Th i t d ti f h t lt i l t i thThe introduction of photovoltaic power plants in the 
conditions of Slovak Republic
Project management for renewable energy projects group
SUNENERGY Slovakia, s.r.o.
On the planet Earth, which was, is and forever will remain our home falls huge 
flow of solar energy, 30 000krát greater than at present the whole of humanity gy g p y
consumes. "It is paradox that in this excess energy is called the energetic crisis? "
Content of presentationp
1. Why photovoltaics
2. The intensity of solar radiation in conditions of Slovak Republic
3.
4. The estimated quantity of produced energy q y p gy
5. Requirements for the localization of photovoltaic power
6. Legislative conditions in the Slovak Republic
7 Proposal the system for the potential investor7. Proposal the system for the potential investor 
‐ Processing of the project plan
‐ Selecting and securing suitable land 
P i f j d i‐ Procesing of project documentation
‐ Engineering of project
‐ Plan for funding assurance the project 
‐ Realization of project
Energy ResourcesEnergy Resources
Nuclear Power Plant
Bohunice
Installed capacity:Installed capacity:
2×440 MW
The first block of 120 MW power plant was built 14 years, a new 2 x 440MW units
were under construction eight years, costs was 1miliard . Such power in PVP was
b ilt i C h R bli f 1 5built in Czech Republic for 1.5 years
Why photovoltaicsWhy photovoltaics 
• In Slovakia represents the electrical energy produced in nuclear power 66 4% share of total• In Slovakia represents the electrical energy produced in nuclear power 66.4% share of total 
electricity produced. 
• One gram of uranium is able, during his fission in nuclear reactors release energy, from which 
33% of efficiency can be obtained 3,800 kWh of electricity ‐ ie about as much electricity, how it 
uses a household per year. 
How can silica FV Article compete in this technology? 
• The answer is simple: the nucleus of uranium can be fissured only once while the FP article can• The answer is simple: the nucleus of uranium can be fissured only once, while the FP article can 
absorb photons and convert them to electricity to 30 years. 15% of the conversion efficiency 
means that one gram of silicon can produce during its lifetime produce of about 3300 kWh, 
which is about as much as it produces one gram of uranium.
Global assumption PV installation
pessimistic scenarios
optimistic scenarios
completed installation
The intensity of solar radiation in conditions of 
Slovak RepublicSlovak Republic 
• In our geographical terms, this means that the energy incident on the horizontal surface of 1 m2 of at 
from 1000 to 1250 kWh / year (approximately 5 GJ). It's the same amount of energy, which contains 
approximately 150 m3 of natural gas. From the intensity of radiation results that at 100% efficiency of pp y g y y
this energy we would area from 3 x 3.3 meter could get enough energy to cover the annual 
consumption of heat and hot water for an average household in the Slovak Republic.
• From the perspective of the use of solar energy through solar collectors there is not much difference• From the perspective of the use of solar energy through solar collectors there is not much difference 
between the regions of Slovakia. Most solar radiation recorded during the entire year is in the south of 
Slovakia,least in the Orava region and Kysuciach, the difference between the coldest and najteplejšími 
regions  is only about 15%.
The estimated quantity of produced energy q y p gy
The intensity of direct
Estimated energy production of photovoltaic panel in climatic conditions in Slovakia
solar radiation at the
boundary of the earth's
atmosphere is about 1
360 W/m2. From the
h h
Estimated energy production of photovoltaic panel in climatic conditions in Slovakia
fixed location (south,
slope: 45 ˚)
automatic shooting
for the sun
atmosphere to the
surface to pierce the
most favorable conditions
for approximately 1 000
/ d f
p )
W/m2. dispersion of
direct radiation on the
clouds and the impurities
in the atmosphere and
fl i i h
Representation of different types of radiation during the year in Slovakia
reflection arises the
diffuse radiation. Total
direct and diffuse
radiation are referred to
l b l di i
direct radiation
diffuse
radiation
as global radiation.
Diffuse radiation in
central Europe is in the
annual average of 50‐70%
f l b l di i ifrom global radiation in
winter, the proportion
reaches 90%.˚
Requirements for the localization of photovoltaic power
Summary of requirements for the installation of FVESummary of requirements for the installation of FVE
‐ Location in the zone of the solar map with annual solar radiation 1250kW/m2 
‐ Location with low price of land, maximum 50 Sk/m2 
Location with low rain activity and low presence of fog‐ Location with low rain activity and low presence of fog
‐ Location with a low presence of dust and smog 
‐ Nominal power system FV: 1000 kW (crystalline silicon)
‐ Slope of modules: 35 °
‐ Orientation (azimuth) modules: 1 ° SW 
‐ Estimated losses caused by heat: 7% 
‐ Estimated losses due to rebound effect: 2.8% 
Loss of cables and converters: 10 14 0%‐ Loss of cables and converters: 10‐14,0% 
‐A total loss: 22.3%
‐‐Requirements for the technical infrastructure of landRequirements for the technical infrastructure of land
‐FP systems and FVE are not demanding on the technical infrastructure, but still must meet the y g
following requirements:
‐locality with a simple connection to the energy network nn / vn ‐ max 100 m from the
connecting point 
Location close amenities of community because of the protection and maintenance system‐ Location close amenities of community because of the protection and maintenance system.
Legislative conditions in the Slovak Republicg p
L 283/2008 Z f 2 7 2008 hi h d A t 656/2004 Z b t E d th d t f lLaw. 283/2008 Z.z. from 2.7.2008, which amends Act no. 656/2004 Z.z. about Energy and the amendment of some laws as
amended and on amendments to certain laws? Effective from 1.8.2008
Law. 112/2008 Z.z. from 14.2.2008, which amends Act no. 656/2004 Z.z. about Energy and the amendment of some laws as
amended? Effective from 1.4.2008
Law 99/2007 Z z from 7 2 2007 which amends the law number657/2004 Z z about thermal power and the amending Act NoLaw. 99/2007 Z.z. from 7.2.2007, which amends the law number657/2004 Z.z. about thermal power and the amending Act No. 
455/1991 Coll. on trade (Trade Licensing Act), as amended? Effective from 1.4.2007
Law. 107/2007 Z.z. from 7.2.2007, which amends the law č.276/2001 Coll on regulation in network industries and amending some
laws as amended and on amendments to certain laws? Effective from 15.3.2007
Law. 658/2004 Z.z. from 11.12.2004 which amends the Law. 276/2001 Z. z. on regulation in network industries and amending
some laws as amended? Effective from 1.1.2005
Law. 656/2004 Z.z. from 26.10.2004 on energy and the amendment of some laws? Effective from 1.1.2005
PROCEEDS URSO No. 7 / 2008 of 1.10.2008 amending the Decree of 18 RONI June 2008 No. 1 / 2008 on the extent of price
regulation in network industries and how its implementation and wich amending certain income
PROCEEDS URSO No. 2 / 2008 of 28.7.2008 establishing the price regulation of electricity
Law. 50/1976 Zb. (Building Act)
Support mechanisms FP Technology
Slovakia (update for 2009) 
redemption prices ‐ 44.8 ct / kW / h ‐ valid for 15 years, in addition EUpodpora 95% for self‐administrations ,for firms till 50% from
the investment costs of the project
B. Direct determination of the fixed prices for electricity produced from renewable energy sources and electricity from combiB. Direct determination of the fixed prices for electricity produced from renewable energy sources and electricity from combinedned heat and powerheat and powerB. Direct determination of the fixed prices for electricity produced from renewable energy sources and electricity from combiB. Direct determination of the fixed prices for electricity produced from renewable energy sources and electricity from combinedned heat and powerheat and power
EfficacyEfficacy
This Decree shall enter into force on 10th August 2008 with the exception of Section 6, which shall enter into forceThis Decree shall enter into force on 10th August 2008 with the exception of Section 6, which shall enter into force
1. January 2009.1. January 2009.
The price of electricity produced from renewable energy sources is determined as a fixed price in U.S. dollars toThe price of electricity produced from renewable energy sources is determined as a fixed price in U.S. dollars to megawatthodinumegawatthodinu for 12 yearsfor 12 years
since introduction facility into operation as followssince introduction facility into operation as followsy py p
Legislative conditions in Slovak republicLegislative conditions in Slovak republic
RevenueRevenue Regulatory Office for Network Industries of 28 c July 2008 2 / 2008Regulatory Office for Network Industries of 28 c July 2008 2 / 2008Revenue Revenue ‐‐ Regulatory Office for Network Industries of 28 c. July 2008 2 / 2008, Regulatory Office for Network Industries of 28 c. July 2008 2 / 2008, 
establishing the price regulation of electricity establishing the price regulation of electricity 
B. Direct determination of the fixed prices for electricity produced from renewable energy sources and electricity from B. Direct determination of the fixed prices for electricity produced from renewable energy sources and electricity from 
combined heat and power Efficacy combined heat and power Efficacy 
This Decree shall enter into force on 10th August 2008 with the exception of Section 6, which shall enter into force This Decree shall enter into force on 10th August 2008 with the exception of Section 6, which shall enter into force 
1. January 2009. 1. January 2009. 
The price of electricity produced from renewable energy sources is determined as a fixed price in U.S. dollars to The price of electricity produced from renewable energy sources is determined as a fixed price in U.S. dollars to 
megawatthodinumegawatthodinu for 12 years since introduction facility into operation as follows for 12 years since introduction facility into operation as follows 
C) from solar energy C) from solar energy 
for equipment put into service until 31 December 2004 for equipment put into service until 31 December 2004 
398,3270398,3270 €€ / / MWhMWh
for equipment put into service from 1 January 2005 to 31 December 2008 for equipment put into service from 1 January 2005 to 31 December 2008 
424,8822 424,8822 €€ / / MWhMWh
for equipment put into service from 1 January 2009 for equipment put into service from 1 January 2009 
448,1179 448,1179 €€ / / MWhMWh
Projects developed and implemented FVE with 
holding SUNENERGYholding SUNENERGY
Realisation  Realisation
  DSP
  Lands in process
ll l bl1‐100   Installing avaliable 
  (choose objects from the table)
Proposal the system for the potential investor p y p
‐ Processing of the project plan
‐ Selecting and securing suitable land 
‐ Procesing of project documentation
‐ Engineering of project
‐ Plan for funding assurance the project 
‐ Realization of project
Complex view of development and pricing of PVComplex view of development and pricing of PV 
installations 
Installation costs:
• It is clear that the total price of installing photovoltaic systems are
different in each installation In many offerings we find that individualdifferent in each installation. In many offerings, we find that individual
offers vary dramatically, why is this so and what elements have an impact
on pricing?
• Total PV system prices vary not only globally.
• If we want to get an accurate overall picture should be processed further
analysis and to know the detail of individual projects and supply systems.
The average price of PV systems installations, worldwide: 
The basic factor acting on the level of prices is the price of PV panels ‐ which represent 50 to 60 percent of the
price system. So at first glance appears to be an easy task to analyze the cost of the panels and installed
i f i ' i i k d f h hi h i isystem price. In fact, it's intricate network composed of such things as the permit, price components,
incentives, state of development of PV systems in the region and, of course, the amount of sunshine
compared to the cost of producing electricity.
• When you look the large ground‐mounted systems, the
typically you have a developer who has a land, or has acces
l d d h ill h i d idto land and they will get the necessary permits and grid
connection authorities and licenses to build a PV system.
• Across Europe, the cost of buying that project, which is
undeveloped or let`s just say has outlined planning
permission or has some approvals, varies very dramatically.
Oft f d ith li ti j t ith th l l f• Often faced with replication projects with the level of use
for the building permit that are designed without detailed
cost / exploration earth tensile test the type of panelcost / exploration, earth tensile test, the type of panel
construction, the cost of connection ......../
Impact FITS
•Support programs for individual states for investors are very similar and motivating butSupport programs for individual states for investors are very similar and motivating but
time limited. This means that after utilization the possibilities of using FITS in one country,
investors moved into neighboring countries where these tariffs are not utilized yet and try
to use them. However, this is extremely dynamic., y y
• The total cost of installed photovoltaic systems are declining at a rapid pace, purchase
prices of electricity are often reducing and regulated by the State to absurdly speculative.
However, it is necessary for the PV industry to the changing prices remain attractive and
affordable for residential customers and implementers. Motivation must play a central role
in the development of PV systems to the time when the panels fell to $ 0.5 / W, what is the
point where the PV systems will be equal to the cost of producing electricity and prices
with other commercial energy systems.
h f k d b ll b h•Therefore, market attractiveness, and subsequent pricing PV systems will be in the states,
provided for production of solar radiation in the region, the price of energy, security
legislation, and FIT tariffs that determine the return on the market.
AttractivenessAttractiveness
Which markets are the most attractive, in terms of prices, to install a PV system?
• Germany will remain one of the most attractive regions until 2012, despite its FIT cust.
Th f i i d h d i h i f h k d i d iThereafter it is expected that reducing the size of the market, and increased attention on
Japan, France, Great Britain then to the U.S. and China.
• Under the the analytical assumptions the costs for PV systems will continue to decline• Under the the analytical assumptions, the costs for PV systems will continue to decline.
Prices in U.S. ground installations were about eight to nine U.S. dollars per watt in 2008,
this year has dropped to about four U.S. dollars per watt, and expects it to fall to the end
of three U S dollarsof three U.S. dollars.
•Compared to the EU, average installed prices in Germany fell from five euros from the
prior two years to around 2 3 euros today The assumption is that will reduce to aroundprior two years to around 2.3 euros today. The assumption is that will reduce to around
two euros in the first half of next year. This is an incredible price reductions create and
creates a lot of demand.
FIT friend or foe?FIT friend or foe? 
What will be cuts in the FIT schemes, particularly in European regions, be a
threat to the attractiveness of PV system installation price?
• One of the factors affecting them is that members of the European Union
(EU) are mandated to meet the 20 percent of their energy from renewable
sources by 2020 and there is much discussion about that beying 30 percent
by 2020.y
•Along with innovation, performance optimization and product
differentiation PV installations can still achieve a reliable rate of return ondifferentiation, PV installations can still achieve a reliable rate of return on
investment, and thereby help maintain the attractiveness of the market.
Decreasing costsDecreasing costs
• In addition to incentives, cost reduction plays an important role in the overall system
price.
• Indeed, for larger, ground‐mounted photovoltaic installation, the margins decreased
significantly, so the market has become very competitive, it is quite a lot of projects
available, whether in Germany, France, Italy, Spain, Greece, Bulgaria, Czech Republic,
Benelux or the United Britain.
• With changes in rates FIT course, the value of projects for planning permission to go
down as the FIT rates are falling.
D l k i th h t t ibl ti t ll th i j t i t t•Developers seek in the shortest possible time to sell their projects, integrators as
soon as possible to implement .. It is tempting to connect the reduce prices of system
by reducing the prices of FIT in the shortest possible time.
And what cost panels?And what cost panels?
If we look at the time the last four years, the cost of panel prices declined steadily from
/3.7 EU / W up to the level of prices in 2010 where price stopped at :
• 1,2 € mono/polycrystalline China
1 5 € / l t lli EU USA• 1,5 € mono/polycrystalline EU, USA
Od tejto chvíle zvýšený dopyt po paneloch zvýšil ich cenu na úroveň:
• 1,58 ‐ 1,65 € mono/polycrystalline China
• 1,76 – 1,85 € mono/polycrystalline EU, USA
However, the most price at which to watch is silicon. As you can see in 2008, "price per
kilogram of silicon has reached nearly $ 400 in 2009, silicon prices have gone below $kilogram of silicon has reached nearly $ 400 in 2009, silicon prices have gone below $
50 per kilogram. The price is now around 70‐80 U.S. dollars per kilogram. After the
decline of the price increase due to shortage of panels can expect their prices in the
range of 1 to 1.4 EU / W .g /
The cost of innovationThe cost of innovation
Focus on the rooftop photovoltaics market however means that it is necessaryFocus on the rooftop photovoltaics market, however, means that it is necessary
to look at further price system.
• When comparing two rooftop installation of the same size, whetherWhen comparing two rooftop installation of the same size, whether
commercial or residential, the cost will vary widely for such things as structural
profiles, cables, mounting structure and the time required for installation,
connection method.
• The difference then lies in factors such as panel performance / price.
• What does this mean? "Is that on the roof, you can get more energy when
using a high-performance panels and installation cost per watt-peak will
decrease as your balance is of a lower system cost per watt-peak.
There are three areas of innovation:
 components
 lpanels
financial.
• All come together to increase the value system that has to do with the 
electricity they generate.
• Within each of the three areas are then : 
 Direct influencing factors Direct influencing factors
 Indirect influencing factors
• In the indirect components of innovation, you have to focus on the range and 
reduce costs for components, which are "due to the competitive nature of the 
supply or availability of materials such as support structures junction boxessupply or availability of materials, such as support structures, junction boxes, 
cables, labour, etc.
• Direct innovation on the other hand include a view of research and trying to• Direct innovation, on the other hand, include a view of research and trying to 
improve the efficiency of electricity generation. 
Overview of areas of innovationOverview of areas of innovation
Innovation PanelsInnovation Panels
• Innovation panel includes the type of used technology.
• Are irretrievably gone times when integrator market will
offer one type of panel from one manufacturer for roofoffer one type of panel from one manufacturer for roof
installation.
• Diversity and functionality of individual installations will
require new innovative technologies such as / asi, double asi,
micromorph, CIS, CIGS, flexible panels
System innovation
• System innovation incorporates the people who are putting together the solutions like
System innovation
System innovation incorporates the people who are putting together the solutions, like
the system integrators, engineering procurement construction companies and value‐added
resellers.
• Indirect innovation system, we are looking to reduce costs of components such as cables
or mounting structure or work, for example.
• But direct innovation system is the optimization of the basic components, which together
have to be able to deliver more kilowatt hours to system.
So, by other words if you have a very good direct innovations , you will have an installed
capacity in theory the same as another project, which is being developed, but you have
optimized the design to get more kilowatt‐hours of the system.
If you take the normal production limousine, all components are built to certain
specifications and have a good performance. However, you can also buy factory‐tuned
i f th hi h ill i b tt l ti b tt b ki b tt llversion of the same car, which will give better acceleration, better braking, better overall
performance and that's really all just about optimizing all of these standard components to
give you better performance.
Financial innovationFinancial innovation
•The market is moving away from cost per watt‐peak of system, toward
payment of the cost of electricity produced in the system.p y y p y
• Through the innovation of components, system innovation and financial
innovation proposing solutions projects that offer the lowest cost to produceinnovation, proposing solutions, projects that offer the lowest cost to produce
electricity, and therefore gives the best return for investors.
• To look at how and why to change the total price of photovoltaic installations• To look at how and why to change the total price of photovoltaic installations,
it is clear that there is a huge variety of cost factors that affect prices.
l h h k i l d i i l h•It seems clear that the key aspects include: motivational schemes,
development costs, panel prices, the cost of innovation.
• Due to the momentary volume production PV panels, it is clear that the
cost of solar installations will continue to decline and will decrease the
faster will be maintained as long as the continual motivational FITfaster will be maintained as long as the continual motivational FIT
reducing tariffs.
• The longer the country of the world support the development of PV
technologies, the faster you set in motion a huge production volume of
PV technologies, which are produced in the short term over‐production
of electricity suitable for the storage process.
• Cheap energy will create conditions for the production of cheaper
products as well as replacement of expensive fossil fuels as a priority theproducts as well as replacement of expensive fossil fuels as a priority the
implementation of renewable energy sources.
Structure of bussiness caseStructure of bussiness case
‐ Offer
‐ Economic evaluation of the project
‐ Design and engineering
‐ Realization
‐ Construction inspection
‐ Service and maintenance
The construction of ground-mountedg
photovoltaic system in the area of Trpin
General Contractor: Sunenergy Slovakia, s.r.o.
Location : Trpin
Total installed power : 1 MWp
D t f ti 1 10 2010Date of execution: 1.10.2010
1. FENCING
2. REFORM OF ACESS ROUTE
3. PRODUCTION OF STRUCTURES
4. OFF-SET KIOSK TRAFOSTATIONS
6. COMPLETING TRAFOSTATIONS
7. MOUNTING STRUCTURES
8. EXPEDITION PANELS NINGBO
11. SUPPLY OF INVERTERS Fronius (September 2010)
9. DELIVERY OF PANELS HELIOSPHERE (June
2010)2010)
10. CONSTRUCTION LINES VN (July 2010)
INVERTERS AND DISTRIBUTORS
LIGHTING
SECURITY
12. COMPLETING FVE
PANELSPANELS
The construction of roof-mounted
photovoltaic system in the area of Dolnep y
Srnie
General Contractor: ENERGOCOM, s.r.o.
Location : Dolne Srnie
Total installed power : 58 kWp
I t ll d th f 47 kW (448 k K k h b id)Installed power on the roof : 47 kWp (448 ks Kaneka hybrid)
Installed power trackers : 11 kWp (48 ks AIDE mono)
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES
BUSINESS CASES

Weitere ähnliche Inhalte

Was ist angesagt?

Nuclear Developments Across Europe Wk
Nuclear Developments Across Europe WkNuclear Developments Across Europe Wk
Nuclear Developments Across Europe Wkweerokoster
 
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011Blake Morgan
 
Siliken Corporate Presentation
Siliken Corporate PresentationSiliken Corporate Presentation
Siliken Corporate PresentationSiliken
 
AREVA, business & strategy overview - April 2009 - Appendix1
AREVA, business & strategy overview - April 2009 - Appendix1AREVA, business & strategy overview - April 2009 - Appendix1
AREVA, business & strategy overview - April 2009 - Appendix1AREVA
 
Is there a limit for photovoltaic capacity Hugo Birkelund
Is there a limit for photovoltaic capacity   Hugo BirkelundIs there a limit for photovoltaic capacity   Hugo Birkelund
Is there a limit for photovoltaic capacity Hugo BirkelundInnovation Norway
 
Energy Week 2011 - dr Ewa Kochańska EN
Energy Week 2011 - dr Ewa Kochańska ENEnergy Week 2011 - dr Ewa Kochańska EN
Energy Week 2011 - dr Ewa Kochańska ENProAkademia
 
Paineis Solares InstalaçAo
Paineis Solares InstalaçAoPaineis Solares InstalaçAo
Paineis Solares InstalaçAocentauro
 
Tsvetelina Filipova - Energy Community Treaty
Tsvetelina Filipova - Energy Community TreatyTsvetelina Filipova - Energy Community Treaty
Tsvetelina Filipova - Energy Community TreatyNALED Serbia
 
Cyprus Energy Market
Cyprus Energy MarketCyprus Energy Market
Cyprus Energy MarketSeanergies
 

Was ist angesagt? (11)

Leznova JI Po A
Leznova JI Po ALeznova JI Po A
Leznova JI Po A
 
Nuclear Developments Across Europe Wk
Nuclear Developments Across Europe WkNuclear Developments Across Europe Wk
Nuclear Developments Across Europe Wk
 
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
 
Montenegro
MontenegroMontenegro
Montenegro
 
Siliken Corporate Presentation
Siliken Corporate PresentationSiliken Corporate Presentation
Siliken Corporate Presentation
 
AREVA, business & strategy overview - April 2009 - Appendix1
AREVA, business & strategy overview - April 2009 - Appendix1AREVA, business & strategy overview - April 2009 - Appendix1
AREVA, business & strategy overview - April 2009 - Appendix1
 
Is there a limit for photovoltaic capacity Hugo Birkelund
Is there a limit for photovoltaic capacity   Hugo BirkelundIs there a limit for photovoltaic capacity   Hugo Birkelund
Is there a limit for photovoltaic capacity Hugo Birkelund
 
Energy Week 2011 - dr Ewa Kochańska EN
Energy Week 2011 - dr Ewa Kochańska ENEnergy Week 2011 - dr Ewa Kochańska EN
Energy Week 2011 - dr Ewa Kochańska EN
 
Paineis Solares InstalaçAo
Paineis Solares InstalaçAoPaineis Solares InstalaçAo
Paineis Solares InstalaçAo
 
Tsvetelina Filipova - Energy Community Treaty
Tsvetelina Filipova - Energy Community TreatyTsvetelina Filipova - Energy Community Treaty
Tsvetelina Filipova - Energy Community Treaty
 
Cyprus Energy Market
Cyprus Energy MarketCyprus Energy Market
Cyprus Energy Market
 

Andere mochten auch

Cd coletania flash para comprar
Cd coletania flash para comprarCd coletania flash para comprar
Cd coletania flash para comprarRenato Katia
 
Energy Efficiency in Small to Medium-sized Enterprises copy
Energy Efficiency in Small to Medium-sized Enterprises copyEnergy Efficiency in Small to Medium-sized Enterprises copy
Energy Efficiency in Small to Medium-sized Enterprises copyRabeeh Moudallal
 
Recommendation letter.scan
Recommendation letter.scanRecommendation letter.scan
Recommendation letter.scanLuis
 
Resume 12012016 192024
Resume 12012016 192024Resume 12012016 192024
Resume 12012016 192024Campsen Miller
 
3 Letter of Recommendation
3 Letter of Recommendation3 Letter of Recommendation
3 Letter of RecommendationEnya De Oliveira
 
Agenda pentru Romania Digitala
Agenda pentru Romania DigitalaAgenda pentru Romania Digitala
Agenda pentru Romania DigitalaTotalSoft
 
Criação de Data Warehouse em Banco de Dados NoSQL com Cassandra, Spark e Python
Criação de Data Warehouse em Banco de Dados NoSQL com Cassandra, Spark e PythonCriação de Data Warehouse em Banco de Dados NoSQL com Cassandra, Spark e Python
Criação de Data Warehouse em Banco de Dados NoSQL com Cassandra, Spark e PythonLeandro Mendes Ferreira
 
How to Sell Cloud Services
How to Sell Cloud ServicesHow to Sell Cloud Services
How to Sell Cloud ServicesCirrity
 

Andere mochten auch (13)

2Matric Certificate
2Matric Certificate2Matric Certificate
2Matric Certificate
 
Cd coletania flash para comprar
Cd coletania flash para comprarCd coletania flash para comprar
Cd coletania flash para comprar
 
Energy Efficiency in Small to Medium-sized Enterprises copy
Energy Efficiency in Small to Medium-sized Enterprises copyEnergy Efficiency in Small to Medium-sized Enterprises copy
Energy Efficiency in Small to Medium-sized Enterprises copy
 
Recommendation letter.scan
Recommendation letter.scanRecommendation letter.scan
Recommendation letter.scan
 
Resume 12012016 192024
Resume 12012016 192024Resume 12012016 192024
Resume 12012016 192024
 
3 Letter of Recommendation
3 Letter of Recommendation3 Letter of Recommendation
3 Letter of Recommendation
 
Bulbuljindal
BulbuljindalBulbuljindal
Bulbuljindal
 
Vhtc toastmaster 68
Vhtc toastmaster 68Vhtc toastmaster 68
Vhtc toastmaster 68
 
Koris
KorisKoris
Koris
 
Agenda pentru Romania Digitala
Agenda pentru Romania DigitalaAgenda pentru Romania Digitala
Agenda pentru Romania Digitala
 
Criação de Data Warehouse em Banco de Dados NoSQL com Cassandra, Spark e Python
Criação de Data Warehouse em Banco de Dados NoSQL com Cassandra, Spark e PythonCriação de Data Warehouse em Banco de Dados NoSQL com Cassandra, Spark e Python
Criação de Data Warehouse em Banco de Dados NoSQL com Cassandra, Spark e Python
 
How to Sell Cloud Services
How to Sell Cloud ServicesHow to Sell Cloud Services
How to Sell Cloud Services
 
Resume2016
Resume2016Resume2016
Resume2016
 

Ähnlich wie BUSINESS CASES

Solar Power Project (45 MW): Bulgarian Electricity Market Study
Solar Power Project (45 MW): Bulgarian Electricity Market  Study  Solar Power Project (45 MW): Bulgarian Electricity Market  Study
Solar Power Project (45 MW): Bulgarian Electricity Market Study Simeon Arnaudov
 
Photovoltaics - Markets and Technologies 2010
Photovoltaics - Markets and Technologies 2010Photovoltaics - Markets and Technologies 2010
Photovoltaics - Markets and Technologies 2010Tuong Do
 
BUSINESS CASE: THE EXPERIENCE OF S.E. IN PV SECTOR
BUSINESS CASE: THE EXPERIENCE OF S.E. IN PV SECTORBUSINESS CASE: THE EXPERIENCE OF S.E. IN PV SECTOR
BUSINESS CASE: THE EXPERIENCE OF S.E. IN PV SECTORpvsinbloom
 
F_Meneguzzo -SuNEC 2011 -Palermo Italy
F_Meneguzzo -SuNEC 2011 -Palermo ItalyF_Meneguzzo -SuNEC 2011 -Palermo Italy
F_Meneguzzo -SuNEC 2011 -Palermo ItalyFRANCESCO MENEGUZZO
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfGlennBerry13
 
Pet Mogili Solar Project
Pet Mogili Solar ProjectPet Mogili Solar Project
Pet Mogili Solar ProjectIvSatinLtd
 
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...Maghrenov
 
Solar pv experience, challenges and opportunities EST
Solar pv experience, challenges and opportunities ESTSolar pv experience, challenges and opportunities EST
Solar pv experience, challenges and opportunities ESTAndres Meesak
 
Final solar generation vi full report lr (1)
Final solar generation vi full report lr (1)Final solar generation vi full report lr (1)
Final solar generation vi full report lr (1)Naman Kumar
 
Floating Power Plant
Floating Power PlantFloating Power Plant
Floating Power PlantIvec01
 
Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...
Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...
Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...AHRP Law Firm
 
IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTRenato Borra
 

Ähnlich wie BUSINESS CASES (20)

B2_Kukuczka
B2_KukuczkaB2_Kukuczka
B2_Kukuczka
 
Solar Power Project (45 MW): Bulgarian Electricity Market Study
Solar Power Project (45 MW): Bulgarian Electricity Market  Study  Solar Power Project (45 MW): Bulgarian Electricity Market  Study
Solar Power Project (45 MW): Bulgarian Electricity Market Study
 
Photovoltaics - Markets and Technologies 2010
Photovoltaics - Markets and Technologies 2010Photovoltaics - Markets and Technologies 2010
Photovoltaics - Markets and Technologies 2010
 
BUSINESS CASE: THE EXPERIENCE OF S.E. IN PV SECTOR
BUSINESS CASE: THE EXPERIENCE OF S.E. IN PV SECTORBUSINESS CASE: THE EXPERIENCE OF S.E. IN PV SECTOR
BUSINESS CASE: THE EXPERIENCE OF S.E. IN PV SECTOR
 
F_Meneguzzo -SuNEC 2011 -Palermo Italy
F_Meneguzzo -SuNEC 2011 -Palermo ItalyF_Meneguzzo -SuNEC 2011 -Palermo Italy
F_Meneguzzo -SuNEC 2011 -Palermo Italy
 
Epia Sunbelt Adel el Gammal
Epia Sunbelt Adel el GammalEpia Sunbelt Adel el Gammal
Epia Sunbelt Adel el Gammal
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdf
 
Pet Mogili Solar Project
Pet Mogili Solar ProjectPet Mogili Solar Project
Pet Mogili Solar Project
 
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
 
Slovakia
SlovakiaSlovakia
Slovakia
 
Czech republic
Czech republicCzech republic
Czech republic
 
Solar pv experience, challenges and opportunities EST
Solar pv experience, challenges and opportunities ESTSolar pv experience, challenges and opportunities EST
Solar pv experience, challenges and opportunities EST
 
Final solar generation vi full report lr (1)
Final solar generation vi full report lr (1)Final solar generation vi full report lr (1)
Final solar generation vi full report lr (1)
 
Floating Power Plant
Floating Power PlantFloating Power Plant
Floating Power Plant
 
Quality Energy Investment Opportunities 100mw letonia
Quality Energy  Investment Opportunities 100mw letoniaQuality Energy  Investment Opportunities 100mw letonia
Quality Energy Investment Opportunities 100mw letonia
 
Energy, Grids and Microgrids
Energy, Grids and MicrogridsEnergy, Grids and Microgrids
Energy, Grids and Microgrids
 
Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...
Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...
Issuance of Ministry of Energy and Mineral Resources Regulation No. 2 of 2024...
 
GreenBuild Seminar
GreenBuild SeminarGreenBuild Seminar
GreenBuild Seminar
 
Ukraine
UkraineUkraine
Ukraine
 
IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANT
 

Mehr von pvsinbloom

Global environmental tendencies and energy sustainability
Global environmental tendencies and energy sustainabilityGlobal environmental tendencies and energy sustainability
Global environmental tendencies and energy sustainabilitypvsinbloom
 
BUILDING ON THE PV EXPERIENCE OF EUROPEAN MARKETS
BUILDING ON THE PV EXPERIENCE OF EUROPEAN MARKETSBUILDING ON THE PV EXPERIENCE OF EUROPEAN MARKETS
BUILDING ON THE PV EXPERIENCE OF EUROPEAN MARKETSpvsinbloom
 
10 george gerovasilis
10 george gerovasilis10 george gerovasilis
10 george gerovasilispvsinbloom
 
09 p vs in bloom budapest september sin miguel montes
09 p vs in bloom budapest september sin miguel montes09 p vs in bloom budapest september sin miguel montes
09 p vs in bloom budapest september sin miguel montespvsinbloom
 
08 farm building11_wierzchoslawice
08 farm building11_wierzchoslawice08 farm building11_wierzchoslawice
08 farm building11_wierzchoslawicepvsinbloom
 
07 vicente guna fa 0073-feasibility of pvp_ps in spain-20110913_ed01
07 vicente guna fa 0073-feasibility of pvp_ps in spain-20110913_ed0107 vicente guna fa 0073-feasibility of pvp_ps in spain-20110913_ed01
07 vicente guna fa 0073-feasibility of pvp_ps in spain-20110913_ed01pvsinbloom
 
06 presentazione sustainability_20-09-2011_
06 presentazione sustainability_20-09-2011_06 presentazione sustainability_20-09-2011_
06 presentazione sustainability_20-09-2011_pvsinbloom
 
04 peter ujehelyi the role_of_energy_centre
04 peter ujehelyi the role_of_energy_centre04 peter ujehelyi the role_of_energy_centre
04 peter ujehelyi the role_of_energy_centrepvsinbloom
 
02 epia m-latour - budapest - 22 09 2011
02 epia   m-latour - budapest - 22 09 201102 epia   m-latour - budapest - 22 09 2011
02 epia m-latour - budapest - 22 09 2011pvsinbloom
 
01 francesco pareti
01 francesco pareti01 francesco pareti
01 francesco paretipvsinbloom
 
11 jan otcenas
11 jan otcenas11 jan otcenas
11 jan otcenaspvsinbloom
 
Negocio fotovoltaico administrativo
Negocio fotovoltaico administrativoNegocio fotovoltaico administrativo
Negocio fotovoltaico administrativopvsinbloom
 
Negocio fotovoltaico financiero
Negocio fotovoltaico financieroNegocio fotovoltaico financiero
Negocio fotovoltaico financieropvsinbloom
 
Negocio fotovoltaico inversor
Negocio fotovoltaico inversorNegocio fotovoltaico inversor
Negocio fotovoltaico inversorpvsinbloom
 
ACTUAL SITUATION OF PV MARKET IN SLOVAKIA
 ACTUAL SITUATION OF PV MARKET IN SLOVAKIA ACTUAL SITUATION OF PV MARKET IN SLOVAKIA
ACTUAL SITUATION OF PV MARKET IN SLOVAKIApvsinbloom
 
ENERGY EFFICIENCY STUDIES, ENERGY AUDITS AND EVALUATION OF THE MANAGEMENT OF ...
ENERGY EFFICIENCY STUDIES, ENERGY AUDITS AND EVALUATION OF THE MANAGEMENT OF ...ENERGY EFFICIENCY STUDIES, ENERGY AUDITS AND EVALUATION OF THE MANAGEMENT OF ...
ENERGY EFFICIENCY STUDIES, ENERGY AUDITS AND EVALUATION OF THE MANAGEMENT OF ...pvsinbloom
 
KEY INVESTOR’S RETURNS AND VALUE CONSIDERATIONS IN PVE PROJECT
KEY INVESTOR’S RETURNS AND VALUE CONSIDERATIONS IN PVE PROJECTKEY INVESTOR’S RETURNS AND VALUE CONSIDERATIONS IN PVE PROJECT
KEY INVESTOR’S RETURNS AND VALUE CONSIDERATIONS IN PVE PROJECTpvsinbloom
 
PERSPECTIVES OF PV SECTOR IN EUROPE
PERSPECTIVES OF PV SECTOR IN EUROPEPERSPECTIVES OF PV SECTOR IN EUROPE
PERSPECTIVES OF PV SECTOR IN EUROPEpvsinbloom
 

Mehr von pvsinbloom (20)

Global environmental tendencies and energy sustainability
Global environmental tendencies and energy sustainabilityGlobal environmental tendencies and energy sustainability
Global environmental tendencies and energy sustainability
 
BUILDING ON THE PV EXPERIENCE OF EUROPEAN MARKETS
BUILDING ON THE PV EXPERIENCE OF EUROPEAN MARKETSBUILDING ON THE PV EXPERIENCE OF EUROPEAN MARKETS
BUILDING ON THE PV EXPERIENCE OF EUROPEAN MARKETS
 
10 george gerovasilis
10 george gerovasilis10 george gerovasilis
10 george gerovasilis
 
09 p vs in bloom budapest september sin miguel montes
09 p vs in bloom budapest september sin miguel montes09 p vs in bloom budapest september sin miguel montes
09 p vs in bloom budapest september sin miguel montes
 
08 farm building11_wierzchoslawice
08 farm building11_wierzchoslawice08 farm building11_wierzchoslawice
08 farm building11_wierzchoslawice
 
07 vicente guna fa 0073-feasibility of pvp_ps in spain-20110913_ed01
07 vicente guna fa 0073-feasibility of pvp_ps in spain-20110913_ed0107 vicente guna fa 0073-feasibility of pvp_ps in spain-20110913_ed01
07 vicente guna fa 0073-feasibility of pvp_ps in spain-20110913_ed01
 
06 presentazione sustainability_20-09-2011_
06 presentazione sustainability_20-09-2011_06 presentazione sustainability_20-09-2011_
06 presentazione sustainability_20-09-2011_
 
04 peter ujehelyi the role_of_energy_centre
04 peter ujehelyi the role_of_energy_centre04 peter ujehelyi the role_of_energy_centre
04 peter ujehelyi the role_of_energy_centre
 
02 epia m-latour - budapest - 22 09 2011
02 epia   m-latour - budapest - 22 09 201102 epia   m-latour - budapest - 22 09 2011
02 epia m-latour - budapest - 22 09 2011
 
01 francesco pareti
01 francesco pareti01 francesco pareti
01 francesco pareti
 
11 jan otcenas
11 jan otcenas11 jan otcenas
11 jan otcenas
 
Negocio fotovoltaico administrativo
Negocio fotovoltaico administrativoNegocio fotovoltaico administrativo
Negocio fotovoltaico administrativo
 
Negocio fotovoltaico financiero
Negocio fotovoltaico financieroNegocio fotovoltaico financiero
Negocio fotovoltaico financiero
 
Negocio fotovoltaico inversor
Negocio fotovoltaico inversorNegocio fotovoltaico inversor
Negocio fotovoltaico inversor
 
ACTUAL SITUATION OF PV MARKET IN SLOVAKIA
 ACTUAL SITUATION OF PV MARKET IN SLOVAKIA ACTUAL SITUATION OF PV MARKET IN SLOVAKIA
ACTUAL SITUATION OF PV MARKET IN SLOVAKIA
 
ENERGY EFFICIENCY STUDIES, ENERGY AUDITS AND EVALUATION OF THE MANAGEMENT OF ...
ENERGY EFFICIENCY STUDIES, ENERGY AUDITS AND EVALUATION OF THE MANAGEMENT OF ...ENERGY EFFICIENCY STUDIES, ENERGY AUDITS AND EVALUATION OF THE MANAGEMENT OF ...
ENERGY EFFICIENCY STUDIES, ENERGY AUDITS AND EVALUATION OF THE MANAGEMENT OF ...
 
KEY INVESTOR’S RETURNS AND VALUE CONSIDERATIONS IN PVE PROJECT
KEY INVESTOR’S RETURNS AND VALUE CONSIDERATIONS IN PVE PROJECTKEY INVESTOR’S RETURNS AND VALUE CONSIDERATIONS IN PVE PROJECT
KEY INVESTOR’S RETURNS AND VALUE CONSIDERATIONS IN PVE PROJECT
 
Sun to power
Sun to powerSun to power
Sun to power
 
PERSPECTIVES OF PV SECTOR IN EUROPE
PERSPECTIVES OF PV SECTOR IN EUROPEPERSPECTIVES OF PV SECTOR IN EUROPE
PERSPECTIVES OF PV SECTOR IN EUROPE
 
Power-One
Power-OnePower-One
Power-One
 

Kürzlich hochgeladen

The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 

Kürzlich hochgeladen (20)

The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 

BUSINESS CASES

  • 1. Th i t d ti f h t lt i l t i thThe introduction of photovoltaic power plants in the  conditions of Slovak Republic Project management for renewable energy projects group SUNENERGY Slovakia, s.r.o. On the planet Earth, which was, is and forever will remain our home falls huge  flow of solar energy, 30 000krát greater than at present the whole of humanity gy g p y consumes. "It is paradox that in this excess energy is called the energetic crisis? "
  • 2. Content of presentationp 1. Why photovoltaics 2. The intensity of solar radiation in conditions of Slovak Republic 3. 4. The estimated quantity of produced energy q y p gy 5. Requirements for the localization of photovoltaic power 6. Legislative conditions in the Slovak Republic 7 Proposal the system for the potential investor7. Proposal the system for the potential investor  ‐ Processing of the project plan ‐ Selecting and securing suitable land  P i f j d i‐ Procesing of project documentation ‐ Engineering of project ‐ Plan for funding assurance the project  ‐ Realization of project
  • 3. Energy ResourcesEnergy Resources Nuclear Power Plant Bohunice Installed capacity:Installed capacity: 2×440 MW The first block of 120 MW power plant was built 14 years, a new 2 x 440MW units were under construction eight years, costs was 1miliard . Such power in PVP was b ilt i C h R bli f 1 5built in Czech Republic for 1.5 years
  • 4. Why photovoltaicsWhy photovoltaics  • In Slovakia represents the electrical energy produced in nuclear power 66 4% share of total• In Slovakia represents the electrical energy produced in nuclear power 66.4% share of total  electricity produced.  • One gram of uranium is able, during his fission in nuclear reactors release energy, from which  33% of efficiency can be obtained 3,800 kWh of electricity ‐ ie about as much electricity, how it  uses a household per year.  How can silica FV Article compete in this technology?  • The answer is simple: the nucleus of uranium can be fissured only once while the FP article can• The answer is simple: the nucleus of uranium can be fissured only once, while the FP article can  absorb photons and convert them to electricity to 30 years. 15% of the conversion efficiency  means that one gram of silicon can produce during its lifetime produce of about 3300 kWh,  which is about as much as it produces one gram of uranium. Global assumption PV installation pessimistic scenarios optimistic scenarios completed installation
  • 5. The intensity of solar radiation in conditions of  Slovak RepublicSlovak Republic  • In our geographical terms, this means that the energy incident on the horizontal surface of 1 m2 of at  from 1000 to 1250 kWh / year (approximately 5 GJ). It's the same amount of energy, which contains  approximately 150 m3 of natural gas. From the intensity of radiation results that at 100% efficiency of pp y g y y this energy we would area from 3 x 3.3 meter could get enough energy to cover the annual  consumption of heat and hot water for an average household in the Slovak Republic. • From the perspective of the use of solar energy through solar collectors there is not much difference• From the perspective of the use of solar energy through solar collectors there is not much difference  between the regions of Slovakia. Most solar radiation recorded during the entire year is in the south of  Slovakia,least in the Orava region and Kysuciach, the difference between the coldest and najteplejšími  regions  is only about 15%.
  • 6. The estimated quantity of produced energy q y p gy The intensity of direct Estimated energy production of photovoltaic panel in climatic conditions in Slovakia solar radiation at the boundary of the earth's atmosphere is about 1 360 W/m2. From the h h Estimated energy production of photovoltaic panel in climatic conditions in Slovakia fixed location (south, slope: 45 ˚) automatic shooting for the sun atmosphere to the surface to pierce the most favorable conditions for approximately 1 000 / d f p ) W/m2. dispersion of direct radiation on the clouds and the impurities in the atmosphere and fl i i h Representation of different types of radiation during the year in Slovakia reflection arises the diffuse radiation. Total direct and diffuse radiation are referred to l b l di i direct radiation diffuse radiation as global radiation. Diffuse radiation in central Europe is in the annual average of 50‐70% f l b l di i ifrom global radiation in winter, the proportion reaches 90%.˚
  • 7. Requirements for the localization of photovoltaic power Summary of requirements for the installation of FVESummary of requirements for the installation of FVE ‐ Location in the zone of the solar map with annual solar radiation 1250kW/m2  ‐ Location with low price of land, maximum 50 Sk/m2  Location with low rain activity and low presence of fog‐ Location with low rain activity and low presence of fog ‐ Location with a low presence of dust and smog  ‐ Nominal power system FV: 1000 kW (crystalline silicon) ‐ Slope of modules: 35 ° ‐ Orientation (azimuth) modules: 1 ° SW  ‐ Estimated losses caused by heat: 7%  ‐ Estimated losses due to rebound effect: 2.8%  Loss of cables and converters: 10 14 0%‐ Loss of cables and converters: 10‐14,0%  ‐A total loss: 22.3% ‐‐Requirements for the technical infrastructure of landRequirements for the technical infrastructure of land ‐FP systems and FVE are not demanding on the technical infrastructure, but still must meet the y g following requirements: ‐locality with a simple connection to the energy network nn / vn ‐ max 100 m from the connecting point  Location close amenities of community because of the protection and maintenance system‐ Location close amenities of community because of the protection and maintenance system.
  • 8.
  • 9. Legislative conditions in the Slovak Republicg p L 283/2008 Z f 2 7 2008 hi h d A t 656/2004 Z b t E d th d t f lLaw. 283/2008 Z.z. from 2.7.2008, which amends Act no. 656/2004 Z.z. about Energy and the amendment of some laws as amended and on amendments to certain laws? Effective from 1.8.2008 Law. 112/2008 Z.z. from 14.2.2008, which amends Act no. 656/2004 Z.z. about Energy and the amendment of some laws as amended? Effective from 1.4.2008 Law 99/2007 Z z from 7 2 2007 which amends the law number657/2004 Z z about thermal power and the amending Act NoLaw. 99/2007 Z.z. from 7.2.2007, which amends the law number657/2004 Z.z. about thermal power and the amending Act No.  455/1991 Coll. on trade (Trade Licensing Act), as amended? Effective from 1.4.2007 Law. 107/2007 Z.z. from 7.2.2007, which amends the law č.276/2001 Coll on regulation in network industries and amending some laws as amended and on amendments to certain laws? Effective from 15.3.2007 Law. 658/2004 Z.z. from 11.12.2004 which amends the Law. 276/2001 Z. z. on regulation in network industries and amending some laws as amended? Effective from 1.1.2005 Law. 656/2004 Z.z. from 26.10.2004 on energy and the amendment of some laws? Effective from 1.1.2005 PROCEEDS URSO No. 7 / 2008 of 1.10.2008 amending the Decree of 18 RONI June 2008 No. 1 / 2008 on the extent of price regulation in network industries and how its implementation and wich amending certain income PROCEEDS URSO No. 2 / 2008 of 28.7.2008 establishing the price regulation of electricity Law. 50/1976 Zb. (Building Act) Support mechanisms FP Technology Slovakia (update for 2009)  redemption prices ‐ 44.8 ct / kW / h ‐ valid for 15 years, in addition EUpodpora 95% for self‐administrations ,for firms till 50% from the investment costs of the project
  • 10. B. Direct determination of the fixed prices for electricity produced from renewable energy sources and electricity from combiB. Direct determination of the fixed prices for electricity produced from renewable energy sources and electricity from combinedned heat and powerheat and powerB. Direct determination of the fixed prices for electricity produced from renewable energy sources and electricity from combiB. Direct determination of the fixed prices for electricity produced from renewable energy sources and electricity from combinedned heat and powerheat and power EfficacyEfficacy This Decree shall enter into force on 10th August 2008 with the exception of Section 6, which shall enter into forceThis Decree shall enter into force on 10th August 2008 with the exception of Section 6, which shall enter into force 1. January 2009.1. January 2009. The price of electricity produced from renewable energy sources is determined as a fixed price in U.S. dollars toThe price of electricity produced from renewable energy sources is determined as a fixed price in U.S. dollars to megawatthodinumegawatthodinu for 12 yearsfor 12 years since introduction facility into operation as followssince introduction facility into operation as followsy py p
  • 11. Legislative conditions in Slovak republicLegislative conditions in Slovak republic RevenueRevenue Regulatory Office for Network Industries of 28 c July 2008 2 / 2008Regulatory Office for Network Industries of 28 c July 2008 2 / 2008Revenue Revenue ‐‐ Regulatory Office for Network Industries of 28 c. July 2008 2 / 2008, Regulatory Office for Network Industries of 28 c. July 2008 2 / 2008,  establishing the price regulation of electricity establishing the price regulation of electricity  B. Direct determination of the fixed prices for electricity produced from renewable energy sources and electricity from B. Direct determination of the fixed prices for electricity produced from renewable energy sources and electricity from  combined heat and power Efficacy combined heat and power Efficacy  This Decree shall enter into force on 10th August 2008 with the exception of Section 6, which shall enter into force This Decree shall enter into force on 10th August 2008 with the exception of Section 6, which shall enter into force  1. January 2009. 1. January 2009.  The price of electricity produced from renewable energy sources is determined as a fixed price in U.S. dollars to The price of electricity produced from renewable energy sources is determined as a fixed price in U.S. dollars to  megawatthodinumegawatthodinu for 12 years since introduction facility into operation as follows for 12 years since introduction facility into operation as follows  C) from solar energy C) from solar energy  for equipment put into service until 31 December 2004 for equipment put into service until 31 December 2004  398,3270398,3270 €€ / / MWhMWh for equipment put into service from 1 January 2005 to 31 December 2008 for equipment put into service from 1 January 2005 to 31 December 2008  424,8822 424,8822 €€ / / MWhMWh for equipment put into service from 1 January 2009 for equipment put into service from 1 January 2009  448,1179 448,1179 €€ / / MWhMWh
  • 13. Proposal the system for the potential investor p y p ‐ Processing of the project plan ‐ Selecting and securing suitable land  ‐ Procesing of project documentation ‐ Engineering of project ‐ Plan for funding assurance the project  ‐ Realization of project
  • 14. Complex view of development and pricing of PVComplex view of development and pricing of PV  installations  Installation costs: • It is clear that the total price of installing photovoltaic systems are different in each installation In many offerings we find that individualdifferent in each installation. In many offerings, we find that individual offers vary dramatically, why is this so and what elements have an impact on pricing? • Total PV system prices vary not only globally. • If we want to get an accurate overall picture should be processed further analysis and to know the detail of individual projects and supply systems.
  • 16. The basic factor acting on the level of prices is the price of PV panels ‐ which represent 50 to 60 percent of the price system. So at first glance appears to be an easy task to analyze the cost of the panels and installed i f i ' i i k d f h hi h i isystem price. In fact, it's intricate network composed of such things as the permit, price components, incentives, state of development of PV systems in the region and, of course, the amount of sunshine compared to the cost of producing electricity.
  • 17. • When you look the large ground‐mounted systems, the typically you have a developer who has a land, or has acces l d d h ill h i d idto land and they will get the necessary permits and grid connection authorities and licenses to build a PV system. • Across Europe, the cost of buying that project, which is undeveloped or let`s just say has outlined planning permission or has some approvals, varies very dramatically. Oft f d ith li ti j t ith th l l f• Often faced with replication projects with the level of use for the building permit that are designed without detailed cost / exploration earth tensile test the type of panelcost / exploration, earth tensile test, the type of panel construction, the cost of connection ......../
  • 18. Impact FITS •Support programs for individual states for investors are very similar and motivating butSupport programs for individual states for investors are very similar and motivating but time limited. This means that after utilization the possibilities of using FITS in one country, investors moved into neighboring countries where these tariffs are not utilized yet and try to use them. However, this is extremely dynamic., y y • The total cost of installed photovoltaic systems are declining at a rapid pace, purchase prices of electricity are often reducing and regulated by the State to absurdly speculative. However, it is necessary for the PV industry to the changing prices remain attractive and affordable for residential customers and implementers. Motivation must play a central role in the development of PV systems to the time when the panels fell to $ 0.5 / W, what is the point where the PV systems will be equal to the cost of producing electricity and prices with other commercial energy systems. h f k d b ll b h•Therefore, market attractiveness, and subsequent pricing PV systems will be in the states, provided for production of solar radiation in the region, the price of energy, security legislation, and FIT tariffs that determine the return on the market.
  • 19. AttractivenessAttractiveness Which markets are the most attractive, in terms of prices, to install a PV system? • Germany will remain one of the most attractive regions until 2012, despite its FIT cust. Th f i i d h d i h i f h k d i d iThereafter it is expected that reducing the size of the market, and increased attention on Japan, France, Great Britain then to the U.S. and China. • Under the the analytical assumptions the costs for PV systems will continue to decline• Under the the analytical assumptions, the costs for PV systems will continue to decline. Prices in U.S. ground installations were about eight to nine U.S. dollars per watt in 2008, this year has dropped to about four U.S. dollars per watt, and expects it to fall to the end of three U S dollarsof three U.S. dollars. •Compared to the EU, average installed prices in Germany fell from five euros from the prior two years to around 2 3 euros today The assumption is that will reduce to aroundprior two years to around 2.3 euros today. The assumption is that will reduce to around two euros in the first half of next year. This is an incredible price reductions create and creates a lot of demand.
  • 20. FIT friend or foe?FIT friend or foe?  What will be cuts in the FIT schemes, particularly in European regions, be a threat to the attractiveness of PV system installation price? • One of the factors affecting them is that members of the European Union (EU) are mandated to meet the 20 percent of their energy from renewable sources by 2020 and there is much discussion about that beying 30 percent by 2020.y •Along with innovation, performance optimization and product differentiation PV installations can still achieve a reliable rate of return ondifferentiation, PV installations can still achieve a reliable rate of return on investment, and thereby help maintain the attractiveness of the market.
  • 21. Decreasing costsDecreasing costs • In addition to incentives, cost reduction plays an important role in the overall system price. • Indeed, for larger, ground‐mounted photovoltaic installation, the margins decreased significantly, so the market has become very competitive, it is quite a lot of projects available, whether in Germany, France, Italy, Spain, Greece, Bulgaria, Czech Republic, Benelux or the United Britain. • With changes in rates FIT course, the value of projects for planning permission to go down as the FIT rates are falling. D l k i th h t t ibl ti t ll th i j t i t t•Developers seek in the shortest possible time to sell their projects, integrators as soon as possible to implement .. It is tempting to connect the reduce prices of system by reducing the prices of FIT in the shortest possible time.
  • 22. And what cost panels?And what cost panels? If we look at the time the last four years, the cost of panel prices declined steadily from /3.7 EU / W up to the level of prices in 2010 where price stopped at : • 1,2 € mono/polycrystalline China 1 5 € / l t lli EU USA• 1,5 € mono/polycrystalline EU, USA Od tejto chvíle zvýšený dopyt po paneloch zvýšil ich cenu na úroveň: • 1,58 ‐ 1,65 € mono/polycrystalline China • 1,76 – 1,85 € mono/polycrystalline EU, USA However, the most price at which to watch is silicon. As you can see in 2008, "price per kilogram of silicon has reached nearly $ 400 in 2009, silicon prices have gone below $kilogram of silicon has reached nearly $ 400 in 2009, silicon prices have gone below $ 50 per kilogram. The price is now around 70‐80 U.S. dollars per kilogram. After the decline of the price increase due to shortage of panels can expect their prices in the range of 1 to 1.4 EU / W .g /
  • 23. The cost of innovationThe cost of innovation Focus on the rooftop photovoltaics market however means that it is necessaryFocus on the rooftop photovoltaics market, however, means that it is necessary to look at further price system. • When comparing two rooftop installation of the same size, whetherWhen comparing two rooftop installation of the same size, whether commercial or residential, the cost will vary widely for such things as structural profiles, cables, mounting structure and the time required for installation, connection method. • The difference then lies in factors such as panel performance / price. • What does this mean? "Is that on the roof, you can get more energy when using a high-performance panels and installation cost per watt-peak will decrease as your balance is of a lower system cost per watt-peak. There are three areas of innovation:  components  lpanels financial.
  • 24. • All come together to increase the value system that has to do with the  electricity they generate. • Within each of the three areas are then :   Direct influencing factors Direct influencing factors  Indirect influencing factors • In the indirect components of innovation, you have to focus on the range and  reduce costs for components, which are "due to the competitive nature of the  supply or availability of materials such as support structures junction boxessupply or availability of materials, such as support structures, junction boxes,  cables, labour, etc. • Direct innovation on the other hand include a view of research and trying to• Direct innovation, on the other hand, include a view of research and trying to  improve the efficiency of electricity generation. 
  • 25. Overview of areas of innovationOverview of areas of innovation
  • 26. Innovation PanelsInnovation Panels • Innovation panel includes the type of used technology. • Are irretrievably gone times when integrator market will offer one type of panel from one manufacturer for roofoffer one type of panel from one manufacturer for roof installation. • Diversity and functionality of individual installations will require new innovative technologies such as / asi, double asi, micromorph, CIS, CIGS, flexible panels
  • 27. System innovation • System innovation incorporates the people who are putting together the solutions like System innovation System innovation incorporates the people who are putting together the solutions, like the system integrators, engineering procurement construction companies and value‐added resellers. • Indirect innovation system, we are looking to reduce costs of components such as cables or mounting structure or work, for example. • But direct innovation system is the optimization of the basic components, which together have to be able to deliver more kilowatt hours to system. So, by other words if you have a very good direct innovations , you will have an installed capacity in theory the same as another project, which is being developed, but you have optimized the design to get more kilowatt‐hours of the system. If you take the normal production limousine, all components are built to certain specifications and have a good performance. However, you can also buy factory‐tuned i f th hi h ill i b tt l ti b tt b ki b tt llversion of the same car, which will give better acceleration, better braking, better overall performance and that's really all just about optimizing all of these standard components to give you better performance.
  • 28. Financial innovationFinancial innovation •The market is moving away from cost per watt‐peak of system, toward payment of the cost of electricity produced in the system.p y y p y • Through the innovation of components, system innovation and financial innovation proposing solutions projects that offer the lowest cost to produceinnovation, proposing solutions, projects that offer the lowest cost to produce electricity, and therefore gives the best return for investors. • To look at how and why to change the total price of photovoltaic installations• To look at how and why to change the total price of photovoltaic installations, it is clear that there is a huge variety of cost factors that affect prices. l h h k i l d i i l h•It seems clear that the key aspects include: motivational schemes, development costs, panel prices, the cost of innovation.
  • 29. • Due to the momentary volume production PV panels, it is clear that the cost of solar installations will continue to decline and will decrease the faster will be maintained as long as the continual motivational FITfaster will be maintained as long as the continual motivational FIT reducing tariffs. • The longer the country of the world support the development of PV technologies, the faster you set in motion a huge production volume of PV technologies, which are produced in the short term over‐production of electricity suitable for the storage process. • Cheap energy will create conditions for the production of cheaper products as well as replacement of expensive fossil fuels as a priority theproducts as well as replacement of expensive fossil fuels as a priority the implementation of renewable energy sources.
  • 30. Structure of bussiness caseStructure of bussiness case ‐ Offer ‐ Economic evaluation of the project ‐ Design and engineering ‐ Realization ‐ Construction inspection ‐ Service and maintenance
  • 31. The construction of ground-mountedg photovoltaic system in the area of Trpin General Contractor: Sunenergy Slovakia, s.r.o. Location : Trpin Total installed power : 1 MWp D t f ti 1 10 2010Date of execution: 1.10.2010
  • 33.
  • 34. 2. REFORM OF ACESS ROUTE
  • 35.
  • 36.
  • 37. 3. PRODUCTION OF STRUCTURES
  • 38. 4. OFF-SET KIOSK TRAFOSTATIONS
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 45.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 53. 11. SUPPLY OF INVERTERS Fronius (September 2010)
  • 54.
  • 55. 9. DELIVERY OF PANELS HELIOSPHERE (June 2010)2010)
  • 56. 10. CONSTRUCTION LINES VN (July 2010)
  • 57.
  • 58.
  • 63.
  • 64.
  • 65.
  • 66.
  • 67. The construction of roof-mounted photovoltaic system in the area of Dolnep y Srnie General Contractor: ENERGOCOM, s.r.o. Location : Dolne Srnie Total installed power : 58 kWp I t ll d th f 47 kW (448 k K k h b id)Installed power on the roof : 47 kWp (448 ks Kaneka hybrid) Installed power trackers : 11 kWp (48 ks AIDE mono)