SlideShare a Scribd company logo
1 of 10
Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
Eight principles of ISO: 9001 – 2008.

    SR.
                    Principles                       ISO : 9001- 2008 APPROACH
    NO.

               Principle – 1               Meet customer needs and expectations
     1.     Customer – focused            determine levels of customer satisfaction
               organization                           / dissatisfaction.

                 Principle – 2
                                            Commit continual improvement of the
     2.          Leadership
                                                          qms.

                 Principle – 3
                                            Focus on competency rather then just
                Involvement of
     3.                                      training. Identify and manage human
                    people
                                                   factors of the work place.

                 Principle – 4
                                           Systematically identify and manage the
     4.       Process approach
                                                    process employed.

               Principle – 5
                                             Implement measures for monitoring
     5.     System approach to                 effectiveness of each process.
               management


Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
Tips to trained internal auditor

1.     Auditor is always fact finder and not fault finder.
2.     As per IMS(EQHSMS) auditor looks for effectiveness of
       system, process approach and not only records.
3.     Auditors 4 Key boundaries
       a. ISO:9001, ISO;14001 and OHSAS:18001 Requirements
       b. Own written documents
       C. Customer requirements
       D. Statutory & regulatory requirements
4.     Audit methodology
       A. Interview people
       B. Verify records
       C. Witness testing/ process checking
       D. Own verification of process / product parameters


Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
IMS(EQHSMS) AUDIT

  As per iso system,         audit   is define as “ a systematic &
  independent examination to determine whether ims(eqhsms) activities
  and related results comply with planned arrangement and whether
  these arrangements are implemented effectively and are suitable to
  achieve the objectives”.


  (1)    Adequacy audit:- (System or management audit)
         Determine the extend to which the documented system (ims(eqhsms)
         manual, procedures, work instructions & forms) adequately meet the
         requirements of standard.
  (2)    Compliance audit:-
         Which seeks to establish the extent to which the documented system is
         implemented and observed by the work force.

Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
1. Audit plan                                               Audit steps

            2. Develop checklists


                       3. Opening meeting


                                4. Gather evidence


                                          5. Record results

                                                  6. Closing meeting


                                                                7. Audit report

Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
Non – compliance reporting
         What is the problem ?
                   Describe clearly, concisely and
                  factually.
        Why is it a non – compliance ?
                   I.e., against which requirement ?
         Where did it occur ?
                   I.e., which department or activity ?
         Who ? – avoid apportioning blame.
                   (I.e., naming individuals)

Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
6.2 Human resources
                                 6.2.1 General
Personnel performing work affecting
conformance to product requirements
must be competent on the basis of:

                  • Appropriate education
                  • Training
                  • Skills
                  • Experience

Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
Structure of standards as per ISO 14001-2004
                                 4.6Management
                                     review
      4.5Checking &
     corrective action
      •Monitor &
      Measure                                                                4.2Environme
      •Non-conformance                                                         ntal policy
      •Corrective/prevent
      ive actions
      •Records
      •Audits                                                                 4.3Planning
                                                                             •Environmental
                               4.4 Implementation and                         Aspects
                                      operation                              •Legal & Other
                                 • Structure / Responsibility                •Objectives &
                                 • Training, Awareness                       Targets
                                 • Communication                             •EMP
                                 • EMS Documentation
                                 • Document Control
                                 • Operation Control
                                 • Emergency Procedures

Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
Procedure for accident investigation

 Procedure to address:
  Kind of accidents to be reported
  Define major accident, high potential accident and high
   potential incident/near miss accident
  When and how events should be reported and investigated
  Who is responsible for conducting and participating in the
   accident/ incident investigation
  Who is employee representative involved in conducting
   accident/ incident investigation
  Who will liaise with external agency/ government functionary
   conducting accident/ incident investigation


Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
Verification matrix
                          physical inspection tour
      As a part of audit the verification should be done in the areas listed
      below as a part of audit process.
     Q.no.                                       Characteristics
     1. General workplace condition
       a.       Floors [ walking and working surface]
          Clean, orderly and sanitary condition;
          Drainage maintained;
          Free of slip, trip or fall hazards;
          Free of protrusion, nails, etc.;
          Openings covered or barricaded;
          Load limits painted on upper floors.
       b.       Aisles and passageways:
          Aisles marked;
          Clear and unobstructed;
          At least 28" wide or as prescribed;
          Sufficient width for all normal movements.


Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405

More Related Content

What's hot

Capa quality system – more than just corrective action
Capa quality system – more than just corrective actionCapa quality system – more than just corrective action
Capa quality system – more than just corrective actionQuality Management
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)ranviry49
 
PQT - Total Productive Maintenance
PQT - Total Productive MaintenancePQT - Total Productive Maintenance
PQT - Total Productive MaintenanceDr. John V. Padua
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 
Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenancevivekmsmech
 
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...IRJET Journal
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceManishaHalai1
 
Barber process basedintegrating9001_14k_18k_final
Barber process basedintegrating9001_14k_18k_finalBarber process basedintegrating9001_14k_18k_final
Barber process basedintegrating9001_14k_18k_finalOmnex Inc.
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018Timothy Wooi
 

What's hot (20)

Capa quality system – more than just corrective action
Capa quality system – more than just corrective actionCapa quality system – more than just corrective action
Capa quality system – more than just corrective action
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
PQT - Total Productive Maintenance
PQT - Total Productive MaintenancePQT - Total Productive Maintenance
PQT - Total Productive Maintenance
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
My machine camp
My machine campMy machine camp
My machine camp
 
Six sigma ppt
Six sigma pptSix sigma ppt
Six sigma ppt
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Kaizen e devops
Kaizen e devopsKaizen e devops
Kaizen e devops
 
Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenance
 
Standard operations preview
Standard operations previewStandard operations preview
Standard operations preview
 
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Tpm 02
Tpm 02Tpm 02
Tpm 02
 
Barber process basedintegrating9001_14k_18k_final
Barber process basedintegrating9001_14k_18k_finalBarber process basedintegrating9001_14k_18k_final
Barber process basedintegrating9001_14k_18k_final
 
Tpm
TpmTpm
Tpm
 
Draft apli
Draft apliDraft apli
Draft apli
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
 
It Audit
It AuditIt Audit
It Audit
 

Similar to Eight principles of ISO 9001

Awareness of iatf 16949
Awareness of iatf 16949Awareness of iatf 16949
Awareness of iatf 16949Pavan Patil
 
Export Compliance Management Seminar 29 May 2012: Key Issues & Complexity in ...
Export Compliance Management Seminar 29 May 2012: Key Issues & Complexity in ...Export Compliance Management Seminar 29 May 2012: Key Issues & Complexity in ...
Export Compliance Management Seminar 29 May 2012: Key Issues & Complexity in ...EagleCompliance
 
Measuring the Results of your Agile Adoption
Measuring the Results of your Agile AdoptionMeasuring the Results of your Agile Adoption
Measuring the Results of your Agile AdoptionSoftware Guru
 
Software quality system - Quality Engineering
Software quality system - Quality EngineeringSoftware quality system - Quality Engineering
Software quality system - Quality EngineeringYash Trivedi
 
SAI Global Webinar: Tips for Effective Internal Auditing
SAI Global Webinar: Tips for Effective Internal AuditingSAI Global Webinar: Tips for Effective Internal Auditing
SAI Global Webinar: Tips for Effective Internal AuditingSwitzerland09
 
What are the steps for ISO 14001 Certification
What are the steps for ISO 14001 CertificationWhat are the steps for ISO 14001 Certification
What are the steps for ISO 14001 Certificationhimalya sharma
 
Awareness of qms
Awareness of qmsAwareness of qms
Awareness of qmsalabs
 
Capability Maturity Model Integration
Capability Maturity Model IntegrationCapability Maturity Model Integration
Capability Maturity Model IntegrationAAKASH S
 
Principles of Management Controlling
Principles of Management ControllingPrinciples of Management Controlling
Principles of Management ControllingDr. John V. Padua
 
Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingSafetyChain Software
 
UNCCInternalControls.pptx
UNCCInternalControls.pptxUNCCInternalControls.pptx
UNCCInternalControls.pptxAral20101
 
Top gun aerospace website presentation
Top gun aerospace website presentationTop gun aerospace website presentation
Top gun aerospace website presentationseanzeeeee
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRSPaul Morffew
 

Similar to Eight principles of ISO 9001 (20)

Awareness of iatf 16949
Awareness of iatf 16949Awareness of iatf 16949
Awareness of iatf 16949
 
Export Compliance Management Seminar 29 May 2012: Key Issues & Complexity in ...
Export Compliance Management Seminar 29 May 2012: Key Issues & Complexity in ...Export Compliance Management Seminar 29 May 2012: Key Issues & Complexity in ...
Export Compliance Management Seminar 29 May 2012: Key Issues & Complexity in ...
 
Intro to ISO
Intro to ISOIntro to ISO
Intro to ISO
 
Measuring the Results of your Agile Adoption
Measuring the Results of your Agile AdoptionMeasuring the Results of your Agile Adoption
Measuring the Results of your Agile Adoption
 
Software quality system - Quality Engineering
Software quality system - Quality EngineeringSoftware quality system - Quality Engineering
Software quality system - Quality Engineering
 
Iso9001training slide
Iso9001training slideIso9001training slide
Iso9001training slide
 
Cmmi (2)
Cmmi (2)Cmmi (2)
Cmmi (2)
 
Cmmi
CmmiCmmi
Cmmi
 
SAI Global Webinar: Tips for Effective Internal Auditing
SAI Global Webinar: Tips for Effective Internal AuditingSAI Global Webinar: Tips for Effective Internal Auditing
SAI Global Webinar: Tips for Effective Internal Auditing
 
What are the steps for ISO 14001 Certification
What are the steps for ISO 14001 CertificationWhat are the steps for ISO 14001 Certification
What are the steps for ISO 14001 Certification
 
Awareness of qms
Awareness of qmsAwareness of qms
Awareness of qms
 
Iso9000
Iso9000Iso9000
Iso9000
 
Capability Maturity Model Integration
Capability Maturity Model IntegrationCapability Maturity Model Integration
Capability Maturity Model Integration
 
Principles of Management Controlling
Principles of Management ControllingPrinciples of Management Controlling
Principles of Management Controlling
 
Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error Proofing
 
UNCCInternalControls.pptx
UNCCInternalControls.pptxUNCCInternalControls.pptx
UNCCInternalControls.pptx
 
Top gun aerospace website presentation
Top gun aerospace website presentationTop gun aerospace website presentation
Top gun aerospace website presentation
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRS
 
Standard operating procedures
Standard operating proceduresStandard operating procedures
Standard operating procedures
 
Iso 9001 training
Iso 9001 trainingIso 9001 training
Iso 9001 training
 

Recently uploaded

Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 

Recently uploaded (20)

Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 

Eight principles of ISO 9001

  • 1. Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
  • 2. Eight principles of ISO: 9001 – 2008. SR. Principles ISO : 9001- 2008 APPROACH NO. Principle – 1 Meet customer needs and expectations 1. Customer – focused determine levels of customer satisfaction organization / dissatisfaction. Principle – 2 Commit continual improvement of the 2. Leadership qms. Principle – 3 Focus on competency rather then just Involvement of 3. training. Identify and manage human people factors of the work place. Principle – 4 Systematically identify and manage the 4. Process approach process employed. Principle – 5 Implement measures for monitoring 5. System approach to effectiveness of each process. management Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
  • 3. Tips to trained internal auditor 1. Auditor is always fact finder and not fault finder. 2. As per IMS(EQHSMS) auditor looks for effectiveness of system, process approach and not only records. 3. Auditors 4 Key boundaries a. ISO:9001, ISO;14001 and OHSAS:18001 Requirements b. Own written documents C. Customer requirements D. Statutory & regulatory requirements 4. Audit methodology A. Interview people B. Verify records C. Witness testing/ process checking D. Own verification of process / product parameters Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
  • 4. IMS(EQHSMS) AUDIT As per iso system, audit is define as “ a systematic & independent examination to determine whether ims(eqhsms) activities and related results comply with planned arrangement and whether these arrangements are implemented effectively and are suitable to achieve the objectives”. (1) Adequacy audit:- (System or management audit) Determine the extend to which the documented system (ims(eqhsms) manual, procedures, work instructions & forms) adequately meet the requirements of standard. (2) Compliance audit:- Which seeks to establish the extent to which the documented system is implemented and observed by the work force. Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
  • 5. 1. Audit plan Audit steps 2. Develop checklists 3. Opening meeting 4. Gather evidence 5. Record results 6. Closing meeting 7. Audit report Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
  • 6. Non – compliance reporting  What is the problem ? Describe clearly, concisely and factually. Why is it a non – compliance ? I.e., against which requirement ?  Where did it occur ? I.e., which department or activity ?  Who ? – avoid apportioning blame. (I.e., naming individuals) Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
  • 7. 6.2 Human resources 6.2.1 General Personnel performing work affecting conformance to product requirements must be competent on the basis of: • Appropriate education • Training • Skills • Experience Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
  • 8. Structure of standards as per ISO 14001-2004 4.6Management review 4.5Checking & corrective action •Monitor & Measure 4.2Environme •Non-conformance ntal policy •Corrective/prevent ive actions •Records •Audits 4.3Planning •Environmental 4.4 Implementation and Aspects operation •Legal & Other • Structure / Responsibility •Objectives & • Training, Awareness Targets • Communication •EMP • EMS Documentation • Document Control • Operation Control • Emergency Procedures Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
  • 9. Procedure for accident investigation Procedure to address:  Kind of accidents to be reported  Define major accident, high potential accident and high potential incident/near miss accident  When and how events should be reported and investigated  Who is responsible for conducting and participating in the accident/ incident investigation  Who is employee representative involved in conducting accident/ incident investigation  Who will liaise with external agency/ government functionary conducting accident/ incident investigation Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405
  • 10. Verification matrix physical inspection tour As a part of audit the verification should be done in the areas listed below as a part of audit process. Q.no. Characteristics 1. General workplace condition a. Floors [ walking and working surface] Clean, orderly and sanitary condition; Drainage maintained; Free of slip, trip or fall hazards; Free of protrusion, nails, etc.; Openings covered or barricaded; Load limits painted on upper floors. b. Aisles and passageways: Aisles marked; Clear and unobstructed; At least 28" wide or as prescribed; Sufficient width for all normal movements. Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com Tele: +91-79-2656 5405