SlideShare ist ein Scribd-Unternehmen logo
1 von 11
100 MW “Turnkey Ready” Wind Farm Building Project March - 2012
[email_address] Marzo  -  2012 Company Who are we?. 100 MW “Turnkey Ready” Wind Farm Building Project QE   is pledged to ensuring a sustainable future    Our company is fully committed to using natural resources to deliver non-polluting energy systems Here at QE  we are aware of the signs that the planet is becoming exhausted. The vast majority of industrialised countries depend on energy sources that lie outside their frontiers, and hence from both the environmental and strategic perspectives it is crucial that we all take on board the idea that energy generation and saving are the key factors in ensuring an efficient and secure future We are on hand to advise our customers at all times, and we provide a comprehensive turnkey service for bringing their equipment into operation that goes from initial design and dealing with licenses and subsidies right up to installation and maintenance.  Innovation, research and development and continuous improvement are some of our fundamental principles. Our commitment to the environment and society is evidenced by our sustainable and cost-effective equipment, our sports and cultural sponsorship and our partnerships with NGOs. It is a challenge which we meet every day.
[email_address] Marzo  -  2012 100 Mw Latvia The  Project 100 MW “Turnkey Ready” Wind Farm Building Project
[email_address] Marzo  -  2012 100 Mw Latvia The Project . 100 MW “Turnkey Ready” Wind Farm Building Project To purpose of this document is to convey a business opportunity to investors who desire to acquire a wind energy electric facility that provides an important source of renewable energy to the electrical system in the area near Riga (Latvia). The company, has developed the 100 MW “turnkey ready” wind project next to the town of Riga, Latvia (see Figure 1) based on the sale of electricity, from energy produced by its wind turbines Figure 1: Project Geographic Location.
[email_address] Marzo  -  2012 100 Mw Latvia Project Description 100 MW “Turnkey Ready” Wind Farm Building Project This project proposes the development of a wind generated facility with 50 turbines at 2 MW of potential power each for a total potential power of 100 MW. Aside from the wind turbines, the project has a historical reading of wind resources through a permanent weather station tower installed in 2008, a gravel access road system, an underground electrical tracking system, an operations and maintenance center, and a collector substation or point of interconnection from substation transformers. Some of the advantages of wind energy are: Wind energy is financially competitive (like coal and the rise in gas prices). Wind turbines do not consume water (in contrast with fossil fuel plants and nuclear energy). Wind energy is a local source, energy that is locally harvested that contributes to national security Wind energy is inexhaustible and infinitely renewable (in contrast with conventional fossil fuels). Wind energy is a clean energy that does not produce CO2 emissions. Wind energy can be used in a variety of ways basic needs services. The wind farm is basically made up of: Wind turbines. Wind turbine foundations. Roads. High voltage line (wind turbine-substation). Substation. Interconnection line, high voltage (substation-electrical system). Communication and remote control system.
[email_address] Marzo  -  2012 100 Mw Latvia Project Description 100 MW “Turnkey Ready” Wind Farm Building Project For the calculation of wind resources for the WIND FARM 100 MW project measurements were taken between 1-6-2008 through 1-6-2010, an average wind speed of 6,2 m/s was obtained at a height of 50 m (P 50). The total estimated losses for wind resource production is considered to be approx. 8 %. Therefore, the wind farm will have a gross production of 260.85 GWh and a net production of  240.00  GWh, its equivalent net hours are  2,400 . For comparison we can offer the average wind speed of other European countries: In Germany – 3.5 - 6 m/s In Austria – 3.5 - 4.5 m/s In Great Britain – 4.5 - >6 m/s In Scandinavian Countries - 4.5 - >6 m/s In Lithuania, Latvia, Estonia – 4 - >6 m/s
[email_address] Marzo  -  2012 100 Mw Latvia Project Description   WORK RESULTS   FASE 0. Project Start. Step achieved. Location of the site. 1. Found and evaluated suitable site for installation OBTAINED Study the rules of Spain. 2. First evaluation of documented and favorable OBTAINED OBTAINED Contact for evacuation of electricity to the grid. business.     3. Retrieved grid connection preconditions.   FASE 1. Previous Confirmation of positive energy resource Determining the real power of the wind farm. Application networking Wind Farm. Preliminary design of the wind farm. 1. Confirmation of suitable location for the installation OBTAINED Engineering - Resource and optimal energy resource to develop the project. OBTAINED OBTAINED Assessment. Step 2. Retrieved networking conditions   achieved. 3. Retrieved grid connection preconditions.   FASE 2. Administrative Details basic projects (wind turbines, substation, 1. Building permits and blueprints required for OBTAINED and Other Authorizations connection to high voltage line, ...). licensing. OBTAINED - Detailed Engineering. Environmental impact study. 2. Network Connection Agreement highest obtained. OBTAINED Step achieved. Management agreement line connection to the electric 3. Energy sales contract (PPA) OBTAINED   CIA 4. Environmental study approved. OBTAINED   Management - Meeting with environmentalists in the area. 5. Transfers of favorable step. OBTAINED   Licensing municipal planning (fees paid). 6. Favorable environmental efforts. OBTAINED   Studies incompatibildad (other projects, agriculture, 7. Incompatibility efforts favorable. OBTAINED   airports, etc 8. And prices for subprojects. OBTAINED   Management of assignments of step. 9. Plan Business-Economic Survey updated. OBTAINED   Request for Proposals equipment and material (wind       turbines, substation, high voltage line connection ...).       Management of infrastructure and logistics.       Updating the economic study.       Determining the price of energy (Grind Conection)     FASE 3. Project stage Finding investors for sale of wind farm under their ACTUAL STAGES PENDING WIND FARM 100 MW.ACTUAL STAGES "turnkey".   Draft prepared for physical implementation. FASE 4. Building of the wind farm. Final negotiation and contracting of outsourced projects   PENDING (wind turbines, substation connection line AT,...). Implementation and project closure.
[email_address] Marzo  -  2012 100 Mw Latvia Market Study 1100 MW “Turnkey Ready” Wind Farm Building Project In terms of renewable energy, Latvia is a virgin market. The potential for wind energy in Latvia is considered one of the highest in northwest Europe (Baltic Sea Region). Through its progressive legislation, the government is creating one of the most welcoming environments in Europe for developers of renewable energy and is encouraging future investments in the wind sector. Latvia has made a commitment to the EU (Directive 2009/28CE) that by 2020 20% of energy consumption will come from renewable energy. Latvia law is clear and concise in project development and subsequent legalization. The free market sale of energy in Latvia is very mature. All laws governing the sale of wind energy have been ratified by the Latvia government and follow the guidelines of the EU The success is due mainly to strong regulatory framework, which  is also the sector after 2020. Wind energy will not only contribute substantially to the European  commitment to reducing emissions of greenhouse gases, but strongly accelerate the exchange model based on expensive   fossil fuels, create jobs, will make Europe more competitive and provide energy production safe and renewable.  
[email_address] Marzo  -  2012 100 Mw Latvia Market Study 100 MW “Turnkey Ready” Wind Farm Building Project It is expected that wind energy production to increase from the 182 TWh, which accounted for 5.5% of total European demand in   2010 to 581 TWh, 15.7% in 2020. Then, wind power will cover the total consumption of households in France, Germany, Poland, Spain and United Kingdom together. The "Pure Power" also shows that wind power will grow differently   in the 27 Member States by 2020. The following table is assignd to the factor by multiplying the installed capacity and the percentage will then wind on the total electricity demand in each country.   Latvian  law  subvention  wind  power generation with a grant of 60 € / MWh.  This law is approved and ratified by the Latvian   government and  binding. The remuneration system is similar tothe one made in Italy, France and Spain.   Country Increment  Wind energy VS Total energy Germany 1,8 17% Austria 3,5 10% Belgium 4,3 10% Bulgaria 8 18% Slovakia 3 5% Slovenia 0 to 50 MW 6% Spain 1,9 27% Estonia 3,4 11% Finland 9,6 5% Grecee 5,4 23% Hungary 3 4% Ireland 4,2 52% Latvia 6,4 5% Lithuania 6,5 18% Luxembourg 7,1 7% Malta 0 to 100 MW 8% Poland  Portugal 1,9 14% Czech Republic 7,4 4% Romania 6,5 10%
[email_address] Marzo  -  2012 100 Mw Latvia Market Study 100 MW “Turnkey Ready” Wind Farm Building Project Income levels are attached in the table below, with an estimated income for the wind farm. The price of energy produced is conservatively estimated at 100 €/MWh for the first 20 years (40 € /MWh_Free market + 60 €/MWh_Subvention). We estimate that the price component of free market energy will average 40 €/MWh. This value is based on tracking the free market over the last few years in Latvia ( www.nordpoolspot.com ). At the same time, , subención law mandates a additional incentive for wind energy production from 60 € / MWh. Therefore the final price is 100 € MWh / WWH, studied from a conservative viewpoint. In summary, the estimate of energy prices (€/MWh) has been made conservatively for the WIND FARM 100 MW wind farm project
CONTACT INFORMATION Antoni Guardia [email_address] Office:  +34 93 4081938 Mobile: +34  669 76 65 72   Skype: toni.guardia Javier Dopazo [email_address] Office:  +34 93 4081938 Mobile: +34 649 30 28 06 Qualityenergies.com Londres num 2 , 1º4 Barcelona Office:  +34 93 4081938 Fax:  +34  93 4087131

Weitere ähnliche Inhalte

Kürzlich hochgeladen

Stock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfStock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfMichael Silva
 
The Inspirational Story of Julio Herrera Velutini - Global Finance Leader
The Inspirational Story of Julio Herrera Velutini - Global Finance LeaderThe Inspirational Story of Julio Herrera Velutini - Global Finance Leader
The Inspirational Story of Julio Herrera Velutini - Global Finance LeaderArianna Varetto
 
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.pptAnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.pptPriyankaSharma89719
 
Unveiling Business Expansion Trends in 2024
Unveiling Business Expansion Trends in 2024Unveiling Business Expansion Trends in 2024
Unveiling Business Expansion Trends in 2024Champak Jhagmag
 
Financial Preparation for Millennia.pptx
Financial Preparation for Millennia.pptxFinancial Preparation for Millennia.pptx
Financial Preparation for Millennia.pptxsimon978302
 
The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarHarsh Kumar
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHenry Tapper
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managmentfactical
 
212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technologyz xss
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economiccinemoviesu
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintSuomen Pankki
 
Role of Information and technology in banking and finance .pptx
Role of Information and technology in banking and finance .pptxRole of Information and technology in banking and finance .pptx
Role of Information and technology in banking and finance .pptxNarayaniTripathi2
 
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170Sonam Pathan
 
NO1 Certified kala jadu karne wale ka contact number kala jadu karne wale bab...
NO1 Certified kala jadu karne wale ka contact number kala jadu karne wale bab...NO1 Certified kala jadu karne wale ka contact number kala jadu karne wale bab...
NO1 Certified kala jadu karne wale ka contact number kala jadu karne wale bab...Amil baba
 
NO1 Certified Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona ka...
NO1 Certified Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona ka...NO1 Certified Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona ka...
NO1 Certified Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona ka...Amil baba
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppmiss dipika
 
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Sonam Pathan
 
Financial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.pptFinancial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.ppttadegebreyesus
 
Managing Finances in a Small Business (yes).pdf
Managing Finances  in a Small Business (yes).pdfManaging Finances  in a Small Business (yes).pdf
Managing Finances in a Small Business (yes).pdfmar yame
 
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...Amil baba
 

Kürzlich hochgeladen (20)

Stock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfStock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdf
 
The Inspirational Story of Julio Herrera Velutini - Global Finance Leader
The Inspirational Story of Julio Herrera Velutini - Global Finance LeaderThe Inspirational Story of Julio Herrera Velutini - Global Finance Leader
The Inspirational Story of Julio Herrera Velutini - Global Finance Leader
 
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.pptAnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
 
Unveiling Business Expansion Trends in 2024
Unveiling Business Expansion Trends in 2024Unveiling Business Expansion Trends in 2024
Unveiling Business Expansion Trends in 2024
 
Financial Preparation for Millennia.pptx
Financial Preparation for Millennia.pptxFinancial Preparation for Millennia.pptx
Financial Preparation for Millennia.pptx
 
The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh Kumar
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview document
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managment
 
212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economic
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraint
 
Role of Information and technology in banking and finance .pptx
Role of Information and technology in banking and finance .pptxRole of Information and technology in banking and finance .pptx
Role of Information and technology in banking and finance .pptx
 
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
 
NO1 Certified kala jadu karne wale ka contact number kala jadu karne wale bab...
NO1 Certified kala jadu karne wale ka contact number kala jadu karne wale bab...NO1 Certified kala jadu karne wale ka contact number kala jadu karne wale bab...
NO1 Certified kala jadu karne wale ka contact number kala jadu karne wale bab...
 
NO1 Certified Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona ka...
NO1 Certified Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona ka...NO1 Certified Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona ka...
NO1 Certified Best Amil In Rawalpindi Bangali Baba In Rawalpindi jadu tona ka...
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsApp
 
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
 
Financial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.pptFinancial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.ppt
 
Managing Finances in a Small Business (yes).pdf
Managing Finances  in a Small Business (yes).pdfManaging Finances  in a Small Business (yes).pdf
Managing Finances in a Small Business (yes).pdf
 
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
 

Empfohlen

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 

Empfohlen (20)

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 

Quality Energy Wind farm 100mw letonia

  • 1. 100 MW “Turnkey Ready” Wind Farm Building Project March - 2012
  • 2. [email_address] Marzo - 2012 Company Who are we?. 100 MW “Turnkey Ready” Wind Farm Building Project QE   is pledged to ensuring a sustainable future   Our company is fully committed to using natural resources to deliver non-polluting energy systems Here at QE we are aware of the signs that the planet is becoming exhausted. The vast majority of industrialised countries depend on energy sources that lie outside their frontiers, and hence from both the environmental and strategic perspectives it is crucial that we all take on board the idea that energy generation and saving are the key factors in ensuring an efficient and secure future We are on hand to advise our customers at all times, and we provide a comprehensive turnkey service for bringing their equipment into operation that goes from initial design and dealing with licenses and subsidies right up to installation and maintenance. Innovation, research and development and continuous improvement are some of our fundamental principles. Our commitment to the environment and society is evidenced by our sustainable and cost-effective equipment, our sports and cultural sponsorship and our partnerships with NGOs. It is a challenge which we meet every day.
  • 3. [email_address] Marzo - 2012 100 Mw Latvia The Project 100 MW “Turnkey Ready” Wind Farm Building Project
  • 4. [email_address] Marzo - 2012 100 Mw Latvia The Project . 100 MW “Turnkey Ready” Wind Farm Building Project To purpose of this document is to convey a business opportunity to investors who desire to acquire a wind energy electric facility that provides an important source of renewable energy to the electrical system in the area near Riga (Latvia). The company, has developed the 100 MW “turnkey ready” wind project next to the town of Riga, Latvia (see Figure 1) based on the sale of electricity, from energy produced by its wind turbines Figure 1: Project Geographic Location.
  • 5. [email_address] Marzo - 2012 100 Mw Latvia Project Description 100 MW “Turnkey Ready” Wind Farm Building Project This project proposes the development of a wind generated facility with 50 turbines at 2 MW of potential power each for a total potential power of 100 MW. Aside from the wind turbines, the project has a historical reading of wind resources through a permanent weather station tower installed in 2008, a gravel access road system, an underground electrical tracking system, an operations and maintenance center, and a collector substation or point of interconnection from substation transformers. Some of the advantages of wind energy are: Wind energy is financially competitive (like coal and the rise in gas prices). Wind turbines do not consume water (in contrast with fossil fuel plants and nuclear energy). Wind energy is a local source, energy that is locally harvested that contributes to national security Wind energy is inexhaustible and infinitely renewable (in contrast with conventional fossil fuels). Wind energy is a clean energy that does not produce CO2 emissions. Wind energy can be used in a variety of ways basic needs services. The wind farm is basically made up of: Wind turbines. Wind turbine foundations. Roads. High voltage line (wind turbine-substation). Substation. Interconnection line, high voltage (substation-electrical system). Communication and remote control system.
  • 6. [email_address] Marzo - 2012 100 Mw Latvia Project Description 100 MW “Turnkey Ready” Wind Farm Building Project For the calculation of wind resources for the WIND FARM 100 MW project measurements were taken between 1-6-2008 through 1-6-2010, an average wind speed of 6,2 m/s was obtained at a height of 50 m (P 50). The total estimated losses for wind resource production is considered to be approx. 8 %. Therefore, the wind farm will have a gross production of 260.85 GWh and a net production of 240.00 GWh, its equivalent net hours are 2,400 . For comparison we can offer the average wind speed of other European countries: In Germany – 3.5 - 6 m/s In Austria – 3.5 - 4.5 m/s In Great Britain – 4.5 - >6 m/s In Scandinavian Countries - 4.5 - >6 m/s In Lithuania, Latvia, Estonia – 4 - >6 m/s
  • 7. [email_address] Marzo - 2012 100 Mw Latvia Project Description   WORK RESULTS   FASE 0. Project Start. Step achieved. Location of the site. 1. Found and evaluated suitable site for installation OBTAINED Study the rules of Spain. 2. First evaluation of documented and favorable OBTAINED OBTAINED Contact for evacuation of electricity to the grid. business.     3. Retrieved grid connection preconditions.   FASE 1. Previous Confirmation of positive energy resource Determining the real power of the wind farm. Application networking Wind Farm. Preliminary design of the wind farm. 1. Confirmation of suitable location for the installation OBTAINED Engineering - Resource and optimal energy resource to develop the project. OBTAINED OBTAINED Assessment. Step 2. Retrieved networking conditions   achieved. 3. Retrieved grid connection preconditions.   FASE 2. Administrative Details basic projects (wind turbines, substation, 1. Building permits and blueprints required for OBTAINED and Other Authorizations connection to high voltage line, ...). licensing. OBTAINED - Detailed Engineering. Environmental impact study. 2. Network Connection Agreement highest obtained. OBTAINED Step achieved. Management agreement line connection to the electric 3. Energy sales contract (PPA) OBTAINED   CIA 4. Environmental study approved. OBTAINED   Management - Meeting with environmentalists in the area. 5. Transfers of favorable step. OBTAINED   Licensing municipal planning (fees paid). 6. Favorable environmental efforts. OBTAINED   Studies incompatibildad (other projects, agriculture, 7. Incompatibility efforts favorable. OBTAINED   airports, etc 8. And prices for subprojects. OBTAINED   Management of assignments of step. 9. Plan Business-Economic Survey updated. OBTAINED   Request for Proposals equipment and material (wind       turbines, substation, high voltage line connection ...).       Management of infrastructure and logistics.       Updating the economic study.       Determining the price of energy (Grind Conection)     FASE 3. Project stage Finding investors for sale of wind farm under their ACTUAL STAGES PENDING WIND FARM 100 MW.ACTUAL STAGES "turnkey".   Draft prepared for physical implementation. FASE 4. Building of the wind farm. Final negotiation and contracting of outsourced projects   PENDING (wind turbines, substation connection line AT,...). Implementation and project closure.
  • 8. [email_address] Marzo - 2012 100 Mw Latvia Market Study 1100 MW “Turnkey Ready” Wind Farm Building Project In terms of renewable energy, Latvia is a virgin market. The potential for wind energy in Latvia is considered one of the highest in northwest Europe (Baltic Sea Region). Through its progressive legislation, the government is creating one of the most welcoming environments in Europe for developers of renewable energy and is encouraging future investments in the wind sector. Latvia has made a commitment to the EU (Directive 2009/28CE) that by 2020 20% of energy consumption will come from renewable energy. Latvia law is clear and concise in project development and subsequent legalization. The free market sale of energy in Latvia is very mature. All laws governing the sale of wind energy have been ratified by the Latvia government and follow the guidelines of the EU The success is due mainly to strong regulatory framework, which is also the sector after 2020. Wind energy will not only contribute substantially to the European commitment to reducing emissions of greenhouse gases, but strongly accelerate the exchange model based on expensive fossil fuels, create jobs, will make Europe more competitive and provide energy production safe and renewable.  
  • 9. [email_address] Marzo - 2012 100 Mw Latvia Market Study 100 MW “Turnkey Ready” Wind Farm Building Project It is expected that wind energy production to increase from the 182 TWh, which accounted for 5.5% of total European demand in   2010 to 581 TWh, 15.7% in 2020. Then, wind power will cover the total consumption of households in France, Germany, Poland, Spain and United Kingdom together. The "Pure Power" also shows that wind power will grow differently   in the 27 Member States by 2020. The following table is assignd to the factor by multiplying the installed capacity and the percentage will then wind on the total electricity demand in each country.   Latvian law subvention wind power generation with a grant of 60 € / MWh. This law is approved and ratified by the Latvian government and binding. The remuneration system is similar tothe one made in Italy, France and Spain.   Country Increment Wind energy VS Total energy Germany 1,8 17% Austria 3,5 10% Belgium 4,3 10% Bulgaria 8 18% Slovakia 3 5% Slovenia 0 to 50 MW 6% Spain 1,9 27% Estonia 3,4 11% Finland 9,6 5% Grecee 5,4 23% Hungary 3 4% Ireland 4,2 52% Latvia 6,4 5% Lithuania 6,5 18% Luxembourg 7,1 7% Malta 0 to 100 MW 8% Poland Portugal 1,9 14% Czech Republic 7,4 4% Romania 6,5 10%
  • 10. [email_address] Marzo - 2012 100 Mw Latvia Market Study 100 MW “Turnkey Ready” Wind Farm Building Project Income levels are attached in the table below, with an estimated income for the wind farm. The price of energy produced is conservatively estimated at 100 €/MWh for the first 20 years (40 € /MWh_Free market + 60 €/MWh_Subvention). We estimate that the price component of free market energy will average 40 €/MWh. This value is based on tracking the free market over the last few years in Latvia ( www.nordpoolspot.com ). At the same time, , subención law mandates a additional incentive for wind energy production from 60 € / MWh. Therefore the final price is 100 € MWh / WWH, studied from a conservative viewpoint. In summary, the estimate of energy prices (€/MWh) has been made conservatively for the WIND FARM 100 MW wind farm project
  • 11. CONTACT INFORMATION Antoni Guardia [email_address] Office: +34 93 4081938 Mobile: +34 669 76 65 72 Skype: toni.guardia Javier Dopazo [email_address] Office: +34 93 4081938 Mobile: +34 649 30 28 06 Qualityenergies.com Londres num 2 , 1º4 Barcelona Office: +34 93 4081938 Fax: +34 93 4087131