
   2.         Desirable properties of soil as highway materials are                                             3.      One halve is kept fixed and other half is free to move horizontally.
         1.       Stability and incompressibility                                                               4.      A vertical load is applied and horizontal movements are measured by dial
         2.       Permanency of strength                                                                                gauges and horizontal force is noted from the providing ring dial.
         3.       Minimum changes in volume
                                                                                                                5.      Limitation : failure plane being predetermined horizontal plane, need not
         4.       Good drainage and Ease of compaction                                                                  necessarily represent the imminent plane of failure.
   3.         Factor on which strength characteristics of soil depends on                                       6.      The shearing stress and strain along this horizontal failure plane is seldom
         1.       Soil type and moisture content                                                                        uniform.
         2.       Dry density
         3.       Internal structural of soil
         4.       Type and mode of stress application
   4.         Evaluation of soil
         1.       Shear tests
         2.       Bearing tests
         3.       Penetration tests

18 April 2013                         Transportation Engineering Rahul                                  23   18 April 2013                    Transportation Engineering Rahul                                 24
                                                   Agrawal                                                                                                 Agrawal




                                                                                                                                                                                                                       4
18/04/2013




                                    Plate Bearing Test                                                                   California Bearing Ratio (CBR) test
                                                                                                          •    CBR was developed by the California Division
   1.         It is used to evaluate this supporting power of sub grade for use in                             of Highways as a method of classifying and
                                                                                                               evaluating soil- sub grade and base course
              pavement design by using relatively large diameter plates.                                       materials for flexible pavements.
   2.         The PBT was originally devised to find the modulus of sub grade reaction                    •    CBR is a measure of resistance of a material to
              in the Westergaard’s analysis for wheel load stress in cement concrete                           penetration of standard plunger under
                                                                                                               controlled density and moisture conditions.
              pavements.                                                                                  •    CBR test may be conducted in remoulded or
   3.         Setup consists of a set of plates of diameter 75, 60, 45 & 30cm, a loading                       undisturbed sample.
              device consisting of jack and providing ring arrangement and reaction                       •    Test consists of causing a cylindrical plunger
                                                                                                               of 50mm diameter to penetrate a pavement
              frame against ehich the jack give thrust to the plate.
                                                              plate                                            component material at 1.25mm/minute. The
                                                                                                                          t t i l t 1 25       / i t Th
   4.         A datum frame resting far from the loaded area and dial gauges from this                         loads for 2.5mm and 5mm are recorded.
                                                                                                          •    This load is expressed as a percentage of
              frame are used to measure the settlement of the loaded plate.                                    standard load value at a respective deformation
                                                                                                               level to obtain CBR value.
                                                                                                          Definition:
                                                                                                          • It is the ratio of force per unit area
                                                                                                             required to penetrate a soil mass with
                                                                                                             standard circular piston at the rate of
                                                                                                             1.25 mm/min. to that required for the
                                                                                                             corresponding penetration of a
                                                                                                             standard material.
18 April 2013                         Transportation Engineering Rahul                              25   18 April 2013                    Transportation Engineering Rahul                 26
                                                   Agrawal                                                                                             Agrawal




                              Test for Road Aggregates                                                                               Bitumen adhesion test
   1.         Crushing test                                                                                   1.    Bitumen and tar adhere well to all normal types of road aggregates
         1.       Stone aggregates give low aggregate crushing valve
                                                                                                                    provided they are dry and are free from dust.
         2.       Crushing valve for base course shouldn’t exceed 45 %
         3.       Crushing valve for surface course shall be less than 30 %                                   2.    Several laboratory test are
   2.         Abrasion test                                                                                        1.    Static immersion test
         1.       Loss Angeles abrasion test                                                                             Very commonly used and very easy and simple test
         2.       Deval abrasion test
                                                                                                                   2.    Dynamic immersion test
         3.       Dory abrasion test
                                                                                                                   3.    Chemical immersion test
   3.         Impact test
                pact
                  Maximum permissible valve is 35% for bituminous macadam and 40% for water bound                  4.    Immersion mechanical test
                  macadam base course.                                                                             5.    Immersion trafficking test
   4.         Soundness
                                                                                                                   6.    Coating test
   5.         Shape test
                  Flakiness index used in road is less than 15% and doesn’t exceed 25%
   6.         Specific gravity and water absorption test
         1.       Specific gravity lies between 2.6 to 2.9
         2.       Water absorption is less then 0.6 %
   7.         Bitumen adhesion test


18 April 2013                         Transportation Engineering Rahul                              27   18 April 2013                    Transportation Engineering Rahul                 28
                                                   Agrawal                                                                                             Agrawal




                               Various test on Bitumen                                                             Various test on Bitumen : Penetration test
   1.         Penetration test
         Determines hardness or softness of bitumen by measuring depth of penetration
                                                                                                              1.    Determine the hardness or softness of bitumen by measuring the
                                                                                                                    depth in tenth of millimeter to which standard loaded needle will
   2.         Ductility test
                                                                                                                    penetrate vertically in five second.
         Carried to test the property of the binder in bitumen
   3.         Viscosity test                                                                                  2.    Needle weight of 100gm and device for releasing and locking in
   4.         Float test                                                                                            any position with dial gauge to read penetration valves of 1/10th of
                                                                                                                    millimeter
   5.         Specific gravity test
   6.
   6          Softening t t
              S ft i test                                                                                     3.
                                                                                                              3     The penetration valves of various types of bitumen used in
                                                                                                                    pavement construction in this country range between 20 and 225,
   7.         Flash and fire point test
                                                                                                                    30/40 and 80/100 grade bitumen are more used.
   8.         Solubility test
   9.         Spot test
                                                                                                              4.    In hot climate lower penetration grade bitumen like 30/40 bitumen
                                                                                                                    is preferred.
   10.        Loss of heating test
   11.        Water content test




18 April 2013                         Transportation Engineering Rahul                              29   18 April 2013                    Transportation Engineering Rahul                 30
                                                   Agrawal                                                                                             Agrawal




                                                                                                                                                                                                   5
18/04/2013




            Various test on Bitumen : Ductility test                                            Various test on Bitumen : Fire point test
   1.       Bitumen binder form ductile films around the aggregates.                       1.      Bitumen leaves out volatiles at temperature depending upon their
   2.       Test is believed to measure adhesive property of bitumen and its                       grade.
            ability to stretch.                                                            2.      These volatiles catch fire causing a flash.
   3.       Bitumen may satisfy penetration test but may fail in bitumen                   3.      This condition is very hazardous and it is therefore essential to
            ductility test. So both test should be satisfied.                                      qualify this temperature for each bitumen grade, so that paving
   4.       The ductility is expressed as the distance in centimeters to which a                   engineers may restrict the mixing and application temperatures.
            standard briquette of bitumen can be stretched before the thread               4.
                                                                                           4       Flash point : the flash point of material is the lowest temperature at
            breaks.                                                                                which the vapor of substance momentarily takes fire in the form of
   5.       Test is conducted at 27’C and rate of pull of 50 mm per minute.                        flash under specified condition of test.
   6.       Ductility valve changes from 5 to over 100 for different bitumen               5.      Fire point : The fire point is the lowest temperature at which the
            grades.                                                                                material gets ignited and burns under specified conditions of test.
   7.       According to ISI ductility valve should be 45 cm for bitumen grade
            75 & above.


18 April 2013                 Transportation Engineering Rahul                     31   18 April 2013                 Transportation Engineering Rahul                          32
                                           Agrawal                                                                                 Agrawal




      Various test on Bitumen : Softening point test                                                           Design of Bitumen Mixes

   1.       It is temperature at which substance attains a particular degree of            1.      Selection of Aggregates
            softening under specified condition of test.                                                Aggregate posses sufficient strength, hardness, toughness & soundness
   2.       The softening point of bitumen is usually determined by Ring &                 2.      Selection of Aggregates Grading
            Ball test.                                                                                  Property of Bituminous mix including density & stability are much
   3.       Higher softening point indicates lower temperature susceptibility                           dependent on aggregates and their grain size
            and its preferred in warm climates.                                            3.      Determination of Specific gravity
   4.
   4        Hard grade bitumen possess higher softening point than soft grade              4.
                                                                                           4       Proportioning of Aggregates
            bitumen.                                                                       5.      Preparation of Specimens
   5.       Softening point of various bitumen grades in paving jobs vary                  6.      Determination of Specific gravity of compacted specimens
            between 35’C to 70’C.
                                                                                           7.      Stability tests on compacted specimens
                                                                                           8.      Selection of optimum Bitumen content




18 April 2013                 Transportation Engineering Rahul                     33   18 April 2013                 Transportation Engineering Rahul                          34
                                           Agrawal                                                                                 Agrawal




                                                                                                        Selection of Mix Constituents :
    Bituminous Mix Design : Introduction
                                                                                                                     Binder
  • A good design of bituminous mix is expected to result in a mix which is
    adequately
        –   strong                                                                        • Generally binders are selected based on some simple tests and
        –   durable                                                                         other site-specific requirements.
        –   resistive to fatigue & permanent deformation                                  • These tests could be different depending of the type of binder
        –   Environment friendly                                                            viz. penetration grade, cutback, emulsion, modified binder etc.
        –   economical and so on.                                                           For most of these tests, the test conditions are pre-fixed in the
                                                                                                                                             pre fixed
  • A mix designer tries to achieve these requirements through a number of                  specifications.
    tests on the mix with varied proportions and finalizes with the best one.             • Rolling Thin Film Oven Test (RTFO), Pressurized Aging
  • This often involves a balance between mutually conflicting parameters.                  Vessel (PAV), Dynamic Shear Rheometer, Rotational
  • The present article tries to identify some of the issues involved in this               Viscometer, Bending Beam Rheometer, Direct Tension Tester
    art of bituminous mix design and the direction of current research.                     are some of the tests recommended in Super pave binder
                                                                                            selection.



18 April 2013                 Transportation Engineering Rahul                     35   18 April 2013                 Transportation Engineering Rahul                          36
                                           Agrawal                                                                                 Agrawal




                                                                                                                                                                                        6
18/04/2013




                 Selection of Mix Constituents :
                                                                                                        Role of Mix Volumetric Parameters
                           Aggregates
                                                                                                  •     Bitumen holds the aggregates in position, and the load is taken by the aggregate
  • Number of tests are recommended in the specifications to judge the                                  mass through the contact points.
    properties of the aggregates, e.g. strength, hardness, toughness,                             •     If all the voids are filled by bitumen, then the load is rather transmitted by
    durability, angularity, shape factors, clay content, adhesion to binder                             hydrostatic pressure through bitumen, and strength of the mix therefore
    etc.                                                                                                reduces.
  • Angularity ensures adequate shear strength due to aggregate                                   •     That is why stability of the mix starts reducing when bitumen content is
    interlocking, and limiting flakiness ensures that aggregates will not                               increased further beyond certain value.
    break during
    b k d i compaction and handling.
                           i     d h dli                                                          •     However excess void will make the mix weak from its elastic modulus and
                                                                                                        fatigue life considerations. The chances of oxidative hardening of bitumen are
  • The restricted zone and control points are incorporated in order to                                 more, where, the mix has more voids.
    ensure certain proportion of fines for                                                        •     Evaluation and selection of aggregate gradation to achieve minimum VMA is
        – proper interlocking of aggregates                                                             the most difficult and time- consuming step in the mix design process.
        – to avoid the fall in shear strength of mix due to excess of fines                       •     VMA specification has always been a big issue in mix design specifications.
        – to maintain requisite Voids in Mineral Aggregates (VMA).                                      The recommendation of minimum VMA is sometimes questioned by the
  • These control points and restriction zones are more as guidelines for                               researchers, and is said not to be equitable across different gradations. It is seen
                                                                                                        that the bitumen film thickness, rather than the VMA, may be related to
    selecting a gradation than a compulsion to be followed.                                             durability of the mix.


18 April 2013                  Transportation Engineering Rahul                            37   18 April 2013                   Transportation Engineering Rahul                           38
                                            Agrawal                                                                                          Agrawal




                                                                                                      Selection of base course and the surface course
            Various mix design approaches                                                                   depend upon the following factors
                                                                                                   1.      Type and intensity of traffic
                                                                                                   2.      Funds available for the construction project and for the subsequent
                                                                                                           maintenance
                                                                                                   3.      Sub grade soil and drainage conditions
                                                                                                   4.      Availability of construction materials at site
                                                                                                   5.      Climatic conditions
                                                                                                   6.      Plants and equipment available
                                                                                                   7.      Time available for completing the project
                                                                                                   8.      Altitude at which construction has to be done




18 April 2013                  Transportation Engineering Rahul                            39   18 April 2013                   Transportation Engineering Rahul                           40
                                            Agrawal                                                                                          Agrawal




          Excavation Equipment : Power Sovels                                                                   Excavation Equipment : Drag Line

  1.      Long lasting and useful class of earth moving equipment.                                 1.      Prominent operation of dragging the bucket against the material to be dug
  2.      One of basic equipment employed to excavate the earth and to load the                    2.      Long light crane boom and bucket is loosely attached to the boom through
          trucks.                                                                                          cables.
  3.      It is capable of excavating all types of earth, except hard rock.                        3.      Useful in digging below its track level and handling softer materials
  4.      It may be crawler mounted or wheel mounted.                                              4.      The capacity of dragline is indicated by size of the bucket in cubic meters
  5.      Crawler mounted have low speeds but very effective in unstable soils                     5.      It can be crawler mounted, wheel mounted or trucked mounted.
  6.      Wheel mounted have higher speeds and are effective only in firm soils                    6.      Basic part dragline include the boom, hoist cable, drag cable, hoist chain,
  7.      The size of Power Sovels varies from 0.375 to 5 cubic meter                                      drag chain and bucket.
  8.      Basic parts include track system, cabin, cables, rack, stick, foot pin, saddle
          block, boom point sheaves and bucket.




18 April 2013                  Transportation Engineering Rahul                            41   18 April 2013                   Transportation Engineering Rahul                           42
                                            Agrawal                                                                                          Agrawal




                                                                                                                                                                                                       7
18/04/2013




                                                                                                                                 Surface Dressing
                Excavation Equipment : Clamshell
                                                                                                        •    A Surface Dressing is a process of spraying a road surface with bituminous
                                                                                                             binder and then covering the binder with clean, crushed aggregate or natural
   1.      Also named as resemblance of its bucket to a clam which is like a shell fish                      gravel.
           with hinged double shell.
                                                                                                        •    These layers are then rolled in order to press the aggregate into the binder
   2.      The front end is essentially a crane boom with specially designed bucket                          film.
           loosely attached at the end through cables as in drag line.
                                                                                                        •    Traffic movement commences the process of chipping movement which will
   3.      Basic part are closing line, hoist line, sheaves, brackets, tagline, shell and
           hinge.                                                                                            produce eventually an interlocking matrix.




18 April 2013                  Transportation Engineering Rahul                             43       18 April 2013                 Transportation Engineering Rahul                         44
                                            Agrawal                                                                                             Agrawal




        FLEXIBLE PAVEMENT                                   RIGID PAVEMENT                                                    Types of Pavements




18 April 2013                  Transportation Engineering Rahul                             45       18 April 2013                 Transportation Engineering Rahul                         46
                                            Agrawal                                                                                             Agrawal




                                                                                                   Properties                  Flexible                                Rigid
                                                                                                 Design              Empirical method                Designed and analyzed by using the elastic
                                                                                                 Principle            Based on load distribution     theory
                                                                                                                     characteristics    of   the
                                                                                                                     components
                                                                                                 Material            Granular material               Made of Cement Concrete either plan,
                                                                                                                                                     reinforced or prestressed concrete
                                                                                                 Flexural            Low or negligible flexible      Associated with rigidity or flexural strength
                                                                                                 Strength            strength                        or slab action so the load is distributed over
                                                                                                                                                     a wide area of subgrade soil.
                                                                                                 Normal              Elastic deformation             Acts as beam or cantilever
                                                                                                 Loading
                                                                                                 Excessive           Local depression                Causes Cracks
                                                                                                 Loading
                                                                                                 Stress              Transmits vertical and          Tensile Stress and Temperature Increases
                                                                                                                                                                           p
                                                                                                                     compressive stresses to the
                                                                                                                     lower layers

                                                                                                 Design              Constructed in number of        Laid in slabs with steel reinforcement.
                                                                                                 Practice            layers.

                                                                                                 Temperature         No stress is produced            Stress is produced
                                                                                                 Force of            Less. Deformation in the         Friction force is High
                                                                                                 Friction            sub grade is not transferred
                                                                                                                     to the upper layers.
                                                                                                 Opening to          Road can be used for traffic Road cannot be used until 14 days of curing
                                                                                                 Traffic             within 24 hours
                                                                                                 Surfacing           Rolling of the surfacing is      Rolling of the surfacing in not needed.
18 April 2013                  Transportation Engineering Rahul                             47       18 April 2013                  Transportation Engineering Rahul                        48
                                            Agrawal
                                                                                                                     needed                      Agrawal




                                                                                                                                                                                                      8
18/04/2013




                Factors for design of pavements
                                  IRC (37-2001)
• Design wheel load
          Static load on wheels
          Contact Pressure
          Load Repetition
• Subgrade soil
          Thickness of pavement required
          Stress- strain behaviour under load
          Moisture variation
•    Climatic factors
•    Pavement component materials
•    Environment factors
•    Traffic Characteristics
•    Required Cross sectional elements of the alignment



18 April 2013                 Transportation Engineering Rahul   49   18 April 2013   Transportation Engineering Rahul   50
                                           Agrawal                                                 Agrawal




18 April 2013                 Transportation Engineering Rahul   51   18 April 2013   Transportation Engineering Rahul   52
                                           Agrawal                                                 Agrawal




                                                                                                                                 9

Weitere ähnliche Inhalte

Was ist angesagt?

Pradhan mantri gram sadak yojana (pmgsy)
Pradhan mantri gram sadak yojana (pmgsy)Pradhan mantri gram sadak yojana (pmgsy)
Pradhan mantri gram sadak yojana (pmgsy)Najibullah Ghaybi
 
Baroda Pioneer Infrastructure Fund Presentation
Baroda Pioneer Infrastructure Fund PresentationBaroda Pioneer Infrastructure Fund Presentation
Baroda Pioneer Infrastructure Fund Presentationgranny2010
 
Road Development and Maintenance of Rural Areas
Road Development and Maintenance of Rural AreasRoad Development and Maintenance of Rural Areas
Road Development and Maintenance of Rural AreasAmit Yadav
 
Types of rural roads and network planning
Types of rural roads and network planningTypes of rural roads and network planning
Types of rural roads and network planningvijay reddy
 

Was ist angesagt? (6)

Pradhan mantri gram sadak yojana (pmgsy)
Pradhan mantri gram sadak yojana (pmgsy)Pradhan mantri gram sadak yojana (pmgsy)
Pradhan mantri gram sadak yojana (pmgsy)
 
Baroda Pioneer Infrastructure Fund Presentation
Baroda Pioneer Infrastructure Fund PresentationBaroda Pioneer Infrastructure Fund Presentation
Baroda Pioneer Infrastructure Fund Presentation
 
Road Development and Maintenance of Rural Areas
Road Development and Maintenance of Rural AreasRoad Development and Maintenance of Rural Areas
Road Development and Maintenance of Rural Areas
 
Types of rural roads and network planning
Types of rural roads and network planningTypes of rural roads and network planning
Types of rural roads and network planning
 
Husain
HusainHusain
Husain
 
Pura Sustainable Habitat
Pura Sustainable HabitatPura Sustainable Habitat
Pura Sustainable Habitat
 

Andere mochten auch

Functions Of Settlement Lesson 3
Functions Of Settlement Lesson 3Functions Of Settlement Lesson 3
Functions Of Settlement Lesson 3geographypods
 
What Is A Settlement Hierarchy
What Is A Settlement HierarchyWhat Is A Settlement Hierarchy
What Is A Settlement HierarchySHS Geog
 
Rural development in bangladesh
Rural development in bangladeshRural development in bangladesh
Rural development in bangladeshMofejul Islam Ador
 
Settlement Characteristics
Settlement CharacteristicsSettlement Characteristics
Settlement Characteristicswhiskeyhj
 
Settlement Patterns
Settlement PatternsSettlement Patterns
Settlement PatternsJiexin Zhang
 
Evolution of settlements
Evolution of settlementsEvolution of settlements
Evolution of settlementsyusra_gul
 

Andere mochten auch (10)

The Internet and Rural Development
The Internet and Rural DevelopmentThe Internet and Rural Development
The Internet and Rural Development
 
Functions Of Settlement Lesson 3
Functions Of Settlement Lesson 3Functions Of Settlement Lesson 3
Functions Of Settlement Lesson 3
 
What Is A Settlement Hierarchy
What Is A Settlement HierarchyWhat Is A Settlement Hierarchy
What Is A Settlement Hierarchy
 
Rural development in bangladesh
Rural development in bangladeshRural development in bangladesh
Rural development in bangladesh
 
Rural marketing
Rural marketingRural marketing
Rural marketing
 
Settlement Characteristics
Settlement CharacteristicsSettlement Characteristics
Settlement Characteristics
 
Settlement Patterns
Settlement PatternsSettlement Patterns
Settlement Patterns
 
Evolution of settlements
Evolution of settlementsEvolution of settlements
Evolution of settlements
 
Rural marketing ppt
Rural marketing pptRural marketing ppt
Rural marketing ppt
 
Rural development ppt
Rural development pptRural development ppt
Rural development ppt
 

Ähnlich wie Tre be civil [compatibility mode]

Training report of road construction
Training report of road constructionTraining report of road construction
Training report of road constructionManavSinghal8
 
Rural development in FVP
Rural development in FVPRural development in FVP
Rural development in FVPCIFE
 
Tre be civil
Tre be civilTre be civil
Tre be civilRahul
 
10.National Rural Employment Programme.pptx
10.National Rural Employment Programme.pptx10.National Rural Employment Programme.pptx
10.National Rural Employment Programme.pptxBoobalanBala12
 
Central govt. schem
Central govt. schemCentral govt. schem
Central govt. schembhargav11111
 
IRJET- A Case Study on Quality Assurance of Road Construction Works Under Mad...
IRJET- A Case Study on Quality Assurance of Road Construction Works Under Mad...IRJET- A Case Study on Quality Assurance of Road Construction Works Under Mad...
IRJET- A Case Study on Quality Assurance of Road Construction Works Under Mad...IRJET Journal
 
Vibrant Gujarat Summit on Road Transportation
Vibrant Gujarat Summit on Road TransportationVibrant Gujarat Summit on Road Transportation
Vibrant Gujarat Summit on Road TransportationVibrant Gujarat
 
Low volume roads
Low volume roadsLow volume roads
Low volume roadsamanullahk
 
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5Resurgent India
 
Handbook on Best Governance Practices of Karnataka
Handbook on Best Governance Practices of Karnataka Handbook on Best Governance Practices of Karnataka
Handbook on Best Governance Practices of Karnataka Bharatiya Jain Sanghatana
 
Rural Infrastructure development and Technology misssions
Rural Infrastructure development and Technology misssionsRural Infrastructure development and Technology misssions
Rural Infrastructure development and Technology misssionsYajush Sonar
 
POVERTY ALLEVIATION PROGRAMME11
POVERTY ALLEVIATION PROGRAMME11POVERTY ALLEVIATION PROGRAMME11
POVERTY ALLEVIATION PROGRAMME11Yagnesh sondarva
 
Rmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavyaRmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavyaBhavya Patel
 
Poverty alleviation programmes irdp, pmgsy, capart
Poverty alleviation programmes  irdp,  pmgsy, capartPoverty alleviation programmes  irdp,  pmgsy, capart
Poverty alleviation programmes irdp, pmgsy, capartKavi Priya J
 
Bharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadakBharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadakANIKETBAMBOLE1
 
Gwadar Development Authority
Gwadar Development AuthorityGwadar Development Authority
Gwadar Development AuthorityMuhammad Arslan
 
Rural Roads as Infrastructure for Economic Development
Rural Roads as Infrastructure for Economic DevelopmentRural Roads as Infrastructure for Economic Development
Rural Roads as Infrastructure for Economic DevelopmentIram Aziz
 
Comprehensive mobility plan jaipur
Comprehensive mobility plan jaipur Comprehensive mobility plan jaipur
Comprehensive mobility plan jaipur Satyam Rai
 

Ähnlich wie Tre be civil [compatibility mode] (20)

Training report of road construction
Training report of road constructionTraining report of road construction
Training report of road construction
 
Rural development in FVP
Rural development in FVPRural development in FVP
Rural development in FVP
 
Tre be civil
Tre be civilTre be civil
Tre be civil
 
10.National Rural Employment Programme.pptx
10.National Rural Employment Programme.pptx10.National Rural Employment Programme.pptx
10.National Rural Employment Programme.pptx
 
Central govt. schem
Central govt. schemCentral govt. schem
Central govt. schem
 
IRJET- A Case Study on Quality Assurance of Road Construction Works Under Mad...
IRJET- A Case Study on Quality Assurance of Road Construction Works Under Mad...IRJET- A Case Study on Quality Assurance of Road Construction Works Under Mad...
IRJET- A Case Study on Quality Assurance of Road Construction Works Under Mad...
 
Vibrant Gujarat Summit on Road Transportation
Vibrant Gujarat Summit on Road TransportationVibrant Gujarat Summit on Road Transportation
Vibrant Gujarat Summit on Road Transportation
 
Low volume roads
Low volume roadsLow volume roads
Low volume roads
 
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
Infrastructure Finance – Building for Growth - ROADS & HIGHWAYS - Part - 5
 
Handbook on Best Governance Practices of Karnataka
Handbook on Best Governance Practices of Karnataka Handbook on Best Governance Practices of Karnataka
Handbook on Best Governance Practices of Karnataka
 
Rural Infrastructure development and Technology misssions
Rural Infrastructure development and Technology misssionsRural Infrastructure development and Technology misssions
Rural Infrastructure development and Technology misssions
 
POVERTY ALLEVIATION PROGRAMME11
POVERTY ALLEVIATION PROGRAMME11POVERTY ALLEVIATION PROGRAMME11
POVERTY ALLEVIATION PROGRAMME11
 
PMGSY
PMGSYPMGSY
PMGSY
 
Rmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavyaRmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavya
 
Poverty alleviation programmes irdp, pmgsy, capart
Poverty alleviation programmes  irdp,  pmgsy, capartPoverty alleviation programmes  irdp,  pmgsy, capart
Poverty alleviation programmes irdp, pmgsy, capart
 
Bharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadakBharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadak
 
Gwadar Development Authority
Gwadar Development AuthorityGwadar Development Authority
Gwadar Development Authority
 
Rural Roads as Infrastructure for Economic Development
Rural Roads as Infrastructure for Economic DevelopmentRural Roads as Infrastructure for Economic Development
Rural Roads as Infrastructure for Economic Development
 
Comprehensive mobility plan jaipur
Comprehensive mobility plan jaipur Comprehensive mobility plan jaipur
Comprehensive mobility plan jaipur
 
2007 03-05 n-ravichandran
2007 03-05 n-ravichandran2007 03-05 n-ravichandran
2007 03-05 n-ravichandran
 

Mehr von Rahul

ACEP Magazine 3.pdf
ACEP Magazine 3.pdfACEP Magazine 3.pdf
ACEP Magazine 3.pdfRahul
 
ACEP Magazine 2.pdf
ACEP Magazine 2.pdfACEP Magazine 2.pdf
ACEP Magazine 2.pdfRahul
 
GECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdfGECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdfRahul
 
ACEP Magazine.pdf
ACEP Magazine.pdfACEP Magazine.pdf
ACEP Magazine.pdfRahul
 
Scope of geology in engineering
Scope of geology in engineeringScope of geology in engineering
Scope of geology in engineeringRahul
 
Engineering project writing
Engineering project writingEngineering project writing
Engineering project writingRahul
 
Wce agronomic water conservation measures
Wce agronomic water conservation measuresWce agronomic water conservation measures
Wce agronomic water conservation measuresRahul
 
WCE -- watershed management
WCE -- watershed managementWCE -- watershed management
WCE -- watershed managementRahul
 
Unit i gel space ratio rpa
Unit i gel space ratio rpaUnit i gel space ratio rpa
Unit i gel space ratio rpaRahul
 
Unit vi ferro cement rpa
Unit vi ferro cement rpaUnit vi ferro cement rpa
Unit vi ferro cement rpaRahul
 
Acem water cement ratio MCQ
Acem water cement ratio MCQAcem water cement ratio MCQ
Acem water cement ratio MCQRahul
 
Formwork
FormworkFormwork
FormworkRahul
 
April bulletin
April bulletinApril bulletin
April bulletinRahul
 
Construction equpiment
Construction equpimentConstruction equpiment
Construction equpimentRahul
 
Egrm
EgrmEgrm
EgrmRahul
 
Retaining walls
Retaining wallsRetaining walls
Retaining wallsRahul
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRahul
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey buildingRahul
 
Indiandrinking
IndiandrinkingIndiandrinking
IndiandrinkingRahul
 
Circular slabs
Circular slabsCircular slabs
Circular slabsRahul
 

Mehr von Rahul (20)

ACEP Magazine 3.pdf
ACEP Magazine 3.pdfACEP Magazine 3.pdf
ACEP Magazine 3.pdf
 
ACEP Magazine 2.pdf
ACEP Magazine 2.pdfACEP Magazine 2.pdf
ACEP Magazine 2.pdf
 
GECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdfGECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdf
 
ACEP Magazine.pdf
ACEP Magazine.pdfACEP Magazine.pdf
ACEP Magazine.pdf
 
Scope of geology in engineering
Scope of geology in engineeringScope of geology in engineering
Scope of geology in engineering
 
Engineering project writing
Engineering project writingEngineering project writing
Engineering project writing
 
Wce agronomic water conservation measures
Wce agronomic water conservation measuresWce agronomic water conservation measures
Wce agronomic water conservation measures
 
WCE -- watershed management
WCE -- watershed managementWCE -- watershed management
WCE -- watershed management
 
Unit i gel space ratio rpa
Unit i gel space ratio rpaUnit i gel space ratio rpa
Unit i gel space ratio rpa
 
Unit vi ferro cement rpa
Unit vi ferro cement rpaUnit vi ferro cement rpa
Unit vi ferro cement rpa
 
Acem water cement ratio MCQ
Acem water cement ratio MCQAcem water cement ratio MCQ
Acem water cement ratio MCQ
 
Formwork
FormworkFormwork
Formwork
 
April bulletin
April bulletinApril bulletin
April bulletin
 
Construction equpiment
Construction equpimentConstruction equpiment
Construction equpiment
 
Egrm
EgrmEgrm
Egrm
 
Retaining walls
Retaining wallsRetaining walls
Retaining walls
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey building
 
Indiandrinking
IndiandrinkingIndiandrinking
Indiandrinking
 
Circular slabs
Circular slabsCircular slabs
Circular slabs
 

Kürzlich hochgeladen

Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 

Kürzlich hochgeladen (20)

Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 

Tre be civil [compatibility mode]

  • 1. 18/04/2013 Pradhan Mantri Gram Sadak Yojana PMGSY • Rural Road Connectivity is not only a key component of Rural Development by promoting access to economic and social services and thereby generating increased agricultural incomes and productive employment opportunities in India, it is also as a result, a key ingredient in ensuring sustainable poverty reduction. Notwithstanding the efforts made, over the years, at the State and Central levels, through different Programmes, about 40% of the Habitations in the country are still not connected by All-weather roads. • It is well known that even where connectivity has been provided, the roads y p , constructed are of such quality (due to poor construction or maintenance) that they cannot always be categorized as All-weather roads. Guided by Dr. R. M. Damgir • With a view to redressing the situation, Government have launched the Pradhan Mantri Gram Sadak Yojana on 25th December, 2000 to provide all-weather access to unconnected habitations. The Pradhan Mantri Gram Sadak Yojana (PMGSY) is a 100% Centrally Sponsored Scheme. 50% of the Cess on High Represented by Rahul Agrawal Speed Diesel (HSD) is earmarked for this Programme. 18 April 2013 Transportation Engineering Rahul 1 18 April 2013 Transportation Engineering Rahul 2 Agrawal Agrawal Pradhan Mantri Gram Sadak Yojana Roman Road Construction PMGSY Basic cross section • The primary objective of the PMGSY is to provide Connectivity, by way of an All- weather Road (with necessary culverts and cross-drainage structures, which is operable throughout the year), to the eligible unconnected Habitations in the rural areas, in such a way that all Unconnected Habitations with a population of 1000 persons and above are covered in three years (2000-2003) and all Unconnected Habitations with a population of 500 persons and above by the end of the Tenth Plan Period (2007). In respect of the Hill States (North-East, Sikkim, Himachal Pradesh, Jammu & Kashmir, Uttaranchal) and the Desert Areas (as identified in the Desert D l D Development P Programme) as well as the Tribal (Schedule V) areas, the ) ll h T ib l (S h d l h objective would be to connect Habitations with a population of 250 persons and above. • The PMGSY will permit the Upgradation (to prescribed standards) of the existing roads in those Districts where all the eligible Habitations of the designated population size (refer Para 2.1 above) have been provided all-weather road connectivity. However, it must be noted that Upgradation is not central to the Programme and cannot exceed 20% of the State’s allocation as long as eligible Unconnected Habitations in the State still exist. In Upgradation works, priority should be given to Through Routes of the Rural Core Network, which carry more traffic (see Para 3.7 below) 18 April 2013 Transportation Engineering Rahul 3 18 April 2013 Transportation Engineering Rahul 4 Agrawal Agrawal Institution for Highway Planning, Design and Implementation at Different Levels Jayakar Committee,1927 • Jayakar Committee (1927) • Road development should be made a national • Central Road Fund (1929) interest since the provincial and local govt do • Indian Roads Congress (IRC), 1934 not have financial and technical capacity for • Central Road Research Institute (CRRI), 1950 road development. • National Highway Act, 1956 g y , • Levy extra tax on p y petrol from road users to • National Highway Authority of India (NHAI),1995 create the road development fund. • National highway act ( 1956 ) • To establish a semi-official ,technical institution • Second twenty year road plan ( 1961 ) to pool technical knowledge, sharing of ideas • Highway Research board ( 1973 ) and to act as an advisory body. • National Transport Policy committee ( 1978 ) • To create a national level institution to carry • Third twenty year road plan ( 1981 ) research , development works and consultation. 18 April 2013 Transportation Engineering Rahul 5 18 April 2013 Transportation Engineering Rahul 6 Agrawal Agrawal 1
  • 2. 18/04/2013 Classification of Highways Depending on weather • All weather roads • Fair weather roads Depending the type of Carriage way • Paved roads • Unpaved roads Depending upon the pavement surface • Surfaced roads • Un surfaced roads Based on the Traffic Volume • Heavy • Medium • Light Based on Load or Tonnage • Class 1 or Class 2 etc or Class A , B etc Tonnes per day Based on location and function ( Nagpur road plan ) NH, SH, MDR, ODR & VR 18 April 2013 Transportation Engineering Rahul 7 18 April 2013 Transportation Engineering Rahul 8 Agrawal Agrawal Road Patterns Factors Influencing Highway Alignment • Rectangular or Block patterns Requirements: • Radial or Star block pattern Short • Radial or Star Circular pattern Easy • Radial or Star grid pattern Safe Economical • Hexagonal Pattern Factors controlling alignment : • Minimum travel Pattern 1) Obligatory points A. Obligatory points through which alignment is to pass ( bridge site, intermediate Classification of Roadways town , Mountain pass e c ow ou p ss etc B. Obligatory points through which alignment should not pass. 2) Traffic • Expressways 200 Km 3) Geometric design 4) Economics • National Highways 70,548 Km 5) Other considerations • State Highways 1,31,899 Km Additional care in hill roads • Major District Roads 4,67,763 Km Stability Drainage • Rural and Other Roads 26,50,000 Km Geometric standards of hill roads Resisting length 18 April 2013 Transportation Engineering Rahul 9 18 April 2013 Transportation Engineering Rahul 10 Agrawal Agrawal Steps in New Highways Project Works Necessity of Re-alignment • Map Study (available topographic map) • Improvement of horizontal alignment design elements such as radius, • Reconnaissance Survey (identification of soil & on spot site inspection) super elevation, transition curve, clearance on inner side of the curve • Preliminary Survey (alternate alignment, comparison of alternate route • Improvement of vertical alignment design elements like steep gradients, & economic analysis) changes in summit curve to increase sight distance, correction of • Location of Final Alignment (transfer of alignment, circular curve & undesirable undulations like humps and dips etc transition curve & super elevation) • Raising level of portion of road which is subjected to flooding, • Detailed Survey (Earth work quantities & other construction materials) submergence or water logging during monsoons • Materials Survey (their collection & testing) • Reconstruction of weak & narrow bridges & culverts & changes in R i f k b id l h i water way at locations slightly away from existing site • Design (embankment & cut slopes, bridges & pavement layers) • Construction of over bridges or under bridges at suitable locations • Earth Work ( highway cutting & drainage system) across a railway line in place of level crossing or another roads to • Pavement Construction (preparation of sub grade, sub base & surface provide grade separate inter section course) • Construction of bypass to avoid the road running through a town or city • Construction Control (quality control tests during different stages) • Defence requirements 18 April 2013 Transportation Engineering Rahul 11 18 April 2013 Transportation Engineering Rahul 12 Agrawal Agrawal 2
  • 3. 18/04/2013 Alignment for hill roads Cross Slope or Camber • Minimum hair pin bends. • Bends should be located on stable and flat slopes. • It is the slope provided to the road surface in the transverse direction to drain off the rain water from the road surface. Drainage and quick disposal of water from pavements surface by providing cross slope is • Cross section for hair pin bends should be at intervals of 20-25m. considered important because 15 m on either side of centre line in straight alignment – To prevent entry of surface water into the sub grade soil through pavement, stability & life of • Avoid bends in valleys. pavement get affected if water enters in the sub grade and the soil gets soaked. • Survey for a width of ; 30m on sharp curves. – To prevent entry of water into the bitumen layer and results in deterioration of pavement layers. • Shape of Camber Geometric Design – Parabolic shape – Straight line camber • Elements of design: – Combination of straight and parabolic shape – Sight distance • The length of road ahead visible to drivers Class of road Width of carriage way – Stopping sight distance Single lane 3.75m – Passing sight distance – Horizontal alignment Two lanes, without raised Krebs 7.0m • Super elevation rates (0.1 for rural areas, 0.06 for urban) Two lanes, with raised Krebs 7.5m • Minimum radius Intermediate carriage way 5.5m – Vertical alignment – Pavement design Multi lane pavements 3.5m per lane – Intersection and crossing design 18 April 2013 Transportation Engineering Rahul 13 18 April 2013 Transportation Engineering Rahul 14 Agrawal Agrawal Sight Distance PIEV Theory • Sight distance available from a point is the actual distance along the road • According to this theory the total reaction time of the driver is split into four surface, which driver from specific height above the carriage way has visibility of the stationary or moving object. parts viz. time by the driver for – Perception • Length of road visible ahead the driver at any instance. • It is time required for the sensation received by the eyes or ears to be transmitted to the • Sight distance are of brain through nervous system & spinal cord. – Stopping or absolute minimum sight distance – Intellection – Safe over taking or passing sight distance • It is time required for understanding the situation – Safe sight distance for entering into uncontrolled intersections – Emotion Stopping Sight Distance • It is time elapsed during emotional sensations and disturbance such as fear, anger or fear – Minimum sight distance available on highway at any spot should be of other feelings. sufficient to length to stop vehicle traveling at design speed, safely without – Volition collision with any other obstruction. • It is time taken for final action. I E – Depends on factor • Total reaction time of driver • Speed of vehicle • Efficiency of brakes • Frictional resistance between road and tyre P V • Gradient of the road Reflex Action 18 April 2013 Transportation Engineering Rahul 15 18 April 2013 Transportation Engineering Rahul 16 Agrawal Agrawal Analysis of Stopping Sight Distance Analysis of Overtaking Sight Distance 1. It is sum of 1. The minimum distance open to the vision of the driver of vehicle intending – Lag distance (distance traveled by vehicle during total reaction time) to overtake of slow vehicle ahead with the safety against traffic of opposite – Braking distance (distance traveled by vehicle after application of brakes) direction is known as Min. OSD or Safe OSD 2. Ld = v t meters 2. Factor for min. OSD 3. Bd = (V.V) / (2gf) meters 1. Overtaking speed of vehicle 2. Overtaken speed of vehicle 3. Speed of Vehicle coming from opposite side 4. SSD = Ld + Bd 4. 4 Skill and reaction time of driver d ti ti fd i = (v t ) + {(v v) / (2gf)} meters 5. Rate of acceleration of overtaking vehicle = (0.278 v t ) + {(v v) / (254 f)} kmph 6. Gradient of road V = speed of vehicles 3. (Justo Khanna Page no. 96) F = design coefficient of friction 0.4 to 0.35 OSD = 0.28 Vb t + 0.28 Vb T + 2s+ 0.28 V T G = acceleration due to gravity = 9.8 m/sec2 Vb = speed of over taking vehicle kmph T = reaction time of driver = 2secs V = speed of overtaking vehicle or design speed kmph T = (14.4 s / A)^0.5 and Spacing = s = (0.2 Vb + 6 ) 18 April 2013 Transportation Engineering Rahul 17 18 April 2013 Transportation Engineering Rahul 18 Agrawal Agrawal 3
  • 4. 18/04/2013 Traffic Engineering PCU Passenger Car Unit 1. Traffic characteristics 1. Different class of vehicles such as cars, vans, buses, trucks, auto rickshaw, 1. Road user characteristics motor cycles, pedal cycles, bullock carts, etc are found to use common 1. Physical characteristics roadway facilities without segregation on most of the roads in developing 2. Mental characteristics countries like India. 3. Environmental factors 2. The flow of traffic with unrestrained mixing of different vehicle classes on 2. Vehicular characteristics the roadways forms the heterogeneous traffic flow or mixed traffic flow. 1. Static characteristic : Vehicle Dimension, Weight, Speed & Power of vehicle 3. Different vehicle have different dimension like speed, length, acceleration.. 2. Braking characteristic and apart this it has different driver behavior.. behavior 2. Traffic studies and analysis 4. Common practice of considering the passenger car as the standard vehicle 1. Traffic volume studies unit to covert the other vehicle classes and this unit is called as PCU 2. Origin and destination study 5. PCU/lane or PCU/ hour or PCU/ kilometer length of lane.. 3. Parking study 3. Traffic operation-control and regulation 4. Planning and analysis 5. Geometric design 6. Administration and management 18 April 2013 Transportation Engineering Rahul 19 18 April 2013 Transportation Engineering Rahul 20 Agrawal Agrawal Regulatory signs Traffic Signals 1. Regulatory or mandatory sign are meant to inform the road users of certain laws, 1. At intersection where there are a large number of crossing and right turn regulations and prohibitions; the violation of these signs is legal offence. traffic, there is possibility of several accidents as there can’t be orderly 2. Signs are classified as movements. 1. Stop and Give-way sign 2. Traffic signals are control devices which could alternately direct traffic to 2. Prohibitory sign stop and proceed at intersections using Red, Yellow and Green. 3. No parking and no stopping sign 4. Speed limit and vehicle control sign 3. Advantages 5. Restriction ends sign 1. Smooth movements and crossings 6. 6 Compulsory direction control and other sign C l di i l d h i 2. 2 Reduce accidents R d id 3. Informative signs 3. Safety 1. This sign are used to guide road users along routes, inform them of destination and 4. Control speed distance and provide with information to make travel easier, safe and pleasant. 2. Direction and place identification signs 4. Disadvantages 3. Facility information signs 1. Rear end collisions may increase 4. Other useful information signs 2. Improper design and location of signal may lead to violation of control systems 5. Parking signs 3. Failure of signal due to electric power. 6. Flood gauge 18 April 2013 Transportation Engineering Rahul 21 18 April 2013 Transportation Engineering Rahul 22 Agrawal Agrawal Highway Materials Direct Shear Tests 1. Sub grade soil is an integral part of the road pavement structure as it 1. It is oldest shear tests. provides the support to the pavement from beneath. 2. Apparatus consists of box divided horizontally into two halves. 2. Desirable properties of soil as highway materials are 3. One halve is kept fixed and other half is free to move horizontally. 1. Stability and incompressibility 4. A vertical load is applied and horizontal movements are measured by dial 2. Permanency of strength gauges and horizontal force is noted from the providing ring dial. 3. Minimum changes in volume 5. Limitation : failure plane being predetermined horizontal plane, need not 4. Good drainage and Ease of compaction necessarily represent the imminent plane of failure. 3. Factor on which strength characteristics of soil depends on 6. The shearing stress and strain along this horizontal failure plane is seldom 1. Soil type and moisture content uniform. 2. Dry density 3. Internal structural of soil 4. Type and mode of stress application 4. Evaluation of soil 1. Shear tests 2. Bearing tests 3. Penetration tests 18 April 2013 Transportation Engineering Rahul 23 18 April 2013 Transportation Engineering Rahul 24 Agrawal Agrawal 4
  • 5. 18/04/2013 Plate Bearing Test California Bearing Ratio (CBR) test • CBR was developed by the California Division 1. It is used to evaluate this supporting power of sub grade for use in of Highways as a method of classifying and evaluating soil- sub grade and base course pavement design by using relatively large diameter plates. materials for flexible pavements. 2. The PBT was originally devised to find the modulus of sub grade reaction • CBR is a measure of resistance of a material to in the Westergaard’s analysis for wheel load stress in cement concrete penetration of standard plunger under controlled density and moisture conditions. pavements. • CBR test may be conducted in remoulded or 3. Setup consists of a set of plates of diameter 75, 60, 45 & 30cm, a loading undisturbed sample. device consisting of jack and providing ring arrangement and reaction • Test consists of causing a cylindrical plunger of 50mm diameter to penetrate a pavement frame against ehich the jack give thrust to the plate. plate component material at 1.25mm/minute. The t t i l t 1 25 / i t Th 4. A datum frame resting far from the loaded area and dial gauges from this loads for 2.5mm and 5mm are recorded. • This load is expressed as a percentage of frame are used to measure the settlement of the loaded plate. standard load value at a respective deformation level to obtain CBR value. Definition: • It is the ratio of force per unit area required to penetrate a soil mass with standard circular piston at the rate of 1.25 mm/min. to that required for the corresponding penetration of a standard material. 18 April 2013 Transportation Engineering Rahul 25 18 April 2013 Transportation Engineering Rahul 26 Agrawal Agrawal Test for Road Aggregates Bitumen adhesion test 1. Crushing test 1. Bitumen and tar adhere well to all normal types of road aggregates 1. Stone aggregates give low aggregate crushing valve provided they are dry and are free from dust. 2. Crushing valve for base course shouldn’t exceed 45 % 3. Crushing valve for surface course shall be less than 30 % 2. Several laboratory test are 2. Abrasion test 1. Static immersion test 1. Loss Angeles abrasion test Very commonly used and very easy and simple test 2. Deval abrasion test 2. Dynamic immersion test 3. Dory abrasion test 3. Chemical immersion test 3. Impact test pact Maximum permissible valve is 35% for bituminous macadam and 40% for water bound 4. Immersion mechanical test macadam base course. 5. Immersion trafficking test 4. Soundness 6. Coating test 5. Shape test Flakiness index used in road is less than 15% and doesn’t exceed 25% 6. Specific gravity and water absorption test 1. Specific gravity lies between 2.6 to 2.9 2. Water absorption is less then 0.6 % 7. Bitumen adhesion test 18 April 2013 Transportation Engineering Rahul 27 18 April 2013 Transportation Engineering Rahul 28 Agrawal Agrawal Various test on Bitumen Various test on Bitumen : Penetration test 1. Penetration test Determines hardness or softness of bitumen by measuring depth of penetration 1. Determine the hardness or softness of bitumen by measuring the depth in tenth of millimeter to which standard loaded needle will 2. Ductility test penetrate vertically in five second. Carried to test the property of the binder in bitumen 3. Viscosity test 2. Needle weight of 100gm and device for releasing and locking in 4. Float test any position with dial gauge to read penetration valves of 1/10th of millimeter 5. Specific gravity test 6. 6 Softening t t S ft i test 3. 3 The penetration valves of various types of bitumen used in pavement construction in this country range between 20 and 225, 7. Flash and fire point test 30/40 and 80/100 grade bitumen are more used. 8. Solubility test 9. Spot test 4. In hot climate lower penetration grade bitumen like 30/40 bitumen is preferred. 10. Loss of heating test 11. Water content test 18 April 2013 Transportation Engineering Rahul 29 18 April 2013 Transportation Engineering Rahul 30 Agrawal Agrawal 5
  • 6. 18/04/2013 Various test on Bitumen : Ductility test Various test on Bitumen : Fire point test 1. Bitumen binder form ductile films around the aggregates. 1. Bitumen leaves out volatiles at temperature depending upon their 2. Test is believed to measure adhesive property of bitumen and its grade. ability to stretch. 2. These volatiles catch fire causing a flash. 3. Bitumen may satisfy penetration test but may fail in bitumen 3. This condition is very hazardous and it is therefore essential to ductility test. So both test should be satisfied. qualify this temperature for each bitumen grade, so that paving 4. The ductility is expressed as the distance in centimeters to which a engineers may restrict the mixing and application temperatures. standard briquette of bitumen can be stretched before the thread 4. 4 Flash point : the flash point of material is the lowest temperature at breaks. which the vapor of substance momentarily takes fire in the form of 5. Test is conducted at 27’C and rate of pull of 50 mm per minute. flash under specified condition of test. 6. Ductility valve changes from 5 to over 100 for different bitumen 5. Fire point : The fire point is the lowest temperature at which the grades. material gets ignited and burns under specified conditions of test. 7. According to ISI ductility valve should be 45 cm for bitumen grade 75 & above. 18 April 2013 Transportation Engineering Rahul 31 18 April 2013 Transportation Engineering Rahul 32 Agrawal Agrawal Various test on Bitumen : Softening point test Design of Bitumen Mixes 1. It is temperature at which substance attains a particular degree of 1. Selection of Aggregates softening under specified condition of test. Aggregate posses sufficient strength, hardness, toughness & soundness 2. The softening point of bitumen is usually determined by Ring & 2. Selection of Aggregates Grading Ball test. Property of Bituminous mix including density & stability are much 3. Higher softening point indicates lower temperature susceptibility dependent on aggregates and their grain size and its preferred in warm climates. 3. Determination of Specific gravity 4. 4 Hard grade bitumen possess higher softening point than soft grade 4. 4 Proportioning of Aggregates bitumen. 5. Preparation of Specimens 5. Softening point of various bitumen grades in paving jobs vary 6. Determination of Specific gravity of compacted specimens between 35’C to 70’C. 7. Stability tests on compacted specimens 8. Selection of optimum Bitumen content 18 April 2013 Transportation Engineering Rahul 33 18 April 2013 Transportation Engineering Rahul 34 Agrawal Agrawal Selection of Mix Constituents : Bituminous Mix Design : Introduction Binder • A good design of bituminous mix is expected to result in a mix which is adequately – strong • Generally binders are selected based on some simple tests and – durable other site-specific requirements. – resistive to fatigue & permanent deformation • These tests could be different depending of the type of binder – Environment friendly viz. penetration grade, cutback, emulsion, modified binder etc. – economical and so on. For most of these tests, the test conditions are pre-fixed in the pre fixed • A mix designer tries to achieve these requirements through a number of specifications. tests on the mix with varied proportions and finalizes with the best one. • Rolling Thin Film Oven Test (RTFO), Pressurized Aging • This often involves a balance between mutually conflicting parameters. Vessel (PAV), Dynamic Shear Rheometer, Rotational • The present article tries to identify some of the issues involved in this Viscometer, Bending Beam Rheometer, Direct Tension Tester art of bituminous mix design and the direction of current research. are some of the tests recommended in Super pave binder selection. 18 April 2013 Transportation Engineering Rahul 35 18 April 2013 Transportation Engineering Rahul 36 Agrawal Agrawal 6
  • 7. 18/04/2013 Selection of Mix Constituents : Role of Mix Volumetric Parameters Aggregates • Bitumen holds the aggregates in position, and the load is taken by the aggregate • Number of tests are recommended in the specifications to judge the mass through the contact points. properties of the aggregates, e.g. strength, hardness, toughness, • If all the voids are filled by bitumen, then the load is rather transmitted by durability, angularity, shape factors, clay content, adhesion to binder hydrostatic pressure through bitumen, and strength of the mix therefore etc. reduces. • Angularity ensures adequate shear strength due to aggregate • That is why stability of the mix starts reducing when bitumen content is interlocking, and limiting flakiness ensures that aggregates will not increased further beyond certain value. break during b k d i compaction and handling. i d h dli • However excess void will make the mix weak from its elastic modulus and fatigue life considerations. The chances of oxidative hardening of bitumen are • The restricted zone and control points are incorporated in order to more, where, the mix has more voids. ensure certain proportion of fines for • Evaluation and selection of aggregate gradation to achieve minimum VMA is – proper interlocking of aggregates the most difficult and time- consuming step in the mix design process. – to avoid the fall in shear strength of mix due to excess of fines • VMA specification has always been a big issue in mix design specifications. – to maintain requisite Voids in Mineral Aggregates (VMA). The recommendation of minimum VMA is sometimes questioned by the • These control points and restriction zones are more as guidelines for researchers, and is said not to be equitable across different gradations. It is seen that the bitumen film thickness, rather than the VMA, may be related to selecting a gradation than a compulsion to be followed. durability of the mix. 18 April 2013 Transportation Engineering Rahul 37 18 April 2013 Transportation Engineering Rahul 38 Agrawal Agrawal Selection of base course and the surface course Various mix design approaches depend upon the following factors 1. Type and intensity of traffic 2. Funds available for the construction project and for the subsequent maintenance 3. Sub grade soil and drainage conditions 4. Availability of construction materials at site 5. Climatic conditions 6. Plants and equipment available 7. Time available for completing the project 8. Altitude at which construction has to be done 18 April 2013 Transportation Engineering Rahul 39 18 April 2013 Transportation Engineering Rahul 40 Agrawal Agrawal Excavation Equipment : Power Sovels Excavation Equipment : Drag Line 1. Long lasting and useful class of earth moving equipment. 1. Prominent operation of dragging the bucket against the material to be dug 2. One of basic equipment employed to excavate the earth and to load the 2. Long light crane boom and bucket is loosely attached to the boom through trucks. cables. 3. It is capable of excavating all types of earth, except hard rock. 3. Useful in digging below its track level and handling softer materials 4. It may be crawler mounted or wheel mounted. 4. The capacity of dragline is indicated by size of the bucket in cubic meters 5. Crawler mounted have low speeds but very effective in unstable soils 5. It can be crawler mounted, wheel mounted or trucked mounted. 6. Wheel mounted have higher speeds and are effective only in firm soils 6. Basic part dragline include the boom, hoist cable, drag cable, hoist chain, 7. The size of Power Sovels varies from 0.375 to 5 cubic meter drag chain and bucket. 8. Basic parts include track system, cabin, cables, rack, stick, foot pin, saddle block, boom point sheaves and bucket. 18 April 2013 Transportation Engineering Rahul 41 18 April 2013 Transportation Engineering Rahul 42 Agrawal Agrawal 7
  • 8. 18/04/2013 Surface Dressing Excavation Equipment : Clamshell • A Surface Dressing is a process of spraying a road surface with bituminous binder and then covering the binder with clean, crushed aggregate or natural 1. Also named as resemblance of its bucket to a clam which is like a shell fish gravel. with hinged double shell. • These layers are then rolled in order to press the aggregate into the binder 2. The front end is essentially a crane boom with specially designed bucket film. loosely attached at the end through cables as in drag line. • Traffic movement commences the process of chipping movement which will 3. Basic part are closing line, hoist line, sheaves, brackets, tagline, shell and hinge. produce eventually an interlocking matrix. 18 April 2013 Transportation Engineering Rahul 43 18 April 2013 Transportation Engineering Rahul 44 Agrawal Agrawal FLEXIBLE PAVEMENT RIGID PAVEMENT Types of Pavements 18 April 2013 Transportation Engineering Rahul 45 18 April 2013 Transportation Engineering Rahul 46 Agrawal Agrawal Properties Flexible Rigid Design Empirical method Designed and analyzed by using the elastic Principle Based on load distribution theory characteristics of the components Material Granular material Made of Cement Concrete either plan, reinforced or prestressed concrete Flexural Low or negligible flexible Associated with rigidity or flexural strength Strength strength or slab action so the load is distributed over a wide area of subgrade soil. Normal Elastic deformation Acts as beam or cantilever Loading Excessive Local depression Causes Cracks Loading Stress Transmits vertical and Tensile Stress and Temperature Increases p compressive stresses to the lower layers Design Constructed in number of Laid in slabs with steel reinforcement. Practice layers. Temperature No stress is produced Stress is produced Force of Less. Deformation in the Friction force is High Friction sub grade is not transferred to the upper layers. Opening to Road can be used for traffic Road cannot be used until 14 days of curing Traffic within 24 hours Surfacing Rolling of the surfacing is Rolling of the surfacing in not needed. 18 April 2013 Transportation Engineering Rahul 47 18 April 2013 Transportation Engineering Rahul 48 Agrawal needed Agrawal 8
  • 9. 18/04/2013 Factors for design of pavements IRC (37-2001) • Design wheel load Static load on wheels Contact Pressure Load Repetition • Subgrade soil Thickness of pavement required Stress- strain behaviour under load Moisture variation • Climatic factors • Pavement component materials • Environment factors • Traffic Characteristics • Required Cross sectional elements of the alignment 18 April 2013 Transportation Engineering Rahul 49 18 April 2013 Transportation Engineering Rahul 50 Agrawal Agrawal 18 April 2013 Transportation Engineering Rahul 51 18 April 2013 Transportation Engineering Rahul 52 Agrawal Agrawal 9